Volume 1 – Appendix G: Bibliography

APPENDIX G

BIBLIOGRAPHY

The following sources are some of the references used in preparing the Social Development Plan. Some of these references are reports of studies or surveys undertaken specifically for the Nam Theun 2 Project, although it is not a complete list of the many and various internal studies undertaken by NTPC and its partners towards the drafting of the SDP. A further listing of some of the internal reports on Consultations is provided in Volume 1 Chapter 4.

Other references are documents not specifically related to the Nam Theun 2 Project, but containing information, data and ideas which have been used in the development of the SDP.

March 2005 Nam Theun2 Project – Social Development Plan i Volume 1 – Appendix G: Bibliography

ADB/SPC/National Statistics Center, 2001. Participatory Poverty Assessment in Lao PDR. American Thoracic Society, 2000. Diagnostic Standards and Classification of Tuberculosis in Adults and Children, Am J Respir Crit Care Med, 161, 1376-95 Australian Centre for International Agriculture Research and Department of Livestock and Fisheries, Lao PDR, 1997. Upland Farming Systems in the Lao PDR: Problems and Opportunities for Livestock. Workshop Papers. Awakul, P. and Ogunlana, S. P., 2002. The effect of attitudinal differences on interface conflict on large construction projects: the case of the Pak Mun Dam project, Environ Impact Assess Rev, 22, 311-35. Bangkok Post, February 3, 1997. : Logging Worsens Dam’s Toll. Bangkok Post Publishing Company. Bernacsek G., 1997. Large Dam Fisheries of the Lower Mekong Countries: Review and Assessment. Mekong River Commission Report 97023, Vol. I, Main Report. Bernacsek G., 1997. Large Dam Fisheries of the Lower Mekong Countries: Review and Assessment. Mekong River Commission Report 97023, Vol. II, Data Base. Birley, M. H., Gomes, M. and Davy, A., 1997. Health aspects of environmental assessment. Update 18 to the environmental impact assessment resource book, World Bank, Washington DC. Brismar, A., 2004. Attention to impact pathways in EISs of large dam projects, Environ Impact Assess Rev, 24, 59- 87. Burnside, R. and G. Oughton, 1996. Land Capability Reconnaissance of Resettlement Sites. NTEC, Vientiane. Cacot, P., March 2005. Activities aquacoles dans le cadre du programme de compensation prevue pour la project de barrage Nam Theun 2, CIRAD. CARE Report: (Chamberlain, James R., Charles Alton, Latsamay Silavong, and Bounleung Philavong) 1996. Socio-Economic and Cultural Survey: Nam Theun 2 Project Area. Parts 1 and 2. Vientiane, Lao PDR: CARE International. Centre for Water Research, 1997. Prediction of the water quality characteristics of the proposed Nakai Reservoir, Centre for Water Research / Sinclair Knight Mertz, Australia. Centre for Water Research, 2002. Review of Prediction of Nakai Reservoir Water Quality, Centre for Water Research / Sinclair Knight Mertz, Australia. Chamberlain, J. R. et al., July 1997. Cultural Diversity and Socio-Economic development in the Context of Conservation: Social Action Plan, 2nd Draft, Vientiane, Lao PDR. Charlwood, J., Paru, R. and Dagoro, H., 1984. Raised platforms reduce mosquito bites, Trans Roy Soc Trop Med Hyg, 78, 141-2. Chatterton, P., 1997. Project Completion Report – Training Participatory Rural Appraisal – Nam Theun 2 Electricity Consortium, Laos. Manidis Roberts International, NSW, Australia. Claridge G.F et al., 1996. Community fisheries in Lao PDR, A survey of Techniques and Issues, IUCN, Vientiane. Committee for Planning and Cooperation, 1995. Basic Statistics About the Socio-Economic Development in Lao PDR, 1975-1995, Vientiane, Lao PDR. Committee for Planning and Cooperation, National Statistical Centre, 1995. Expenditure and Consumption Survey and Social Indicator Survey 1992 - 1993, Vientiane, (LECS1). Committee for Planning and Cooperation, National Statistical Centre, December 1999. The Households of Lao PDR: Social and Economic Indicators. Lao Expenditure and Consumption Survey 1997/8, Vientiane, (LECS2). Committee for Planning and Cooperation; National Statistical Centre, March 2004. The Households of Lao PDR: Social and Economic Indicators. Lao Expenditure and Consumption Survey 2002/03, Vientiane, (LECS3). Committee for Planning and Cooperation; National Statistical Centre, 2002. Poverty in Lao PDR during the 1990's, Vientiane. Craig and Faust, 1970. Clinical Parasitology 8th Edition. de Silva, N. R., Brooker, S., Hotez, P. J., Montresor, A., Engels, D. and Savioli, L., 2003. Soil-transmitted helminth infections: updating the global picture, Trends Parasitol, 19, 547-51. Desjarlais, R., Eisenberg, L., Good, B. and Leinman, A., 1995. Dislocation in World Mental Health: Problems and priorities in low-income countries. Oxford University Press, New York, pp. 136-54.

March 2005 Nam Theun2 Project – Social Development Plan 1 Volume 1 – Appendix G: Bibliography

Doumenge, J. P., Mott, K. E., Cheung, C., Villenave, D., Chapuis, O., Perrin, M. F. and Reaud-Thomas, G., 1987. Atlas of the global distribution of schistosomiasis, Geneva. Earth Systems Lao, April 2004. Final Preliminary Project Lands Report (Nakai to XBF) of the Project Lands (Infrastructure) Baseline Study Part 1 of Phase 1: Main Text, and 3 Volumes of Photo GIS maps, Vientiane. Earth Systems Lao, June 2004. NT2 Physical Cultural Resource Survey. Downstream Channel Draft Report. Earth Systems Lao, September 2004. NT2 Physical Cultural Resource Survey. Nakai Plateau, Draft Report. Earth Systems Lao, September 2004. NT2 Physical Cultural Resource Survey. Transmission Lin, Xe Bangfai, Road, Lak Sao Road, Phou Phakho Quarry, Draft Report. Earth Systems Lao, December 2004. Project Lands Baseline Study Phase 2-A: Selected Project Lands (33, 34, 35 and 36) Working Draft Report, Vientiane. EGAT, October 1996. Pak Mun Environmental Impact Mitigation Completion Report, Bangkok. EGS International Inc. and WS Atkins Int., March 2001. Bujagali Project Hydropower facility. Resettlement and Community Development Action Plan. EGS International Inc. and WS Atkins Int. March 2001. Bujagali Project Hydropower facility. Resettlement Action Plan. Electricité de France. Nam Theun 2, Compte Rendu de la Mission Effectuée en Thailande et au Laos du 8 au 20 Octobre 1994. Grenoble, France (in French). Electricité de France, March 1995. Nam Theun 2 Process Design, Back-Up Documents. Hydro-Meteorological Data, Nam Theun Valley, Review No. 1. Electricité de France, September 1995. “Geological and Geotechnical Report, Damsite”, Vol. 1 Basic Design Report No. EFTGG/95078, Nam Theun 2 Hydroelectric Project, Lao P.D.R.. Electricité de France, March 1996. Technical Study of Alternative Project Concepts. Nam Theun 2 Hydroelectric Project, Environmental Assessment and Management Plan. Electricité de France, November 2000. Nam Theun 2 Hydroelectric Project. Concept Design - Project Description. Electricité du Laos, June 1997. Right of Way, Land Acquisition and Compensation Policy. ERM, November 1997. Public Involvement Guideline for Natural Resource Development Projects, UNDP and ESCAP. Ezzati, M., Lopez, A. D., Rodgers, A., Vander Hoorn, S., Murray, C. J. L. and Group, t. C. R. A. C., 2002. Selected major risk factors and global and regional burden of disease, Lancet, 360, 1347-60. Ezzati, M., Utzinger, J., Cairncross, S., Cohen, A. J. and Singer, B. H., 2004. Environmental exposure indicators in the developing world: review, conceptual framework, and examples. J Epidemiol Community Health, (submitted for publication). Flint, C.A., December 1996. Gross Margin Budgets and Crop Models for Field and Tree crops of the Boloven’s Plateau, Lao Upland Agricultural Development Project. Flint, C.A., September 1997. Final Report: Extension processes and methodologies for upland, forested areas of Laos, Lao- Swedish Forestry Project Phase 4. Flint, C.A., August 1998. Participatory Management for Conservation in Nam Phui and Phu Xanghe Protected Areas/NBCAs, IUCN/LSFP. Flint, C.A., October 1998. Agricultural Systems and Soils Component: Nam Ngum Watershed Management Planning Project, BCEOM for CPAWM, DoF/MAF, Vientiane, Lao PDR. Flint, C.A., February, 1999. A review of PRA methods and processes for the planning of Protected Area Co- management and ICAD in the proposed Dakrong Nature Reserve, QuangTri, Vietnam, PDI, Hanoi. Flint, C.A., June 1999. Evaluation Report: FIAT - Farmer Irrigated Agriculture Training Project UNDP, Vientiane, Lao PDR. Flint, C.A., December 1999. Integrating Development with Conservation - Dong Houa Sao Protected Area, BCP/IUCN Project, Champassak Provincial Forestry Office, Lao PDR. Foppes, J, Saypaseth, T, Sengkeo, K & Chantilat, S., September 1997. The Use of Non-Timber Forest Products on the Naki Plateau - Report on a short mission from 26/2 to 30/3 1997 prepared for NTEC, Thakhek, Khammouane (IUCN & Department of Forestry). FAO, 1990. Geology and Soils in Lao PDR, FAO publications. FAO, January 1996. A Policy and Programme Framework for Socio-Economic Development of the Central Region of Laos, Agricultural Component. FAO Regional Office for Asia and the Pacific.

March 2005 Nam Theun2 Project – Social Development Plan 2 Volume 1 – Appendix G: Bibliography

Franklin, B., September 1997. A review of local public consultations for the Nam Theun 2 Hydroelectric Project, Vientiane. Gamage-Mendis, A., Carter, R., Mendis, C., De Zoysa, A., Herath, P. and Mendis, K., 1991. Clustering of malaria infections within an endemic population: risk of malaria associated with the type of housing construction, Am. J. Trop. Med. Hyg., 45, 77-85.Geological Survey of Vietnam. “Geology of Cambodia, Laos and Vietnam”, Scale 1:1,000,000, Hanoi. Ghebreyesus, T., Haile, M., Witten, K., Getachew, A., Yohannes, M., Lindsay, S. and Byass, P., 2000. Household risk factors for malaria among children in the Ethiopian highlands, Trans. R. Soc. Trop. Med. Hyg., 94, 17-21. Gilbos, V., October 2004. Identification of traditional Health practices and medicines: Phase 1 (for the NT2 Project), Vientiane. Gilles, H.M. and Warrell, D.A., 1993. Bruce-Chwatt’s Essential Malariology 3rd Edition, Edward Arnold, London. GoL, 1994. Socio-Economic Development Strategies. GoL, 1995. Basic Statistics on Socio-Economic Development in Lao PDR 1975-1995, Vientiane. GoL, 1996. Fertility and Birth Spacing Survey; National Statistical Centre, Vientiane. GoL, February 1997. Lao PDR. NT2 Hydropower Project – Nation Participation Workshop on NTEC Commissioned Studies held at NT2 Public Information Centre; STENO; Vientiane. GoL, May 2000. Operation Plan for the Environmental and Social Management of the Nakai-Nam Theun 2 Watershed and NBCA. GoL, 2001. Regulations on Implementing the Environmental Assessment for Electricity Producing Projects in Lao PDR, Ministry of Industry and Handicrafts. GoL/MAF, January 2001. Soil Survey of NT2 Resettlement Area No. 16 – Results and Analysis. GoL, Ministry of Public Health, National Institute of Hygiene and Epidemiology, September 1996. Annual Progress Report, 1995-1996 (of the National Water Supply and Environmental Health Programme), Vientiane. GoL/WHO/European Union, 1996. Malaria and Its Control in the Lao People’s Democratic Republic; paper read at Joint European Union and WHO Meeting, Brussels, Belgium 13-14 March 1996. Goldsmith, E. and N. Hildyard, 1991. The Social and Environmental Effects of Large Dams. Wadebridge, Cornwall: Camelford Ecological Centre. Gondoin, B., March 1996. Water Use Investigation on the Nam Theun River, a Trip along the Nam Theun River. NT2 Project. Goodland, R., 1982. Tribal People and Economic Development. Washington, DC: The World Bank. Goodland, R., 1996. Lao PDR: Nam Theun 2 Hydro Project: The Status of the Environmental Assessment Process (as of September 1996), World Bank. Goodland, R., 1996. “The Big Dams Debate”, The Environmental Sustainability Challenge for Dam Engineers. Boston Society of Civil Engineers, Cambridge, Mass. Gunawardena, D., Wickremasinghe, A., Muthuwatta, L., Weerasingha, S., Rajakaruna, J., Senenayaka, T., Kotta, P., Attanayake, N., Carter, R. and Mendis, K., 1998. Malaria risk factors in an endemic region of Sri Lanka and the impact and cost implications of risk-factor based interventions, American Journal of tropical Medicine and Hygiene, 58, 533-42. Hadis, M., Lulu, M., Makonnen, Y. and Asfaw, T., 1997. Host choice by indoor-resting Anopheles arabiensis in Ethiopia, Trans Roy Soc Trop Med Hyg, 91, 376-8. Hardin, G., 1968. The Tragedy of the Commons, Science, 162: 1243-1248. Hartmann, W.D. and Campelo, C.M.F., 1998. Reluctant enforcers: Rules and conflicts in the co-management of Brazilian reservoir fisheries. In: Reservoir fisheries co-management experiences away from home: a review, in Sollows and Hartmann 2001; Proceedings of the 4th Technical Symposium on Mekong Fisheries; Phnom Penh. Horne, P.M. and Stur, W.W., 2003 Developing agricultural solutions with smallholder farmers - how to get started with participatory approaches, ACIAR Monograph 99. Hunter, J. M., Rey, L., Chu, K. Y., Adekolu-John, E. O. and Mott, K. E., 1993. Parasitic diseases in water resources development: the need for intersectoral negotiation, World Health Organization, Geneva. Hydropower Engineering Consultants, 1997. Survey Report of Social Impact on the Downstream Waterway from regulating Pond to Xe Bang Fai. Hydropower Engineering Consultants, Lao PDR.

March 2005 Nam Theun2 Project – Social Development Plan 3 Volume 1 – Appendix G: Bibliography

Institut de la Francophonie pour la Medecine Tropicale, WHO and Japan International Cooperation Agency (JICA), 2003. Diagnosis and Treatment in District Hospitals, Ministry of Health, Lao P.D.R., Vientiane, Lao P.D.R. International Advisory Group, August 1997. World Bank’s Handling of Social and Environmental Issues in the Proposed Nam Theun 2 Hydropower Project in Lao PDR – Report No. 1. International Advisory Group, December 1998. World Bank’s Handling of Social and Environmental Issues in the Proposed Nam Theun 2 Hydropower Project in Lao PDR – Report No. 2. International Advisory Group, March 2001. World Bank’s Handling of Social and Environmental Issues in the Proposed Nam Theun 2 Hydropower Project in Lao PDR – Report No. 3. Interim Committee for Coordination of Investigations of the Lower Mekong River Basin, November 1984. “Development and Management of Fisheries in Nam Ngum Reservoir, Lao PDR”, MKG/112. Irrigation Technical Team, Feb, 1996. “The Investigation of the Impact of 200 cumec on the Xe Bang Fai in the Vicinity of Nam Phit, Mahaxai and Nearby”, Vientiane. IUCN, 1998. Nakai-Nam Theun Conservation Project – Phase 2, Progress Reports No. 2-4. IUCN, May 1998. Environmental and Social Management Plan for the Nakai-Nam Theun Catchment and Corridor Areas (Revised). IUCN, Vientiane. IUCN, October 1999. Nakai-Nam Theun Conservation Project – Phase 2, Community Development and Biodiverstiy Conservation – Pilot Field Activities – Final Report. IUCN, September 2000. Nam Theun Social and Environmental Project Year 2000 Activities. IUCN and World Bank, April 1997. Large Dams – Learning from the Past, Looking at the Future, Slaud, Switzerland. J.A. Rozendaal, 1989. Impregnated Mosquito Nets and Curtains for Self-Protection and Vector Control; Special Report, Tropical Diseases Bulletin vol. 86 No 7. Japan International Cooperation Agency (JICA) and Ministry of Health, 2002. Study on the improvement of health and medical services in the Lao People's Democratic Republic: Lao Health Master Planning: Final Report. Jobin, W., 2003. Health and equity impacts of a large oil project in Africa, Bull World Health Organ, 81, 420-6. Jones, S., 1999. Almost like a whale, the origin of species updated, Anchor Books, Transworld Publishers, Random House, London. Keen, F.G.B., 1978. “Ecological Relationships in a Hmong (Meo) Economy.” 210-221 In Farmers in the forest - economic development and marginal agriculture in northern Thailand. East-West Center Books, Univ. Hawaii Press, Honolulu,. Kemm, J., 2003. Perspectives on health impact assessment, Bull World Health Organ, 81, 387. Khammouane Provincial Health Department, Technical Bureau, 2001. Report on Health Check-up of Populations living in Ban Nong Bua, Sailom, Pamanton, Nam Theun 2 Project Area; 26 February – 2 March,2001. Kobayashi, J., Phompida, S., Toma, T., Looareensuwan, S., Toma, H. and Miyagi, I., 2004. The effectiveness of impregnated bed net in malaria control in Laos, Acta Trop, 89, 299-308. Kobayashi, J., Somboon, P., Keomanila, H., Inthavongsa, S., Nambanya, S., Inthakone, S., Sato, Y. and Miyagi, I., 2000. Malaria prevalence and a brief entomological survey in a village surrounded by rice fields in , Lao PDR, Trop Med Int Health, 5, 17-21. Kolstrup, N., 1980. Studies on the transmission and control of Wuchereria bancrofti in North east Tanzania, Univ of London, London. Kottelat, M., 1996. Potential Impact of the Nam Theun 2 Hydropower Project on the Fish and Aquatic Fauna of the Nam Theun and Xe Bang Fai Basins. Lao PDR. Cornol, Switzerland. Kottelat, M., 1997. Distribution of fishes previously considered endemic to the Nam Theun and Xe Bangfai basins, Lao PDR. Kottelat, M., 2001. Fishes of Laos, World Bank/IUCN/WWF. Kottelat, M., 2002. Distribution and status of the fishes previously considered endemic to the Nam Theun basins, Lao PDR. Krieger, G. R., Magnus, M. and Hassig, S. E., 2004. HIV/AIDS prevention programs: methodology and insights from the dynamic modelling literature., Clin Occupat Environ Med, (in press).

March 2005 Nam Theun2 Project – Social Development Plan 4 Volume 1 – Appendix G: Bibliography

Krieger, N., Northridge, M., Gruskin, S., Quinn, M., Kriebel, D., Davey Smith, G., Bassett, M., Rehkopf, D. H., Miller, C. and group, t. H. p. a. p. c., 2003. Assessing health impact assessment: multidisciplinary and international perspectives, J Epidemiol Community Health, 57, 659-62. Kuznetsov, J.J., 1991. “Geological Map of the Lao PDR”, Scale 1:500,000, Moscow. Lahmeyer International and Hydrotecnica Portuguesa, 1994. “Hydropower Development Plan for the Lao PDR”, Inception Report to Commission of the European Communities. Lao-IRRI, 1996. Lao PDR National Rice Research Program and Lao-IRRI Project, 1996 Wet Season Research Program, In-Brief. Vientiane, Lao PDR.: Lao-IRRI Project. Lengeler, C., 2000. Insecticide-treated bednets and curtails for preventing malaria, Cochrane Database Systematic Reviews, CD000363. Lindsay, S. W., Jawara, M., Paine, K., Pinder, M., Walraven, G. E. L. and Emerson, P. M., 2003. Changes in house design reduce exposure to malaria mosquitoes, Trop Med Int Health, 8, 512-17. Lindsay, S. W. and Snow, R. W., 1988. The trouble with eaves; house entry by vectors of malaria, Trans R Soc Trop Med Hyg, 82, 645-6. Listorti, J. A. and Doumani, F. M., 2001. Environmental health: bridging the gaps, World Bank Discussion Paper No. 422, World Bank, Washington, D.C. Lock, K., 2000. Health impact assessment, BMJ, 320, 1395-8. Lohachit, C., April 1996. Snail Mediated Diseases of Nam Theun 2 Project. Lumsden, D., 1993. Dams, Displacement and mindful distress, International Mental and Behavioral Health Project, Center for the Study of Culture and Medicine, Harvard Medical School, Boston. Lohachit, C & TEAM, April 1996. Freshwater Snails in the Nam Theun 2 Project Area of Kammouane and Bolikhamxai Provinces, Lao PDR. MAF, November 2001. Forest Inventory and Preliminary Harvesting and Management Considerations. Nam Theun 2 Resettlement Tract, Nakai District & Gnommalat District, Khammouane Province, Forest Inventory and Planning Center. Margules Groome Pöyry, 1996. Nam Theun 2 Hydropower Project: Forestry Report. Manuka, Australia: MGP Ltd. Margules Pöyry, June 1997. Forest Resources and Management Options in the Nakai Plateau Resettlement Area (Volume B), Vientiane. Margules Pöyry, June 1997. Location and land suitability of Nakai Plateau Resettlement Sites (Volume A), Vientiane. Mattson. N. et al., 2001, Changes in fish yield and catch composition at the Nam Ngum Reservoir, Lao PDR, MCR/ACIAR Proc. # 98. Mayxay, M., Newton, P. M., Khanthavong, M., Tiengkham, P., Phetsouvanh, R., Phompida, S., Brockman, A. and White, N. J., 2003. Chloroquine versus sulfadoxine-pyrimethamine for treatment of Plasmodium falciparum malaria in province, Lao People's Democratic Republic: an assessment of national antimalarial recommendations., Clin Infect Dis, 37, 1021-28. McCully, Patrick, 1996. Silenced Rivers: The Ecology and Politics of Large Dams. London, UK: Zed Publishing. McCully, Patrick et al., July 1997. “Letter to Jan Piercy, Executive Director, World Bank”. Center for International Environmental Law, Environmental Defense Fund, Friends of the Earth, International Rivers Network and National Wildlife Federation. Mercier, J.-R., 2003. Health impact assessment in international development assistance: the World Bank experience, Bull World Health Organ, 81, 461-2. Ministry of Health, 2001. Report of national health survey: health status of the people in Lao P.D.R., Ministry of Health, Vientiane. Ministry of Health, 2004. Health service improvement project: draft baseline survey report, PCU, Vientiane. Morgan, R. K., 2003. Health impact assessment: the wider context, Bull World Health Organ, 81, 390. Nilsson, H. et al., 2001. Fisheries co-management in two large reservoirs – problems and challenges, MCR/ACIAR Proc. # 98. Norplan A.S., November 1995. Impact Studies for the Theun-Hinboun Hydropower Project, Laos. Draft Final Report. Norplan A.S., April 1997. Water Management Plan for the Nam Theun/Nam Hinboun, Lao PDR. Final Report, Ministry of Industry and Handicrafts Hydropower Office, Vientiane.

March 2005 Nam Theun2 Project – Social Development Plan 5 Volume 1 – Appendix G: Bibliography

NTEC, 1996. “Nam Theun 2 Hydroelectric Project”, Value Engineering Turnkey Revises, Chambery Working Session. 26-30 August, 1996. NTEC, 1996. Nam Theun 2 Hydroelectric Project Environmental Assessment and Management Plan, Part 2: Natural Resources and Project Implementations. (Revision December 1995). Vientiane, Lao PDR, 1996. NTEC, April 1997. Nam Theun 2 Hydropower Project Public Consultation Participation Process on Downstream Channel & Transmission Lines in Gnommalat District. NTEC, April 1997. Village Consultation & Participation on Downstream Channel Issues and Transmission Line Corridor of NT2 Project. NTEC, May 1997. “Nam Theun 2 Hydroelectric Project Resettlement Action Plan (Draft). Vientiane. NTEC, July 1997. Xe Bang Fai Socio-Economic Survey. NTEC, August 1997. “Nam Theun 2, IRN-sponsored Report; Review Commentary by NTEC”. Vientiane. NTEC, September 1997. Survey of Villages along Xe Bang Fai for Rice Production, Rice Losses, and 1996-97 Flood Levels. NTEC, January 1998. Report on Monitoring and Action Planning Pilot Village Resettlement Support Activities on Nakay Plateau. NTEC, July 1998. Nam Theun 2 Hydroelectric Project Resettlement Action Plan. NTEC, January 1999. Nam Theun 2 Resettlement Action Plan/National Public Consultation and Participation Workshop, Vientiane, Lao PDR. NTEC, August 1999. Results of the October 1998 Census/Registration and Socio-Economic Survey on the Nakai Plateau. NTEC, October 1999. Nam Theun 2 Hydroelectric Project Resettlement Action Plan Activities Report, July 1998 to October 1999 Vientiane. NTEC, October 1999. Resettlement Action Plan Activities Report – July 1998 to October 1999. NTEC, October 2001. Social and Environmental Assessment, NT2 Project Executive Review. NTEC, September 2002. “Nam Theun 2 Hydroelectric Project Social Development Plan Volumes 1, 2 and 3. Vientiane. NTEC, September 2002. Preliminary Reservoir Fisheries Management Plan. Draft. NTEC, December 2002. A Report on the Xe Bangfai Socio-Economic, Health and Fisheries Survey, 2001. NTPC, November 2003. Report on Results from Theun Duane and Nakai Neua. (Lao Language). NTEC, December 2003. “Nam Theun 2 Hydroelectric Project Social Development Plan Volumes 1, 2 and 3. Vientiane. NTPC, August 2004. Report on Results of Consultations with Nakai Plateau Villagers (Nakai and Khamkerd Districts), Vientiane NTPC, October 2004. Report on Public Consultations with Villagers along the Xe Bangfai river, Mahaxai District, Vientiane. NTPC, October 2004. Report on Public Consultations with Villagers along the Xe Bangfai river, Nongbok District, Vientiane. NTPC, October 2004. Report on Public Consultations with Villagers along the Xe Bangfai river, Xaybouly District, Vientiane. NTPC, October 2004. Report on Public Consultations with Villagers along the Xe Bangfai river, Xe Bangfai District, Vientiane. NTPC, November 2004. Nam Theun 2 Hydropower Project Social Development Plan, Appraisal Draft, in 4 Volumes, Vientiane. Paphassarang, C. et al., February 1995. The Lao National Drug Policy: Lessons along the journey. The Lancet Vol. 345, pp 433-435. Parry, J. and Stevens, A., 2001. Prospective health impact assessment: pitfalls, problems, and possible ways forward, BMJ, 323, 1177-82. Phanlivay, K. and G.A. Oughton., 1996. FAO/Netherlands Project for Tropical Forest Conservation and Management in Bolikamsay and Kammouane Provinces of Central Lao PDR. Vientiane, Lao PDR: Ministry of Agriculture and Forestry, Centre for Protected Areas Management. Peters, W. and Gilles, H.M, 1997. A Color Atlas of Tropical Medicine and Parasitology; Wolfe Medical Atlases - 17. Phimphachanh, C., Philavong, B., Sayabounthavong, K., Bennett, T., Phothong, A. and Gallway, J., 2000. HIV/AIDS/STD technical assessment on Lao People's Democratic Republic August 10-23, 1999 In IInd Lao-Vietnam Symposium on Health Research to Promote the Quality of Preventive and Curative Medicine. Abstracts & Reports (Eds, MOH and WHO) Ministry of Health, National Committee for the Control of AIDS Bureau, Vientiane 10-11 January 2000, pp. 57-62.

March 2005 Nam Theun2 Project – Social Development Plan 6 Volume 1 – Appendix G: Bibliography

Pholsena, K., Hongvangthong, B., Vanisaveth, V. and Promkutkao, C., 1997. The health status of resident populations in the Nam Theun 2 project area, Khammouane Province, Lao PDR, Institute of Malariology, Parasitology and Entomology, Vientiane. PICO, February 2001. Irrigation Weir and Irrigated Agriculture Potential in Resettlement Area No. 16. Pierce, D., 1997. Report of the Reconnaissance Trip Down the Nam Kathang/Nam Gnom River, 15th-21st January 1997. Thakhek, Lao PDR, NTEC. Pierrehumbert, C., November 2000. Estimation of Probably Maximum Preciptitaion – NT Catchment, Lao PDR. Pillai, D. R., Labbé, A.-C., Vanisaveth, V., Hongvangthong, B., Pomphida, S., Inkathone, S., Zhong, K. and Kain, K. C., 2001. Plasmodium falciparum malaria in Laos: chloroquine treatment outcome and predictive value of molecular markers., J Infect Dis, 183, 789-95. POE (Panel of Experts), February 1997. Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. POE (Panel of Experts), July 1997. Second Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. POE (Panel of Experts), January 1998. Third Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. POE (Panel of Experts), January 1999. Fourth Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. POE (Panel of Experts), January 2001. Fifth Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. POE (Panel of Experts), March 2003. Sixth Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. POE (Panel of Experts), March 2004. Seventh Report of the International Environmental and Social Panel of Experts. Ministry of Industry and Handicraft, Vientiane, Lao PDR. Project Development Group, July 1995. “Nam Theun 2 Hydroelectric Project Environmental Assessment and Management Plan - Appendices”, Second Draft. Prosser, J.R., 1997. Estimation of Residual Biomass and Its Distribution in the Nam Theun 2 Reservoir. Vientiane, Lao PDR: NTEC. Ried, R.L ed., 1990. The Manual of Australian Agriculture, Brisbane. Rim, H. J., Chai, J. Y., Min, D. Y., Cho, S. Y., Eom, K. S., Hong, S. J., Sohn, W. M., Yong, T. S., Deodato, G., Strandgaard, H., Phommasack, B., Yun, C. H. and Hoang, E. H., 2003. Prevalence of intestinal parasite infections on a national scale among primary schoolchildren in Laos, Parasitol Res, 91, 267-72. Sornmani S., 1994, Neotricula SPP and Surveys in the Vicinity of the Reservoir of the Sirindhorn Dam, Ubol Ratchathani Province, Thailand, Mahidol University, Thailand. English Synopsis pp 75-95. Sayer, J., 1998. Shifting Cultivation in Laos. Gland, Switzerland: IUCN Technical Report. Schouten R., 1998. Effects of dams on downstream fisheries, case of Nam Ngum Reservoir. Catch and Culture – Mekong Fisheries Network Newsletter, MRC, Vol. 5 No.2. Schouten, R., May 1998. Fisheries Report for Nam Ngum Watershed Management Project, SEATEC for ADB, Vientiane. Schouten, R. Visounnarath,V. Souvannalth, B. Volakummane, K., September 2004. Evaluation of Environmental and Social Impacts by Theun Hinboun Hydropower Plant on Aquatic Life and Fisheries, Theun-Hinboun Power Company Limited. Scott-Samuel, A., 1998. Health impact assessment--theory into practice, J Epidemiol Community Health, 52, 704-5. Scott-Samuel, A., Birley, M. and Ardern, K., 2001. The Merseyside guidelines for health impact assessment, International Health Impact Assessment Consortium, Liverpool. Scudder, T. and Colson, E., 1982. “From Welfare to Development: A Conceptual Framework for the Analysis of Dislocated People” in Involuntary Migration and Resettlement: The Problems and Responses of Dislocated People. Westview Press, Boulder, Colo. Seatec International, February 2001. Nam Theun 2 Hydroelectric Project Environmental Assessment and Management Plan – Main Report (DRAFT). Seatec International, February 2001. Nam Theun 2 Hydroelectric Project Environmental Assessment and Management Plan – Annexes (DRAFT).

March 2005 Nam Theun2 Project – Social Development Plan 7 Volume 1 – Appendix G: Bibliography

Seatec International, April 2001. Nam Theun 2 Hydroelectric Project Environmental Assessment and Management Plan – Annexes (DRAFT). Seidensticker, J., 1984. Managing Elephant Depredation in Agricultural and Forestry Projects. Washington D.C. World Bank. Shoemaker, B., April 1998. Trouble on the Theun-Hinboun, A field report on the socio-economic and environmental effects of the Nam Theun-Hinboun Hydropower Project in Laos. Shoemaker, B., Baird, I. and Baird, M., November 2001. The People and their River – A Survey of River Based Livelihoods in the Xe Bang Fai River Basin in Central Lao PDR. Singhasivanon, P., 1999. Mekong malaria: malaria, multi-drug resistance and economic development in the greater Mekong subregion of Southeast Asia, Southeast Asian J Trop Med Public Health, 30, 1-101. SMEC, 1991. Nam Theun 2 Hydroelectric Project Feasibility Study - Environment Assessment. SMEC, September 1991. Nam Theun 2 Hydroelectric Feasibility Study, Hydrological Report. Vol 5. SMEC, March 1994. Nam Theun 2 Hydropower Project Hydrology Review - Preliminary Draft. SMEC, May 1994. Nam Theun 2 Process Design, Back-Up Documents. Hydro-Meteorological Data, Nam Theun Valley, Review No. 1. SMEC, March 1995. Nam Theun 2 Process Design, Back-Up Documents. Hydro-Meteorological Data, Nam Theun Valley, Review No 1. SMEC, November 1996. Nam Theun 2 Hydropower Project, Xe Bang Fai Hydrology Assessment. Draft Report 1. SMEC, October 2002. Impact of Releases from Nam Theun 2 Power Station on the Xe Bangfai River. Final Report, Cooma, Australia. SMEC, November 2002. Nam Theun 2 Hydropower Project. Review of the Nam Theun 2 Reservoir Sedimentation, Cooma, Australia. SMEC, September 2004. Hydrological Study of Lower Xe Bangfai. Volume 1: Final Report, Volume 2: Data, Cooma, Australia. SMEC, August 2001. Review of EDF Report "Impact of Changes to Reservoir and Regulating Dam based on new FSL, Cooma, Australia. Soil Survey Staff, 1993. Soil Survey Manual. USDA-SCS Agric. Handbk. 18. US. Government Printing Office, Washington, D.C. Sollows, J.D. and Hartmann, W.D., 2002. Reservoir fisheries co-management experiences away from home: a review. Proceedings of the 4th Technical Symposium on Mekong Fisheries; Phnom Penh. Soukaloun, D., Kounnavong, S., Pengdy, B., Boupha, B., Durondej, S., Olness, K., Newton, P. N. and White, N. J., 2003. Dietary and socio-economic factors associated with beriberi in breastfed Lao infants, Ann Trop Paediatr, 23, 181-6. Sparkes, S., July 1997. Observations Relating to Resettlement of People on the Nakai Plateau, Vientiane Sparkes, S., July 1998. Public Consultation and Participation on the Nakai Plateau. Sparkes, S., July 1998. Public Consultation, Participation on the Nakai Plateau (Forms & Photos #1). State Planning Committee, National Statistical Centre, March 2001. Lao Reproductive Health Survey - 2000. Steidel, M.W., 1996. Reconnaissance Mission for Irrigation Capability Assessment. Vientiane Lao PDR,: NTEC, Internal document. STENO and Project Development Group., December 1995. “Nam Theun 2 Hydroelectric Project Environmental Assessment and Management Plan - Appendices”. Revision. Storey, J., March, 1997. Survey for Malaria, Anopheles Mosquitoes & Aquatic Snails in Selected Villages of NT2 Project Area, Khammouane Province, Lao PDR. STS Consultants, May 2001. Assessment of Irrigation Potential in Resettlement Area No. 16. Stur, W.W. and Horne, P.M., 2001. Developing forage technologies with smallholder farmers - how to grow, manage and use forages ACIAR Monograph No. 88. 96 pp. Subramanian, S., Manoharan, A., Sahu, S., Jambulingam, P., Govardhini, P., Mohapatra, S. and Das, P., 1991. Living conditions and occurrence of malaria in a rural community, Indian J Malariol, 28, 29-37. Sukumar, R., 1992. The Asian Elephant - Ecology and Management. Cambridge, UK.: Cambridge Univ. Press.

March 2005 Nam Theun2 Project – Social Development Plan 8 Volume 1 – Appendix G: Bibliography

TERRA. Pak Mun – The lessons are clear, but is anyone listening?, Watershed Vol 1, No.3, Thailand. Thomas, J.W. (Ed.), 1979. Wildlife Habitats in Managed Forests - the Blue Mountains of Oregon and Washington. USDA - Forest Service, Agricultural. Handbook No. 553. U.S. Govt. Printing Office, Washington D.C. Thompson, R., Begtrup, K., Cuamba, N., Dgedge, M., Mendis, C., Gamage-Medis, A., Enosse, S., Barreto, J., Sinden, R. and Hogh, B., 1997. The Matola Malaria Project: a temporal and spatial study of malaria transmission and disease in a suburban area of Maputo, Mozambique, Am J Trop Med Hyg, 57, 550-9. TKC, 1997. Environmental Assessment for Construction Phase Activities, Information prepared by Turnkey Contractor. Trape, J.-F., Lefebvre-Zante, E., Legros, F., Ndiaye, G., Bouganali, H., Druilhe, P. and Salem, G., 1992. Vector density gradients and the epidemiology of urban malaria in Dakar, Senegal, Am J Trop Med Hyg, 47, 181- 9. Trung, H. D., Van Bortel, W., Sochantha, T., Keokenchanh, K., Quang, N. T., Cong, L. D. and Cooseemans, M., 2004. Malaria transmission and major malaria vectors in different geographical areas of Southeast Asia, Trop Med Int Health, 9, 230-37. UNDP, 1993. Shifting Cultivation Systems and Rural Development in the Lao PDR, Report of the Nabong Technical Meeting, July 14-16, 1993, UNDP Lao PDR. UNDP, 1997. Resettlement and Social Characteristics of New Villages – Basic Needs for Resettled Communities in the Lao PDR, Vientiane (Volumes 1 and 2). University of Western Australia-Centre for Water Research, 1996. Prediction of the Water Quality Characteristics of the Proposed Nam Theun Reservoir System. Nedlands, Australia. Urbani, C., Sinoun, M., Socheat, D., Pholsena, K., Strandgaard, H., Odermatt, P. and Hatz, C., 2002. Epidemiology and control of mekongi schistosomiasis, Acta Trop, 82, 157-68. US Army Corps of Engineers, 1970. “Probable Maximum Precipitation, Mekong River Basin”, Hydrometeorological Report No. 46. Utzinger, J., Tozan, Y., Doumani, F. and Singer, B. H., 2002. The economic payoffs of integrated malaria control in the Zambian copperbelt between 1930 and 1950, Trop Med Int Health, 7, 657-77. Utzinger, J., Wyss, K., Moto, D. D., N'Diekhor, Y., Tanner, M. and Singer, B. H., 2004. Assessing health impacts of the Chad-Cameroon petroleum development and pipeline project: challenges and a way forward, Environ Impact Assess Rev (in press). Van Zoggel, 1996. Suggestion and recommendations from a practical point of view, collected from field situations in Thailand and Cambodia on: Resettlement and Relocation of village. Vientiane. Von Uexkull, 1984. “Managing Acrisols in the Humid Tropics.” In Management of Problems Soils in Asia. Food and Fertilizer Technology Center, Bulletin Series No. 27. Warren, T., October 2001. The NT2 Pre-Impoundment Baseline Study of the Fishery Resources of the Lower Xe Bang Fai – Inception Report. Warren, T., August 2002. Xe Bang Fai Fishing Technologies Report - Final Report Warren, T., October 2003. The NT2 pre-impoundment baseline study of the fishery resources of the lower Xe Bang Fai, Annual Report 1 (covering period from October 2001 to November 2002). Warren, T., April 2004. The NT2 pre-impoundment baseline study of the fishery resources of the lower Xe Bang Fai, Annual Report 2 (covering period from December 2002 to December 2003). Warren, T., January 2005. The NT2 pre-impoundment baseline study of the fishery resources of the lower Xe Bang Fai, Annual Report 3 (covering period from January 2004 to December 2004). Water Resources Consultant Services. Groundwater in Resettlement Areas of Nakai Plateau. WHO, 2000. Human health and dams, WHO/SDE/WSH/00.01, World Health Organization, Geneva. WHO, 2001. Health impact assessment: harmonization, mainstreaming and capacity building, WHO/SDE/WSH/01.07, World Health Organization, Geneva. WHO, 2002. The global plan to stop tuberculosis, WHO, Geneva. WHO, 2003a. Draft third edition of the WHO guidelines for drinking water quality, World Health Organization, Geneva. WHO, 2003b. The world health report 2003: shaping the future, World Health Organization, Geneva. World Bank, 1995. Lao PDR Agricultural Sector Memorandum – An Agricultural Sector Strategy.

March 2005 Nam Theun2 Project – Social Development Plan 9 Volume 1 – Appendix G: Bibliography

World Bank, 1996. Aide Memoire Nam Theun Social and Environmental Project, World Bank Identification Mission, November 11-25, 1996. World Bank, 1996 Background Note on Construction Management, Nam Theun Social and Environmental Project (NTSEP), World Bank Identification Mission, November 11-25, 1996. World Bank, 1996. Background Note on Public Health, Nam Theun Social And Environmental Project (NTSEP), World Bank Identification Mission, November 11-25, 1996. World Bank, 1996. Background Paper: Environmental Aspects, Nam Theun Social and Environmental Project (NTSEP), World Bank Identification Mission, November 11-25, 1996. World Bank, 1996. Background Paper on Resettlement, Lao P.D.R Social Environmental Project, World Bank Identification Mission, November 11-25, 1996. World Bank, 1997. Aide Memoire Nam Theun Social and Environmental Project, World Bank Preparation Mission, February 3-18, 1997. World Bank, 1997. Background Note on Downstream Environmental Impacts (Draft for discussion) Nam Theun Social and Environmental Project, World Bank Preparation Mission, February 3-18, 1997. World Bank, 1997. Creating a Watershed Management Institution for NT2 : First Steps Nam Theun Social and Environmental Project, World Bank Preparation Mission, February 3-18, 1997. World Bank, 1997. ‘Establishing the NT2 Watershed Conservation Institution : First Steps’ [briefing document for round table discussion] Nam Theun Social and Environmental Project, World Bank Preparation Mission, February 3-18, 1997. World Bank, 1997. Livelihood Package Assessment, Nam Theun Social and Environmental Project, World Bank Preparation Mission, February 3-18, 1997. World Bank, 2000. Logging Survey Mission – Technical Report, 1-12 May, 2000. World Bank/Sida/Government of Finland, June 2001. Lao PDR Production Forestry Policy – Status and Issues for Dialogue, Volumes 1 & 2 (Main Report and Annexes). World Commission on Dams, 2000. Dams and development: a new framework for decision-making. The report of the World Commission on Dams, Earthscan Publications, London. World Health Organization, 1990. Manila; Country Health Information Profile. Revision. World Health Organization, 1992. Lymphatic Filariasis: The Disease and Its Control; World Health Organization Technical Report Series Number 821, Geneva. World Health Organization, 1995. Guidelines for Dengue Surveillance and Mosquito Control; Western Pacific Education in Action Series No 8, WHO Manila.

March 2005 Nam Theun2 Project – Social Development Plan 10