Investment Opportunity Moel Maelogan Wind Farm

Total Page:16

File Type:pdf, Size:1020Kb

Investment Opportunity Moel Maelogan Wind Farm Investment opportunity Moel Maelogan Wind Farm Key facts: Commissioned: January 2003 Installed capacity: 2.3MW Average capacity factor: c36% Sales Contract: NFFO 5 EBITDA (5 year average): £354,623 Land lease to March 2027 + savills.co.uk Savills Energy Savills are approaching potential Moel Maelogan Wind Farm Project Information investors on behalf of the General Directors of Cwmni Gwynt Teg Location Conwy, North Wales Ltd, “the Seller” who are seeking Consent Obtained May 2000 (unlimited duration) to dispose of their interest in the Commissioning Date January 2003 Moel Maelogan Wind Farm. Capacity1 Installed Capacity 2.3 MW Transaction Structure Number of Turbines 2 The Seller intends to dispose of 100% of the shares in Cwmni Gwynt Teg Ltd Turbine Manufacturer Siemens (Bonus) with consideration paid on close of the Turbine Size 1300 kW (Downrated to 1169 kW until March 2018) transaction. Generation (Since Commissioning) Average Capacity Expressions of Interest c36.04% Factor Interested parties should submit Average Production c7,246 MWh/annum expressions of interest, which should include the following information: Average wind speed c7.47 m/s Average site c98.68% • Identity of acquirer (including availability background information on organisation Revenue and ultimate ownership) Contract Summary NFFO 5 (Index linked) • Any corporate, regulatory, financial or Term2 Feb 2018 other conditions/approvals required to complete the transaction. Price (currently) 6.50p/KWh 3 • Information required to complete the 2007 2008 2009 2010 2011 due diligence Turnover £430,649.43 £493,647.12 £486,269.93 £408,575.94 £444,702.88 • Confirmation of ability to meet process EBITDA £354,521.43 £412,564.57 £396,045.85 £313,632.80 £296,350.99 timetable detailed below Operations • Any other information you consider to Operations and Siemens be relevant Maintenance Interested parties may be shortlisted on Site Operations Cwmni Gwynt Teg Ltd the basis of the information provided. Key Contracts Land Lease4 Expires March 2027 Timetabling Following receipt of an expression of Connection 33KV dedicated line to Llanrwst Sub-Station (SP Manweb plc). Network Capacity interest, bidders will be provided with 2.6 MW more detailed information. Access to the Allocation data room will be provided at the sole 1 Moel Maelogan Wind Farm comprises 3 turbines, two are owned by the Seller, the remaining turbine is owned by Energiekontor UK Ltd. discretion of the Seller and its agents. 2 It is expected that bids would reflect the uplift in price following the removal of the NFFO restriction on both price and export capacity. 3 In 2011, the scheme was subject to one-off refurbishment costs which impacted upon both expenditure and revenues. Full details of the work undertaken will A date for submission of offers will be be provided in the data room. advised at a later date. Financial close for 4 The lease is protected by the security of tenure provisions of the Landlord & Tenant Act 1954. the transaction is anticipated to be in May 2012. Contact Details All communications and enquiries relating to this offering should be directed to the Whilst it is the Seller’s firm intention to sell contacts as detailed below. they are not obliged to accept the highest or indeed any offer. Nick Green BLE (Hons) MRICS Miles Thomas MRICS Savills Energy Savills Energy Viewings are strictly by appointment 55 York Place, PERTH 57 Berkeley Square with Savills. PH2 8EH London W1J 6ER t: 01738 477518 / 07968 550378 t: 0203 107 5466 / 07807 999128 e: [email protected] e: [email protected] Important Notice Savills and their clients give notice that: They do not make or give any representations or warranties in relation to the property, financial figures or other information either here or elsewhere, either on their own behalf or on behalf of their client or otherwise. They assume no responsibility for any statement that may be made in these particulars. These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. Any areas, measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. It should be assumed that the property has all necessary planning, building regulation or other consents and Savills have not tested any services, equipment or facilities. Purchasers must satisfy themselves by inspection or otherwise. Neither these particulars nor any subsequent communication relative to the property shall be binding upon Savills or the Sellers (whether acted on or otherwise). The reference to any mechanical or electrical equipment or other facilities at the property shall not constitute a representation (unless otherwise stated) as to its state or condition or that it is capable of fulfilling its intended function and prospective purchasers/tenants should satisfy themselves as to the fitness of such equipment for their equirements.r + savills.co.uk Savills Energy.
Recommended publications
  • A Development Strategy for the Hiraethog Area
    A development strategy for the Hiraethog area October 2014 A development strategy for the Hiraethog area October 2014 Acknowledgements We would like to offer our thanks to all those interviewed as part of the development of this strategy who gave their time so willingly and answered our questions in such detail. This report would not have been possible without their contributions. Report written by: Endaf Griffiths Dr Lowri Wynn Charlotte Ellis Charlie Falzon Version: Final report Date: October 2014 Client contact: Silas Jones, Cadwyn Clwyd t: 01824 705802| e: [email protected] Page | 1 A development strategy for the Hiraethog area October 2014 Contents Synopsis ........................................................................................................................... 3 1. Introduction ............................................................................................................ 11 2. The area and the current situation ........................................................................... 12 2.1. Overview ................................................................................................................... 12 2.2. Socio economic profile .............................................................................................. 14 2.3. Landscape and biodiversity baseline and issues analysis ......................................... 33 3. Needs in the area: strengths, weaknesses, opportunities and threats ....................... 37 3.1. Introduction..............................................................................................................
    [Show full text]
  • SPM LC14 Charging Statement – April 2019 (Incl: Solr Adjustment
    SP Manweb Use of System Charging Statement NOTICE OF CHARGES Effective from 1st April 2019 Version 0.3 1 ATLANTIC QUAY, ROBERTSON STREET, GLASGOW, G2 8SP SC189125 SP MANWEB PLC DECEMBER 2017 Version Control Version Date Description of version and any changes made 0.2 02.01.2019 Annex 5 & 6 updated 0.3 31.01.2019 Annex 1 & 3 adjusted for SoLR A change-marked version of this statement can be provided upon request. 1 ATLANTIC QUAY, ROBERTSON STREET, GLASGOW, G2 8SP SC189125 SP MANWEB PLC DECEMBER 2017 Contents 1. Introduction 4 Validity period 5 Contact details 5 2. Charge application and definitions 7 Supercustomer billing and payment 7 Site-specific billing and payment 9 Application of capacity charges 11 Application of charges for excess reactive power 13 Incorrectly allocated charges 15 Generation charges for pre-2005 designated EHV properties 16 Provision of billing data 17 Out of area use of system charges 17 Licensed distribution network operator charges 17 Licence exempt distribution networks 18 3. Schedule of charges for use of the distribution system 21 4. Schedule of line loss factors 22 Role of line loss factors in the supply of electricity 22 Calculation of line loss factors 22 Publication of line loss factors 23 5. Notes for Designated EHV Properties 24 EDCM network group costs 24 Charges for new Designated EHV Properties 24 Charges for amended Designated EHV Properties 24 Demand-side management 24 6. Electricity distribution rebates 26 7. Accounting and administration services 26 8. Charges for electrical plant provided ancillary
    [Show full text]
  • Report Template
    Appendices 2-5 to Proof of Evidence Landscape and Visual Issues Prepared by Michelle Bolger CMLI, Dip.LA, BA, PGCE, BA In respect of Appeal concerning 7 Wind Turbines on land off A44 South West of Llandegley, Llandrindod Wells On behalf of Campaign for the Protection of Rural Wales Appeal ref APP/T6850/A/17/3176128 LPA ref P/2014/0672 February 12th 2018 Company Registration No. 09809868 Registered Office: 35 Pickford Road Bexleyheath DA7 4AG APPENDICES MB Appendix 2 Appendix J from Facilitating Planning for Renewable Energy in Wales- Meeting the Target, 2004 MB Appendix 3 LANDMAP Aspect Area Descriptions MB Appendix 4 Extracts from Historic Accounts of Visitors to the Area MB Appendix 5 Plans and Photographs Relating to Access Tracks at Bryn Blaen Wind Farm Appendices to Landscape PoE Page 1 MB APPENDIX 2 Appendix J from Facilitating Planning for Renewable Energy in Wales- Meeting the Target, 2004 Appendices to Landscape PoE Page 2 Welsh Assembly Government Facilitating Planning for Renewable Energy in Wales: Meeting the Target Final Report - Research Contracts 105/2002 and 269/2003 Appendices to Landscape PoE Page 3 Appendix J Initial Guidance to Local Planning Authorities on the treatment of the strategic areas Please note that the contents of the this appendix do not represent the Planning Policy of the Welsh Assembly Government Appendices to Landscape PoE Page 4 Welsh Assembly Government Facilitating Planning for Renewable Energy in Wales: Meeting the Target Final Report - Research Contracts 105/2002 and 269/2003 General planning advice/guidance at the development control level With respect to the general technical and environmental issues associated with the planning for onshore wind energy developments at the planning application stage, there are a wide range of documents already available.
    [Show full text]
  • 7 La Gestion Des Déchets
    Capacité Technique et Financière SEPE Les Pâtis Longs Annexe 11 CONTRAT DE GARANTIE DE DEMENTELEMENT Les Pâtis Longs 96 rue Nationale 59000 Lille Téléphone : + 33 3 20 51 16 59 Télécopie : + 33 3 20 21 84 66 Sarl au capital de 1 000 € N° Siret 804 723 989 00021 R.C.S. LILLE Code APE 3511Z PROPOSITION DE CAUTION FINANCIERE – EOLIEN Date : 09/03/2017 Compagnie (« La caution »): ATRADIUS CREDIT INSURANCE NV 159 Rue Anatole France 92596 Levallois-Perret RCS Nanterre : 417 498 755 Souscripteur (« Le cautionné ») : Les Pâtis Longs 96 Rue Nationale 59000 LILLE Siret : 804 723 989 00021 Montant de la caution et conditions tarifaires : - Montant de la caution : 50 000 € par éolienne - Au taux de 0,60% l’an, soit 1 200 € TTC - Frais d’ouverture de dossier : 425 € - Frais d’acte : 75 € Page 1/2 En application de l’article L.553-3 du code de l’environnement, des articles R.553-1 et suivants du code de l’environnement et des articles 3 et suivants de l’arrêté du 26 août 2011 relatif à la remise en état et à la constitution des garanties financières pour les installations de production d’électricité utilisant l’énergie mécanique du vent pris en application des articles R.553-2 et R.553-5 du code de l’environnement. La garantie constitue un engagement purement financier. Elle est exclusive de toute obligation de faire et elle est consentie dans la limite du montant maximum visé au contrat en vue de garantir au préfet le paiement en cas de défaillance du cautionné des dépenses liées au démantèlement des installations de production, à l’excavation d’une partie des fondations, à la remise en état des terrains et à la valorisation ou l’élimination des déchets de démolition ou de démantèlement, conformément à l’article R.553-6 du Code de l’environnement et à l’article 1 de l’arrêté du 26 août 2011.
    [Show full text]
  • SP Manweb Final Use of System Charging Statement
    SP Manweb Final Use of System Charging Statement Effective from 1st April 2011 Version 1.0 This statement is in a form to be approved by the Gas and Electricity Markets Authority. SP ENERGY NETWORKS, NEW ALDERSTON HOUSE, DOVE WYND, STRATHCLYDE BUSINESS PARK, BELLSHILL. ML4 3FF Contents 1. Introduction 3 2. Tariff Application and Charging Definitions 4 Billing and Payment by Settlement Class (Supercustomer) 4 Site-Specific Billing and Payment 5 Extra High Voltage (EHV) supplies 5 Unmetered Supplies 5 Capacity Charges (demand only) 6 Chargeable Capacity 6 Maximum Import Capacity 6 Standby Capacity for Additional Security on Site 6 Exceeded Capacity 7 Minimum Capacity Levels 7 Import Reactive Power Charge 7 Generation Billing and Payment by Settlement Class 8 Generation Site Specific Billing and Payment 8 Generation Reactive Power Charge 8 Generation connected at EHV 9 Provision of Billing Data 9 Licensed Distributor Network Operator (LDNO) tariffs 10 3. Schedule of Demand Tariffs 11 Tariffs for Profile Classes 1& 2 11 Tariffs for Profile Classes 3 & 4 12 Tariffs for Profile Classes 5-8 13 Tariffs for Half-Hourly Metered LV and HV 14 Tariffs for Half-Hourly Metered EHV 15 Unmetered Non-Half Hourly and Pseudo Half-Hourly Tariffs 19 Use of System Charges Out of Area 20 Preserved LLFCs 20 4. Generation Tariffs 22 5. Licensed Distributor Network Operator (LDNO) tariffs 25 LDNO LV Connections to DNO Network; Low Voltage Tariffs for Profile Classes 1 to 8 25 LDNO LV Connections to DNO Network: Low Voltage Tariffs for HH Metered Customers 26 LDNO HV Connections to DNO Network: Low Voltage Tariffs for Profile Classes 1 to 8 27 LDNO HV connections to DNO network: HIGH voltage tariffs for HH Metered Customers 27 6.
    [Show full text]
  • Dr Amanda Harry M.B.Ch.B
    Wind Turbines, Noise and Health February 2007 By Dr Amanda Harry M.B.Ch.B. P.G.Dip.E.N.T. 1 Acknowledgements. Dr Mariana Alves- Pereira, MSc (Biomechanical Engineering)- for providing information and advice on Vibroacoustic disease. Dr David Manley PhD, BSc (Hons.) MIEE MIOA, F Ins.P, C.Dip.AF, FICDDS, C.Eng. Who sadly died in 2006. His advice and knowledge in the field of acoustics was invaluable. Mrs Barbara Frey, BA, MA For kindly providing all the relevant journal searches and citations. Mr Peter Hadden, BSc,FRICS For his ongoing support and advice. Professor Ralph V Katz, DMD, MPH, PhD – Professor and Chair of The Department of Epidemiology and Health Promotion New York University college of Dentistry-for reading over the report and doing the SPSS programming to collate the data collected and providing the specific graphs with that data. Professor James Lovelock CH, PhD, DSc– for kindly reading over the report Mr Alan Nunn- for initially introducing me to the first couple suffering from noise issues as a result of living near turbines. Mr John Stewart Chair of the UK noise association 2 THE EFFECT OF WIND TURBINES ON HEALTH. I first realised there might be a problem associated with wind turbines when I was introduced to a couple living near a wind farm in Cornwall. The distance from their home to the nearest turbine is about 400 meters. They told me about poor sleep, headaches stress and anxiety symptoms brought on when the wind was blowing in certain directions. At times, they told me that they have been so disturbed by the noise that after several disturbed nights sleep, they have sought refuge in a nearby bed and breakfast establishment (far enough away not to be similarly affected by the noise).
    [Show full text]
  • SP Manweb Use of System Charging Statement NOTICE of CHARGES Effective from 1St April 2021 Version
    SP Manweb Use of System Charging Statement NOTICE OF CHARGES Effective from 1st April 2021 Version 0.4 3 PRENTON WAY, BIRKENHEAD, MERSEYSIDE CH43 3ET 02366937 SP MANWEB PLC FEBRUARY 2021 V0.4 Version Control Version Date Description of version and any changes made 0.2 15/10/2020 DCP 341 & DCP 342 incorporated 0.3 08/12/2020 LAFs updated, Annex 6 updated, TCR LLFCs updated in Annex 1 0.4 26/02/2021 Annexes 4 & 7 updated to include omitted Storage Facility import tariffs A change-marked version of this statement can be provided upon request. 3 PRENTON WAY, BIRKENHEAD, MERSEYSIDE CH43 3ET 02366937 SP MANWEB PLC FEBRUARY 2021 V0.4 Contents 1. Introduction 5 Validity period 6 Contact details 6 2. Charge application and definitions 8 The supercustomer and site-specific billing approaches 8 Supercustomer billing and payment 9 Site-specific billing and payment 10 Incorrectly allocated charges 15 Generation charges for pre-2005 designated EHV properties 16 Provision of billing data 17 Out of area use of system charges 18 Licensed distribution network operator charges 18 Licence exempt distribution networks 18 3. Schedule of charges for use of the distribution system 21 4. Schedule of line loss factors 22 Role of line loss factors in the supply of electricity 22 Calculation of line loss factors 22 Publication of line loss factors 23 5. Notes for Designated EHV Properties 24 EDCM network group costs 24 Charges for new Designated EHV Properties 24 Charges for amended Designated EHV Properties 24 Demand-side management 24 6. Electricity distribution rebates 26 7.
    [Show full text]
  • SPM LC14 Indicative Charging Statement
    SP Manweb Use of System Charging Statement INDICATIVE NOTICE Effective from 1st April 2012 Version 1.0 This statement is in a form to be Approved by the Gas and Electricity Markets Authority. SP ENERGY NETWORKS, NEW ALDERSTON HOUSE, DOVE WYND, STRATHCLYDE BUSINESS PARK, BELLSHILL. ML4 3FF Contents 1. Introduction 3 2. Charge Application and Definitions 5 Supercustomer Billing and Payment 5 Supercustomer Charges 5 Site-Specific Billing and Payment 6 Site-Specific Billed Charges 6 Charges for Unmetered Supplies 8 Use of System Charges Out of Area 8 Application of Capacity Charges 8 Chargeable Capacity 8 Demand Chargeable Capacity 8 Generation Chargeable Capacity 9 Standby Capacity for Additional Security on Site 9 Exceeded Capacity 9 Minimum Capacity Levels 10 Application of charges for excess reactive power 10 Demand Chargeable Reactive Power 10 Generation Chargeable Reactive Power 11 Provision of billing data 11 Licensed Distributor Network Operator (LDNO) charges 12 3. Schedule of Charges for use of the Distribution System 13 4. Schedule of Line Loss Factors 14 Role of Line Loss Factors in the Supply of Electricity 14 Calculation of Line Loss Factors 14 Line Loss Factor time periods 14 Line Loss Factor tables 15 5. Notes for Designated EHV Properties 16 EDCM network group costs 16 Demand Side Management 16 6. Electricity Distribution Rebates 17 7. Accounting and Administration Services 17 8. Charges for electrical plant provided ancillary to the grant of Use of System 17 9. Glossary of Terms 18 Annex 1 - Schedule of Charges for use of the Distribution System by LV and HV Designated Properties 1 Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users).
    [Show full text]
  • Strategaeth Datblygu Ar Gyfer Ardal Hiraethog
    Strategaeth datblygu ar gyfer ardal Hiraethog Hydref 2014 Strategaeth datblygu ar gyfer ardal Hiraethog Hydref 2014 Cydnabyddiaethau Hoffem ddiolch i bawb a gafodd eu cyfweld fel rhan o ddatblygiad y strategaeth hon, pawb a oedd mor barod i roi eu hamser ac ateb ein cwestiynau mor fanwl. Ni fyddai'r adroddiad hwn wedi bod yn bosib heb eu cyfraniad. Ysgrifennwyd yr adroddiad gan: Endaf Griffiths Dr Lowri Wynn Charlotte Ellis Charlie Falzon Fersiwn: Adroddiad terfynol Dyddiad: Hydref 2014 Cyswllt cleient: Silas Jones, Cadwyn Clwyd ff: 01824 705802| e: [email protected] Tudalen | 1 Strategaeth datblygu ar gyfer ardal Hiraethog Hydref 2014 Cynnwys Crynodeb 3 1. Cyflwyniad 11 2. Yr ardal a'r sefyllfa bresennol 12 2.1. Trosolwg 12 2.2. Proffil economaidd-gymdeithasol 14 2.3. Tirwedd a bioamrywiaeth sylfaenol a dadansoddiad o'r problemau 33 3. Anghenion yr ardal: cryfderau, gwendidau, cyfleoedd a bygythiadau 37 3.1. Cyflwyniad 37 3.2. Tabl crynodeb o'r dadansoddiad SWOT 39 3.3. Cryfderau 40 3.4. Gwendidau 46 3.5. Cyfleoedd 53 3.6. Bygythiadau 56 4. Cyd-destun strategol 59 4.1. Cyflwyniad 59 4.2. Cynlluniau Sengl Integredig yr Awdurdod Lleol 59 4.3. Cynlluniau rheoli cyrchfannau 62 4.4. Cynllun Rheoli Cyrchfannau Sir Ddinbych 63 4.5. Uchelgais economaidd Gogledd Cymru: strategaeth dros newid 64 4.6. Rhaglen Datblygu Gwledig Cymru 2014-2020 66 4.7. Cronfeydd Strwythurol 2014-2020 66 5. Cynllun gweithredu a strategaeth 69 5.1. Cyflwyniad 69 5.2. Nod 70 5.3. Amcanion 70 5.4. Gweithredoedd 71 5.5.
    [Show full text]
  • All-Party Parliamentary Group on Tourism 24Th May 2006 'The Impact
    All-Party Parliamentary Group on Tourism 24th May 2006 ‘The impact of wind farms on the tourist industry in the UK’ Presentation Prepared by the British Wind Energy Association (BWEA) Executive Summary 1. Introduction 2. Benefits of wind energy 3. Overview of tourism 4. General Public Attitudes and Tourism Studies 5. Case Studies & Anecdotal Evidence Annex: Tourism Survey Details ©E.ON UK, open day at Out Newton wind farm 2002 1 Executive Summary • A diverse range of influences affect the UK tourist industry including September 11th 2001, the war in Iraq, high fuel prices, foot & mouth disease, the strength of the pound, weather conditions, economy airlines & increased holiday home ownership abroad – issues unrelated to wind farm development. • It is not feasible to attempt to draw any conclusions about the effect of wind farms on tourism from national tourism statistics. There is no possible way that any cause and effect could be established for such a massive industry with such a multitude of influences. • There have been several surveys and reports investigating wind energy and tourism conducted by reputable poll companies and consultants. • The results from all these surveys demonstrate that the effect of wind farms on tourism is negligible at worst, with many respondents taking a positive view to wind farms, and saying it would not affect their likelihood of returning to an area. • Whilst carrying out research for this paper, BWEA contacted national and regional tourist boards for information and any views. There was a modest response – the tourist boards contacted did not give references for any tourist surveys/studies, and there were no particular comments raised on the issue.
    [Show full text]
  • Duos Methodology Mod SPEN-10-03 Changes for DG Pre 2005 080710
    MODIFICATION REPORT SP Energy Networks Mod. Proposal SPEN-10-03 Amendment of Use of System Charging Methodologies for removal of blanket exemption to pre-2005 Generators Date of Issue: 8 July 2010 For approval by the Authority MODIFICATION REPORT USE OF SYSTEM CHARGING METHODOLOGY SPEN-10-03 CONTENTS SCOPE .................................................................................................................................................................. 1 ISSUE AUTHORITY ............................................................................................................................................ 1 INTRODUCTION .................................................................................................................................................. 2 HOW THE PROPOSAL BETTER MEETS RELEVANT OBJECTIVES ..................................................... 2 BACKGROUND TO CHARGING PRE-2005 DG GENERATION ............................................................... 2 DESCRIPTION OF THE MODIFICATION ....................................................................................................... 2 LEGAL REVIEW OF CONTRACTUAL ARRANGEMENTS ......................................................................... 3 PROPOSED WORDING OF THE USE OF SYSTEM METHODOLOGY STATEMENT .......................... 3 REVISED USE OF SYSTEM CHARGES ........................................................................................................ 3 APPENDIX 1.A. SPD .........................................................................................................................................
    [Show full text]
  • Facilitating Planning for Renewable Energy , File Type
    Welsh Assembly Government Facilitating Planning for Renewable Energy in Wales: Meeting the Target Final Report - Research Contracts 105/2002 and 269/2003 Contents EXECUTIVE SUMMARY 1 Glossary 7 Acknowledgements – Stage 1 8 Acknowledgements – Stage 2 9 1 Introduction and overview 10 1.1 Project background and aim 10 1.2 Phasing of Project 10 1.3 Report Structure 11 1.4 Methodology 11 Part A - Context 13 2 Policy context in Wales 14 2.1 Introduction 14 2.2 Energy Policy 14 2.3 Planning Policy 15 2.4 Conclusions of review 19 2.5 Planning approaches available to the Welsh Assembly Government 19 Part B - Stage 1 -Initial work 24 3 Summary of the Stage 1 Research 25 3.1 Introduction and Stage 1 Brief 25 3.2 Context – Developing a planning tool 26 3.3 Methodology for Stage 1 28 3.4 Scoping the Technologies 29 3.5 Developing locational criteria 35 3.6 Conclusions of the Stage 1 Research 39 Part C- Stage 2 Research and Analysis 40 4 Context to the Stage 2 research 41 4.1 Introduction 41 4.2 Understanding the 4TWh Benchmark Target 42 5 The identification of strategic areas for onshore wind 47 5.1 Introduction 47 5.2 Methodology 47 5.3 Part A - Preliminary screening for strategic areas 49 5.4 Part B – Refinement of strategic areas 66 5.5 Results 70 6 Testing and validation of Strategic Areas 73 6.1 Introduction 73 6.2 Influence of other existing wind farms. 73 6.3 Landscape Capacity and Sensitivity 76 6.4 Landscape and Visual Effects upon nationally designated sites / features 80 6.5 Higher Wind Speeds 84 6.6 Summary of testing and validation of
    [Show full text]