CC-341- Rutenberg Power Station

Total Page:16

File Type:pdf, Size:1020Kb

CC-341- Rutenberg Power Station THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: BZC-2100-34 ISSUE: For Proposal DATE: July, 2015 SPECIFICATION FOR SCR SYSTEM - STRUCTURAL STEEL FABRICATION FOR RUTENBERG POWER STATION - UNITS 3 and 4 1. PURCHASER: The Israel Electric Corporation Limited. 2. NAME OF PROJECT: Emissions Control in existing coal fired Power Stations. 3. LOCATION OF PROJECT: Rutenberg Power Station, Near Ashkelon on the Mediterranean Sea Shore. 4. SCOPE OF WORK: The scope of work includes fabrication and supply of steel structure and on-site erection supervision services for the steel structure supporting the SCR system including of Rutenberg Units 3 and 4, which is required as an integral part of the emission control project (installation of SCR System) in Rutenberg Power Station. The scope of work shall include, but shall not be limited to the following: 4.1 Scope of Supply: Contractor’s scope of supply shall include fabrication (including material and corrosion protection) and delivery of structural steel and cladding in categories for Rutenberg Power Station, Units 3 and 4, based on conceptual design and complete set of structural workshop, parts lists and erection drawings provided by Purchaser, as follows: 4.1.1 Basic scope of supply, subdivided as follows: a. Steel structure and legs holding the reactor and the reactor’s inlet / outlet ducts. b. Reserved. Approved By: Gideon Israeli BZC-2100-34 rev 2015 07 05 B - 1 THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: BZC-2100-34 ISSUE: for Proposal c. Reserved. d. Steel structure for modifications in the existing boiler steel structure. The estimated Structural Steel weights for all above structures are given in the breakdown in Annexure “C1”, which is subject to additions/deletions per Purchaser’s provided final conceptual design and shop drawings. 4.1.2 The Categories of Steel and works forming part of the scope of work: (Hebrew translation) (פרופילים ופלטות קלים) a. Light Shapes and Plates )פרופילים ופלטות בינוניים( b. Medium Shapes and Plates )פרופילים ופלטות כבדים) c. Heavy Shapes and Plates (מסבכים( d. Trusses (קורות פחים) e. Girders (פלטות בסיס( f. Base Plates )סבכות ומשטחים) g. Grating + Checker Plates (מעקות) h. Handrails (מדרגות) i. Stair treads (ברגים אומים ודסקיות) j. Bolts, Nuts and Washers (מותחנים) k. Sag Rods )קופסאות מרותכות( l. Welded box sections m. Reserved (צביעה ואספקה( n. Painting and Delivery (גילוון, צביעה ואספקה( o. Galvanizing, Painting and Delivery 4.1.3 The Scope of Work includes: 4.1.3.1 Reserved. 4.1.3.2 Reserved. 4.1.3.3 Fabrication of the structural steel members as set forth herein in accordance with DIN18800. 4.1.3.4 The fabrication contains everything that belongs to the normal execution according to the designs and parts lists. The scope of supply contains also the supply of all material, the manufacturing, assembly, quality testing, cleaning as well as the quality documentation. BZC-2100-34 rev 2015 07 05 B - 2 THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: BZC-2100-34 ISSUE: for Proposal For the avoidance of doubt, all materials such as structural steel, filler materials, operating supplies, equipment, inspection equipment, packing material, materials for devices, templates and supports, which can be processed, are in the scope of supply of the Contractor. 4.1.3.5 If because of delivery constraints of the basic material there is a need for on Site works for making complementary joints of steel elements to comply with the fabrication requirements, such works have to be coordinated and approved by the Purchaser. 4.1.4 The structural steel shall meet the following essential requirements: 4.1.4.1 Low Hydrogen welding processes to be applied in production are: a. Submerged Arc Welding (SAW). b. Shielded Metal Arc Welding (SMAW). c. Flux Cored Arc Welding (FCAW). 4.1.4.2 The Structural Steel including protective coatings shall meet Purchaser’s provided conceptual and detail design and shall be fabricated and supplied to form a COMPLETE, RELIABLE AND SAFE CONSTRUCTION. 4.1.4.3 High Strength Bolts, Nuts and Washers shall be EN/ DIN Standard, shall be hot dip galvanized and shall be supplied by the Contractor in accordance with Purchaser’s Bills of Materials (specifying lengths, locations and quantities (100%)) plus 20% spare. 4.1.4.4 All Structural Steel Members shall be corrosion protected as per 11.5 below. 4.1.4.5 The structural steel members shall be fabricated and supplied in accordance with DIN18800. 4.1.4.6 The elements shall be delivered to the Site in accordance with the delivery schedule, properly matching and pre mounted in the factory to the largest extent possible. BZC-2100-34 rev 2015 07 05 B - 3 THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: BZC-2100-34 ISSUE: for Proposal 4.1.4.7 Subject to Purchaser's approval (not to be unreasonably withheld): To simplify manufacturing processes Contractor may replace S275J0+N material to S275J0+M material and /or to the higher graded S355 J2+N and/or S355 J2+M material. Similarly, with respect to the S355 J2+N material, Contractor may replace said material to S355 J2+M material. Similarly, with respect to the S275 material, Contractor may replace said material to S355 material. Filler plates up to thickness 5 mm can be produced from material S235 or S275. Steel that has requirement for Z15 can be provided in Z25 state. For handrails, the Material S275J0H can be used. 4.2 Special Equipment, Tools and Instruments Contractor shall provide all special equipment, tools and instruments required for safe and secure transport of all components from ex works to final destination. Said equipment, tools, and instruments (if any) should be / are listed in Contractor's Proposal where it should be / is clearly stated which are provided on a loan basis and which are included in the Contract Price/Option list. 4.3 Contractor Services The Contractor shall provide the services of competent advisors to direct Purchaser's personnel and assure proper, complete and successful erection and installation of the Steel Structure provided under this Specification. The services shall be provided as part of the basic Scope of Work or as Purchaser’s option, at the per diem or lump sum rates, all as stated in the Summary of Prices and Delivery Schedule, Annexure “C1”. Field personnel provided by the Contractor shall be capable and qualified to perform the required duties to the satisfaction of the Purchaser. They shall be vested with authority to make decisions that could affect the status of the Steel Structure and which are binding on the Contractor. BZC-2100-34 rev 2015 07 05 B - 4 THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: BZC-2100-34 ISSUE: for Proposal 4.4 Work by Others (Facilities and Services to be provided by the Purchaser) 4.4.1 Purchaser shall provide and be responsible for the conceptual design of the Steel Structure. Note: In the event that the Contractor is exceptionally requested to provide conceptual design, such conceptual design shall be prepared under the auspices of a structural engineer registered in Israel, and shall be certified by him. 4.4.1.1 Purchaser shall provide a complete set of structural steel Shop and Erection Drawings, and all the documentation as specified in Article 8 below. 4.4.1.2 Purchaser shall provide Material Source lists based on the design drawings. 4.4.2 Purchaser shall provide all the necessary labor force, tools and facilities in order to erect and install the Steel Structure provided under this Specification, following Contractor’s instructions and according to Contractor’s plans, procedures and (if applicable) supervision. 4.5 Terminal Points and Terminal Connections Contractor shall terminate the Steel Structure provided under this Specification at the Terminal Points depicted in Purchaser’s provided conceptual and detail design with the appropriate terminal connections. 5. SUPPLEMENTS: The following supplements are attached hereto or referenced in Purchaser’s transmittal list, and their requirements form an integral part of this specification - to the extent they are consistent and conform with the requirements specifically set forth herein. In the event of a variance between the requirements of the Supplements and the particular requirements set forth in the Specification, the requirements specifically set forth in the Specification shall take precedence. In the event of inconsistent requirements set forth in the various Supplements, the Contractor shall consult with the Purchaser to verify which requirement takes precedence. BZC-2100-34 rev 2015 07 05 B - 5 THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: BZC-2100-34 ISSUE: for Proposal 5.1 Purchaser's general documentation, quality assurance and quality control requirements: 5.1.1 I.E.C. Painting Specification 217-000093-2011: Specification for inorganic Zinc-Silicate painting on non-galvanized surfaces. 5.1.2 I.E.C. Spec/Procedure CL-716/1600/99 Issue 5: Specification for painting on galvanized surfaces by wet/electrostatic powder painting. 5.1.3 BZM2100-Supplement 5.5.3 rev 02 – Surface preparation Corrosion Protection and painting 5.1.4 Standard Q-APP-02 – Rev. 4: Appendices for Contracts / Orders Quality Requirements 5.1.5 N941023-QP--BNG-BM90--00001_Rev01-STATUS_1 Minimum requirements of the Inspection and Test Plan 5.2 Purchaser's conceptual design drawings: 5.2.1 General notes and drawings list [Hold] 5.2.2 Lower level steel structure [Hold] 5.2.3 Middle level steel structure [Hold] 5.2.4 Upper level steel structure [Hold] 5.2.5 SCR-UNIT 3 - 4 assembling part 1 – 4 [Hold – example attached] 5.3 Purchaser's additional requirements: 5.3.1 Source List of Raw Materials (Based on the Design Drawings) The source list is for information only “Material Report of Steel”.
Recommended publications
  • Israel Electric Corporation Strategic Aspects Overview
    IsraelIsrael ElectricElectric CorporationCorporation StrategicStrategic AspectsAspects OverviewOverview NovemberNovember 20122012 TheThe ElectricityElectricity SectorSector inin IsraelIsrael 2 1919: Water utilization survey in the State of Israel initiated by Pinchas Rutenberg Pinchas Rutenberg: Founder of the Company “The sole and only interest of the Israel Electric Company is the economic development of the country based on pure business considerations.” 1926: Concession agreement Pinchas Rutenberg, 1926 from the British Crown 3 IsraelIsrael ElectricElectric CorporationCorporation SelectedSelected DataData Government company: 99.85% of the Company is owned by the Government. Installed capacity: 13,248 MW (~500MW self-generation/private). Peak demand: 11,920 MW on 19.7.2012. Annual budget: approximately NIS 32B MW(2012). Total employees: approximately 13,000 (of which some 9,800 have tenure). Total customers: over 2.5 million. 4 SpecialSpecial CharacteristicsCharacteristics ofof thethe ElectricityElectricity SectorSector Fast growth rate – which doubled in the last decade. A growth of 3%-4% is expected in the next decade. Low reserve compared with the electricity sectors in western countries (without the emergency plan and IPPs). “Electricity Island” – no backup or connection to any other source of electricity supply. Type of product: Product that cannot be stored Fluctuation in consumption and generation 5 TheThe ElectricityElectricity ChainChain Generation Transmission Distribution 63 Generation 400/161 KV 9 161 KV Approx. 190 High
    [Show full text]
  • Long Term Remedial Measures of Sedimentological Impact Due to Coastal Developments on the South Eastern Mediterranean Coast
    Littoral 2002, The Changing Coast. EUROCOAST / EUCC, Porto – Portugal Ed. EUROCOAST – Portugal, ISBN 972-8558-09-0 LONG TERM REMEDIAL MEASURES OF SEDIMENTOLOGICAL IMPACT DUE TO COASTAL DEVELOPMENTS ON THE SOUTH EASTERN MEDITERRANEAN COAST Dov S. Rosen1,2 1Head, Marine Geology & Coastal Processes Department, Israel Oceanographic and Limnological Research (IOLR), Tel Shikmona, POB 8030, Haifa 31080, Israel, Tel: 972-48515205, Fax: 972-48511911, email: [email protected]. 2Director General, Sea-Shore-Rosen Ltd., 2 Hess St., Haifa 33398, Israel, Tel:972-48363331, fax: 972-48374915, mobile: 972-52844174, email:[email protected] Abstract Coastal developments in the 20th century in the South-eastern Mediterranean coast have al- ready induced sedimentological impacts, expressed as coastal erosion, silting of marinas and other protected areas, and cliff retreat. New development activities are underway or planned for implementation in the near future. The forecasted future sea-level rise (already apparently detected in the last decade in the Eastern Mediterranean) and storm statistics change due to global warming, as well as future diminishing of longshore sand transport in the Nile cell, add to the increased sensitivity of coastal development in this region. This paper presents a review of the various projects underway or due to be implemented in the next few years, discusses in an integrated manner the outcome of various field and model studies on the sedimentological impacts of these developments, and presents a series of re- medial
    [Show full text]
  • Desalination in Israel
    Desalination: Group 2 Executive Summary 2010 MDDP Project – Desalination in Israel Group Members: Supervisors: Salah Ali (SA) Gerry Parke Peter Brown (PB) Carl Sofield Elizabeth Drake (ED) Nigel Seaton Norliza Jabar (NJ) Kularajh Kandasamy (KK) Prashanth Srinivasan (PS) i Author: KK, PS, SA & ED Desalination: Group 2 Executive Summary Executive Summary Over the years, Israel has supplied water to its population by extracting water from its natural sources, such as the Sea of Galilee, mountain aquifers and coastal aquifers. Over reliance on these sources has depleted them, to a point where the level is critically low. Desalination has been successfully implemented in Israel, on a large scale, to bridge the gap between water demand and supply. This project looks at the various aspects and challenges associated with the design of another desalination plant in the region along the Mediterranean coast. This desalination plant is designed to produce 110 million m3 of water annually over the design period of 20 years. The production capacity was determined by considering the future population growth of Israel and an analysis of projected water demand and supply. This amount contributes 5% of Israel‟s total potable water demand. The two desalination technologies explored were Multi Stage Flash Distillation (MSFD) and Reverse Osmosis (RO); on critical examination, it was found that MSFD is inefficient compared to RO. This is illustrated by the specific energy requirements, which for MSFD ranges from 49.66 kWh/m3 – 99.74 kWh/m3. On the other hand, RO requires only 3.41 kWh/m3, which is an order of magnitude smaller than the MSFD requirement.
    [Show full text]
  • 126-142 Capwa Pilot Test Results
    PPC HEM Pilot Test to Capture Water from the Flue Gas of a Coal-Fired Power Station Pilot Test to Capture Water from the Flue Gas of a Coal-Fired Power Station Frank de Vos, Paul van Daele, Jeff Gabster, Danny Sherban, Rony Mehr, Dror Yitzhak, Ines Bettermann, Stefan Weuster, Wolfgang Ansorge, Herman Teunis, Zandrie Borneman, and Ludwin Daal ABSTRACT One of the major challenges of this century is the provision of water for a growing population and the industry. The shortage in water resources in arid areas requires the availability of more efficient and cheaper water production processes. A large source of water is found in the form of evaporated water emitted from different industrial processes. This water vapour can be selectively removed by gas-gas separation membranes. Within the European CapWa project, thirteen partners set out to upscale this technology and pilot test the membranes in a coal-fired power plant. The pilot test was conducted for a period of 3 months at the Rutenberg plant. It can be concluded that a large scale pilot plant produces similar fluxes to lab findings and that the water quality easily fulfils drinking water standards (except for pH). The measured energy consumption values support previously conducted modelling work. INTRODUCTION One of the major challenges of this century is the provision article describes the set-up of the pilot unit, the mem - of water for a growing population and the industry. The brane modules, and the results of the pilot test. Based on shortage in water resources in arid areas requires the this pilot test, recommendations are made and a conclu - availability of more efficient and cheaper water production sion is provided that can help describe the future outlook processes.
    [Show full text]
  • REDUCTION of Nox FURNACE by CHANGING in TANGENTIAL FIRED
    IL0006656 REDUCTION OF Nox IN TANGENTIAL FIRED FURNACE BY CHANGING B. Chudnovsky, A, Taianker, L. Levin, S. Kahana Israel Electric Corporation, Engineering Department, Haifa * Conference lecturer ABSTRACT service. In stoichiometric combustion, when all the The present work analyses the results of tests on secondary air was fed through the main burner 575 MW units with tangential firing furnace nozzles, NOx emissions were about 1500 mg/dNm3 arrangement in sub-stoichioiuetric combustion. (for MD "B" Power Station) and 1140 mg/dNm3 (for Tangential firing provides good conditions for Rutenberg Power Station). Feeding a part of the implementing sub-stoichiometric combustion owing secondary air through the OFA nozzles (OFA 100% to the delivery scheme of pulverized coal and air. open) reduced the NOx content to 1200 ing/dNm3 The furnace was tested in several different modes of (for MD "B" ) and 920 mg/dNm3 (for Rutenberg). operation (Over Fire Air, Burners Out Of Service. When the fifth pulverizer (top burners level) was Excess air, Tilt etc.) to achieve iow cos! NOx shut-down, but secondary air was fed through the reduction. Actual performance data are presented upper burner level the rate of NOx emission based on experiments made on IEC'S boiler in M.D. dropped to 850 mg/dNni3 (for MD"B") and 640 'B' power station.. mg/dNin3 (for Rutenberg). The presented data show that implementing non- INTRODUCTION stoichiometric combustion reduces considerably NOx The modern trends of combustion equipment emissions, however, it was accompanied by a slight development are aimed at new low emission burner increase in the content of unburned carbon in the technology in order to meet increasingly stringent ash.
    [Show full text]
  • View from the Top a Newsletter from Commonwealth Dynamics, Inc., Specialists in Tall Structures
    VOL. 2 ISSUE 2 VIEW FROM the TOP A newsletter from Commonwealth Dynamics, Inc., Specialists in Tall Structures IN THIS ISSUE: n Chimney Breech and Tail Gas Replacement Project; 19-Day Outage n International Update: Israel Orot Rabin Power Station Rutenberg Power Station n Join us at Power Gen 2014 Orlando, December 9th–11th Booth #2635 VISIT US at POWER GEN 2014 ORLANDO DECEMBER 9TH – 11TH BOOTH #2635 PRODUCTS SERVICES n Concrete Chimneys n Design & Engineering n Steel Stacks n New Construction n Turbine Exhaust Systems n Modifications & Repairs n Solar & Wind Support Towers n Demolition n Natural Draft Cooling Towers n Project Management n Storage Silos & Stacking Tubes n Consulting n Other Tall Specialized Structures CORPORATE WORLD HEADQUARTERS Commonwealth Dynamics, Inc. Portsmouth, New Hampshire USA www.comdynam.com CHIMNEY BREECH AND TAIL GAS REPLACEMENT PROJECT; 19-daY Outage Commonwealth provided engineering, fabrication, and erection services for the replacement of a new chimney breeching duct, tail gas duct, expansion joint, and other ancillary materials for a large manufacturing plant in Louisiana. Existing Condition Chimney Breech & Tail Gas Replacement Scope of Work: CDI completed a final inspection once the plant was brought off- line, cooled and vented. After the work areas within the structure were deemed safe to enter, the crew began removing the failed refractory from the worn out tail gas sections. After the sections to be demolished were stabilized structur- ally, the tail gas section was removed in three lifts and the chimney breeching duct was removed in one. The installation of the new tail gas duct sections and chimney breeching were installed as planned.
    [Show full text]
  • Impact of Coastal Development on the Israeli Coast
    Littoral 2002, The Changing Coast. EUROCOAST / EUCC, Porto – Portugal Ed. EUROCOAST – Portugal, ISBN 972-8558-09-0 LONG TERM REMEDIAL MEASURES OF SEDIMENTOLOGICAL IMPACT DUE TO COASTAL DEVELOPMENTS ON THE SOUTH EASTERN MEDITERRANEAN COAST Dov S. Rosen1 1Head, Marine Geology & Coastal Processes Department, Israel Oceanographic and Limnological Research (IOLR), Tel Shikmona, POB 8030, Haifa 31080, Israel, Tel: 972-48515205, Fax: 972-48511911, email: [email protected]. Abstract Coastal developments in the 20th century in the South-eastern Mediterranean coast have al- ready induced sedimentological impacts, expressed as coastal erosion, silting of marinas and other protected areas, and cliff retreat. New development activities are underway or planned for implementation in the near future. The forecasted future sea-level rise (already apparently detected in the last decade in the Eastern Mediterranean) and storm statistics change due to global warming, as well as future diminishing of longshore sand transport in the Nile cell, add to the increased sensitivity of coastal development in this region. This paper presents a review of the various projects underway or due to be implemented in the next few years, discusses in an integrated manner the outcome of various field and model studies on the sedimentological impacts of these developments, and presents a series of re- medial measures which would have to be implemented to achieve a sustainable integrated coastal zone development in this region. Among the remedial measures discussed are sand bypassing and coastal nourishment, cliff and coastal protection by submerged ("Beachsaver Reef"TM) and protruding detached "respir- ing" rubble mound breakwaters, the "WaveTrap Island" concept developed by the author and utilisation of long-term coast stabilisation using large scale crenulated beaches at artificial peninsulas derived from initial artificial islands development.
    [Show full text]
  • Tamar Petroleum Ltd
    Tamar Petroleum Ltd. Annual Report 2019 Table of Contents Chapter A Description of the Company's Business Chapter B Board of Directors Report for the year ended December 31, 2019 Chapter C Financial Statements as of December 31, 2019 Chapter D Additional Details regarding the Company Test for Impairment of Oil and Gas Asset as of December 31, 2019 Chapter E Annual Report on Effectiveness of Internal Control over Financial Reporting and Disclosure Tamar Petroleum Ltd. Chapter A Description of the Company's Business A-1 This report is a translation of Tamar Petroleum Ltd.'s Hebrew-language Description of the Company's Business, and is prepared solely for convenience purposes. Please note that the Hebrew version constitutes the binding version, and in the event of any discrepancy, the Hebrew version shall prevail. Chapter A – Description of the Company's Business 1. Description of the General Development of the Company’s Business1 1.1 Tamar Petroleum Ltd. (the "Company") was incorporated on November 4, 2015 as a private company limited by shares under the Companies Law, 5759-1999 (the "Companies Law"). The Company’s name was changed to its current name on May 21, 2017. 1.2 Pursuant to Israeli Government Resolution No. 476 from August 16, 2015 (which was readopted by the Government with certain changes on May 22, 2016) regarding "a framework for the increase of the natural gas quantity produced from the ‘Tamar’ natural gas field and the rapid development of the natural gas fields ‘Leviathan’, ‘Karish’ and ‘Tanin’ and other natural gas fields"
    [Show full text]
  • B" Engineering Division SPEC.: CE-33901 ISSUE: for PROPOSAL
    THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: CE-33901 ISSUE: FOR PROPOSAL RUTENBERG POWER STATION, SPECIFICATION FOR FOR ELECTRICAL RETROFIT OF TWO 1800 MTPH COAL SHIP UNLOADERS 1. PURCHASER: The Israel Electric Corporation Limited (I.E.Co). 2. NAME OF ITEM: Electrical Retrofit Of Two 1800 MTPH Coal Ship Unloaders #91 and #92 for Rutenberg Power Station. 3. LOCATION OF ITEM: Near Ashkelon, at the Mediterranean Seashore. 4. SCOPE The scope of work includes Engineering, Equipment and services for the Electrical and Control Retrofit Of Two (2) 1800 MTPH Coal Ship Unloaders 4.1 Project description Upgrading of the existing control system and part of the electrical system, described in item 10.2. The operational parameters shall remain unchanged (see item 10.2.4). and Annex. D 4.2 Scope of supply and work The scope of work shall include, but shall not be limited to the following: Within the scope of engineering and supply the contractor shall, as applicable, design, develop, engineer, manufacture, simulate, preserve, assemble, tune, shop test, pack and furnish with export packing, deliver, install, commission and test the following: 4.2.1 Basic Scope of Engineering, supply and services, for Electrical Retrofit Of Two 1800 MTPH Coal Ship unloaders: a.1. Following arrival of the components in Israel the Contractor shall install, test and put the complete ship unloaders into operation, all as specified in item 10.4.1 0020 - IEC - Anx - B- Specification CE-33901 for UL#9192 2016 07 13.doc B - 1 THE ISRAEL ELECTRIC CORPORATION LTD. ANNEXURE "B" Engineering Division SPEC.: CE-33901 ISSUE: for Proposal a.2.
    [Show full text]
  • Microalgae Removal of CO2 from Flue Gas CCC250
    Microalgae removal of CO2 from flue gas Xing Zhang April 2015 © IEA Clean Coal Centre Microalgae removal of CO2 from flue gas Author: Xing Zhang IEACCC Ref: CCC/250 ISBN: 978–92–9029–572-3 Copyright: © IEA Clean Coal Centre Published Date: April 2015 IEA Clean Coal Centre 14 Northfields London SW18 1DD United Kingdom Telephone: +44(0)20 8877 6280 www.iea-coal.org 2 IEA Clean Coal Centre – Microalgae removal of CO2 from flue gas Preface This report has been produced by IEA Clean Coal Centre and is based on a survey and analysis of published literature, and on information gathered in discussions with interested organisations and individuals. Their assistance is gratefully acknowledged. It should be understood that the views expressed in this report are our own, and are not necessarily shared by those who supplied the information, nor by our member countries. IEA Clean Coal Centre is an organisation set up under the auspices of the International Energy Agency (IEA) which was itself founded in 1974 by member countries of the Organisation for Economic Co-operation and Development (OECD). The purpose of the IEA is to explore means by which countries interested in minimising their dependence on imported oil can co-operate. In the field of Research, Development and Demonstration over fifty individual projects have been established in partnership between member countries of the IEA. IEA Clean Coal Centre began in 1975 and has contracting parties and sponsors from: Australia, Austria, China, the European Commission, Germany, India, Italy, Japan, New Zealand, Poland, Russia, South Africa, Thailand, the UK and the USA.
    [Show full text]
  • Investor Presentation Israel Electric Corp
    Investor Presentation Israel Electric Corp. Business update as of 03/31/2020 June 2020 Disclaimer The Company is a public company, with all it entails, and this information provided to you, all or part of it, may constitute “Inside Information” in accordance with Israel’s Securities Law, 1968 (hereinafter: “Securities Law”), and making use of this information (including, but not only, by way of carrying out a transaction in a security of IEC, and/or delivering this information, or an opinion regarding a security of IEC, to any third party who may use this information for purposes of such transaction) may constitute a criminal offence pursuant to Securities Law. Please treat this information as CONFIDENTIAL and do not disclose, publish or deliver all or any part of this information, directly or indirectly, to any third party, except for your employees, officers and any person acting for you or on your behalf, strictly on a “need to know” basis, and only after you have notified the person receiving any of this information that the information is confidential and that making use of this information may constitute a criminal offence as specified above This Presentation does not constitute or form part of and should not be construed as an offer to sell or issue, or the solicitation of an offer to buy or acquire, securities of the Company. This Presentation is solely for informational purposes. The information contained in this presentation regarding the Company's operations is concise and presented for convenience purposes only. To get a complete picture of the Company's operations, please refer to the immediate and timely reports of the Company to the Israeli Securities authority and the Tel-Aviv Stock Exchange.
    [Show full text]