Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

SECTION I: PROJECT DETAILS

1. EXECUTIVE SUMMARY The textile industry is primarily concerned with the production of yarn, and cloth and the subsequent design or manufacture of clothing and their distribution. The raw material may be natural or synthetic using products of the chemical industry. The Indian textile industry has a presence in the economic life of the country. The proposed project is approved by Ministry of textiles, Government of , November 2011, under scheme of Integrated Textile Park. The Scheme of Integrated Textile Park (SITP) has been launched by Ministry of Textiles, Government of India with an objective to establish Integrated/ Hi-tech Textile Park with world-class infrastructure and manufacturing facilities. Himmada Integrated Textile Park is one such park with state-of-the-art manufacturing facilities supported by good quality infrastructure and corporate style of functioning. It is the First Private/ Public Sector Industrial Park of Western .

The proposed project involves the development of a textile park on a plot admeasuring 41.68 hectare involving a centralized Effluent Treatment Plant of capacity 6 MLD to treat the effluent generated from the textile industries proposed in the industrial area. About 24 textiles & textile related units will be set up in the park. Along with these textile industries the project will have common infrastructure facilities like Administration Block, ware House, Utility Block, Medical Center Commercial Center etc. Table: Salient Features of the Project Name of the project Himmada Integrated Textile Park housing CETP. Promoter Himmada integrated textile park Pvt. ltd. Location of Village & Mewa Nagar Industry Tehsil Pachpadra District Barmer State Rajasthan Khasra details 1426/374, 1427/374, 1428/374, 1425/374, 1429/374, 1431/374,

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

1432/374, 1069/463, 1423/356, 1068/463, 1430/374. Total Plot Area 4,16,819.48 sq.m. Total water requirement : 7.5 MLD Water Requirement Fresh water demand : 2 MLD Recycled water demand : 5.5 MLD Power Requirement 14 MW Manpower Requirement 3750 nos. approx Estimated Project cost Rs.121,08.14 lakh. Nearest Railway Station Junction : 8.9 km NE Nearest Highway SH-28 : 3.8 km towards SE SH-38 : 5.7 km towards NE Nearest Airport Airport : 103 Km NE Coordinates Pillars Latitude Longitude A 250 01’5.62”N 750 54’ 37.58”E B 250 01’30.97”N 750 54’ 15.89”E C 250 01’39.47”N 750 54’ 26.46”E D 250 01’17.93”N 750 54’ 49.56”E

2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

(i) Identification of the Project

The proposed project Himmada Integrated Textile Park promoted by Himmada Integrated Textile Park Private Limited coming up at Khasra No. 1426/374, 1427/374, 1428/374, 1425/374, 1429/374, 1431/374, 1432/374, 1069/463, 1423/356, 1068/463, 1430/374 Village Jasol, Tehsil Balotra, District Barmer, Rajasthan. The proposed Project is categorized under 7(h), i.e. category 'B', project of Gazette Notification dated Sep 14th, 2006 and subsequent amendments thereafter.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

As the proposed Project involves development of Integrated Textile Park having area less than 50 ha. and not having any Cat. A or Cat B industry as listed under schedule of EIA Notification, However, CETP is proposed for the project, Therefore we have applied for obtaining EC for HITP having CETP under 7(h). The project is coming up on land area of 41.68 ha. The total green cover area will be approximately 4.1 ha. The estimated of cost proposed project is at Rs. 12,108.14 Lakh.

Table: Internal Land use breakup

Particulars Area (Sq. m.) Area (Hectare) Area % Industrial Plot Area 2,68,813 26.88 64.50% Common infrastructure & Facilities 27,777 2.78 6.67% Landscape Area 32,698.57 3.27 7.84% Area for CETP,STP, Electric Station 40,925 4.09 9.81% Area Under Roads 46,605.91 4.66 11.18% Total Plot Area 4,16,819.48 41.68 100%

Table : Project Facilities S. no. Description of Constriction Work Built –Up Area (sq.m.) 1. Administrative block 1000 2. Ware house 1250 3. Utility block 7000 4. Medical centre 1000 5. Commercial 1200 6. Testing facility 750 7. Crèche / labour welfare 750 Total 12950 sq.m.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

Project Proponent

The project is promoted by Himmada Integrated Textile Park Private Limited. It is classified as Non-govt Company and is registered at Registrar of Companies, Jaipur. The company having its registered office at Daga Hospital Road Balotra, Rajasthan.

Address of Project Proponent: Himmada Integrated Textile Park Pvt. Ltd. Daga Hospital Road, Balotra (Raj.)

Address of Project Correspondence: Mr. Pradeep Kumar Bafna (Director) Himmada Integrated Textile Park Pvt. Ltd. Daga Hospital Road, Balotra (Raj.) Email: [email protected]

(ii) Brief Description of Nature of Project

The proposed project involves the development of a textile park on a plot admeasuring 41.68 hectare involving a centralized Effluent Treatment Plant of capacity 6 MLD. About 24 textiles & textile related units will be set up in the park. Along with these textile industries the project will have common infrastructure facilities like Administration Block, ware House, Utility Block, Medical Center Commercial Center etc. The interior land use break up is given under below:

Table: Details of land use

Particulars Area (Sq. m.) Area (Hectare) Area % Industrial Plot Area 2,68,813 26.88 64.50% Common infrastructure & Facilities 27,777 2.78 6.67% Landscape Area 32,698.57 3.27 7.84%

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

Area for CETP,STP, Electric Station 40,925 4.09 9.81% Area Under Roads 46,605.91 4.66 11.18% Total Plot Area 4,16,819.48 41.68 100%

Table : Size and No. of proposed Plots S. Activity No. of Units no. 1. Textile Processing Type A - 8,000 sq m plot area 11 2. Textile Processing Type B - 12,000 sq m plot area 8 3. Textile Processing Type C -16,000 sq m plot area 5 Total 24

(iii) Need for the project and its importance to the Country and or Region

Post quota, the global textile and apparel industry is undergoing a change in the sourcing patterns of buyers. Buyers are looking at consolidating their sourcing by having tie ups with limited suppliers providing them reliable products at lesser prices. The focus is on value added services along with cost and quality factors. Suppliers need to be flexible to meet buyers’ expectations. Textile & Clothing industry contribute to about 1/3rd of the total country’s export and has been identifies as a major thrust area. Considering the factors mentioned, there are only few countries in the world meeting the first two criteria and only two countries, India and China, in the world meeting all the first four criteria. Hence, the growing potential for textile products are mainly for Indian companies, provided state-of-the-art technology and world class infrastructure go hand in hand to meet international requirement of quality and service at a competitive price. Considering the strategic importance of the textile sector to the economy, the Ministry of Textiles, Government of India has launched the Scheme for Integrated Textile Park (SITP).

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

Need for CETP: ➢ Disposal of treated effluent and sludge becomes more organized ➢ Reduced burden of various regulatory authorities in ensuring pollution control requirements. Small scale Industries cannot afford fully fledged treatment facility ➢ Saving in operating and capital cost of treatment plant ➢ Neutralization and equalization of heterogeneous waste makes its treatment techno economically viable. Availability of land is difficult for individuals units to set ETP. ➢ Professional and trained staff can be made available at CETP

(iv) Demand and Supply Gap

The project, upon completion, will help bridge the gap between demand and supply of garments in the regional, national and international markets.

(v) Employment generation (Direct & Indirect) due to the project

Direct Employment Direct and temporary opportunities will be created for local workers at the construction phase. Long term, large scale and stable employment will be generated at the post construction phase. Local villagers will be given preference and trained to work in the unit. The proposed project will provide direct employment to 4,000 people.

Indirect Employment

As large as 10,000 people employment opportunities will be created indirectly due to the proposed Integrated Textile Park. Transportation will be required to transfer the raw material and finished goods and eventually be needed therefore truckers and jobs in logistical activities will come up. As there would be vocational training camps and Technical Training to the regional people, hence there will be potential manpower available for the unit. There will be development of externalities for the workers petty shops (tea, repair stations for trucksetc.) as supporting services. The proposed social responsibility activities in the study area aim to engage

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

many people around the proposed project. This would create IndigenousTechnologies for sustainable development.

3. PROJECT DESCRIPTION i. Type of Project including interlinked and interdependent projects, if any. The proposed project involves the development of a textile park on a plot admeasuring 41.68 hectare involving a centralized Effluent Treatment Plant of capacity 6 MLD. About 24 textiles & textile related units will be set up in the park. Along with these textile industries the project will have common infrastructure facilities like Administration Block, ware House, Utility Block, Medical Center Commercial Center etc.

The textile industry is primarily concerned with the production of yarn, and cloth and the subsequent design or manufacture of clothing and their distribution. The raw material may be natural, or synthetic using products of the chemical industry. The Indian textile industry has an presence in the economic life of the country. ii. Location detail. Himmada Integrated Textile Park (HITP) is coming up in Balotra, Tehsil Pachpadara, District Barmer of Rajasthan. The development of a Textile Park at Jasol-balotra region of Rajasthan is ideal as it involves all the incentives and support structure required for Textile Park. The area falls under toposheet no. 45 C/1, 45 C/2, 45 C/5 & 45 C/6. Road Location map is as follows:

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

Fig: Road Location map

Site Coordinates: S corner E Corner 25º46' 1.48" N 25º46' 28.97" N 72º10' 59.58" E 72º11' 22.12" E WSW Corner NNW Corner 25º46' 20.95" N 25º46' 38.78" N 72º10' 31.39" E 72º10' 48.37" E

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

Fig: Google map

iii. Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. No alternative site has been considered for the project.

Site Selection criteria: 1. Ground water quality is saline which is not fit for drinking purpose but can be used in various industrial process.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

2. Better road connectivity 3. Far from habitation iv. Size and Magnitude of Operation The proposed project involves the development of a textile park on a plot admeasuring 41.68 hectare involving a centralized Effluent Treatment Plant of capacity 6 MLD. About 24 textiles & textile related units will be set up in the park. Along with these textile industries the project will have common infrastructure facilities like Administration Block, ware House, Utility Block, Medical Center Commercial Center etc. Table: Land use breakup Particulars Area (Sq. m.) Area (Hectare) Area % Industrial Plot Area 2,68,813 26.88 64.50% Common infrastructure & Facilities 27,777 2.78 6.67% Landscape Area 32,698.57 3.27 7.84% Area for CETP,STP, Electric Station 40,925 4.09 9.81% Area Under Roads 46,605.91 4.66 11.18% Total Plot Area 4,16,819.48 41.68 100%

Table: Size and No. of proposed Plots S. No. Activity No. of Units 4. Textile Processing Type A - 8,000 sq m plot area 11 5. Textile Processing Type B - 12,000 sq m plot area 8 6. Textile Processing Type C -16,000 sq m plot area 5 Total 24

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

v. Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. should be given) The project involves development of integrated textile Park. Project layout (Site plan) is enclosed as Annexure.

Fig: Plant Layout vi. Raw material required: General construction materials viz. sand, aggregates, bricks, etc. will be used for infrastructure (roads, service areas, administrative office) development.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

vii. Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined. Since, the project involves the development of integrated textile park, therefore, the proponents will be responsible for providing common infrastructure facilities only. The industrial units coming up within the industrial area will implement EMP for resource optimization. viii. Availability of water its source, energy/power requirement and source should be given. Water Requirement: The total water demands for the HITP will be approximately 7.5 MLD. The fresh water demand will be to the tune of 2 MLD (Domestic: 0.70 MLD + Industrial: 1.3 MLD) and will be met through ground water.

Power Requirement The estimated power demand for the project is 14 MW, which will be met through JVVNL supply. In addition to the conventional sources of energy feasibility of non-conventional energy sources have also been planned for the project such as the use of solar energy.

S. No. Description 1. Source of supply Jodhpur Vidyut Vitaran Nigam Limited 2. Electrical load 14 MW 3. Transformer No. Of transformers 2 Capacity 7 MVA/132/33/0.433 4. DG Sets No. Of DG sets 2 DG Capacity 1500 kVA (2nos: 750 kVA each) Fuel Used HSD (sulphur content: 0.05%) Fuel Consumption 318.6 l/hr (159.3 l/hr/DG)

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd. ix. Quantity of wastes to be generated (liquid and solid) and scheme for their management/ disposal. There will be generation of solid as well as liquid waste during the operational phase of the project which will be responsibly managed by respective industry only. Common ETP facility will be provided within the project site for the management/disposal of solid or liquid waste. The estimated quantity of Municipal waste (domestic and or commercial wastes) generated from the industrial site will be 1500 kg/day (@0.4 kg/worker/day) which is proposed to be sent and disposed off at the district municipal corporation site. The Industrial process may also lead to generation of hazardous waste as defined under HWM Rules. However the same will be disposed off to the CTDF at Udaipur. Industrial solid waste (ISW) will be generated from the industrial process which is proposed to be disposed off suitably. Construction waste like soil, brick bits, etc will be utilized in leveling of land and road making.

Details of waste Generation are as under: S. No Particulars Nature Proposed Quantity Disposal /

Ton/day Management

1. Sludge from ETP Hazardous About 5 TPD of combineddisposed off to TSDF

Waste sludge will be generatedsite at Balotra

from CETP

2. Textile waste (cloth pieces, Non Hazardous 38500 meters / day Sold to vendor

Cutting remains, threads etc.) Waste

3. Municipal Solid waste Non Hazardous 1500 kg / day Balotra Municipal

Waste Council, Balotra,

Barmer

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

4. SITE ANALYSIS (i) Connectivity of the Project Site Railway Station Balotra Railway sation at approx. 8.9 Km towards NE direction (aerially) Airport Jodhur – at approx. distance of 101 Km in NE direction aerilly) Highway ❖ SH 16: Towards E at 6.7 km ❖ SH 28: Towards E at 5.0 km ❖ SH 38: Towards NE at 8.3 km Industrial Areas ❖ 7 km from Balotra Industrial Area ❖ 115 km from Western Rajasthan Business Hub Jodhpur ❖ 115 km from Textile City of Pali ❖ 150 km From Proposed Delhi-Mumbai Industrial Corridor (DMIC) Of North-West Railway.

(ii) Land Form, Land use and Land ownership The proposed project involves the development of a textile park on a plot admeasuring 41.68 hectare involving a centralized Effluent Treatment Plant of capacity 6 MLD. About 24 textiles & textile related units will be set up in the park. There will be permanent change in the land cover as the project site is dominated with scattered vegetation. Table: Land Status of Leased out Area

Near Village Tehsil District & State Khasra No. Status of land Area in Sq.m. 1426/374, 1427/374, 1428/374, 1425 /374 , Jasol & Mewa District Barmer, 1429 /374, Pachpadra 1431/374, 41.68 hectare Nagar Rajasthan. 1432/374, 1069/463, 1423/356, 1068/463, 1430/374

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

(iii) Topography (Along with map) The applied project is coming up at Khasra Nos.1426/374, 1427/374, 1428/374, 1425 /374 , 1429 /374, 1431/374, 1432/374, 1069/463, 1423/356, 1068/463, 1430/374 village Jasol & Mewa Nagar ,Tehsil Pachpadra, District Barmer, Rajasthan.

There will be permanent change in the land cover as the project site is dominated with scattered vegetation. Topographic map is as follows:

Fig: Topographical Map of Project Site

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be industrial area, a copy of the Gazette notification should be given. The land use has been allotted for the industrial use. The proposed project would obtained industrial park registration from State Government, which provides deemed NA status for the land earmarked for the park. The construction activities will start after obtaining all the necessary approvals from the statutory authorities.

The land breakup of the project will be as under: Particulars Area (Sq. m.) Area (Hectare) Area % Industrial Plot Area 2,68,813 26.88 64.50% Common infrastructure & Facilities 27,777 2.78 6.67% Landscape Area 32,698.57 3.27 7.84% Area for CETP,STP, Electric Station 40,925 4.09 9.81% Area Under Roads 46,605.91 4.66 11.18% Total Plot Area 4,16,819.48 41.68 100%

Environmental Sensitivity of the Project site (10 km radius) S. No. Particulars Details Distance and Direction 1. Nearest Forest R.F near Nakoda temple 1.2 km towards WNW

Pabra Bhakar R.F 0.6 km towards NW

R.F near Vanya 4.6 km towards West

2. National park, Wild Life None within the 10 km radius of the project site Sanctuary, Eco Sensitive Areas etc 3. River/Water Body Luni River 5.4 km towards North

4. Seismic Zone The Project site falls in Seismic Zone-III (Moderate Damage risk Zone) as per IS 1893 (Part=I)-2002

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

(v) Existing Infrastructure This is a proposed Industrial Park project. No infrastructure facilities exist within the area. A well equipped first aid facility is proposed to be available at there. Permanent rest shelter, urinal and latrine are proposed. Water will be sourced by ground water supply. Amenities / Facilities will be provided for construction workers by the industry owners. There will be no separate designated temporary sites for construction workers. There will be provisions of Common Effluent treatment plant and Sewage treatment Plant within the project site.

(vi) Soil Classification The soils of the district are alluvial in nature. Soils are generally deep to very deep with texture varying from clayey loam to clay and are generally non-calcareous. Colour of the soil varies from brown to dark brown. According to the soil taxonomical classification, there are six categories of classification i.e. i. Order (the broadest category) ii. Suborder, iii. Great group, iv. Subgroup, v. Family and vi. Series (the most specific category). The soil of the Rajasthan state have been grouped under five orders, namely, Aridosols, Alfisols, Entisols, Inceptisols and Vertisols. Soils have further been subdivided at suborder and great group levels under these five orders as shown below: Table: Classification of Soils found in Rajasthan S. No. Order Suborder Great group Occurrence 1. Aridisols Orthids a. Camborthids Parts of Jalore, Churu, Jodhpur, Pali, Barmer, Sikar and Jhunjhunu districts. b. Calciorthids Parts of Jalore, Jodhpur, Pali, Barmer, Nagaur, Sikar, Churu, Sriganganagar and Jhunjhunu districts. c. Salorthids Found scattered in Ghaggar floodplain in Sriganganagar; Near sambhar, Pachpadra, Deedwana lakes, little Rann of Kutch area

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

in Jalore and in Barmer districts d. Paleorthids Scattered and cover a small area in Jaisalmer, Barmer and Nagaur districts. 2. Alfisols Ustalfs a. Haplustalfs Eastern and south-eastern part of Rajasthan in Udaipur, Chittorgarh, Bhilwara, Ajmer and Jaipur districts. 3. Entisols Psamments a. Torripsamments Cover upto 80% of the area at many places in western Rajasthan. Also cover a part of Jaipur, Alwar and Ajmer districts. b. Quartzipsamments Small part of Jaisalmer and Barmer districts. Fluvents c. Torrifluvents Occur in Ghaggar floodplain area of Sriganganagar district. d. Ustifluvents Occur on the north-eastern and eastern portion of Rajasthan covering parts of Alwar and almost whole of Bharatpur districts. 4. Inceptisols Ochrepts a. Ustochrepts Occur along the foothill slopes and cover extensive areas in Bhilwara, Udaipur, north-eastern Sawaimadhopur and in parts of Sirohi, Pali, Jaipur and Chittorgarh districts. 5. Vertisols Usterts a. Chromusterts Parts of Bundi, Kota &Jhalawar districts in south-eastern part of Rajasthan and to a lesser extent in Chittorgarh, Dungarpur, Banswara&Bharatpur districts. b. Pellusterts Cover a large are of Bundi, Kota, Jhalawar, Chittorgarh, Dungarpur, Banaswara and Bharatpur districts.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

(vii) Climatic data from secondary sources The district experiences arid type of climate. Mean annual rainfall (1971-2005) of the district is 281.8 mm whereas normal rainfall (1901-1971) is lower than average rainfall and placed at 277.5 mm. Almost 90% of the total annual rainfall is received during the southwest monsoon, which enters the district in the first week of July and withdraws in the mid of September. As the district lies in the desert area, it faces extremes of heat in summer and cold in winter. Both day and night temperatures increase gradually and reach their maximum values in May and June. The temperature varies from 48 degree in summer to 2 degree in winter. Atmosphere is generally dry except during the monsoon period. Humidity is at its highest in August with mean daily relative humidity of 43%. The annual maximum potential evapotranspiration in the district is 1850 mm and it is highest (260 mm) in the month of May and lowest (77 mm) in the month of December.

(viii) Social Infrastructure Available The district supports various mineral industries in the area/region. It promotes good industrial growth via provides better infrastructure facilities. S. No Particulars Details 1. Railway Station Balotra Junction :8.9 km towards NE 2. Airport Jodhpur Airport : 103 Km towards NE 3. Road SH-28 : 3.8 km towards SE SH-38 : 5.7 km towards NE

5. PLANNING BRIEF (i) Planning Concept (type of industries, facilities, transportation etc.) Town and country Planning/Development authority Classification Facilities include temporary rest shelter, first aid center proposed in the area. The project is well connected with road network. Site development is a continuous process at the location. Other

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

facilities such as power, transportation and communication, social infrastructure facilities are locally available near project site.

(ii) Population Projection The project will employ most of the workers from nearby areas. Local people from nearby villages will be give preference.

(iii) Assessment of Infrastructure Demand (Physical & Social) The road facility is already available which shall be used and properly maintained. The industry is well connected with national highway and state highway The proposed project of industrial park in the area proposed to employ 4000 to 5000 people. Labors will be employed from nearby villages. Clean drinking water and medical facilities will be made available at project area and in nearby villages.

6. PROPOSED INFRASTRUCTURE 1. Industrial Area (Processing Area) The project involves development of industrial area consisting of 24 nos of industries plots over an area of 41.43 ha.

2. Resident Area (Non Processing Area) Workers’ Hostel has been proposed in the project.

3. Green Belt Plantation activities will be carried out in an area of 32,698.57sq. m. i.e. 7.84 % of the total area. During plantation, local plant species will give preference or in consultation with local forest officials. Area is sparsely vegetated by few shrubs and bushes. Plantation will be done with local plant species and proper fencing arrangement for survival of trees will be provided.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

The trees will be provided along the road, applied lease area and approach road. The dead plants will be replaced by fresh plants in next monsoon season. The plantation should be grown in each monsoon season and every in house industry will be bound to maintain 33% green belt of its total area.

4. Connectivity (Traffic and transportation Road/Rail/Metro/Water ways etc.) The project site is located about 8.15 Km towards NE of village Balotra. Nearest railway station is at Balotra Junction which is at a distance of about 8.9 km towards NE direction from the project site. The site is well connected with SH -28 at 3.8 km towards SE.

5. Drinking Water Management (Source & supply of water) Water required for drinking purpose will be met through ground water supply. Approx 700 KLD water will be required for domestic purposes.

6. Industrial Waste Management Industrial waste will be generated from the individual project which will be disposed off suitably by respective industries.

7. Solid Waste Management Municipal solid waste generated will be around 1500 kg/day (@0.4 kg/worker/day) which will be sent to District municipal corporation site for safe disposal.

7. REHABILITATION & RESETTLEMENT (R&R PLAN) (Policy to adopted (Central/State) in respect of the project affected person including home oustees, land oustee and landless labour (A brief outline to be given).

Human settlement is away from the applied lease area thus no impact is anticipated on human settlement by the proposed project. So, there is no need of rehabilitation and resettlement plan so far.

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

8. PROJECT SCHEDULE AND COST ESTIMATES a. (Likely date of start of construction and likely date of completion (time schedule for the project to be given) Project will commence after getting all the statutory approvals from the competent authotities.

b. Estimated project cost along with analysis in terms of economic viability of the project Total Project Cost : Rs. 121,08.14 lakh.

Table: Breakup of the cost is as under S. No. Items Amount in Lakh Position 1. Land 461.04 4.1 % 2. Common Infrastructure 8954.44 80.3 % Site development and compound wall 1381.00 Roads 479.00 Storm water drainage system 287.07 water supply system 2127.84 Sewerage & Effluent Conveyance & treatment plant 2851.75

Electrical transmission & distribution 1680.00 Street lighting system 43.86 Telecommunication 77.96 Landscaping 25.85 3. Common Facilities 1282.05 11.5 % 4. Design, Engineering & Supervision fees 460.66 4.1 %

Project cost eligible under SITP 11158.69 100.0 % 5. Pre-operative expenses 949.15 Total 12108.14

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.

Project : Himmada Integrated Textile Park Pre Feasibility Report Promoter : Himmada integrated textile park Pvt. ltd.

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area.

Proposed project of ‘textile Park’ by M/s Himmada integrated textile park Pvt. ltd. for an area 41.68 Ha Khasra No. 1426/374, 1427/374, 1428/374, 1425/374, 1429/374, 1431/374, 1432/374, 1069/463, 1423/356, 1068/463, 1430/374 Village Jasol, Tehsil Balotra, District Barmer, Rajasthan is of utmost importance to the area/region for interest of area development and improves the socio-economic conditions of the local habitants. The Project will provide direct and indirect employment opportunities to about 15000 persons approx... The applicant is committed to provide better infrastructural facilities such as education, medical, clean drinking water, maintenance of approach roads in nearby areas of the project site. *******

Gaurang Environmental Solutions Pvt. Ltd. Himmada Integrated Textile Park Pvt. Ltd.