Comdain Connect ISSUEISSUE 24 28 JANUARY MAY 2019 2018 a Newsletter for the Comdain Infrastructure Team
Total Page:16
File Type:pdf, Size:1020Kb
Comdain Connect ISSUEISSUE 24 28 JANUARY MAY 2019 2018 A newsletter for the Comdain Infrastructure team ALSO INSIDE National Safe Work Month PAGE 3 DevelopmentComdain Awarded Group Update PAGE 3 ServicingReliability the Eternal Flame PAGE 5 MajorProgram milestone for QLD team PAGE 6 FOR SOUTH EAST WATER PAGE 6 Timing is everything for Brushy Creek project team PAGE 4 This Issue... Safety Update Page 3 Queensland Urban Utilities Replacement Program Page 5 Training Hits New Heights Page 6 What We’ve Been Up To Page 8 2 COMDAIN CONNECT | A newsletter for the Comdain Infrastructure team 3 Message From the CEO Safety Update and I do thank all those who continue to respectful of his crew leader’s knowledge Over the past few months we have been Mt Atkinson, Tarneit Street water mains workplace, these outcomes indicate go the ‘extra yard’ for the benefit of the and eager to learn. Nathan reminded subject to a number of external audits. replacement, Aitkin Boulevard and that we are continually improving, Epping North Tanks projects. Then it and demonstrate our commitment to organisation and their colleagues. me of the significant opportunity we Firstly, we have undergone the re- have in moulding and creating the next was off to MultiNet Gas works in Elwood, ensuring that Comdain is a safe and The integration between Comdain and certification audits for Health and generation of Australian utility experts Carnegie and Glen Huntly. Finally, our great place to work. Service Stream is proceeding well. The Safety (ISO18001, AS4801), Environment and, more importantly, quality individuals travels were completed in Queensland two organisations are collaborating (ISO14001) and Quality (ISO9001). The who are informed leaders. This evolution with visits to Luggage Point and on several operational functions to re-certification audit is every three Kevin Morrison and education doesn’t just happen; Springfield Lakes. ensure our dynamic nature is not only years and covers each of the elements General Manager—HSEQ it is our responsibility and privilege to retained but enhanced. Operations are of the standards. Therefore, it is very In April, we were also subjected to the embrace the newcomers to the industry. performing well and customer feedback comprehensive auditing our processes and Federal Safety Commission external audit. Consider the less experienced in your is positive. This confirms our work the implementation of these in the field. This was conducted at the Nimmie Ciara work group and the positive impact you continues to be delivered in the Comdain Project in outback NSW being completed can have on them through constructive We commenced with a review of our way. Furthermore, a number of clients by the Regional Business Unit. This communication, support on new or HSEQ procedures in Epping, but soon have expressed interest in collectively certification allows Comdain to complete difficult tasks and leading by example. found ourselves on the road, travelling leveraging Service Stream’s expertise in federal funded projects, which places The maturing of a highly capable to the Echuca office. We visited the field mobility solutions, audit, renewable Comdain in a unique position against and committed young professional is Fonterra Pipeline Project in Stanhope energy alternatives and safety governance, some of its competitors. This is one of the extremely satisfying and rewarding for all. before heading back to Melbourne to to enhance our service offering and best outcomes since Comdain entered May 2019, the year is flying by. Comdain visit a number of projects around the provide better outcomes to our end Take the lead and embed good into this scheme in 2015. continues to be extremely busy on all Melbourne suburbs. These included Land customers (the water and gas consumers workplace habits in the next generation fronts—tendering, design and planning, Developments projects at True North I would like to thank everyone involved of Australia). The ability to leverage that are looking up at you. delivery and all support functions Subdivision, Lyndarum North Subdivision in these audits for their commitment such expertise and the harmonisation (Safety, People and Culture, IT, Legal & Enjoy the read. and Saltwater Estate Point Cook. We and participation. Whilst we still have of functions will enable Comdain to Commercial, Finance). We are well on also visited Vic Engineering projects at some work to improve the safety of our maintain a healthy growth rate, in a our way to a financial year 2019 revenue Cheers, controlled and governed environment. total of $340m, $23m over the budget and a 15% increase on last financial year. With growth comes the need for new In the last 4 years we have realised an Comdain staff members. At a recent average annual growth of 16.4%. This level site visit to a gas service repair in metro of growth is exciting and provides an array Melbourne, I met one of our new gas of opportunities, but it also requires some networks apprentices, Nathan Stargatt. Moving Forward extraordinary efforts from the existing Nathan was engaging, expressing Peter Coen team. These discretionary efforts are on his appreciation for the employment Together display daily throughout the organisation, opportunity on the Victorian gas network, In only a short few month’s terrific Service Stream’s Managing Director progress has been made to help us Leigh Mackender and CFO Bob Grant assimilate within the Service Stream visited our Clayton office to meet the group. Teams across both businesses teams and learn more about the asset have been working together to identify management services we provide for natural alignments and opportunities the Multunet Gas network. where we can share resources and Keep up the great work everyone! learnings in an effort to add value to all Asari Wins Chairman’s HSE Award that we do. The HSEQ group are undertaking a The award was presented to Asari by On an annual basis Multinet comprehensive review to ensure we Multinet / AGIG Chairman Peter Lowe Gas recognises exemplary HSE continue to capture best practices for: initiatives completed by their across the safety programs within the Having the courage to STOP— service partners. group. highlighting electrical asset risks Our very own Asari Giousoh Consulting with crew leaders and Our People and Culture teams are (Project Manager, Clayton) was seeking further clarification busily working on an upcoming release of a new cloud–based awarded the CEO / Chairman’s Eliminating the risk of working in the human resources system which will HSE Recognition Award. vicinity of HV underground assets streamline many processes and offer Leigh Mackender from Service Stream visits Smiles all round: Asari celebrates at award Janet Allen from Service Stream working Fantastic effort Asari, keep up the Clayton depot announcement with colleagues John Deluca, greater reporting. with our People and Culture team at great work! Gary Bennett and Paul Baker. Comdain’s head office. 4 Projects Around Australia 5 New South Wales Queensland PROJECT: PROJECT: Chisholm and Gillieston Heights AC Pipeline Replacement Program Recycled Water Treatment Plants START DATE: START DATE: APRIL 2019 May 2017 CLIENT: CLIENT: Queensland Urban Utilities Hunter Water Corporation ABOUT THE PROJECT: ABOUT THE PROJECT: Comdain’s Queensland Engineering Networks team has been engaged by As part of an important water-saving Queensland Urban Utilities to deliver initiative, Hunter Water engaged the replacement of some 13 kms of Comdain to design, supply, install, asbestos cement water mains that have construct, test and commission two now reached the end of their design recycled water treatment plants New treatment plant ready for commissioning life across 58 streets in the suburbs (RWTPs) for the supply of reusable of Cannon Hill, Seven Hills, Carina, water to the suburbs of Chisholm and Morningside and Norman Park. Plants, the team was able to successfully Gillieston Heights in the Lower Hunter deliver despite the tight timeframe. The teams focus on quality to ensure the works are of the highest standard Region of New South Wales. The Design and Construct project was The project will see water normally Delivering this project is a awarded to the team in December 2018 The scope also required the team discarded from household bathrooms, key water-saving initiative as and the team immediately commenced to supply, install and commission laundries and kitchens treated to become properties receiving recycled planning, survey and design works. Design a chlorine generator at Berry Park high quality recycled water. The treated water reduce their total surveys of the entire scope was completed Wastewater Pumping Station. recycled water can then be safely used by use of drinking water by in February followed by detailed design Coordinating with several residents and local business for things like approximately 40%. of the first separable portion of works stakeholders as they worked in and watering gardens, washing cars, flushing totalling 5,800m of 100 and 150mm around the live Wastewater Treatment toilets and external cleaning, etc. diameter water main replacements at the end of March. While survey and detailed design has been progressing, the Comdain team The installation of temporary bypass water supply helps to minimise disruption to customers has procured the project permanent materials with coordination from the Asset Management Services national procurement team to ensure Comdain’s purchasing influence is utilised PROJECT: ABOUT