Minutes of 255 th SEAC Meeting Date 15/01/2016

The 255 th meeting of SEAC was held in Directorate of Environment, U.P. on 15/01/2016. Following members were present in the meeting along with Secretary, SEAC:

1. Dr. M. S. Khan, Chairman 2. Dr. S.N. Singh, Member 3. Dr. D. C. Gupta, Member 4. Shri Ajay Kumar Shukla, IAS Secretary, SEAC / Director, Environment

The Chairman welcomed the members to the 255 th SEAC meeting.

The Members of SEAC unanimously taken following decisions on the agenda points discussed: • It has observed that in previous meeting the conditional E.C. was recommended subject to submission of some quires before preparation of the minutes but it was Miss Interpreted. As such in the light of above facts the SEAC took the decision that such quires raised by the SEAC if submitted before the end of the meeting and marked by the chairman and dully endorsed by the Secretary SEAC will be registered in the office record, these only considered in the meeting minutes only. If any quires submitted after that the objection/quires raised will be retained and considered in the coming SEAC agenda as per chronology.

1. M/s Walia Brick Field Vill: Roshanpur, Gangoh, , Sri Tariq Ahmad & Gainda Hashan, Vill: Roshanpur, Gangoh, Saharanpur. File N0. 15 / Ent-OSD(T) The project proponent neither appeared in the meeting nor made any request to consider the matter in next meeting . The committee discussed and deliberated that project fie should be closed and should be considered in chronology after recipt of the request from the project proponent. The file shall not be treated as pending at SEIAA/SEAC.

2. M/s DSP Bhatta Company, Vill: Nangla Agri, The: Khekra, Distt: Baghpat Mr. Dinesh Kumar , Vill: Mewla Bhatt, Distt: . File N0. Ent./34 / AD(Sub) The committee noted that an application dated 05-05-2015 was made by the project proponent for environmental clearance of Brick Field at gata no- 106mi, 153, 99,115,120,154 & 145 Village-Nagla Agri, District- Baghpat, Leased Area – 3.558 Ha M/s DSP Bhatta Company. A presentation was made by Dinesh Kumar, project proponent alongwith their consultant M/s Cognizanace Research Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at gata no- 106mi, 153, 99,115,120,154 & 145 Village-Nagla Agri, District-Baghpat, Leased Area – 3.558 Ha M/s DSP Bhatta Company. 2. Gata vise details:- S. Khasra Total Leased Land Owner Agreemen Proposed Mineable Mineable Vol. of No. /Gata Area Area t Period Depth of Area Depth Excavation (Ha) Mining (Years) Mining (m2) (m) (m3) (Ha) (ft.) 1 115 0.778 0.778 Deshraj, s/o 4 4 5156 1.0668 5500 Lalsingh & 2015 to Munni, 2019 2 0.649 0.649 Mahendra s/o 4 4 7248 1.0668 7732 106 म . Anta & Bali, 2015 to Sugreev s/o 2019 3 99 1.103 0.421 Bhopal & 4 4 3330 1.0668 3552 Dayavati w/o 2015 to Bhopal & 2019 Minutes of 255 th SEAC Meeting Dated 15/01/2016

4 153 0.896 0.896 Rajen dra s/o 4 4 6270 1.0668 6689 Jaipraksh & 2015 to Prakashwati w/o 2019 5 154 0.193 0.193 Jaiprakash & 4 4 4390 1.0668 4683 Salek s/o Ballu & 2015 to Indresh w/o Firy 2019 6 145 0.071 0.071 & Gangadutt s/o 4 4 1473 1. 0668 1571 Mitthun & 2015 to Mahipal, Veerpal 2019 7 120 1.1 0.55 s/o Oralahad 4 4 498 1.0668 531 2015 to 2019 Total 3.558 Total 30260 3. Other Details:- Brick Production 30 Lakh / Annum Approx. Expected Life Of mine 4 Year Method Of Mining Opencast Manual Ultimate Depth of Mining 1.0 m Water Requirement 2.15 KLD 4. The proposed rate of production of the mine is 7565 cum/year of Clay. 5. During the presentation the project Proponent submitted the affidavit dated 13-01-2016 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. During the presentation the project Proponent submitted the original letterNo. 679/kha. Li./2015, dated 22/12/2015 issued by the Mining officers, Bagpat Office of D M Bagapat that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that (A) The distance of Mine to Mine is 340 mt. (B) The Distance of Mine to Brick Klin is 1 km.. (C) The leanth of haulage road is 1km. (D) The Total cost of the project is 30 lakh. (E) Number of Workers is 30. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking dated 31/08/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : The CSR plan for Rs. 3.5 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 1. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 2. Approach road 1.60 km katchha to be made motorable. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. Page 2 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. M/s DSP Brick Field, Vill: Nangla Agri, The: Khekra, Distt: Baghpat Mrs. Saroj, Vill: Mewla Bhatt, Distt: Ghaziabad. File N0. Ent./35/ OSD(T) The committee noted that an application dated 05-05-2015 was made by the project proponent for environmental clearance of Brick Field at gata no- 48, 58 & 63 Village-Nagla Agri, District-Baghpat Leased Area – 3.537 Ha M/s M/s DSP Brick Field A presentation was made by Saroj, project proponent alongwith their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at gata no- 48, 58 & 63 Village-Nagla Agri, District-Baghpat Leased Area – 3.537 Ha M/s M/s DSP Brick Field 2. Gata vise details:- S.No. Khasra Total Leased Land Land Agreement Propos ed Vol. / Gata Area Area Owner Leased To Period Depth Of Of (Ha.) Mining (Years) Mining Excava (Ha.) (ft.) tion (m 3) 1 58 0.792 0.792 Satpal, SatishS/o Smt. Saroj 4 4 76 17 Ramrikha&Santa,Rajenda W/o 06/04/15 rS/o Kaalu&Jaipal Santram To S/oKundan&Rakesh 05/04/1 9 Kumar, Dinesh Kumar, Rohitas, santram S/o Jaiprakash&Smt. Prakashwati W/o Jaiprakash 2 48 1.208 0.661 Satpal, Satish S/o Smt. Saroj 4 4 6454 Ramrikha&Santa,Rajenda W/o 06/04/15 r S/o Kaalu&Jaipal S/o Santram To Kundan& Rakesh Kumar, 05/04/19 Dinesh Kumar, Rohitas, santram S/o Jaiprakash& Smt. Prakashwati W/o Jaiprakash 3 63 2.921 2.084 Satpal, Satish S/o Smt. Saroj 4 4 20429 Ramrikha&Santa,Rajenda W/o 06/04/15 r S/o Kaalu&Jaipal S/o Santram To Kundan& Rakesh Kumar, 05/04/19 Dinesh Kumar, Rohitas, santram S/o Jaiprakash& Smt. Prakashwati W/o Jaiprakash TOTAL 3.537 TOTAL 34500 3. Other Details:- Brick Production 30 Lakh / Annum Approx. Expected Life Of mine 4 Year Method Of Mining Opencast Manual Ultimate Depth of Mining 1.0 m Water Requirement 2.15 KLD 4. The proposed rate of production of the mine is 7674 cum/year of Clay.

Page 3 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

5. During the presentation the project Proponent submitted the affidavit dated 31-08-2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. During the presentation the project Proponent submitted the original letterNo. 678/kha. Li./2015, dated 22/12/2015 issued by the Mining officers, Bagpat Office of D M Bagapat that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that (A) The longest distance of Mine to Mine is 230 mt. (B) The Distance of Mine to Brick Klin is 1.5 km. (C) The Total cost of the project is 30 lakh. (E) Number of Workers is 30. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking dated 31/08/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. The CSR plan for Rs. 3.5 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 1.60 km katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

4. M/s Patel Ent Udyog, Vill: Daharpurjapti urf Bandhpur, Tehsil Soraon, Distt: . Shri Jagdish Prasad Patel, S/o Late Holai Patel, Vill: Birahimpur, P.O. Lal Gopal Ganj, Tehsil Soran, Distt: Allahabad. File N0. Ent./86/DD(Sh) The committee noted that an application dated 05-05-2015 was made by the project proponent for environmental clearance of Brick Field at gata no- 48, 58 & 63 Village-Nagla Agri, District-Baghpat Leased Area – 3.537 Ha M/s M/s DSP Brick Field A presentation was made by Saroj, project proponent alongwith their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at gata no- 48, 58 & 63 Village-Nagla Agri, District-Baghpat Leased Area – 3.537 Ha M/s M/s DSP Brick Field 2. Gata vise details:- Gata no Area Depth of Period of Excavation Volume of excavated soil (After consideration of mining as per agreement Berm and safety measures) M 3 65 0.805 1 3 7406 Total 7406 3. Other Details:- Method Of Mining Manual Ultimate Depth of Mining 1.0 m

Page 4 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Water Requirement 2.58 KLD Proposed Man power 25 4. The proposed rate of production of the mine is 7406 cum/year of Clay. 5. The Project Proponent submitted the affidavit regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. The project Proponent submitted the original letterNo.151/khanan Ent/2015-16, dated 17/12/2015 issued by the District Mining officers, Allahabad,Office of D M Allahabad that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that (A) The Total cost of the project is 47 lakh. (b) The length of haulage road is 0.45 km. 8. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 11. During the presentation the project proponent informed as follows- The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. The CSR plan for Rs. 2.35 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

5. M/s Narendra Singh, Vill: Barauli Basdevpur, Syana, Bulandshahar Sri Narendra Singh S/o Shri Nepal Singh, Resd: Vanjarpur, Sadar, Gautam Buddha Nagar. File N0. Ent./128/AD(H) The committee noted that the matter was earlier discussed in SEAC meeting dated 08/12/2015 and directed the project proponent to submit following information: a. Cluster certificate of 500 meters should be submitted with exhibiting dispatch number on it. b. Affidavit regarding compliance of MoEF Om dated 24/06/2013 should commensurate to actual production. A revised certificate should be submitted ink this regards. c. Letter of intent District Magistrate. The committee also directed the project proponent to submit the information for the above which shall be heard in the next meeting. However, affidavit regarding compliance of MoEF OM dated 24/06/2013, commensurating to the actual production of 37411 cum was submitted by the project proponent during the meeting dated 08/12/2015. Cluster certificate of 500 m exhibiting dispatch no it and letter of intent from the District Magistrate was submitted on 09/12/2015 by the project proponent. The case was put up in SEAC meeting dated 19/12/2015 for discussion, the committee noted that the document, copy of certificate issued by District Mining Officer, Bulandshar which clearly state about existing operating mining areas within 500 m of the project site of “Soil Excavation” at Gata No.- 744, 777, 743 and 776, Village-Baraauli Basdevpur, Tehsil-Syana, District-Bulandshahar, U.P. on this the committee deliberated that the submitted Cluster certificate is not in order, not clear and it is vague. Revised, corrected 500 mt. cluster certificate should be submitted in this regard. The matter shall be discussed after submission of information as above. The matter was again discussed in SEAC meeting

Page 5 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016 dated 15/01/2016. A presentation was made by Shri Narendra Singh, project proponent along with their consultant M/s Geogreen Enviro House Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for soil /clay earth excavation at Gata no. 744, 777, 741, 776, Vill: Barauli Basdevpur, Syana, Bulandshahar, (Leased Area 3.938 Ha), M/s New Priya Ent Udyog. 2. As per Form-1 and presentation; 37411.00 cum/annum of soil excavation is proposed. 3. The ultimate depth of mining will be restricted to 01 meter as proposed in PFR. 4. The water requirement will be limited to 1.5 KLD & will be supplied from water tankers. 5. During operation the maximum no. of workers will 10. 6. An affidavit dated 09/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. Mining Officer, Bulandshahar through letter no. 850/khanan lipik dated 10/6/2015 it has been informed that there is no existing operating mine within 500 m from the periphery of the proposed site. 8. The mining will be opencast type and carried out Semi mechanized as proposed in PFR. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 11. Regarding the project no litigation is pending in any court. The committee discussed the matter and recommended grant of environmental clearance for the project proposals alongwith general and specific conditions: General condition: 1. Any excavation work shall only be undertaken after obtaining permission of District Administration under related rules. 2. No change is mining technology and scope of working shall be made without approval of Authority. 3. Personnel working in dusty areas shall be provided with protective respiratory devices and they shall also be imparted adequate training and information on safety and health aspects. 4. The Authority reserves the right to revoke the clearance if conditions stipulated are not implemented. The Authority will also be entitled to impose additional environmental conditions or modify the existing ones, if necessary. 5. In case of any deviation or alteration in the project proposed from those submitted to this Authority for clearance, a fresh reference should be made to the Authority to assess the adequacy of the condition(s) imposed and to add additional environmental protection Measures required, if any. 6. Concealing factual data or submission of false/fabricated data and failure to comply with any of the conditions mentioned above may result in withdrawal of this clearance and attract action under the provisions of Environment (Protection) Act, 1986. Specific Conditions: 1. This environmental clearance does not create or verify any claim of applicant on the proposed site/activity. 2. The Environmental clearance will be co-terminus with the mining lease period. 3. This environmental clearance shall be subject to valid lease in favour of project proponent for the proposed mining proposals. In case, the project proponent does not have a valid lease, this environmental clearance shall automatically become null and void. 4. The mining work will be open-cast and JCB shall be used for excavation work as proposed. 5. Top soil should be adequately preserved and should be used for landscaping. 6. Excavated soil should be properly stored in a manner not to increase surrounding SPM level. 7. Water sprinkling should be exercised during excavation and storage of soil for suppression of fugitive dust. 8. Excavated area should be properly reclaimed and ensured that no open bore hole is left. 9. Safety measures for the people working at the site shall be duly taken care of as per law. Page 6 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

10. The excavation work shall be done in day time only. 11. The project boundary shall be properly covered to restrict dust dispersion. 12. Precautionary measures during soil excavation for conservation and protection of rare and endangered flora and fauna found in the study area. 13. Equivalent Level of Noise level shall be maintained as per standards for both day and night. 14. The route map for soil transportation from excavation plots to work site should be firmed up and necessary permissions shall be sought from District Administration. 15. Vehicles hired for the transportation should be in good condition and should have Pollution Check Certificate and should conform to applicable air and noise emission standards. 16. Approach road will be maintained periodically. 17. Personnel exposure monitoring for respirable mineral dust shall be carried out for the workers and records maintained including health records of the workers. Awareness program for workers on impact of mining on their health and precautionary measures like use of personal protective equipments etc. shall be carried out periodically. First aid facilities and adequate sanitary facility in the form of temporary toilets/septic tanks. 18. Solid waste material viz gutkha rappers, plastic bags, glasses etc. to be generated during project activity will be separately stored in bins and managed as per Solid Waste Management Rules. 19. Project proponent should maintain daily register for information of (a) collection of soil/clay, (b) manpower & (c) transportation purpose. 20. Norms of Transport Department/PWD shall be strictly followed during transportation of soil. 21. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 22. Kutchha Approach Road should be made motorable. 23. Corporate Social Responsibility (CSR) plan along with budgetary provision amounting to 2% of the total project cost shall be prepared and approved by Board of Directors of the company. A copy of resolution as above shall be submitted to the authority alongwith list of beneficiaries with their mobile nos./address. The project proponent is also required to comply with following stipulations as per MoEF, GOI OM No. 11011/47/2011-IA.II(M) dated 24/06/2013: 1. The borrowing/excavation activity shall be restricted to a maximum depth of 2 m below general ground level at the site. 2. The borrowing/excavation activity shall be restricted to 2 m. above the ground water table at the site. 3. The borrowing/excavation activity shall not alter the natural drainage pattern of the area. 4. The borrowed/excavated pit shall be restored by the project proponent for useful purpose(s). 5. Appropriate fencing all around the borrowed/excavated pit shall be made to prevent any mishap. 6. Measures shall be taken to prevent dust emission by covering of borrowed/excavated earth during transportation. 7. Safeguards shall be adopted against health risks on account of breeding of vectors in the water bodies created due to borrowing/excavation of earth. 8. Workers/labourers shall be provided with facilities for drinking water and sanitation. 9. A berm shall be left from the boundary of adjoining field having a width equal to at least half the depth of proposed excavation. 10. A minimum distance of 15 m from any civil structure shall be kept from the periphery of any excavation area.

6. M/s Asha Ent Udhyog, Vill: Bharwal, P.O. Belipar, Bansgaon, Smt. Ash Shahi, W/o Sri Ranjeet Shahi, 10, Vill: Bharwal, Bansgaon, Distt: Gorakhpur. File N0. Ent./131 /DD(Sh)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed to submit following information: 1. Aerial distance among Mining sites and distance from mining sites to brick kiln. 2. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 3. A details CSR plan of Rs. 2.05 Lakh to be submitted along with the details of beneficiary.

Page 7 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

4. An original notarized affidavit from project proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 5. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through undated letter received on 01/01/2016. A presentation was made by Sri Ranjeet Singh, project proponent alongwith their consultant M/s ENV DAS India Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Plot No. 53,171,137,334, Village - Bharwal, P.O. - Belipar, Tehsil Bansgaon, District - Gorakhpur, .,(Leased area 2.66 Ha), M/s Asha Ent Udhyog 2. As per Form-1, presentation and documents submitted, 36708 cum soil excavation is proposed from the area 2.66ha. Gata wise excavation details are proposed as follows: Gata No Area (ha) Depth of Period of Volume of soil excavated (after Excavation (m) Excavation as per considering of berm & safety agreement measures) 53 0.721 1.5 5 yrs 9949.80 171 0.906 1.5 5 yrs 12502.80 137 0.628 1.5 5 yrs 8666.40 334 0.405 1.5 5 yrs 5589.00 Total Volume 36708 cum 3. The ultimate depth of mining will be restricted to 1.5 meter. 4. The water requirement will be limited to 2.8 KLD & will be supplied from water tankers. 5. During operation the maximum no. of workers will not be more than 25. 6. The mining will be opencast type and carried out manually. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. An Affidavit dated 01/01/2016 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 10. The project Proponent submitted the original letter No.113/2015, dated 16/10/2015 issued by the Tehsildaar, Basgoan, Gorakhpur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 11. During the presentation the project Proponent informed the committee that (A) The Total cost of the project is 48 lakh. 12. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. The CSR plan for Rs. 2.05 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 8 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

7. M/s Shivam Brick Field, Vill: Dudhli, Tehsil Sadar, Muzaffarnagar Mr. Pradeep Kumar, H. No. 129, Aalamageerpur, Vill:/Town Charthawal, Distt:Muzaffarnagar. File N0. Ent./139 / AD(Sub)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed to submit following information: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Aerial distance among Mining sites and distance from mining sites to brick kiln. 4. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 5. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Pradeep Kumar, project proponent alongwith their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at gata no- 505/2, 603, 330, 328, 325, 329, 24 & 331, Village-Dudhli, Tehsil-Sadar, District-Muzafarnagar, U.P., Leased Area – 3.4301 Ha M/s Shivam Brick Field. 2. Gata vise details:-

S. Khasra Total Leased Land Land Agreement Proposed Mineab le Mineable Vol. No. / Gata Area Area Owner Leased Period Depth Of Area Depth Of (Ha.) Mining To (Years) Mining (m 2) (m) Excavation (Ha.) (ft.) (m 3) 1 505/2 0.0200 0.0200 Bijendra, Pradeep 5 5 103 1.3716 141 Jaiveer Kumar 01/10/15 Singh, S/o To Ashwani Medhraj 30/09/20 Kumar, Singh Praveen Kumar S/o Medhraj Singh & Smt. Dheervati W/o Medhraj Singh 2 603 1.3870 1.3870 Bijendra, Pradeep 5 5 11166 1.3716 15315 Jaiveer Kumar 01/10/15 Singh, S/o To Ashwani Medhraj 30/09/20 Kumar, Singh Praveen Kumar S/o Medhraj Page 9 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Singh & Smt. Dheervati W/o Medhraj Singh 3 330 1.0934 1.0934 Udayve er Pradeep 5 5 8784 1.3716 12048 Kumar 01/10/15 S/o To Medhraj 30/09/20 Singh 4 328 0.0934 0.0934 Smt. Pradeep 5 5 651 1.3716 893 Saraina Devi Kumar 01/10/15 W/o S/o To Surta Singh Medhraj 30/09/20 Singh 5 325 0.1614 0.1614 Mahipal Pradeep 5 5 1183 1.3716 1623 S/o Kumar 01/10/15 Rulha S/o To30/09/20 Medhraj Singh 6 329 0.0935 0.0935 Chandrapal Pradeep 5 5 653 1.3716 895 S/o Kumar 01/10/15 Surta S/o To Medhraj 30/09/20 Singh 7 24 0.4404 0.4404 Praveen Pradeep 5 5 3428 1.3716 4702 Kumar Kumar 01/10/15 S/o S/o To Medhraj Medhraj 30/09/20 Singh Singh 8 331 0.1410 0.1410 Bhartu Pradeep 5 5 1022 1.3716 1402 S/o Kumar 01/10/15 Roohla S/o To Medhraj 30/09/20 Singh TOTAL 3.4301 TOTAL 37020 3. Other Details:- Brick Production 2961572 Lakh / Annum Method Of Mining Opencast Manual Ultimate Depth of Mining 1.0 m Water Requirement 2.15 KLD Manpower 30

4. The proposed rate of production of the mine is 37020 cum of Clay. 5. During the presentation the project Proponent submitted the affidavit dated 01-05-2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. During the presentation the project Proponent submitted the original letter No. 971/NOC dated 19/12/2015 issued by the Mining Supritendent, Muzafarnagar, office of D M, Muzafarnagar that there is no other mining lease/permit is sanctioned within 500 m of the proposed sites.

Page 10 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

7. The proposed method of mining is Opencast Manual method. 8. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 11. During the presentation the project proponent informed as follows- The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. The CSR plan for Rs. 50,000/- executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

8. M/s Balaji Brick Fields, Vill: Pinna, Sadar Distt: Muzaffarnagar. Sri Anuj Kumar, H.No.765/1, Civil Line Dakshini- 8, Muzaffarnagar. File N0. Ent./140/ OSD(T)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed to submit following information: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Aerial distance among Mining sites and distance from mining sites to brick kiln. 4. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 5. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. 6. The committee also directed to submit the Undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Pankaj Kumar, representative of project proponent alongwith their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at gata no-38/2, 253, 255 Maa, Village- Peena, Tehsil & District-Muzaffarnagar, U.P. Leased Area – 3.3983 Ha M/s Balaji Brick Fields. 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. 2 No. / Gata Area Area Owner Leased To Period Depth Of Area (m ) Depth (m) Of (Ha.) Mining (Years) Mining Excavation (Ha.) (ft.) 1 38/2 1.0860 1.0860 Ompal Anuj 5 5 8724 1.3716 11965 S/o Kumar 01.10.2015

Page 11 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Hargyan S/o To Karan 30.09.2020 Singh 2 253 2.092 0.6973 Rajkumar Anuj 5 5 5527 1.3716 7581 Singh, Kumar 01.10.2015 Rajendar S/o To Kumr, Karan 30.09.2020 Devendar Singh Singh & Bijendar Singh S/o Kiran Singh 3 255 1.615 1.615 Rajkumar Anuj 5 5 13057 1.3716 17909 Maa Singh, Kumar 01.10.2015 Rajendar S/o To Kumr, Karan 30.09.2020 Devendar Singh Singh & Bijendar Singh S/o Kiran Singh TOTAL 3.3983 TOTAL 37455 3. Other Details:- Brick Production 2996400 /Annum Method Of Mining Opencast Manual Water Requirement 2.15 KLD Manpower 20 4. The proposed rate of production of the mine is 37455 cum of Clay. 5. During the presentation the project Proponent submitted the affidavit dated 07/08/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. During the presentation the project Proponent submitted the original letter No. 970/NOC dated 19/12/2015 issued by the Mining superintendent, Muzaffarnagar, Office of D M, Muzaffarnagar that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that (A) The distance of Mine to Mine is 415 mt. (B) The Distance of Mine to Brick Klin is 1.4 km. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.

Page 12 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. The CSR plan for Rs. 3.35 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

9. M/s Mohit Brick Field, Khasra no. 799, 833 & 834, Vill: Lalyana, Tehsil Khekra, Distt: Baghpat. Mr. Mohit Kumar Vill: Lalyana, Tehsil Khekra, Distt: Baghpat. File N0. Ent./141/ DD(Sh)

The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Distances among Mining sites and distance from mining sites to brick kiln. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Natthuram, representative of project proponent alongwith their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at Khasra no. 799, 833 & 834, Vill: Lalyana, Tehsil Khekra, Distt: Baghpat. U.P. Leased Area – 2.996 Ha M/s Mohit Brick Field. 2. Gata wise details:-

S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. 2 No. / Gata Area Area Owner Leased Period Depth Of Area (m ) Depth Of (Ha.) Mining To (Years) Mining (m) Excavation (Ha.) (ft.) 1 833 0.369 0.369 Ram KUmar Mohit 3 3 2955 0.762 2251 S/o Kumar 2014 to Chandrabha S/o 2017 Natthu 2 834 0.797 0.797 Natthu Mohit 3 3 6508 0.762 4959 S/o Kumar 2014 to Sheeshram S/o 2017 Natthu 3 799 1.83 1.830 Satpal Mohit 4 4 14963 1.0668 15962 S/o Kumar 2014 to Tejram S/o 2018 Natthu TOTAL 2.996 TOTAL 23173 3. Other Details:- Brick Production 10657 /day Method Of Mining Opencast Manual Water Requirement 2.4 KLD Manpower 30 Page 13 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

4. The proposed rate of production of the mine is 23173 cum of Clay. 5. During the presentation the project Proponent submitted the affidavit dated 07/08/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. During the presentation the project Proponent submitted the original letter No. 649/Kha. Li.-2015 dated 24/11/2015 issued by the Mining Officer, Baghpat, Office of D M, Baghpat that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that (A) The distance of Mine to Mine is 210 mt. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. The CSR plan for Rs. 2.80 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

10. M/s Mahadev Brick Field, Khasra no. 388, 395, 406, 416, 386, 415 & 391, Vill: Pooranpur Nawada, Khekra, Baghpat. Sri Devendra Sharma, Vill: Pooranpur Nawada, Tehsil Khekra, Distt: Baghpat. File N0. Ent./142/ DD(Y) The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Distances among Mining sites and distance from mining sites to brick kiln. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 28/12/2015. A presentation was made by Shri Devendra Sharma, project proponent along with their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth Mining at Khasra no. 388, 395, 406, 416, 386, 415 & 391, Vill: Pooranpur Nawada, Khekra, Baghpat. U.P. Leased Area – 1.683 Ha M/s Mahadev Brick Field. 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. No. / Gata Area Area Owner Leased To Period Depth Of Area Depth Of (Ha.) Mining (Years) Mining (m 2) (m) Excavation (Ha.) (ft.) (m 3) 1 395 0.314 0.314 Mr. Pappu Mr. 4 4 2447 1.0668 2610 Page 14 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

S/o Devendar 01/01/15 Mr. Singhraj Sharma To S/o 31/12/19 Mr.Dayanand Sharma 2 386 0.177 0.177 Mr. Kannu Mr. 4 4 1346 1.0668 1436 S/o Devendar 01/01/15 Mr. Jethha Sharma To S/o 31/12/19 Mr.Dayanand Sharma 3 406 0.658 0.250 Mr. Mr. 4 4 1934 1.0668 2063 Balkishan Devendar 01/01/15 S/o Sharma To Mr. Sohanlal S/o 31/12/19 Mr.Dayanand Sharma 4 391 0.226 0.226 Mr. Mr. 4 4 1739 1.0668 1855 Ramchandra Devendar 01 /01/15 S/o Sharma To Mr. Birji S/o 31/12/19 Mr.Dayanand Sharma 5 416 1.395 0.337 Mr. Mr. 4 4 2643 1.0668 2820 Ramnarayan Devendar 01/01/15 & Sharma To Mr. S/o 31/12/19 Premnarayan Mr.Dayanand S/o Sharma Mr. Tilakram 6 388 4.157 1.674 Mr. Subhash Mr. 4 4 13665 1.0668 14578 Mathur Devendar 01/01/15 S/o Sharma To Mr. Baburam S/o 31/12/19 Mathur Mr.Dayanand Sharma 7 415 0.4696 0.1324 Mr. Mr. 4 4 988 1.0668 1054 Shayamlal Devendar 01/01/15 S/o Sharma To Mr. Baburam S/o 31/12/19 Mr.Dayanand Sharma TOTAL 3.1104 TOTAL 26416 3. Other Details:- Brick Production 11007 /day Method Of Mining Opencast Manual Water Requirement 2.15 KLD Manpower 30 4. The proposed rate of production of the mine is 26416 cum of Clay. 5. The project Proponent submitted the affidavit dated 08/08/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. Page 15 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

6. The project Proponent submitted the original letter No. 633/Kha. Li.-2015 dated 19/11/2015 issued by the Mining Officer, Baghpat, Office of D M, Baghpat that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that (a) The Maximum distance of Mine to Mine is 325 mt. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. The CSR plan for Rs. 2.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. Number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

11. M/s Shishodia Ent Bhatta, Khasra no.483, Vill: Sanda Faridpur, Tehsil Khurja, Bulandshahr. Sri Vinay Kumar Vill: Kala Khuri, Khurja, Distt: Bulandshahar. File N0. Ent./143/ AD(H)

The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Distances among Mining sites and distance from mining sites to brick kiln. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Natthuram, representative of project proponent alongwith their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at Khasra no.483, Vill: Sanda Faridpur, Tehsil Khurja, Bulandshahr. U.P. Leased Area – 1.581 Ha M/s Shishodia Ent Bhatta. 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. 2 No. / Gata Area Area Owner Leased Period Depth Of Area (m ) Depth Of (Ha.) Mining To (Years) Mining (m) Excavation (Ha.) (ft.) 1 438 3.427 1.518 Ravi Datt Vinay 5 4 12843 1.0668 13701 S/o Kumar 201 5 to Khachedu Singh 2020 Singh S/o 2014 to

Page 16 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Virendra 2018 Pal Singh TOTAL 1.518 TOTAL 13701 3. Other Details:- Method Of Mining Opencast Manual Water Requirement 1.65 KLD Manpower 30 4. The proposed rate of production of the mine is 13701 cum of Clay. 5. During the presentation the project Proponent submitted the affidavit dated 07/08/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. During the presentation the project Proponent submitted the original letter No. 1070/Kha. Li.-2015 dated 12/10/2015 issued by the Mining Officer, Bulandshahar, Office of D M, Bulandshahar that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. The proposed method of mining is Opencast Manual method. 8. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 11. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 15.00 Lacks. The CSR plan for Rs. 2.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

12. M/s Akash Brick Fields, Khasra no. 551 & 542, Vill: Sanjhak, Sadar, MuzaffarnagarMr. Zahiruddin, Vill: Sanjhak, Tawali, Sadar, Muzaffarnagar. File No. Ent./144/ AD(Sub)

The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Distances among Mining sites and distance from mining sites to brick kiln. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Lukman, a representative of project proponent along with their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at Gata No. 551 and 542 Village-Sanjhak, Tehsil-Sadar, District - Muzaffarnagar, Uttar Pradesh., (Leased area 2.8436 Ha), M/s Akash Brick Field. Page 17 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol . No. / Gata Area Area Owner Leased To Period Depth Of Area Depth Of (Ha.) Mining (Years) Mining (m 2) (m) Excavation (Ha.) (ft.) (m 3) 1 551/2 2.1065 0.8196 Ali Zahiruddin 5 5 6532 1.3716 8959 Mohammad, S/o 01/10/15 Mohammad Jaffar ali To Salauddin 30/09/15 S/o Basheer 2 542 2.0240 2.0240 Meharbaan Zahiruddin 5 5 16453 1.3716 22567 S/o S/o 01/10/15 Shaakar Ali Jaffar ali To & 30/09/15 Smt. Baatun W/o Shaabar Ali TOTAL 2.8436 TOTAL 31526 3. Other Details:- Method Of Mining Opencast Manual Water Requirement 1.9 KLD Manpower 30 4. The proposed rate of production of the mine is 31526 cum of Clay. 5. The project Proponent submitted the affidavit dated 01/06/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. The project Proponent submitted the original letter No. 975/NOC dated 22/12/2015 issued by the Mining Superintendent, Muzaffarnagar, Office of D M, Muzaffarnagar that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 165 mt. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 25.00 Lacks. The CSR plan for Rs. 3.20 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining.

Page 18 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

13. M/s Indian Brick Field, Khasra no. 4333, 4334 & 4396, Vill: Khiwai, Sardhana, Distt: MeerutShri Bunda Khan, Vill: & Post Khiwai, Tehsil Sardhana . File No. Ent./145 / OSD(T)

The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Distances among Mining sites and distance from mining sites to brick kiln. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Lukman, a representative of project proponent along with their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at mining at Gata No. 4333, 4334 and 4396 Village-Khiwari, Tehsil-Sardhana, District - Meerut, Uttar Pradesh., (Leased area 2.402 Ha), M/s Indian Brick Field. 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. No. / Gata Area Area Owner Leased Period Depth Of Area Depth Of (Ha.) Mining To (Years) Mining (m 2) (m) Excavation (Ha.) (ft.) (m 3) 1 4396 0.5480 0.5480 Taimur Bilal Bunda 5 5 0.4305 1.3716 5905 Ahmad S/o Khan S/o 01/01/15 Sayeed Late To Ahmed & Imdaad 31/12/20 Smt. Khan Anoofa W/o Abdul Haq 2 4333 0.5610 0.5610 Haq, Tabu, Bunda 5 5 0.4362 1.3716 5983 Bilal S/o Khan S/o 01/01/15 Sayeed Late To Ahmed & Imdaad 31/12/20 Smt. Amna Khan W/o Late Sayeed 3 4334 1.293 1.293 Ayub, Kallu Bunda 5 5 1.0439 1.3716 14318 S/o Bhurey Khan S/o 01/01/15 Late To Imdaad 31/12/20 Khan TOTAL 2.402 TOTAL 26207 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 1.9 KLD Manpower 30

Page 19 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

4. The proposed rate of production of the mine is 26207 cum of Clay. 5. The project Proponent submitted the affidavit dated 07/08/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. The project Proponent submitted the original letter No. 1769/Kha Li-2015 dated 17/12/2015 issued by the Mining Superintendent, Meerut, Office of D M, Meerut that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 0 mt. i.e. all khasras are connected with each other 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 15.00 Lacks. The CSR plan for Rs. 2.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

14. M/s Rohtas Kumar Banksal Bricks Works, Vill: Lalyana Mansoorpur, The: Khekra, Baghpat.Mr. Sanjeev Kumar Bansal, Vill: Lalyana, Khekra, Baghpat.File No. Ent./146/ DD(SH)

The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Distances among Mining sites and distance from mining sites to brick kiln. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted their replies through letter dated 04/01/2016. A presentation was made by Shri Sanjeev Kumar Bansal, the project proponent along with their consultant M/s Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field at mining at Gata No. 99, 702, 703, 706, 707, 714, 97, 98 and 99 Village-Lalyana, Tehsil-Khekra, District - Baghpat, Uttar Pradesh., (Leased area 4.565 Ha), M/s Rohtas Kumar Bansal Brick Works. 2. Gata wise details:- S. Khasra / Total Leased Land Land Agreement Proposed Mineable Mineable Vol. No. Gata Area Area Owner Leased Period Depth Of Area Depth Of (Ha.) Mining To (Years) Mining (m 2) (m) Excavation (Ha.) (ft.) (m 3) Page 20 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

1 99 0.215 0.215 Aseram S/o Sanjeev 4 4 0.1652 1.0668 1762 Kundan Kumar 2014 to Bansal 2018 S/o Rohtas Kumar Bansal 2 702 0.27 4 0.274 Ravider S/o Sanjeev 3 3 0.2177 0.762 1659 Mukhtiyare Kumar 2014 to Bansal 2017 S/o Rohtas Kumar Bansal 3 703 0.576 0.576 Mithun Sanjeev 3 3 0.4673 0.762 356 1 Haramveer Kumar 2014 to Kawarpal Bansal 2017 Jaivender S/o S/o of Rohtas Hardan Kumar Bansal 4 714 0.923 0.923 Mithun Sanjeev 3 3 0.7509 0.762 5722 Haramveer Kumar 2014 to Kawarpal Bansal 2017 Jaivender S/o S/o of Rohtas Hardan Kumar Bansal 5 707 0.974 0.487 Subhash S/o Sanjeev 3 3 0.3935 0.762 2958 Iime Kumar 2014 to Bansal 2017 S/o Rohtas Kumar Bansal 6 97 1.859 0.929 Mrs. Sanjeev 4 4 0.7521 1.0668 8023 Neelam Kumar 2014 to W/o of Bansal 2018 Pradeep S/o S/o Mahaveer Rohtas Kumar Bansal 7 98 0.863 0.431 Harichandra Sanjeev 4 4 0.3412 1.0668 3640 S/o Budhu & Kumar 2014 to Tejpal, Bansal 2018 Rampal, S/o Rajender, Rohtas Satendar Kumar S/o Lehri Bansal 8 706 1.461 0.730 Mrs. Sanjeev 3 3 0.5953 0.762 4536

Page 21 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Dayawati Kumar 2014 t o W/o Bansal 2017 Mahendra S/o Rohtas Kumar Bansal TOTAL 4.565 TOTAL 31902 3. Other Details:- Method Of Mining Opencast Manual Water Requirement 2.4 KLD Manpower 30 4. The proposed rate of production of the mine is 31902 cum of Clay. 5. The project Proponent submitted the affidavit dated 02/05/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. The project Proponent submitted the original letter No. 651/Kha Li-2015 dated 27/11/2015 issued by the Mining Officer, Baghpat, Office of D M, Baghpat that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 7. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 315 mt. 8. The proposed method of mining is Opencast Manual method. 9. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. During the presentation the project proponent informed as follows- The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 35.00 Lacks. The CSR plan for Rs. 3.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

15. M/s Jadaun Brick Field, Khasra no. 207,269,151,265,187,214,215, Vill: Sikandarpur, Khet no. 1741,1742,1743, 1744 & Gata n. 2136 Vill: Pilakhna, Tehsil- Kol, Distt: Mr. Omveer Singh, S/o Shri Bhikam Singh, 29, Sikandarpur, Tehsil Kol, Distt: Aligarh. File No. Ent./180/ AD(S)

The committee noted that the matter was earlier discussed in SEAC meeting dated 8/12/2015 wherein the project proponent was directed to submit following information: 1. Affidavit regarding compliance of MoEF OM dated 24/06/2013 should commensurate to actual production. A revised certificate should be submitted in this regards. 2. Cluster certificate of 500 metres should be submitted.

Page 22 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 4. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 5. Distances among Mining sites and distance from mining sites to brick kiln. 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 7. Total Project Cost and CSR plan with committed work to be executed with name displayed and address and details of beneficiary and gram pradhan along with phone number, photographs should be submitted with an affidavit to Directorate as well as to the District magistrate / Chief Development officers, Aligarh, U.P. The project proponent submitted their replies through letter dated 08/01/2016. A presentation was made by Mr. Omveer Singh, project proponent / representative along with their consultant M/s Gogreen Enviro house Pvt Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth at Khasra no.-207,269,151,265,187,214,215, Village- Sikandarpur, Tehsil- Kol, Dist. Aligarh U.P. & Khet No.-1741,1742,1743,1744 & Gata No.- 2136,2137, Village- Pilakhna, Tehsil- Kol, Dist. Aligarh, U.P. (Leased area 4.67 Ha) M/s Jadaun Brick Field. 2. During the presentation in SEAC meeting dated 15/01/2016 the project proponent through his letter dated 15/01/2016 informed that the gata no 187 (area 0.48 ha) will not be included in the project proposal therefore, the soil excavation is proposed after leaving safety zone from the area 4.19 Ha. Gata wise excavation details are proposed as follows: SN Khasra No/ Area Owners Village Excavati Depth in Minable Gata No/ Hact. on mt reserve Khet No Period cubicMt Years

1 207,269 0.40 Ha Mr.Ram Prasad S/O Shri Sikandarpur Four 1.50 5700.00 Narsingh Pal Singh 2 151,265 & 0.96 Ha Mr.BhikamSingh S/O Shri Indra Sikandarpur Four 1.50 13680 .00 Pal Singh & Smt.Sumitra Devi W/O Shri Indra Pal Singh 3 214,215 0.80 Mr.Bharat Singh S/O Shri Sikandarpur Four 1.50 11400.00 Parasadi Lal & Smt.Sheela Devi W/O Shri Durjan Singh & Smt.Susheela Devi W/O Shri Ram Nivas & Smt.Rajnesh Devi W/O Nathu Ram S/O Shri Daulat Ram

4 2136 0.590 Mr.Bhikam Singh & Mr. Pilakhna Four 1.5 8407.00 Vijendra Singh S/O S hri Indra Pal Singh 5 1741,1742,1 1.440 Mr. Anang Pal Singh S/O Shri Pilakhna Four 1.5 20520.00 743 Bihari Singh, Mr. Mahesh

& 1744 kumar singh,Umesh kumar Singh S/o Shri Pritvi Singh & Mr.Sonu Singh, Mr.Monu Singh S/O Shri Narendra Pal Singh & Smt .Gayatri Devi W/O Shri Sarvesh Kumar Adobted S/O Shri Rajpal Singh Total 4. 19 59707 .00 Page 23 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. The ultimate depth of mining will be restricted to 1.5 meter. 4. Total water requirement is about 3.0 KLD = 0.5 KLD (Drinking & Domestic Uses) + 0.25 KLD (Dust Suppression)+ 0.25 KLD Green Belt + 2.00 KLD Moulding of Clay . The water requirement will be met through nearby existing dug well & bore wells and water from these sources will be made available at site by private water tankers. 5. During operation the maximum no. of workers will not be more than 42. 6. The brick earth mining will be opencast type and would be carried out manually. 7. Distances among Mining sites and distance from mining sites to brick kiln is within 500 mts. 8. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 11. The project Proponent submitted the affidavit dated 07/12/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 12. The project Proponent submitted the original letter No. 672/DLRC dated 26/10/2015 issued by the Mining Superintended, Aligarh, Office of D M, Aligarh that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 16.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

16. M/s Raj Ent Bhatta, Gata no.488, 574Mi, 580 & 662 Vill: Sursi, Post Adalapura, Tehsil Chunar, Distt: Mirzapur Shri Rajendra Kumar Mishra, S/o Shri Shitala Prasad, Vill: Kushahan, Post Adalpura, Tehsil Chunar, Distt: Mirzapur. File N0. Ent./192/ DD(Sh)

The committee noted that the matter was earlier considered in SEAC meeting dated 8/12/2015 wherein the project proponent did not appear. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by Shri Rajendra Kumar Mishra, the project proponent along with their consultant M/s Earth Vision Enviro Tech Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no.488, 574Mi, 580 & 662 Vill: Sursi, Post Adalapura, Tehsil Chunar, District- Mirzapur Uttar Pradesh., (Leased area 1.30 Ha), M/s Raj Ent Bhatta 2. Gata wise details:- Gata Area Area Depth Area of Volume of Total Volume of Minable Nos. (Ha.) (SQM) (M) berm Top Soil Available blockage quantity of left for riffling quantity of (CUM) soil (CUM) (SQM) (CUM) soil after Page 24 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

leavimg berm (cum) 488 0.123 1230 2 136.28 218.74 2187.43 351.44 1835.98 574 0.555 5550 2 293.99 1051.20 10512.01 770.42 9741.59 Mi. 580 0.331 3310 2 226.13 616.77 6167.74 590.13 5577.60 662 0.291 2910 2 211.77 539.64 5396.44 552.00 4844.44 TOTAL 1.30 13000 2.0 868.17 2426.35 24263.62 226 3.99 21999.61 Ha. sq.mt. mt. M2 Sq. meter cubic meter cubic mt. cubic meter Per Year Production: 4,399 m 3/annum for 5 years Number of bricks production per year- 14.51 lacs (330 bricks per cubic meter) 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 0.9 KLD Manpower 10 Total Cost 18.15 4. The proposed rate of production of the mine is 21999.61 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 85 mt. and Brick Killn to Mine is 400 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The committee discussed the matter and directed the project proponent to submit the following information: 1. Clarification regarding the gata no mentioned in form-1 as 662 and 662 mi in khatauni. The form-1, affidavit regarding compliance of provisions given in MoEF OM dated 24/06/2013 and 500 m cluster certificate issued from Mining Officer/District Administration should be revised accordingly and submitted. 2. Depth of mining is to be considered as 1.5 meter instead of 2 meter as proposed. Revised calculation of soil to be excavated and bricks production etc. to be submitted The matter is to be considered after receipt of information.

17. M/s Shri Ram Ent Bhatta, Gata no.666 678Mi,649,663,665,484/1, 528,529, 662,680 & 661 Vill: Kela Bela, Pargana Kriyat, Tehsil Chunar,Distt:Mirzapur Sri Dasmi Yadav, S/o Sukhram Yadav, Vill: Kachhwan Bazar, Post Kachhwan, Tehsil Sadar, Distt: Mirzapur. File N0. Ent./201/ OSD(T)

The committee noted that the matter was earlier considered in SEAC meeting dated 09/12/2015 wherein the project proponent did not appear. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by Shri Krishan Kumar Yadav, representative of the project proponent along with their consultant M/s Earth Vision Enviro Tech Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no.666 678Mi,649,663,665,484/1, 528,529, 662,680 & 661 Vill: Kela Bela, Pargana Kriyat, Tehsil Chunar, District Mirzapur Uttar Pradesh., (Leased area 2.766 Ha), M/s Shri Ram Ent Bhatta, 2. During the presentation the SEAC directed the project proponent to consider the depth of mining as 1.75 meter instead of 2 meter as proposed in the application. The project proponent in this regard submitted the revised gata wise details through letter dated 15/01/2016 as follows:- Gata Nos. Area Area Depth Area of Volume of Total Volume Minable Page 25 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

(Ha.) (SQM) (M) berm left Top Soil for Available of quantity of (SQM) riffling quantity of blockage soil (CUM) (CUM) soil after (CUM) leaving berm (cum) 666 0.215 2150 1.75 159.2258 398.1548 3483.855 474.1475 3009.707 678 Mi, 649, 663, 665, 484/1, 528, 529, 662, 680 2.121 21210 1.75 506.6654 4140.667 36230.84 1529.053 34701.78 661 0.43 4300 1.75 226.4478 814.7104 7128.716 678.249 6450.467 TOTAL 2.766 27660 1.75 892.33 5353.53 46843.41 2681.45 44161.95 Per year production - 8, 832 cubic meter (for 5 years) No. of bricks production per year- 29.14Lacs (330 bricks per cubic meter) (for 5 years) 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 2.0 KLD Manpower 15 4. The proposed rate of production of the mine is 50609.89 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 43 mt. and Brick Killn to Mine is 175 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. The project Proponent submitted the affidavit dated 20/12/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 11. The project Proponent submitted the original letter No. 6162/Khanij/2015 dated 26/12/2015 issued by the Mining Officer, Mirzapur, Office of Mining Officer, Mirzapur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 15.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 26 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

18. M/s Sat Guru Ent Bhatta, Gata no. 601, 604, 605, 606, 609, 611, 643, 651, 652, 653, 654, 657, 658, 659, 660, 587, 603 & 607 Vill: Sursi, Kriyat, Chunar, Mirzapur. Shri Krishna Kumar Yadav,Vill:Nandupur, Rudauli, Chunar, Mirzapur. File N0. Ent./202/ DD(Sh)

The committee noted that the matter was earlier considered in SEAC meeting dated 09/12/2015 wherein the project proponent did not appear. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by Shri Krishan Kumar Yadav, the project proponent along with their consultant M/s Earth Vision Enviro Tech Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 601, 604, 605, 606, 609, 611, 643, 651, 652, 653, 654, 657, 658, 659, 660, 587, 603 & 607 Vill: Sursi, Kriyat, Chunar, District Mirzapur Uttar Pradesh., (Leased area 2.679 Ha), M/s Sat Guru Ent Bhatta, 2. During the presentation the SEAC directed the project proponent to consider the depth of mining as 1.75 meter instead of 2 meter as proposed in the application. The project proponent in this regard submitted the revised gata wise details through letter dated 15/01/2016 as follows:- Gata Nos. Area Area Depth Area of Volume of Total Available Volume of Minable (Ha.) (SQM) (M) berm left Top Soil for quantity of soil blockage quantity (SQM) riffling (CUM) after leaving berm (CUM) of soil (cum) (CUM) 587, 603, 607 1.127 11270 1.75 368.4984 2180.3 19077.63 1109.547 17968.08 604, 605, 606, 609, 611, 643, 651, 652, 653, 654, 657, 658, 659 & 660 0.892 8920 1.75 327.4976 1718.5 15036.88 985.0592 14051.82 601 0.66 6600 1.75 281.2788 1263.744 11057.76 844.7284 10213. 03 TOTAL 2.679 26790 1.75 977.27 5162.54 45172.27 2939.33 42232.93 Per year production - 8,446 cubic meter (for 5 years) No. of bricks production per year- 27.87 Lacs (330 bricks per cubic meter) (for 5 years) 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 2.0 KLD Manpower 15 4. The proposed rate of production of the mine is 42232.93 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 135 mt. and Brick Killn to Mine is 318 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. The project Proponent submitted the affidavit dated 13/01/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 11. The project Proponent submitted the original letter No. 6157/Khanij/2015 dated 26/12/2015 issued by the Mining Officer, Mirzapur, Office of Mining Officer, Mirzapur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites.

Page 27 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 15.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 160 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

19. M/s Prahalad Ent Udyog, Gata no. 242, 261,269,275,322,323 & 378 Vill: Purani Chhawani, Post Adalpura, Tehsil Chunar Distt: Mirzapur. Sri Prabhu Narayan Singh S/o Sri Kamla Prasad Singh, Vill: Araji Line Sultanpur, Post Adalpura Tehsil Chunar, Distt: Mirzapur. File N0. Ent./203/ DD(Y)

The committee noted that the matter was earlier considered in SEAC meeting dated 09/12/2015 wherein the project proponent did not appear. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by Shri Krishan Kumar Yadav, the project proponent along with their consultant M/s Earth Vision Enviro Tech Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 242, 261,269,275,322,323 & 378 Vill: Purani Chhawani, Post Adalpura, Tehsil Chunar District Mirzapur Uttar Pradesh., (Leased area 3.722 Ha), M/s Prahalad Ent Udyog 2. During the presentation the SEAC directed the project proponent to consider the depth of mining as 1.75 meter instead of 2 meter as proposed in the application. The project proponent in this regard submitted the revised gata wise details through letter dated 15/01/2016 as follows:- Gata Nos. Area Area Depth Area of Volume of Total Available Volume of Minable (Ha.) (SQM) (M) berm left Top Soil for quantity of soil blockage quantity of (SQM) riffling (CUM) after leaving (CUM) soil (CUM) berm (cum) 275 0.315 3150 1.75 193.3745 591.3251 5174.095 577.8308 4596.264 322, 323, 269 2.262 22620 1.75 523.3356 4419.333 38669.16 1579.668 37089.49 242 0.13 1300 1.7 5 123.1318 235.3736 2059.519 364.5578 1694.962 378 0.682 6820 1.75 285.979 1306.804 11434.54 858.9992 10575.54 261 0.333 3330 1.75 198.909 626.2182 5479.409 594.6348 4884.774 TOTAL 3.722 37220 1.75 1324.73 7179.05 62816.7 2 3975.69 58841.03 Per year pro duction - 11,768 cubic meter (for 5 years) No. of bricks production per year- 38.89 ( 330 bricks per cubic meter) (for 5 years) 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 2.0 KLD Manpower 15 4. The proposed rate of production of the mine is 58841.03cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 135 mt. and Brick Killn to Mine is 305 Meter

Page 28 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. The project Proponent submitted the affidavit dated 28/11/2015 on 15/01/2016 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 11. The project Proponent submitted the original letter No. 6156/Khanij/2015 dated 26/12/2015 issued by the Mining Officer, Mirzapur, Office of Mining Officer, Mirzapur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 15.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 550 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

20. M/s Gauri Riddhi Ent Udyog, Gata no. 1667, 1732,1698 ka 1/4 Bhag & 1688 Vill: Aram Sarai, Bhogaon, Mainpuri. Sri Rajender Kumar Gupta, S/o Late Babu Ram Gupta, Eatwa Road, Tehsil Bhogaon, Distt: Mainpuri. File N0. Ent./218/ DD(Y)

The committee noted that the matter was earlier discussed in SEAC meeting dated 19/12/2015 in which the committee noted that area given in gata wise production chart is not correctly given. The gata wise production chart should be revised with correct area and production capacity. Distance between mining sites and from mining sites to brick kiln should also be submitted, also on google map. 500 m cluster certificate mentioning approved mining areas within 500 m should be submitted. The project proponent submitted their replies through letter dated 28/12/2015.A presentation was made by Shri Sanjeev Kumar, authorized representative of project proponent along with their consultant M/s Global Environment & Mining Services. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 1667, 1732, 1698 ka 1/4 Bhag & 1688, Vill: Aram Sarai, Tehsil-Bhogaon, District-Mainpuri, U.P., (Leased Area 1.224 Ha), M/s Gauri Riddhi Ent Udyog. 2. 20802 cum soil excavation is proposed from the proposed sites (area 1.224 ha) as per following production chart: Sr. Gata no. Total Area in Safety Provision Excavated Production capacity No. ha. Area Area in ha. at two meter depth 1. 1667 dk 1@4 Hkkx 0.855 0.1285 0.7265 14530 2. 1732 dk 1@4 Hkkx 0.1487 0.0223 0.1264 25028 3. 1698 dk 1@4 Hkkx 0.0302 0.0045 0.0257 514 4. 1688 0.1900 0.0285 0.1615 3230 1.224 0.1838 1.0401 20802 Page 29 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. Salient features of the project is as follows: Area 1.224 Ha Mining Method Manual Proposed Manpower 30 Water Requirement / Source 3.5 KLD through tankers 4. The project Proponent informed the committee that the Maximum distance of Mine to Mine is 200 mt. and Brick Killn to Mine is 2 Km 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. Regarding the project no litigation is pending in any court. 7. An affidavit dated 04/09/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 8. A letter no. 1883, dated 17/12/2015 from Mining Inspector, Mainpuri has been submitted which mentions that there is no other mining work is being undertaken within 500 m of proposed sites. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 4.00 Lacks. The CSR plan for Rs. 0.30 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 550 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

21. M/s Vijay Laxmi Brick Field, Gata no. 1106, 285, 45, 202, 210, 220, 285, 326, 30, 394 Kh, 575 Na, 595, 171, 322, 182, 46, 192, 91, 76, 158 Vill: Digharua, Gola, Gorakhpur. Shri AkhileshRai, S/o Dharmdev Rai Vill: Chari, Gola, Gorakhpur.File N0. Ent./219/ AD(H)

The committee noted that the matter was earlier considered in SEAC meeting dated 19/12/2015 wherein the committee discussed the matter and observed that gata no. 285, 326, 30, 394 Ka, 575 Na, 595 are not mentioned in certificate issued by Tehsildaar regarding cluster situation. The gata wise production chart should be revised with correct area and production capacity. Distance between mining sites and from mining sites to brick kiln should also be submitted. The revised submission including above information and final 500 m cluster certificate should be submitted. The committee also directed to submit revised CSR plan. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by Shri Akhilesh Kumar Rai, project proponent along with their consultant M/s Rai Environmental Services Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 1106, 285, 45, 202, 210, 220, 285, 326, 30, 394 Kh, 575 Na, 595, 171, 322, 182, 46, 192, 91, 76, 158 Vill: Digharua, Gola, District - Gorakhpur. Uttar Pradesh., (Leased area 4.6105 Ha), M/s Vijay Laxmi Brick Field,

Page 30 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

2. The gata wise details are as follows:- Gata no. Area in Area Depth Soil Mineable Soil Excavation Time Duration hactare in In Volume Volume excluding 0.75 m of Agreement/ (sq.m.) meter (cum) Bunding Area from periphery Lease Period (cum) (Years) 285 1.5580 15580 1.5 23370 22473 5 45 mi, 202 0.3420 3420 1.5 5130 4633 5 mi., 210 Kha, . 171,322 0.3125 3125 1.5 4687 4207 5 220 0.2590 2590 1.5 3885 3435 5 182 Mi., 46 Mi.,192 1.8030 18030 1.5 27045 26134 5 Mi., 91 Mi., 76 Mi., 158 Mi., 1106 0.3360 3360 1.5 5040 4548 5 Total 4.6105 69157 65430 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 2.0 KLD Manpower 20 4. The proposed rate of production of the mine is 65430 cum of Clay. 5. The proposed method of mining is Opencast Manual method. 6. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 7. Regarding the project no litigation is pending in any court. 8. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 9. The project Proponent submitted the affidavit dated 28/11/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013. 10. The project Proponent submitted the original letter No. 6156/Khanij/2015 dated 26/12/2015 issued by the Mining Officer, Mirzapur, Office of Mining Officer, Mirzapur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 12.00 Lacks. The CSR plan for Rs. 0.60 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 31 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

22. M/s Ganeshilal Shyambiharilal Ent Udyog, Gata no. 207, 181Ba, 138Aa, 138 Ba, 139 Aa, Vill: Elampura Tehsil Gabhana, Distt: Aligarh. Pradeep Kumar S/o Shri Shyambihari, Vill: Chadaus, Tehsil Gabhana, Aligarh. File N0. Ent./256/ OSD(T) The committee noted that the matter was earlier considered in SEAC meeting dated 19/12/2015 wherein the committee noted that area given in form-1 is 2.868 ha wheras the presentation is on lease area 3.678 ha. This difference in mining area should be clearified. The committee also directed to submit plan for 500 m kauccha road made motorbale. The project proponent submitted the reply through letter dated 06/01/2016. A presentation was made by Shri Pradeep Kumar Maheswari, project proponent along with their consultant M/s Rai Environmental Services Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 207, 181Ba, 138Aa, 138Ba, 139Aa, Elampura Gabhana, Aligarh, U.P., (Leased Area 3.67 Ha), M/s Ganeshilal Shyambiharilal Ent Udyog. 2. 28764 cum soil excavation is proposed from the proposed sites (area 3.67 ha) as per following production chart: Gata Area in Areaa Depth Soil Mineable soil excavation volume Time duration of no. hect. in sqm in Volume excluding 1.0 m bunding area agreement/lease meter (cum) from periphery (cum) period (Years) 207 0.900 9000 1 9000 6568 03 181Ba 1.200 12000 1 12000 7545 03 138Aa 0.865 8650 1 8650 8181 03 138 Ba 0.213 2130 1 2130 1849 03 139Aa 0.500 5000 1 5000 4621 03 Total 3.67 36780 28764 3. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 4. Regarding the project no litigation is pending in any court. 5. An aunotarized affidavit dated 15/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A reference dated 08/10/2015 from Mining Officer, Aligarh has been submitted which mentions that there is no other approved mining permit/lease within 500 m of proposed sites. 7. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The committee noted that area given in form-1 and revised form-1 the khasra No mentioned as 139a but it is not mentioned in the affidavit dated 11/12/2015 regarding compliance of provisions given in MoEF OM dated 24/06/2013 and not mentioned in the 500 meter cluster certificate issued by the Mine supreientendent Aligarh. The committee directed the project proponent to submit the following information: 1. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. 2. Revised notarized affidavit regarding compliance of provisions given in MoEF OM dated 24/06/2013.

The matter shall be discussed after submission of information as above.

Page 32 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

23. M/s Nirmal Bharat Eint Udyog, Plot no.493,1170,497,1129, 1138,1145,1173 Vill: Kalwari, Tehsil Jaunpur Distt: Jaunpur.Shri Dinesh Kumar Singh, S/o Shri Bansh Bahadur Singh, Vill: Bansafa, P.O. Sikrara, Jaunpur. File N0. Ent./267/ DD(Sh)

The committee noted that the matter was earlier considered in SEAC meeting dated 20/12/2015 wherein the committee discussed the matter and directed the project proponent to following information/documents: 1. Reduce the depth of soil excavation and restrict to the depth of 1.5 mt. to an area of 3.392 Ha. and also revise chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Revised Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 3. Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation in appropriate format. 4. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 5. Aerial/Road distance among Mining sites and distance from mining sites to brick kiln. 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The project proponent submitted the reply through letter dated 01/01/2016. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by the representative of the project proponent along with their consultant M/s ENV DAS India Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata No. 493, 1170, 497, 499, 1129, 1138, 1145, 1173, Vill: Kalwari, Tehsil-Sadar, District: Jaunpur, State-Uttar Pradesh (Leased area 3.392 Ha)., M/s Nirmal Bharat Eint Udyog. 2. Gata-wise production details with corresponding period (Chart form- Gata No. vs. production details for complete agreement period), duly considering the safety provisions Gata No Area Depth Period of Excavation Vol ume of excavated soil in cum (after (ha) (m) as per agreement considering berm & safety measures) 493 ,1170,497,499, 3.392 1.5 5 46809.6 1129,1138,1145 & 1173 Total Volume 46809.6 3. Salient features of the project is as follows: Sanctioned Capacity 7,260 cum/year 27.5 lakhs bricks /season(19 Paya) Life of Mine Since the total soil requirement of Brick kiln is 7,260 cum hence the Life of Mine is 6.4 years. Mining Method Manual Proposed Manpower 25 Water Requirement / Source 2.89 KLD & will be supplied from water tankers. Total Project Cost 43.0 lakhs Proposed CSR 2.15 Lakhs 4. The brick earth mining will be opencast type and would be carried out manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. Regarding the project no litigation is pending in any court. Page 33 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

7. An affidavit dated 01/01/2016 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013 for Gata No. 493, 1170, 497, 499, 1129, 1138, 1145, 1173, Vill: Kalwari, Tehsil-Sadar, District: Jaunpur, State-Uttar Pradesh (Leased area 3.392 Ha)., M/s Nirmal Bharat Eint Udyog for excavation of 46809.6 cum soil. 8. The project Proponent submitted the original letter No. 1244/DLRC(Khanij) dated 22/12/2015 issued by the Mining Officer, Jaunpur, Office of DM, Jaunpur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 9. The project Proponent informed the committee that the Maximum distance of Mine to Mine is 390 mt. and Brick Killn to Mine is 450 Km The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 43.00 Lacks. The CSR plan for Rs. 2.15 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 600 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

24. M/s Shivam Eint Udyog, Plot no. 49(P) 54(P) 60(P),62,66, Vill: Kamruddinpur, Tehsil Mariahu, Distt: Jaunpur . Shri Ravi Shankar Singh, S/o Shri Subhas Singh, Vill: Kamruddinpur, P.O. Sishwan, Tehsil Mariahu, Distt: Jaunpur. File N0. Ent./268/ DD(Y)

The committee noted that the matter was earlier considered in SEAC meeting dated 20/12/2015 wherein the committee discussed the matter and directed the project proponent to following information/documents: 1. Reduce the depth of soil excavation and restrict to the depth of 1.5 mt. to an area of 1.499 Ha. and also revise chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Revised Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 3. Certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation in appropriate format. 4. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features for the E.C. period of 5 years 5. Aerial/Road distance among Mining sites and distance from mining sites to brick kiln. 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The project proponent submitted the reply through letter dated 01/01/2016. The matter was again considered in the meeting dated 15/01/2016. A presentation was made by the representative of the project proponent along with their consultant M/s ENV DAS India Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- Page 34 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

1. The Environmental Clearance is sought for Brick earth mining at Gata No. 49 (P), 54 (P), 60 (P), 62, 66, Vill: Kamruddinpur, Tehsil-Mariahu, District: Jaunpur, Uttar Pradesh (Leased area 1.499 Ha)., M/s Shivam Eint Udyog. 2. 20,686 cum soil excavation is proposed from the proposed sites (area 1.499 ha) agreement for a period of 10 years as per following production chart: 3. Gata-wise production details with corresponding period (Chart form- Gata No. vs. production details for complete agreement period), duly considering the safety provisions Gata No Area Depth (m) Period of Excavation as Volume of excavated soil in (ha) per agreement cum (after considering berm & safety measures) 49 (P) 0.156 1.5 10 2152.8 54 (P) 0.149 1.5 10 2056.2 60 (P) 0.222 1.5 10 3063.6 62 0.433 1.5 10 5975.4 66 0.539 1.5 10 7438.2 Total Volume 20,686.2 4. Salient features of the project is as follows: Sanctioned Capacity 7,260 cum/year 27.5 lakhs bricks/season(19 Paya) Life of Mine Since the total soil requirement of Brick kiln is 7,260 cum hence the Life of Mine is 2.8 years. Mining Method opencast type, Manual Proposed Manpower 20 Water Requirement / Source 2.46 KLD & will be supplied from water tankers. Total Project Cost 38.0 lakhs Proposed CSR 1.90 Lakhs 10. The brick earth mining will be opencast type and would be carried out manually. 11. Distances among Mining sites and distance from mining sites to brick kiln is within 500 m. 12. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 13. Regarding the project no litigation is pending in any court. 14. An affidavit dated 01/01/2016 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 15. The project Proponent submitted the original letter No. 1245/DLRC(Khanij) dated 22/12/2015 issued by the Mining Officer, Jaunpur, Office of DM, Jaunpur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 16. The project Proponent informed the committee that the Maximum distance of Mine to Mine is 230 mt. and Brick Killn to Mine is 450 Km The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 38.00 Lacks. The CSR plan for Rs. 2.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 240 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 35 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

25. M/s Bharat Eint Udyog, Plot no. 627,637,649,650,688,700,707, 709,716, 749,751,Vill: Sakardehla, Jaunpur. Shri Devi Prasad Singh S/o Shri Vijay Bahadur Singh, Vill: Chandpur, P.O. Gonapar, Tehsil Jaunpur Distt: Jaunpur . File N0. Ent./269/ AD(H)

The committee noted that the matter was earlier considered in SEAC meeting dated 20/12/2015 wherein the committee discussed the matter and directed the project proponent to following information/documents: 1. Reduce the depth of soil excavation and restrict to the depth of 1.5 mt. to an area of 2.957 Ha. and also revise chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Revised Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 3. Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation in appropriate format. 4. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 5. Aerial/Road distance among Mining sites and distance from mining sites to brick kiln. 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The project proponent submitted the reply through letter dated 01/01/2016. The matter was again considered in the meeting dated 15/01/2016. A presentation was made by the representative of the project proponent along with their consultant M/s ENV DAS India Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata No. 627, 637, 649, 650, 688, 700, 707, 709, 716, 749, 751, Vill: Sakardelha, Tehsil-Sadar, District: Jaunpur, Uttar Pradesh (Leased area 2.957 Ha)., M/s Bharat Eint Udyog, 2. 56,786.23 cum soil excavation is proposed from the proposed sites (area 2.957 ha) for a period of 05 years as per following production chart: 3. Gata-wise production details with corresponding period (Chart form- Gata No. vs. production details for complete agreement period), duly considering the safety provisions Gata Area Depth Period of Excavat ion as per agreement Volume of excavated soil in cum No (ha) (m) (after considering berm & safety measures) 627 0.125 1.5 5 1725 637 649 0.156 1.5 5 2152.8 650 0.284 1.5 5 3919.2 688 0.151 1.5 5 2083.8 700 0.663 1.5 5 9149.4 707 0.452 1.5 5 6237.6 709 0.209 1.5 5 2884.2 716 0.040 1.5 5 552 749 0.492 1.5 5 6789.6 751 0.385 1.5 5 5313 Total Volume 40806.6 4. Salient features of the project is as follows: Sanctioned Capacity 7,260 cum/year 27.5 lakhs bricks/season(19 Paya) Page 36 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Life of Mine Since the total soil requirement of Brick kiln is 7,260 cum hence the Life of Mine is 5.6 years. Mining Method opencast type, Manual Proposed Manpower 25 Water Requirement / 2.84 KLD & will be supplied from water tankers. Source Total Project Cost 41.0 lakhs Proposed CSR 2.05 Lakhs 5. The brick earth mining will be opencast type and would be carried out manually. 6. Distances among Mining sites and distance from mining sites to brick kiln is within 500 m. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. An affidavit dated 01/01/2016 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 10. The project Proponent submitted the original letter No. 1243/DLRC(Khanij) dated 22/12/2015 issued by the Mining Officer, Jaunpur, Office of DM, Jaunpur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 11. The project Proponent informed the committee that the Maximum distance of Mine to Mine is 260 mt. and Brick Killn to Mine is 370 Km The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 41.00 Lacks. The CSR plan for Rs. 2.10 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 260 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

26. M/s S.K.S. Ent Udyog, Gata no. 236,244,591 & 652 Vill: Utrauli, Jamania, Ghazipur. Smt. Shobha Singh, Vill: Utrauli, Tehsil Zamania, Distt: Ghazipur.File N0. Ent./310/ AD(S)

The project proponent neither appeared in the meeting nor made any request to consider the matter in next meeting. The Committee also noted that the project proponent was also absent in earlier SEAC meeting dated 20/12/2015.The committee discussed and deliberated that project fie should be closed and dlisted. The file shall not be treated as pending at SEIAA/SEAC.

27. M/s Mahaveer Ent Udyog, Gata no. 325,324,336,36,156,34,33,44, 105 Vill: Sakharua Bujurg, Tehsil Gola, Distt: Gorakhpur Shri Dhruv Kumar Yadav, Vill: Sakharua Bujurg, Tehsil Gola, Distt: Gorakhpur. File N0. Ent./317/ DD(Sh) The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee discussed the matter and directed the project proponent to submit documents regarding the QCI accreditation of their consultant. The project proponent submitted the reply through letter dated 05/01/2016. The matter was again considered in the meeting dated 15/01/2016. A presentation was made by Sri. Dhruv Kumar Yadav the

Page 37 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016 project proponent along with their consultant Rai Environmental Services Pvt. Ltd The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 325, 324, 336, 36, 156, 34, 33, 44, 105 Village-Sakharua Bujurg, Tehsil Gola, District-Gorakhpur, Uttar Pradesh (Leased area 2.957 Ha)., M/s Mahaveer Ent Udyog 2. Gata-wise production details are as follows: Gata Area in Area Depth Soil Mineable Soil Excavation Volume Time Duration of No. hectare in in Volume excluding 0.75 m Bunding Area from Agreement/ Lease sq.m. meter (cum) periphery (cum) Period 325 0.1010 1010 1.5 1515 1179 5 Year 324 0.4980 4980 1.5 7470 6900 5 Year 336 0.7110 7110 1. 5 10665 10014 5 Year 36 0.9140 9140 1.5 13710 10056 5 Year 156 1.0360 6360 1.5 9540 8914 5 Year 34 0.1170 1170 1.5 1755 1404 5 Year 33 0.0970 970 1.5 1455 1123 5 Year 44 0.185 1850 1.5 2775 2371 5 Year 105 0.158 1580 1.5 2370 1986 5 Year Total 3.617 48255 43947 3. Salient features of the project is as follows: Sanctioned Capacity 8,785 m 3/30.0 lacs bricks per annum Mining Method opencast type, Manual Proposed Manpower 20 Water Requirement / Source 2. 0 KLD & will be supplied from water tankers. Total Project Cost 12 .0 lakhs Proposed CSR 0.60 Lakhs 4. The brick earth mining will be opencast type and would be carried out manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. Regarding the project no litigation is pending in any court. 7. An affidavit dated 11/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 8. The project Proponent submitted the original letter No. 660/Khanij/2015 dated 21/09/2015 issued by the Mining Suprientemdent, Gorakhpur, Office of DM, Gorakhpur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 9. The project Proponent informed the committee that the Maximum distance of Mine to Mine is 200 mt. and Brick Killn to Mine is 310 Km The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 12.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 800 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 38 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

28. M/s Mahaveer Ent Udyog, Gata no. 18Mi, 369Mi, 513Mi, 512, 509, 514, 549 Vill: Deipar Tehsil Sahajanwa, Distt: Gorakhpur Shri Mandhari Yadav S/o Shri Sawroo Yadav, Vill: Madhupur Tehsil Gola, Distt: Gorakhpur. File N0. Ent./318/ DD(Y)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee discussed the matter and directed the project proponent to submit the following information/documents: 1. Revised Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 2. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 3. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 4. Road distance among Mining sites and distance from mining sites to brick kiln. 5. Documents regarding the QCI accreditation of their consultant 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 7. Clarification regarding the depth of mining as proposed in questionnaire as 2 meter and in presentation as 1.5 meter. 8. Plan regarding katchha/approach road 150.00 meter to be made motorable. 9. Total Cost of the project is Rs 14.0 lakhs. 4 and plan for CSR cost Rs 70000.00 The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The project proponent submitted the reply through letter dated 05/01/2016. The matter was again considered in the meeting dated 15/01/2016. A presentation was made by Sri. Mandhari Yadav the project proponent along with their consultant Rai Environmental Services Pvt. Ltd The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 18Mi, 369Mi, 513Mi, 512, 509, 514, 549 Vill: Deipar Tehsil Sahajanwa, District-Gorakhpur, Uttar Pradesh (Leased area 2.957 Ha)., M/s Mahaveer Ent Udyog, 2. Gata-wise production details are as follows: Gata no. Area in Area Depth Soil Mineable Soil Excavation Volume Time Duration of hactare in in Volume excluding 0.75 m Bunding Area Agreement/ sq.m. meter (cum) from periphery (cum) Lease Period 18mi 0.5260 3260 1.5 4890 4401 5 Years 369mi 0.0500 500 1.5 750 607 5 Years 517mi 0.3690 3690 1.5 5535 5025 5 Years 512 0.4620 4620 1.5 6930 6378 5 Years 509 0.2550 2550 1.5 3825 3376 5 Years 514,549 2.554 21540 1.5 32310 31282 5 Years Total 54240 51069 3. Salient features of the project is as follows: Sanctioned Capacity 10,212 m 3/ 35 lacs bricks per annum Mining Method ope ncast type, Manual Proposed Manpower 30 Water Requirement / Source 2. 0 KLD & will be supplied from water tankers. Total Project Cost 14.0 lakhs Proposed CSR 0. 70 Lakhs 4. The brick earth mining will be opencast type and would be carried out manually.

Page 39 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. Regarding the project no litigation is pending in any court. 7. An affidavit dated 29/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 8. The project Proponent submitted the original letter No. 661/Khanij/2015 dated 21/09/2015 issued by the Mining Suprientemdent, Gorakhpur, Office of DM, Gorakhpur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. 9. The project Proponent informed the committee that the Maximum distance of Mine to Mine is 140 mt. and Brick Killn to Mine is 160 Km The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 14.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 300 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

29. M/s KJRS Ent Udyog, Gata no. 185, 199, 221, 222, 239, 242, 357, 361, 363 Vill: Sursi, Post Adalapura, Pargana Kriyat, Chunar, Mirzapur. Smt. Reshama Kiran W/o Shri Indradev Singh Vill: Majhawan Taras, Adalpura, Chunar, Mirzapur. File N0. Ent./323/ DD(Y)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the project proponent did not appear. The matter was again considered in the meeting dated 15/1/2016. A presentation was made by Shri Indra Dev Singh, the project proponent along with their consultant M/s Earth Vision Enviro Tech Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 185, 199, 221, 222, 239, 242, 357, 361, 363 Vill: Sursi, Post Adalapura, Pargana Kriyat, Chunar District- Mirzapur Uttar Pradesh., (Leased area 2.995 Ha), M/s KJRS Ent Udyog 2. Gata wise details:- Gata Nos. Area Area Depth Area of Volume of Total Available Volume of Min able (Ha.) (SQM) (M) berm left Top Soil for quantity of soil blockage quantity of (SQM) refilling after leaving (CUM) soil (CUM) (CUM) berm (cum) 221, 222 0.215 2150 1.75 159.2258 398.1548 3483.855 474.1475 3009.707 185 0.281 2810 1.75 182.4705 525.5059 4598.177 544.7237 4053.453 239, 242 0.809 8090 1.75 311.743 1555.651 13611.95 937.2245 12674.73 199 0.329 3290 1.75 197.6923 618.4615 5411.538 590.9406 4820.598 357 0.405 4050 1.75 219.6761 766.0648 6703.067 657.6885 6045.378 361, 363 0.956 9560 1.75 339.1509 1844.17 16136.49 1020.441 15116.04 Total 2.995 29950 1.75 m 1409.95 5708.00 49945.08 4225.16 45719.91 Per Year Production - 9,143 cubic meter Number of bricks production per year- 30.17 lacs (330 bricks per cubic meter) 3. OtherDetails:-

Page 40 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Method Of Mining Opencast Manual Water Requirement 1.5 KLD Manpower 20 4. The proposed rate of production of the mine is 45719.91 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 350 mt. and Brick Killn to Mine is 145 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. An affidavit dated 12/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 11. The project Proponent submitted the original letter No. 6159/Khanij/2015 dated 26/12/2015 issued by the Mining Officer, Mirzapur, Office of DM, Mirzapur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 24.00 Lacks. The CSR plan for Rs. 1.20 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 300 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

30. M/s Malik Brick Field, Plot no. 59, Vill: Jagtapur, Safipur, Unnao. Smt. Vimla Devi, W/o Shri Ved Prakash Katiyar, Vill: Murtazapur, Bangarmau, Unnao. File No. Ent./325/ AD(S)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee directed the project proponent to submit the revised certificate from Mining Officer/District Administration regarding 500 m cluster situation. The committee also directed to project proponent that the Depth of mining is to be considered 1.80 Mt. instead of 2.0 Mt as discussed and the plan approach road 200.0 Mt. Kutchha to be made motorable be submitted. The project proponent submitted the reply through undated letter received in this office on 01/01/2016. The committee noted that 500 meter cluster certificate issued by the Tehshildaar Bangarmau is not in proper format and there is no stamp or dispatch number is mentioned in the certificate. The committee directed the project proponent to submit the revised certificate in the appropriate format. The matter shall be discussed after submission of information as above.

Page 41 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

31. M/s Star Brick Works, Khasra no. 367 & 380 Vill: Bulbulpur, Tehsil Chandpur, Distt: Bijnor Sri Abdul Waheed Vill: Bulbulpur, Tehsil Chandpur, Distt: Bijnor. File N0. Ent./329/ AD(H)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee discussed the matter and directed the project proponent to submit the following information/documents:- 1. Revise the land documents submitted on as on 21/12/15 but the revised notarized affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India, In original is to be submited as per the land documents. 2. Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation in appropriate format. The project proponent submitted the reply through undated letter received in this office on 04/01/2016. A presentation was made by Shri Jamshed, the representative of the project proponent along with their consultant Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining Khasra no. 367 & 380 Vill: Bulbulpur, Tehsil Chandpur, District -Bijnor Uttar Pradesh., (Leased area 0.7405 Ha), M/s Star Brick Works 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. No. / Gata Area Area Owner Leased To Period Depth Of Area (m 2) Depth Of (Ha.) Mining (Years) Mining (m) Excavation (Ha.) (ft.) (m 3) 1 367 0.425 0.2125 Virendra Singh, Abdul 5 6.5 0.1521 1.84 2810 Mahipal Singh, Waheed 2015 To Chandrabhan Singh & S/o 2020 Yogendra Singh Barqat Ali S/o Tejpal Singh 2 380 1.056 0.5280 Virendra Singh, Abdul 5 6.5 0.3989 1.84 7370 Mahipal Singh, Waheed 2015 To Chandrabhan Singh & S/o 2020 Yogendra Singh Barqat Ali S/o Tejpal Singh 3 Total 1.481 1.5025 Total 10180 For Mining ½ of 0.7405 Total Area 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 1.4 KLD Manpower 30 4. The proposed rate of production of the mine is 10180 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 136 mt. and Brick Killn to Mine is 470 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. An affidavit dated 22/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013.

Page 42 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

11. The project Proponent submitted the original letter No. 523/Kha0Anu0-2015 dated 11/12/2015 issued by the Mining Suprirendtendent, Bijnaur, Office of DM, Bijnaur that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 15.00 Lacks. The CSR plan for Rs. 1.00 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

32. M/s New Rana Brick Fields, Khasra no. 475, 476 & 477/2 Vill: Jaula, Budhana, Muzaffarnagar Mr. Naeem Rana, Vill: Jaula, Budhana, Distt: Muzaffarnagar. File N0. Ent./330/ AD(S)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee discussed the matter and directed the project proponent to submit the following information/documents:- 1. Mining depth to be allowed only 0.762 Mt as discussed and the excavation of Earth quantity is to be revised acoordingly. 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted the reply through undated letter received in this office on 04/01/2016. A presentation was made by Shri Naim Rana, the representative of the project proponent along with their consultant Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Khasra no. 475, 476 & 477/2 Vill: Jaula, Budhana, Muzaffarnagar Mr. Naeem Rana, Vill: Jaula, Budhana, Distt: Muzaffarnagar. Uttar Pradesh., (Leased area 0.7405 Ha), M/s New Rana Brick Fields, 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Mineable Vol. No. / Gata Area Area Owner Leased To Period Depth Of Area Depth Of (Ha.) Mining (Years) Mining (m 2) (m) Excavation (Ha.) (ft.) (m 3) 1 475 1.0910 1.0910 Mr. Pitam Mr. 2 3 8909 0.762 6789 Singh & Mr. Naeem 28/08/15 Dhara Singh Rana To S/o S/o 28/08/17 Mr. Leela Mr.Shokat Singh & Mr. Abdul Gaffar & Mr. abdul Asfaq

Page 43 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

S/o Mr. Chota 2 476 1.3070 1.3070 Mr. Islam & Mr. 2 3 10764 0.762 8202 Mohd. Abid Naeem 28/08/15 S/o Rana To Mr. Fayaaz S/o 28/08/17 & Mr.Shokat Mr. Imran & Rizwan S/o Mr. Zaki r Huassain & Mr. Abdul Karim S/o Mr. Zakir Huassain 3. 477 0.7250 0.7250 Mr. Mr. 2 3 5909 0.762 4503 Khurshid, Naeem 28/08/15 Mr. Jiledar, Rana To Mr. Subedar S/o 28/08/17 S/o Mr.Shokat 28/08/15 Mr. To Muntiyaz Ali 28/08/17 & Mr. Shakar Ali, Mr. Tamkin TOTAL 3.1230 TOTAL 19494 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 2.15 KLD Manpower 30 4. The proposed rate of production of the mine is 19494 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 0 mt. and Brick Killn to Mine is 700 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. An affidavit dated 22/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 11. The project Proponent submitted the original letter No. 968/Ana0 Praman Patra dated 17/12/2015 issued by the Mining Suprirendtendent, Muzaffarnagar, Office of DM, Muzaffarnagar that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.

Page 44 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 25.00 Lacks. The CSR plan for Rs. 1.40 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

33. M/s Rana Brick Field, Khasra no. 324Mi, 324ma,323ma, 195ma & 325ma Vill: Jaula, Budhana, Muaffarnagar. Mr. Iqbal Rana Vill:Jaula, Budhana, Muzaffarnagar. File N0. Ent./335/ AD(S)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee discussed the matter and directed the project proponent to submit the following information/documents:- 1. Revised Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 2. A Revised certificate from Mining Officer/District Administration should be submitted regarding 500 m cluster situation. The project proponent submitted the reply through undated letter received in this office on 04/01/2016. A presentation was made by Shri Iqbal Rana, the representative of the project proponent along with their consultant Cognizanace Research India Private Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Khasra no. 324Mi, 324ma, 323ma, 195ma & 325ma Vill: Jaula, Budhana, Muaffarnagar. Uttar Pradesh., (Leased area 0.7405 Ha), M/s New Rana Brick Fields, 2. Gata wise details:- S. Khasra Total Leased Land Land Agreement Proposed Mineable Vol. No. / Gata Area Area Owner Leased Period Depth Of Area (m 2) Mineable Of (Ha.) Mining To (Years) Mining Depth Excavation (Ha.) (ft.) (m) (m 3) 1 0.647 Naseem Iqbal 3 4 1.0668 5483 324 म Ahmad, Rana 2015 To 0.5140 0.647 Saleem S/o 2018 Ahmad S/o Ummed Hasan Ali Ali 2 0.485 0.485 Naseem Iqbal 3 4 0.3805 1.0668 4059 324 म Ahmad, Rana 2015 To Saleem S/o 2018 Ahmad S/o Ummed Hasan Ali Ali 3 0.079 0.079 Naseem Iqbal 3 4 0.0564 1.0668 601 323 म Ahmad, Rana 2015 To Saleem S/o 2018 Ahmad S/o Ummed Hasan Ali Ali 4 0.615 0.615 Naseem Iqbal 3 4 0.4925 1.0668 5254 195 म Ahmad, Rana 2015 To

Page 45 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Saleem S/o 2018 Ahmad S/o Ummed Hasan Ali Ali 5 0.747 0.747 Naseem Iqbal 3 4 0.6006 1.0668 6407 323 म Ahmad, Rana 2015 To Saleem S/o 2018 Ahmad S/o Ummed Hasan Ali Ali TOTAL 2.573 TOTAL 21805 3. OtherDetails:- Method Of Mining Opencast Manual Water Requirement 1.90 KLD Manpower 30 4. The proposed rate of production of the mine is 19494 cum of Clay. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 0 mt. and Brick Killn to Mine is 700 Meter 6. The proposed method of mining is Opencast Manual method. 7. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 12. An affidavit dated 05/10/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 13. The project Proponent submitted the original letter No. 968/Ana0 Praman Patra dated 17/12/2015 issued by the Mining Suprirendtendent, Muzaffarnagar, Office of DM, Muzaffarnagar that there is no other mining lease/permit is sanctioned within 500 mt of the proposed sites. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 20.00 Lacks. The CSR plan for Rs. 1.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

34. M/s Kisan Brick Field, Chak no. 858, Gata no. 2380,2381,2382, 2384, 2385 2390 & Chak no. 279 Gata no. 2390,2391,2392,2393, 2394, 2489, 2490 Vill: Shekhpura Kadeem, Saharanpur. Shri Abid Hasan, Vill: Taprikalan, Saharanpur. File N0. Ent./336/ OSD(T)

The project proponent neither appeared in the meeting nor made any request to consider the matter in next meeting. The Committee also noted that the project proponent was also absent in earlier SEAC meeting dated 21/12/2015.The committee discussed and deliberated that project fie should be closed and dlisted. The file shall not be treated as pending at SEIAA/SEAC.

Page 46 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

35. M/s Chand Brick Works, Gata no. 342 & 377, Vill: Ismailpur, Pargana Boodhpur, Tehsil Chandpur, Distt: Bijnor. Shri Ahmad Hasan S/o Shri Amir Hasan, R/o 174, Nai Basti Ward-2, Naugawan, Tehsil Sadar, Distt: Amroha. File N0. Ent./337/ DD(Sh)

The project proponent neither appeared in the meeting nor made any request to consider the matter in next meeting. The Committee also noted that the project proponent was also absent in earlier SEAC meeting dated 21/12/2015.The committee discussed and deliberated that project fie should be closed and dlisted. The file shall not be treated as pending at SEIAA/SEAC.

36. M/s Jameel Ent Udyog, Gata no. 1838,221,1871,1893/2,1895 Vill: Pilakhna Tehsil Kol, Distt: Aligarh. Sri Jameel Khan S/o Sri Yassen Khan, Vill: Pilakhna Tehsil Kol, Distt: Aligarh. File N0. Ent./354/ AD(H)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the committee discussed the matter and noted that in the Cluster Certificate the one of the gata no is mentioned 1891/1 but in form -1 it is mentioned as 1897. The SEAC directed the directed the project proponent to submit the clarification in this regard. The project proponent submitted the reply through letter dated 04/01/2016. The matter was again considered in seac meeting dated 15/01/2016. A presentation was made by Jameel Khan, the project proponent along with their consultant M/s GeoGreen Enviro House Pvt. Ltd., . The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for brick earth mining at Gata no. 1838, 221, 1871, 1893/2, 1895 Village- Pilakhna Kol, Aligarh, Uttar Pradesh, (Leased Area – 3.27 Ha), M/s Jameel Ent Udyog 2. Gata wise production details: S. Khasra/Gata Lease area Depth Excavation Mining Safety Mineable No. No./ Arajee Hectare in period area zone (Ha) reserve No. (Ha) meter (years) Hectare (Cubicmt) (mt) (Ha) 1 1838 1.1190 1.8 5 1.06305 0.05595 19135.00 2 221 1.229 1.8 5 1.16755 0.06145 21016.00 3 1871 0.0460 1.8 5 0.0437 0.0023 786.60 4 1893/1 0.0460 1.8 5 0.0437 0.0023 786.60 5 1893/2 0.2650 1.8 5 0.25175 0.01325 4531.50 6 1895 0.5650 1.8 5 0.53675 0.02825 9661.50 Total 3.27 3.1065 0.1635 55900.00 3. Salient feature details: Life of Mine 5 Years Mining Method Manual Proposed Manpower 42 Water Requirement / Source 3.0 KLD Existing dug well or Borewell Total Project Cost 10.00 lakhs Proposed CSR 1.00 Lakhs 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 300 mt. 6. The proposed method of mining is Opencast Manual method. 7. An affidavit dated 16/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013.

Page 47 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

8. A letter No. 630/DLRC dated 16/10/2015 has been issued by the Mining Superintendent, office of DM, Aligarh that there is no other mining area sanctioned within 500 m of proposed sites. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted undertaking dated 21/12/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 10.00 Lacks. The CSR plan for Rs. 1.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

37. M/s Guru Gorakhnath Ent Udyog, Gata no. 282, 231 & 287 Vill: Kasimpur Tehsil Kol, Distt: Aligarh Mr. Ajay Mahajan S/o Shri Vishambhar Dyal, Vill: Kasimpur Kaudiaganj,Tehsil Kol, Distt: Aligarh. File N0. Ent./357/ DD(Sh)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the the project proponent was absent in this regard. The project proponent submitted the clarification through letter dated 04/01/2016. The matter was again considered in seac meeting dated 15/01/2016. A presentation was made by Jameel Khan, the project proponent along with their consultant M/s GeoGreen Enviro House Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for brick earth mining at Gata no. 282, 231 & 287 Vill: Kasimpur Tehsil Kol, District-Aligarh,, Uttar Pradesh, (Leased Area – 3.27 Ha), M/s Guru Gorakhnath Ent Udyog, 2. Gata wise production details: S. Khasra/Gata Lease area Dept h Excavation Mining Safety zone Mineable No. No./ Arajee Hectare in period area (Ha) reserve No. (Ha) meter (years) Hectare (Cubicmt) (mt) (Ha) 1 282 0.680 1. 5 5 0.646 0.034 9690.00 2 231 1.506 1. 5 5 1.4307 0.0753 21460.50 3 287 2.460 1. 5 5 2.337 0.123 35055.00 Total 4.646 4.4137 0.2323 66205.50 3. Salient feature details: Life of Mine 5 Years Mining Method Manual Proposed Manpower 42 Water Requirement / Source 3.0 KLD Existing dug well or Borewell Total Project Cost 15.00 lakhs Proposed CSR 1.00 Lakhs 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006.

Page 48 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 382 mt., Brick kiln to min 480 meter. 6. The proposed method of mining is Opencast Manual method. 7. An affidavit dated 10/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 8. A letter No. 880/DLRC dated 16/10/2015 has been issued by the Mining Superintendent, office of DM, Aligarh that there is no other mining area sanctioned within 500 m of proposed sites. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted undertaking dated 21/12/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 10.00 Lacks. The CSR plan for Rs. 1.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 100 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

38. M/s Rashmi Ent Udyog, Gata no. 106, 126, 217, 127, 215, 217 Vill: Dabhaura, Tehsil Kol, Distt: Aligarh Sri Sanjay Mahajan, S/o Mr. Vishambar Dayal Mahajan, Vill: Dabhaura, Tehsil Kol, Distt: Aligarh. File N0. Ent./358/ DD(Y)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the the project proponent was absent. The project proponent requested through letter dated 04/01/2016 to consider the matter. The committee discussed the matter and directed the project proponent to submit the Clarification regarding the gata no mentioned in form-1 as 215 and 215 mi in khatauni. The form-1, affidavit regarding compliance of provisions given in MoEF OM dated 24/06/2013 and 500 m cluster certificate issued from Mining Officer/District Administration should be revised accordingly and submitted. The project proponent during the presentation informed the committee that the total cost of the project is Rs. 15.00 lakh, CSR is 1.00 Lakh and Haulage road 125 meter shall be made motorable. The matter is to be considered after receipt of information.

39. M/s Anil Brick Field, Gata no. 4407/1 4410, 4354, 4242,4346, Vill: Jalali-1, Tehsil Kol, Distt: Aligarh. Sri Anil Kumar Maheshwari S/o Late Mr. Ramgopal Maheshwari, Vill: Turavali Jalali, Tehsil Kol, Aligarh. File N0. Ent./359/ AD(H)

The committee noted that the matter was earlier considered in SEAC meeting dated 21/12/2015 wherein the the project proponent was absent in this regard. The project proponent submitted the clarification through letter dated 13/01/2016. The matter was again considered in seac meeting dated 15/01/2016. A presentation was made by Jameel Khan, the project proponent along with their consultant M/s GeoGreen Enviro House Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for brick earth mining at Gata no. 282, 231 & 287 Vill: Kasimpur Tehsil Kol, District-Aligarh,, Uttar Pradesh, (Leased Area – 3.27 Ha), M/s Guru Gorakhnath Ent Udyog, 2. Gata wise production details: S.No. Khasra/Gata Lease area Depth Excavation Mining Safety zone Total soil No./ Arajee Hectare metre period area (Ha) excavated Page 49 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

No. (Ha) (mt) (years) Hectare (Cubicmt) (Ha) 1 4407/1 0.450 1.5 5 0.4275 0.0225 6412.50 2 4410 0.496 1.5 5 0.4712 0.0248 7068.00 3 4354 0.7140 1.5 5 0.6783 0.0357 10174.50 4 4242 0.7720 1.5 5 0.7334 0.0386 11001.00 5 4346 0.6340 1.5 5 0.6023 0.0317 9034.50 Total 3.066 2.9127 0.1533 43700.00 S. Khasra/Gata Lease area Depth Excavation Mining Safety zone Mineable No. No./ Arajee Hectare in period area (Ha) reserve No. (Ha) meter (years) Hectare (Cubicmt) (mt) (Ha) 1 282 0.680 1. 5 5 0.646 0.034 9690.00 2 231 1.506 1. 5 5 1.4307 0.0753 21460.50 3 287 2.460 1. 5 5 2.337 0.123 35055.00 Total 4.646 4.4137 0.2323 66205.50 3. Salient feature details: Life of Mine 5 Years Mining Method Manual Proposed Manpower 42 Water Requirement / Source 3.0 KLD Existing dug well or Borewell Total Project Cost 15.00 lakhs Proposed CSR 1.00 Lakhs 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 20 mt., Brick kiln to min 490 meter. 6. The proposed method of mining is Opencast Manual method. 7. An affidavit dated 14/10/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 8. A letter No. 1026/DLRC dated 01/01/2015 has been issued by the Mining Superintendent, office of DM, Aligarh that there is no other mining area sanctioned within 500 m of proposed sites. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted undertaking dated 21/12/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions : 1. Total project cost is Rs. 30.00 Lacks. The CSR plan for Rs. 1.50 Lacks, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Approach road 100 meter katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 50 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

40. M/s Ansal Ent Udyog, Gata no. 911,914,920,356,893 Vill: Purkhas, Tehsil Chail, Distt: Kausambi. Sri Hassan Akhtar Kamaal S/o Mohammad Safi, Resd: Vill: Purkhas Tehsil Chail Distt: Kausambi. File N0. Ent./360/ AD(S)

The SEAC noted that the was considered earlier in the SEAC meeting dated 21/12/2015. The matter was again considred in SEAC meeting dated 15/01/2016 but the project proponent did not appear in the meeting. The SEAC observed that the project proponent is not interested in pursuing his case so that the matter/file is to be closed and delisted and the project proponent is to be informed that no mining work is to be carried out before obtaining the environmental clearance. The matter is not to be pending with SEAC/SEIAA.

41. M/s P.N. Marka Ent. Udhyog, plot no. 75, 104,141,142,148(A),148(B), 149 Vill: Amripur, Tehsil Raja Talab, Distt: . Smt. Prem Lata Devi, W/o Shri Narayan Sharma, Amirpur Colony, Hathi Bazar, Jansa, Distt: Varanasi. File N0. Ent./361/ OSD(T) The committee noted that the matter was earlier discussed in SEAC meeting dated 21/12/2015 wherein the project proponent was directed to submit following information: 1. The gata no in form-1 are mentioned in form-1 as 104, 141, 142, 148a, 148b, 149, 75 but in Cluster certificate the gata nos are mentioned as 148, 148 104, 142, 149, 75, 141, 75. The clarification in this regard is to be submitted along with the revised document if required. 2. The depth of the mining should be maximum of 1.5 meter instead of 2.0 meter as proposed and the total soil to be excavated should be calculated accordingly. The project proponent submitted their replies through undated letter received on 01/01/2016. A presentation was made by Sri. Arvind Kumar, the project proponent along with their consultant M/s ENV DAS India Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for brick earth mining at Plot No. 75,104, 141,142,148 (A), 148 (B), 149,Village- Amripur, Tehsil – Raja Talab, District - Varanasi, Uttar Pradesh, Total Lease Area- 2.89 Ha or 7.16 Acres, M/s P.N.Marka Ent udyog 2. 39992.4 cum soil excavation is proposed from the proposed sites (area 2.89 ha) as per following production chart: Gata Area Depth of Period of Excavation as Volume of soil excavated (after No (ha) Excavation (m) per agreement (years) considering of berm & safety measures) 104 0.310 1.5 5 4278 141 0.397 1.5 5 5478.6 142 0.405 1.5 5 5589 148(A) 0.335 1.5 5 4623 148 (B) 0.167 1.5 5 2304.6 149 0.798 1.5 5 11012.4 75 0.486 1.5 5 6706.8 Total Volume 39992.4 cum 3. Salient feature details: Life of Mine 5 Years Mining Method Manual Proposed Manpower 20 Water Requirement / Source 2.68 KLD Existing dug well or Borewell Total Project Cost 42.00 lakhs Pr oposed CSR 2.10 Lakhs Total Bricks Production 23.5 Lakh 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. An affidavit dated 18/11/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter No. 5750/30 UpKhanij/2014-15 dated 07/07/2015 has been issued by the Mining Superintendent , DM Office, Varanasi, that there is no other mining lease/permit is sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. Page 51 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

8. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

The applicant also submitted undertaking dated 18/12/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining. 4. Total cost (Rs 42.00 Lakh) of the project and CSR plan for Rs. 2.10 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 5. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government.

42. M/s Shiv Brick Company, Plot no. 10, 68, Vill: Sapla Begampur Tehsil Nakur, Distt: Saharanpur . Mr. Arvind Kumar, S/o Shri Ramji Lal, Vill: Ahmadpur, Tehsil Nakur, Distt: Saharanpur. File N0. Ent./363/ DD(Y) The committee noted that the matter was earlier discussed in SEAC meeting dated 21/12/2015 wherein the project proponent was directed as follows: “The matter was discussed in the meeting and the committee directed the project proponent to submit the cluster certificate from the competent authority regarding there is no other mining lease/permit is sanctioned within 500 m of proposed sites in the appropriate format for the gatas as proposed in the Form-1. The plan for katchha road to be made motorable should also be submitted.” The project proponent submitted their replies through undated letter received on 01/01/2016. A presentation was made by Sri. Arvind Kumar, the project proponent along with their consultant M/s ENV DAS India Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Gata No: 10, 68, Vill: Sapla Begampur, Tehsil Nakur, Distt: Saharanpur, U.P, (Leased Area 1.812 ha), M/s Shiv Brick Company. 2. 20171.2 cum soil excavation is proposed from the proposed sites (area 1.812 ha) as per following production chart: Gata Area Depth of Period of Excavation Volume of soil excavated (after considering No (ha) Excavation (m) as per agreement of berm & safety measures) 10 0.316 1.21 5 years 3517.7 68 1.496 1.21 5 years 16653.5 Total Volume 20171.2 3. Salient features of the project is as follows: Sanctioned Capacity 6,204 c um/year 23.5 lakhs bricks/season( 16 Paya) Life of Mine Since the total requirement of Brick kiln is 6,204 cum hence the Life of Mine is 3.25 years. Mining Method Manual Proposed Manpower 25 Water Requirement / Source 2.67 KLD Total Project Cost 20 lakhs Proposed CSR 1 Lakhs 4. The mining will be opencast type and carried out Manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. An affidavit dated 14/10/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter dated 1435/Khanij/2015-16 dated 29/12/2015 has been issued by, Mine officers, Saharanpur that there is no other mining lease/permit approved within 500 m of proposed sites. Page 52 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

The applicant also submitted uundertaking dated 11/12/2015 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 20.00 Lakh) of the project and CSR plan for Rs. 1.0 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

43. M/s New Durga Brick Industries, Gata no. 588,590,336 & 155 Vill: Paraura, Tehsil Mirganj, Distt: .Sri Mahesh Babu, S/o Sri Durga Prasad, Vill: Paraura, Tehsil Mirganj, Distt: Bareilly. File N0. Ent./365/ AD(S)

The committee noted that the matter was earlier discussed in SEAC meeting dated 21/12/2015 wherein the project proponent was directed to submit the cluster certificate from the competent authority regarding there is no other mining lease/permit is sanctioned within 500 m of proposed sites in the appropriate format for the gatas as proposed in the Form-1. The project proponent submitted the cluster certificate as directed by the SEAC in its meeting dated 21/12/2015. The committee gone through the above said certificate and noted that the area of the gata no. has not been mentioned in the certificate. Therefore, the SEAC directed the project proponent to submit the revised certificate showing areas of corresponding gatas no. The matter shall be discussed after submission of information as above.

44. M/s Baba Jahar Guru Ent Udyog, Gata no.282,320 Vill: Kasimpur, Kaudiaganj, Tehsil Kol, Distt:Aligarh.Sri Himanshu Mahajan S/o Mr. Sanjay Mahajan, Vill: Kasimpur Kaudiaganj, Tehsil Kol, Distt: Aligarh. File N0. Ent./367/ DD(Sh)

The committee noted that an application dated 14/10/2015 was made by the project proponent for environmental clearance of Brick Earth Mining at Gata no.282, 320, Vill: Kasimpur, Tehsil-Kol, Distt: Aligarh, U.P. (Leased area-4.28 Ha), M/s Baba Jahar Guru Ent Udyog. The committee noted that the matter was earlier discussed in SEAC meeting dated 21/12/2015 wherein the project proponent did not appear. The matter was again scheduled in SEAC meeting dated 15/01/2016. A presentation was made by Sri Sanjay Kumar Mahajan, project proponent along with their consultant M/s Geo Green Enviro House Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Gata no.282, 320, Vill: Kasimpur, Tehsil-Kol, Distt:Aligarh, U.P. (Leased area-4.28 Ha), M/s Baba Jahar Guru Ent Udyog. 2. 60,990.0 cum soil excavation is proposed from the proposed sites (area 4.28 ha) as per following production chart: S.No. Khasra/Gata Lease area Depth Excavation Mining area Safety Mineable reserve No./ Arajee Hectare metre period Hectare zone (Cubicmt) No. (Ha) (mt) (years) (Ha) (Ha) 1 282 1.680 1.5 5 1.596 0.084 23940.00 2 2.600 1.5 5 2.47 0.13 37050.00 320 Total 4.28 4.066 0.214 60,990.00 Page 53 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. Salient features of the project is as follows: Mining Method Manual Proposed Manpower 42 Water Requirement / Source 3.0 KLD Tot al Project Cost 15 lakhs Proposed CSR 1 Lakhs 4. The mining will be opencast type and carried out manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. An affidavit dated 14/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter dated 881/DLRC dated 09/12/2015 has been issued by, Mine Superintendent, Aligarh that there is no other mining lease/permit approved within 500 m of proposed sites. 8. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 200 mt., Brick kiln to min 300 meter. 9. The proposed method of mining is Opencast Manual method. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted uundertaking dated 07/01/2016 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 125 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 15.00 Lakh) of the project and CSR plan for Rs. 1.25 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

45. M/s Krishna Ent Udhyog, Gata no. 683, 684, 685, 686, 486, 487, 488, 490, 491 Vill: Dayapur, Manjra Beswa, Tehsil Iglass, Distt: Aligarh Sri MaheshChandra S/o Mr. Rajveer Singh, Violl: Jahrauli, Tehsil Iglas, Distt: Aligarh. File N0. Ent./368/ DD(Y)

The committee noted that an application dated 14/10/2015 was made by the project proponent for environmental clearance of Brick Earth Mining at Gata no.683, 684, 685, 686, 486, 487, 488, 489, 490, 491, Vill: Dayapur, Manjra Beswa, Tehsil-Iglass, Distt: Aligarh, U.P. Total Lease Area- 2.5 Ha, M/s Krishna Ent Udhyog. The committee noted that the matter was earlier discussed in SEAC meeting dated 21/12/2015 wherein the project proponent did not appear. The matter was again scheduled in SEAC meeting dated 15/01/2016. A presentation was made by Sri Mahesh Chandra, project proponent along with their consultant M/s Geo Green Enviro House Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Gata no.683, 684, 685, 686, 486, 487, 488, 489, 490, 491, Vill: Dayapur, Manjra Beswa, Tehsil-Iglass, Distt: Aligarh, U.P. Total Lease Area- 2.5 Ha, M/s Krishna Ent Udhyog. 2. 35625 cum soil excavation is proposed from the proposed sites (area 2.5 ha) as per following production chart: S. Khasra/Gata Lease area Depth Excavation Mining area Safety zone (Ha) Total soil No. No./ Arajee Hectare metre period Hectare excavated No. (Ha) (mt) (years) (Ha) (Cubicmt) Page 54 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

1 683 0.415 1.5 5 0.39425 0.02075 5913.75 2 684 0.138 1.5 5 0.1311 0.0069 1966.50 3 685 0.173 1.5 5 0.16435 0.00865 2465.25 4 686 0.422 1.5 5 0.40 09 0.0211 6013.5 5 486 0.191 1.5 5 0.18145 0.00955 2721.75 6 487 0.146 1.5 5 0.1387 0.0073 2080.5 7 488 0.247 1.5 5 0.23465 0.01235 3519.75 8 489 0.223 1.5 5 0.21185 0.01115 3177.75 9 490 0.234 1.5 5 0.2223 0.0 117 3334.5 10 491 0.311 1.5 5 0.29545 0.01555 4431.75 Tota 2.50 2.375 0.125 35625 l 3. Salient features of the project is as follows: Mining Method Manual Proposed Manpower 40 Water Requirement / Source 3.0 KLD Total Project Cost 10 l akhs Proposed CSR 1 Lakhs 4. The mining will be opencast type and carried out Manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. An affidavit dated 14/12/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter dated 1089/DLRC dated 14/01/2016 has been issued by, Mine Superintendent, Aligarh that there is no other mining lease/permit approved within 500 m of proposed sites. 8. Regarding the project no litigation is pending in any court. 9. The proposed method of mining is Opencast Manual method. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted uundertaking dated 13/01/2016 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 250 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 10.00 Lakh) of the project and CSR plan for Rs. 1.0 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

46. M/s Rana Bricks Supply, Chak no. 87, Gata no. 932Mi,958, 959, 967, 968, 969, 970, 972,076,979,980 & Chak no. 235, Gata no. 959,960,961,962,963,966, 967, 968Mi,1015Mi, 1016, 1017, 1018, 1019Mi,1021, 1022 Vill: Kurdi, And Khasra no.394 Vill: Belra Buzurg, Devband, Saharanpur. Shri Mahipal Singh Rana S/o Shri Jahan Singh, Vill: Duddhlee, Pargana Charthawal, Muzaffar Nagar.File N0. Ent./375/ AD(S)

The SEAC noted that the matter was considered earlier in the SEAC meeting dated 21/12/2015 . The matter was again considered in SEAC meeting dated 15/01/2016 but the project proponent did not appear in the meeting. The SEAC observed that the project proponent is not interested in pursuing his case so that the matter/file is to be closed and the project proponent is to be informed that no mining work is to be carried out before obtaining the environmental clearance. The matter is not to be pending with SEAC/SEIAA.

Page 55 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

47. M/s Rana Bricks Supply, Chak no. 72, Khasra no. 453/1, 454/1, 454/2, 455/1, 455/2,456,457/1, 457/2,459/1,459/2 460, Chak no. 309, Khasra no. 43, 44, 45/1, 46/1, 46/2,46/3,46/4,535/2, 536/1,536/2,537, 543/2, 544/5,545/4 Vill: Budhakhera, Pargana Charthawal, Muzaffarnagar. Shri Mahipal Singh Rana S/o Shri Jahan Singh, Vill: Duddhlee, Pargana Charthawal, Muzaffar Nagar. File N0. Ent./376/ OSD(T)

The SEAC noted that the matter was considered earlier in the SEAC meeting dated 21/12/2015. The matter was again considered in SEAC meeting dated 15/01/2016 but the project proponent did not appear in the meeting. The SEAC observed that the project proponent is not interested in pursuing his case so that the matter/file is to be closed and the project proponent is to be informed that no mining work is to be carried out before obtaining the environmental clearance. The matter is not to be pending with SEAC/SEIAA.

48. Sri Virendra Singh, S/o Late Shri Sarda Singh, Vill: , Kamauli, Distt: Varanasi. M/s Swami Agragaranandji Ent Udyog, Vill: Mauja Babhanpura, Tehsil Sadar Distt: Varanasi. File N0. Ent./73/ AD-H

The SEAC noted that the matter was considered earlier in the SEAC meeting dated 21/12/2015 but the project proponent did not appear in the meeting. Proponent requested though letter dated 09/12/2015. The committee again consider the matter in SEAC meeting dated 15/01/2016. A presentation was made by Sri Virendra Singh, representative of project proponent along with their consultant M/s Geo Green Enviro House Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Khasra no. 87/2, 87/3, 29/2 Mi, 376, 24, 27, 375, 44/1, 349/1, 44/2, Vill: Mauja Babhanpura, Tehsil-Sadar, Distt: Varanasi, U.P. (Leased area-3.532 Ha), M/s Swami Agragaranandji Ent Udyog. 2. 30198.60 cum soil excavation is proposed from the proposed sites (area 3.532 ha) as per following production chart: S.No. Khasra/ Gata No./ Lease Depth Excavation Mining area Safety zone Mineable Arajee No. area metre period Hectare (Ha) reserve (Ha) (mt) (years) (Ha) (Cubicmt) 1 87/2 0.344 Ha 0.9 5 0.3268 0.0172 2941.20 2 87/3 0.113 Ha 0.9 5 0.10735 0.00565 966.15 3 29/2 0.121 Ha 0.9 5 0.11495 0.00605 1034.55 4 376 0.291 Ha 0.9 5 0.27645 0.01455 2488.05 5 24 0.166 Ha 0.9 5 0.1577 0.0083 1419.30 6 27 0.283 Ha 0.9 5 0.26885 0.014 15 2419.65 7 375 0.081 Ha 0.9 5 0.07695 0.00405 692.55 8 44/1 0.401 Ha 0.9 5 0.38095 0.02005 3428.55 9 349/1 1.3310 Ha 0.9 5 1.26445 0.06655 11380.05 10 44/2 0.401 Ha 0.9 5 0.38095 0.02005 3428.55 Total 3.532 Ha 3.3554 0.1766 30198.60 3. Salient features of the project is as follows: Mining Method Manual Proposed Manpower 42 Water Requirement / Source 3.0 KLD Total Project Cost 13.5 lakhs Proposed CSR 1 Lakhs 4. The mining will be opencast type and carried out manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. An affidavit dated 14/01/2016 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter dated 6091/30 Upkhanij/2014-15 dated 06/10/2015 has been issued by, Mine Superintendent, Varanasi that there is no other mining lease/permit approved within 500 m of proposed sites. 8. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 150 mt., Brick kiln to min 470 meter. Page 56 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

9. The proposed method of mining is Opencast Manual method. 10. Regarding the project no litigation is pending in any court. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted uundertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 70 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 13.5 Lakh) of the project and CSR plan for Rs. 1.0 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

49. M/s Mahendrapal Singh B.K.O. Plot no. 166,385Kha, 386,833,874,913ga, 961, 678 Vill: Mahrajganj, Sadar, Gorakhpur. Shri Mahendrapal Singh, Vill: Mahrajganj, Sadar, Gorakhpur. 3.666. File N0. Ent./377/ DD(Sh)

The committee noted that an application dated 19/10/2015 was made by the project proponent for environmental clearance of Brick Earth Mining at at Plot no 166, 385 Kha, 386, 671, 678, 833, 874, 913 Ga, 961, Vill: Maharajganj, Tehsil:Sadar, Distt: Gorakhpur, U.P. (Leased area-3.666 Ha), M/s Mahendrapal Singh B.K.O. A presentation was made by Sri Mahendra Singh, project proponent along with their consultant M/s DAS India Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that: 1. The environmental clearance is initially proposed for Brick Earth Mining at at Plot no 166, 385 Kha, 386, 671, 678, 833, 874, 913 Ga, 961, Vill: Maharajganj, Tehsil:Sadar, Distt: Gorakhpur, U.P. (Leased area-3.666 Ha), M/s Mahendrapal Singh B.K.O. 2. During the presentation the project proponent informed the committee that only gata no. 166, 874, 671 & 678 are to be considered for the proposed proposal. The remaining areas are not to be considered. In this regards the project proponent submitted the information vide letter dated 15/01/2016 before the SEAC. Therefore, the details of gata no./production chart are as follows: Gata No Area (ha) Depth of Period of Excavation Volume of excavated soil in cum Excavation as per agreement (after considering of berm & safety (m) measures) 166 1.023 1.5 2 874 0.426 5 years 36583.8 671 0.520 678 0.682 Total Volume 36583.8 3. Salient features of the project is as follows: Annual requirement 7260 cum soil for 27.5 lakhs bricks/season(19 Paya) Total requirement 7260 cum x 5 years = 36300 c um Life of Mine Life of Mine is 5.03 Year Mining Method Manual Proposed Manpower 25 Water Requirement / Source 2.76 KLD Total Project Cost 38 Proposed CSR 1.9 Page 57 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

4. The mining will be opencast type and carried out manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. An affidavit dated 19/10/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter dated 659/Khanij/2015 dated 21/09/2015 has been issued by, Mine Superintendent, Gorakhpur that there is no other mining lease/permit approved within 500 m of proposed sites. 8. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 350 mt., Brick kiln to min 300 meter. 9. Regarding the project no litigation is pending in any court. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted uundertaking dated 07/01/2016 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 300 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 38.0 Lakh) of the project and CSR plan for Rs. 2.00 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

50. M/s Bajrang Brick Field, Plot no. 6, 7, 49Cha, 98, 123, 104Ka, 104Kha, 113, 134 Vill: Sakharuwan, Khajni, Gorakhpur. Smt. Amrita Singh, W/o Shri Ajay Singh, Vill: Bheusa urf Bankata, Khhajni, Gorakhpur. 4.158 File N0. Ent./378/ DD(Y) The committee noted that an application dated 19/10/2015 was made by the project proponent for environmental clearance of Brick Earth Mining at Plot no. 6, 7, 49 Cha, 98, 123, 104Ka, 104Kha, 113, 134, Vill: Sakharuwan, Tehsil-Khajni, District-Gorakhpur, U.P. (Leased area-4.15 Ha), M/s Bajrang Brick Field. A presentation was made by Sri Surendra Nath Mishra, representative of project proponent along with their consultant M/s DAS India Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Plot no. 6, 7, 49 Cha, 98, 123, 104Ka, 104Kha, 113, 134, Vill: Sakharuwan, Tehsil-Khajni, District-Gorakhpur, U.P. (Leased area-4.15 Ha), M/s Bajrang Brick Field. 2. During the presentation 39840.6 cum soil excavation is proposed from the proposed sites (area 4.15 ha) as per following production chart: Gata Area (ha) Depth of Period of Excavation as Volume of soil excavated (after No Excavation per agreement considering of berm & safety (m) measures) 104ka 0.095 1.5 5 1311.0 104kha 0.268 1.5 5 3698.4 113 0.709 1.5 5 9784.2 123 0.310 1.5 5 4278.0 134 0.235 1.5 5 3243 49 Cha 0.025 1.5 5 345 6 0.450 1.5 5 6210 7 0.372 1.5 5 5133.6 Page 58 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

98 0.423 1.5 5 5837.40 Total 2.887 Total 39840.6 3. Salient features of the project is as follows: Annual requirement 7260cum soil for 27.5 lakhs bricks/season(19Paya) Total requirement 7260 cum x 5 years = 36300 cum Life of Mine Life of Mine is 5.48Year Mining Method Manual Proposed Manpower 25 Water Requiremen t / Source 2.98KLD Total Project Cost 30 Proposed CSR 1.5 4. The mining will be opencast type and carried out manually. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. An affidavit dated 14/10/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter dated 29/09/2015 has been issued by, Mine Superintendent, Gorakhpur that there is no other mining lease/permit approved within 500 m of proposed sites. 8. Regarding the project no litigation is pending in any court. 9. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 300 mt., Brick kiln to min 400 meter. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 800 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 30.0 Lakh) of the project and CSR plan for Rs. 1.5 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

51. M/s New Annapurna Brick Field, Vill: Ahraura, Bighapur, Unnao. Sri Om Prakash Singh, S/o Late Ambika Pratap Singh, 715,Annapurna Bhawan, A.B.Nagar Unnao. File N0. Ent./101/ DD(Sh)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed as follows: “The committee noted that the project proponent applied for environmental clearance for brick earth excavation through application dated 21/07/2015. The applicant again submitted the revised application through letter dated 20/10/2015. The committee discussed and deliberated that the matter is scheduled according to chronology of application dated 21/07/2015, which is now revised on 20/10/2015, so the earlier application dated 21/07/2015 is hereby closed and disposed. The application dated 20/10/2015 shall be taken up as per its chronology. The committee also directed to complete the application 20/10/2015 with following information/documents:

Page 59 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Land agreement paper (In original). 4. Certified Khasra map. 5. Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 6. Aerial distance among Mining sites and distance from mining sites to brick kiln. 7. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 8. Corporate Social Responsibility (CSR) plan along with budgetary provision amounting to Rs. 1,00,000/- shall be prepared and approved by Board of Directors of the company. A copy of resolution as above shall be submitted to the authority alongwith list of beneficiaries with their mobile nos./address. 9. The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.” The project proponent submitted their replies through undated letter received on 07/12/2015. A presentation was made by Sri Om Prakash Singh, project proponent along with their consultant M/s Earthvision Envirotech Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for brick earth mining at Gata No. 201, Village-Ahraura, Tehsil- Bighapur, District-Unnao, U.P., Total Lease Area- 2.241 Ha, M/s New Annapurna Brick Field. 2. During the presentation 36733.72 cum soil excavation with the depth of 1.75 meter is proposed from the proposed sites (area 2.241 ha) as per following production chart: Village Gata No. Owner Of site Agreement duration 201 Shri Sudhir Singh S/o Shree Ram Narsh Singh 01 -10 -2015 Ahraur to 30-09- a 2018

Gata Area (Ha.) Area Depth Area of Volume Total Volume Minable Nos. (SQM) (M) berm left of Top Available of quantity of (SQM) Soil for quantity blockage soil (CUM) refilling of soil (CUM) (CUM) after leaving berm (cum) 201 2.241 22410 1.75 520.8864 4377.823 38305.95 1572.232 36733.72 Total 2.241 Hect 22410 1.75 m 520.88 4,377.82 38305.95 1572.23 36,733.72 SQM SQM Cubic Cubic Cubic Cubic Meter Meter Meter Meter Per year production - 12,244 cubic meter (for 3 years) No. of bricks production per year- 40.40 Lacs (330 bricks per cubic meter) (for 3 years) 3. Salient feature details: Mining Method Manual Proposed Manpower 20 Water Requirement / Source 1.0 KLD Existing dug well or Borewell Total Project Cost 17.6 lakhs Proposed CSR 1.0 Lakhs Total Bricks Production 46.26 Lakh 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. Page 60 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

5. An affidavit dated 18/11/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter No. 654/kha.Li./2015 dated 28/11/2015 has been issued by the ADM, Unnao, that there is no other mining lease/permit is sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. 8. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 9. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 300 mt., Brick kiln to min 280 meter. 10. The mining will be opencast type and carried out manually. The applicant also submitted undertaking dated 12/01/2016 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 280 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 46.26 Lakh) of the project and CSR plan for Rs. 1.0 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining.

52. M/s Auditya Brick Field, Samesi, Mohanlalganj, Lucknow. Sri Arvind Kumar, S/o Sri Arun Kumar, Vill: Samesi, Mohanlalganj, Lucknow. File N0. Ent./102/ DD(Y)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed as follows: “The committee noted that the project proponent applied for environmental clearance for brick earth excavation through application dated 22/07/2015. The applicant again submitted the revised application through letter dated 20/10/2015. The committee discussed and deliberated that the matter is scheduled according to chronology of application dated 22/07/2015, which is now revised on 20/10/2015, so the earlier application dated 22/07/2015 is hereby closed and disposed. The application dated 20/10/2015 shall be taken up as per its chronology. The committee also directed to complete the application 20/10/2015 with following information/documents: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Certified Khasra map. 4. Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 5. Aerial distance among Mining sites and distance from mining sites to brick kiln. 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total).

Page 61 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

7. Corporate Social Responsibility (CSR) plan along with budgetary provision amounting to Rs. 85,000/- shall be prepared and approved by Board of Directors of the company. A copy of resolution as above shall be submitted to the authority alongwith list of beneficiaries with their mobile nos./address. 8. The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.” The project proponent submitted their replies through letter dated 12/01/2016. A presentation was made by Sri Arvind Kumar, project proponent along with their consultant M/s Earthvision Envirotech Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for brick earth mining at Gata No. 527, 608, 908, 1037, 1256, 1811, 1842, 2284, 531 Kha, Village-Samesi, Tehsil-Mohanlalganj, District-Lucknow, U.P. Leased area-4.773, M/s Auditya Brick Field. 2. 44633.01 cum soil excavation is proposed from the proposed sites (area 4.773 ha) as per following production chart: Gata Area Area Depth Area of Volume of Top Total Available Volume of Minable Nos. (Ha.) (SQM) (M) berm left Soil for quantity of soil blockage quantity of (SQM) refilling (CUM) after leaving berm (CUM) soil (CUM) (cum) 527 0.8950 8950 1 188.21 1752.36 8761.79 276.75 8485.04 531 0.2150 2150 1 91.73 411.65 2058.26 134.13 1924.13 kha 608 0.3890 3890 1 123.74 753.25 3766.26 181.44 3584.81 908 0.1900 1900 1 86.17 362.76 1813.82 125.92 1687.90 1037 0.5270 5270 1 144.19 1025.16 5125.81 211.67 4914.13 1256 0.8980 8980 1 188.52 1758.29 8791.47 277.22 8514.25 1811 0.8350 8350 1 181.75 1633.65 8168.24 267.21 7901.03 1842 0.2680 2680 1 102.53 515.4 9 2577.46 150.10 2427.36 2284 0.5560 5560 1 148.13 1082.37 5411.87 217.50 5194.36 Total 4.773 47730 1 m 1254.97 9294.98 46474.98 1841.94 44633.01 3. Salient feature details: Mining Method Manual Proposed Manpower 13 Water Requirement / Source 2.0 KLD Existing dug well or Borewell Total Project Cost 13.20 lakhs Proposed CSR 0.75 Lakhs Total Bricks Production 21.04 Lakh Life of mine 4. During the presentation the project proponent informed the committee the life of the project is to be reduced as 5 years instead of 7 years as proposed. In this regards the project proponent submitted a letter dated 15/01/2016. 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. During the presentation an affidavit dated 07/07/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 7. A letter No. 229/Khanan/2015-16 dated 31/08/2015 has been issued by the Mine Superintendent,, Lucknow that there is no other mining lease/permit is sanctioned within 500 m of proposed sites. 8. Regarding the project no litigation is pending in any court. 9. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 328 mt., Brick kiln to min 397 meter. 10. The mining will be opencast type and carried out manually. 11. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

Page 62 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

The applicant also submitted undertaking dated 12/01/2016 signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 1km shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 13.20 Lakh) of the project and CSR plan for Rs. 0.75 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining.

53. M/s Shiv Brick Field, Pachauri Mohanlalganj, Lucknow. Sri Aditya Kumar Jaiswal S/o Sri Arun Kumar, Vill: Samesi, Mohanlalganj, Lucknow. File N0. Ent./103/ AD(H)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed to submit following information: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Certified Khasra map. 4. Affidavit regarding compliance of OM dated 24/06/2013 of MoEF Govt. of India (In original). 5. Aerial distance among Mining sites and distance from mining sites to brick kiln. 6. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 7. Corporate Social Responsibility (CSR) plan along with budgetary provision amounting to Rs. 85,000/- shall be prepared and approved by Board of Directors of the company. A copy of resolution as above shall be submitted to the authority alongwith list of beneficiaries with their mobile nos./address. 8. The committee also directed to submit the undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.” The project proponent submitted their replies through letter dated 12/01/2016. A presentation was made by Sri Aditya Kumar Jaiswal, project proponent along with their consultant M/s Earthvision Envirotech Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Gata No. 2166, 2182, 2020, 2336, 2136, 2224, 2327, 2216, 2178, 2160, Village-Hulas Kheda, Tehsil-Mohanlalganj, District-Lucknow, U.P., Total Lease Area- 4.444 Ha, M/s Shiv Brick Field. 2. 41820.09 cum soil excavation is proposed from the proposed sites (area 4.444 ha) as per following production chart: Gata Area Area Depth Area of Volume of Total Volume Minable Nos. (Ha.) (SQM) (M) berm left Top Soil for Available of quantity (SQM) refilling quantity of blockage of soil (CUM) soil after (CUM) (CUM) leaving

Page 63 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

berm (cum) 2020 0.3930 3930 1 124.38 761.12 3805.62 182.39 3623.23 2136 0.267 2670 1 102.34 513.53 2567.65 149.81 2417.84 2160, 0.867 8670 1 185.22 1696.95 8484.77 272.34 8212.43 2166 2178, 1.835 18350 1 269.92 3616.01 18080.08 397.55 17682.52 2327 2182 0.467 4670 1 135.67 906.86 4534.32 199.09 4335.23 2216 0.392 3920 1 124.22 759.15 3795.78 182.15 3613.62 2224 0.126 1260 1 69.99 238.00 1190.00 101.99 1088.01 2336 0.1 1000 1 62.24 187.55 937.75 90.54 847.21 Total 4.444 44470 1 m 1073.98 8679.17 43395.97 1575. 86 41820.09 3. Salient feature details: Mining Method Manual Proposed Manpower 10 Water Requirement / Source 2.0 KLD Existing dug well or Borewell Total Project Cost 11.80 lakhs Proposed CSR 0.6 Lakhs Total Bricks Production 27.60 Lakh 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. An affidavit dated 07/07/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter No. 219/Khanan/2015-16 dated 31/08/2015 has been issued by the Mining Superintendent, Lucknow that there is no other mining lease/permit is sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. 8. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 377 mt., Brick kiln to min 308 meter. 9. The mining will be opencast type and carried out manually. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.

The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 1.40 km kachha shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 11.80 Lakh) of the project and CSR plan for Rs. 1.00 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining.

Page 64 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

54. M/s Aman Ent Bhatta, Vill: Sikra Kalan, P.O. Dadva Pakseda, Sadar, Distt: Mirzapur. Sri Rajendra Prasad Mishra, S/o Sri Late Vasist Narayan, Vill: Sikra Kalan, P.O. Dadva Pakseda, Sadar, Mirzapur. File N0. Ent./116/ DD(Sh)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed as follows: “The committee noted that the project proponent applied for environmental clearance for brick earth excavation through application dated 05/08/2015. The applicant again submitted the revised application through letter dated 26/10/2015. The committee discussed and deliberated that the matter is scheduled according to chronology of application dated 05/08/2015, which is now revised on 26/10/2015, so the earlier application dated 05/08/2015 is hereby closed and disposed. The application dated 26/10/2015 shall be taken up as per its chronology. The committee also directed to complete the application 26/10/2015 with following information/documents: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Aerial distance among Mining sites and distance from mining sites to brick kiln. 4. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 5. The committee also directed to submit the Undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.” The project proponent submitted their replies through letter dated 12/01/2016. A presentation was made by Sri Aditya Kumar Jaiswal, project proponent along with their consultant M/s Earthvision Envirotech Pvt. Ltd., Lucknow. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The environmental clearance is sought for Brick Earth Mining at Gata No. 135, 154, 422, Vill: Sikra Kalan, P.O. Dadva Pakseda, Sadar, Distt: Mirzapur Uttar Pradesh. Total Lease Area- 1.213 Ha, M/s Aman Ent Bhatta, 2. 10436.22 cum soil excavation is proposed from the proposed sites (area 4.444 ha) as per following production chart: Gata Area Area Depth Area of Volume of Top Total Available Volume of Minable Nos. (Ha.) (SQM) (M) berm left Soil for refilling quantity of soil after blockage quantity of (SQM) (CUM) leaving berm (cum) (CUM) soil (CUM) 135, 0.693 693 0 0.914 151.33 1355.73 6195.69 210.50 5985.18 154 422 0.52 5200 0.914 130.98 1013.80 4633.08 182.03 4451.04 Total 1.213 12130 0.914 282.31 2369.53 10828.77 392.53 10436.22 3. Salient feature details: Mining Method Manual Proposed Manpower 5 Water Requirement / Source 1.0 KLD Existing dug well or Borewell Total Project Cost 11.80 lakhs Proposed CSR 0.6 Lakhs Total Bricks Production 27.60 Lakh 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006.

Page 65 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

5. An affidavit dated 05/11/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter No. 6783/Khanij/Jan-Suchna/2015 dated 19/10/2015 has been issued by the Mining officer Mirzapur, Office of the Mining Officer Mirzapur that there is no other mining lease/permit is sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. 8. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 330 mt., Brick kiln to min 320 meter. 9. The mining will be opencast type and carried out manually. 10. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals alongwith general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Haul road 600 meter shall be made motorable. 2. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution. 3. Total cost (Rs 11.45 Lakh) of the project and CSR plan for Rs. 1.00 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining

55. M/s S.S. Ent Udhyog, Vill: SurirKalan Bangar & Bhidauni Bangar, Nauh -jheel, The: Mant, Distt: . Shri Devendra Kumar S/o Sohanlal, R/o Surir Kalan, Tehsil Mant, Distt: Mathura. File N0. Ent./117/DD(Y)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed as follows: “The committee noted that the project proponent applied for environmental clearance for brick earth excavation through application dated 04/08/2015. The applicant again submitted the revised application through letter dated 26/10/2015. The committee discussed and deliberated that the matter is scheduled according to chronology of application dated 04/08/2015, which is now revised on 26/10/2015, so the earlier application dated 04/08/2015 is hereby closed and disposed. The application dated 26/10/2015 shall be taken up as per its chronology. The committee also directed to complete the application 26/10/2015 with following information/documents: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Aerial distance among Mining sites and distance from mining sites to brick kiln. 4. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 5. The committee also directed to submit the Undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge.”

Page 66 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

The project proponent submitted their replies through letter dated 12/01/2016. A presentation was made by Sri Devendra Kumar, project proponent along with their consultant M/s Earthvision Envirotech Pvt. Ltd., Lucknow. The committee discussed the matter and noted that In the form the Gata no is mentioned as 168 but in 500 meter cluster certificate it is mentioned as 168/1/1 therefore SEAC directed the project proponent to submit the following information: 1. Revised calculation of the soil to be excavated and number of bricks production. 2. Revised certificate from Mining Officer/District Administration. 3. Revised affidavit regarding compliance of provisions given in MoEF OM dated 24/06/2013. The matter shall be discussed after submission of information as above.

56. M/s Shiv Ent Udyog, Vill: Kashi Sarpati, Pargana Kantit, Tehsil Sadar Distt: Mirzapur. Sri Shiv Sahay, S/o Keval Prasad Yadav, Vill: Paksed Dandwa, Pargana Kantit, Tehsil Sadar Distt: Mirzapur. File N0. Ent./119/AD(S)

The committee noted that the matter was earlier discussed in SEAC meeting dated 07/12/2015 wherein the project proponent was directed as follows: The committee noted that the project proponent applied for environmental clearance for brick earth excavation through application dated 04/08/2015. The applicant again submitted the revised application through letter dated 20/10/2015. The committee discussed and deliberated that the matter is scheduled according to chronology of application dated 04/08/2015, which is now revised on 20/10/2015, so the earlier application dated 04/08/2015 is hereby closed and disposed. The application dated 20/10/2015 shall be taken up as per its chronology. The committee also directed to complete the application 20/10/2015 with following information/documents: 1. A chart showing details of volume of earth excavation Gata-wise alongwith owner and area of each corresponding Gata and excavation period as per agreement with owner of the site/proposed depth of excavation from each Gata. Total volume of earth excavation proposed over the agreement period should also be provided. 2. Actual volume of excavated soil proposed after taking the losses resulting from leaving the berm around the excavation site into account and including safety features. 3. Aerial distance among Mining sites and distance from mining sites to brick kiln. 4. Calculation of volume of proposed brick earth excavation on the basis of proposed brick production should be submitted (annual and total). 5. An original affidavit from project proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. The committee also directed to submit the Undertaking from project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The matter was again considered in seac meeting dated 15/01/2016. A presentation was made by Sri Shiv Sahay Yadav, representative of the project proponent along with their consultant M/s Earthvision Envirotech Pvt. Ltd., Lucknow. The committee discussed the matter and nated that In the Khatuani the Gata no is mentioned as 194 kha but in 500 meter cluster certificate it is mentioned as 194 therefore SEAC directed the project proponent to submit the revised certificate from Mining Officer/District Administration. The project proponent during the presentation informed the committee that the total cost of the project is Rs. 10.00 lakh, CSR is 1.00 Lakh and Haulage road 250 meter shall be made motorable. The matter shall be discussed after submission of information as above.

Page 67 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

57. M/s Sadguru Int Udyog, Araji no.128, 197,229 &313Mi, Vill: Tinahra, Tehsil Sahjanwa, Distt: Gorakhpur. Sri Rama Shankar Shukla, S/o Sri Deenanath Shukla, R/o Vill: Tinahra, Tehsil Sahjanwa Distt: Gorakhpur. 3.39 File N0. Ent./379/AD(H)

The committee noted that an application dated 20-10-2015 was made by the project proponent for environmental clearance of Brick Field, Araji no.128, 197,229 &313Mi, Vill: Tinahra, Tehsil Sahjanwa, Distt: Gorakhpur, Leased Area – 3.39 Ha., M/s Sadguru Int Udyog A presentation was made by Sri Rama Shankar Shukla, project proponent alongwith their consultant M/s Environmental Research and Analysis. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field, Araji no.128, 197,229 &313Mi, Vill: Tinahra, Tehsil Sahjanwa, Distt: Gorakhpur, Leased Area – 3.39 Ha., M/s Sadguru Int Udyog 2. Gata vise details:- Araji Area Max. Depth Existing Depth Extractable Total Mineable Reserve Time No. (Ha) Extraction (m) Volume Proposed Volume (m 3) after 20% Reduction Period 128 1.0210 2.0 m 20,420 m 3 1.5 m 15,315 m 3 12,252 m 3 Five 197 1.1770 2.0 m 23,540 m 3 1.5 m 17,655 m 3 14,124 m 3 Years 229 0.4270 2.0 m 8,540 m 3 1.5 m 6,405 m 3 5,124 m 3 0.7610 2.0 m 15,220 m 3 1.5 m 11,415 m 3 9,132 m 3 313 म . Total 3.39 Hectare Total 50,850 m 3 40,680 m3 After 20% reduction 40,680 m3 3. Salient features of the project is as follows: Type of Excavation Open Cast Mining of Minor Mineral ( Soil) Total Area 3.39 Ha Proposed Quantity 40,680 m 3 Depth of Excavation 1.5 m Excavated Quantity per Year 8,136 m 3 per year Agreement Period 5 Years Mode of Excavation Manual 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. An affidavit dated 19/10/2015 been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter no- 649/--- dated 28/12/2015 has been issued by the Mining officers, Gorakhpur that there is no other mining area sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. 8. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 320 mt., Brick kiln to min 354 meter. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Total cost (Rs 25.00 Lakh) of the project and CSR plan for Rs. 3.75 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. Page 68 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road 300 meter shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

58. M/s Shivlal Brick Field, Gata no.188, 190 Vill: Khander, Fatehabad, . Sri Mahendra Singh, S/o Late Sh. Shivlal Singh,Vill:Akbara,Kirawali, Agra. 2.68 File N0. Ent./380/ AD(S)

The committee noted that an application dated 17-10-2015 was made by the project proponent for environmental clearance of Brick Field, Gata no.188, 190 Vill: Khander, Fatehabad, Agra, Leased Area – 2.68 Ha., M/s Shivlal Brick Field. A presentation was made by Sri Mahendra Singh, project proponent alongwith their consultant M/s Environmental Research and Analysis. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field, Gata no.188, 190 Vill: Khander, Fatehabad, Agra, Leased Area – 2.68 Ha., M/s Shivlal Brick Field. 2. Gata vise details:- Gata Area Area taken Max. Depth Existing Depth Extractable Total Time No. (Ha) for Extraction Volume Proposed Volume (m 3) Mineable Period excavation (m) Reserve After 20% Reduction 188 1.1620 3.1270 x 6/7= 2.0 2.680 x 1.5 2.680 x Five 2.680 10,000 x 10,000 x 1.5 32,160 Years 2= 53,600 190 1.9650 m3 Total 3.1270 Total 40,20 0 3. Salient features of the project is as follows: Total Water Required 3.5 KLD Total Manpower 60 Type of Excavation Open Cast Mining of Minor Mineral (Soil) Site Location Gata No. 188,190 at Village: Khander, Tehsil: Fatehabad & District Agra, Uttar Pradesh Total Area 2.680 Ha Proposed Quantity 32,160 m 3 Depth of Excavation 1.5 m Excavated Quantity per Year 6,432 m 3 per year Agreement Period 5 Years Mode of Excavation Manual 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. An affidavit dated 19/10/2015 been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter no- 901/--- dated 28/12/2015 has been issued by the Mining officers, Agra that there is no other mining area sanctioned within 500 m of proposed sites. 7. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 20 mt., Brick kiln to min 199 meter. 8. Regarding the project no litigation is pending in any court. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended).

Page 69 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Total cost (Rs 10.00 Lakh) of the project and CSR plan for Rs. 2.00 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 5 number of toilets (2 gents & 2 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road 199 meter shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

59. M/s Durga Brick Industries, Gata no. 259 Vill: Singra, 460,461,462 Vill: Jatpura Urf Mugalpur, 606,684,812 Vill: Gularia, Meerganj, Bareilly. Sri Mahesh Babu, S/o Sri Durga Prasad, Vill: Paraura, Mirganj, Bareilly. 4.177 File N0. Ent./381/ OSD(T)

The matter was considered in seac meeting dated 15/01/2016. A presentation was made by Sri Shiv Mahesh Babu, the project proponent along with their consultant M/s Enviromental Reseach & Analysis Lucknow. The committee discussed the matter and noted that in the 500 meter cluster certificate the area of individual gatas as well as the total area of the proposed mining are not mentioned therefore SEAC directed the project proponent to submit the revised certificate from Mining Officer/District Administration. During the presentation the SEAC also noted that the distance between mining sites are more than 500 meter therefore the cluster certificate should also be revised in this regard. The matter shall be discussed after submission of information as above.

60. M/s Anant Ent Bhatta, Araji no53,572,316,585,52,575 &489Vill:Badgoa Dhuriyapar Gola, Gorakhpur . Sri Vinok Kumar Rai S/o Shri Radhakrishn Rai, Vill: Lal pur Bhagharai, Kauriram,Bansgao, Gorakhpur. 3.97 File N0. Ent./382/ DD(Sh)

The matter was considered in seac meeting dated 15/01/2016. A presentation was made by Sri Vinod Kumar Rai, the project proponent along with their consultant M/s Enviromental Reseach & Analysis Lucknow. During the presentation the SEAC noted that the distance between mining sites are more than 500 meter therefore the cluster certificate should also be revised and submitted in this regard. The matter shall be discussed after submission of information as above.

61. M/s Abhishek Bricks Field, Araji no. 239,263,270 Vill: Padauli Tappa Khuthan and Araji no. 210,287,291 Vill: Baghagada Ta Khuthan, Tehsil Gola, Distt: Gorakhpur. Sri Ajay Kumar Mishra, S/o Sri Vidyaprasad Mishra, R/o Vill: Samaythan Padauli, Tehsil Gola, Distt: Gorakhpur. 4.343 File N0. Ent./383/ DD(Y)

The committee noted that an application dated 17-10-2015 was made by the project proponent for environmental clearance of Brick Field, Araji no. 239,263,270 Vill: Padauli Tappa Khuthan and Araji no. 210,287,291 Vill: Baghagada Ta Khuthan, Tehsil Gola, Distt: Gorakhpur, Leased Area – 4.343 Ha., M/s Abhishek Bricks Field. A presentation was made by Sri Ajay Kumar Mishra, project proponent alongwith their consultant M/s Environmental Research and Analysis. The proponent, through the documents submitted and the presentation made, informed the committee that:-

Page 70 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

1. The Environmental Clearance is sought for Brick Field, Araji no. 239,263,270 Vill: Padauli Tappa Khuthan and Araji no. 210,287,291 Vill: Baghagada Ta Khuthan, Tehsil Gola, Distt: Gorakhpur, Leased Area – 4.343 Ha., M/s Abhishek Bricks Field. 2. Gata vise details:- Araji Area Max. Depth Existing Depth Extractable After 20% reduction Time No. (Ha) Extraction (m) Volume Proposed Volume (m 3) from each Gata(m 3) Period 239 2.934 2.0 58,680 1.5 m 44,010 35,208 Five 263 0.277 2.0 5,540 1.5 m 4,155 3,324 Years 270 0.670 2.0 13,400 1.5 m 10,050 8,040 210 0.143 2.0 2,860 1.5 m 2,145 1,716 287 0.287 2.0 5,740 1.5 m 4,305 3,444 291 0.032 2.0 640 1.5 m 480 384 Tot al 4.343 Hectare Total 65,145 52,116 3. Salient features of the project is as follows: Total Water Required 4.5 KLD Total Manpower 60 Type of Excavation Open Cast Mining of Minor Mineral (Soil) Total Area 4.343 Ha Proposed Quantity 52,116 m3 Depth of Excavation 1.5 m Excavated Quantity per Year 10,423 m 3 per year Agreement Period 5 Years Mode of Excavation Manual 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. An affidavit dated 14/01/2016 been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter no- 666/--- dated 29/09/2015 has been issued by the Mining officers, Gorakhpur that there is no other mining area sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. 8. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 270 mt., Brick kiln to min 1.5 kilometer. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Total cost (Rs 15.00 Lakh) of the project and CSR plan for Rs. 3.75 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 5 number of toilets (3 gents & 2 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road 1.5 m shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 71 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

62. M/s Pahalwan Ent Udyog, Gatano.52 34Sa, Vill:Maharajpur,Dibai, Bulandshahr. Sri Devendra Singh, Vill:Narupur Kataka, Dibai, Bulandshahr. 1.79 File N0. Ent./384/ AD(H)

The committee noted that an application dated 17-10-2015 was made by the project proponent for environmental clearance of Brick Field, Gatano.52 34Sa, Vill:Maharajpur,Dibai, Bulandshahr, Leased Area – 1.79 Ha., M/s Pahalwan Ent Udyog A presentation was made by Sri Nivas yadav, project proponent alongwith their consultant M/s Udaipur Min-Tech Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick Field, Gatano.52 34Sa, Vill:Maharajpur,Dibai, Bulandshahr, Leased Area – 1.79 Ha., M/s Pahalwan Ent Udyog 2. Gata vise details:- Sr. Gata Owner of Land Village Total Area left for Area Production depth Period of No. No. Area Green Belt considered (cu.m.) Agreement (ha.) & Trenches during (ha.) Mining (ha.) 1. 52 Hajari Sin gh, Maharajpur 0.87 0.07 0.80 7200 0.9 3 Years Rohtash kumar, Meter Dulare Singh, Anil Kumar, & Anguri Devi 2. 34 Sa Bhagwan Singh & Maharajpur 0.92 0.08 0.84 7560 0.9 3 Years Name SIngh Meter Total 1.79 0.15 1.64 14,760 3. Salient features of the project is as follows: Co-ordinates of Project Site Latitude: 28 0 07 ’ 23.39” N (Maharajpur) Longitude:78 025’17.33”E Volume of Soil Excavated 14,760 cu.m. Manpower 15 Mode of Excavation Manual 4. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 5. An affidavit dated 26/06/2015 been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 6. A letter dated 11/01/2016 has been issued by the Mining officers, Bulandshahr that there is no other mining area sanctioned within 500 m of proposed sites. 7. Regarding the project no litigation is pending in any court. 8. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 9. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 300 mt., Brick kiln to min 1.0 kilometer. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions:

Page 72 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

1. Total cost (Rs 10.00 Lakh) of the project and CSR plan for Rs. 1.0 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 2 number of toilets (1 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. Haul road 200 km katchha to be made motorable. 4. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

63. M/s Manoj Brick Works, Gata no. 390, 873,874,891,895,907 & 910 Vill: Gargawan, Tehsil Dibai, Distt: Bulandshahr. Sri Anar Singh S/o Vijay Singh Vill: Gargawan, Tehsil Dibai, Distt: Bulandshahr. 4.14 File N0. Ent./385/ AD(S)

The matter was considered in seac meeting dated 15/01/2016. A presentation was made by Sri Ram Swaroop Verma, representative of the project proponent along with their consultant M/s Udaipur Min- Tech Pvt. Ltd. During the presentation the SEAC noted that the cluster certificate submitted by the project proponent is not clear as well as not in the proper format therefore SEAC directed to submit the appropriate cluster certificate. The project proponent during the presentation informed the committee that the depth of mine shall be 0.9 meter, total cost of the project is Rs. 14.00 lakh, CSR is 1.0 Lakh and Haulage road 200 meter shall be made motorable. The matter shall be discussed after submission of information as above.

64. M/s Satya Sai Brick Works, Gata no. 285, 289/2, 289/3 Vill: Aukhand, Dibai, Bulandshahar. Sri Surendra Singh, Vill: Rahmapur Dibai, Bulandshahar. 1.978. File N0. Ent./386/ OSD(T)

The matter was considered in seac meeting dated 15/01/2016. A presentation was made by Sri Surendra Singh, the project proponent along with their consultant M/s GRC India Pvt. Ltd. During the presentation the SEAC noted that in the 500 meter cluster certificate the area of individual gatas as well as the total area of the proposed mining are not mentioned therefore SEAC directed the project proponent to submit the revised certificate from Mining Officer/District Administration. The matter shall be discussed after submission of information as above.

65. M/s Janta Bricks Field, Khasra no.803 & 1106 Vill: Malendi, Tehsil & Distt: Shamli. Mr. Deepak Kumar Vill: & Post Peer Kheda, Shamli. 1.856 File N0. Ent./387/ DD(Sh)

The project proponent did not appear in the meeting but made a request through letter dated 15/01/2016 to consider the matter in next meeting. The committee discussed and deliberated that project is to be considered in next meeting as per the request of project proponent.

66. M/s Om Brick Field, Khasra no.258 1/2 275 & 276 Vill: Bhikki Deh, Tehsil & Distt: Shamli. Sri Deepak Kumar S/oVill: & Post Peer Kheda, Shamli. 1.99 File N0. Ent./388/ DD(Y)

The project proponent did not appear in the meeting but made a request through letter dated 15/01/2016 to consider the matter in next meeting. The committee discussed and deliberated that project is to be considered in next meeting as per the request of project proponent.

Page 73 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

67. M/s Markandey Mahadev Ent Udyog, Gata no.391,389,395,343,386,438/2 & 516 Sa Vill: Garthauli & Ajawan, Pargana Kather, Varanasi. Mr. Abhishek Kumar Vill: Amauli, Pargana Jalhupur, Varanasi. 3.233 File N0. Ent./389/ AD(H)

The matter was considered in seac meeting dated 15/01/2016. A presentation was made by Abhishek Kumar, the project proponent along with their consultant M/s Global Enviromental Reseach & Analysis Lucknow. The committee discussed the matter and noted that in the 500 meter cluster certificate the area of individual gatas are mentioned which are more than 5 ha. The project proponent informthat in some of the gatas the mining areas are to be taken partially. Therefore, SEAC directed the project proponent to submit the revised 500 meter cluster certificate acoordingly. The matter shall be discussed after submission of information as above.

68. M/s R.K.Enterprises Gata nio. 199,70, 202,72,148,13,67Sa,154Sa,67Sa,68, 69, 73Sa, & 66 Sa, Vill: Senta Pargana Agutta, Bulandshar. Sri Anup Kasana S/o Shri Rishipal Singh Kaasana, Nivasi-Sikanderabad, Bhati Market, Railway Road, Dadri G.B.Nagar. 1.82 File N0. Ent./390/ AD(S)

The project proponent did not appear in the meeting but made a request through letter dated 15/01/2016 to consider the matter in next meeting. The committee discussed and deliberated that project is to be considered in next meeting as per the request of project proponent.

69. M/s Sandeep Ent Udyog, Gata no. 31,52,136,7940,142,118,96, 259,108,110,89, 93,256,242,92, 85, 23,258 Vill: Chandapur, Bhadohi, Bhadohi. Shri Bahadur Lal Maurya, S/o Late Heengu Lal Maurya, Vil;: Maghaipur, Aurai, Bhadohi. File N0. Ent/253/ DD(Y)

The committee noted that the matter was earlier discussed in SEAC meeting dated 19/12/2015 wherein the project proponent was directed to submit following information: ‘The committee noted that gata no. 108 and 7940 which were part of original application (received on 16/09/2015) and affidavit dated 30/11/2015 regarding compliance of MoEF OM dated 24/06/2013, have not been included in the final presentation. Status of these 02 gatas should be clarified and final gata wise chart should be submitted. Distance between mining sites, distance between mining sites to brick kiln and length of approach road should also be submitted. 500 m cluster certificate from District Mining Officer mentioning approved/operational mines within 500 m of the project sites should be submitted. The length of approach road should also be submitted. Total cost is Rs. 10 Lakhs. CSR plan with minimum Rs. 50,000/- should also bel submitted. The committee directed to defer the matter till submission of information as above. The matter shall not be treated pending till submission of information’. The project proponent submitted their replies through undated letter received on 19/12/2015, 22/12/2015 and 09/01/2016. A presentation was made by Shri Bahadur Lal Maurya, project proponent along with their consultant M/s Rai Environmental Services Pvt. Ltd. The proponent, through the documents submitted and the presentation made, informed the committee that:- 1. The Environmental Clearance is sought for Brick earth mining at Gata no. 31, 52, 136, 7940, 142, 118, 96, 259, 108, 110, 89, 93, 256, 242, 92, 85, 23, 258 Vill: Chandapur, Tehsil & District- Bhadohi, U.P., (Leased Area 3.48 Ha), M/s Sandeep Ent Udyog. 2. During the presentation the SEAC noted that the actual area of proposed gata no as per khatuani is 4.275 ha but in 500 meter cluster certificate issued by the mining officer bhadoi through letter dated 21/12/2015 the total area is mentioned as 3.48 ha which also proposed by the project proponent.

Page 74 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

3. 46600 cum soil excavation is proposed from the proposed sites (area 3.48 ha) as per following production chart: Gata Area in Area Depth in Soil Mineable soil excavation volume Time durationof No. Ha in Sqm (m) volume excluding 0.75 m bunding area from agreement /lease (cum) periphery ( cum) period (year) 31 0.533 0 5330 1.5 7995 7411 05 52 0.7110 7110 1.5 10665 10014 05 136, 142 0.3310 3310 1.5 4965 4474 05 118, 96 0.1780 1780 1.5 3670 2273 05 259 0.3210 3210 1.5 4815 4329 05 110, 0.2500 2500 1.5 3750 3306 05 109, 89, 93 256, 0.4710 4710 1.5 7065 5895 05 242, 243 92, 85 0.2710 2710 1.5 4065 3204 05 258 0.4150 4150 1.5 6225 5694 05 Total 52215 46600 4. Salient features of the project is as follows: Area 3.48 Ha Mining Method Manual/ Semi - Mechanized Proposed Manpower 30 Water Requirement / Source 2.0 KLD through tankers Total cost of the project Rs. 30 .0 Laks CSR Cost Rs. 1.5 0 Laks 5. This project does not attract any of the general conditions applicable on mining projects specified in EIA Notification 14/09/2006. 6. Regarding the project no litigation is pending in any court. 7. An aunotarized affidavit dated 30/11/2015 has been submitted by the proponent regarding compliance of provisions given in MoEF OM dated 24/06/2013. 8. A letter dated 20/11/2015 from Mining Officer, Mirzapur/Bhadohi has been submitted which mentions that there is no other mining work being undertaken within 500 m of is proposed sites. 9. The project proposal falls under category 1(a) of EIA Notification, 2006 (as amended). 10. During the presentation the project Proponent informed the committee that the Maximum distance of Mine to Mine is 150 mt., Brick kiln to min 1.56 kilometer. The applicant also submitted undertaking signed by project proponent and consultant that all the information/data submitted with regards to application for environmental clearance is correct and true to best of their knowledge. The committee discussed the matter and recommended grant of environmental clearance to the project proposals along with general and specific conditions as attached at annexure-1 of these minutes. The committee also stipulated following conditions: 1. Total cost (Rs 30.00 Lakh) of the project and CSR plan for Rs. 1.50 Lakh, executable work at phase wise with photographs should be prepared and detail of works to be executed with an affidavit as above is to be submitted to Directorate as well as to the District magistrate / Chief Development officers. 2. 3 number of toilets (2 gents & 1 ladies), 1 hand pump to be provided before start of mining. 3. The capacity of trucks for loading purpose will be in tonnes as per PWD and Transport Department applicable norms and standard fixed by the Government. 4. Haul road 100 meter shall be made motorable. 5. Green belt shall be developed around the mining site and along the haul road to mitigate noise pollution.

Page 75 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

70. M/s Sandeep Ent Udyog, Gatano.11/3,179,225,234 Cha,337,1/1,Vill: Majhalipatti, Sadar, Mirzapur. Shri Bahadur Lal Maurya, Vil-Maghaipur, Aurai, Bhadohi. File N0. Ent./270/ AD(S)

The SEAC discussed the matter and directed the secretariat to check the reply submitted by the project proponent regarding the matter and submit the report to the SEAC and putup the matter in next SEAC meeting dated 16/01/2016 for consideration of the matter.

71. M/s Sandeep Ent Udyog, Gata no. 64Mi, Vill: Chakwa Ghanshyam Bhadohi, Bhadohi. Shri Bahadur Lal Maurya, Vil-Maghaipur, Aurai,Bhadohi. File N0. 271/ Ent/OSD-T

The SEAC discussed the matter and directed the secretariat to check the reply submitted by the project proponent regarding the matter and submit the report to the SEAC and putup the matter in next SEAC meeting dated 16/01/2016 for consideration of the matter.

(Dr. M. S. Khan) (Dr. S. N. Singh) (Dr. D. C. Gupta) Chairman, SEAC,UP Member, SEAC, UP Member, SEAC, UP

(Ajay Kumar Shukla) Secretary, SEAC, UP/ Director, Environment

Page 76 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Annexure-1

General condition for Soil Mining Projects:

1. This environmental clearance does not create or verify any claim of applicant on the proposed site/activity. 2. Any mining activity shall be undertaken only after valid permission from Mining Department/District Administration and written agreement with land owner from where earth excavation is proposed. 3. No change is mining technology and scope of working shall be made without approval of Authority. 4. Personnel working in dusty areas shall be provided with protective respiratory devices and they shall also be imparted adequate training and information on safety and health aspects. 5. The Authority reserves the right to revoke the clearance if conditions stipulated are not implemented. The Authority will also be entitled to impose additional environmental conditions or modify the existing ones, if necessary. 6. In case of any deviation or alteration in the project proposed from those submitted to this Authority for clearance, a fresh reference should be made to the Authority to assess the adequacy of the condition(s) imposed and to add additional environmental protection Measures required, if any. 7. Concealing factual data or submission of false/fabricated data and failure to comply with any of the conditions mentioned above may result in withdrawal of this clearance and attract action under the provisions of Environment (Protection) Act, 1986.

Page 77 of 78

Minutes of 255 th SEAC Meeting Dated 15/01/2016

Annexure-2 Specific Conditions for Soil Mining Projects: 1. Approach kaccha road should be made motorable and maintained periodically. 2. Transportation of soil should be undertaken in covered containers. 3. Rehabilitation plan with planting of trees to be submitted along with the closure plan. 4. Land to be levelled and handed over to the owners after completion of excavation work. 5. A valid NOC from State Pollution Control Board shall be obtained for the Brick kiln prior to operation as per law and all guidelines must be followed. 6. The mining operations shall be strictly limited to the proposed mining sites and proposed purpose. 7. Top soil should be adequately preserved and should be used for landscaping. 8. Excavated soil should be properly stored in a manner not to increase surrounding air pollution level. 9. Water sprinkling should be exercised during excavation and storage of soil for suppression of fugitive dust. 10. Excavated area should be properly reclaimed and ensured that no open bore hole is left. 11. Safety measures for the people working at the site shall be duly taken care of as per law. 12. The excavation work shall be done in day time only. 13. The project boundary shall be properly covered to restrict dust dispersion. 14. Precautionary measures during soil excavation for conservation and protection of rare and endangered flora and fauna found in the study area. 15. Noise level shall be maintained as per standards for both day and night. 16. The route map for soil transportation from excavation plots to work site should be firmed up and necessary permissions shall be sought from District Administration. 17. Vehicles hired for the transportation should be in good condition and should have Pollution Check Certificate and should conform to applicable air and noise emission standards. 18. Personnel exposure monitoring for respirable mineral dust shall be carried out for the workers and records maintained including health records of the workers. Awareness program for workers on impact of mining on their health and precautionary measures like use of personal protective equipments etc. shall be carried out periodically. First aid facilities and adequate sanitary facility in the form of temporary toilets/septic tanks. 19. Solid waste material viz gutkha rappers, plastic bags, glasses etc. to be generated during project activity will be separately stored in bins and managed as per Solid Waste Management Rules. 20. Project proponent should maintain daily register for information of (a) collection of soil/clay, (b) manpower & (c) transportation purpose. 21. Soil mining shall strictly be undertaken as per rules and regulations/permissions obtained from District Administration/Mining Department 22. 2% of project cost should be earmarked for CSR activities. Firm up plan should be submitted to District Administration and to SEIAA with proposed activities and time schedule. A copy of resolution as above shall be submitted to the authority alongwith list of beneficiaries with their mobile nos./address. The project proponent is also required to comply with following stipulations as per MoEF, GOI OM No. 11011/47/2011-IA.II(M) dated 24/06/2013: 1. The borrowing/excavation activity shall be restricted to a maximum depth of 2 m. below general ground level at the site. 2. The borrowing/excavation activity shall be restricted to 2 m. above the ground water table at the site. 3. The borrowing/excavation activity shall not alter the natural drainage pattern of the area. 4. The borrowed/excavated pit shall be restored by the project proponent for useful purpose(s). 5. Appropriate fencing all around the borrowed/excavated pit shall be made to prevent any mishap. 6. Measures shall be taken to prevent dust emission by covering of borrowed/excavated earth during transportation. 7. Safeguards shall be adopted against health risks on account of breeding of vectors in the water bodies created due to borrowing/excavation of earth. 8. Workers/labourers shall be provided with facilities for drinking water and sanitation. 9. A berm shall be left from the boundary of adjoining field having a width equal to at least half the depth of proposed excavation. 10. A minimum distance of 15 m from any civil structure shall be kept from the periphery of any excavation area. Page 78 of 78