FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

Total Page:16

File Type:pdf, Size:1020Kb

FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Region III 2,074 projects 39,743,327,000 Aurora District Engineering Office 108 projects 1,892,340,000 AURORA 108 projects 1,892,340,000 OO1: Ensure Safe and Reliable National Road System 16 projects 460,381,000 Asset Preservation - Preventive Maintenance - Secondary Roads 83,222,000 1. P00302372LZ 310102100212000 83,222,000 Baler-Casiguran Rd (Baler-Dinadiawan) - K0231 + -382 - K0232 +236, K0234 + 699 - K0239 + 024.50 P00302372LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 11.803 80,309,230 Central Office / Asphalt Overlay - at Specific Maintenance of Aurora District Locations along Baler-Casiguran Rd Road: Asphalt Engineering Office (Baler-Dinadiawan) (S04735LZ) Overlay K0231 + -382 - K0239 + 024.50 P00302372LZ-EAO 2,912,770 Central Office / Aurora District Engineering Office Asset Preservation - Preventive Maintenance - Tertiary Roads 72,969,000 2. P00302623LZ 310103100292000 36,835,000 A Castañeda--Ma Aurora-Sn Luis Rd - K0208 + 000 - K0209 + 635.8, K0215 + 000 - K0216 + 102 P00302623LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 5.490 36,098,300 Aurora District Asphalt Overlay - at Specific Maintenance of Engineering Office Locations along A Castañeda--Ma Road: Asphalt / Aurora District Aurora-Sn Luis Rd (S04732LZ) Overlay Engineering Office K0208 + 000 - K0216 + 102 P00302623LZ-EAO 736,700 Aurora District Engineering Office / Aurora District Engineering Office 3. P00302624LZ 310103100293000 36,134,000 Baler-Cemento via Dicaloyungan - K0231 + 471 - K0231 + 882, K0231 + 1000 - K0233 + 068, K0236 + 481 - K0237 + 000, K0231+-411 - K0231+291 P00302624LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 5.464 35,411,320 Aurora District Asphalt Overlay - at Specific Maintenance of Engineering Office Locations along Baler-Cemento via Road: Asphalt / Aurora District Dicaloyungan (S01522LZ) K0231 + Overlay Engineering Office -411 - K0237 + 000 P00302624LZ-EAO 722,680 Aurora District Engineering Office / Aurora District Engineering Office Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 47,660,000 Roads - Secondary Roads MYPS: 06/28/2019 03:01:21 pm Page 1 of 645 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 4. P00302913LZ 310105100236000 47,660,000 Nueva Ecija-Aurora Rd - K0177 + 439 - K0178 + 000, K0178 + 174 - K0178 + 415, K0204 + 468 - K0204 + 491, K0204 + 570 - K0205 + 580, K0205 + 592 - K0205 + 609, K0205 + 640 - K0205 + 737 P00302913LZ-CW1 Reconstruction to Concrete Reconstruction to Lane Km 3.838 46,706,800 Aurora District Pavement - at Specific Locations Concrete Engineering Office along Nueva Ecija-Aurora Rd Pavement / Aurora District (S01516LZ) K0177 + 439 - K0205 + Engineering Office 737 P00302913LZ-EAO 953,200 Aurora District Engineering Office / Aurora District Engineering Office Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 75,600,000 Collapse, and Landslide - Secondary Roads 5. P00300316LZ 310108100187000 75,600,000 Baler-Casiguran Rd (Baler-Dinadiawan) - K0267 + 240 - K0267 + 346 P00300316LZ-CW1 Construction of Road Slope Construction of Square 4,500.000 72,954,000 Central Office / Protection Structure - along Road Slope meters Aurora District Baler-Casiguran Rd Protection Engineering Office (Baler-Dinadiawan) (S04735LZ) Structure K0267 + 240 - K0267 + 346 P00300316LZ-EAO 2,646,000 Central Office / Aurora District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 17,609,000 National Roads - Secondary Roads 6. P00300040LZ 310111100092000 10,410,000 Baler-Casiguran Rd (Baler-Dinadiawan) - K0265 + 136, K0267 + 985, K0272 + 570, K0273 + 700, K0275 + 475, K0275 + 640, K0275 + 745, K0276 + 700, K0276 + 900, K0277 + 340, K0283 + 500, K0283 + 673, K0284 + 108 P00300040LZ-CW1 Construction of Drainage Structure Construction of Lineal 149.000 10,201,800 Aurora District along Road - at Specific Locations Drainage meters Engineering Office along Baler-Casiguran Rd Structure along / Aurora District (Baler-Dinadiawan) (S04735LZ) Road Engineering Office Chainage 34856 - Chainage 0 P00300040LZ-EAO 208,200 Aurora District Engineering Office / Aurora District Engineering Office 7. P00300041LZ 310111100093000 7,199,000 Nueva Ecija-Aurora Rd - K0189 + 536, K0190 + 450, K0195 + 482, K0201 + 157, K0204 + 547, K0207 + 800, K0212 + 970 MYPS: 06/28/2019 03:01:21 pm Page 2 of 645 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00300041LZ-CW1 Construction of Drainage Structure Construction of Lineal 73.000 7,055,020 Aurora District along Road - at Specific Locations Drainage meters Engineering Office along Nueva Ecija-Aurora Rd Structure along / Aurora District (S01516LZ) Chainage 18506 - Road Engineering Office Chainage 0 P00300041LZ-EAO 143,980 Aurora District Engineering Office / Aurora District Engineering Office Network Development - Off-Carriageway Improvement - Secondary Roads 91,541,000 8. P00301995LZ 310208100170000 25,891,000 Baler-Casiguran Rd (Baler-Dinadiawan) - K0239+000 - K0241+231, K0242 + 827 - K0243 + 183, K0243 + 207 - K0243 + 467, K0243 + 900 - K0243 + 1043, K0246 + 422 - K0247 + 302, K0247 + 315 - K0249 + 007 P00301995LZ-CW1 Off-Carriageway Improvement: Off-Carriageway Square 17,083.200 25,373,180 Aurora District Shoulder Paving / Construction - at Improvement: meters Engineering Office Specific Locations along Shoulder Paving / / Aurora District Baler-Casiguran Rd Construction Engineering Office (Baler-Dinadiawan) (S04735LZ) K0239 + 000 - K0249 + 007 P00301995LZ-EAO 517,820 Aurora District Engineering Office / Aurora District Engineering Office 9. P00301996LZ 310208100136000 65,650,000 Baler-Casiguran Rd (Dinadiawan-Casiguran Sect) - K0295 + (-438) - K0295 + (-253), K0295 + (-222) - K0295 + 174, K0295 + 389 - K0296 + 630, K0302 + 000 - K0304 + 249, K0308 + 713 - K0309 + 085, K0309 + 248 - K0310 + 649, K0310 + 811 - K0311 + 826, K0315+141 - K0315+971, K0316+686 - K0316+840, K0317+090 - K0317+896, K0320+167 - K0320+255, K0321+380 - K0321+985 P00301996LZ-CW1 Off-Carriageway Improvement: Off-Carriageway Square 32,498.730 63,352,250 Central Office / Shoulder Paving / Construction - at Improvement: meters Aurora District Specific Locations along Shoulder Paving / Engineering Office Baler-Casiguran Rd Construction (Dinadiawan-Casiguran Sect) (S04736LZ) K0295 + (-438) - K0321 + 985 P00301996LZ-EAO 2,297,750 Central Office / Aurora District Engineering Office Network Development - Off-Carriageway Improvement - Tertiary Roads 14,280,000 10. P00301994LZ 310209100134000 14,280,000 A Castañeda--Ma Aurora-Sn Luis Rd - K0199 + 150 - K0199+300, K0199 + 318 - K0199 + 866, K0199 + 903 - K0200 + 065, K0200 + 252 - K0200 + 483, K0202 + 560 - K0202 + 701, K0202 + 768 - K0203 + 179, K0203 + 423 - K0203 + 671, K0203 + 687 - K0203 + 775, K0204 + 727 - K0204 + 960, K0205 + 160 - K0205 + 574, K0205 + 629 - K0205 + 958, K0205 + 975.70 - K0206 + 340 MYPS: 06/28/2019 03:01:21 pm Page 3 of 645 IO Report FY 2019 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00301994LZ-CW1 Off-Carriageway Improvement: Off-Carriageway Square 9,563.070 13,994,400 Aurora District Shoulder Paving / Construction - at Improvement: meters Engineering Office Specific Locations along A Shoulder Paving / / Aurora District Castañeda--Ma Aurora-Sn Luis Rd Construction Engineering Office (S04732LZ) K0199 + 150 - K0206 + 340 P00301994LZ-EAO 285,600 Aurora District Engineering Office / Aurora District Engineering Office Network Development - Paving of Unpaved Roads - Secondary Roads 35,100,000 11. P00303180LZ 310211100047000 35,100,000 Nueva Ecija-Aurora Rd - K0172 + 097 - K0172 + 158, K0173 + 900 - K0174 + 373 P00303180LZ-CW1 Paving of Unpaved Roads - at Paving of Lane Km 1.042 34,398,000 Aurora District Specific Locations along Nueva Unpaved Roads Engineering Office Ecija-Aurora Rd (S01516LZ) K0172 / Aurora District + 097 - K0174 + 373 Engineering Office P00303180LZ-EAO 702,000 Aurora District Engineering Office / Aurora District Engineering Office Bridge - Replacement of Permanent Weak Bridges 9,000,000 12. P00300833LZ 310302100132000 9,000,000 Pimpolisan Br. (B04348LZ) along Baler-Casiguran Rd (Baler-Dinadiawan) P00300833LZ-CW1 Replacement of Bridge - Replacement of Square 120.000 8,820,000 Aurora District Pimpolisan Br. (B04348LZ) along Bridge meters Engineering Office Baler-Casiguran Rd / Aurora District (Baler-Dinadiawan) Engineering Office P00300833LZ-EAO 180,000 Aurora District Engineering Office / Aurora District Engineering Office Bridge - Retrofitting/ Strengthening of Permanent Bridges 11,400,000 13. P00300829LZ 310303100468000 6,000,000 Dimani Br. (B02824LZ) along Nueva Ecija-Aurora Rd P00300829LZ-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 5,880,000 Aurora District Bridge - Dimani Br. (B02824LZ)
Recommended publications
  • Needs Assessment of Barangay Tanawan, Dingalan, Aurora Towards a Proposed Oplan Development Program Dr
    International Journal of Environment, Agriculture and Biotechnology (IJEAB) Vol-3, Issue -6, Nov-Dec- 2018 http://dx.doi.org/10.22161/ijeab/3.6.28 ISSN: 2456-1878 Needs Assessment of Barangay Tanawan, Dingalan, Aurora towards a Proposed Oplan Development Program Dr. Bernardo A. Zabala, Jr., Dr. Manuela P.Gutierrez, Dr. Gener S. Subia Abstract— This quantitative research determined the help Ecija, Region III, Philippines. It offers quality and Level 3 needed by two hundred households resettled in Barangay accredited graduate education programs [1] to its clienteles. Tanawan in Dingalan, Aurora after they were devastated by Its research goals focus on effective extension services [2] flashfloods in 2004. The road networks of the Barangay and in producing responsible and productive citizens who were underdeveloped. It also has vast idle lands and unused are skilled in research [3]. concrete structures. During difficult times, many among its One of the NEUST missions is to transform human people go to nearby towns for part-time work. Findings of resources into productive citizenry to bring about the study revealed that the resettlement needs help from development impact especially to local communities. In Nueva Ecija University of Science and Technology connection with this, the Graduate Studies through its Graduate School in terms of Beautification and Sanitation, Extension Department chose Barangay Tanawan, in development of Garden Tourism, Barangay Management Dingalan, Aurora as its adopted Barangay. and Administration, Development Education and Citizen’s The proponents believed that Tanawan might turn Productivity.A 3-year development program with a budget into a model barangay and a tourist destination if provided of P400, 000 was proposed by the researchers to address with a needs-based technical assistance.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population AURORA
    2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population AURORA 201,233 BALER (Capital) 36,010 Barangay I (Pob.) 717 Barangay II (Pob.) 374 Barangay III (Pob.) 434 Barangay IV (Pob.) 389 Barangay V (Pob.) 1,662 Buhangin 5,057 Calabuanan 3,221 Obligacion 1,135 Pingit 4,989 Reserva 4,064 Sabang 4,829 Suclayin 5,923 Zabali 3,216 CASIGURAN 23,865 Barangay 1 (Pob.) 799 Barangay 2 (Pob.) 665 Barangay 3 (Pob.) 257 Barangay 4 (Pob.) 302 Barangay 5 (Pob.) 432 Barangay 6 (Pob.) 310 Barangay 7 (Pob.) 278 Barangay 8 (Pob.) 601 Calabgan 496 Calangcuasan 1,099 Calantas 1,799 Culat 630 Dibet 971 Esperanza 458 Lual 1,482 Marikit 609 Tabas 1,007 Tinib 765 National Statistics Office 1 2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Bianuan 3,440 Cozo 1,618 Dibacong 2,374 Ditinagyan 587 Esteves 1,786 San Ildefonso 1,100 DILASAG 15,683 Diagyan 2,537 Dicabasan 677 Dilaguidi 1,015 Dimaseset 1,408 Diniog 2,331 Lawang 379 Maligaya (Pob.) 1,801 Manggitahan 1,760 Masagana (Pob.) 1,822 Ura 712 Esperanza 1,241 DINALUNGAN 10,988 Abuleg 1,190 Zone I (Pob.) 1,866 Zone II (Pob.) 1,653 Nipoo (Bulo) 896 Dibaraybay 1,283 Ditawini 686 Mapalad 812 Paleg 971 Simbahan 1,631 DINGALAN 23,554 Aplaya 1,619 Butas Na Bato 813 Cabog (Matawe) 3,090 Caragsacan 2,729 National Statistics Office 2 2010 Census of Population and
    [Show full text]
  • MANILA BAY AREA SITUATION ATLAS December 2018
    Republic of the Philippines National Economic and Development Authority Manila Bay Sustainable Development Master Plan MANILA BAY AREA SITUATION ATLAS December 2018 MANILA BAY AREA SITUATION ATLAS December 2018 i Table of Contents Preface, v Administrative and Institutional Systems, 78 Introduction, 1 Administrative Boundaries, 79 Natural Resources Systems, 6 Stakeholders Profile, 85 Climate, 7 Institutional Setup, 87 Topography, 11 Public-Private Partnership, 89 Geology, 13 Budget and Financing, 91 Pedology, 15 Policy and Legal Frameworks, 94 Hydrology, 17 National Legal Framework, 95 Oceanography, 19 Mandamus Agencies, 105 Land Cover, 21 Infrastructure, 110 Hazard Prone Areas, 23 Transport, 111 Ecosystems, 29 Energy, 115 Socio-Economic Systems, 36 Water Supply, 119 Population and Demography, 37 Sanitation and Sewerage, 121 Settlements, 45 Land Reclamation, 123 Waste, 47 Shoreline Protection, 125 Economics, 51 State of Manila Bay, 128 Livelihood and Income, 55 Water Quality Degradation, 129 Education and Health, 57 Air Quality, 133 Culture and Heritage, 61 Habitat Degradation, 135 Resource Use and Conservation, 64 Biodiversity Loss, 137 Agriculture and Livestock, 65 Vulnerability and Risk, 139 Aquaculture and Fisheries, 67 References, 146 Tourism, 73 Ports and Shipping, 75 ii Acronyms ADB Asian Development Bank ISF Informal Settlers NSSMP National Sewerage and Septage Management Program AHLP Affordable Housing Loan Program IUCN International Union for Conservation of Nature NSWMC National Solid Waste Management Commission AQI Air Quality Index JICA Japan International Cooperation Agency OCL Omnibus Commitment Line ASEAN Association of Southeast Nations KWFR Kaliwa Watershed Forest Reserve OECD Organization for Economic Cooperation and Development BSWM Bureau of Soils and Water Management LGU Local Government Unit OIDCI Orient Integrated Development Consultants, Inc.
    [Show full text]
  • Academic Performance Among Minority Students in Dingalan National High School Andie T
    ISSN 2321 3361 © 2021 IJESC Research Article Volume 11 Issue No. 02 Academic Performance among Minority Students in Dingalan National High School Andie T. Capinding Faculty Member, College of Education, Nueva Ecija University of Science and Technology – Gabaldon Campus, Gabaldon Nueva Ecija, Philippines. Abstract The study focused on the academic performance of minority students of Dingalan National High School. The goal of this study was to establish an evaluation of the factors that may affect the Academic Performance of students from an ethnic minority perspective. In particular, it sought to define and examine the following: the age, sex and grade profile of respondents, the relationship of students’ academic achievements to the age and sex; and the relationship between academic achievement and the educational environment of the student. Researcher utilized the descriptive-correlational design of research using survey questionnaires in gathering data from the total population of minority students of Dingalan National High School. Study showed that 61.54% of the respondents have fair grades, 30.77% satisfactory, and only 7.69% outstanding grade. Study also showed that age, sex and educational environment have no direct relationship with academic performance among minority students. Keywords: Academic Performance, Minority Students, Environment 1. Introduction academically (Garcia, 2017).All the hypotheses suggest that Traditional practices and beliefs are part of our girls and boys continue to follow gender roles in their country’s historical background. It is embedded within our convictions and conducts about motivation (Meece et al., civilization. Our beloved country, Philippines, was once known 2006). Kusurkar et el., 2013, added that the two important for its cultural way of living and for its abundance of natural factors influencing academic performance are student resources.
    [Show full text]
  • NDCC Update No. 2 CALOY
    Caragsacan 50 4 in Dingalan National High School and 46 in Brgy Hall Aplaya 12 6 in Dingalan National High School and 6 in Dingalan Central School Butas na Bato 1 TESDA Davil-Davilan 3 1 in Dingalan National High School 2 in Fajarillo House Poblacion 14 3 in Dingalan National High School and 11 in Dingalan Central School Sub-total 208 BALER Buhangin 27 Rescued by 48 IB PA TOTAL 235 Brgy. Paltic was temporarily isolated from Brgy. Poblacion at the height of flooding due to the overflowing of riverbanks and cuts in the river slopes. However, evacuees in Dingalan and Baler returned to their respective homes when flood waters subsided C. Status of Roads and Bridges as of 12:00 Noon, July 19, 2010 Region IIII Aurora • Minor slides at Gabaldon-Dingalan Road (km. 174+343 to km. 182+000) and Km. 177+800 to km. 177+810 (Brgy. Tanauan, Dingalan) but still passable to all types of vehicles. Expected date of completion for the removal of slides is on July 22, 2010 Nueva Ecija • Tablang-Gabaldon Road (km. 166+850 Brgy. Panloc, Gabaldon, Nueva Ecija) 60.00 meters roadway covered with sand but still passable to all types of vehicles. Clearing operations completed on the 12:00 Noon of July 19, 2010 • Km. 171+500 to km. 173+000 with exception at Brgys. Cuyapa and Pinamalisan, Gabaldon, Nueva Ecija – eroded shoulders but passable to all types of vehicles – warning sign installed. Expected date of completion for the restoration of shoulder is on July 22, 2010 • Km. 173+000 to km.
    [Show full text]
  • Aquatic Resources in the Philippines and the Extent of Poverty in the Sector
    Aquatic resources in the Philippines and the extent of poverty in the sector Item Type monograph Authors Rivera, R.; Turcotte, D.; Boyd-Hagart, A.; Pangilinan, J.; Santos, R. Publisher Support to Regional Aquatic Resources Management (STREAM) Download date 04/10/2021 13:50:11 Link to Item http://hdl.handle.net/1834/20137 Aquatic resources in the Philippines and the extent of poverty in the sector May 2002 Table of contents List of tables.......................................................................................................vi List of figures ....................................................................................................vii Abbreviations...................................................................................................viii 1 Introduction..................................................................................................1 2 Status of aquatic resources in the Philippines .........................................2 2.1 Marine resources ...............................................................................................2 2.1.1 Coral reefs .............................................................................................................. 3 2.1.2 Seagrasses and seaweeds...................................................................................... 4 2.2 Inland resources.................................................................................................5 2.2.1 Mangroves and brackish water ponds.....................................................................
    [Show full text]
  • Geomorphologic Characterization of Dingalan Town Proper and Barangays in Its Proximity: Implications for Infrastructure Development and Sustainable Land Usage
    International Journal of Scientific & Engineering Research Volume 9, Issue 9, September-2018 ISSN 2229-5518 708 Geomorphologic Characterization of Dingalan Town Proper and Barangays in its Proximity: Implications for Infrastructure Development and Sustainable Land Usage by Khelly Shan C. Sta. Rita IJSER A Thesis submitted to the School of Civil, Environmental, and Geological Engineering in partial fulfillment of the requirements for the Degree Bachelor of Science in Geological Science and Engineering Mapúa Institute of Technology December 2017 ii IJSER © 2018 http://www.ijser.org International Journal of Scientific & Engineering Research Volume 9, Issue 9, September-2018 ISSN 2229-5518 709 SLHS CERTIFICATION IJSER iii IJSER © 2018 http://www.ijser.org International Journal of Scientific & Engineering Research Volume 9, Issue 9, September-2018 ISSN 2229-5518 710 APPROVAL SHEET This is to certify that we have supervised the preparation of and read the thesis prepared by Khelly Shan C. Sta. Rita entitled Geomorphologic Characterization of Dingalan Town Proper and Barangays in its Proximity: Implications for Infrastructure Development and Sustainable Land Usage and that the said thesis has been submitted for final examination by the Oral Examination Committee. Guillerma Jayne T. Atienza, M. Sc. Thesis Adviser As members of the Oral Examination Committee, we certify that we have examined this thesis, presented before the committee on December 3, 2017, and hereby recommend that it be accepted as fulfillment of the thesis requirement for the degree in Bachelor of Science in Geological Science and Engineering. Arturo S. Daag, Ph. D. Arnulfo B. Santiago, M. Sc. Panel Member Panel Member IJSER Marianne V. Fernandez, M.
    [Show full text]
  • Media Update
    Media Update MEDIA UPDATE Effects of Tropical Depression “Winnie” As of December 1, 2004 11:30 AM A. Background The continuous monsoon rains brought about by Tropical Depression “Winnie” triggered massive floodings in the low-lying areas of the provinces of Bulacan, Nueva Ecija, Aurora, Quezon, Camarines Norte, Rizal and Metro Manila particularly Quezon City, Marikina City, San Juan and Malabon affecting 37,418 families or 168,214 persons in 114 barangays of 31 municipalities. These had also resulted to 182 persons deaths and 27 injured. The floodwaters ranging from five (5) meters to knee/house-deep rendered roads and bridges impassable to all types of vehicles. B. Emergency Management Activities 1. Damage and Needs Assessment 1.1 Profile of Areas and Population Affected ( Source : Local DCCs) Region/Province No. of Mun No of Bgys Affected Fam Per Region II 3 18 424 1,793 Isabela 3 18 424 1,793 1 Region III 23 83 33,123 148,566 Bulacan 10 35 8 ,515 51,087 Nueva Ecija 8 Cabanatuan City 40 12,556 35,130 Palayan City 8 1,086 4,837 Aurora 5 10,966 57,511 Media Update Region IV 6 6 1,409 7,045 Quezon (for 3 1 validation) Rizal 3 5 1,409 7,045 Region V 1 Camarines Sur 1 NCR 2 7 2,462 10,810 Metro Manila 2 Marikina City 4 722 3,610 Quezon City 1 40 200 Pasig City 2 1,700 6,800 Grand –Total 31 114 37,418 168,214 Note: During the passage of Tropical Depression Winnie, there were 584 passengers, and 17 rolling cargoes stranded in the terminals of Tabaco, Albay; Virac, Catanduanes; and Sabang, Camarines Sur, all in Region V.
    [Show full text]
  • Scad Corridor Conceptual Land Use Plan
    SCAD CORRIDOR CONCEPTUAL LAND USE PLAN FINAL REPORT JUNE 2009 SUBIC-CLARK ALLIANCE FOR DEVELOPMENT COUNCIL (SCADC) SCAD Corridor Conceptual Land Use Plan (SCoLUP) Final SCoLUP Report June 2009 EXECUTIVE SUMMARY Keenly aware of the pressing need to capitalize on emerging local and international opportunities, the Subic-Clark Alliance for Development Council (the “SCADC“) embarked in late September 2008 on a framework and concept-level land use planning study for the 98,020-hectares (has.) SCAD Corridor (the “Corridor”) i.e. the SCAD Corridor Conceptual Land Use Plan (the “SCoLUP”). The Corridor is an approximately ten kilometer (10.0 km) wide swath with the Subic-Clark- Tarlac Expressway (SCTEx) at its center line. It runs the entire length of the SCTEx and is comprised of productive/ non-productive agricultural lands, minor forests and built-up areas. While the planning horizon considered is 25 years (2009-2033), the concept-level SCoLUP is intended to be dynamic and flexible enough to be modified as changes come about over the next several decades. 1. The Development Framework Z Development Plans Influencing the SCAD Corridor include: a) the Enhanced “W” Growth Corridor strategy for Central Luzon; b) Provincial Physical Framework Plans (“PPFPs”) of the 4 Corridor provinces; and c) Luzon Urban Beltway infrastructure projects; Z Applicable Development Concepts considered to transform the Corridor into a hub: a) expressways and high-speed motorways that improve access, stimulate commerce; b) supply chain management and logistics hubs, citing successful Asian models; c) Smart Growth with compact, self-contained settlements that avoid urban sprawl, preserve green areas and promote accessibility thru mass transport systems; and d) Green Corridors that define, preserve and sustain natural environments.
    [Show full text]
  • B. CASUALTIES (TAB B) As of 5:00 PM, 15 August 2013
    B. CASUALTIES (TAB B) As of 5:00 PM, 15 August 2013 • The total number of casualties is 19 Dead: 8 (1 in Benguet; 1 in Dupax del Sur, Nueva Vizcaya; 2 in Boljoon, Cebu; 1 in Infanta, Quezon; 1 in Casiguran, Aurora; 1 in San Agustin, Isabela; and 1 in Dingalan, Aurora) Injured: 7 (3 in Ifugao, 3 in Baguio City, and 1 in Sta. Cruz, Zambales) Missing: 4 (1 in Batanes, 2 in Camarines Norte, and 1 in Sta. Barbara, Pangasinan) Rescued / Accounted Fishermen – 76 CITY/MUNICIPALITY/PROVINCE NUMBER OF INDIVIDUALS Bolinao, Pangasinan 6 Virac, Catanduanes 8 Pandan, Catanduanes 20 Gigmoto, Catanduanes 15 Baras, Catanduanes 2 Baganoc, Catanduanes 3 Mercedes, Camarines Norte 19 Daet, Camarines Norte 3 TOTAL 76 C. AFFECTED POPULATION (TAB C) As of 5:00 PM, 15 August 2013 • A total of 76,002 families or 349,487 persons were affected in 653 barangays in 87 municipalities and 5 cities in 16 provinces of Regions I, II, III, V and CAR • Out of the affected, 83 families / 326 persons are still housed inside 3 Evacuation Centers (ECs) while 17,953 families / 83,114 persons opted to stay with friends’/relatives’ houses D. STRANDEES As of 5:00 PM, 15 August 2013 • Forty (40) passengers, 1 vessel, and 8 motorbancas in North Eastern Luzon are still stranded E. STATUS OF LIFELINES (TAB D) As of 5:00 PM, 15 August 2013 • Nineteen (19) roads (1 in Region I, 1 in Region II, 2 in Region III, and 15 in CAR) are impassable due to floodwaters except Kayapa –Nueva Vizcaya Road, Bongabon Baler Road, Baler–Casiguran Road, Dinadlawan-Madela Road, and Brgy Dinadlawan Dipaculao Aurora Road which are due to rock slide, landslide and/or soil collapsed.
    [Show full text]
  • Sitrep No. 7 for TY Santi 13 Oct 2013, 6PM.Pdf
    Sitrep 7 Tab A Effects of Typhoon "SANTI" (NARI) CASUALTIES As of 6:00 PM, 13 October 2013 REGION/PROVINCE/ Name Age Address Cause / Date / Remarks MUNICIPALITY/BARANGAY GRAND TOTAL 13 DEAD REGION III 13 Prk 2, Brgy. Mawaque Mabalacat, 181Ricardo Del Rosario Pinned down by collapsed wall Pampanga 1Michael Parungao 35 Brgy. Lourdes, Candaba, Pampanga Electrocution Pampanga 1PO1 Crisencio Bueno 30 Brgy. Ayala, Magalang, Pampanga Due to mudslide Severe anxiety secondary to strong 1Francisco Serrano Sta. Teresa 2nd Lubao, Pampanga winds brought about by TY "Santi" resulted to heart attack 1Irish Balingit 4 Brgy. Marawa, Jaen, Nueva Ecija Hit by fallen tree Nueva Ecija 1Florida Riguar 70 Brgy. Pesa, Bongabon, Nueva Ecija Hit by fallen tree 1Genelle Yutoc 7 Brgy. Larin, Bongabon, Nueva Ecija Hit by fallen tree 1Raymond Samson 7Sitio Soliman, Brgy Morsia, Concepcion, Hit by fallen tree Tarlac 1Rachele Samson 8Tarlac Hit by fallen tree 1Roberto Melo Santos 78 San Miguel, Bulacan Drowning Bulacan 1Teresita Manabat 30 Tigpalas, San Miguel, Bulacan Pinned down by collapsed house 1Kringkring San Miguel, Bulacan Drowning Zambales 1Carlos D. Pacheco 56 Sta. Barbara, Iba, Zambales Hit by fallen tree GRAND TOTAL 32 INJURED REGION III 32 1Jay Abille 39 Sta. Agustin, Iba, Zambales Lacerated wound 1April Andrea Pacheco 10 Sta. Barbara, Iba, Zambales Contusion, forehead Zambales 1Alessandra Pacheco 3 Sta. Barbara, Iba, Zambales 1Roan Pacheco 1 Sta. Barbara, Iba, Zambales 1Ronalyn Pacheco 29 Sta. Barbara, Iba, Zambales Multiple injuries due to fallen tree 1Jose Libunao 47 Sta. Rosa, Nueva Ecija Lacerated wound, left leg 1Ronie Buenviaje 25 Sta. Rosa, Nueva Ecija Punctured wound, right foot 1Vicente Mabarani 44 Cabanatuan City, Nueva Ecija Punctured wound, left foot 1Denis Luciano 27 Sta.
    [Show full text]
  • Annex 2. Private Companies, Pos, Ngos in Biodiversity Conservation.Pdf
    Table 1. Private companies, POs, NGOs, and local communities involved in biodiversity conservation. TITLE PARTNERS STRATEGY SCOPE AMOUNT DURATION Private Sector Energy Development Corporation Watershed Management UP Institute of Biology B-U-F-F-E-R: Geothermal sites in 2015: Annually since Programs (UPIB) Biodiversity Conservation and Bicol, Negros, Leyte, ₱81,209,172.25 2009 Diliman Science Research Management Program and Kidapawan Foundation Upland Community 2016: (DSRF) Management ₱82,827,273.01 Center for Conservation and Forest Restoration Innovation, Inc. Forest Protection 2017 (CCI) Ecotourism ₱81,781,258.82 Siliman University Regulatory Compliance UPLB Foundation, Inc. Philippines Agroforestry Education and Research Network (PAFERN) Bluewater Consultancy Planning Networks, Inc. Resources, Environment and Economics Center for Studies (REECS) BINHI Tree for the Future DENR - BMB Rescue of Philippine threatened Selected partners in 16 2014: Annually since DENR - ERDB tree species (4 Key Steps) regions; selected key ₱5,415,529.55 2009 UPLB Foundation Inc. Species rescue and protection biodiversity areas in UPLB CFNR Propagation of threatened tree all regions; EDC and 2015: UP Diliman Institute of species other Lopez Group ₱4,844.888.97 Biology Establishment of tree parks operational site Eugenio Lopez Centre and arboretum 2016: ₱7,950778,81 Lopez Incorporated (In-situ conservation) etc. Partnership & Advocacy 2017: Publication of books for ₱8,196,036.28 Philippine threatened tree species and an interactive BINHI
    [Show full text]