The Banyjima Report (Edited 2013) Dr William B Day WARNING – Contains Names of Deceased Elders 1
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Documentary Records Locating Aboriginal People on Mulga Downs Pre 1922 Identified Marriage / Death Certificates (From W.A
Documentary Records locating Aboriginal people on Mulga Downs pre 1922 Identified Marriage / Death certificates (from W.A. Registry Services) - Death Certificate Registration 18/1955, Roebourne district - Tommy Tucker (stockman) male aged 73 born (c.1882) at Mulga Downs Station, son of unknown parents, no marriage details recorded, no children recorded, deceased 10/12/1955 at Roebourne district hospital, buried 10/12/1955 in native portion Roebourne cemetery, last resident at Mulga Downs station prior to death. Note: witnesses were Tumbler and F. Hick - Death Certificate Registration 20/1956, Roebourne district - Banjo (indigent) male age 75 born (c1881) at Mulga Downs, child of Peter (occupation unknown) and Polly spouse not recorded, children Ada (age unknown), date of death 08/12/1956, deceased at Mulga Downs Station, buried at Native Portion Mulga Downs cemetery, last resident at Mulga Downs Station, Wittenoom prior to death. This could possibly be a record of Banjo shown by Palmer to be a partner of ivy Tucker @ Naijong : p. 26 Ivy Tucker shown as mother of Harold (father Harold Mayor, Euro, partner of Daphne Jones); Selina (father Gayuna), Blanche Tucker (father Gayuna), Gertie (father Gayuna), Eric Cosmo (father Spiro Cosmos, Greek); Selina (father Gayuna, partner of Pat Long), Blanche Tucker (father Gayuna), Gertie (father Gayuna, partner of Ginger Parker), John Douglas MacArthur (father McArthur, Euro); Eustace (partner of Dulcie Tumbler) and Ivy also partner of Spider (Ngarla man, no children), Banjo (no children) and Hickey Bung. - Death Certificate Registration 18/1956, Roebourne district - Sally Dundy (indigent native) female age 80 born (c1876) at Mulga Downs, Wittenoom, child of unknown parents, spouse not recorded, no children recorded, date of death 19/10/1956, deceased at Mulga Downs Station, buried at Native Portion Mulga Downs cemetery, last resident at Mulga Downs station, Wittenoom prior to death. -
September Shire of Roebourne Local Planning Strategy Evidential Analysis Paper: (Major Industry Projects)
September Shire of Roebourne Local Planning Strategy Evidential Analysis Paper: (Major Industry Projects) Shire of Roebourne – Economic Development Strategy Preliminary Paper Version Control Document History and Status Status Issued To Qty Date Reviewed Approved Draft MP 1 23/4/13 Report Details Name: Author: Client: Name of doc: Doc version: Project number: P85029 SM Shire of Shire of Roebourne Electronic Draft 85029 MPD Roebourne – Local Planning P1263 SM Strategy 3103 PS Disclaimer: If you are a party other than the Shire of Roebourne, MacroPlan Dimasi: owes you no duty (whether in contract or in tort or under statute or otherwise) with respect to or in connection with the attached report or any part thereof; and will have no liability to you for any loss or damage suffered or costs incurred by you or any other person arising out of or in connection with the provision to you of the attached report or any part thereof, however the loss or damage is caused, including, but not limited to, as a result of negligence. If you are a party other than the Shire of Roebourne and you choose to rely upon the attached report or any part thereof, you do so entirely at your own risk. The responsibility for determining the adequacy or otherwise of our terms of reference is that of the Shire of Roebourne. The findings and recommendations in this report are given in good faith but, in the preparation of this report, we have relied upon and assumed, without independent verification, the accuracy, reliability and completeness of the information made available to us in the course of our work, and have not sought to establish the reliability of the information by reference to other evidence. -
Mineral Facilities of Asia and the Pacific," 2007 (Open-File Report 2010-1254)
Table1.—Attribute data for the map "Mineral Facilities of Asia and the Pacific," 2007 (Open-File Report 2010-1254). [The United States Geological Survey (USGS) surveys international mineral industries to generate statistics on the global production, distribution, and resources of industrial minerals. This directory highlights the economically significant mineral facilities of Asia and the Pacific. Distribution of these facilities is shown on the accompanying map. Each record represents one commodity and one facility type for a single location. Facility types include mines, oil and gas fields, and processing plants such as refineries, smelters, and mills. Facility identification numbers (“Position”) are ordered alphabetically by country, followed by commodity, and then by capacity (descending). The “Year” field establishes the year for which the data were reported in Minerals Yearbook, Volume III – Area Reports: Mineral Industries of Asia and the Pacific. In the “DMS Latitiude” and “DMS Longitude” fields, coordinates are provided in degree-minute-second (DMS) format; “DD Latitude” and “DD Longitude” provide coordinates in decimal degrees (DD). Data were converted from DMS to DD. Coordinates reflect the most precise data available. Where necessary, coordinates are estimated using the nearest city or other administrative district.“Status” indicates the most recent operating status of the facility. Closed facilities are excluded from this report. In the “Notes” field, combined annual capacity represents the total of more facilities, plus additional -
Shire of East Pilbara
ell nn Do O’ Fitzroy Halls Creek 118º 120º 122º 124º Fitzroy 126º e s Mount 128º Crossing Mt Ball n g r R a Amhurst Elvire Cape Latouche Treville u e l l e Y Windoo Hill River M A Noonkanbah HW ORD RIVER Port Smith Dampier Downs Kalyeeda Mt Huxley Margaret IG Nerrima H Old GREAT River REGENERATION Creek Lagrange Bay Babrongan Tower Mt Bertram Lamboo Ruby Plains SHIRE OF TANAMI E Bidyadanga Community d RESERVE 1 g Saint George Cape Bossut ar Mt Tuckeld NO N 1 Ardjorie Ranges RTHER Mt Dockrell Gordon Downs Frazier Downs Ra nge Millajiddee Cherrabun Christmas as Creek McClintock tm Mt West Wall INDIAN s Sturt ri Creek h Range East Pilbara C G WOLFE CREEK ar dn OCEAN Nita Downs METEORITE CRATER er R ange WESTERN AUSTRALIA Bulka Swamp NP Sturt Creek Carranya Mt Junction h c a e B ile M Mt Bannerman y Lake Betty ht EIGHTY MILE BEACH Eig DRAGON TREE Billiluna Tanami Desert MARINE PARK HIGHWAY SOAK NR Lake Lanagan ROAD Sandfire Mt Erskine Roadhouse Cape Wallal Downs Keraudren 1 Larrey Point NORTHERN 20º 20º Spit Point De Grey L ew S Pardoo Roadhouse is H Ra A De Grey D KIDSON Mt Ernest Balgo n Y g PORT GREAT R e Mt Cornish G E HEDLAND A N Lake Gregory P I Cape Thouin 1 L Shaw E Great Sandy South Hedland Mulyie RD R O (WAPET) Cape Cossigny B 138 M Mt Elliott A River 2 Desert R 3 River Mt Stewart BL Muccan E Callawa Warralong Yarrie BA Oakover Whim R TRACK Wallareenya R ROUTE Creek Indee D W Southesk AR Yule RA Warrawagine Tablelands Mallina W 1 95 Lalla Doolena A River Rookh Peak G Woodie Woodie IN E Pyramid Mining Centre Kangan River R G Gooda -
Brockman 2 Detrital Iron Ore Mine Extension Phase 2B
Brockman 2 Detrital Iron Ore Mine Extension Phase 2B Hamersley Iron Pty Ltd Report 1393 April 2011 Assessment on Proponent Information Environmental Impact Assessment Process Timelines Date Progress stages Time (weeks) 07/02/11 Level of assessment set 22/03/11 Proponent’s final API document received by EPA 6 19/04/11 Publication of EPA report (3 days after report to Minister) 4 03/05/11 Close of appeals period 2 Timelines for an assessment may vary according to the complexity of the project and are usually agreed with the proponent soon after the level of assessment is determined. In this case, the Environmental Protection Authority met its timeline objective in the completion of the assessment and provision of a report to the Minister. Dr Paul Vogel Chairman 19/4/11 ISSN 1836-0483 (Print) ISSN 1836-0491 (Online) Assessment No. 1865 Report 1393: Brockman 2 Detrital Iron Ore Mine Extension Phase 2B Contents Page 1. Introduction and background ...................................................................... 1 2. The proposal ................................................................................................. 1 3. Consultation .................................................................................................. 3 4. Key environmental factors ........................................................................... 3 4.1 Groundwater .......................................................................................... 3 4.2 Mine Closure and Rehabilitation ......................................................... -
Handbook of Western Australian Aboriginal Languages South of the Kimberley Region
PACIFIC LINGUISTICS Series C - 124 HANDBOOK OF WESTERN AUSTRALIAN ABORIGINAL LANGUAGES SOUTH OF THE KIMBERLEY REGION Nicholas Thieberger Department of Linguistics Research School of Pacific Studies THE AUSTRALIAN NATIONAL UNIVERSITY Thieberger, N. Handbook of Western Australian Aboriginal languages south of the Kimberley Region. C-124, viii + 416 pages. Pacific Linguistics, The Australian National University, 1993. DOI:10.15144/PL-C124.cover ©1993 Pacific Linguistics and/or the author(s). Online edition licensed 2015 CC BY-SA 4.0, with permission of PL. A sealang.net/CRCL initiative. Pacific Linguistics is issued through the Linguistic Circle of Canberra and consists of four series: SERIES A: Occasional Papers SERIES c: Books SERIES B: Monographs SERIES D: Special Publications FOUNDING EDITOR: S.A. Wurm EDITORIAL BOARD: T.E. Dutton, A.K. Pawley, M.D. Ross, D.T. Tryon EDITORIAL ADVISERS: B.W.Bender KA. McElhanon University of Hawaii Summer Institute of Linguistics DavidBradley H.P. McKaughan La Trobe University University of Hawaii Michael G. Clyne P. Miihlhausler Monash University University of Adelaide S.H. Elbert G.N. O'Grady University of Hawaii University of Victoria, B.C. KJ. Franklin KL. Pike Summer Institute of Linguistics Summer Institute of Linguistics W.W.Glover E.C. Polome Summer Institute of Linguistics University of Texas G.W.Grace Gillian Sankoff University of Hawaii University of Pennsylvania M.A.K Halliday W.A.L. Stokhof University of Sydney University of Leiden E. Haugen B.K T' sou Harvard University City Polytechnic of Hong Kong A. Healey E.M. Uhlenbeck Summer Institute of Linguistics University of Leiden L.A. -
A Grammatical Sketch of Ngarla: a Language of Western Australia Torbjörn Westerlund
UPPSALA UNIVERSITY master thesis The department for linguistics and philology spring term 2007 A grammatical sketch of Ngarla: A language of Western Australia Torbjörn Westerlund Supervisor: Anju Saxena Abstract In this thesis the basic grammatical structure of normal speech style of the Western Australian language Ngarla is described using example sentences taken from the Ngarla – English Dictionary (by Geytenbeek; unpublished). No previous description of the language exists, and since there are only five people who still speak it, it is of utmost importance that it is investigated and described. The analysis in this thesis has been made by Torbjörn Westerlund, and the focus lies on the morphology of the nominal word class. The preliminary results show that the language shares many grammatical traits with other Australian languages, e.g. the ergative/absolutive case marking pattern. The language also appears to have an extensive verbal inflectional system, and many verbalisers. 2 Abbreviations 0 zero marked morpheme 1 first person 1DU first person dual 1PL first person plural 1SG first person singular 2 second person 2DU second person dual 2PL second person plural 2SG second person singular 3 third person 3DU third person dual 3PL third person plural 3SG third person singular A the transitive subject ABL ablative ACC accusative ALL/ALL2 allative ASP aspect marker BUFF buffer morpheme C consonant CAUS causative COM comitative DAT dative DEM demonstrative DU dual EMPH emphatic marker ERG ergative EXCL exclusive, excluding addressee FACT factitive FUT future tense HORT hortative ImmPAST immediate past IMP imperative INCHO inchoative INCL inclusive, including addressee INSTR instrumental LOC locative NEG negation NMLISER nominaliser NOM nominative N.SUFF nominal class suffix OBSCRD obscured perception P the transitive object p.c. -
AR Radcliffe-Brown]
P129: The Personal Archives of Alfred Reginald RADCLIFFE-BROWN (1881- 1955), Professor of Anthropology 1926 – 1931 Contents Date Range: 1915-1951 Shelf Metre: 0.16 Accession: Series 2: Gift and deposit register p162 Alfred Reginald Radcliffe-Brown was born on 17 January 1881 at Aston, Warwickshire, England, second son of Alfred Brown, manufacturer's clerk and his wife Hannah, nee Radcliffe. He was educated at King Edward's School, Birmingham, and Trinity College, Cambridge (B.A. 1905, M. A. 1909), graduating with first class honours in the moral sciences tripos. He studied psychology under W. H. R. Rivers, who, with A. C. Haddon, led him towards social anthropology. Elected Anthony Wilkin student in ethnology in 1906 (and 1909), he spent two years in the field in the Andaman Islands. A fellow of Trinity (1908 - 1914), he lectured twice a week on ethnology at the London School of Economics and visited Paris where he met Emily Durkheim. At Cambridge on 19 April 1910 he married Winifred Marie Lyon; they were divorced in 1938. Radcliffe-Brown (then known as AR Brown) joined E. L. Grant Watson and Daisy Bates in an expedition to the North-West of Western Australia studying the remnants of Aboriginal tribes for some two years from 1910, but friction developed between Brown and Mrs. Bates. Brown published his research from that time in an article titled “Three Tribes of Western Australia”, The Journal of the Royal Anthropological Institute of Great Britain and Ireland, Vol. 43, (Jan. - Jun., 1913), pp. 143-194. At the 1914 meeting of the British Association for the Advancement of Science in Melbourne, Daisy Bates accused Brown of gross plagiarism. -
Innawonga and Bunjima People Native Title Application Wc96/61; Wad6096/98
INNAWONGA AND BUNJIMA PEOPLE NATIVE TITLE APPLICATION WC96/61; WAD6096/98. MARTU IDJA BANYJIMA PEOPLE NATIVE TITLE APPLICATION WC98/62; WAD 6278/98 COMMENTS ON THE KINGSLEY PALMER ANTHROPOLOGIST’S REPORT 2010 by William B. Day PhD May, 2011 1 Introduction 1. The report by Kingsley Palmer presents a good case for a single Banyjima claim by arguing that rights to land in Banyjima society follow a cognative descent system through matrilineal and patrilineal descent. After presenting well-supported evidence of patrilineal descent of rights in Banyjima society (Paragraphs 205, 528, 530, 571), Palmer (Paragraph 496) speculates that it is possible that a preference for patrilineal descent may have become lessened as a result of demographic changes (see Paragraph Error: Reference source not found). Palmer then uses the historical evidence of descent of rights to support a supposed movement towards a cognative system as a legitimate extension of a customary system (Paragraph 206). However, it is suggested in a cognative system a person would have 16 choices of rights from great-great grandparents and 32 choices from another generation back. Such a system would be unworkable. 2. Similarly, Palmer (Paragraph 499) describes a change from defined estates to ‘coalesced estates’ as ‘radicular, since the contemporary way of defining country is developed from and based upon the customary system’ and therefore not a break with the past. The former analysis of continuity may be justified; however, as I will argue, within the Fortescue Banyjima there is evidence that the patrilineal descent of rights has continued through apical ancestors Pirripuri and Wirrilimarra, and putative descendants and that these male descendants continue to be keepers of ‘fundamental rights’ and esoteric ritual knowledge. -
Iron Ore Deposits of the Pilbara Region 2007 Kangeenarina Creek (1:500 000 Scale): Western Australia Geological Survey
GEOLOGICAL SURVEY OF WESTERN AUSTRALIA 116°00À 116°30À 117°00À 117°30À 118°00À 115°25À 115°30À 118°30À 119°00À 20°06À 119°30À 120°00À 120°30À 120°55À 20°06À IRON ORE GEOLOGY I N D I A N O C E A N Zones of supergene enrichment Bobby Bobby Ridley 1-4 Channel iron deposits and pisolite (Robe Pisolite and Poondano Formation) Olivia PORT HEDLAND Finucane Island NORTH Brockman Iron Formation (Note: also includes some Weeli Wolli Formation) Ord 1-5 WEST COASTAL HIGHWAY Harriet Point (proposed) Nelson Point F13 North Anderson Point GOLDSWORTHY Marra Mamba Iron Formation MONTEBELLO Wedgefield South Limb ISLANDS LEGENDRE I Mt Goldsworthy Boodarie HBI (closed) Lena SHAY GAP Townsites ROAD Banded iron-formation in graniteÊgreenstone terrane South Nim A HAUY I Hedland Nimingarra B Population more than 10 000 PORT HEDLAND GIDLEY I Nimingarra E ROSEMARY I 1000Ê10000 DAMPIER Poondano West Poondano East - Table Hill Sunrise Hill West Poondano Central Nim 1 less than 1000 Roebourne ANGEL I I S L A N D S 20°30À COONGAN MALUS I Sunrise Hill Shay Gap IRON ORE MINERALIZATION STYLES Salgash Ronsard Island (proposed) RONSARD I Locality Hematite Hill 20°30À Conservation estate boundary WEST LEWIS I Cattle Gorge Pisolitic and limonitic riverine palaeochannel mineralization or channel iron deposits (CID) BURRUP GOLDSWORTHY Cundaline Highway PENINSULA Cape Lambert F O R E S T I E R of the Cenozoic Robe Pisolite and Poondano Formation. ENDERBY I EAST LEWIS I Yarrie 10 DIXON I DEPUCH I ROAD Yarrie 4 Mineralization style is 'Regolith _ alluvial to beach placer mineralization' Road; sealed Point Samson Yarrie Yarrie 8 LOWENDAL Parker Point MARBLE ISLANDS Road; unsealed EAGLEHAWK I East Intercourse Island DAMPIER Hematitic conglomerate of the Neoproterozoic Eel Creek Formation (Tarcunyah Group, ROAD Callawa WEST INTERCOURSE I WICKHAM Cossack A BAR Officer Basin), which formed in a near-shore environment. -
Manuwarra Red Dog Highway S38 Referral Supporting Information
Manuwarra Red Dog Highway s38 Referral Supporting Information Revision | 1 26 November 2020 Main Roads Western Australia s38 R efe rral Sup po rti ng In fo rmatio n Main Roa ds Weste rn A us trali a s38 Referral Supporting Information Manuwarra Red Dog Highway Project No: IW217863 Document Title: s38 Referral Supporting Information Revision: 1 Document Status: Final Date: 26 November 2020 Client Name: Main Roads Western Australia Project Manager: Lisa Boulden Author: Lisa Boulden & Claire Beckett File Name: MRDH-4_EPA_ReferralSupportingInformationDocument_Rev1_Tracked_2020-11- 25.docx Jacobs Group (Australia) Pty Limited ABN 37 001 024 095 8th Floor, Durack Centre 263 Adelaide Terrace PO Box H615 Perth WA 6001 Australia T +61 8 9469 4400 F +61 8 9469 4488 www.jacobs.com © Copyright 2019 Jacobs Group (Australia) Pty Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Document history and status Revision Date Description Author Checked Reviewed Approved A 07/07/20 Draft for Client Review CB LB PS ADV B 11/08/20 Draft for Client Review LB ADV PS ADV C 16/09/20 Final Draft for Client Review LB ADV PS ADV 0 06/10/20 Final for Issue LB ADV PS ADV 1 26/11/20 Revised following EPA Comments HN LB PS ADV i s38 Referral Supporting Information Contents 1. -
Integrated Rail Network Closure Plan
Report Integrated Rail Network Closure Plan Long Term Mine Planning 7 June 2018 R-PL-EN-0041 Rev 0 CLOSURE GUIDELINE CHECKLIST Report This closure plan addresses the progressive rehabilitation and closure of rail infrastructure projects associated with the Railway and Port (The Pilbara Infrastructure Pty Ltd) Agreement Act 2004. In the absence of regulatory guidelines for inland infrastructure projects, this closure plan follows the report structure described within the Guidelines for Preparing Mine Closure Plans May 2015 published by the Government of Western Australia Department of Mines and Petroleum (now the Department of Mines, Industry Regulation and Safety) and Environmental Protection Authority. The closure of mining operations, including quarries, is not within the scope of this closure plan. Closure Plan (CP) checklist Y/N Page Comments 1 Has the Checklist been endorsed by a senior Y 2 Report has been endorsed using representative within the tenement holder/operating standard Fortescue processes. company? Public Availability 2 Are you aware that from 2015 all CPs will be made N/A This report is not subject to mine closure publicly available? conditions under the Mining Act. 3 Is there any information in the CP that should not be N publicly available? 4 If “Yes” to Q3, has confidential information been N/A submitted in a separate document/section? Cover Page, Table of Contents 5 Does the CP cover page include: Y 1 This report is provided for information • Project Title only. • Company Name • Contact Details (including telephone numbers and email addresses) • Document ID and version number • Date of submission (needs to match the date of this checklist) Scope and Purpose 6 State why the CP is submitted Y 11 This plan has been provided to support the Eliwana Rail Project Public Environmental Review.