Etsi Tr 103 545 V1.1.1 (2018-08)
Total Page:16
File Type:pdf, Size:1020Kb
ETSI TR 103 545 V1.1.1 (2018-08) TECHNICAL REPORT SmartM2M; Pilot test definition and guidelines for testing cooperation between oneM2M and Ag equipment standards 2 ETSI TR 103 545 V1.1.1 (2018-08) Reference DTR/SmartM2M-103545 Keywords alarm, ITS, M2M, oneM2M ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N° 348 623 562 00017 - NAF 742 C Association à but non lucratif enregistrée à la Sous-Préfecture de Grasse (06) N° 7803/88 Important notice The present document can be downloaded from: http://www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the present document, please send your comment to one of the following services: https://portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. © ETSI 2018. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTM and the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GPPTM and LTETM are trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo is protected for the benefit of its Members. GSM® and the GSM logo are trademarks registered and owned by the GSM Association. ETSI 3 ETSI TR 103 545 V1.1.1 (2018-08) Contents Intellectual Property Rights ................................................................................................................................ 5 Foreword ............................................................................................................................................................. 5 Modal verbs terminology .................................................................................................................................... 5 Executive summary ............................................................................................................................................ 5 1 Scope ........................................................................................................................................................ 7 2 References ................................................................................................................................................ 7 2.1 Normative references ......................................................................................................................................... 7 2.2 Informative references ........................................................................................................................................ 7 3 Definitions and abbreviations ................................................................................................................... 8 3.1 Definitions .......................................................................................................................................................... 8 3.2 Abbreviations ..................................................................................................................................................... 8 4 Global Overview .................................................................................................................................... 10 4.1 Rationale........................................................................................................................................................... 10 4.2 Objective .......................................................................................................................................................... 11 5 Scenario definition and collection of requirements ................................................................................ 11 5.1 Detection of slow agriculture or forestry equipment on the road ..................................................................... 11 5.1.1 Description .................................................................................................................................................. 11 5.1.2 Actors .......................................................................................................................................................... 12 5.1.3 Pre-conditions ............................................................................................................................................. 13 5.1.4 Triggers ....................................................................................................................................................... 13 5.1.5 Normal Flow ............................................................................................................................................... 13 5.1.6 Alternative flows ........................................................................................................................................ 14 5.1.6.1 Alternative flow 1: Safety issue is detected by the agriculture or forestry equipment .......................... 14 5.1.6.2 Alternative flow 2: Infrastructure equipment is involved in the alert ................................................... 15 5.1.7 Post-conditions ........................................................................................................................................... 15 5.1.8 High Level Illustration ................................................................................................................................ 16 5.2 Potential requirements ...................................................................................................................................... 16 5.2.1 ITS messages main parameters ................................................................................................................... 16 5.2.2 Scenario requirements for the pilot test ...................................................................................................... 17 5.2.3 Potential requirements for a M2M system .................................................................................................. 18 6 Test definition and guidelines ................................................................................................................ 18 6.1 Overview .......................................................................................................................................................... 18 6.2 Data model ....................................................................................................................................................... 19 6.2.1 Parameters for the data model..................................................................................................................... 19 6.2.2 Functional Architecture .............................................................................................................................. 21 6.2.3 Data model files .......................................................................................................................................... 23 6.2.4 Semantic model .......................................................................................................................................... 24 6.3 Protocols and interfaces .................................................................................................................................... 26 6.4 Data management for the exchange of information ......................................................................................... 27 6.5 Security of connectivity and data ..................................................................................................................... 40 6.6 Guidelines for the implementation of the pilot test and parametrization .......................................................... 41 6.6.1 Test Setup ................................................................................................................................................... 41 6.6.2 Triggering conditions .................................................................................................................................. 42 6.6.3 Configuration and common parameters ...................................................................................................... 43 6.6.3.1 OneM2M system configuration ............................................................................................................ 43 6.6.3.2 C-ITS sub-system configuration ..........................................................................................................