Summary of the Mineral Block Part-A- GENERAL INFORMATION ABOUT MINERAL BLOCK S. no Features Details 1 Location Degve-Banda Mineral Block Iron Ore N 73052' 05” - 73053' 20” Corner Points (Latitude, longitude) E 15048' 30” - 15049' 40” Villages Degve, Banda Tehsil/Taluka District Sindhudurg State 2 Area (Hectares/Sq. Kilometre) 152 Hect Mineralised Area 100 Hect. Non-mineralised Area 52 Hect. 3 Exploration Status (G2/G3/G4 etc.) G-2 Exploration Agency DGM Maharashtra Total No. Of Boreholes with meterage 68 Boreholes (6109 Mt.) Borehole spacing (Density) 50 Mt. 4 Quantity of Minerals (Grade-wise) Mineral1, Mineral2, Mineral3------Mineraln Iron Ore, Laterite Total Geological Resources (Reserves) 14.55 MT (45% Cut off Fe) 5 Mineral Zones Number of Mineral Zones Northern, Central and Southern Zone Trend (Dip & Strike) Strike NNE-SSE to NNW-SSW Total thickness 3.84 m to 7.13 m 6 Accessibility Nearest Rail Head Sawantwadi, 25 km Road Sawantwadi- Road (National Highway) Airport Dabolim (Goa) Port Redi (Sindhudurg) 7 Hydrography Local Surface Drainage Pattern (Channels) Rivers/Streams due east at about 2 kms 8 Climate Mean Annual Rainfall 4000 mm Temperature (December) 150C Temperature (June) 380C 9 Topography Topo Sheet Number T.S. NW 48 E/13 Morphology of the area Hilly terrain with shallow valleys * There is one mining lease in the vicinity of the area. * Laterite can be mined by the successful bidder after payment of royalty as per prevailing Rules PART B- PARTICULARS OF STATUTORY LICENSES, PERMITS, PERMISSIONS, CONCESSIONS, APPROVALS AND CONSENT RELATED TO MINING OPERATIONS

S. no Particulars Details/Status

1 Forest Clearance To be Obtained by the successful Bidder

Wild life clearances (Sanctuary, reserve or 2 special zone clearances) ---do-- 3 Environmental clearances ---do-- 4 Consent to establish ---do-- 5 Explosive license ---do-- 6 Permission for mining opening ---do-- Permission for installation/trial operation of 7 equipment ---do-- 8 Ground water clearance (Centre/State) ---do-- 9 Railway siding approval ---do-- 10 Approval for Diesel Storage ---do-- 11 Power line from State Discom Available in the area Clearances relating to work under an existing 12 transmission line or shifting of the Not applicable transmission line. 13 Gram Sabha Consent To be Obtained by the successful Bidder

PART C- PARTICULARS OF LAND S.No. Area Details 1 Total Concession Area 152 Hect. 2 Forest Land with Status Nil 3 Government Land with Status 10.74 Hect. 4 Private land with Status 141.26 Hect. 5 Revenue Survey detail of the area ---