Senarai Kerja Undi 1/2021 Pejabat Daerah / Tanah Klang

Total Page:16

File Type:pdf, Size:1020Kb

Senarai Kerja Undi 1/2021 Pejabat Daerah / Tanah Klang LAMPIRAN A SENARAI KERJA UNDI 1/2021 PEJABAT DAERAH / TANAH KLANG Semua Kontraktor Bumiputra Kelas F / G1 yang berdaftar dengan Pusat Khidmat Kontraktor (PKK) & Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) serta Unit Perancang Ekonomi Negeri Selangor (UPEN) beralamat di DAERAH KLANG adalah dijemput untuk menyertai undian bagi Perolehan Kerja - Kerja Kecil Bahagian Pembangunan, Pejabat Daerah/Tanah Klang seperti berikut :- BIL TAJUK PROJEK SYARAT HARGA PENDAFTARAN PROJEK (RM) 1. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA JALAN MASUK KE KATEGORI CE TANAH PERKUBURAN ISLAM KG PENGKHUSUSAN 100,000.00 PENDAMAR, PELABUHAN KLANG CE01 DAN CE21 2. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA PERMUKAAN KATEGORI CE DATARAN KEJAT DI MASJID KAMPUNG PENGKHUSUSAN 70,000.00 PENDAMAR, PELABUHAN KLANG B04 DAN CE21 3. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA BALAI MPKK KG KATEGORI CE 100,000.00 PANDAMARAN JAYA, PELABUHAN KLANG PENGKHUSUSAN B04 DAN CE21 4. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA BUMBUNG DI KATEGORI CE 20,000.00 PENGKALAN NELAYAN KG KAPAR PENGKHUSUSAN B04 DAN CE21 5. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA GELANGGANG KATEGORI CE 50,000.00 FUTSAL DI KG. KAPAR PENGKHUSUSAN CE21 1 6. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA SURAU HJ WAHIDON KATEGORI CE 50,000.00 KG SEMENTA PENGKHUSUSAN B04 DAN CE21 7. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENYELENGGARA DEWAN ORANG KATEGORI CE 100,000.00 RAMAI KG PEREPAT PENGKHUSUSAN B04 DAN CE21 8. KERJA-KERJA MEMBAIKPULIH TEMBOK GRED ‘G1’ DAN PAGAR DI BALAI MPKK DAN DEWAN KATEGORI CE 25,000.00 KG PADANG JAWA, KLANG PENGKHUSUSAN CE21 9. KERJA-KERJA MENAIKTARAF GRED ‘G1’ LONGKANG DAN MENAIKTARAF JALAN KATEGORI CE SERTA PEMBERSIHAN LONGKANG DI PENGKHUSUSAN 100,000.00 LORONG HAJI SALLEH, KG KUANTAN, CE01 DAN CE21 KLANG 10. KERJA-KERJA MENURAP SEMULA GRED ‘G1’ DATARAN NIAGA DI JALAN KEMPAS, KG. KATEGORI CE 79,900.00 BUKIT KAPAR PENGKHUSUSAN CE21 11. KERJA-KERJA MEMBAIKPULIH GRED ‘G1’ GELANGGANG FUTSAL DI KAMPUNG KATEGORI CE 100,000.00 JOHAN SETIA, KLANG PENGKHUSUSAN CE21 96,249.60 12. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENURAP SEMULA JALAN DI LOT 4824, KATEGORI CE LORONG HJ TARMUZI 2A & LORONG HJ PENGKHUSUSAN TARMUZI 2B (LOT 4833) JALAN CEMPAKA, CE01 DAN CE21 KG MERU 13. KERJA-KERJA MEMBAIKPULIH DAN GRED ‘G1’ MENURAP SEMULA JALAN DI LOT 16561, KATEGORI CE JALAN KUNDANG 1A, JALAN KUNDANG PENGKHUSUSAN 100,000.00 1B DAN JALAN KUNDANG 1C, KG PADANG CE01 DAN CE21 JAWA,KLANG 2 14. KERJA-KERJA MEMBINA DAN GRED ‘G1’ MEMASANG PAPAN TANDA KAMPUNG KATEGORI CE TRADISI DI SELURUH DAERAH KLANG PENGKHUSUSAN 81,250.00 BAGI PEJABAT DAERAH / TANAH KLANG, CE01 DAN CE21 SELANGOR DARUL EHSAN GRED ‘G1’ 15. KERJA-KERJA MEMBAIKPULIH KATEGORI CE 71,270.00 DEWAN DAN BALAI MPKK KG. BARU PENGKHUSUSAN PANDAMARAN, PELABUHAN KLANG B04 DAN CE21 3 .
Recommended publications
  • Pulih Sepenuhnya Pada 8:00 Pagi, 21 Oktober 2020 Kumpulan 2
    LAMPIRAN A SENARAI KAWASAN MENGIKUT JADUAL PELAN PEMULIHAN BEKALAN AIR DI WILAYAH PETALING, GOMBAK, KLANG/SHAH ALAM, KUALA LUMPUR, HULU SELANGOR, KUALA LANGAT DAN KUALA SELANGOR 19 OKTOBER 2020 WILAYAH : PETALING ANGGARAN PEMULIHAN KAWASAN Kumpulan 1: Kumpulan 2: Kumpulan 3: Pulih Pulih Pulih BIL. KAWASAN sepenuhnya sepenuhnya sepenuhnya pada pada pada 8:00 pagi, 8:00 pagi, 8:00 pagi, 21 Oktober 2020 22 Oktober 2020 23 Oktober 2020 1 Aman Putri U17 / 2 Aman Suria / 3 Angkasapuri / 4 Bandar Baru Sg Buloh Fasa 3 / 5 Bandar Baru Sg. Buloh Fasa 1&2 / 6 Bandar Baru Sri Petaling / 7 Bandar Kinrara / 8 Bandar Pinggiran Subang U5 / 9 Bandar Puchong Jaya / 10 Bandar Tasek Selatan / 11 Bandar Utama / 12 Bangsar South / 13 Bukit Indah Utama / 14 Bukit Jalil / 15 Bukit Jalil Resort / 16 Bukit Lagong / 17 Bukit OUG / 18 Bukit Rahman Putra / 19 Bukit Saujana / 20 Damansara Damai (PJU10/1) / 21 Damansara Idaman / 22 Damansara Lagenda / 23 Damansara Perdana (Raflessia Residency) / 24 Denai Alam / 25 Desa Bukit Indah / 26 Desa Moccis / 27 Desa Petaling / 28 Eastin Hotel / 29 Elmina / 30 Gasing Indah / 31 Glenmarie / 32 Hentian Rehat dan Rawat PLUS (R&R) / 33 Hicom Glenmarie / LAMPIRAN A SENARAI KAWASAN MENGIKUT JADUAL PELAN PEMULIHAN BEKALAN AIR DI WILAYAH PETALING, GOMBAK, KLANG/SHAH ALAM, KUALA LUMPUR, HULU SELANGOR, KUALA LANGAT DAN KUALA SELANGOR 19 OKTOBER 2020 WILAYAH : PETALING ANGGARAN PEMULIHAN KAWASAN Kumpulan 1: Kumpulan 2: Kumpulan 3: Pulih Pulih Pulih BIL. KAWASAN sepenuhnya sepenuhnya sepenuhnya pada pada pada 8:00 pagi, 8:00 pagi, 8:00
    [Show full text]
  • Malaysia Port Klang Power Station Project (Phase 3 /Phase 3-Stage2)
    Malaysia Port Klang Power Station Project (Phase 3 /Phase 3-Stage2) External Evaluator: Taro Tsubogo (KRI International Corp.) Tenaga Nasional Berhad1 Field Survey: March, 2006 1. Project Profile and Japan’s ODA Loan Location of the project site Port Klang (Kapar Phase 3) power station 1.1 Background With the high economic growth, energy demand in the Peninsular Malaysia had grown significantly over the last years with an annual growth rate of 11.4% to 3,447 MW in 1990. Although the growth pace was expected to slow down in the future, energy demand was forecasted to reach 10,448 MW in 2000 with an annual growth rate of 10.6%. Since total installed capacity in 1990 was still 4,576 MW, a serious energy shortage was expected to occur in the future. To fill this gap, construction and expansion of power plants was indispensable option. On the other hand, the Malaysian Government carried out “Four fuel diversification strategy” to enhance the use of indigenous resources and reduce petroleum dependency. The Sixth Malaysia Plan (1991-1995) also envisioned to augment gas supply. The project, to construct 1,000 MW multi-fuel fired power plant, was therefore expected to contribute to both increment of supply capacity and diversification of energy source. 1.2 Objectives The project’s objective was to meet the rapidly increasing demand for energy and assure stable energy supply in the Peninsular Malaysia through construction of a thermal power station (known as Kapar Phase 3 Plant) located adjacent to the existing plants in Port Klang area, and thereby contribute to further economic growth and reducing oil dependence of the country.
    [Show full text]
  • Klang River Basin Environmental Improvement and Flood Mitigation Project
    Completion Report Project Number: 26009 Loan Number: 1500 December 2007 Malaysia: Klang River Basin Environmental Improvement and Flood Mitigation Project CURRENCY EQUIVALENTS Currency Unit – ringgit (RM) At Appraisal At Project Completion 6 November 1996 31 August 2007 RM1.00 = $0.3962 $0.2899 $1.00 = RM2.5239 RM3.4494 ABBREVIATIONS ADB – Asian Development Bank AFS – audited financial statement ARI – average recurrence interval DID – Department of Irrigation and Drainage DOE – Department of Environment EA – executing agency EIRR – economic internal rate of return ha – hectare IRBM – integrated river basin management KBMC – Klang Basin Management Council km – kilometer MASMA – Urban Stormwater Management Manual for Malaysia (or Manual Saliran Mesra Alam Malaysia) MOA – Ministry of Agriculture MNRE – Ministry of Natural Resources and Environment MTR – midterm review MWSS – Malaysia Wetland Sanctuary, Selangor OPP3 – Malaysia Third Outline Perspective Plan O&M – operation and maintenance PAM – project administration memorandum PCR – project completion review PELAWI II Strategic Plan for Klang River Basin PPTA – project preparatory technical assistance SMART – storm water management and road tunnel TA – technical assistance NOTE In this report, "$" refers to US dollars. Vice President C. Lawrence Greenwood, Jr., Operations Group 2 Director General A. Thapan, Southeast Asia Department Director U. Malik, Agriculture, Environment and Natural Resources Division, Southeast Asia Department Team leader M. Nasimul Islam, Environmental Engineer, Southeast Asia Department Team members N. Calma, Associate Project Analyst, Southeast Asia Department H. Refareal-Nacario, Senior Operations Assistant, Southeast Asia Department CONTENTS Page BASIC DATA i MAP I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Project Outputs 2 C.
    [Show full text]
  • Social Accountability Mechanism and Customer Satisfaction: Findings from the Study of Padang Jawa Road Transport Department, Selangor, Malaysia
    SOCIAL ACCOUNTABILITY MECHANISM AND CUSTOMER SATISFACTION: FINDINGS FROM THE STUDY OF PADANG JAWA ROAD TRANSPORT DEPARTMENT, SELANGOR, MALAYSIA MARNI BT HJ GHAZALI Malaya of FACULTY OF ARTS AND SOCIAL SCIENCES UNIVERSITY OF MALAYA KUALA LUMPUR 2018 University SOCIAL ACCOUNTABILITY MECHANISM AND CUSTOMER SATISFACTION: FINDINGS FROM THE STUDY OF PADANG JAWA ROAD TRANSPORT DEPARTMENT, SELANGOR, MALAYSIA MARNI BT HJ GHAZALI THESIS SUBMITTED IN FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF MalayaPHILOSOPHY of FACULTY OF ARTS AND SOCIAL SCIENCES UNIVERSITY OF MALAYA KUALA LUMPUR 2018 University CHAPTER 1: INTRODUCTION 1.1 Background of the Study Good governance has long been a topic of discussion in Malaysia as in many other countries. In fact, it became a world-wide phenomenon in many aspects of life either for public sector, private sector, society, non-profit organisation and international institutions. Generally, the aim of good governance is to increase development effectiveness, improved governance and also to enhance citizen empowerment (Malena et al., 2004; Siddiquee et al., 2010). In recent times, interest in good governance practices within Asian countries and in any other countries has also increased. Apparently, this is due to the financial crisis and because of poor governance practices (Mardiasmo, Diaswati, Barnes, Paul, Sakurai and Yuka,Malaya 2008). Besides that, good governance is ofa universal idea relevant into almost every aspect of organizational management in achieving good government. Hence, good governance has become the yardstick where the success of the nation-states is being measured (The Daily Star, November 17, 2005). Most importantly, developing countries need good governance practices immensely to accelerate the overall performance of the state in a more satisfactory level (Ara and Khan, 2006).
    [Show full text]
  • Colgate Palmolive List of Mills As of June 2018 (H1 2018) Direct
    Colgate Palmolive List of Mills as of June 2018 (H1 2018) Direct Supplier Second Refiner First Refinery/Aggregator Information Load Port/ Refinery/Aggregator Address Province/ Direct Supplier Supplier Parent Company Refinery/Aggregator Name Mill Company Name Mill Name Country Latitude Longitude Location Location State AgroAmerica Agrocaribe Guatemala Agrocaribe S.A Extractora La Francia Guatemala Extractora Agroaceite Extractora Agroaceite Finca Pensilvania Aldea Los Encuentros, Coatepeque Quetzaltenango. Coatepeque Guatemala 14°33'19.1"N 92°00'20.3"W AgroAmerica Agrocaribe Guatemala Agrocaribe S.A Extractora del Atlantico Guatemala Extractora del Atlantico Extractora del Atlantico km276.5, carretera al Atlantico,Aldea Champona, Morales, izabal Izabal Guatemala 15°35'29.70"N 88°32'40.70"O AgroAmerica Agrocaribe Guatemala Agrocaribe S.A Extractora La Francia Guatemala Extractora La Francia Extractora La Francia km. 243, carretera al Atlantico,Aldea Buena Vista, Morales, izabal Izabal Guatemala 15°28'48.42"N 88°48'6.45" O Oleofinos Oleofinos Mexico Pasternak - - ASOCIACION AGROINDUSTRIAL DE PALMICULTORES DE SABA C.V.Asociacion (ASAPALSA) Agroindustrial de Palmicutores de Saba (ASAPALSA) ALDEA DE ORICA, SABA, COLON Colon HONDURAS 15.54505 -86.180154 Oleofinos Oleofinos Mexico Pasternak - - Cooperativa Agroindustrial de Productores de Palma AceiteraCoopeagropal R.L. (Coopeagropal El Robel R.L.) EL ROBLE, LAUREL, CORREDORES, PUNTARENAS, COSTA RICA Puntarenas Costa Rica 8.4358333 -82.94469444 Oleofinos Oleofinos Mexico Pasternak - - CORPORACIÓN
    [Show full text]
  • Cadangan Komplek Baru Kerajaan Daerah Kuala Langat Di Ladang Sungai Sedu Jalan Klang Banting Mukim Tanjung Dua Belas Daerah Sung
    MS ISO 9001:2000 REG.NO. AR 2636 PROJECT:- CADANGAN KOMPLEK BARU KERAJAAN DAERAH KUALA LANGAT DI LADANG SUNGAI SEDU, JALAN KLANG BANTING, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN LOCATION :- OWNER :- Sg. Sedu Estate (Main Division) Selangor State Government Klang-Banting Road, Kuala Langat PROJECT COST :- COMPLETION DATE:- RM23 Million October 2005 DESCRIPTION :- This project involved building a new District Office for Kuala Langat District. The building stands 3 storeys high and is to be made the heart of the entire development of Sg. Sedu Estate (Main Division). The building is specially designed with local cultural heritage features and also being built on soft ground. Soil improvement works were carried out on the site as the site was founded on soft marine clay. All infrastructure works were also designed to suit the ground condition. Structurally the new District Office is founded on pile foundation and built with precast slabs and wall, beams and columns throughout the building. Upon nearing completion, the new District Office was awarded The Nippon Paint Design Award for Architectural Coating 2006. SERVICES PROVIDED :- ¾ Feasibility study on the building location. ¾ Design of all infrastructure works. ¾ Desiggggn of reinforced concrete building structure and building foundation. ¾ Tendering and construction management. ¾ Construction supervision of the entire project. Kuala Langat Administrative Centre District Office WISMA SSP, LEVEL 8-18, NO. 1 JALAN SR 8/3 SERDANG RAYA SEKSYEN 8 TEL NO.: 03-89433366(HL) FAX NO.: 03-89432691/2707 43300 SERI KEMBANGAN SELANGOR DARUL EHSAN MALAYSIA EMAIL : [email protected] WEB SITE : www.sspsb.com.my.
    [Show full text]
  • List of Installations Affected Under Efficient Management of Electrical Energy Regulations 2008 (Emeer 2008) State: Selangor
    LIST OF INSTALLATIONS AFFECTED UNDER EFFICIENT MANAGEMENT OF ELECTRICAL ENERGY REGULATIONS 2008 (EMEER 2008) STATE: SELANGOR No. Installation Name Address 12 (10 & 8),JLN TLK GADUNG 27/93,40400 SEKSYEN 27,SHAH ALAM, 1 PERUSAHAAN JAYA PLASTIK SELANGOR 2 PLASTIC CENTRE SDN BHD 6065,JLN HJ ABD MANAN BT 5,,41050 MERU,KLANG, SELANGOR LOT 1, JALAN P/2A, KAWASAN PERUSAHAAN PKT 1, 43650 BANDAR BARU 3 PLASTICTECNIC (M) SDN BHD BANGI, SELANGOR LOT 8595, KG. AIR HITAM, BATU 6 1/2, JALAN LANGAT, 41200 KLANG, 4 PLASTIK V SDN BHD SELANGOR LOT 60 & 61, JALAN SUNGAI PINANG 5/1, SEKSYEN 5, FASA 2A, TAMAN 5 POSCO-MALAYSIA SDN BHD PERINDUSTRIAN PULAU INDAH, 42920 PELABUHAN KLANG, SELANGOR 6464 & 6486,JLN SG PULUH,42100 KAW PERINDUSTRIAN LADANG SG 6 PRESS METAL BERHAD PULUH,KAPAR, SELANGOR 24,JLN CJ 1,43200 BERSATU INDUSTRIAL PARK CHERAS 7 R O WATER SDN BHD JAYA,BALAKONG, SELANGOR 11,JLN PERUSAHAAN 1,43700 BERANANG IND ESTATE,BERANANG, 8 RANK METAL SDN BHD SELANGOR NO. 2,JLN SULTAN MOHAMED 1, ,42000 KAWASAN PERINDUSTRIAN 9 KAWAGUCHI MFG. SDN BHD BANDAR SULTAN SULAIMAN,PELABUHAN KLANG, SELANGOR 10 BOX-PAK (MALAYSIA) BHD LOT 4 JALAN PERUSAHAAN 2, 68100 BATU CAVES, SELANGOR Inti Johan Sdn. Bhd., Lot. 18, Level 3 (1 St Floor), Persiaran Mpaj, Jalan Pandan 11 PANDAN KAPITAL Utama, Pandan Indah, 55100 Kuala Lumpur LOT 1888,JLN KPB 7,43300 KAWASAN PERINDUSTRIAN BALAKONG,SERI 12 MEGAPOWER HOLDINGS S/BHD KEMBANGAN, SELANGOR AVERY DENNISON MATERIALS SDN LOT 6 JALAN P/2, KAWASAN PERUSAHAAN BANGI, 43650 BANGI 13 BHD SELANGOR NO.
    [Show full text]
  • The Forgotten World War II Airfield: the Case of Morib Airfield
    EDUCATUM – Journal of Social Science (EJOSS), Vol.7 No.1, 2021 ISSN 2289-9391 / eISSN 2462-2443 (10-18) The Forgotten World War II Airfield: The Case of Morib Airfield Wardatul Hayat Adnan1, Dazmin Daud2, MohdFarizi Jamaluddin3 1Faculty of Communication and Media Studies, UniversitiTeknologi MARA, Selangor, Malaysia 2Faculty of Business and Management, UCSI University, Kuala Lumpur, Malaysia 3Faculty of Social Sciences and Liberal Arts, UCSI University, Kuala Lumpur, Malaysia *e-mail: [email protected] Received: 28 May 2020; Accepted: 24 December 2020; Published: 02 January 2021 To cite this article (APA): Adnan, W. H., Daud, D., & Jamaluddin, M. F. (2021). The Forgotten World War II Airfield: The Case of Morib Airfield. EDUCATUM Journal of Social Sciences, 7(1), 10-18. https://doi.org/10.37134/ejoss.vol7.1.2.2021 To link to this article: https://doi.org/10.37134/ejoss.vol7.1.2.2021 Abstract The airfield site at Kelanang in Selangor, Malaysia was operated during World War II under the Japanese Occupation. During that time, it was noted for its air force surveillance centre which protected the area from Port Swettenham or previously known as Port Klang to Port Dickson. It also acted as a military logistics that planned and carried out the movement, supply, and maintenance of military forces to sustenance Morib area. Currently, this historical structure and its remains have no longer exist. The area has now been transformed to a palm oil plantation. As time goes by, this airfield has been forgotten and invisible to our young generation. In addition to that, there are lack of literature and studies about the history and its roles during and after World War II.
    [Show full text]
  • Haze in the Klang Valley of Malaysia
    Atmos. Chem. Phys., 3, 591–605, 2003 www.atmos-chem-phys.org/acp/3/591/ Atmospheric Chemistry and Physics Haze in the Klang Valley of Malaysia M. D. Keywood1, G. P. Ayers1, J. L. Gras1, R. Boers2, and C. P. Leong3 1CSIRO Atmospheric Research, Australia 2Atmospheric Research Division KNMI Netherlands 3Malaysian Meteorological Service, Malaysia Received: 15 November 2002 – Published in Atmos. Chem. Phys. Discuss.: 10 February 2003 Revised: 27 May 2003 – Accepted: 27 May 2003 – Published: 5 June 2003 Abstract. Continuous measurements of dry aerosol light biomass burning in Kalimantan and Sumatra. Haze events scattering (Bsp) were made at two sites in the Klang Valley have been recorded in 1983, 1990, 1991, 1994, 1997 and of Malaysia between December 1998 and December 2000. 1998 (Radojevic and Hassan 1999, Muraleedharan et al. In addition 24-hour PM2.5 samples were collected on a one- 2000). Koe et al. (2001) noted that reduced visibility in day-in-six cycle and the chemical composition of the aerosol Malaysia during the 1997 haze episode was the result of long was determined. Periods of excessive haze were defined range transport of smoke from Sumatra. Historically, ma- as 24-hour average Bsp values greater than 150 Mm−1 and jor smoke hazes have been observed in the region, at times these occurred on a number of occasions, between May and impeding shipping, as early as the 1800s (McDonald 1938). September 1999, during May 2000, and between July and Episodes like the 1997 haze events prompt the need for a September 2000. The evidence for smoke from biomass thorough understanding of the factors regulating the severity burning being a significant contributor to aerosol during pe- of haze in Kuala Lumpur (KL) and the surrounding Klang riods of excessive haze is discussed.
    [Show full text]
  • Mainx Alc 0207 Klang Valley Train Route
    Klang Valley Rail Map Batu Caves Batu Caves–Tampin Tanjung Malim KTM Komuter Kuala Kubu Baru Rasa Tanjung Malim–Port Klang Batang Kali KTM Komuter Taman Wahyu Serendah Gombak Rawang LRT Ampang Line Kuang Taman Melati Wangsa Maju Kg Batu Sungai Buloh LRT Sri Petaling Line Sri Rampai Setiawangsa LRT Kelana Jaya Line Kepong Jelatek Sentral Sentul Timur Batu Kentonmen Dato Keramat Kampung Kepong Selamat ERL Klia Express Sentul Sentul Ampang Damai Kwasa Damansara Cahaya ERL Klia Transit Segambut Titiwangsa Ampang Park Cempaka KLCC Chow Kit KL Monorail Pandan Indah Kwasa Sentral Medan Putra PWTC Tuanku Kampung Baru MRT Sg Buloh-Kajang Line Pandan Jaya Kota Damansara Dang Bukit Nanas Wangi Sultan Ismail Raja Chulan Surian BRT Sunway Line Bukit Bintang Maluri Mutiara Damansara Tun Razak Cochrane Taman Note: The proposed MRT2, LRT3 and Bank Negara Bandaraya Exchange Pertama Klang BRT are not in this map Taman Bandar Utama Imbi Masjid Merdeka Midah ©The Star Graphics Miharja Taman Tun Jamek Hang Tuah Pudu Taman Dr Ismail Chan Sow Lin Mutiara Plaza Phileo Rakyat Taman Damansara Kuala Lumpur Pasar Maharajalela Cheras Seni Connaught Pusat Bandar Semantan Muzium Taman Tun Sambanthan Damansara Negara Salak Selatan Suntex KL Sentral Sri Raya Midvalley Bandar Tun Hussein Onn Bangsar Seputeh Abdullah Bandar Tun Razak Batu 11 Cheras KL Eco City (future) Salak Hukum Lembah Kelana Taman Taman Selatan Subang Jaya Bahagia Paramount Kerinchi Angkasapuri Bukit Dukung Bandar Tasik Terminal Pantai Dalam Bersepadu Skypark Terminal Asia Taman Selatan Ara Petaling
    [Show full text]
  • The Planning of Mosque in Shah Alam, Selangor
    Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Sciences 105 ( 2013 ) 723 – 733 AicE-Bs2013London Asia Pacific International Conference on Environment-Behaviour Studies University of Westminster, London, UK, 6-8 September 2013 "From Research to Practice" Travel Behaviour and Landuse Planning: The planning of mosque in Shah Alam, Selangor Ishak Che Abdullah*, Fatimah Yusof , Siti Mazwin Kamaruddin, Abdul Rauf Abdul Rasam Universiti Teknologi MARA, Shah Alam 40450, Malaysia Abstract Mosque is an important place for the Muslim to perform religious activities and as a place for social gathering. Several studies by M. Yilmaz, 2012 and A.Kahera et al 2009 provided with the design criteria for the optimal siting of mosque. In Malaysia, the criteria to provide mosque in any locality is based on the Guideline for Planning Mosque and Surau. Several studies have shown that a higher density and mixed-use neighbourhood yield less vehicle trips compared to lower density development. This has resulted in ideas to apply new approach in landuse planning to reduce motor vehicle trips. This paper intends to investigate the travel behavior of respondents to reach the mosque from their house to demonstrate the travel behavior of people in different type of neighbourhood. © 20132013 The Published Authors. byPublished Elsevier by ElsevierLtd. Selection Ltd. and peer-review under responsibility of the Centre for Environment- BehaviourSelection and Studies peer-review (cE-Bs), under Faculty responsibility of Architecture, of Centre for Planni Environment-Behaviourng & Surveying, UniversitiStudies (cE-Bs), Teknologi Faculty MARA, of Architecture, Malaysia. Planning & Surveying, Universiti Teknologi MARA, Malaysia. Keywords: Landuse planning; planning of mosque; travel behaviour 1.
    [Show full text]
  • Natural Heritage of Environmentally Sensitive Areas in Kuala Selangor District, Malaysia
    International Proceedings of Chemical, Biological and Environmental Engineering, Vol. 91 (2016) DOI: 10.7763/IPCBEE. 2016. V91. 6 Natural Heritage of Environmentally Sensitive Areas in Kuala Selangor District, Malaysia M Zainora Asmawi and Tuminah Paiman Department of Urban and Regional Planning, International Islamic University Malaysia (IIUM) Abstract. This paper addresses the issue of the conserving the natural heritage of environmentally sensitive areas in Kuala Selangor District, Malaysia. Being as environmental goods, the existence of these natural heritage elements is all important as overall it enhances the quality of life. Simultaneously, it is greatly marked that presently there is an increasing tendency in the development which may hamper these sensitive areas. Thus, this research was embarked to analyses the importance of areas of natural heritage found in Kuala Selangor. The research mainly employed the collection of secondary information in terms of textual and statistical information in the form of GIS format to assemble info for analysis purpose. The results indicate that the natural heritage of environmentally sensitive areas comprises of Kuala Selangor Nature Park, Kampung Kuantan, Kampung Bukit Belimbing and Permanent Forest Reserves. These fields hold the prominent values of historical archaeology and biodiversity which should be protected for future generations. As a conclusion, it is clearly evident that environmental goods, letting in natural heritage have invaluable assets that hold its own contribution to raising the overall environmental quality. Keywords: environmental goods, natural heritage, environmentally sensitive areas, Kuala Selangor. 1. Introduction The integration of environmentally sensitive areas (ESAs) into the spatial planning by coherent environmental goods system has received increasing attention by many stakeholders in Malaysia in the last decades.
    [Show full text]