Planning Control Applications

Total Page:16

File Type:pdf, Size:1020Kb

Planning Control Applications PLANNING CONTROL APPLICATIONS *17305. L-ONOR KEVIN CUTAJAR staqsa lill-Ministru għall-Ambjent, it-Tibdil fil-Klima u l-Ippjanar: Jista' l-Ministru jgħid kemm hemm Planning Control Applications f'kull lokalità f'Malta u f'Għawdex u dan sal-mument li titwieġeb din id-domanda? Jista' jindika wkoll l-iskop ta' kull waħda minn dawn l-applikazzjonijiet? 16/11/2020 ONOR. AARON FARRUGIA: Qed inpoġġi fuq il-Mejda tal-Kamra tabella bid-dettalji mitluba. Seduta Numru 403 23/11/2020 PQ 17305. PC's Pending - Status not in DEC, INV, REC, WDN and WPD and Validation Date is not null 17/11/2020 L.C. Proposal Attard Redesigning Alignment Scheme of 2 corner properties. Attard Proposed shifting of existing building and front garden alignment. Attard Creation of cul-de-sac. Attard proposed shifting of building alignment (no changes to front garden alignment) to match building alignment of adjacent building Birkirkara To reduce splay from 4.57m to 4.09m. Birkirkara To amend existing front garden alignment and extend the existing road, and to limit the provisions of Central Malta Local Plan policy BK06 (CPPS) to the levels below road level. Standard policies for residential areas (CG07) to apply above road level. Birkirkara Proposal to shift part of building alignment Birkirkara Realignment of building alignment, and change of schemed road connecting Triq l-Imdina and Triq l-Inginerija from proposed road to pedestrian only footway path, connecting the industrial area to the main road. Birkirkara Proposed changes to building alignment and proposed public pedestrian open space. Birkirkara Proposed change in Zoning from Industrial Area to Residential Area. Birzebbuga To establish the zoning, building height and road alignment on site identified in Local Plan and Rationalisation Scheme (2006) Birzebbuga To increase built up of site coverage from 0% on site A and 25% on site B to 40% on both Site A and Site B, retaining a height of 9.8m, to change landscaping coverage from 20% of Sites area to a 3m wide cartilage along the street alignment only for both Sites A and B and rezoning of Sites A and B to Class 6A Warehouses. Dingli Change in road alignment Fgura The proposed shifting of schemed alignment in Triq A M Valperga Gharghur Change of zoning to be 2 floors without semi basement Gharghur To designate the area as a commercial area Ghaxaq Widening of road to 6.4m Ghaxaq Proposed alterations to building alignment and other alignment changes. Gzira To amend North Harbours Local Plan Policy NHGT14. Hamrun To change the alignment to existing building alignment on site at Triq il- Kappillan Mifsud c/w Triq Oscar Zammit. Iklin Rationalisation Site B - Iklin - 3 floors + Semi - basement (17.5m) Residential Development Including New Road. 1 Iklin PROPOSED EXTENSION TO EXISTING BUILDING / ROAD ALIGNMENT Imtarfa Proposed re-introduction of the U-shape road to respect the former scheme alignments and levels. Kalkara Proposed shifting of building/ front garden alignment and proposed change in zoning. Application also includes the establishment of the height limitation for the area subject to this PC. Kirkop Proposed change of internal open area into a public schemed space. Lija Proposed cul de sac Lija. Comprehensive Planning Scheme in terms of Central Malta Local Plan Policy LJ-03. Luqa Proposed formation of roads and building alignment to improve housing provision project. Luqa Rationalisation area to be proposed within a building height of 13.5m and widening of existing alley with introduction of official building line Marsa To eliminate cul-de-sac (change in alignment), retaining the current designation of the area as established by the Local Plans Marsascala To effect minor alterations to already approved public staircase Marsascala Proposed change in alignment and changes to the adjacent staircase layout. Marsascala To shift building & front garden alignments to follow existing building & front garden alignment Marsaxlokk Proposed sub-division of existing farmhouse into 2 separate dwellings. To amend condition imposed in PC 57/07/57B related to Site E. Mellieha Embellishment of Public Pedestrian stepped road with landscaped teraces Mellieha To shift road alignment Mellieha To amend alignments conforming with the existing road Mellieha Request for official alignments for new cul-de-sac with a turning circle, off Triq Ghajn Zejtuna, Santa Maria Estate, Mellieha Mellieha To Delete Schemed Road Mosta Building volume and proposed scheme alignment for approved Rationalisation Site K as per CMLP Map 27, and CMLP Figure MOB 2. Use of site as defined in CMLP Policy CG07 Mosta Proposed change to road alignment. Mosta Addition of class 4A office use to list of land uses as per policy MO04 of the Central Mosta local plans (CMLP) concerning the SME site k.a. ’Tal- Qares’ Industrial Area Mosta To establish zoning, building heights and road alignments of the rationalisation exercise site. Mosta To extend scheme alignment Mosta Shifting the building line forward of eight houses to reduce their front garden depth to three metres on Triq L-Antinni. Msida To reduce width of road 2 Msida To establish zoning, building heights and alignment of roads and buildings for the rationalisation site at Ta' Fuq il-Wied, Swatar, Msida. Msida Proposed change of building alignment below street level only on slip Road to Triq Dun Karm (B’kara by-pass). Msida Proposed change of zoning from residential priority area to residential area, not effecting height limitation. Msida To establish road network, building heights, zoning conditions and development parameters on site bounded by Triq Dun Karm, Triq is- Swatar, Triq Indri Grima and Triq Mons. Innocenz Zammit, Swatar. (Msida / Birkirkara). Mtarfa To include site for development (change in existing alignment) with a height limitation of one floor and semi-basement. Munxar TO REMOVE WIDENING ALIGNMENT Nadur Proposed amendments to building alignment. Naxxar Proposed Planning Control application for change in alignment. Naxxar To shift part of the building alignment outwards to be in-line with the remaining block and existing street/pavement alignment. Naxxar Continuation of Front garden as approved in PC/00052/17 into adjacent within scheme plot of land. Naxxar Proposed uses and height limitation of area marked NA02 on map NAM1 in Central Malta Local Plan including Class 1 Residential, Underground parking, Class 4A offices, Class 4B Retail and local centre/ community area. Naxxar Proposal to develop a road to access land locked plots off Triq Santa Marija Naxxar. The proposal excludes the comprehensive road network planning policy which combines NA01 (consisting of the land in question and land of Gwejda) and NA02 consisting of the ex-trade fair grounds as indicated in the central Malta policy plan of Naxxar. Naxxar Correction to road/scheme alignment to be made parallel to the current existing road Triq A Darcel. Naxxar To Change Facade alignment (to reduce splay to 15ft/4.60m) Paola Proposal to shift existing building alignment. (Proposal changed from original submission). Pembroke It is proposed to change the designation of the site under consideration from Public Open Space to part of the White Rocks Area Development Brief. Pembroke To propose widening of road to allow for 2 sided parking and footpath on the outer side Qormi Proposed Rationalisation of Development Boundaries - 17.5m Rabat Change from splay to rounded corner. Rabat To change Building line alignment Rabat To shift building alignment 3 Rabat (Gozo) To establish the planning parameters for the site, namely road alignments and levels, and proposed access road from Triq Mro. Dirjanu Lanzon. Rabat (Gozo) To amend alignment as approved in PC/0073/16 Rabat (Gozo) To sanction amendment to splay Safi To establish the zoning, building heights and road alignment of the Rationalisation Site (2006). Safi Proposed change of zoning to residential area for basement three floor and penthouse height 17.5m, . Safi To introduce public passage between Triq San Pawl & Triq San Gorg. San Giljan To amend the zoning of the site at Merkanti/Dragunara resort, retaining existing uses of Hotel, Residential and leisure and including food and beverage plus office use within the site. San Giljan Proposed amendment to alignment as approved in PC/39/17. San Giljan Proposed amendment to alignment as approved in PC/11/18. San Gwann Shifting of building and front garden alignment outwards till position of existing pavement and boundary wall. San Gwann Introduction of schemed road. San Pawl il-Bahar Change of zoning: to increase the existing height limitation to 17.5m and to remove site curtilage between sites in question as per attached masterplan and conditions, as per policy NWSP11 – Map 40, site A area) of the North West Harbour Local Plan. San Pawl il-Bahar To establish height limitation (3 floors with semi-basement), zoning and development parameters as per Local Plan Policy NWST 11. San Pawl il-Bahar Proposed change in alignment to Include a pedestrian road and piazza within site San Pawl il-Bahar Proposed revision of building alignment for the Dolmen Hotel at the splay located between Triq Id-Dolmen & Triq It-Turisti. Sannat Proposed alignment at Triq id-Pinnur & Triq ta' Bebunaq Sannat TO REZONE EXISTING PEDESTRIAN AREA AS AN OPEN SPACE Sannat Minor amendment to street alignment Sannat Proposed change in building line Sannat To establish the parameters related to land use zoning and building alignment and building heights of the rationalization exercise site (2006) Santa Lucija Proposed shifting of building alignment to create a 3m wide front garden. Santa Lucija To modify existing official front garden alignment and to shift alignment to be more in line with the general street alignment along Triq il-Bruka. Proposed alignment shall not extend beyond applicant’s property. Santa Venera To propose a minor alteration to the existing front garden alignment.
Recommended publications
  • CV Dhi No Client 2020
    Valuation Portfolio 2020 Sample Valuations undertaken - Over the past 12 years Office space 2019 Offices, "Holland court" Bisazza street, Sliema, Malta 2016 Offices, "Panta house" Valley road, Msida, Malta Offices, “Annex (Panta House)”, Triq Il-Wied, Msida, Malta Offices , BOV Legal Office Premises, Palace Square, Valletta, Malta Offices+Parking Facilities , Triq Hal Tarxien, Luqa, Malta Offices+Parking Facilities, Valley Road, Birkirkara, Malta Offices, "Regional House", Triq Edgar Bernard,Gzira, Malta Office Block, TriqL-Abate Rigord/ Triq Il-Qoton, Ta'Xbiex, Malta 2015 Offices, triq il- Gnien/ triq ix –Xatt, Gzira. Gzira, Malta Offices+Garage , Sir Borton Street, Mosta, Malta Offices , The Cornerstone Complex, Constitution Street, Mosta, Malta 2014/15 Offices, Triq ir-Rebha/Triq il-Gzira, Gzira, Malta 2014 Offices, T riq Tigne, Sliema, Malta Offices, Triq Joe Gasan, Hamrun, Malta 2013 Offices , South Street Valletta, Malta Offices , St Paul's Street Valletta, Malta Grant Thornton , Tax Xbiex, Malta Kuwait Embassy, Mriehel, Malta 2012 Offices , Msida, Malta Europa Centre , Floriana, Malta Office space The Strand , Sliema, Malta TG Complex , Mriehel, Malta Developement House , Valletta, Malta Whitehall Manions , Ta'-Xbiex, Malta Office space Fort Mansions , Ta Xbiex, Malta St. Christopher Str. , Valletta, Malta 2010 Vincenti Buildings , Valletta, Malta 2008 Office Block , Valletta, Malta Offices , Tarxien, Malta Office Developments 2017 Offices+Garages,(Ex Savoy Hotel Property) Sliema, Malta Old Peoples Homes 2020 Ex Imperial hotel, Sliema, Malta Casa Antonia, Balzan, Malta 2018 H.O.P.H. LTD. Sta. Venera, Malta 2016 ACK. LTD. Property No.4, Msida, Malta 2014 Bugibba Holiday Complex Block C, Bugibba, Malta 2011 Roseville Retirement Complex, Lija, Malta Villa Messsina, Rabat, Malta 2010 Sa Maison, Msida, Malta Hotels 2020 Ape Boutique Accomadation, St Julians hill c/w old college, Sliema.
    [Show full text]
  • Mediterranean Island Flair with English Influence
    Escuela-Ref.Ma4 - Msida - Familia y residencia Malta Mediterranean island flair with English influence Nowhere else in Europe will you be better able to both consolidate your English skills and enjoy the Mediterranean sea than in Malta. At Eurocentres Malta, located in the area of Msida with all amenities within reach, students can dive into the island’s culture and the shore-side lifestyle. The school building has a terrace and ensures with its air-conditioned classrooms that you stay cool while studying towards your language goals. The lively cities of Valletta, Sliema and St. Julians – Malta’s nightlife district – are close by and offer further possibilities for exploring Malta’s magic. School - COURSES & EXAMS COURSES & EXAMS 20 Basic General Language 20 Basic General Language 25 Intensive General Language, IELTS, TOEFL 25 Intensive General Language 30 Super Intensive CAE, CPE, FCE, General 30 Super Intensive General Language, IELTS Language, IELTS Cape Town PRICES IN EUR Malta LESSONS PER 20 25 30 8 Classrooms Learning Centre Computer Room Student Lounge 12 Classrooms Learning Centre Computer Room Student Lounge WEEK Library Kitchen Snack machines Air conditioning Free Wi-fi 2 weeks 412 480 550 Library Terrace / Balcony Garden Air conditioning Free Wi-fi 3 weeks 618 720 825 4 weeks 780 920 1,060 5 weeks 975 1,150 1,325 6 weeks 1,170 1,380 1,590 7 weeks 1,365 1,610 1,771 8 weeks 1,464 1,736 2,016 9 weeks 1,647 1,953 2,268 10 weeks 1,830 2,170 2,520 11 weeks 2,013 2,387 2,772 12 weeks 2,088 2,496 2,916 Add.
    [Show full text]
  • Inclusive and Special Education Review
    INCLUSIVE AND SPECIAL EDUCATION REVIEW Lino Spiteri George Borg Anne Marie Callus Joseph Cauchi Micheline Sciberras June, 2005 INCLUSIVE AND SPECIAL EDUCATION REVIEW INCLUSIVE AND SPECIAL EDUCATION: REVIEW REPORT June 2005 Ministry of Education, Youth and Employment, Floriana, Malta Tel: (+356) 21231374/5 Fax: (+356) 21242759 E-mail: [email protected] Url: www.education.gov.mt www.education.gov.mt/inclusion.htm © Ministry of Education, Youth and Employment 2004 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means without prior permission in writing of the author, and of the publisher, which must be obtained beforehand. Published by: Ministry of Education, Youth and Employment ISBN 99909-74-21-7 Author: Inclusive and Special Education Review Working Group Publication: Ministry of Education, Youth and Employment Designed & Printed by Salesian Press INCLUSIVE AND SPECIAL EDUCATION REVIEW Inclusive and Special Education Review Working Group 31st May 2005 Hon. Dr Louis Galea, B.A., LL.D., MP Minister of Education, Youth and Employment Ministry of Education, Youth and Employment Floriana, CMR 02 Dear Minister, Review of Inclusive and Special Education We enclose herewith a Report following a review of Inclusive and Special Education we have carried out, in accordance with your letter and terms of reference of 2nd December 2004. The Working Group are available to meet with you to discuss this Report, at your convenience. We wish to thank all those who made their views known to us, and who helped us to progress with our deliberations.
    [Show full text]
  • Local Councils Within the Central Region Open Water Swimming
    Dok A Proposed sports events and the relative expenses to be organized in the local councils within the Central Region Local councils within the Central Region The Central Region includes the following 13 local councils: Attard - include the areas of Ħal Warda, Misraħ Kola, Sant'Anton and Ta' Qali. Balzan Birkirkara - include the areas of Fleur-de-Lys, Swatar, Tal-Qattus, Ta' Paris and Mrieħel. Gżira - include the area of Manoel Island Iklin Lija - include the area of Tal-Mirakli Msida - include the areas of Swatar and Tal-Qroqq Pietà - include the area of Gwardamanġa St. Julian's - include the areas of Paceville, Balluta Bay, St. George's Bay, and Ta' Ġiorni San Ġwann - include the areas of Kappara, Mensija, Misraħ Lewża and Ta' Żwejt. Santa Venera - include parts of Fleur-de-Lys and Mrieħel Sliema - include the areas of Savoy, Tigné, Qui-si-Sana and Fond Għadir Ta' Xbiex Hamlets Fleur-de-Lys Gwardamanġa Kappara Paceville Swatar Open Water Swimming A series of four open water swims will be held in St. Julian’s, Sliema and Msida/Pieta/Ta’Xbiex area in collaboration with the Lifelong Swimming Project of the Ligue Europeenne de Natation under the auspices of the Aquatic Sports Association of Malta. The estimated cost of these four events amounts to Eur 4,400.00. Athletics Two athletics events in the form of road running races will be held in the Birkirkara/Balzan/Attard/Fleur-de-Lys area under the auspices of the Malta Amateur Athletic Association. The estimated cost of these two events amounts to Euro 2,500.00.
    [Show full text]
  • Winter Schedules
    ISLA/VALLETTA 1 Monday to Friday Saturday Sunday Route 1 - Schedule Times Route 1 - Schedule Times Route 1 - Schedule Times 05:30-09:30 20 minutes 05:30-20:00 30 minutes 05:30-20:00 30 minutes 09:31-15:30 30 minutes 20:01-23:00 60 minutes 20:01-23:00 60 minutes 15:31-20:30 20 minutes 20:31-23:00 30 minutes BIRGU VENDA/VALLETTA 2 Monday to Friday Saturday Sunday Route 2 - Schedule Times Route 2 - Schedule Times Route 2- Schedule Times 05:15-20:25 20 minutes 05:30-20:30 30 minutes 05:30-20:00Isla/Birgu/Bormla/Valletta 30 minutes 20:26-22:45 60 minutes 20:31-23:00 60 minutes 20:01-23:00 60 minutes KALKARA/VALLETTA 3 Monday to Friday Saturday Sunday Route 3 - Schedule Times Route 3 - Schedule Times Route 3 - Schedule Times 05:30 - 23:00 30 minutes 05:30 - 23:00 30 minutes 05:30Isla/Birgu/Bormla/Valletta - 23:00 30 minutes BIRGU CENTRE/VALLETTA 4 Monday to Friday Saturday Sunday Route 4 - Schedule Times Route 4 - Schedule Times Route 4 - Schedule Times 05:30:00 - 20:30 30 minutes 05:30-20:00 30 minutes 05:30-20:00 30 minutes 20:31 - 23:00 60 minutes 20:01-23:00 60 minutes 20:01-23:00 60 minutes BAHAR IC-CAGHAQ/VALLETTA 13 Monday to Friday Saturday Sunday Route 13 - Schedule Times Route 13 - Schedule Times Route 13 - Schedule Times 05:05 - 20:30 10 minutes 05:05 - 20:30 10 minutes 05:05 - 20:30 10 minutes 20:31 - 23:00 15 minutes 20:31 - 23:00 15 minutes 20:31 - 23:00 15 minutes PEMBROKE/VALLETTA 14 Monday to Friday Saturday Sunday Route 14 - Schedule Times Route 14 - Schedule Times Route 14 - Schedule Times 05:25 - 20:35 20 minutes 05:25 -
    [Show full text]
  • L-4 Ta' Diċembru, 2019
    L-4 ta’ Diċembru, 2019 25,349 PROĊESS SĦIĦ FULL PROCESS Applikazzjonijiet għal Żvilupp Sħiħ Full Development Applications Din hija lista sħiħa ta’ applikazzjonijiet li waslu għand This is a list of complete applications received by the l-Awtorità tal-Ippjanar. L-applikazzjonijiet huma mqassmin Planning Authority. The applications are set out by locality. bil-lokalità. Rappreżentazzjonijiet fuq dawn l-applikazzjonijiet Any representations on these applications should be sent in għandhom isiru bil-miktub u jintbagħtu fl-uffiċini tal-Awtorità writing and received at the Planning Authority offices or tal-Ippjanar jew fl-indirizz elettroniku ([email protected]. through e-mail address ([email protected]) within mt) fil-perjodu ta’ żmien speċifikat hawn taħt, u għandu the period specified below, quoting the reference number. jiġi kkwotat in-numru ta’ referenza. Rappreżentazzjonijiet Representations may also be submitted anonymously. jistgħu jkunu sottomessi anonimament. Is-sottomissjonijiet kollha lill-Awtorità tal-Ippjanar, All submissions to the Planning Authority, submitted sottomessi fiż-żmien speċifikat, jiġu kkunsidrati u magħmula within the specified period, will be taken into consideration pubbliċi. and will be made public. L-avviżi li ġejjin qed jiġu ppubblikati skont Regolamenti The following notices are being published in accordance 6(1), 11(1), 11(2)(a) u 11(3) tar-Regolamenti dwar l-Ippjanar with Regulations 6(1), 11(1), 11(2)(a), and 11(3) of the tal-Iżvilupp, 2016 (Proċedura ta’ Applikazzjonijiet u Development Planning (Procedure for Applications and d-Deċiżjoni Relattiva) (A.L.162 tal-2016). their Determination) Regulations, 2016 (L.N.162 of 2016). Rappreżentazzjonijiet fuq l-applikazzjonijiet li ġejjin Any representations on the following applications should għandhom isiru sat-13 ta’ Jannar, 2020.
    [Show full text]
  • Annual Report 2017 Contents
    ANNUAL REPORT 2017 CONTENTS 3 4 9 CEO Water Water Report Resources Quality 14 20 32 Compliance Network Corporate Infrastructure Services Directorate 38 45 48 Strategic Human Unaudited Information Resources Financial Directorate Statement 2017 ANNUAL REPORT CEO REPORT CEO Report 2017 was a busy year for the Water Services quality across Malta. Secondly, RO plants will be Corporation, during which it worked hard to become upgraded to further improve energy efficiency and more efficient without compromising the high quality production capacity. Furthermore, a new RO plant service we offer our customers. will be commissioned in Gozo. This RO will ensure self-sufficiency in water production for the whole During a year, in which the Corporation celebrated island of Gozo. The potable water supply network to its 25th anniversary, it proudly inaugurated the North remote areas near Siġġiewi, Qrendi and Haż-Żebbuġ Wastewater Treatment Polishing Plant in Mellieħa. will be extended. Moreover, ground water galleries This is allowing farmers in the Northern region to will also be upgraded to prevent saline intrusion. benefit from highly polished water, also known as The project also includes the extension of the sewer ‘New Water’. network to remote areas that are currently not WSC also had the opportunity to establish a number connected to the network. Areas with performance of key performance indicator dashboards, produced issues will also be addressed. inhouse, to ensure guaranteed improvement. These Having only been recently appointed to lead the dashboards allow the Corporation to be more Water Services Corporation, I fully recognize that the efficient, both in terms of performance as well as privileges of running Malta’s water company come customer service.
    [Show full text]
  • Summer Schedules
    ISLA/VALLETTA 1 Monday to Friday Saturday Sunday Route 1 - Schedule Times Route 1 - Schedule Times Route 1 - Schedule Times 05:30-09:30 20 minutes 05:30-22:30 30 minutes 05:30-22:30 30 minutes 09:31-11:29 30 minutes 11:30-16:30 20 minutes 16:31-23:00 30 minutes BIRGU VENDA/VALLETTA 2 Monday to Friday Saturday Sunday Route 2 - Schedule Times Route 2 - Schedule Times Route 2- Schedule Times 05:15-20:25 20 minutes 05:30:00-22:45 30 minutes 05:30:00-22:45Isla/Birgu/Bormla/Valletta30 minutes 20:26-22:45 60 minutes KALKARA/VALLETTA 3 Monday to Friday Saturday Sunday Route 3 - Schedule Times Route 3 - Schedule Times Route 3 - Schedule Times 05:30 - 23:00 30 minutes 05:30 - 23:00 30 minutes 05:30Isla/Birgu/Bormla/Valletta - 23:00 30 minutes BIRGU CENTRE/VALLETTA 4 Monday to Friday Saturday Sunday Route 4 - Schedule Times Route 4 - Schedule Times Route 4 - Schedule Times 05:30:00 - 20:30 30 minutes 05:30-20:00 30 minutes 05:30-20:00 30 minutes 20:31 - 23:00 60 minutes 20:01-23:00 60 minutes 20:01-23:00 60 minutes BAHAR IC-CAGHAQ/VALLETTA 13 Monday to Friday Saturday Sunday Route 13 - Schedule Times Route 13 - Schedule Times Route 13 - Schedule Times 05:05 - 20:30 10 minutes 05:05 - 20:30 10 minutes 05:05 - 20:30 10 minutes 20:31 - 23:00 15 minutes 20:31 - 23:00 15 minutes 20:31 - 23:00 15 minutes PEMBROKE/VALLETTA 14 Monday to Friday Saturday Sunday Route 14 - Schedule Times Route 14 - Schedule Times Route 14 - Schedule Times 05:25 - 20:35 20 minutes 05:25 - 20:35 20 minutes 05:25 - 20:35 20 minutes 20:36 -22:48 30 minutes 20:36 -22:48 30 minutes
    [Show full text]
  • Is-26 Ta' Mejju, 2021 5221 This Is a List of Complete Applications
    Is-26 ta’ Mejju, 2021 5221 PROĊESS SĦIĦ FULL PROCESS Applikazzjonijiet għal Żvilupp Sħiħ Full Development Applications Din hija lista sħiħa ta’ applikazzjonijiet li waslu għand This is a list of complete applications received by the l-Awtorità tal-Ippjanar. L-applikazzjonijiet huma mqassmin Planning Authority. The applications are set out by locality. bil-lokalità. Rappreżentazzjonijiet fuq dawn l-applikazzjonijiet Any representations on these applications should be sent in għandhom isiru bil-miktub u jintbagħtu fl-uffiċini tal-Awtorità writing and received at the Planning Authority offices or tal-Ippjanar jew fl-indirizz elettroniku ([email protected]. through e-mail address ([email protected]) within mt) fil-perjodu ta’ żmien speċifikat hawn taħt, u għandu the period specified below, quoting the reference number. jiġi kkwotat in-numru ta’ referenza. Rappreżentazzjonijiet Representations may also be submitted anonymously. jistgħu jkunu sottomessi anonimament. Is-sottomissjonijiet kollha lill-Awtorità tal-Ippjanar, All submissions to the Planning Authority, submitted sottomessi fiż-żmien speċifikat, jiġu kkunsidrati u magħmula within the specified period, will be taken into consideration pubbliċi. and will be made public. L-avviżi li ġejjin qed jiġu ppubblikati skont Regolamenti The following notices are being published in accordance 6(1), 11(1), 11(2)(a) u 11(3) tar-Regolamenti dwar l-Ippjanar with Regulations 6(1), 11(1), 11(2)(a), and 11(3) of the tal-Iżvilupp, 2016 (Proċedura ta’ Applikazzjonijiet u Development Planning (Procedure for Applications and d-Deċiżjoni Relattiva) (A.L.162 tal-2016). their Determination) Regulations, 2016 (L.N.162 of 2016). Rappreżentazzjonijiet fuq l-applikazzjonijiet li ġejjin Any representations on the following applications should għandhom isiru sal-25 ta’ Ġunju, 2021.
    [Show full text]
  • Petition Booklet
    Referenda Act : Declaration for the holding of a Referendum We the undersigned persons, being registered as voters for the election of members of the House of Representatives, demand that the question whether the following provision of law, that is to say Framework for Allowing a Derogation Opening a Spring Hunting Season for Turtledove and Quail Regulations (Subsidiary Legislation 504.94 - Legal Notice 221 of 2010) should not continue in force, shall be put to those entitled to vote in a referendum under Part V of the Referendum Act. Electoral Name and Surname Signature ID Card Address (in full) Division Please return to 57/28 Triq Abate Rigord, Ta’ Xbiex XBX 1120 What spring hunting takes place in Malta? In view of the consistent lack of action by government and Dear Members, inertia on the European Commission’s part, the Coalition To hunt birds in spring, hunters apply for a license that allows believes it is time for the people to have their say through a them to shoot quails (summien) and turtle doves (gamiem) referendum to remove the law that allows hunting in spring. Thirteen Maltese organisations have decided to work for two weeks in April. Last spring about 9500 hunters were together to bring an end to spring hunting in Malta. licensed to shoot up to 11,000 turtle doves and 5000 quail Isn’t it unfair to deprive hunters of their hobby? The task of the Coalition for the Abolition of among themselves. The licence (previously €50) is free of Spring Hunting is to gather at least 34,000 signatures charge, and hunters are asked to report what they catch by Maltese bird hunters already have months in autumn and to petition the government to hold a referendum to sending an SMS to the relevant authority.
    [Show full text]
  • Gazzetta Tal-Gvern Ta' Malta
    Nru./No. 20,408 Prezz/Price €1.98 Gazzetta tal-Gvern ta’ Malta The Malta Government Gazette L-Erbgħa, 20 ta’ Mejju, 2020 Pubblikata b’Awtorità Wednesday, 20th May, 2020 Published by Authority SOMMARJU — SUMMARY Avviżi tal-Awtorità tal-Ippjanar ....................................................................................... 4025 - 4064 Planning Authority Notices .............................................................................................. 4025 - 4064 L-20 ta’ Mejju, 2020 4025 PROĊESS SĦIĦ FULL PROCESS Applikazzjonijiet għal Żvilupp Sħiħ Full Development Applications Din hija lista sħiħa ta’ applikazzjonijiet li waslu għand This is a list of complete applications received by the l-Awtorità tal-Ippjanar. L-applikazzjonijiet huma mqassmin Planning Authority. The applications are set out by locality. bil-lokalità. Rappreżentazzjonijiet fuq dawn l-applikazzjonijiet Any representations on these applications should be sent in għandhom isiru bil-miktub u jintbagħtu fl-uffiċini tal-Awtorità writing and received at the Planning Authority offices or tal-Ippjanar jew fl-indirizz elettroniku ([email protected]. through e-mail address ([email protected]) within mt) fil-perjodu ta’ żmien speċifikat hawn taħt, u għandu the period specified below, quoting the reference number. jiġi kkwotat in-numru ta’ referenza. Rappreżentazzjonijiet Representations may also be submitted anonymously. jistgħu jkunu sottomessi anonimament. Is-sottomissjonijiet kollha lill-Awtorità tal-Ippjanar, All submissions to the Planning Authority,
    [Show full text]
  • Of the Central Region of Malta a TASTE of the HISTORY, CULTURE and ENVIRONMENT
    A TASTE OF THE HISTORY, CULTURE AND ENVIRONMENT of the Central Region of Malta A TASTE OF THE HISTORY, CULTURE AND ENVIRONMENT of the Central Region of Malta Design and layout by Kite Group www.kitegroup.com.mt [email protected] George Cassar First published in Malta in 2019 Publication Copyright © Kite Group Literary Copyright © George Cassar Photography Joseph Galea Printed by Print It, Malta No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the author and the publisher. ISBN: 978-99957-50-67-1 (hardback) 978-99957-50-68-8 (paperback) THE CENTRAL REGION The Central Region is one of five administrative regions in the Maltese Islands. It includes thirteen localities – Ħ’Attard, Ħal Balzan Birkirkara, il-Gżira, l-Iklin, Ħal Lija, l-Imsida, Tal- Pietà, San Ġwann, Tas-Sliema, San Ġiljan, Santa Venera, and Ta’ Xbiex. The Region has an area of about 25km2 and a populations of about 130,574 (2017) which constitutes 28.36 percent of the population of the country. This population occupies about 8 percent of the whole area of the Maltese Islands which means that the density is of around 6,635 persons per km2. The coat-of-arms of the Central Region was granted in 2014 (L.N. 364 of 2014). The shield has a blue field signifying the Mediterranean Sea in which there are thirteen bezants or golden disks representing the thirteen municipalities forming the Region. The blazon is Azure thirteen bezants 3, 3, 3, 3 and 1, all ensigned by a mural coronet of five eschaugettes and a sally port Or.
    [Show full text]