Stormwater Management

Total Page:16

File Type:pdf, Size:1020Kb

Stormwater Management City of Alexandria, VA Proposed FY 2021 - FY 2030 Capital Improvement Program STORMWATER MANAGEMENT Stormwater Management Page 15.1 City of Alexandria, VA Proposed FY 2021 - FY 2030 Capital Improvement Program Note: Projects with a $0 total funding are active capital projects funded in prior CIP's that do not require additional resources. FY 2020 and FY 2021 - Before FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2030 Stormwater Management Cameron Station Pond Retrofit 4,681,8850000000000 0 City Facilities Stormwater Best Management Practices (BMPs) 1,633,0000000000000 0 Four Mile Run Channel Maintenance 3,293,000 0 0 936,60000001,251,300 4,177,000 0 6,364,900 Green Infrastructure 1,850,000 206,500 210,000 0 1,549,0000000001,965,500 Lucky Run Stream Restoration 2,800,0000000000000 0 MS4-TDML Compliance Water Quality Improvements 1,255,000 3,000,000 3,500,000 3,500,000 7,000,000 7,000,000 7,000,000 9,000,000 5,000,000 3,000,000 3,000,000 51,000,000 NPDES / MS4 Permit 815,000 165,000 170,000 168,400 170,000 171,700 173,500 175,200 177,000 178,700 180,500 1,730,000 Phosphorus Exchange Bank 00000000000 0 Storm Sewer Capacity Assessment 4,713,500 498,750 508,300 0 0 7,529,100 0 588,100 10,213,900 0 0 19,338,150 Storm Sewer System Spot Improvements 7,605,221 420,000 430,500 441,400 452,500 464,000 475,800 488,000 500,500 513,400 526,700 4,712,800 Stormwater BMP Maintenance CFMP 135,000 140,000 144,200 148,600 153,000 1,201,500 1,220,100 157,700 160,900 164,100 167,400 3,657,500 Stormwater Utility Implementation 1,673,2000000000000 0 Strawberry Run Stream Restoration 800,0000000000000 0 Stream & Channel Maintenance 6,570,454 450,000 459,000 468,200 477,600 487,100 496,900 506,800 517,000 527,300 537,800 4,927,700 Taylor Run Stream Restoration 2,092,8500000000000 0 Stormwater Management Total 39,918,110 4,880,250 5,422,000 5,663,200 9,802,100 16,853,400 9,366,300 10,915,800 17,820,600 8,560,500 4,412,400 93,696,550 Grand Total 39,918,110 4,880,250 5,422,000 5,663,200 9,802,100 16,853,400 9,366,300 10,915,800 17,820,600 8,560,500 4,412,400 93,696,550 Stormwater Management Page 15.2 City of Alexandria, VA Proposed FY 2021 - FY 2030 Capital Improvement Program Stormwater Management Utility Ten-Year Plan Proposed FY 2021 – FY 2030 Capital, Operating and Debt Service The Stormwater Management Utility plan presented on the following pages represents the approved operating budget, debt service and capital program for FY 2020 and a preliminary estimate for FY 2022 – FY 2030. Staff will reevaluate the program and Stormwater Utility rate every year and present changes to City Council as part of each year’s budget development cycle. FY 2020 Stormwater Rate Approved FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Stormwater Utility Rate per ERU $140.00 $140.00 $146.30 $159.47 $173.82 $190.33 $208.41 $223.00 $239.73 $267.30 $279.32 Proposed Rate Increase 0.0% 4.5% 9.0% 9.0% 9.5% 9.5% 7.0% 7.5% 11.5% 4.5% 1.5% New Stormwater Utility Rate $140.00 $146.30 $159.47 $173.82 $190.33 $208.41 $223.00 $239.73 $267.30 $279.32 $283.51 FY 2020 Revenues Approved FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total FY 21-30 Billing Units 60,279 60,279 60,520 60,762 61,005 61,249 61,494 61,740 61,987 62,235 62,484 Annual Revenue Generation 8,439,060 8,818,818 9,650,961 10,561,626 11,611,240 12,765,166 13,713,362 14,800,832 16,568,939 17,383,799 17,715,135 133,589,878 Other Revenue Sources 21,017 21,017 21,017 21,017 21,017 21,017 21,017 21,017 21,017 21,017 21,017 210,170 Revenue Stream Reductions (239,064) (246,236) (253,623) (261,232) (269,069) (277,141) (285,455) (294,019) (302,839) (311,924) (321,282) (2,822,819) New Debt Issuance 3,987,993 2,910,000 3,570,000 3,845,000 8,020,000 15,110,000 7,665,000 9,255,000 16,205,000 6,990,000 2,890,000 76,460,000 Use of Fund Balance 0 0 0 0 0 0 0 0 0 0 0 0 Total Revenues 12,209,006 11,503,599 12,988,355 14,166,411 19,383,189 27,619,042 21,113,924 23,782,830 32,492,117 24,082,892 20,304,870 207,437,229 FY 2020 Expenditures Approved FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total FY 21-30 All Operating 5,108,961 5,075,335 5,271,840 5,487,220 5,719,271 5,964,923 6,195,773 6,443,685 6,758,591 6,990,305 7,181,047 61,087,990 All Capital Projects 6,280,697 5,534,740 6,109,000 6,385,200 10,560,100 17,650,400 10,204,300 11,795,800 18,744,600 9,530,500 5,431,400 101,946,040 All Debt Service 819,348 893,523 1,313,114 1,667,773 2,501,109 3,938,908 4,646,283 5,477,725 6,946,814 7,525,665 7,671,860 42,582,774 Total Expenditures 12,209,006 11,503,599 12,693,954 13,540,193 18,780,480 27,554,232 21,046,356 23,717,209 32,450,004 24,046,470 20,284,307 205,616,804 FY 2020 Operating Costs Approved FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total FY 21-30 TES Personnel 3,145,624 3,345,023 3,445,374 3,548,735 3,655,197 3,764,853 3,877,798 3,994,132 4,113,956 4,237,375 4,364,496 38,346,940 Main Operating 587,695 453,831 467,446 481,469 495,913 510,791 526,115 541,898 558,155 574,900 592,147 5,202,664 BMP's Operation 263,008 262,508 270,383 278,495 286,850 295,455 304,319 313,448 322,852 332,537 342,513 3,009,360 Oronoco Outfall Maintenance 100,000 103,000 106,090 109,273 112,551 115,927 119,405 122,987 126,677 130,477 134,392 1,180,780 Additional operating impact from capital 194,480 62,525 64,000 66,000 68,000 70,000 72,000 74,000 76,000 78,000 80,000 710,525 Indirect Costs 778,154 811,331 887,888 971,670 1,068,234 1,174,395 1,261,629 1,361,677 1,524,342 1,599,310 1,629,792 12,290,269 Contingent Cash Funding 40,000 37,117 30,659 31,579 32,526 33,502 34,507 35,542 36,608 37,707 37,707 347,453 Subtotal, Operating Costs 5,108,961 5,075,335 5,271,840 5,487,220 5,719,271 5,964,923 6,195,773 6,443,685 6,758,591 6,990,305 7,181,047 59,027,967 Stormwater Management Page 15.3 City of Alexandria, VA Proposed FY 2021 - FY 2030 Capital Improvement Program Stormwater Management Utility Ten-Year Plan Proposed FY 2021 – FY 2030 Capital, Operating and Debt Service (continued) FY 2020 Capital Projects Approved FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total FY 21-30 City Facilities Stormwater Best Management Practices (BMPs) 0 0 0 0 0 0 0 0 0 0 0 Four Mile Run Channel Maintenance 600,000 0 0 936,600 0 0 0 0 1,251,300 4,177,000 0 6,364,900 Green Infrastructure (1) 0 206,500 210,000 0 1,549,000 0 0 0 0 0 0 1,965,500 MS4-TMDL Compliance Water Quality Improvements 1,255,000 3,000,000 3,500,000 3,500,000 7,000,000 7,000,000 7,000,000 9,000,000 5,000,000 3,000,000 3,000,000 51,000,000 NPDES / MS4 Permit 160,000 165,000 170,000 168,400 170,000 171,700 173,500 175,200 177,000 178,700 180,500 1,730,000 Storm Sewer Capacity Assessment & Improvements 475,000 498,750 508,300 0 0 7,529,100 0 588,100 10,213,900 0 0 19,338,150 Storm Sewer System Spot Improvements 300,000 420,000 430,500 441,400 452,500 464,000 475,800 488,000 500,500 513,400 526,700 4,712,800 Stormwater Utility Implementation 0 0 0 0 0 0 0 0 0 0 Stream and Channel Maintenance 450,000 450,000 459,000 468,200 477,600 487,100 496,900 506,800 517,000 527,300 537,800 4,927,700 Stormwater BMP Maintenance CFMP 135,000 140,000 144,200 148,600 153,000 1,201,500 1,220,100 157,700 160,900 164,100 167,400 3,657,500 Strawberry Run Stream Restoration 550,000 0 0 0 0 0 0 0 0 0 0 0 Taylor Run Stream Restoration 1,695,000 0 0 0 0 0 0 0 0 0 0 0 DPI Personnel 609,373 602,200 632,000 664,000 697,000 732,000 769,000 807,000 847,000 889,000 933,000 7,572,200 Capitalized Sustainability Coordinator 51,324 52,290 55,000 58,000 61,000 65,000 69,000 73,000 77,000 81,000 86,000 677,290 Subtotal, Capital Projects 6,280,697 5,534,740 6,109,000 6,385,200 10,560,100 17,650,400 10,204,300 11,795,800 18,744,600 9,530,500 5,431,400 101,946,040 FY 2020 Debt Service Approved FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total FY 21-30 Total Debt Service Payments $819,348 $893,523 $1,313,114 $1,667,773 $2,501,109 $3,938,908 $4,646,283 $5,477,725 $6,946,814 $7,525,665 $7,671,860 $42,582,774 Total Expenditures, All Categories 12,209,006 11,503,599 12,693,954 13,540,193 18,780,480 27,554,232 21,046,356 23,717,209 32,450,004 24,046,470 20,284,307 205,616,804 Stormwater Management Page 15.4 City of Alexandria, VA Proposed FY 2021 - FY 2030 Capital Improvement Program CAMERON STATION POND RETROFIT DOCUMENT SUBSECTION: Stormwater Management PROJECT LOCATION: Ben Brenman Park, 4800 Brenman Park Dr, Alexandria, VA 22304 MANAGING DEPARTMENT: Department of Transportation REPORTING AREA: Landmark/Van Dorn and Environmental Services PROJECT CATEGORY: 3 PRIMARY STRATEGIC THEME: Theme 8: Environmental ESTIMATE USEFUL LIFE: 30+ Years Sustainability Cameron Station Pond Retrofit A (B + M) B C D E F G H I J K L M (C:L) Total Total Budget & Through FY 2021 - Financing 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2030 Expenditure Budget 4,681,885 4,681,885 0 0 0 0 0 0 0 0 0 0 0 Financing Plan Cash Capital 0 0 0 0 0 0 0 0 0 0 0 0 0 GO Bonds (Stormwater) 1,750,000 1,750,000 0 0 0 0 0 0 0 0 0 0 0 Private Capital Contributions 1,050,000 1,050,000 0 0 0 0 0 0 0 0 0 0 0 State/Federal Grants 1,750,000 1,750,000 0 0 0 0 0 0 0 0 0 0 0 Stormwater Local Assistance Gra 131,885 131,885 0 0 0 0 0 0 0 0 0 0 0 Financing Plan Total 4,681,885 4,681,885 0 0 0 0 0 0 0 0 0 0 0 Additional Operating Impact 0 0 0 0 0 0 0 0 0 0 0 0 0 CHANGES FROM PRIOR YEAR CIP No changes from previous CIP.
Recommended publications
  • Paper Is an Update of the Paper Presented by Dave Greenfield and Ron Ryczak of BAMR at the 2008 NAAMLP Conference in Durango, Colorado
    Assessment of Fluvial Geomorphology Projects at Abandoned Mine Sites in 1 the Anthracite Region of Pennsylvania Dennis M. Palladino, P.E.² Pennsylvania Department of Environmental Protection Bureau of Abandoned Mine Reclamation 2 Public Square, Wilkes-Barre, PA 18701-1915 [email protected] (570) 830-3190 ABSTRACT Some watersheds have been so severely impacted by mining that the streams do not support aquatic life and can no longer accommodate flows or transport sediment. To fully recover the environmental resource of these scarred landscapes the land must be reclaimed and the streams reconstructed. As abandoned mine sites are being reclaimed to their approximate original contours, the hydrology of the watersheds will be returning to pre-mining conditions and generating base flows and storm discharges that residents may not have experienced in many years. A stable system will have to be designed to transport the flows and sediment while preventing erosion and flooding. Traditionally, rigid systems have been implemented that are rectangular or trapezoidal in shape and are constructed entirely of rock and concrete. These systems have a good survival rate but do not replace the resource that was lost during mining. In an attempt to reclaim the watersheds that were destroyed during mining to a natural state, the application of Fluvial Geomorphologic (FGM) techniques has been embraced at several sites in the Anthracite Region of Pennsylvania. These sites have had various degrees of success. All of the sites were designed based on bankfull conditions and were immediately successful in creating habitat for a wide variety of species. Some sites remained stable until damaged due to extreme discharge events where design, construction, or implementation flaws were revealed in regions above the bankfull elevation.
    [Show full text]
  • NPDES) INDIVIDUAL PERMIT to DISCHARGE STORMWATER from SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (Ms4s
    3800-PM-BCW0200e Rev. 8/2019 COMMONWEALTH OF PENNSYLVANIA Permit DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) INDIVIDUAL PERMIT TO DISCHARGE STORMWATER FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) NPDES PERMIT NO. PAI132224 In compliance with the provisions of the Clean Water Act, 33 U.S.C. Section 1251 et seq. (“the Act”) and Pennsylvania’s Clean Streams Law, as amended, 35 P.S. Section 691.1 et seq., Lackawanna County 1280 Mid Valley Drive Jessup, PA 18434-1819 is authorized to discharge from a regulated small municipal separate storm sewer system (MS4) located in Lackawanna County to Roaring Brook (CWF, MF), Powderly Creek (CWF, MF), Lackawanna River (HQ-CWF, MF), Unnamed Tributary to Lucky Run (CWF, MF), Wildcat Creek (CWF, MF), Keyser Creek (CWF, MF), Unnamed Tributary to Stafford Meadow Brook (HQ-CWF, MF), and Unnamed Stream (CWF, MF) in Watersheds 5-A in accordance with effluent limitations, monitoring requirements and other conditions set forth herein. THIS PERMIT SHALL BECOME EFFECTIVE ON MAY 1, 2021 THIS PERMIT SHALL EXPIRE AT MIDNIGHT ON APRIL 30, 2026 The authority granted by coverage under this Permit is subject to the following further qualifications: 1. The permittee shall comply with the effluent limitations and reporting requirements contained in this permit. 2. The application and its supporting documents are incorporated into this permit. If there is a conflict between the application, its supporting documents and/or amendments and the terms and conditions of this permit, the terms and conditions shall apply. 3. Failure to comply with the terms, conditions or effluent limitations of this permit is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application.
    [Show full text]
  • NPDES) INDIVIDUAL PERMIT to DISCHARGE STORMWATER from SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (Ms4s
    3800-PM-BCW0200e Rev. 8/2019 COMMONWEALTH OF PENNSYLVANIA Permit DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) INDIVIDUAL PERMIT TO DISCHARGE STORMWATER FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) NPDES PERMIT NO. PAI132224 In compliance with the provisions of the Clean Water Act, 33 U.S.C. Section 1251 et seq. (“the Act”) and Pennsylvania’s Clean Streams Law, as amended, 35 P.S. Section 691.1 et seq., Lackawanna County 1280 Mid Valley Drive Jessup, PA 18434-1819 is authorized to discharge from a regulated small municipal separate storm sewer system (MS4) located in Lackawanna County to Roaring Brook (CWF, MF), Powderly Creek (CWF, MF), Lackawanna River (HQ-CWF, MF), Unnamed Tributary to Lucky Run (CWF, MF), Wildcat Creek (CWF, MF), Keyser Creek (CWF, MF), Unnamed Tributary to Stafford Meadow Brook (HQ-CWF, MF), and Unnamed Stream (CWF, MF) in Watersheds 5-A in accordance with effluent limitations, monitoring requirements and other conditions set forth herein. THIS PERMIT SHALL BECOME EFFECTIVE ON TBD THIS PERMIT SHALL EXPIRE AT MIDNIGHT ON TBD The authority granted by coverage under this Permit is subject to the following further qualifications: 1. The permittee shall comply with the effluent limitations and reporting requirements contained in this permit. 2. The application and its supporting documents are incorporated into this permit. If there is a conflict between the application, its supporting documents and/or amendments and the terms and conditions of this permit, the terms and conditions shall apply. 3. Failure to comply with the terms, conditions or effluent limitations of this permit is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application.
    [Show full text]
  • Wild Trout Waters (Natural Reproduction) - September 2021
    Pennsylvania Wild Trout Waters (Natural Reproduction) - September 2021 Length County of Mouth Water Trib To Wild Trout Limits Lower Limit Lat Lower Limit Lon (miles) Adams Birch Run Long Pine Run Reservoir Headwaters to Mouth 39.950279 -77.444443 3.82 Adams Hayes Run East Branch Antietam Creek Headwaters to Mouth 39.815808 -77.458243 2.18 Adams Hosack Run Conococheague Creek Headwaters to Mouth 39.914780 -77.467522 2.90 Adams Knob Run Birch Run Headwaters to Mouth 39.950970 -77.444183 1.82 Adams Latimore Creek Bermudian Creek Headwaters to Mouth 40.003613 -77.061386 7.00 Adams Little Marsh Creek Marsh Creek Headwaters dnst to T-315 39.842220 -77.372780 3.80 Adams Long Pine Run Conococheague Creek Headwaters to Long Pine Run Reservoir 39.942501 -77.455559 2.13 Adams Marsh Creek Out of State Headwaters dnst to SR0030 39.853802 -77.288300 11.12 Adams McDowells Run Carbaugh Run Headwaters to Mouth 39.876610 -77.448990 1.03 Adams Opossum Creek Conewago Creek Headwaters to Mouth 39.931667 -77.185555 12.10 Adams Stillhouse Run Conococheague Creek Headwaters to Mouth 39.915470 -77.467575 1.28 Adams Toms Creek Out of State Headwaters to Miney Branch 39.736532 -77.369041 8.95 Adams UNT to Little Marsh Creek (RM 4.86) Little Marsh Creek Headwaters to Orchard Road 39.876125 -77.384117 1.31 Allegheny Allegheny River Ohio River Headwater dnst to conf Reed Run 41.751389 -78.107498 21.80 Allegheny Kilbuck Run Ohio River Headwaters to UNT at RM 1.25 40.516388 -80.131668 5.17 Allegheny Little Sewickley Creek Ohio River Headwaters to Mouth 40.554253 -80.206802
    [Show full text]
  • SPECIAL SESSION FLOOD CONTROL and HAZARD MITIGATION ITEMIZATION ACT of 1996 Act of Jul
    SPECIAL SESSION FLOOD CONTROL AND HAZARD MITIGATION ITEMIZATION ACT OF 1996 Act of Jul. 11, 1996, Special Session 2, P.L. 1791, No. 8 Cl. 86 Special Session No. 2 of 1996 No. 1996-8 AN ACT Itemizing public improvement projects for flood protection and flood damage repair to be constructed by the Department of General Services, together with their estimated financial costs; authorizing the use of disaster assistance bond funding for financing the projects to be constructed by the Department of General Services; stating the estimated useful life of the projects; making an appropriation; providing for the adoption of specific blizzard or flood mitigation projects or flood assistance projects to be financed from current revenues or from debt incurred under clause (1) of subsection (a) of section 7 of Article VIII of the Constitution of Pennsylvania; and making repeals. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: CHAPTER 1 GENERAL PROVISIONS Section 101. Short title. This act shall be known and may be cited as the Special Session Flood Control and Hazard Mitigation Itemization Act of 1996. CHAPTER 3 FLOOD CAPITAL BUDGET PROJECT ITEMIZATIONS Section 301. Short title of chapter. This chapter shall be known and may be cited as the Special Session Flood Capital Budget Project Itemization Act of 1996. Section 302. Construction of chapter. The provisions of this chapter shall be construed unless specifically provided otherwise as a supplement to the act of July 6, 1995 (P.L.269, No.38), known as the Capital Budget Act of 1995-1996. Section 303. Total authorization.
    [Show full text]
  • This Is the Acknowledgements Page
    Brodhead Watershed Conservation Plan Water Resources A watershed ultimately connects the communities within it through their common dependence on water resources. Our flowing creeks and streams are perhaps the best barometer of how well we accept stewardship of the land on which we live. Watersheds are important in every community because they embody our sense of place in the landscape, and their waters are important in our daily life. Watersheds are the geographic addresses for our communities. In addition to being an important source of recreation and wildlife habitat, the Brodhead watershed provides the drinking water supply for area residents and visitors. The boroughs of Stroudsburg and East Stroudsburg and surrounding areas are served by public water systems which draw on the Brodhead and Sambo Creeks and nearby wells. The water resources of the Brodhead watershed include the Brodhead Creek and its tributaries, and the connected but unseen water in aquifers below the surface of the land. Subwatersheds The Brodhead watershed drains an area of about 285 square miles, almost half of Monroe County, emptying into the Delaware River just north of where the Delaware River flows through the dramatic cut in Kittatinny Mountain known as the Delaware Water Gap. The Brodhead watershed can be divided into six major subwatersheds: Upper Brodhead Subwatershed; Lower Brodhead Subwatershed; Marshalls Creek Subwatershed; Paradise Creek Subwatershed; Pocono Creek Subwatershed; and McMichael Creek Subwatershed. Upper Brodhead Subwatershed The Upper Brodhead subwatershed includes the headwater tributaries, as well as eight miles of the main stem of the Brodhead Creek above its confluence with Paradise Creek. The Upper Brodhead subwatershed drains an area of 65.9 square miles, including parts of Coolbaugh, Barrett, Price, and Middle Smithfield townships.
    [Show full text]
  • Figure 2.6.1 Hydrologic11x17
    HE k AR e T LEMON e LA NICHOLSON r K N RD C E O S k R K c SOUTH BRANCH TUNKHANNOCK CREEK b D R o Tri 288 A n J 95 L n O T C a o S k D h R o R o k D ut KS ck D h o FELL 107 n no Cre B TUNKHANNOCK CREEK ek R r GREENFIELD r N u n an a A c T h B A h E k N h L T h B n c u s H L n u I n H u a T k S Y unkhannock Creek O R r 407 V h D k h 7 e B a c L S GREE n 4 N e h n 2 FALL BROOK t L n 11 r a N A V 0 u r I o C o O T A B c S K r S k k f h W NFI i t SR c ranch T P b E O u C o o r E 2 3 R n M G S e L 85 n 5 o e D 83 E a 8 T D O k O SR 0 BENTON f 8 R F L h 8 T RD a 2 7 ll Broo L k S 8 k U n b 8 D i R O 2 u r b S R 011 SH SR 0107 SH T C T i 0 H RD To South B r S 4 T LL h B HI c BU ER 0 NK N n R 7 a A O r S M O B 28849 H A K h t E S S u Trib D o S 438 R T S R k E e 1 o L e 0 T ek L r k re I 0 V e C A C 6 k W L L S 6 k oc roo e 1 n y B r an S 8 h d D sh k e u C n 8 Tu H R n o s 2 anch R T e r n Tun b B h kh T 3 a e e 107 nc nno 7 i ra ck C A r h re 5 L t K B ek CLINTON T h C 8 t L u o u 2 LACKAWANNA o D o S e T b o e S i T IL 4 97 r s 6 88 T 2 W C R 8 RD ib R D Tr r C 8 2 k e Y e NING e D k D ib N RUSH BROOK R E 524 re A HW r C ON C M S E N T W M K y 81 N e HRIS E U n d TY MAT H L E n P D ed e A T R K y n L SE C n 6 N r e U ee S k K S o 6 R SR T 0006 SH LAPLUME 0 FACTORYVILLE 5 4 G 6 I LEES CREEK 8 3 B 8 8 S NORTH ABINGTON 2 O k Sou N To th Bran H S 827 S e ch b B 28 o S U ib e T i H R Tr u r N t r u TUNKHANNOCK h n T H D C k CARBONDALE B R h 524 U r E ly a 0 a r n B n M e k n U e o R C D ch L k e c S SOUTH BRANCH TUNKHANNOCK CREEK P c r k O R T A
    [Show full text]
  • Site Report: Lucky
    ARCHAEOLOGICAL INVESTIGATIONS AT LUCKY RUN STREAM AND SITE 44AX0031, ALEXANDRIA, VIRGINIA PREPARED FOR: CITY OF ALEXANDRIA TRANSPORTATION AND ENVIRONMENTAL SERVICES, STORMWATER SECTION 200B BUSINESS CENTER DRIVE ALEXANDRIA, VA 22314 PREPARED BY: RALPH KOZIARSKI PHD, RPA BENJAMIN M. STEWART PRINCIPAL INVESTIGATOR: SCOTT SEIBEL, MSC, RPA AECOM 12420 MILESTONE CENTER DRIVE, SUITE 150 GERMANTOWN, MD 20876 301.820.3000 DECEMBER 2018 Page Intentionally Blank Abstract ABSTRACT The City of Alexandria (the city) is undertaking a stream restoration along 266 meters (m) [875 feet (ft)] of the Lucky Run stream, located on the west side of the City of Alexandria, Virginia. Phase I survey and Phase II evaluation archaeological investigations were completed to assist the city in meeting regulatory obligations for the undertaking. The project’s area of potential effect (APE) extends from a culvert emerging from the road prism east of Braddock Road approximately 72 m (236 ft) north of the I-395 viaduct and continues northeast to a retention pond, whose center-point is located 225 m (40 ft) southwest of the intersection of Ford Avenue and Park Center Drive. The width of the approximately 0.68 hectare (1.69 acre) APE varies throughout the project, but generally follows the foot of the bluff slopes along the edges of the stream floodplain. Three archaeological isolates and two archaeological sites (44AX0031 and 44AX0236) were identified as a result of the current survey. Site 44AX0236 is located on the southern bank of the stream and consists of a small number of commingled lithic debitage and historic artifacts. Artifacts may have been transported into the area by stream activity.
    [Show full text]
  • Lackawanna River Watershed Conservation Plan
    Lackawanna River Watershed Conservation Plan prepared by The Lackawanna River Corridor Association November 2001 This project is funded with support from the Chesapeake Bay Program Small Watershed Grants Program administered by the National Fish and Wildlife Foundation, the Scranton Area Foundation, the Rivers Conservation Program of the Commonwealth of Pennsylvania, Department of Conservation and Natural Resources and The membership and community support funding received through contributions to the Lackawanna River Corridor Association. This document has been prepared by: Bernard McGurl, Executive Director For the: Arthur Popp, Project Manager Deilsie Heath Kulesa, Administrative Assistant Gail Puente, Education and Outreach Coordinator Table of Contents 1. Introduction 1.1. Executive Summary: Issues, Process 1.2. Executive Plan Recommendations 1.3. Priority Recommendations 1.4. Considerations for Implementation 2. Purpose and Vision 2.1 Vision 2.2 Scope of Work 3. The River and Its Watershed 3.1 Soils and Geology 3.2 Flora and Fauna 3.3 Socio-economics and Cultural History 4. Issues: A discussion and review of public policy issues and topics affecting the Lackawanna River Watershed Environment 4.1 A discussion and review of public policy issues and topics affecting the Lackawanna River Watershed environment 5. Water Quality and Quantity 5.1 Sewage Treatment, Treatment Plants, CSO’s, Act 537 Planning 5.2 Storm Water Management 5.3 Acid Mine Drainage/Abandoned Mine Reclamation 5.4 Erosion and Sedimentation 5.5 Water Supply 5.6 Aquatic Habitats and Fisheries 6. Land Stewardship 6.1 Flood Plain Management 6.2 Stream Encroachment 6.3 Riparian and Upland Forest and Forestry Management 6.4 Wetlands 6.5 Natural Areas and Open Space Management 6.6 Land Use Regulations and Watershed Best Management Practices 6.7 Reclamation and Economic Development 6.8 Litter, Illegal Dumping and Contaminated Sites 7.
    [Show full text]
  • Municipal Separate Storm Sewer System Program Plan
    Alexandria, Annandale, Loudoun & Woodbridge Campuses Municipal Separate Storm Sewer System Program Plan For General Permit No. VAR040095 During Permit Year 2021 - 2022 From November 1, 2018 until October 31, 2023, in accordance with the VAR04 General Permit Northern Virginia Community College is authorized to discharge stormwater and authorized non-stormwater discharges described in 9VAC25-890-20 D from the small municipal separate storm sewer system into surface waters within the boundaries of the Commonwealth of Virginia consistent with 9VAC25-890-30. June 30, 2021 TABLE OF CONTENTS APPENDICES .................................................................................................................................................. ii LIST OF TABLES .............................................................................................................................................. ii ACRONYMS ................................................................................................................................................... ii DEFINITIONS ................................................................................................................................................. iii 1.0 MS4 PROGRAM PLAN .............................................................................................................................. 1 1.1 Minimum Control Measures ............................................................................................................... 1 1.2 Special Conditions for TMDLs
    [Show full text]
  • Capital Improvement Plan (CIP) Is One of the Most Significant Planning Processes for Arlington County and Arlington Public Schools
    COUNTY MANAGER’S PROPOSED FY2022–FY2024 CAPITAL IMPROVEMENT PLAN COUNTY BOARD MATT DE FERRANTI CHAIR KATIE CRISTOL VICE CHAIR CHRISTIAN DORSEY LIBBY GARVEY TAKIS KARANTONIS COUNTY MANAGER’S OFFICE MARK SCHWARTZ COUNTY MANAGER ARLINGTON COUNTY VISION "Arlington will be a diverse and inclusive world-class urban community with secure, attractive residential and commercial neighborhoods where people unite to form a caring, learning, participating, sustainable community in which each person is important." — Adopted by the Arlington County Board January 26, 2002 Arlington County, C H A IN B R ID G E R D G E O R G E Virginia W D A R R S E AM H B P IN E G L M T G I O L N I N T M CH A E ES R M T Y O E R R R B IA RO D L O P K K RD W Y N H A D R V J R L O B I N S E E H LL G O Y G R N C N U U S D M O T I B IS S L D R S A Y R T ORKTOWN BLVD D B M R D IA S Y L O L H M E I A I K W D N LS R L IO FAL L LO E N R TL D CO LIT D M WY T R LN K R P S UN UT R PO N N S N T T W N Y S S L S E C K S E O N C T T R T M O O S T T O LEE HWY M S R N A D E C O V L Y E A O S I D Marine Corps N T V W L D B N C N N O H D S EN T R S LA T N C R War Memorial Arlington County C D Y O R U D N R LV E T B FA H Government Center H IRFAX N DR K O O T E C U I G IDG R S IN R B T E L L A R IA P R A OR D M ME N IN T G R ER E E S V A T O A AT L M E R ST N IA 66 G 10TH R P N O WB E M M E Q ^ M A IN U TE S RA O I ^ M R S N P TA N T C E D RFAX DR 6 FAI Y 6 E R B P S M T A R R B D G N IN S H E LVD RS B E ^ N B N A SO P L N R L N WI 5 O V 9 O O 3 H E S D 5 T E R 9 A V 3 T N S E O E T R L S
    [Show full text]
  • SECOND SPECIAL SESSION of 1995-96 Act 1996-8 (S52) 1791 No. 1996-8 (SS2) an ACT HB2 Enacts As Follows: Section 101. Short Title
    SECOND SPECIAL SESSION OF 1995-96 Act 1996-8 (S52) 1791 No. 1996-8 (SS2) AN ACT HB2 Itemizing public improvement projects for flood protection and flood damage repair to be constructed by the Department of General Services, together with their estimated financial costs; authorizing the use of disaster assistance bond funding for financing the projectstobe constructed by the Department of General Services; stating the estimated useful life of the projects; making an appropriation;providing for the adoption of specific blizzard or flood mitigation projects or flood assistance projects to be financed from current revenues or from debt incurred under clause (1) of subsection (a) of section 7 of Article Viii of the Constitution of Pennsylvania; and making repeals. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: CHAPTER 1 GENERAL PROVISIONS Section 101. Short title. This act shall be known and may be cited as the Special Session Flood Control and Hazard Mitigation Itemization Act of 1996. CHAPTER 3 FLOOD CAPITAL BUDGET PROJECT ITEMIZATIONS Section 301. Short title of chapter. This chapter shall be known and may be cited as the Special Session Flood Capital Budget Project Itemization Act of 1996. Section 302. Construction of chapter. The provisions of this chapter shall be construed unless specifically provided otherwise as a supplement to the act of July 6, 1995 (P1.269, No.38), known as the Capital Budget Act of 1995-1996. Section 303. Total authorization. The total authorization for the capital projects in the category of public improvement projects itemized in section 304 and to be constructed by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $391,541,000.
    [Show full text]