WAABIZHESHIKANA THE MARTEN TRAIL: A RIVER HERITAGE TRAIL
MINI-MASTER PLAN ST. LOUIS RIVER CORRIDOR DULUTH, MINNESOTA | COUNCIL APPROVED NOVEMBER 25, 2019 STAKEHOLDER COMMITTEE
• Joel Sipress, Duluth City Council • Hansi Johnson, Minnesota Land Trust • Deb DeLuca, Duluth Seaway Port Authority • Daryl Peterson, Minnesota Land Trust • Scott Cieniawski, Environmental Protection Agency • Mike Bares, MN Pollution Control Agency • Wayne Dupuis, Fond du Lac Band of Lake Superior Chippewa • Erin Endsley, MN Pollution Control Agency • Jill Hoppe, Fond du Lac Band of Lake Superior Chippewa • Debbie Isabell-Nelson, Morgan Park Community Club • Mike Casey, Friends of Western Duluth Parks & Trails • Bill Majewski, Morgan Park Community Club - SLRA • Alison J. Clarke, Friends of Western Duluth Parks & Trails • Amanda Crosby, Parks & Recreation Commission - Disability Representative • Harry Hanson, Friends of Western Duluth Parks & Trails • Dean Votgman, Parks & Recreation Commission, District 5 • Denette Lynch, Friends of Western Duluth Parks & Trails • Dave Moore, Railway Solutions/LS&M • Virginia Olson, Friends of Western Duluth Parks & Trails • Carole Newkumet, Riverside Community Club • David Bolgrien, Friends of Western Duluth Parks & Trails • Charlie Staudahar, Spirit Lake Development • Rick Staffon, Izaak Walton League • Charlie Nelson, Twin Ports Walleye Association • Craig Sterle, Izaak Walton League • Dave Nelson, Twin Ports Walleye Association • Glenn Merrick, Izaak Walton League • Jack Ezell, Western Lake Superior Sanitary District • Will Munger, Izaak Walton League • Dwight Morrison, Wheels on Trails • Joel Manns, Lake Superior & Mississippi Railroad • Brad Massengill, Lake Superior & Mississippi Railroad • Andy Webb, Lake Superior & Mississippi Railroad • Keith Okeson, Lake Superior Muskies • Pat Okeson, Lake Superior Muskies • Russ Francisco, Marine General • John Lindgren, MnDNR • Lisa Angelos, MnDNR - Jay Cooke State Park • Kevin Johnson, MnDNR - Parks & Trails - Two Harbors ACKNOWLEDGEMENTS
City Council Members Parks & Recreation Commission City of Duluth Staff Contact Information: Members • Gary Anderson • Jim Filby Williams, Lisa Luokkala • Amanda Crosby • Joel Sipress Director of Assistant Parks & Recreation Manager • Jill Joyce Administration • Em Westerlund City of Duluth Parks & Recreation Department • Tjaard Breeuwer Parks & Planning Staff • Renee Van Nett 218.730.4300 • Jennifer Peterson • Jay Fosle • Lisa Luokkala, [email protected] • Dudley Edmondson Project Lead • Zack Filipovich • Dennis Isernhagen • Arik Forsman • Jim Shoberg, • Britt Rohrbaugh Technical Support • Noah Hobbs • Erik Torch • Hank Martinsen, • Barb Russ • David Demmer Property Services Mayor of Duluth • Emily Larson
CONSULTANT TEAM LHB Inc. 21 West Superior Street, #500 Duluth, MN 55802
WAABIZHESHIKANA | THE MARTEN TRAIL MINI-MASTER PLAN TABLE OF CONTENTS
01 INTRODUCTION AND OVERVIEW 5 05 MASTER PLAN DEVELOPMENT 39 PROJECT BACKGROUND AND PURPOSE 6 TRAIL INTERPRETATION PLAN 40 IMPLEMENTING AGENCIES AND PLAN ALIGNMENTS 7 ACCESSIBILITY 42 TRAIL DESIGNATION AND REGIONAL SIGNIFICANCE 10 TRAIL DESIGN STANDARDS 42 02 VISION, TRENDS AND PUBLIC VALUES 13 DESIGN CONSIDERATIONS - CULTURAL RESOURCES 44 VISION 14 PROGRAMMING FOR PUBLIC ACCESS AND LINEAR PARK SITES 44 TRENDS AND PUBLIC VALUES 14 DESIGN BEST PRACTICES 46 03 EXISTING CONDITIONS AND SITE ANALYSIS 19 PLANNING PROCESS RESULTS 47 SITE HISTORY 20 RAIL OR TRAIL PREFERENCES 48 LAND USE CONTEXT 20 06 IMPLEMENTATION AND SUSTAINABILITY 51 LOCAL AND REGIONAL TRAIL CONNECTIONS 22 RECOMMENDATIONS AND IMPLEMENTATION TIMELINE 52 PHYSICAL CONDITIONS AND NATURAL RESOURCES 23 TRAIL SEGMENT RECOMMENDATIONS 54 TRAIL SEGMENTS: ISSUES AND OPPORTUNITIES 23 OVERALL TRAILHEAD AND PUBLIC ACCESS MAPS 70 OVERALL PROJECT LIMITS MAP 25 PUBLIC WATER ACCESS SITES OVERVIEW 64 PRECEDENTS 28 TRAILHEADS AND LOCAL TRAIL ACCESS POINTS OVERVIEW 66 EXISTING TRAIL IMAGES 30 OPINION OF COSTS - TRAIL EXTENSION 74 04 COMMUNITY ENGAGEMENT 33 TRAIL MAINTENANCE PLAN 75 HISTORY OF THE PLANNING EFFORT 34 OPINION OF COSTS - PUBLIC WATER ACCESS SITES 76 PUBLIC INVOLVEMENT 34 SUMMARY 77 SUPPORTING DOCUMENTS 78 WAABIZHESHIKANA | THE MARTEN TRAIL 01 INTRODUCTION AND OVERVIEW Introduction and Overview access to the river via a ten-mile riverfront bike/ pedestrian trail, improve existing water access sites, and provide new water access sites tailored Project Background specifically for paddlers. The City is committed The current Western Waterfront Trail (the Trail) to design all of these facilities to be as accessible consists of a 3.3-mile multi-use recreational trail as practically possible regardless of income or that traces the shore of the St. Louis River Estuary physical ability. in Duluth, Minnesota. Constructed in the 1980’s, the Trail was based on the 1979 City of Duluth plan that envisioned a ten-mile riverfront trail Project Goals extending to Jay Cooke State Park. The remaining This plan’s overall project goals include but are seven miles of trail are yet to be constructed. not limited to: The nearly $400 million federal/state clean-up of the St. Louis River is approaching completion, • Increasing connectivity from adjacent therefore the time is ripe to finish the Trail and neighborhoods to the St. Louis River and each connect Duluth residents and visitors to the other. restored river. • Stimulating development on private land in the St. Louis River Corridor. Project Purpose • Meaningfully engaging and responding to In August 2016, the City of Duluth Parks and citizen and stakeholder input. Recreation Division began a public planning process to determine the future recreational use Figure1.1 WWFT 1979 City Plan • Enhancing neighborhood quality of life. of ten miles of public riverfront encompassing • Restoring and protecting natural habitat along 1,200 acres of green space. Public access to the the trail corridor. riverfront is limited at present. The northernmost 3.3 miles are accessible via the existing Western Waterfront Trail. The next 4.5 miles are accessible primarily via an excursion train that provides a wonderful service but operates infrequently and necessarily charges a fee that is unaffordable to many. The majority of the southernmost 2.5 miles of riverfront lack improved access. The City intends to develop a plan that will enhance public
Figure1.2 WWFT existing trail sign
6 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Implementing Agencies and • US Steel Corporation Plan Alignments • Minnesota Pollution Control Agency The City of Duluth Parks and Recreation Division • Lake Superior and Mississippi Railroad (LSMR) will lead trail and park planning efforts, detailed • St. Louis River Alliance design and construction, as well as facilitate operations and ongoing maintenance of the Trail. • US Army Corps of Engineers The City will also collaborate with the following departments and community partners for St. Louis River Corridor Initiative additional support and to ensure the overall vision In 2014, the City of Duluth established the St. and implementation of the plan are met with Louis River Corridor Initiative. The Initiative is to success: invest in public parks and trails from Lincoln Park to the Fond du Lac neighborhood. The overall Anticipated Partners goals of this Initiative are to support the natural environment, enrich quality of life, attract new • Duluth Public Works Department home buyers, establish new visitor destinations, •Duluth Property and Facilities Management and stimulate appropriate development. Division Corridor Initiative projects are funded in part •Duluth Parks Maintenance by an additional half-percent increment in the local tourism tax, which was approved by the • Duluth Indigenous Commission Minnesota Legislature in 2014. These funds • Duluth Natural Resource Commission leverage additional dollars through community partnerships and grants. • Riverside Community Club • Morgan Park Community Club • Fond du Lac Community Club “Duluth’s history and its future are profoundly • Fond du Lac Band of Lake Superior Chippewa tied to the health, sustainability and steward- ship of the St. Louis River and Lake Superior. • Friends of Western Duluth Parks and Trails We are excited to work with the community to • Minnesota Land Trust unveil the potential of the River Corridor and • Minnesota Department of Natural Resources its historic and culturally rich gifts.” • Environmental Protection Agency - Mayor Emily Larson
MINI-MASTER PLAN | DULUTH PARKS 7 • Supports a growing need for commuters using alternate modes of transportation. • Connects neighborhoods and regional destinations. • Secures access to a missing piece of the corridor along the St. Louis River.
Duluth Natural Area Program St. Louis River Natural Area Management Figure1.3 St. Louis River Corridor Ongoing Projects The Duluth Natural Areas Program is a city program that designates certain lands with access to safe and enjoyable recreational Greater Minnesota Regional Parks and environmental value as permanently protected assets. By providing gateways to the St. Louis Trails Strategic Plan natural places. The St. Louis River Natural Area is River waterfront, enhancing the ecological To secure future funding from the State of comprised of nine places along the shoreline of health of former industrial sites, and increasing Minnesota Legacy Parks and Trails grant program the St. Louis River, from Chambers Grove Park in connectivity of people to the natural world, administered by the Greater Minnesota Parks the Fond du Lac neighborhood, to Grassy Point the Trail will provide opportunity for the public and Trails Commission, the City aims to align this in the Irving neighborhood. The approximately to practice good stewardship of our natural trail plan with the Greater Minnesota Regional 1,200 acres of land are home to a mix of 17 distinct resources. Parks and Trails Strategic Plan. Legacy funding is native plant communities and over 150 species available through the State of Minnesota for parks of birds. The natural areas program protect the and trail projects outside of the seven-county The Trail and park expansion investment is waters of the St. Louis River Estuary and provide metropolitan area that illustrate a need and meet grounded in the following regionally significant river access for Duluth’s residents and visitors. The certain regional objectives. objectives: Trail will connect the nine areas encompassed by the nominated St. Louis River Natural Area. This This plan aligns with the Greater Minnesota • Provides a unique experience to users that they plan aligns with the St. Louis River Natural Area Regional Parks and Trails Commission vision to may not experience anywhere else (the estuary plan by concentrating the impacts of recreational provide every Minnesotan the opportunity to is considered the largest freshwater estuary in use in small hardened areas, fostering appreciation have a strong connection to natural resource- the U.S.). for the natural world, and establishing habitat based parks and trails, which improves quality • Links to a larger network of existing local and protection primary purposes of the Trail. of life for surrounding communities through regional trails.
8 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL St. Louis River - Area of Concern (AOC) 3. Protect, enhance, and restore ecological ST. LOUIS RIVER NATURAL AREA functions and maximize biodiversity without K e The St. Louis River is one of the 43 Areas of e n e C r e e seeking to restore the estuary to its presettlement Concern (AOCs) in the Great Lakes Basin that k Kingsbu ry C re was included in the Great Lakes Water Quality ek condition.
Irving Agreement established by the United States and Fairmount Know lto This plan aligns with the Habitat Plan by n C reek Canada in 1987. AOCs are places once polluted Norton Park GRASSY concentrating the impacts of recreational use POINT by common past practices of dumping untreated KINGSBURY Western BAY in small hardened areas, fostering appreciation Waterfront Trail waste on land and water. All designated AOCs TALLUS Riverside ISLAND for the natural world, and establishing habitat
S te require remedial action plans (RAP) to address wa rt Cr eek protection primary purposes of the Trail. specific beneficial use impairments, which are managed by natural resource agencies. The City MUNGER Lake Superior & Mississippi Railroad Morgan LANDING of Duluth is one of the AOC partners working Park S a r Local Historic Landmark Designation g e n t with regulatory agencies to implement projects C r e St. Louis River M e k is Stee s U.S. l Cr io ee n k The Lake Superior & Mississippi Railroad (LSMR) that will remediate contaminated sediments and C r e e k restore aquatic habitat within the River. This plan MUD LAKE was designated as a historic landmark in July
Gary aligns with the goals of the AOC, as cleaning up New 2019 by the City of Duluth Heritage Preservation Duluth the river will allow for better public use along Fond du Lac Commission. This designation of local heritage CHAMBERS this natural resource corridor. This plan aligns GROVE N preservation landmark aims to preserve LEGEND RASK BAY RADIO with the AOC plan by concentrating the impacts NORTH BAY landmarks that reflect elements of the City’s TOWER BAY Proposed natural area boundary* of recreational use in small hardened areas, City of Duluth trails cultural, social, economic, political, engineering, in the natural area Trout streams in fostering appreciation for the natural world, and the natural area visual or architectural history. The City intends 0 1 2 Miles *Inclusion in the natural area subject to landowner assent. establishing habitat protection primary purposes 02.21.2019 to develop a rail and trail system that preserves of the Trail. Figure1.4 Map of the St. Louis River Natural Area the historic integrity of the Lake Superior and Mississippi Railroad as much as possible. Lower St. Louis River Habitat Plan The Habitat Plan guides local and state agencies The City supports the Lower St. Louis River Habitat implementation goals and strives to: Plan which was created by the St. Louis River 1. Recognize that management lies within the Citizens Action Committee (CAC). The Plan serves actions of humans and not management of the to protect the ecological diversity of this area. environment. The Estuary provides habitat for a rich variety of fish, aquatic invertebrate, bird, and other wildlife 2. Promote stewardship of the resource by species. The lower 21 river miles, plus extensive local residents, users of the resource, and those areas of adjacent forested land, are included in the concerned with it. initial phase of the Habitat Plan.
MINI-MASTER PLAN | DULUTH PARKS 9 Trail Designation and Regional enhanced, including areas formerly off-limits to Campground, Magney Snively Natural Area, and Significance the public. Restoring, protecting, and enhancing Jay Cooke State Park. Additional points of interest the ecological health of former industrial sites that are otherwise hard to access but will be Classification are unique to this Trail, and this Plan will fill in enhanced by the Trail include, views to Tallas and the missing link through a former industrial site Clough Islands, Spirit Lake Marina, the Riverside Designation of the trail as a regionally significant owned by US Steel and by working with various Marina, Blackmer Park, the former US Steel Plant, destination is an important goal of this plan, as clean-up efforts. Slag Point (manmade landform), Mud Lake, and the project will be eligible to receive State of the Oliver Bridge, to name a few. Currently, the Minnesota Legacy Parks and Trails grant funding. Criteria #2: Be Well-located to Serve Regional only way the St. Louis River Corridor The intent for this Trail is to be recognized as a Population and/or Tourist Destination neighborhoods are connected is via Trunk Non-Motorized Regional Trail, according to the Highway 23. The Trail will enhance the sense of Greater Minnesota Regional Parks and Trails Duluth is a popular tourist destination, attracting community by creating a linear system that links Strategic Plan of April 2015, by adhering to the 6.7 million visitors annually and a growing city, the waterfront to following criteria. home to over 87,000 residents. The Trail will serve seven adjacent residential neighborhoods, and an historically underserved area of Duluth and providing transportation alternatives to nearby Criteria #1: Provide a High-Quality the surrounding region. There are few linear, businesses, recreational destinations, and public “Destination” Trail Experience recreational amenities with adequate length that green spaces. Creating the missing links within The Trail is located along the meandering provide both land and water access in the western the trail will provide a better connection to the shoreline of the St. Louis River. This unique portion of Duluth. The Trail will provide better larger network of trail systems throughout the location provides opportunity to curate a safe waterfront access and increase connectivity from City. experience for trail users of all abilities, while adjacent neighborhoods to the St. Louis River honoring and celebrating the rich history along Estuary, enhancing neighborhood quality of life. this great body of water. This area was and still is Criteria #3: Enhance Connectivity to Regional incredibly significant to the Anishinabe people. Rebranding the Trail to better articulate this Destinations heritage story is important to our region. The trail The Trail provides gateways to the St. Louis River corridor will include quality site amenities, offer waterfront, linking to a larger network of existing spectacular views and interpretation opportunities local and regional, land and water trails. Other at key points of interest, while also providing significant trails and recreational destinations in improved water access for paddling, boating and the area include the Munger State Trail, the Cross fishing activities. The natural and cultural history City Trail, the Duluth Traverse Trail, the Superior will be integrated into the design of the Trail Hiking Trail, the St. Louis River Estuary Water Trail, through mindful recreational development. Points U.S. Bicycle Route 41, Spirit Mountain Recreational of interest and viewsheds will be preserved and Area, the Lake Superior Zoo, Indian Point Figure1.6 Existing Trail near Indian Point Campground
10 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Criteria #4: Fills a Gap in Recreational • Take Care of What We Have. The Trail builds Opportunity within a Region on an existing linear trail already established The 2010 City of Duluth Parks and Recreation in the region. The expansion will lead to new Master Plan flagged the absence of high quality acquisitions or easement of lands and facilities outdoor recreation amenities in the western half increasing the operational and maintenance of Duluth. Extending the Trail and expanding boat requirement. However, these investments access as indicated in this plan will correct that have been planned with conservative life-cycle significant inequity. The project also establishes management costs providing a clear picture of a regionally important, high quality, continuous expected investments over the life of the asset. It waterfront bike/pedestrian linkage from the is critical that continued coordination with local Gitchi Gammi State Trail to the Lakewalk and the and regional entities occur to assure that this Cross City Trail all the way to Jay Cooke State Park. trail expansion be stewarded by a network of The water access sites in this plan provide crucial stakeholders to provide for long term operational canoe/kayak infrastructure for the St. Louis River and maintenance commitments. National Water Trail. • Collaborate Among Partners. Park and trail users will enjoy a seamless experience Additionally, the Trail will... Figure1.7 City Wayfinding & Signage Detail along the trail, as planning efforts have included • Connect People to the Outdoors. The Trail collaboration with local, state, and regional will create a welcoming and safe way for people stakeholders to ensure a strong network of of all abilities and incomes to enjoy the St. Louis partners provide a cohesive experience for trail River. The Trail will establish an enhanced venue users. These partnerships better tell the collective for future regional programming and events story of the river and its ecological, cultural, and including organized walks, run, and paddles. historical significance. Overall, the Trail will connect many more people much more powerfully to the St. Louis River than has historically been the case. • Create Opportunity. High quality trail access to ten miles of publicly owned riverfront located within easy walking distance of neighborhoods will make western Duluth a more desirable place to live, work, play, and invest, improving quality of life for all.
MINI-MASTER PLAN | DULUTH PARKS 11 12 WAABIZHESHIKANA | THE MARTEN TRAIL 02 VISION, TRENDS AND PUBLIC VALUES Vision, Trends and Public Values of interest and viewsheds are preserved and enhanced. Vision • Equitable Experience. Maximize accessibility for The Trail‘s vision began in 1979 and remains the all regardless of income or physical ability by same today - to create a multi-use recreational trail providing a free trail experience constructed to along the shore of the St. Louis River Estuary from the highest accessibility standards that the City the Irving neighborhood up river to the Fond du can finance without unacceptably scarring the Lac neighborhood in Western Duluth. The linear natural landscape. pathway will provide a unique and safe • Technically and Environmentally Feasible. Be experience for trail users of all abilities, while mindful of technical and economic feasibility. honoring and celebrating the rich history along Ensure trail design is realistic and can be Trends and Public Values this great body of water. The trail corridor will maintained long term for community benefit. include quality site amenities and provide Greater Duluth Area Demographics spectacular views and interpretation • Environmentally Sustainable. Minimize Duluth is the center of a growing metropolitan opportunities at key points of interest. The Trail disruption to the natural terrain and sensitive area with a population of 279,000 that is expected will also provide improved water access for environmental areas. Implement low to exceed 300,000 in 2040. In addition to a picnicking, boating, and fishing activities. impact development and sustainable best growing population, Duluth hosts 6.7 million management practices to avoid degrading visitors per year, making it one of the most Guiding Principles natural environment. popular tourist destinations in the upper Great Six principles were established for this project to Lakes region. • Promote Economic Development. Recognize help guide decisions and measure success of the opportunities and encourage future Public Health Trends •plan.Community Connection. Enhance sense of development by connecting other regional Duluth community organizations improve community by creating a linear trail system areas of interest, neighborhoods, and community health by making active healthy that links the waterfront to adjacent residential commercial districts. lifestyle choices more accessible to all. The neighborhoods, and provides transportation provision of high quality parks and trails for every alternatives to nearby businesses, recreational neighborhood is central to this effort. The City’s destinations, and public green spaces. Provide a 2010 Parks and Recreation Master Plan identified better connection to the larger network of trail “Did you know? an absence of high quality parks and trails in west systems throughout the City. Duluth was awarded the premier Duluth. The St. Louis River Corridor Initiative, of • Unique Duluth Experience. Implement the “Outdoor City” in the USA by which the Trail is an integral part, aims to address natural and cultural history into the design of Outside Magazine, 2014. that inequity. Critical partners include the State the Trail. Educate on natural habitat, resource Health Improvement Program, the Duluth YMCA, management, and local heritage. Ensure points the St. Louis County Department of Public Health, and the Zeitgeist Center for Arts and Community.
14 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Recreational Trends and Tourism Opportunities NRPA’s 2017 Pulse Poll Duluth’s status as a nationally significant outdoor (1,003 Americans polled) recreation destination has driven steady increases in tourist visitation that now exceed 6.7 million 83% of American’s say it is important that per year. In recognition, Outside Magazine named Duluth America’s best outdoor town in 2014. local government agencies prioritize Research commissioned by Visit Duluth validates environmental initiatives. that outdoor activities, especially walking and hiking, are the favorite activities of visitors while 82% of Americans agree that it is important in Duluth. Duluth is capitalizing on the national to preserve public lands. interest by renewing existing parks and trails and investing in new parks and trails with an emphasis 4 out of 5 Americans make an effort to stay on providing access to the restored St. Louis River. physically fit during winter. (Top activities include walking, jogging, running, or hiking outdoors, making up 46% of winter exercise).
According to NRPA’s 2017 Agency Performance Review, a typical agency (municipal) should strive for...
1 park per every 2,266 residents and 9.6 acres of parkland per 1,000 residents.
The City of Duluth has 1 park per every 670 residents and 182 acres of Park and Open Space per 1,000 residents.
MINI-MASTER PLAN | DULUTH PARKS 15 Trends and Best Practices: Accessible Boat Launch for Water Access
Design Considerations* Provide Access Route • Surface, grade, width and cross slope need to be accessible (not to exceed 5% for ADA, not to exceed 8.33% for ABA), and as even and level as possible without gaps or interruptions • Route clearly marked • 5’ minimum width
Level and stable landing/loading area • There should be an area adjacent to the loading area that is stable, at least 60”x60” • Can be anywhere adjacent to loading area, including in water up to 12” deep
Transfer assistance • Transfer step • Transfer board • Overhead handles/grab bars • Non-slip surface textures
*National Park Service Report, ‘Long Lasting Launches,’ 2004
16 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL MINI-MASTER PLAN | DULUTH PARKS 17 18 WAABIZHESHIKANA | THE MARTEN TRAIL 03 EXISTING CONDITIONS AND SITE ANALYSIS Existing Conditions and 1850 -1900’s: The 1854 Treaty ceded lands to clean-up and restore portions of the estuary the US government. Shipping on the Great Lakes have begun. The outcome has been better water Site Analysis begins, allowing for export of iron ore, lumber, quality, and improved fish and wildlife habitat. and grain. First railroad in Duluth is established Ojibwe people continue to live alongside the River. Site History and portions of the track are still in operation The St. Louis River Corridor has a rich history, today. An increase in logging industry brings the one that is filled with historical, ecological, and development of sawmills to the river. Land Use Context cultural significance. See Figure 1.4 for a visual representation of the area’s historical timeline. 1900-1975: Industrialization of a natural The Trail project limits are entirely within the City waterfront begins with the creation of the US Steel of Duluth with nearly all of the proposed trail Pre-1600’s: For nearly 14,000 years, indigenous Mill, Atlas Cement Plant, and railroad expansions. alignment located on land or easements that are, peoples inhabited the shores of the St. Louis Riverside, Smithville, Norton Park, and Morgan Park or soon will be, city-owned. River, living off the land and water. Villages were neighborhoods are established along the corridor The existing 3.3 mile trail traverses an area that located throughout what is known today as the to house steel and cement workers. By mid-20th Twin Ports region. Activities included fishing, wild alternates between natural areas and single century, the lower St. Louis River is significantly family neighborhoods. The trail is approximately ricing, and hunting. Stories that have been orally impaired because of human activities. passed down about the Anishinabe lifestyle 8’ feet-wide with 1-foot shoulders. In 2016, the illustrate the spiritual connection they have with 1975-Present “Return of the River”: City rewidened, regraded, and resurfaced the the land. Restoration efforts take place to clean-up the river trail to improve accessibility and restored native and restore the estuary to healthy natural habitat vegetation to the surrounding greenspace. Grades 1600’s-1700’s: In the 1600’s the region of as part of a larger Great Lake Basin Remedial Action along the existing trail vary from flat terrain to Duluth was home to the Dakota people. By the Plan. In 1980, Phase I of the Trail was built, spanning over 8% in some areas. Other land uses in the mid-1700’s, Ojibwe people had begun to occupy 3.3 miles from Indian Point Campground to area include light industrial, recreational, and the area and are still present today. European Riverside neighborhood. Also during this time, the unimproved greenspace. settlement occurs and trading between the LSMR excursion rail was established. The St. Louis South of the existing trail terminus at the Riverside indigenous people and European voyageurs River Estuary is designated as an Area of Concern neighborhood, the next four miles of shoreline begin. The river is seen as a vital link connecting (AOC) in 1987. Remediation and restoration to host the LSMR excursion railroad. Where the the Mississippi River waterways to the west with rail was originally constructed on the mainland, the Great Lakes to the east. Did you know?u know? there is sufficient wide, flat, and dry space to 1800 -1850’s: Fur trading posts and commercial accommodate the trail right by the rail. In other fisheries are established. Land treaties open land The Ojibwe name of the River is locations, the rail bed was placed in the river and to European settlers and displaced the Ojibwe Gichigami-ziibi (Great-lake River). is now surrounded by open water on one side people. The St. Louis River Estuary is considered the and wetlands on the other. These segments of largest fresh water estuary in the U.S. rail bed cannot accommodate a trail next to the rail. On
20 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL LaPointe Treaty opens Indigenous peoples European contact first French and Indian War/Seven Years’ American Fur the land for European inhabited the shores reported when Etienne Brule War ends, ceding French territory to Company organized, settlement and of the St. Louis River meets with the Chippewa Great Britain and bringing the Great establishes first displaces the Ojibwe prior to the 1600’s at Sault Ste. Marie; French Lakes region under British rule, creating commercial fishery at people. The Fond du traders and Chippewa people greater hardship for the Ojibwe people Fond du Lac trading Lac Reservation was establish positive alliance post in 1817 established. 1600 1622 1763 1808 1854
Image: Duluth Public Library Image: historyinanhour.com Image: reproduction of James Otto Lewis 1826 Image: University of MN Duluth, Hudson Bay painting, Duluth Public Library Trading Co.
Locks open at Sault Ste. Marie, making it possible Logging industry US Steel completes for large ships Image: Lake Superior & Mississippi Railroad operations are construction of mill Image: LHB Image: LS&M Railroad to sail between MN Harbor concentrated at Jay on MN side of St. Lake Superior and Improvement Cooke State Park; Louis River; Morgan Lake Huron, and Company dredges by 1894 there are Park community is allowing for the first shipping canal at least 15 sawmills established to house export of iron ore, in the St. Louis along the St. Louis steel and cement lumber and grain River Estuary River plant workers 1855 1872 1894 1915
1861 1869 1870 1877 1930’S 1979 1980 2019 Construction The destruction First train arrives LSMR is Northern Western Waterfront Present day LSMR “We are Water” on 154 miles of and relocation in Duluth from reorganized as the section of what Trail originally planned, tourist train started campaign, track of the Lake of burial St. Paul St. Paul and Duluth was originally designed to be 9 miles by volunteers from Fond du Lac hosts Superior and grounds occur Railroad, and later the LS&M is long. The first two the Lake Superior traveling exhibit to Mississippi Railroad in Fond du Lac folded into the moved and no segments, totaling close Transportation Club, educate people on (LSMR) begins neighborhood Northern Pacific longer carries to four miles, are built using original track Image: Unknown Image: trainworldcity.webs.com Minnesota Railway passengers as an 8’ wide gravel along the St. Louis water stories corridor River Figure1.8 Historical Timeline of the St. Louis River Corridor
MINI-MASTER PLAN | DULUTH PARKS 21 the mainland, the shoreline is backed by steep wooded bluffs that are mostly undeveloped. At Boy Scout Landing, the rail and ties end but the rail bed continues providing a hardened, flat, and dry corridor for cost-effective trail development along the thin strip of shoreline between the river and the bluff until it reaches Perch Lake. From Perch Lake to Chambers Grove Park, land along the river is mostly privately owned, and transitions back to residential areas with a flatter terrain for the duration of the project limits. Safety issues and physical barriers along the corridor include five roadway crossings, two at-grade railroad crossings, several creek or significant drainage crossings, as well as steep slopes.
Local and Regional Trail Connections
“Connecting the System” Vision The City of Duluth takes great pride in their local and regional trail systems and it strives to become the premier trail city in North America. The Trail will play a critical role in this vision in several ways. Regionally, the trail route will serve as one of the primary connectors from the western portion of the town, linking up with the Cross City and Munger State Trails, which in turn, connects to the Lakewalk and Gitchi Gami State Trail on the east and north side of Figure1.9 Duluth Trail Vision Plan Source: Trail & Bikeway Plan, 2011 town. With this series of interconnected routes, trail users will be able to travel from Jay Cooke State Park up the north
22 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL shore, spanning more than 30 miles across the sheltered bays, extensive coastal wetlands, and Trail Segments: Greater Duluth region. The Trail will be designed to expanses of open water. The envisioned trail Issues and Opportunities exceed ABA standards, and will strive to meet ADA alignment is bounded by a 1,200-acre green standards, creating the greatest amount of access corridor comprised of a mix of native and invasive Existing Trail to the most people. tree species. The City and its partners are in the The existing 3.3 miles of trail serve a special midst of a multi-year effort to remove invasive At the neighborhood level, the Trail will provide purpose. Located at the center of the St. Louis species and restore natives from this corridor. equally important community linkages connecting River tourism hub, the trail connects flagship The riverfront upland slopes toward the river at over seven neighborhoods, as well as several tourist attractions like the Lake Superior Zoo and grades ranging from 2% to 30%. Neighborhood business districts, parks and open space. Other Spirit Mountain Recreation Area, and serves as an development is concentrated on ridges set back recreational trail areas that are accessible from the attraction in its own right. The existing trail was from the shoreline. The trail corridor crosses Trail include the Superior Hiking Trail, the Duluth rewidened, regraded, and resurfaced in 2016 to numerous natural streams. Looming in the Traverse, the Spirit Mountain Recreation Area, improve access and enjoyment. From 2016 to 2017, background is an undeveloped 600-foot-tall ridge and Magney Snively Natural Area. the green corridor around the trail was cleared of that hosts thousands of acres of mature forest, invasive plant species and replanted with natives. cold water trout streams, and dramatic granite Physical Conditions and Natural Installation of a handsome new wayfinding outcrops, most of which is protected City-owned and signage system and additional accessibility Resources greenspace. improvements is slated for 2020. Together, these Topography, Wetlands, Streams and Habitat improvements will help transform what was a The St. Louis River Estuary landscape is extremely cluster of disconnected tourism attractions into a diverse. The estuary itself is a 12,000-acre body of linked series of complimentary outdoor recreation water comprised of deep water channels, shallow experiences.
Figure1.10 Rail at Blackmer Park (view north)
MINI-MASTER PLAN | DULUTH PARKS 23 Existing Trail Re-Route (at Tate & Lyle Site) Segment 2: Munger Landing to Blackmer Park The current trail alignment as it approaches The shoreline in Segment 2 is comprised primarily the Spring Street terminus near the Riverside of a rail causeway surrounded by water and neighborhood is unsafe for trail users. Not only wetlands that is too narrow to accommodate is there an at grade railroad crossing to navigate a rail with trail; however, there is an appealing through, the user experience is also not ideal as the and affordable inland alternative that follows trail is in close proximity to Tate & Lyle’s operations. a cleared and hardened utility easement that The plan will consider re-route alternatives for the has become a popular unofficial trail. 0.28 mile segment; one that routes the trail closer to the river, as well as an inland route. Site constraints that may be encountered along the inland alternative include property Site constraints within this re-route area include Figure1.11 Existing Trail Crossing at Kingsbury Creek (future connection to Zoo) issues, navigating a new railroad crossing, significant wetland impacts, drainage crossing, sloping topography, and wetland/drainage private property access, and steep slopes. With crossings. Trail extension distance for Segment 2 a safer route and more defined trail entry point, is approximately 3/4 mile. this portion of the Trail will provide for a better connection to Spirit Lake Marina as well as offer Segment 3: Blackmer Park to Boathouse Point new development opportunities within the (US Steel/EPA Clean-Up Area) Riverside neighborhood. Segment 3 begins near Blackmer Park and Segment 1: Spring Street to Munger Landing traverses through a portion of the riverfront that is going to be cleaned-up and restored by Segment 1 poses significant trail development Figure1.12 Existing Trail Crossing at Tate & Lyle site the EPA and US Steel, resulting in a unique challenges. The land here is owned by BN railroad. situation for trail and linear park expansion. It is traversed by two parallel tracks – one close to Because of these significant clean-up efforts, there the shore, another on the hillside above. The City is an opportunity for the City to work with these owns the lower tracks and ties as well as a trail partners to design how this 1.67 mile segment of easement that extends down to the river’s edge. In riverfront should be restored. this slim corridor, the sliver of flat land not occupied by train tracks ranges from twenty feet to as little as Slag Point, which is a narrow manmade spit of 5 feet. The challenge is to devise an affordable way land that juts out almost one half mile into the to build a safe and enjoyable trail in this small area. River, is situated midway along Segment 3 and If that challenge can be surmounted, Segment has the potential to be a new water access 1 provides a unique opportunity to give users an site and/or open park space. Slag Point is experience very close to the river. slated to become a Contained Disposal Facility Figure1.13 Segment 1 Existing Conditions (CDF) as part of the
24 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL TO Existing DOWNTOWN Trailhead START Lake Superior Grassy Point Zoo
I-35W Spirit Mountain Recreation Indian Point Campground Segment 1 Start Spirit Landing
Segment 2 Start Clough Island Magney-Snively TO CLOQUET Natural Area Munger Landing Segment 3 Start Slag Point
EPA Segment 4 Start Clean Up LEGEND US Steel EXISTING LAKE Jay Cooke r Boathouse Point Site e SUPERIOR MISSISSIPPI State Park MIssion Creek Segment 5 Start iv R RAILROAD TOURIST is Trail System u LINE Lo Segment 6 Start t. EXISTING WESTERN Segment 7 Start S END WATERFRONT TRAIL Mud EXTENTS Lake PROJECT LIMITS
Chambers Grove 0’ 2000’ 4000’ 8000’ Park Perch Lake Landing Boy Scout Landing
Figure1.14 Overall Project Limits
2000' 4000'
MINI-MASTER PLAN | DULUTH PARKS 25 EPA’s clean-up efforts. CDF’s at superfund sites a recreational easement. The trail alignment on the have historically been designed for greenfield re- top of the bluff would provide stunning views to the use, providing open green space that adds value river and nearby landmarks and rich opportunities to a community adjacent to historical industrial for cultural interpretation. It would be a highlight waste. Greenfields are successful recreational re- of the trail. use models. Segment 5: East McCuen Street to This segment provides many opportunities for Boy Scout Landing view corridors to Spirit Lake as well as cultural and The 0.7-mile Segment 5 connects Mud Lake to Boy historical interpretation along a unique stretch of Scout Landing skirting the southern periphery of land. the Gary New Duluth neighborhood. A narrow Figure1.15 Segment 2 Existing Conditions Segment 4: Boathouse Point rail causeway with wetlands on either side bisects much of this area. It is too narrow to to East McCuen Street accommodate a rail with trail. An alternative is The 1.5 mile segment 4 extends from an upland to follow the base of a sloped hill to Boy Scout peninsula known as Boathouse Point along the Landing. Existing conditions along this segment shore of Mud Lake to McCuen Street in the Gary include wetlands and steep slopes that will pose New Duluth neighborhood. Owned by US Steel, engineering, cost, and regulatory challenges. Boathouse Point could be acquired for public use Views of the river from Segment 5 are limited. and unobtrusively improved as a nature-based Boy Scout Landing is already a public access park featuring mature forestland and views of location used by motorized and non-motorized Spirit Lake and Spirit Island. recreationists, and recently had site improvements Figure1.16 Segment 3 Existing Conditions Segment 4 poses the trail development challenge installed by the DNR, including portable toilets, of constructing an appealing and affordable trail trailer parking, and an improved fishing pier. This from the north shore of Mud Lake to the south riverfront location offers opportunity to build on shore. The rail causeway that bisects Mud Lake the existing amenities for a larger multi-use group. is too narrow to accommodate affordable trail Enhancements could include designated trailhead construction. The shore of Mud Lake and the bluff parking, as well as a separated, non-motorized above are potential alignments but neither will be watercraft launching area. available for trail development unless and until US Steel completes contaminant clean-up and agrees to sell the undevelopable periphery of their property to serve as public green space or provides
Figure1.17 Segment 4 Existing Conditions
26 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Segment 7: Perch Lake to Chambers Grove Park The last segment of the Trail spans from Perch Lake landing to Chambers Grove Park and a portion of the trail will be constructed by MnDOT as part of the Trunk Highway 23 roadway improvements project. The waterfront is mostly privately owned within Segment 7. Site constraints will need to be addressed, including private land ownership crossing (just west of Perch Lake) or to alternately consider a roadway crossing to the north side of Figure1.18 Segment 5 Existing Conditions Highway 23. Other considerations include wetland impacts adjacent to Highway 23 as well as public safety along the road corridor. Figure1.19 Segment 4 Existing Conditions from US Steel Perch Lake, located on the north side of Highway 23, Segment 6: Boy Scout Landing to Perch Lake is the location of a DNR for restoration alternatives study. The City will work in partnership with the The City-owned rail line currently ends at Boy DNR to further opportunities for public recreation Scout Landing, however the railroad used to run all and water access as part of the future restoration the way to Jay Cooke State Park, so there is an old efforts. On the riverside of Perch Lake, the City remnant corridor cleared of mature trees within already has an existing parking lot with modest Segment 6. The old corridor consists of a dirt trail, amenities. There is once again, an opportunity to Figure1.20 Segment 6 Existing Conditions which is primarily flat and very close to the water’s enhance this existing riverfront site to become a edge, providing good access and an intimate more robust trailhead location providing additional experience with this section of the river. Property parking, portable toilet, a picnic shelter/overlook ownership will not pose a concern unless the trail and possibly a better non-motorized watercraft alignment moves inland closer to Highway 23. launch.
Figure1.21 Segment 7 Trail Terminus at Chambers Grove Park
MINI-MASTER PLAN | DULUTH PARKS 27 Precedents
Rail and Trail Heritage Rail Trail County Park and As part of the study, the Maryland’s Torrey C. Brown Rail Trail design team looked at other Maryland and Pennsylvania community models across the nation where trails have been • 44.4 miles combined successfully implemented • Crushed stone and dirt directly adjacent to a railroad • Walking, biking, horseback riding, alignment. In our case, the x-country skiing design team looked for Great Allegheny Passage excursion rail operations Maryland and Pennsylvania with limited speeds. The four • 150 miles examples shown to the right • Asphalt, crushed limestone share similar conditions with the Trail corridor varying from • Biking, horseback riding, skiing, fishing, walking natural surfacing materials, landscape type, anticipated Santa Fe Rail Trail trail width and length, as well New Mexico as potential shoreline and causeway conditions. • 17 miles • Asphalt and dirt Many of these precedent sites • Horseback riding, mountain biking, combine the rail and trail walking opportunities to offer multiple recreational and tourism attractions. Astoria River Walk Oregon • 17 miles • Asphalt, dirt and boardwalk • Horseback riding, mountain biking, walking
28 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Rail to Trail Vermont’s Island Line Vermont The design team also • 14 miles, 3.5 of which are a causeway examined rail to trail over water conversion projects where • Asphalt and gravel existing inactive rail • Biking, inline skating, fishing, walking, lines were removed and x-country skiing converted over to a shared- use pathway. Rail to trail Elroy Sparta State Bike Trail conversions are considered a Wisconsin sustainable practice and an • 32 miles acceptable re-use of land. • Crushed stone • Hiking, jogging, x-country skiing, snowmobile,
Utah’s Historic Union Pacific Rail Trail State Park Utah • 28 miles • Crushed stone and asphalt • Hiking, biking, x-country skiing
Kansas’ Prairie Spirit Trail Kansas • 51 miles • Compacted, crushed limestone • Biking, hiking, x-country skiing
MINI-MASTER PLAN | DULUTH PARKS 29 Figure1.22 Existing conditions images: (Top Row: Before 2016 improvements, Bottom Rows: After 2016 improvements)
30 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL MINI-MASTER PLAN | DULUTH PARKS 31 32 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL WAABIZHESHIKANA | THE MARTEN TRAIL 04 COMMUNITY ENGAGEMENT Community Engagement History of the Planning Effort Public Involvement The vision for a riverfront trail system originated In 2014, the trail extension was identified as one of The City has conducted an intensive and meaningful with the 1979 City Plan. While the master plan was the backbone projects of the larger St. Louis River public planning process including six stakeholder not formally revisited until August 2016, discussions Corridor Initiative, creating connectivity between advisory committee meetings, two public about better connectivity to the river for residents recreational areas and the neighborhoods along meetings, an online survey, a randomly sampled and visitors has been a topic of every St. Louis River the river, which are currently isolated from one survey of the 5th district, and several supporting Corridor planning process in the last thirty years. another with their only connection being the studies of cultural resources, environmental Minnesota State Highway 23. resources, rail infrastructure, rail business planning, After experiencing multiple economic downturns, trail alignment and design. the hope to reconnect people to the river was As part of the larger St. Louis River Corridor always present in community conversations. This Initiative, the City reopened the conversation of desired connection was referred to in the following what a completed trail would look like, and how it City planning documents: would serve the community. • 2015 Riverside Small Area Plan • 2013 Gary New-Duluth Small Area Plan • 2012 Morgan Park Neighborhood Revitalization Plan • 2011 Duluth Trails and Bikeway Master Plan • 2010 Parks and Recreation Plan
Figure1.24 Stakeholder Workshop, October 2016 Figure1.23 Word Cloud Summary based on Stakeholder Input Figure1.25 Stakeholder Workshop, January 2017
34 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL 39-member Stakeholder Committee Community engagement efforts were uniquely 4. Initial trail extension and rail options LSMR Specific Meetings diverse and widespread. The City convened a • November 9, 2016 - Review of AMI Engineers group of stakeholders made up of regulatory 5. Exploring further – River-friendly with upland Report agencies, business owners, community/ trail, rail-to-trail conversion and full rail-and neighborhood leaders, elected officials, City staff, trail • January 20, 2017 - LSMR Business Plan Meeting and environmental and recreation groups. * The stakeholder group re-convened on August • May 5, 2017 - Federal Railroad Administration 29, 2019 for a sixth and final meeting to discuss A series of five, 3-hour Stakeholder Committee Site Visit meetings occurred from September 2016 to and review recommendations for implementation January 2017 and focused on: of the Plan. • July 17, 2017 - LSMR Operations 1. Interpretation and branding to better reflect The City of Duluth also met with the non-profit • October 6, 2017 - Mud Lake Restoration Plan the heritage of the river corridor organization, Lake Superior Mississippi Railroad Overview (LSMR), the current lease-holder of the City-owned • August 26, 2019 - Rail & Trail Direction 2. Riverfront green spaces – Slag Point and Spirit railroad corridor, a total of six times to discuss Landing components of the trail work. 3. St. Louis River access and put-in sites – Munger Landing, Boy Scout Landing, and Perch Lake Landing
Figure1.26 Stakeholder Workshop at Morgan Park Community Center
MINI-MASTER PLAN | DULUTH PARKS 35 Natural Resource Management Group January 19, 2017 - Natural Resource overview of Updates and Tabling City-owned river corridor August 25, 2016 US Steel Superfund Site- Minnesota August 11, 2017 - Mud Lake Restoration half-day Pollution Controls Agency Open House workshop Presentations to Parks & Recreation September 22, 2017 - Mud Lake Restoration Commission: Concept Plan working meeting • June 14, 2017
Natural Resource Technical Advisors: • October 10, 2017 • Desirae Hendrickson, DNR • November 8, 2017 • John Lindgren, DNR • December 13, 2017 • Melissa Sjolund, DNR • July 10, 2019 • Jeremy Tinkerton, DNR • August 14, 2019
• Joel Hoffman, EPA • September 11, 2019 Figure1.29 Sample Question from Online Survey • Daryl Peterson, MN Land Trust • November 12, 2019 • Rick Gitar, Fond du Lac Band of Lake Superior Chippewa • Nancy Schuldt, Fond du Lac Band of Lake Superior Chippewa • Erin Endsley, MPCA • Dan Breneman, MPCA • Dave Warburton, USFWS
Figure1.27 Stakeholder Workshop, January 2017 Figure1.28 City Presentation, January 2017
36 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Public Meetings Mud Lake Causeway Alternatives Analysis Two public meetings were held during the In order to analyze the feasibility and potential planning process. The first was held on November effects of various alternative designs for the Mud 15, 2016 and attended by approximately 60 people. Lake section, a team of natural resource managers, At the first meeting the City shared the scope of ecologists, and biologist associated with the AOC, the Plan, and options currently being studied by examined five conceptual restoration alternatives. the design team. The second meeting was held The Minnesota Department of Natural Resources on June 13, 2017. Nearly 100 people attended the (DNR) and the US Environmental Protection meeting where City staff shared the recommended Agency Mid-Continent Ecology Division led the trail extension alignment and other riverfront process. The alternatives compared habitat and improvements. human service metrics to evaluate the benefits and trade-offs between the options. The studied Online Survey alternatives were based on designs established The City administered a voluntary online survey Figure1.30 City staff site tour, September 2016 over the past several years, including the 2017 from January 9th-26th, 2017. It featured 29 Mud Lake Restoration Plan, focused on restoring questions and had 988 responses. The survey was habitat function and values at Mud Lake. An All- developed by LHB and administered through the Commission Mud Lake Workshop was also held City of Duluth’s website. The findings from the on May 30, 2019. The results helped inform the survey helped direct the development of the Plan recommendations found later in this Plan. A recommendations. detailed summary of the study can be found in the Randomly sampled survey of the 5th District Appendix. of Duluth Ground Truth Process Telephone interviews were conducted with 440 Duluth planning staff and the design team led a adult residents of Council District 5, Precincts 28 ground truthing process to identify and confirm – 34 in Duluth, Minnesota completed between various trail segment feasibilities. Over a dozen on- February 3 and February 5, 2017. The survey was sight visits took place during the process. The City developed and administered by Zenith Research also sought additional technical assistance from Group. consultants for portions of the trail along Segment 1 and Segment 2. The consultant findings were used to further study alignment and cost options Figure1.31 City staff site tour, January 2017 in particularly difficult areas.
MINI-MASTER PLAN | DULUTH PARKS 37 38 WAABIZHESHIKANA | THE MARTEN TRAIL 05 MASTER PLAN DEVELOPMENT Master Plan Development
Unique Features of the Region Chapter Overview: Trail Interpretation Plan • Cultural importance to Anishinabe people. This chapter is intended to give an overview As part of the stakeholder workshop and public of planning and site programming, typical input process, the design team gathered valuable • Birding and fishing along the river. information on trail character definition and future trail development and design standards, • Connection to Lake Superior as the interpretation ideas. This Plan recommends preliminary cost comparisons, and a results headwaters and Great Lakes. summary from the public involvement. that the City conduct a future interpretation planning process to clearly define the specific • Northern port cities - unique with both details of interpretation along the Trail and Minnesota and Wisconsin border. Based on original project goals, as well as linear park expansion project. The process • Geographical significance of Sawtooth stakeholder and public input, the development will bring together stakeholders to develop Mountains/Canadian Shield. of preliminary concepts and design strives to significant common themes and to determine accomplish the following: how best to implement them. The following pages • Duluth watersheds: streams, tributaries, and • Extend and improve the Western Waterfront include ideal qualities and characteristics that wetlands. Trail as cited in the 1979 City Plan. the community would like to see incorporated into the future Trail and are helpful in the early Key Stories to Celebrate • Re-brand the Western Waterfront Trail as a formulation of the Plan. heritage trail that celebrates and interprets • The river is the largest US tributary to Lake the rich culture and natural heritage of the Superior and the estuary is the largest corridor. Heritage freshwater estuary in the USA. • Develop potential new linear park and river What does heritage mean to you? ? • Urban development and how it has affected access sites at key locations. the river, flooding and damming. • Develop potential new non-motorized, Lineage: connection through time • Ancestral and contemporary stories of the watercraft launches at Munger Landing, Boy Change over time: from indigenous land use indigenous people. Scout Landing, and Perch Lake. to heavy industrial to present • Industrial development: railroads, ship • Decide the future use of the City-owned Values and customs of the past building industry, and US Steel beginnings. riverfront. Valued objects and qualities that • Fishing; the revival of sturgeon and • Create synergy between the Water Trail, the have been passed down from previous whitefish. Trail, and the City-owned rail. generations • The forest and vegetative changes, including significance of wild rice.
40 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL • Feature area as a hub, a crossroads, historically against the numerous attacks of the fierce Dakotas, and for the future as well. Honoring the Heritage whose villages were but two days’ march toward the • Use recreation as a catalyst - has the power to of the Area south on the St. Croix River, and the west, at Sandy bring people together. Lake.” The City of Duluth partnered with the Fond • One river, many stories. du Lac Band of Lake Superior Chippewa to The proposed Trail intersects historic trails along determine a dual-name for the Trail. the river. The Ojibway made use of existing • Establishment of borough-type portages and trails in the area so the name neighborhoods, company towns, nestled into “Waabizheshikana” Waabizheshikana (Marten trail) is meant to the landscape. honor the Marten clan for their establishment • Investments in restoration of aquatic habitat The Marten Trail of a foothold on the estuary, as well as for the and remediation of contaminated sediments. leadership of the hereditary chiefs from the Marten clan as they guided the path of the Fond Strategies for Implementation Significance of The Marten Clan du Lac people through interactions with fur traders and the US Government in treaty making. • Focus interpretation at specific and key The significance of the Waabizheshikana naming locations. comes from the second edition of “History of • Have a variety of interpretation features, the Ojibway People” by William W. Warren. In the varying from traditional story-telling panels, book, the author states: scenic overlooks for personal reflection, to Interpreting the Trail local public art and living history. “Soon after the above occurrence, the Ojibways pressed up the lake shore, and Wa-me-gis-ug-o, a The City is initiating a separate interpretation • Include a wide span of interpretive themes, daring and fearless hunter, obtained a firm footing plan to develop the narrative themes and ranging from the ecological richness of and pitched his wigwam permanently at Fond du implementation of story-telling along the Trail. the estuary, history of the railroad, spiritual Lac, or Wi-a-quah-ke-che-gume-eng. He belonged significance of certain namesakes to present to the Marten Totem family, and the present clean-up efforts. respected chiefs of that now important village, Shin- • Emphasis on celebrating Anishinabe history goob and Nug-aun-ub, are his direct descendants. - recognizing the Anishinabe people are Many families of his people followed the example still living here, practicing traditions and of this pioneer, and erecting their wigwams on the reinvigorating language and culture. islands of the St. Louis River, near its outlet into the lake, for greater security, they manfully held out
MINI-MASTER PLAN | DULUTH PARKS 41 Rail traffic on spurs (which serve the last segment to freight destinations), shortline railroads (which shuttle freight from mainline railroads to custom- ers), and other operations such as excursion trains generally operate at lower speeds, with fewer cars and lighter engines. Some operations work with Accessibility flaggers and other personnel to clear the way and control traffic. Providing an accessible route that meets ADA • The trail will be 8 feet wide with 1 foot Per the Manual on Traffic Control Devices (MUTCD): accessibility guidelines for all users along the Trail shouldersThe absolute for a total minimum width clearancesof 10 feet tobetween match rail-The dynamic envelope is the clearance required road rolling stock and trackside obstacles is re- is a primary goal for the City. An accessible route for the train and its cargo overhang due to any existingferred segments to as the of dynamic the trail. envelope of the train. is defined as a pathway specifically designed to These dimensions define the relevant clearancescombination of loading, lateral motion, or suspension provide access for individuals with disabilities, • The City will meet the accessibility standards failure, including the area swept by a turning train. as setto fixedforth in objectsthe ADA/ABA (Figure accessibility 8) and provide reference Figure 8. Some segments of the existing Western Waterfront including those using wheelchairs or mobility Trail are soft-surface pathways. standardsfor how for people recreational and movable trails. objects (see may occupy devices. Although detailed grading design has the right-of-way. The dynamic envelope is not a set Accessibility Section for details) not occurred yet for the trail segments, the City is nationwide dimension (Figure 9), referring instead committed to making all trail segments and public • Thisto plan specific will notrolling recommend stock and alignments. the installation access sites accessible, if at all feasible. Should of lightingThe dynamic along envelope the trail. of Lighting the LSMR at can be seen in existing terrain and site constraints prevent a trailheadsFigure 10, and based parking on field areas willmeasurements be site of rolling 5% minimum slope to occur, the City will then specificstock. Additionaland the necessity clearance for is such necessary lighting to accom- adhere to ABA universal design standards for trail determinedmodate the through sweep finalof the sitevehicles design in curves.on a A dy- routes, allowing an 8.3% slope to occur for short case-by-casenamic envelope basis. of 9 feet (4’6” from the centerline) distances. The City will continue to collaborate is assumed for this report. with local accessibility partners, such as Wheels • The trail will be open to pedestrians, bicyclists, on Trails and the Commission on Disabilities, for cross country skiers, and snowshoers. further input on accessibility implementation • The trail will not be open to equestrians strategies. or motorized vehicles. (ATV’s, motorbikes, Figure 9. Dynamic enelope delineation (MUTCD Note: there snowmobiles, etc.) are no dimensions given in MUTCD) Dynamic Envelope Image by ALTA Planning + Design, Inc Trail Design Standards • Public access to the St. Louis River will be supported and encouraged at designated Design standards were developed with user safety, locations only. environmental protection, universal access, cost, • Screening of the trail from adjacent private and maintenance in mind. Those design standards residents may be necessary. Location of are as follows: screening, type and extent will be determined • The trail will be surfaced with a crushed stone during the design process and coordination material that meets accessibility requirements with homeowners. of “firm and stable”. (Preferably limestone to match existing trail condition).
Figure 10. The width of the LSMR rolling stock is 9’ wide, typi- cal of most railroads
42 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL
Western Waterfront Trail, Duluth Minnesota 3 September 13, 2019 Spring Street to Clyde Avenue Rail-with-Trail Alta Planning + Design Tight to Shoreline Condition Trail Segments 1 and 3 may only be located in a • There is infrequent use of the rail line with the 6. The width of the trail may be reduced to as narrow corridor of land between the active Lake train in operation less than 2% of the hours in little as 5.5 feet provided that the train comes Superior and Mississippi Railroad track and the a year. to a complete stop before such sections and estuary. To guide trail design in these “tight to sends out a flag person to ensure the safety of shoreline conditions”, the team developed a set In this context, the design team, in consultation any trail users. of rail-with-trail design standards intended to with the Lake Superior and Mississippi Railroad, 7. No fixed object, structure, bridge or tunnel balance the following goals: developed the following rail-with-trail design standards for Segments 1 and 3: may be within 8.5 feet from the centerline of 1. Retaining the rail line. the track . 1. Strive to locate the trail 15 feet from the 2. Limiting trail construction costs to what the centerline of the railroad track whenever The lease agreement between the City of Duluth City can realistically afford. funding and regulatory restrictions permit. and the Lake Superior and Mississippi Railroad will be amended to incorporate requirements under 3. Foster access to and enjoyment of the public 2. Unless site-specific circumstances dictate the described circumstance to reduce speed, stop, riverfront. otherwise, do not place fencing or plantings send out a flag person, and/or take other unusual between the rail and the trail. 4. Limit disruption to the excursion rail line measures to ensure the safety of trail users. operations. 3. Strive to maintain a trail width of 8 feet with 1 foot shoulders whenever funding and 5. Protect the safety of trail users. regulatory restrictions permit. Where the “tight to shoreline conditions” occur, 4. When necessary to make trail construction the City and LSMR are able to modify operations possible, the separation between rail line that significantly mitigate safety concerns due to and trail may be reduced to as little as 8.5 the following unique circumstances: feet, measured from the centerline of the rail, • The trail and rail line are owned by the City of without mandating reduced speed limits or Duluth. unusual rail line safety procedures. • The nonprofit railroad operator has agreed to 5. When necessary to make trail construction reduce speed as necessary to ensure safety possible, the trail separation may be reduced when trail users are present. They are willing to 4.5 feet, measured from the centerline of to stop the train altogether and send out a the rail line. This is the minimum clearance flag person to clear the line. necessary for the engine and cars from the edge of the trail.
MINI-MASTER PLAN | DULUTH PARKS 43 Design Considerations - Cultural Resources • Keep sites wild with natural feel. Site Culturally sensitive lands furnishings and materials should be made out The City acknowledges there is a rich history and of natural, local materials. ever-present connection between the river and indigenous people of this region. As we proceed • Parking. Include additional or small parking into the design phase of the Trail and water lots at trailheads for five or more vehicles. access improvements, the City will work with the • Space for shuttles/large trailers. Drop off affiliated tribes to identify potentially cultural area close to water is ideal, with long-term sensitive areas and work together to determine parking further away if space is limited. the level of examination necessary to proceed with new recreational facilities. • Multi-use gathering space. Provide outdoor area with shade for family groups, educational Programming for Public Access and programming, etc. Linear Park Sites • Accessible non-motorized boat launches. In addition to interpretative ideas, the See page 46 for examples. stakeholders and general public provided • Toilet facilities and/or changing enclosure. feedback on how they envisioned the trail, linear Include at least two stalls and one for family/ park, and public access sites to look and feel. The group changing. Permanent versus portable design team facilitated several group exercises to be determined based on site constraints, that addressed site programming and user budget, and long-term maintenance. experience. Recommendations include: • Staging area for larger groups (outfitting/ education). With implementation of water • True multi-use trail and nature paths. Meet trail, a flat staging area for outfitting and trek the needs of a variety of users. Incorporate preparation will be critical. loops or spurs that provide different experiences, if possible. • Temporary concessions. To be used for Figure1.32 Typical trail sections illustrating spatial dimensions seasonal events, such as fishing opener, • Points of interest with interpretative race tournaments, festivals. Coordination signage. Design a natural winding trail with with utilities and City rental to be further key scenic overlooks creating upland views, programmed. along with river’s edge experience.
44 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL • Ecological interpretation. Tell the story • Sheltered bays for beginner paddlers. With of the area’s flora and fauna through visual the anticipated increase in the Water Trail use, interpretative panels. designate sheltered areas near access sites for beginner paddlers. • Pollinator/restoration plantings. Where invasive species are problematic, restore with • Create opportunities for rail-trail-water native pollinator plantings for increased bio- experiences. Encourage LSMR and outfitters diversity. Feature stormwater management to work together to provide a unique Duluth best practices as well. experience. • Formal seating. Benches, picnic tables, council ring, seat boulders. Provide trail users with a variety of seating options, benches along the trail, and tables for picnicking in both sun and shade. • Field/open lawn space. Open green space is limited in the St. Louis River Corridor. Provide a field or informal lawn space where spontaneous recreation could occur (frisbee, playing catch, walking dogs).
• Fishing piers/docks. With the rebound of Figure1.33 Exploring Trail Options Charrette healthy fish habitat, fishing is more popular than ever. • Swimming beach. Very little opportunity to swim in western Duluth. If sandy shoreline allows, designate small beach area for swimming (no lifeguard on duty).
MINI-MASTER PLAN | DULUTH PARKS 45 Design Best Practices for Water Access Sites Best Practices* For accessibility During the stakeholder and public meetings, • Accessible to all paddlers: slopes should not many examples of accessible launch types were exceed 8.33%. explored and discussed. To the right is a summary of best practices and launch types that the • Between nine inches and two-feet from Plan will be implementing. highest expected water level, at least five-feet wide, preferably six to twelve feet; at least 25 feet in length. • Handrails or other support structures are helpful. • Located in areas without heavy flow, erosion, exposure to elements, heavy boat traffic or fragile riparian habitats .
For best-suited launch type • Choose most suitable type of launch for water body, climate and ecological factors.
To be cost effective and durable • Existing natural sites are preferable, though not always durable and require reinforcement over time.
To be environmentally friendly • Low impact design and non-toxic materials protect water quality, vegetation, and riparian habitats.
*National Park Service Report, ‘Long Lasting Launches,’ 2004
46 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Planning Process Results • More than 30% of respondents have never used • Trailhead amenities ranked the highest for The following is a summary of what we heard one of the existing river public access points. improvements that would add greatest value to from the general public through the community the trail experience. engagement process as well from technical design • Over 70% of respondents prefer walking as analyses. Design decisions were made based on a primary activity on the trail followed by bird • Winter recreation opportunities and community the findings. watching at 36%. festivals and events ranked highest as park and trail activities were the activities of greatest • The majority of respondents prefer to honor and What We Heard... interest to respondents.. celebrate the St. Louis River Estuary, its natural The City conducted two surveys: a randomly resources, and local ecology as a primary features. 4. PRIORITY IMPROVEMENT PREFERENCES (Online Survey) sampled phone survey administered only to 2. VALUES (Online Survey) residents of far western Duluth, and an online • Kayak and canoe put-in sites ranked highest • Nearly 75% of respondents value the scenic convenience survey that anyone could complete. for Spirit Landing and Munger Landing site enjoyment of the surrounding landscape as a The objectives of the surveys were to invite improvements followed by trailhead amenities. participation and define priorities of the Trail, primary feature of the current rail experience. linear park and public access sites, including • Kayak and canoe put-in sites ranked highest for • Respondents prioritized the guiding principles determining existing use and activity type Boy Scout Landing site improvements closely in the following order: along the corridor, identifying the current rail followed by ticketing and boarding for rail experience values, distinguishing unique and 1st - Unique Duluth experience operations and trailhead amenities. culturally significant features to celebrate, and 2nd- Environmentally sustainable • Kayak and canoe put-in sites ranked highest for determining priority site improvements preferred 3rd - Community connection Perch Lake site improvements closely followed by at each access point. The online survey had 988 4th - Equitable experience picnic shelter/overlook area. respondents, while the randomly selected survey 5th - Technically & economically feasible polled 444 residents from the 5th District of 6th - Promote economic development • Kayak and canoe put-in sites ranked highest for Duluth. Slag Point site improvements closely followed 3. ELEMENTS/FEATURES/ACTIVITIES historic and natural resource interpretation and Online Survey (Online Survey) restore shoreline with shore fishing. Results are categorized into four topic areas: • Public access to the river shoreline, historic and 1. USE (Online Survey) natural resource implementation, and signage and wayfinding ranked as the highest priority trail • More than 50% of respondents stated that their elements. use of the existing trail was limited to once a month to once a year. • Public space, parking, and picnic area ranked the highest as adjacent priority trail features for • 40% of respondents use the existing LSMR implementation. excursion train once a year.
MINI-MASTER PLAN | DULUTH PARKS 47 Randomly Sampled Phone Survey of Far Rail or Trail Preferences Western Duluth Survey Question 6: “As one option, the City has been seeking to find a way to extend the trail without VALUES & USES GUIDING PRINCIPLES having to remove the City-owned rail line between (Randomly Sampled Phone Survey) (Randomly Sampled Phone Survey) Smithville and Gary/New Duluth that is used by RAIL When asked to prioritize the guiding principles, the Lake Superior and Mississippi Railroad for their respondents were more likely to support options seasonal passenger train trips. If, for any reason, • 46% of all respondents identified the LSMR as to develop a plan that is: extending the trail while keeping the railroad proves being somewhat important to them. not to be feasible, the City may have to choose one of 1. Environmentally sustainable. • 61% of all respondents said the LSMR was of the other – rail or trail”. importance to the entire community. 2. Technically & economically feasible. NO RESPONSE TRAIL RAIL • 11% of all respondents use the rail at least four 3. Creating an accessible riverfront for as many PREFERENCE times per year. people as possible regardless of income and OVERALL physical ability. 54% 32% 14% • Rail runs weekends June through October. PERCENT 4. Develop a plan that preserves historically TRAIL 55807 52% 31% 17% significant resources. • 64% of all respondents considered the Western 55808 59% 31% 10% Waterfront Trail important to them personally. • 74% of all respondents said the Western Waterfront Trail was important to the entire community. • 48% of all respondents use the existing trail at least four times per year. • Existing trail is open year-round. • 83% of the respondents were supportive of extending the trail.
48 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL Trail Cost Estimates The cost estimates are based on the design What We Discovered... Accessible public access to the river will be further team’s trail construction experience, professional met by improving three existing water access sites, qualifications, and knowledge of the site. The City of Duluth chose to site the Trail on and developing three additional public access Estimates for Segment 3 and 7 should be each segment as close to the shoreline as sites along the river’s edge. These sites dually considered preliminary. Estimates for the re- environmental protection standards, trail serve visitors who are recreating on the trail and route of the existing Trail and Segments One construction costs, and preservation of the rail line on the water and provide important trailhead and Two are based on an additional stage of site would permit. In practice, that meant siting the amenities that enhance the user experience. examination and predesign work. Trail right along the water on Segments 1, 3, and 6 and further from the water on Segments 2, 4, 5, Assumptions in determining opinion of cost and 7. included: Decisions Made based on Findings... 1. Contingencies are included as provisions to cover unforeseen circumstances that would affect After thorough study and investigation into the overall construction costs. potential trail alignments, the City of Duluth will proceed with a trail with rail condition. The 2. Estimates do not include costs for survey, decision is grounded in the Guiding Principles engineering design, environmental analysis, set forth at the beginning of the planning permitting, or construction administration/site process. The Guiding Principles provided a lens observation. to study potential impacts of each trail alignment 3. Topographic survey and geotechnical option and work to achieve balance amongst information were not available at the time of the community values. The City used this framework estimates. when engaging stakeholders and subject-experts in compiling and studying data to inform the 4. Sensitive area impacts refers to impacts to decision-making process. Upon review of all data wetlands or riverbank. These areas will require and community feedback, the City determined exhaustive permitting and may require mitigation, that a trail alignment with preservation of the full special plantings, slope stabilization, etc. rail provides the greatest amount of public access to the river and accessible user options, while still 5. Significant drainage crossings refer to culverts honoring the cultural and environmental values of or pedestrian bridges to provide crossing of the community. drainage ways. Minor drainage modifications are included in LIN FT unit prices.
MINI-MASTER PLAN | DULUTH PARKS 49 50 WAABIZHESHIKANA | THE MARTEN TRAIL: A RIVER HERITAGE TRAIL WAABIZHESHIKANA | THE MARTEN TRAIL 06 IMPLEMENTATION AND SUSTAINABILITY Recommendations Overall Trail and Park Recommendations Implementation and Phasing Management and Operations The following chapter illustrates trail and park This master plan serves as a framework to which It is anticipated that the City of Duluth Parks will recommendations and preliminary opinions of future park and trail development can be forecasted be the primary operator and manager for the cost based on the project’s guiding principles, and planned. As funding becomes available and Trail. Further work will need to occur with the community input, and design decisions that came partnerships are formed, trail segments and public Parks Commission and City Council to establish out of the master planning process. access amenities will be designed, constructed, an ongoing annual budget and reserve operating and implemented. Below is an implementation funds for park amenities and trail maintenance. Next steps of the project will include further site timeline that illustrates anticipated phasing for the and trail detailed design, additional technical Maintenance activities for the public access, park full realization of the Plan. studies, securing funding, land acquisitions and amenities and Trail will include but are not limited to easements, as well as developing an operations Land Acquisition and Easements mowing, invasive weed removal, parking lot snow and management plan for long term maintenance removal, trash removal, tree clearing, trail repair, Although the City owns most of the land within the and life-cycle assessment of the linear parks and bridge/culvert repair, sign and site furnishings project limits, they will need to secure easements trail system. maintenance. or acquire land for a portion of Segment 4 and easements from private property owners for Refer to page 75 for a detailed maintenance plan. Segments 6 and 7.