Corrigendum/11-12/1646 Dated: 29.06.2011 BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) Office of the General Manager, Katras Area P.O. Sijua Distt. Dhanbad - 828121. Ref. No. BCCL/GM/IV/Civil/Corrigendum/11-12/1646 Dated: 29.06.2011. CORRIGENDUM Due to some unavoidable technical reasons date of issue/ sale, receipt and opening of Tender for the work invited vide NIT Ref.No. BCCL/GM/IV/Civil/Tender/11-12/1101Dated 15.06.2011 has been extended as mentioned below:- Issue of tender documents- begins on 11.07.2011 Closed on-13.07.2011 Date of receiving of Tender- 15.07.2011 upto 3.00 PM. Date of opening of Tender -18.07.2011 at 4.00 P.M. All other terms & conditions of the original NIT as mentioned above will remain unchanged. The detailed Tender Notice, GTC & BOQ. Can also be seen in the company website www.bccl.gov.in and can be downloaded within sale period of tender documents. Area Civil Engineer, Katras Area Distribution:- 1) The C.V.O., BCCL, Koyla Bhawan, Dhanbad. 2) G.M. (Civil), Civil HQ, Koyla Nagar, Dhanbad. 3) General Manager (Administration), Koyla Bhawan, BCCL 4) General Manager (EDP), BCCL. Koyla Bhawan for publication of tender in website. 5) General Manager, Katras Area 6) S.O.(Mining)/AFM/APM/A.M.(Planning)/A.M.(Safety), Katras Area, All Area CGM/GM’s, Areas & Projects of BCCL & CCWO 7) All Area Civil Engineers, Area-I to XII, Sudamdih, Moonidih, PB. Area, Block-II, EJ. & W J. Areas, CCWO. 8) All Project Officers, Collieries of Katras Area. 9) Asstt. Commandant,CISF Camp Angarpathra- with a request to depute Security personnel during the time period of receiving of tender near tender box and sealing the box at the time mentioned in NIT. 10) Inspector In-Charge, CISF Post, Koyla Bhawwan Gate BCCL Dhanbad -for necessary arrangement at his end. 11) Inspector In-Charge,CISF Post, Area Office, Govindpur Area-III. 12) Inspector In-Charge, CISF Post, Area Office, Sijua Area-V. 13) The Builders Association of India, Akashkinaree Kanta, P.O. Katrasgarh, Dhanbad. 14) Sr. FO/SE (Civil), Katras Area. 15) Cashier, Katras Area. 16) Notice Board, Katras Area. 17) Tender file. 18) LEO(C), Katrasgarh. 19) The Secretary, Chhatabad Malkera, Adarsh Sharmik Sahyog Samitee Ltd. 5, Chhatabad at Malkera Road, P.O. Katrasgarh, Dhanbad BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) Office of the General Manager, Katras Area P.O. Sijua Distt. Dhanbad - 828121. Ref. No. BCCL/GM/IV/Civil/Corrigendum/11-12/ Dated: 30.06.2011. CORRIGENDUM Due to some unavoidable technical reasons date of issue/ sale, receipt and opening of Tender for the work invited vide NIT Ref.No. BCCL/GM/IV/Civil/Tender/10-11/1085 Dated 15.06.2011 has been extended as mentioned below:- Issue of tender documents- begins on 11.07.2011 Closed on-13.07.2011 Date of receiving of Tender- 15.07.2011 upto 3.00 PM. Date of opening of Tender -18.07.2011 at 4.00 P.M. All other terms & conditions of the original NIT as mentioned above will remain unchanged. Area Civil Engineer, Katras Area.IV.Distribution:- 5) The C.V.O., BCCL, Koyla Bhawan, Dhanbad. 6) G.M. (Civil), Civil HQ, Koyla Nagar, Dhanbad. 7) General Manager (Administration), Koyla Bhawan, BCCL 8) General Manager (EDP), BCCL. Koyla Bhawan for publication of tender in website. 9) The Public Relation Officer,BCCL,Koyla Bhawan, Dhanbad.-with 5 copies of corrigendum of the NIT for publication of the same in approved News papers as per norms of the company. Corrigendum to NIT.No. BCCL/GM/IV/Civil/Tender/10-11/9061 Dated 28.02.2011 Corrigendum Notice No.BCCL/GM/IV/Civil/Corrigendum/10-11/ Dated 14.03.2011 Tender for the following work/works are invited by Civil Engg. Deptt, BCCL Katras Area.on behalf of BCCL Management-Providing and laying water supply pipe line from WMC Filter Plant to Gaslitand colony,AKWMC under Katras Area. Estimated cost. Earnest Money Cost of Tender Paper Time of completion Rs.4,25,084.00 Rs.4,251.00 Rs.250.00 One & half months. All other details i.e. Estimated cost of work, Completion period, Cost of EMD,etc. cab be seen on Company’s Website http://bccl.cmpdi.co.in The sale period of tender documents : from 28.03.2011 to 30.03.2011. Date of receipt of tender : on 01.04.2011 from 10.00AM to 3.00 PM. Date of opening of Tender : on 04.04.2011 at 4.00 PM 6) General Manager, Katras Area 7) S.O.(Mining)/AFM/APM/A.M.(Planning)/A.M.(Safety), Katras Area, All Area CGM/GM’s, Areas & Projects of BCCL & CCWO 8) All Area Civil Engineers, Area-I to XII, Sudamdih, Moonidih, PB. Area, Block-II, EJ. & W J. Areas, CCWO. 9) All Project Officers, Collieries of Katras Area. 10) Asstt. Commandant,CISF Camp Angarpathra- with a request to depute Security personnel during the time period of receiving of tender near tender box and sealing the box at the time mentioned in NIT. 11) Inspector In-Charge, CISF Post, Koyla Bhawwan Gate BCCL Dhanbad -for necessary arrangement at his end. 12) Inspector In-Charge,CISF Post, Area Office, Govindpur Area-III. 13) Inspector In-Charge, CISF Post, Area Office, Sijua Area-V. 14) The Builders Association of India, Akashkinaree Kanta, P.O. Katrasgarh, Dhanbad. 15) Sr. FO/SE (Civil), Katras Area. 16) Cashier, Katras Area. 17) Notice Board, Katras Area. 18) Tender file. 19) LEO(C), Katrasgarh. 20) The Secretary, Chhatabad Malkera, Adarsh Sharmik Sahyog Samitee Ltd. 5, Chhatabad at Malkera Road, P.O. Katrasgarh, Dhanbad .
Recommended publications
  • Is the Head of the Administration of Our BCCL. Admini
    ADMINISTRATION DEPARTMENT Director (Personnel) is the head of the Administration of our BCCL. Administration Department BCCL(HQ) successfully and smoothly functioning in the right direction and are always ready to undertake any type of challenging job for the Company as a whole and to develop image of the Company. Important activities of the Administration Department: (1) Koyla Bhawan Administration Activity : 1. Central Despatch 2. Central Store 3. Maintenance, repairing of office furniture /equipment new procurement. 4. Sanitation / Cleanliness 5. Gardening and beautification of land scap of Koyla Bhawan Complex (2) Koyla Bhawan Civil Deptt. : Maintenance of whole Building, Water Supply and Civil Jobs. (3) KNTA & JNTA, KARMIK NAGAR, EXEX----CBCBCBCB Colony a. Revenue Collection b. Within boundary Estate matter c. Maintenance of township . d. Transit Hostel e. Four Nos. Golambers maintenance and Gardening. i. Subhash Chowk ii. Ambedkar Chowk iii. Saheed Chowk iv. Rajiv Gandhi Chowk (4) BTA : Maintenance and repairing of Bhuli Township consisting of 6011 nos. of quarters (biggest workers colony of Asia) including water supply & electricity. (5) BCCL PRESS : Printing Jobs. (6) Guest House's/Transit Hostels : Maintenance and supervision of KNGH, JNGH, Expert Hostel & Executive Hostel. (7)CAW & CTP : 1. Departmental Vehicles, Repairing and Maintenance 2. Procurement & tender processing of LCV,TATA 407 for CISF & buses for school duty & CISF. (8) Regional Hospital, Bhuli ::: 1. 20 Bed Hospital, 2. PME 3. Outdoor function 4. Family welfare camp INFORMATION ON GUEST HOUSE OF HEAD QUARTER Sl. Name of Guest House Appx.Distance from Appx. Distance from Dhanbad Rail Station Dhanbad Bus Station No. 1. Jagjiwan Nagar Guest House 5 KM 5 KM 2.
    [Show full text]
  • Jamadoba Coal Washery (Capacity: Expansion from 1 to 2 Mtpa Raw Coal Throughput) Tehsil: Jharia, Dist: Dhanbad, Jharkhand
    HALF YEARLY COMPLIANCE REPORT (PERIOD: APRIL’19 – SEPTEMBER’19) JAMADOBA COAL WASHERY (CAPACITY: EXPANSION FROM 1 TO 2 MTPA RAW COAL THROUGHPUT) TEHSIL: JHARIA, DIST: DHANBAD, JHARKHAND TATA STEEL LIMITED, JHARIA DIVISION P.O.- JAMADOBA, DIST. - DHANBAD, STATE- JHARKHAND, PIN CODE – 828112. ENVIRONMENTAL CLEARANCE GRANTED VIDE LETTER NO. - J-11015/203/2011- IA.II(M) DATED- 03.03.2014 ISSUED BY GOVT. OF INDIA, MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE, NEW DELHI. Compliance status of Expansion of Jamadoba Coal washery (1 MTPA to2 MTPA in 7 ha Area) of M/s Tata Steel Ltd. Tehsil Jharia, dist. Dhanbad, Jharkhand vide MoEFCC Letter no J- 11015/203/2011-IA.II (M) dated March 3, 2014 S. No. Condition Compliance Status Specific Condition Adequate green belt shall be provided Greenery has been developed in many areas around coal handling and other areas. around the washery premises. Since the expansion job has been completed, remaining (i) area is also being developed since last monsoon. The report on greenbelt development with photographs is provided in Annexure-I. Action plan be developed and Action plan for cut-off of tailing ponds from implemented for abandoned tailing ponds tailing management system is in place. and for their restoration to the original Abandoned tailing ponds have been reclaimed by (ii) land use. backfilling. Technical reclamation have taken place in two large ponds. Biological reclamation is going on by planting native species in this monsoon season. Fly ash generated from the captive power This is not applicable as we have ceased the plant of the washery be utilized for house operation of our captive Jamadoba power plant construction, roads and such uses, strictly since April’15.
    [Show full text]
  • Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2Ggststs
    F. No.: 41912015- PMU(DASI Ministry of Informatlon and Broadeasting Shastri Bhawan, New Delhi **** Date: 2td November, 2015 hrblic Notice Reference list of urban areas to be covered in phase III of cable TV digitisation, which was issued by the Ministry on 30.4.2015. The updated list of urban areas for 16 States/UTs has been notified vide Rrblic Notice dated 16. 10.2015 Now, based on comments/data received from the State/UT Governments, the list of the following States/UTs has been updated; 1. Andhra Pradesh 2. Chhattisgarh 3. Jammu & Kashmir 4. Kerala 5. Madhya Pradesh 6. Manipur 7. Telengana 8. Daman & Diu 2. A copy of the updated list of these States/UTs is attached. Wt4ltr Deputy Secretar5r (DAS) Phone: O 1 1-2338 1O1, 2ggSTSTs 2ND UPDATED URBAN AREAS LIST FOR PHASE III OF CABLE TV DIGITISATION Andhra Pradesh S.No. Districts Urban Areas TV Households Remarks 1 Srikakulam Srikakulam (M + OG) 28,149 Palasa Kasibugga (M) 9,706 Ichchapuram (M) 6,242 Sompeta (CT) *Deleted Hiramandalam (CT) *Deleted Upgraded Palakonda 3,349 Tekkali (CT) *Deleted Rajam (NP) 7,367 Amadalavalasa (M) 6,844 Narasannapeta (CT) *Deleted Balaga (CT) *Deleted Ponduru (CT) *Deleted 2 Vizianagaram Parvathipuram (M) 9,382 Bobbili (M) 10,337 Salur (M) 8,644 Gajapathinagaram (CT) *Deleted Sriramnagar (CT) *Deleted Cheepurupalle (CT) *Deleted Tummikapalle (CT) *Deleted Kothavalasa (CT) *Deleted Vizianagaram (M + OG) 44,379 Kanapaka (CT) *Deleted Malicherla (CT) *Deleted Jarjapupeta (CT) *Deleted Upgraded Nellimarla 3,402 Chintalavalasa (CT) *Deleted Visakhapatnm All areas except Visakhapatnam 3 Greater Visakhapatnam (M. (MC)covered in Corp) ? Phase II Yelamanchali ? **Added Narsipatnam ? **Added 4 East Godavari Kakinada (M Corp.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]
  • Official Gazette Government Of· Gqa,Daman and Diu
    :Panafr; l1tllNovemher, 1971 IKartika 20. 1893) ··SERIESI·No,-3l ! :~ i I I i OFFICIAL GAZETTE GOVERNMENT OF· GQA,DAMAN AND DIU -OJ 0 GOVERNMENT OF GOA, DAMAN ,.,' Prqvidi,q tliat, AND DIU (~)tlJe maximuni<;lge limit specified in the Schedule in' resp<!ct of .direct recruitm~nt Special Departmem may be relaxed i~ the case of' candid~tes \ belonging to the Scheduled Castes and Sche­ Notification duled Tribes and' other 3pecial categories in OSD/RRVS/19/,Ta accordance with the orders issued by the In exercise of the powers conferred by the proviso Central Government from time to time; and to Article 309 of the Constitution, read with the (b) no lIIaie candidate, who has more than one Government of' India, Ministry of Home· Affairs wife living and no female candidate, who Notification No. F.1/29/68-GP dated the 29th June bas married a person having already a wife 1968, the Administrator of Goa, Daman and Diu is living, shall be eligible for appoitltm~nt, pleased to make the .foHowing rules regulating ·the . unless the Government, after having been Recruitment of persons to Class I postg:in·the River satisfied that there are special grounds for Navigation Department under the Government of doing so,exempts any such CMldidate from Goa, Daman and Diu. the operation of this rule. 1. Short title. - These rules may be, called Goa o. Power. to relax, _ Where the Administrator is Administration, Ports .officer, Class I Gazetted pos,t of the opinion that it is necessary or expedient SO Recruitment Rules, 1971. to do, he may, by order, for reasons to he recorded in writing and in consultation with the Union Public 2.
    [Show full text]
  • For the Year Ended 31 March 2014
    Report of the Comptroller and Auditor General of India on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 Government of Jharkhand Report No. 2 of the year 2015 TABLE OF CONTENTS Reference to Paragraph Page Preface v Overview vii CHAPTER – 1 INTRODUCTION Budget profile 1.1.1 1 Application of resources of the State Government 1.1.2 1 Persistent savings 1.1.3 2 Funds transferred directly to the State implementing agencies 1.1.4 2 Grants-in-aid from Government of India 1.1.5 3 Planning and conduct of audit 1.1.6 3 Lack of responsiveness of Government to Inspection Reports 1.1.7 3 Follow-up on Audit Reports 1.1.8 4 Government response to significant audit observations (draft 1.1.9 5 paragraphs/reviews) Status of placement of Separate Audit Reports of Autonomous Bodies 1.1.10 6 in the State Assembly CHAPTER – 2 PERFORMANCE AUDIT DRINKING WATER & SANITATION DEPARTMENT Total Sanitation Campaign/Nirmal Bharat Abhiyan 2.1 7 LABOUR, EMPLOYMENT & TRAINING DEPARTMENT AND SCIENCE AND TECHNOLOGY DEPARTMENT Establishment and Upgradation of Government Women ITIs and 2.2 25 Government Women Polytechnics in Jharkhand HUMAN RESOURCES DEPARTMENT (HIGHER EUUCATION) Functioning of State Universities in Jharkhand 2.3 38 FOREST AND ENVIRONMENT DEPARTMENT Compliance with Environmental Laws in Dhanbad district including 2.4 66 Dhanbad Agglomeration SOCIAL WELFARE, WOMEN & CHILD DEVELOPMENT DEPARTMENT AND PLANNING & DEVELOPMENT DEPARTMENT Implementation of Schemes for Welfare and Protection of Girls in 2.5 77 Jharkhand HOME DEPARTMENT Information Technology Audit on preparedness of Crime and 2.6 94 Criminal Tracking Network System HUMAN RESOURCE DEVELOPMENT DEPARTMENT AND HEALTH, MEDICAL EDUCATION & FAMILY WELFARE DEPARTMENT Tribal Sub Plan (Education and Health Sectors) 2.7 105 ENERGY DEPARTMENT Implementation of Solar Energy programmes in Jharkhand 2.8 116 Audit Report on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 CHAPTER – 3 COMPLIANCE AUDIT Non-Compliance with the Rules, Orders, etc.
    [Show full text]
  • BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) Office of the General Manager, Katras Area P.O
    BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) Office of the General Manager, Katras Area P.O. Sijua Distt. Dhanbad – 828121 Camp Office of Civil Engg. Deptt.at CCWO Complex, Saraidhela,Dhanbad Ref. No. BCCL/GM/IV/Civil/Quotation/2012-13/7006 Dated: 27.10.2012. QUOTATION NOTICE Sealed QUOTATION is invited in percentage rate above/below basis in single part from Experienced and bonafide resourceful civil contractors for the following civil works:- Sl. Nature of Job & Location Estimated Earnest Cost of Time of No. Cost Money Tender Completion Paper 1. Replacement of pit water pipe line from filter plant no 1 to new quarter malkera at KCC. ` 34079.80 ` 341/- Nil. 10 days Date and time of receipt/opening of Quotation a) The quotation will be received on 06.11.2012 from 10.00A.M. to 3.00 P.M. in a tender box kept at:- i) Office of Asstt. Commandant, CISF. Camp, Angarpathra in the Tender Box marked Katras Area.. ii)CISF Post, near Koyala Bhawan gate, Koyala Nagar, BCCL, Dhanbad in the Tender Box marked Katras Area. b) The quotations received will be opened on 08.11.2012 at 4.00 P.M. onwards in the office of Chief Manager (Civil)/ACE, Katras Area. In the event of the specified date for submission/ opening of bids declared a holiday by the employer, the bids will be received /opened on the appointed time on the next working day. All the materials and equipments required for this work will be responsibility of the contractor. Contractors have to abide by the Labour regulations/abolitions Act.
    [Show full text]
  • Government of Jharkhand State Transport Department Ranchi
    GOVERNMENT OF JHARKHAND STATE TRANSPORT DEPARTMENT RANCHI From: Date :24-Feb-2020 District Transport Officer Dhanbad To: SANTOSH PASWAN F/H : NAGENDRA PASWAN MALKERA DAKSHIN MALKERA MALKERA Sub: Tax demand notice for motor vehicle no : JH10BR6137 It has been observed that due Tax/es along with penalty, if any, in terms of the provisions of the under section 5/7/21/23 of Jharkhand Motor Vehicles Taxation Act 2001 and under rule 4/5 of Jharkhand Motor Vehicles Taxation Rules 2001 has not been paid by you after 07-Feb-2019 against the aforementioned vehicle. You are, therefore, hereby directed to pay the Government dues forthwith, i. e. within a week of this notice date, failing which appropriate punitive measures will be initiated from this end. Please note that actual assessment of due tax/es may vary depending on the date of actual payment of such dues and subject to verification of relevant documents. In case if such tax/es payments have been made in the meantime against the concerned vehicle, then proof of such payment is to be submitted within the aforementioned period. This, however, does not apply to any vehicle, tax/es in respect of which is being paid or not being paid as a result of any decision /order of any Court of Law. Treat this as URGENT. District Transport Officer Dhanbad NOTE: Computer generated notice therefore requires no signature. To Pay Your's Tax ,Please visit : https://vahan.parivahan.gov.in/vahanservice From: Date :24-Feb-2020 District Transport Officer Dhanbad To: VIRENDRA KUMAR DUSADH F/H : SAHADEV DUSADH MALKERA KATRASGARH DHANBAD DHANBAD Sub: Tax demand notice for motor vehicle no : JH10BR9582 It has been observed that due Tax/es along with penalty, if any, in terms of the provisions of the under section 5/7/21/23 of Jharkhand Motor Vehicles Taxation Act 2001 and under rule 4/5 of Jharkhand Motor Vehicles Taxation Rules 2001 has not been paid by you after 07-Feb-2019 against the aforementioned vehicle.
    [Show full text]
  • Schools for Class-VIII in All Districts of Jharkhand State School CODE UDISE NAME of SCHOOL
    Schools for Class-VIII in All Districts of Jharkhand State School CODE UDISE NAME OF SCHOOL District: RANCHI 80100510 20140117617 A G CHURCH HIGH SCHOOL RANCHI 80100376 20140105605 A G CHURCH MIDDLE SCHOOL KANKE HUSIR 80100383 20140106203 A G CHURCH SCHOOL FURHURA TOLI 80100806 20140903803 A G CHURCH SCHOOL 80100917 20140207821 A P E G RESIDENTIAL SCHOOL RATU 80100808 20140904002 A Q ANSARI URDU MIDDLE SCHOOL IRBA 80100523 20140119912 A S PUBLIC SCHOOL 80100524 20140120009 A S T V S ZILA SCHOOL 80100411 20140109003 A V K S H S 80100299 20140306614 AADARSH GRAMIN PUBLIC SCHOOL TANGAR 80100824 20140906303 ADARSH BHARTI PUBLIC HIGH SCHOOL MANDRO 80100578 20142401811 ADARSH H S MCCLUSKIEGANJ 80100570 20142400503 ADARSH HIGH SCHOOL SANTI NAGAR KHALARI 80100682 20142203709 ADARSH HIGH SCHOOL KOLAMBI TUSMU 80100956 20141108209 ADARSH UCHCHA VIDYALAYA MURI 80100504 20140116916 ADARSHA VIDYA MANDIR 80100846 20140913601 ADARSHHIGH SCHOOL PANCHA 80100214 20140603012 ADIVASI BAL VIKAS VIDYALAYA JINJO THAKUR GAON 80100911 20140207814 ADIVASI BAL VIKAS VIDYALAYA RATU 80100894 20140202702 ADIVASI BAL VIKAS VIDYALAYA TIGRA GURU RATU 80100119 20140704204 ADIVASI BAL VIKAS VIDYALAYA TUTLO NARKOPI 80100647 20140404507 ADIWASI VIKAS HIGH SCHOOL BAJRA 80101106 20140113028 AFAQUE ACADEMY 80100352 20140100813 AHMAD ALI MORDEN HIGH SCHOOL 80100558 20140123620 AL-HERA PUBLIC SCHOOL 80100685 20142203716 AL-KAMAL PLAY HIGH SCHOOL 80100332 20142303514 ALKAUSAR GIRLS HIGH SCHOOL ITKI RANCHI 80100741 20140803807 AMAR JYOTI MIDDLE CUM HIGH SCHOOL HARDAG 80100651 20140404516
    [Show full text]
  • 1 Contents Page No. 1. Notice 2. Management 3. Bankers & Auditors
    Contents Page No. 1. Notice 2. Management 3. Bankers & Auditors 4. Directors’ Report and Corporate Governance Report. 5. Comments of the Comptroller and Auditor General of India 6. Statutory Auditor’s Report and replies of Management. 7. Balance Sheet 8. Profit & Loss Account 9. Schedule to Balance Sheet 10. Schedule to Profit and Loss Account 11. Accounting Policy 12. Notes on Accounts 13. Particulars of Employee 1 BHARAT COKING COAL LIMITED (A subsidiary of coal India Ltd.) KOYLA BHAWAN, KOYLA NAGAR, DHANBAD Board Secretariat Ref.No.BCCL:CS: F-AGM/2013/ 389 Dated : 20.05.2013 NOTICE Notice is hereby given to all the Shareholders of Bharat Coking Coal Limited that the 42nd Annual General Meeting of Bharat Coking Coal Limited will be held on 27.05.2013(monday) at 11.00 AM at the Registered Office, Koyla Bhawan, P.O. Koyla Nagar, Dhanbad to transact the following businesses: ORDINARY BUSINESS 1) To receive, consider and adopt the audited Balance Sheet as at 31st March, 2013 and the Profit & Loss Account for the year ended on that date along with Auditor’s Report and Directors’ Report thereon. 2) To appoint a Director in place of Shri N. Kumar, who retires in terms of Article 34(i) (e) (iii) of the Articles of Association of the Company, and is eligible for re- appointment. 3) To appoint a Director in place of Shri Hemant Jain, who retires in terms of Article 34(i) (e) (iii) of the Articles of Association of the Company, and is eligible for re-appointment. By Order of the Board (K.N.
    [Show full text]
  • Abstract Death and Birth 2021.Xlsx
    DISTRICT STATISTICS OFFICE, DHANBAD BIRTH REPORT OF DHANBAD DISTRICT , FOR THE MONTH OF APRIL-2021 REG. UNIT NAME NO. OF Apr-21 SL TOTAL BIRTH - RURAL UNITS M F 1 DHANBAD BLOCK 12 1 2 3 2 TUNDI BLOCK 17 4 3 7 3 PURVI TUNDI BLOCK 9 1 2 3 4 PHC Raghunathpur 1 0 0 0 5 HSC Rampur 1 0 0 0 6 HSC Rupan 1 0 0 0 7 HSC Latani 1 0 2 2 8 HSC Mairanwatand 1 0 0 0 9 HSC Chepkia 1 0 0 0 10 HSC Chururia 1 0 0 0 11 TOPCHANCHI BLOCK 28 2 1 3 12 GOVINDPUR BLOCK 39 29 24 53 13 BALIAPUR BLOCK 23 11 10 21 14 NIRSA BLOCK 27 44 36 80 15 BAGHMARA BLOCK 61 42 33 75 16 EGARKUND BLOCK 20 8 9 17 17 KALIASOL BLOCK 20 7 11 18 18 CHC TUNDI 1 53 46 99 19 PHC Tundi 1 0 0 0 20 PHC Maniadih 1 1 0 1 21 PHC Balkush 1 0 0 0 22 HSC Pratappur 1 0 0 0 23 HSC Charak kala 1 0 0 0 24 HSC Dhandhikitand 1 0 0 0 25 HSC Palma 1 0 0 0 26 HSC Jhinaki 1 0 0 0 27 HSC Ludhuria 1 0 0 0 28 HSC Maharajganj 1 0 0 0 29 HSC Kharmo 1 0 0 0 30 HSC Keska 1 0 0 0 31 HSC Begnaria 1 1 0 1 32 CHC TOPCHANCHI 1 37 37 74 33 PHC, GOMOH 1 0 0 0 34 PHC, RAMAKUNDA 1 0 0 0 35 PHC, ROWM 1 0 0 0 36 PHC, TOPCHANCHI 1 0 0 0 37 HSC, ASHNASINGHA 1 0 0 0 38 HSC, BISHUNPUR 1 0 0 0 39 HSC, CHITRPUR 1 0 0 0 40 HSC, DHANGI 1 0 0 0 41 HSC, GUNGAHSA 1 0 0 0 42 HSC, HARIHARPUR 1 0 0 0 43 HSC, KABIRDIH 1 0 0 0 44 HSC, KHESHMI 1 0 0 0 45 HSC, KHARIO 1 0 0 0 46 HSC, KHURDIH 1 0 0 0 47 HSC, MADAIDIH 1 0 0 0 48 HSC, MATARI 1 0 0 0 49 HSC, PABAPUR 1 0 0 0 50 HSC, SINGDIH 1 0 0 0 51 HSC, SINGDAH 1 0 0 0 52 HSC, TANTRI 1 0 0 0 53 CHC GOVINDPUR 1 68 55 123 Page 1 of 4 REG.
    [Show full text]
  • And Bhelatand Coal Washery (Expansion from 0.96 Mtpa to 1.5 Mtpa Raw Coal Throughput)
    HALF YEARLY COMPLIANCE REPORT (PERIOD: OCTOBER’17 – MARCH’18) BHELATAND A. COLLIERY (EXPANSION FROM 0.38 MTPA TO 0.41 MTPA OF RAW COAL PRODUCTION) AND BHELATAND COAL WASHERY (EXPANSION FROM 0.96 MTPA TO 1.5 MTPA RAW COAL THROUGHPUT) P.O.: BHELATAND, DIST: DHANBAD, JHARKHAND TATA STEEL LIMITED, JHARIA DIVISION P.O.- JAMADOBA, DIST. - DHANBAD, STATE- JHARKHAND, PIN CODE – 828112. Compliance status of Environmental Clearance of Expansion of Bhelatand A. Colliery (0.38 MTPA to 0.41 MTPA of raw coal production) and Bhelatand Coal Washery (Expansion from 0.96 MTPA to 1.5 MTPA raw coal throughput) of M/s Tata Steel Ltd., District- Dhanbad, Jharkhand vide MoEFCC Letter no J-11015/29/2012-IA.II (M) dated April 28, 2017 S. No. Condition Compliance Status Specific Condition It is being strictly followed. The EC capacity of Bhelatand A. Colliery is for 0.41 MTPA raw coal production is well within the limit. The EC capacity of Bhelatand Coal Washery is for 1.5 MTPA raw coal throughput which is also being maintained within the limit. The production details of last three years are as The maximum production from the follow- mine at any given time shall not (i) Year Bhelatand A. Bhelatand Coal exceed the limit as prescribed in the Colliery- Raw Washery- Raw EC. Coal Production Coal Throughput (MTPA) (MTPA) FY15 0.323 0.937 FY16 0.336 0.869 FY17 0.270 0.685 FY18 0.207 0.625 The washery shall be as per the It shall be strictly complied with and status report (ii) project report submitted and presented shall be submitted.