MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

141st SEAC, A.P.

(Online Meeting held on 25.06.2020)

Present:

The following members were present:

1. Dr. V.S.R.K.Prasad Visakhapatnam Chairman

2. Prof. S. Bala Prasad Visakhapatnam Member

3. Smt. M.Vijayalakshmi Guntur Member

4. Prof. P. Jagannadha Rao Visakhapatnam Member

5. Dr.Pulipati King Visakhapatnam Member

6. Prof. B.V.Sandeep, ( Retd.) Visakhapatanam Member

7. Dr. M. Bullaiah, IFS (Retd.) Hyderabad Member

8. Prof. K.Seshaiah Tirupati Member

9. Dr. G.Devala Rao Member Vijayawada

10. Sri. V. Veda Kumar, Hyderabad Member 11. Prof. K. Kameswara Rao (Retd.) Visakhapatnam Member

12. Prof. KVG Murali Krishna . Member

MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

Agenda Name and Address Line of Activity No. 1. 4.67 Ha Silica Sand of M/s. Mineral Development Silica Sand Corporation Limited at Sy.No. 612P, 613P, 615P, 616P, 617P of Thamminapatnam Village, Chillakur Mandal, S.P.S.R Nellore District, Andhra Pradesh.

SIA/AP/MI Category : B2 N/152297/2 The representatives of the project proponent M/s APMDC Ltd. (DGM Geology) and their 020 (EC) consultant M/s. SV ENVIRO LABS & CONSULTANTS have attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed silica sand mining project for the production quantities: Silica sand – 186800 TPA, duly stipulating the following conditions that the project proponent shall carryout mining only Two meters depth sand from the top manually and no underwater mining is undertaken.

 All the silica sand are to be accounted for authorized users for the purpose of silica users only, an undertaking shall be submitted.  Sand quality report for salinity, Electrical Conductivity, chlorides, fluorides, pH shall be submitted.  Green belt shall be taken up in the peripheral Bufferzone of 7.5 m width all along the boundary of the mine and planted with casuarina plantation.  APSEIAA Sub-committee guidelines shall be implemented;  50 m set back from Buckingham canal need to be maintained;  Sand dunes at the southern boundary should not be mined;  Strictly manual mining only is permitted.  The validity of the EC is for 1 year or the life of mine which is earlier.

The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

2. 4.98 Ha Silica Sand of M/s. Andhra Pradesh Mineral Development Silica Sand Corporation Limited at Sy.No. 800/P of Thamminapatnam Village, Chillakur Mandal, S.P.S.R Nellore District, Andhra Pradesh.

SIA/AP/MI Category : B2 N/152399/2 The representatives of the project proponent M/s APMDC Ltd (DGM) Geology and their 020 (EC) consultant M/s. SV ENVIRO LABS & CONSULTANTS have attended the Online meeting.

The Committee recommended to defer the proposal for want of NOC from Forest department for mining activity. The greenbelt details along with Lat Longs shall be submitted and presented again for appraisal by the proponent. 3. 4.50 Ha Silica Sand of M/s. Andhra Pradesh Mineral Development Silica Sand Corporation Limited at Sy.No: 809P, Thamminapatnam Village, Chillakur Mandal, S.P.S.R Nellore District, Andhra Pradesh SIA/AP/MI Category : B2 N/152416/2 The representatives of the project proponent M/s APMDC Ltd (DGM Geology) and their 020 (EC) consultant M/s. SV ENVIRO LABS & CONSULTANTS have attended the Online meeting.

The Committee recommended to defer the proposal for want of NOC from Forest department for mining activity. The greenbelt details along with Lat Longs shall be submitted and presented again for appraisal by the proponent. 4. 4.98 Ha Silica Sand of M/s. Andhra Pradesh Mineral Development Silica Sand Corporation Limited at Sy.No:291/P(Block-14), ThamminapatnamVillage, ChillakurMandal, S.P.S.RNellore District, AndhraPradesh

SIA/AP/MI Category : B2 N/152412/2 The representatives of the project proponent M/s APMDC Ltd (DGM Geology) and their 020 (EC) consultant M/s. SV ENVIRO LABS & CONSULTANTS have attended the Online meeting.

The Committee recommended to defer the proposal for want of NOC from the Forest department for mining activity. The greenbelt details along with Lat Longs shall be submitted and presented again for appraisal by the proponent. MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

5. 4.98 Ha Silica Sand of M/s. Andhra Pradesh Mineral Development Silica Sand Corporation Limited at Sy. No: 583 & 584/P, Thamminapatnam Village, Chillakur Mandal, S.P.S.R Nellore District, Andhra Pradesh

SIA/AP/MI Category : B2 N/152403/2 The representatives of the project proponent M/s APMDC Ltd (DGM Geology) and their 020 (EC) consultant M/s. SV ENVIRO LABS & CONSULTANTS have attended the Online meeting.

The Committee recommended to defer the proposal for want of NOC of Forest department for mining activity. The greenbelt details alongwith Lat Longs shall be submitted and presented again for appraisal by the proponent..

6. 3.80 Ha. Proposed Ordinary Sand Mine, Nidhanawada Sand Reach of Ordinary Sand Penna River at Sy.No. 156, Nidhanawada Sand Reach, Nidhanawada Village, SinganamalaMandal, Anantapur District, Andhra Pradesh. Penna River

SIA/AP/MI Category : B2 N/155779/2 The representatives of the project proponent Deputy Director Mines and Geology Anantapur and 020 their Consultant/RQP attended the Online meeting. The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 38,000 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken along with additional conditions.

 Green belt shall be developed along the road, the area to be marked and submitted.  Stock point has to be provided adjacent to the road.

The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

7. 1.843 Ha. Proposed Ordinary Sand Mine, Pamidi Sand Reach of Penna Ordinary Sand River at Sy.No. 1247, Pamidi Sand Reach, Pamidi Village, Pamidi Mandal, Anantapur District, Andhra Pradesh. Penna River

SIA/AP/MI Category : B2 N/156704/2 020 The representatives of the project proponent and their Consultant/RQP attended the Online

meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 18,430 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken alongwith additional conditions.

 Compensatory plantation shall be taken up on the river bank/bund so as to strengthen it, as several trees will be felled in the mining area.  Since the provision is there in this area, a 7.5 meters buffer zone shall be provided and the change in the quantity of sand shall be submitted.

The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

8. 4.940 Ha.Proposed Ordinary Sand Reach, Mantralayam Sand Reach -II at Ordinary Sand Mantralayam Village of Tungabhadra River, Mantralayam Mandal, Kurnool District, Andhra Pradesh Tungabhadra River

SIA/AP/MI The representatives of the project proponent and their Consultant // RQP attended the Online N/155022/2 meeting. 020 MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

The Committee observed that a canal dug by the farmers is passing at a distance of 200 meters, from the reach boundary, and after detailed discussions it is felt that the proponent shall revise the boundaries of the mine leaving a buffer of 500 meters from the farmer’s canal as proposed in the Inspection Report of the mine, and revise the boundaries of the mine and quantity of sand mining. Fresh approval from the District Collector with the revised proposal shall be obtained and application be submitted.

In the inspection report of the District Committee, it is recorded that mining will be done by leaving 500 meters buffer area for each sand mine as per the WALTA Act. Hence, deferred the proposal on the request of the proponent for rectification of the errors.

9. 4.580 Ha.Proposed Ordinary Sand Reach, Mantralayam Sand Reach -I at Ordinary Sand Mantralayam Village of Tungabhadra River, Mantralayam Mandal, Kurnool District, Andhra Pradesh Tungabhadra River

SIA/AP/MI The representatives of the project proponent and their Consultant // RQP attended the Online N/154950/2 meeting. 020 The Committee observed that a canal dug by the farmers is passing at a distance of 200 meters, from the reach boundary, and after detailed discussions it is felt that the proponent shall revise the boundaries of the mine leaving a buffer of 500 meters from the farmer’s canal as proposed in the Inspection Report of the mine, and revise the boundaries of the mine and quantity of sand mining. Fresh approval from the District Collector with the revised proposal shall be obtained and application be submitted.

In the inspection report of the District Committee, it is recorded that mining will be done by leaving 500 meters buffer area for each sand mine as per the WALTA Act. Hence, deferred the proposal on the request of the proponent for rectification of the errors.

10. 4.2978 Ha. Proposed Ordinary Sand Mine, Kandisa Sand Mine at Kandisa Ordinary Sand Village, R.Amadalavalasa Mandal, Srikakulam District, Andhra Pradesh. (Nagavali River)

SIA/AP/MI Category : B2 N/155941/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant / RQP attended the meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 42,978 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken along with following conditions.  Green belt shall be developed at a suitable place, preferably along the River Bund/bank in coordination with the Forest Dept.

The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP. 11. 4.50 Ha Proposed Ordinary Sand Mine,Madapam Sand Mine, Madapam Ordinary Sand Village, Narasannapeta Mandal, Srikakulam District, Andhra Pradesh (Vamsadhara River)

SIA/AP/MI Category : B2

N/155949/2 The representatives of the project proponent, Deputy Director Mines and Geology Srikakulam and 020 their Consultant / RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 45,000 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken along with following condition.  Green belt shall be developed along the River Bund/bank in coordination with the Forest MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

Dept.

The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

12. 4.48 Ha Proposed Ordinary Sand Mine ,Killipalem Sand Mine at Killipalem Ordinary Sand Village, Srikakulam Mandal & District, Andhra Pradesh. (Nagavali River)

SIA/AP/MI Category : B2 N/155947/2 020 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and their Consultant /RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 44,800 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken along with following condition..

 Plantation should not be disturbed in the mining area or compensatory plantation shall be taken up. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP. 13. 4.50 Ha Proposed Ordinary Sand Mine,Yeragam Sand Mine at Yeragam Ordinary Sand Village, Sarubujjili Mandal, Srikakulam District, Andhra Pradesh. (Vamsadhara River)

SIA/AP/MI Category : B2 N/155980/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant / RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 45,000 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

14. 4.9245 Ha Proposed Ordinary Sand Mine, Parlam-II Sand Mine at Sy.No:1, Ordinary Sand Parlam Village, Jalumuru Mandal, Srikakulam District, Andhra Pradesh (Vamsadhara River)

SIA/AP/MI Category : B2 N/156491/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant /RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 49,245 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

15. 4.97 Ha Proposed Ordinary Sand Mine, K. Venkatapuram Sand Mine at Ordinary Sand K.Venkatapuram Village, Kandyam Village, R. Amadalavalasa Mandal, (Nagavali River) Srikakulam District, Andhra Pradesh

SIA/AP/MI Category : B2 N/156687/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant /RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

proposed sand mining project for the production quantities: Ordinary sand – 49,700 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

16. 4.467 Ha Proposed Ordinary Sand Mine, Andavarm-III Sand Mine at Ordinary Sand Sy.No:1, Andavaram Village, Jalumuru Mandal, Srikakulam District, (Vamsadhara River) Andhra Pradesh

SIA/AP/MI Category : B2 N/156700/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant / RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 44,670 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

17. 4.3 Ha. Proposed Ordinary Sand Reach, Hiramandalam Sand Reach at Ordinary Sand Sy.No 134 of Hiramandalam Village & Mandal, Srikakulam District, Andhra (Vamsadhara River) Pradesh

SIA/AP/MI Category : B2 N/156866/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant / RQP attended the Online meeting.

The Committee observed that the proposed mining area is in the stream, and the underwater mining is not permitted. Hence, the proposal is REJECTED.

18. 4.10Ha proposed Ordinary Sand, Pothayyavalasa Sand Reach at Sy.No:140, Ordinary Sand Pothayyavalasa Village, Narasannapeta Mandal, Srikakulam District, (Vamsadhara River) Andhra Pradesh

SIA/AP/MI Category : B2 N/159346/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant / RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 41,000 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

19. 4.59 Ha. of Medamerthi Sand Reach, Sy.No:40, Medamirthi Village, Ordinary Sand Santhakaviti Mandal, Srikakulam District, Andhra Pradesh (Nagavali River)

SIA/AP/MI Category : B2 N/159412/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant /RQP attended the Online meeting

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 45,900 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

along with the EMP.

20. 4.50 Ha. of Andavaram-II Sand Reach, Sy. No:1 of Andavaram and Sy. Ordinary Sand No:663 of Purushothapuram Villages, Jalumuru and Surbujili Mandals, (Vamsadhara River) Srikakulam District, Andhra Pradesh

SIA/AP/MI Category : B2 N/159427/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant /RQP attended the Online meeting

The Committee recommended for issue of Environmental Clearance for one year to this 3 proposed sand mining project for the production quantities: Ordinary sand – 45,000 m /annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

21. 4.97 Ha. of Butchipeta Sand Reach, Sy.No:198, Butchipeta Village, Ordinary Sand Madapam Panchayat, Narasannapeta Mandal, Srikakulam District, Andhra (Vamsadhara River) Pradesh

SIA/AP/MI Category : B2 N/159407/2 The representatives of the project proponent Deputy Director Mines and Geology Srikakulam and 020 their Consultant /RQP attended the Online meeting

The Committee recommended for issue of Environmental Clearance for one year to this 3 proposed sand mining project for the production quantities: Ordinary sand – 49,700 m /annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

22. 3.01 Ha .Proposed Ordinary Sand Mine, De-casting of Ordinary Sand , Ordinary Sand Gopalapuram Sand Reach, at Sy No:493/2, 494/2, 494/3, 494/7, 494/9 (Godavari River) Gopalapuram Village, Mandal, , Andhra Pradesh.

SIA/AP/MI Category : B2 N/147982/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

The Committee observed that the proposal is for sand de-casting in patta land, the proponent failed to produce the patta land details. Hence, deferred the proposal.

23. 0.821 Ha. Proposed Ordinary Sand Mine, De-Casting of Ordinary Sand Ordinary Sand Mining Kapileswarapuram Sand Reach , at Sy No: 466,469,473- (Godavari River) 11,Kapileswarapuram Village & Mandal, East Godavari District, Andhra Pradesh.

SIA/AP/MI Category : B2 N/148139/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

The Committee observed that the proposal is sand de-casting in patta land, the proponent failed to produce the patta land details. Hence, deferred the proposal. MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

24. 2.16 Ha. Ordinary Sand of Sand Reach at Ubalanka village, Ordinary Sand , East Godavari District, Andhra Pradesh (Godavari River)

SIA/AP/MI Category : B2 N/152583/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

Clarification regarding cluster is not submitted & hence deferred the proposal.

25. 1.88 Ha. Proposed Ordinary Sand Mine, Korumilli Sand Reach at Korumilli Ordinary Sand Village, Kapileswarapuram Mandal, East Godavari District, Andhra (Godavari River) Pradesh.

SIA/AP/MI Category : B2 N/152533/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

Clarification regarding cluster is not submitted & hence deferred the proposal.

26. 3.14 Ha. Proposed Ordinary Sand Mine, Ankampalem Sand Reach at Ordinary Sand Ankampalem Village, Mandal, East Godavari District, Andhra (Vasista Godavari Pradesh. River)

SIA/AP/MI Category : B2 N/152649/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

Clarification regarding cluster is not submitted & hence deferred the proposal.

27. 2.58 Ha. Proposed Ordinary Sand Mine, Gopalapuram Sand Reach at Ordinary Sand Gopalapuram Village, Ravulapalem Mandal, East Godavari District.– (Vasista Godavari River)

SIA/AP/MI Category : B2 N/152593/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 25,800 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

28. 1.33 Ha. Proposed Ordinary Sand Mine, Pulidindi Sand Reach at Pulidindi Ordinary Sand Village, Atreyapuram Mandal, East Godavari District, Andhra Pradesh.– (Vasista Godavari River)

SIA/AP/MI Category : B2 N/152542/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 13,300 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP. MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

29. 2.69 Ha. Proposed Ordinary Sand Mine, Pottilanka- Kondukudhuru Sand Ordinary Sand Reach at Pottilanka- Kondukudhuru Villages, Ainavilli Mandal, East (Vasista River) Godavari District, Andhra Pradesh

SIA/AP/MI Category : B2 N/151353/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting.

The Committee observed that, the mining area is in stream and it is an island, hence recommended to defer the proposal.

30. 2.13 Ha. Proposed Ordinary Sand Mine, Vakalagaruvu Sand Reach Ordinary Sand atVakalagaruvu village, Ambajipeta Mandal, East Godavari District, (Godavari River) Andhra Pradesh.

SIA/AP/MI Category : B2 N/151565/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the meeting

The Committee recommended for issue of Environmental Clearance for one year to this proposed sand mining project for the production quantities: Ordinary sand – 21,300 m3/annum, duly stipulating a condition that the project proponent shall carryout mining only one meter depth sand from the top manually and no underwater mining is undertaken. The project proponent shall allocate sufficient funds for implementation of CSR activities as committed by the representative along with the EMP.

31. 4.90 Ha. Proposed Ordinary Sand Mine, Jonnada Sand Reach at Jonnada Ordinary Sand Village, Alamuru Mandal, East Godavari District ,Andhra Pradesh. (Godavri River)

SIA/AP/MI Category : B2 N/152515/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting .

Clarification regarding cluster is not submitted & hence the Committee recommended to defer this proposal.

32. 4.96 Ha. Ordinary Sand Mine, De casting of sand in Kotipalli Sand Reach , Ordinary Sand Mansas Trust at Sy. No: 68/3&284 of Kotipalli Village , K.Gangavaram, East (Godavari River) Godavari District, Andhra Pradesh

SIA/AP/MI Category : B2 N/157210/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting .

The mining area in the patta land in which the decasting is proposed, some differences in the extent of the land were observed and hence the proposal is deferred.

33. 4.84 Ha. Ordinary Sand Mine, De casting of sand in Kotipalli Sand Reach at Ordinary Sand Sy. No: 68/3 of Kotipalli Village, K.Gangavaram, East Godavari District (Godavri River)

SIA/AP/MI Category : B2 N/155396/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting .

The mining area in the patta land in which the decasting is proposed, some differences in the extent of the land were observed and hence the proposal is deferred. MINUTES OF THE 141st MEETING OF STATE EXPERT APPRAISAL COMMITTEE (SEAC), A.P., HELD ON 25th

June 2020 AT VISAKAPATNAM, A.P.

34. 4.98 Ha.De-casting of sand in Kotipalli Sy. No: 82,84 &107 of Kotipalli Ordinary Sand Village, K.GangavaramMandal, East Godavari District, Andhra Pradesh (Godavri River)

SIA/AP/MI Category : B2 N/155379/2 The representatives of the project proponent Asst. Geologist, East Godavari and their Consultant 020 /RQP attended the Online meeting .

The mining area in the patta land in which the decasting is proposed, some differences in the extent of the land were observed and hence the proposal is deferred.

Sd/- Dr. V.S.R.K.Prasad CHAIRMAN SEAC, A.P