List of Work Order Between 01-01-2016 to 31-12-2016

Total Page:16

File Type:pdf, Size:1020Kb

List of Work Order Between 01-01-2016 to 31-12-2016 List of Work Order between 01-01-2016 to 31-12-2016 Work Order No Date Re Name of the Work: Contractor Work Order Value VECC/ATG/CMS/W-29/2015-16/1 01-01-2016 CONSTRUCTION OF TEMPORARY SHED AT M/S SC GHOSH & CO., AE-489, SALT 47,99,250 RAJARHAT CAMPUS OF VECC LAKE CITY, KOLKATA - 64 VECC/ATG/2015-16/C-108/2 07-01-2016 MATERIAL SUPPLY AND FABRICATION OF TWO M./S DAS ELECTOMEC, SULANGURI, PO- 45,300 NOS. OF TRANSFORMER ENCLOSURES FEED GHUNI, NEW TOWN, KOLKATA - 700 157 THROUGH HOUSING AND MATERIAL SHIFTING VECC/MEG/WORKSHOP/2015/189/333/KM/3 08-01-2016 RENOVATION OF WIRE CUT EDM ROOM AND VECC M/S DEVOCON PROPERTIES, SHYAMNANGAR, 8,92,300 VECC/ATG/ESD/ES/WS/2015-16/C-110/PJ/4 08-01-2016 WORK ORDER FOR PROVIDING CABLE TV TO 40 M/S MAHESWARI SKYWAVE NETWORK, AG26 1,03,728 NOS. OF TV SALT LAKE CITY, KOLKTA - 91 VECC/ATG/ESD/ES/WS/2015-16/C-111/PJ/5 08-01-2016 WORK ORDER FOR PROVIDING CABLE TV TO 40 M/S IBIJI PRIVATE LTD., 3, C AVENUE, 93,958 NOS. OF TV KOLKATA VECC/CPIESG/AC/PETTY WORKS/WO//6 08-01-2016 AMC 2016 FOR 4 NOS CASSETTE TYPE AC M/S VOLAS LTD., CAB DIVISION 27,480 UNITS KOLKATA VECC/CPIESG/AC/PETTY WORKS/WO//7 08-01-2016 AMC 2016 FOR 2 NOS M/S VOLAS LTD., CAB DIVISION 33,863 KOLKATA VECC/RIB/DS39/15/364//8 08-01-2016 FALSE CELLING AND WASS CLANDDING IN ROOM M/S TIRUPATI ENTERPRISE, RECKJOANI 3,19,000 NUMBER 26 & 27 GHOSH PARA, RAJARHAT KOLKATA - 700 135 VECC/CIG/2015/FW2/WO/01/9 11-01-2016 WORK ORDER FOR RENEWAL OF THE LICENSE OF M/S SURESTEP VENTURES PRIVATE LTD., 3,35,485 THE CHECKPOINT FIRWALL SUKANTA NAGAR, KOLKATA 98 VECC/APG/PYN/WO/10 19-01-2016 PROVIDING MISCELLANEOUS SUPPORT M/S ORION ENGINEERING SERVICES, F3, 14,02,800 ECRISF............ PURBACHAL, KOLKATA VECC/WS/T/MEG//11 21-01-2016 AMC FOR COORDINATE MEASURING MACHINE M/S AC & INST. PVTL LTD., 67, HIE, 2,00,000 MAHARASHTRA VECC/ATG/CMS/W-30/2015-16/12 22-01-2016 PROVIDING AND FIXING UPVC PIPE LINE FOR M/S DEVCON PROPERTIES, 363/1, B. 1,88,185 WATER SUPPLY TO UNDER GROUND ROAD, SHYAMNAGAR, VECC/WS/T-1616/15-16/C-112/PD/13 25-01-2016 PREPARING ENGINEERING DRAWAING FOR M/S RAINBOW ENTERPRISE, 34/A, B 1,23,840 PENNNING ION TRAP PROJECT MITRA LANE, HOOGHLY VECC/ATG/ESD/CMS/W-31/2015-16/14 25-01-2016 OPENING AND RE-FIXING OF CRATESFOR M/S R. SAHA, BA/1, CHIRANTANI PARK, 36,600 MEDICAL CYCLOTRON PROJECT STACKED AT PRAFULLA KANAN, KOLKATA BIDHAN NAGAR VECC/ATG/ESD/ES/2015-16/C-113/BBS/15 25-01-2016 PRE-COMMISSIONING CHECKS OF THE UPS AND M/S. EMERSON NETWORK POWER (INDIA) 40,075 CONNECTION OF THE NEWLY INSTALLED PVT. LTD., ADVANTAGE TOWER, 7TH BATTERY BANK FLOOR, PLOT NO.EN-27, SEC-V, SALT LAKE CITY, KOLKATA-700 091 VECC/C&I/AIC/AR/2016/01/16 28-01-2016 THE DISMANTLING AND REFITTING OF GODREJ M/S ALERT SECURITY, E 28/C, ADARSHA 8,350 MAKE WORK STATION NAGAR, NIMTA, KOLKATA VECC/MEG/WORKS/WO./17 28-01-2016 DIRECTOR, VECC M/S CHOWDHURY ENTERPRISE, 22/3/A, S. 3,24,996 ROAD, KOLKATA VECC/ATG/ESD/ES/2015-16C-114/BBS//18 28-01-2016 RENEWAL OF COMPREHENSIVE AMC OF 400 KVA M/S EMERSON NETWORK POWER INDIA (P) 2,31,365 LTD., ADVANTAGE TOWER, SALT LAKE, KOLKATA VECC/CPIS/2015-16/SP/19 28-01-2016 SUPPLY OF PURE HELIUM GAS MS LINDE INDIA LIMITED, OXYGEN 41,280 HOUSE, P43 TARATALA ROAD, KOLKATA - 700 088 VECC/CPIS/2015-16/SP/20 29-01-2016 SUPPLY OF PURE HELIUM GAS MS LINDE INDIA LIMITED, OXYGEN 41,280 HOUSE, P43 TARATALA ROAD, KOLKATA - 700 088 VECC/CPIS/2015-16/SP/21 01-02-2016 DIRECTOR, VECC M/S LINDE INDIA LTD., OXYGEN HOUSEM 41,280 TARATALA ROAD, KOLKATA VECC/CPIS/2015-16/SP/22 02-02-2016 DIRECTOR, VECC M/S LINDE INDIA LTD., OXYGEN HOUSEM 41,280 TARATALA ROAD, KOLKATA VECC/ESD/AC/WO//23 02-02-2016 AMC OF 9 NOS AQUA GUARD PURE CHILL 60/80 M/S EUREKA FORBS LTD., CCD, SALT 81,396 Page 1 of 12 List of Work Order between 01-01-2016 to 31-12-2016 Work Order No Date Re Name of the Work: Contractor Work Order Value SS WATER COOLER CUM PURIFIER UNIT LAKE CITY, KOLKATA VECC/ESD/AC/WO//24 02-02-2016 AMC 2016-2017 OF 7 NO.S APYRON MAKE M/S APYRON TECHNOLOGY INDIA PVT. 51,450 MODEL SS 80 WATER COOLER CUM PURIFIER LTD., 8/19 F ROAD, R.NIBAS, KOLAKTA UNIT OF 9 NOS AQUA GUARD PURE CHILL 60/80 SS WATER COOLER CUM PURIFIER UNIT VECC/CPIESG/15-16/C-/25 03-02-2016 WORK ORDER FOR ELCTRIFICATION OF RIB M/S MC COMPANY, BHATENDA, KARMAKAR 1,97,230 ANNEXURE BUILDING FOR UPS POWER PARA, RAJAR HAT, KOLKATA DISTRIBUTION. VECC/ATG/ESD/CMS/W-31/2015-16/26 09-02-2016 REFARICATING/REPAIRING OF MA STRUCTUAL M/S FAIRDEAL CONSTRUCTION, 40 BABU 3,03,100 PLATFORM RAM GHOSH LANE, KOLKATA VECC/ESD/AC/WO//27 15-02-2016 DISMANTLING AND INSTALLATION OF ACS AT M/S BHAGAT COOLING SERVICES, RRP, 12,415 DIFFERENT AREAS BIRATI, KOLKATA - 700 051 VECC/ESD/AC/WO//28 16-02-2016 THROUGH CLEANING OF DRINKING AND SOFT M/S CALCUTTA CONSTRUCTION, 399, DUM 17,800 WATER DUM PARK, KOLKATA VECC/ATG/ESD/ES/2015-16/C116BBS/29 16-02-2016 REPAIRING OF 02 NOS. RADIATOS WITH M/S GPP LTD., JIP, JOKA, KOLKATA 90,483 ACCESSORIES VECC/MEG/SAFETY/NIT/249/WO/30 17-02-2016 SUPPLY AND INSTALLATION OF 3MM M/S PM WORK & SUPPLY, 14/2 OLD CHINA 47,900 TRANSPARENT ACRELIC SHEET PRINTED BAZAR STREET, ROOM NO. 152, KOLKATA EMERGENCY CONTACT VECC/RIB/VN24/16/365/31 17-02-2016 MAKING CUT-OUTS ON EXISTING 800MM THINK M/S MODERN CONSTRUCTION, MILENNIUM 2,60,000 TOWER KOLKATA VECC/ESD/WO//32 18-02-2016 AMC 2016-2017 FOR AIR COOLED CHILLING M/S COLD WAVES, 241 RAIBHADUR ROAD, 31,488 PLANT FOR LCW AT INO LAB KOLKATA - 700 053 VECC/WS/T-1611/15-16/C-118/HPU/33 23-02-2016 PROVIDING OPERATION AND MAINTENANCE M/S VIBGYOR INDIA, 8D, AM LANE, 6,38,400 SUPPORT KOLKATA VECC/WS/T-1612/15-16/C-117/SRB/34 23-02-2016 PROVIDING SUPPORT TOWARDS TRANSPORTATION M/S VIBGYOR INDIA, 8D, AM LANE, 8,43,000 AND FILLING OF SCINTILLATOR LIQUID.... KOLKATA VECC/WS/T-3364/ATG/ESD/AC/WO/C-119//35 23-02-2016 EXHAUST SYSTEM OF CENTEENS KITCHEN M/S DB ENTERPRISE, 636 GT ROAD, 5,30,000 KOLKATA 712201 VECC/ATG/WO/2015-16/36 24-02-2016 SEPARATION AND STACKING OF OLD UNSTABLE, M/S DAS ELECTOMEC, SULANGURI, 40,000 UNSERVICAABLE GHUNI, KOLKATA VECC/CPIS/MEG//37 25-02-2016 SHIFTING OF SCRAP BATTERIES FROM LAWN M/S RJN ENERPRISE, 9/1N. LANE, 3,000 KOLKATA VECC/DAE/MEG/XPIS/15-16/38 25-02-2016 SHIFTING OF LN2 COMPRESSOR....... M/S BRIJ LAL NISHAD, 220 B. SARANI, 8,000 KOLKATA VECC/ATG/ESD/15-16/C-121//39 26-02-2016 SHIFTING OF 2MVA TRANSFORMER M/S FAIRDEAL CONSTRUCTION, 40, BRG 38,000 LANE, KOLKATA VECC/WS/T-1617/15-16/122/SS/40 29-02-2016 WORD PROCESSING & OFFICE ASSISTANCE FOR M/S SARKAR ELECTRIC CO,., 20B, 4,31,424 MEDICAL CYCLOTRON RAJENDRALAL STREET, KOLKATA VECC/ATG/ESD/T-1614/15-16/C-120/41 29-02-2016 SEASONAL DEVELOPMENT OF PARKS & GARDEN M/S SAHA ENTERPRISE, BA/1, PRAFULLA 16,79,400 AT VARIOUS PLACES, CLEANING UPDATING OF KANA (W), WILD BUSHES, HORTICULTURE ETC. CHIRANTANI PARK, KOLKATA - 700 101 VECC/ATG/ESD/ESTN/2015-16/C- 29-02-2016 GRANT OF EXTENTION OF TIME FOR M/S CREATION, BA-1, PRAFULLA KANAN, 4,33,404 124/SRG//42 MISCELLANEOUS CLEANING & UPKEEPING OF KOLKATA AREAS AT VECC VECC/ATG/ESD/ESTN/2015-16/C- 29-02-2016 GRANT OF EXTENTION FOR UPKEEPING OF M/S CREATION, BA-1, PRAFULLA KANAN, 4,36,695 124/SRG//43 AREAS LIKE CRYOGENIC PLANT STORES KOLKATA VECC/ATG/ESD/ESTN/2015-16/C- 29-02-2016 GRANT OF EXTENTION FOR COSMETIC M/S CREATION, BA-1, PRAFULLA KANAN, 3,34,554 124/SRG//44 MAINTENACE OF SUPERCONDUCTION CYCLOTRON KOLKATA BUILDING VECC/ATG/EXTN/2015-16/C-128SC/45 29-02-2016 REGULAR CLEANING OF THE TWO DINNING M/S TI0RUPATI ENTERPRISE, RECKJOANI 3,00,450 HALLS GHOSH PARA, RAJAR HAT, VECC/ATG/EXTN/2015-16/C-129/SC/46 29-02-2016 PREPARATION OF TEA & SNACKS M/S TI0RUPATI ENTERPRISE, RECKJOANI 3,12,000 GHOSH PARA, RAJAR HAT, Page 2 of 12 List of Work Order between 01-01-2016 to 31-12-2016 Work Order No Date Re Name of the Work: Contractor Work Order Value VECC/ATG/EXTN/2015-16/C-126/SC/47 29-02-2016 PROVIDING SUPPORT FOR GAS DETECTOR M/S TI0RUPATI ENTERPRISE, RECKJOANI 2,46,600 GHOSH PARA, RAJAR HAT, VECC/ATG/EXTN/2015-16/C-127/PMD/48 29-02-2016 PROVIDING SUPPORT FOR CBM PROJECT R&D M/S R. SAHA, BA-1, CHIRANTANI PARK, 2,03,325 WORK PRAFULLA KANAN, KOLKATA - 700 101 VECC/ATG/EXTN/2015-16/C-130/49 01-03-2016 PROVIDING MISECLLANEOUS SUPPOR SERVICES M/S ANNAPURNA ENTERPRISE, 29,050 AT C&IG, VECC BA/1/CHIRANTANI PARK, PRAFULLA KANAN, KOLKATA VECC/MEG/TMU/EO/2016/1330WO/50/50 01-03-2016 ENGINE OVERHAULING OF TATA SUMO VEHICLE M/S MILAP ENGINEERING WORKS, AE, 33,000 NO.
Recommended publications
  • Place of Route March
    Daily Report of Route March/ CMB Activity By BSF/CAPF Anexure- Date: 04 .04.2021 Place of Route March Programme for next day No. of Actual No. of Force Type of Force Vulnerable t c Date of Block/ Total Deployed (Report Polling Station nos. i r deployed ( Hamlets t s Route Subdivision Municipalit Police Station Time From Via To Distance By section covered under Route Police Station From To Remarks i CRPF/BSF covered by D March y covered mentioning coy. March etc.) the Route And Bn.) March 169, 170, 173, 174, 174A from 08:00 hrs to Duttabad, EB Block, Central Park, & 3 sections BSF, Bidhannagar BMC EA Block EC Block 09 km BSF 175, 175A, 176, 177 & 1 DE Block CF Block Shift-I 1 2 11:30 hrs Different roads of these blocks 39/F- Coy 0 178 2 . 4 BDN North PS BDN North PS 0 . 4 0 from 16:00 hrs to Duttabad, DB Block, DC Block, & 3 sections BSF, Bidhannagar BMC DA Block DD Block 08 km BSF 171 & 172 1 AE Block BF Block Shift-II 19:30 hrs Different roads of these blocks 39/F- Coy 181, 182, 183, 184, 185, 186, 186A, 187, 187A, BL, CL, DL, AK, BK,CK, DK, from 08:00 hrs to 2 KM 3 sections BSF, 188, 189, 189A, 190, Bidhannagar BMC AL Block Karunamoyee, DJ, DG, CG, BG, EE Block BSF 2 AG Block DG Block Shift-I 1 11:30 hrs (Approx) 191, 192, 193, 194, 195, 2 AG 39/F- Coy 0 196, 197, 198, 199, 200, 2 .
    [Show full text]
  • WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED Vidyut Bhavan, Bidhan Nagar Kolkata – 700 091
    ENVIRONMENTAL & SOCIAL Public Disclosure Authorized IMPACT ASSESSMENT UNDER GROUND CABLING NETWORK FOR BAGUIATI & KRISHNAPUR TOWN UNDER WBEDGMP Document No: IISWBM/ESIA-WBSEDCL/2019-2020/019 (Version: 1.1) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized December 2020 ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT FOR UNDER GROUND CABLING NETWORK OF BAGUIATI & KRISHNAPUR TOWN UNDER WBEDGMP WITH WORLD BANK FUND ASSISTANCE Document No: IISWBM/ESIA-WBSEDCL/2019-20/019 Version: 1.1 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED Vidyut Bhavan, Bidhan Nagar Kolkata – 700 091 Executed by Indian Institute of Social Welfare & Business Management, Kolkata – 700 073 December, 2020 CONTENTS ITEM PAGE NO LIST OF FIGURE LIST OF TABLE LIST OF ACRONYMS & ABBREVIATIONS EXECUTIVE SUMMARY i-xiv 1.0 INTRODUCTION 1-8 1.1 Background 1 1.2 Need of ESIA 1 1.3 Objectives of the Study 2 1.4 Scope of the Study 2 1.5 Engagement & Mobilization of Consultant for the Study 4 1.6 Structure of Report 5 2.0 PROJECT DETAILS 9-20 2.1 National & State Programs in Power Section 9 2.1.1 Country and Sector Issue 9 2.1.2 West Bengal Power Sector 9 2.2 Project Overview 11 2.3 Proposed Project Development Objectives and Benefits 12 2.4 Project Location & Consumer Profile 13 2.4.1 Location 13 2.4.2 Consumer Details 15 2.4.3 Annual Load Growth 15 2.5 Project Description and Key Performance Indicators 16 2.5.1 Implementing Agency 16 2.5.2 Co-Financing 16 2.5.3 Project Components 16 2.5.4 Key Performance Indicators 18 2.6 Selection of Optimum
    [Show full text]
  • Rainfall, North 24-Parganas
    DISTRICT DISASTER MANAGEMENT PLAN 2016 - 17 NORTHNORTH 2424 PARGANASPARGANAS,, BARASATBARASAT MAP OF NORTH 24 PARGANAS DISTRICT DISASTER VULNERABILITY MAPS PUBLISHED BY GOVERNMENT OF INDIA SHOWING VULNERABILITY OF NORTH 24 PGS. DISTRICT TO NATURAL DISASTERS CONTENTS Sl. No. Subject Page No. 1. Foreword 2. Introduction & Objectives 3. District Profile 4. Disaster History of the District 5. Disaster vulnerability of the District 6. Why Disaster Management Plan 7. Control Room 8. Early Warnings 9. Rainfall 10. Communication Plan 11. Communication Plan at G.P. Level 12. Awareness 13. Mock Drill 14. Relief Godown 15. Flood Shelter 16. List of Flood Shelter 17. Cyclone Shelter (MPCS) 18. List of Helipad 19. List of Divers 20. List of Ambulance 21. List of Mechanized Boat 22. List of Saw Mill 23. Disaster Event-2015 24. Disaster Management Plan-Health Dept. 25. Disaster Management Plan-Food & Supply 26. Disaster Management Plan-ARD 27. Disaster Management Plan-Agriculture 28. Disaster Management Plan-Horticulture 29. Disaster Management Plan-PHE 30. Disaster Management Plan-Fisheries 31. Disaster Management Plan-Forest 32. Disaster Management Plan-W.B.S.E.D.C.L 33. Disaster Management Plan-Bidyadhari Drainage 34. Disaster Management Plan-Basirhat Irrigation FOREWORD The district, North 24-parganas, has been divided geographically into three parts, e.g. (a) vast reverine belt in the Southern part of Basirhat Sub-Divn. (Sundarban area), (b) the industrial belt of Barrackpore Sub-Division and (c) vast cultivating plain land in the Bongaon Sub-division and adjoining part of Barrackpore, Barasat & Northern part of Basirhat Sub-Divisions The drainage capabilities of the canals, rivers etc.
    [Show full text]
  • Political Economy of Dispossession and Rural Livelihoods
    Vol. XVII No.1, 2020 Social Change and Development The Land Question: Political Economy of Dispossession and Rural Livelihoods Animesh Roy1 Abstract Land dispossession under the neoliberal capitalist development has become a focal point of debate across the states in India and West Bengal is no exception. Based on primary data collected through three rounds of household-survey in 2009, 2014 and 2016 in Rajarhat, West Bengal, this paper examines the mechanism of land acquisition executed by the former Left Front Government (LFG). It illuminates the impact of large-scale land acquisition for a planned township for Information Technology (IT) parks, business centres and dwelling units. The study shows that the government had substantially diluted several legal provisions laid down in the Land Acquisition Act (LAA) of 1894 and denigrated the Rehabilitation and Resettlement (R&R) benefits recommended in the National Policy for Rehabilitation and Resettlement (NRRP). The ensuant transformation in livelihood activities of the dispossessed in the post-acquisition stage came forth with two key characteristics: first, there had been a sudden increase in the share of non-farm workers; and second, a bulk of this increase in non-farm activities comprised both menial and flourishing livelihood activities. The transitional informal employment opportunities in the form of ‘syndicates’ created by the government for the dispossessed households were ‘non-inclusive’, which kept three quarters of dispossessed households outside their circuits. Comparatively well-off households well-linked with the local authority and political leadership had better access in gaining these opportunities. 1. Introduction The government of India has always attempted to uphold a commitment to higher industrial growth and infrastructure development ever since the end of colonial rule (Bapat, 2009).
    [Show full text]
  • West Bengal Housing Infrastructure Development Corporation Limited (A Govt
    West Bengal Housing Infrastructure Development Corporation Limited (A Govt. of West Bengal Undertaking) „HIDCO BHABAN‟, Premises No. 35-1111, Major Arterial Road, 3rd Rotary, New Town, Kolkata-700156. Telephone No. (033) 2324-6037/38, Fax (033) 2324-3016/6009 e-mail:[email protected] / [email protected] website : www.wbhidcoltd.com No. 344/HIDCO/Plng/152(Z)/2020Date :07.08.2020 Notice inviting Expressions of Interest for conducting a detailed land survey for preparation of a Base Map for demarcation of the boundaries of New Town Police Station, New Town Eco-Park Police Station and Techno City Police Station Expressions of Interest (EOI) are hereby invited from reputed & experienced Firms / Companies / Organizations for conducting a detailed land surveycovering an area of 3000 Acres (approximately) in the following Mouzas for preparation of a Base Map for demarcation of the boundaries of New Town Police Station, New Town Eco-Park Police Station and Techno City Police Station. The areas to be surveyed are outside the New Town Project Area, but within the New Town Planning Area. NAME OF NAME OF J.L. SHEET PORTION PORTION POLICE MOUZA NO. NO. INSIDE NEW OUTSIDE NEW STATION TOWN TOWN PROJECT PROJECT BOUNDARY BOUNDARY CHANDIBERIA 15 - YES YES TARULIA 21 - YES YES MAHISHGOT 20 - YES YES MAHISHBATHAN 18 1 YES - THAKDARI 19 1 YES YES NEW TOWN POLICE THAKDARI 19 2 YES YES STATION SULANGGARI 22 - - YES GHUNI 23 1 - YES GHUNI 23 3 YES YES JATRAGACHHI 24 2 YES YES JATRAGACHHI 24 3 YES YES SULANGGARI 22 - YES YES NEW TOWN GHUNI 23 1 YES YES ECO PARK GHUNI 23 2 YES - POLICE STATION GHUNI 23 3 - YES JATRAGACHHI 24 1 YES YES Page 1 of 6 West Bengal Housing Infrastructure Development Corporation Limited (A Govt.
    [Show full text]
  • F O R E W O R D This Publication Contains the Details of Departmental
    F O R E W O R D This publication contains the details of Departmental Non-Plan (including Developmental and Committed) and State Plan Schemes included in the Demands for Grants for the financial year 2014-2015. H. K. DWIVEDI Kolkata Principal Secretary to the The 17th February, 2014 Government of W est Bengal Finance Department DETAILS OF DEPARTMENTAL NON-PLAN [including Developmental and Committed] AND PLAN [State Plan, Centrally Sponsored and Central Sector] SCHEMES included in the DEMAND FOR GRANTS 2014-2015 . Sl. No. Department Pages . 1. Agricultural Marketing ............................................................................... 1-2 2. Agriculture ............................................................................... 3-10 3. Animal Resources Development ............................................................................... 11-19 4. Backward Classes Welfare ............................................................................... 20-25 5. Bio-Technology ............................................................................... 26 6. Chief Minister Secretariat ............................................................................... 27 7. Chief Minister"s Office ............................................................................... 28 8. Child Development ............................................................................... 29-32 9. Civil Defence ............................................................................... 33-34 10. Co-Operation ..............................................................................
    [Show full text]
  • Download Download
    Annals of R.S.C.B., ISSN:1583-6258, Vol. 25, Issue 6, 2021, Pages. 12993 - 13002 Received 25 April 2021; Accepted 08 May 2021. Block-Level Socio-Economic Development Statusin North 24 Parganas District of West Bengal, India Chandra Shekhar Sarkar 11*, Aritra Chakraborty 22 1Research Scholar, Department of Geography, Presidency University, Kolkata, India 2Assistant Professor, Department of Geography, Presidency University, Kolkata, India *[email protected] ABSTRACT The study assesses the block-level socio-economic development status in the North 24 Parganas district of West Bengal, applying the factor analysis technique based on thirty selected socio-economic indicators. The factor analysis of 30 indicators related to socio-economic of North 24 Parganas yielded seven factors which together account for 84.12 percent of the total variance. The results of the study highlight that there is a wide disparity in block-level social-economic development in the North 24 Parganas district. The study shows that Rajarhat (0.776), Habra-I (0.623) and Hingalganj (0.537) are the most developed blocks, whereas the most backward blocks are Haroa (-0.814) and Minakhan (-0.578) in the district. The Government should take the proper development plans for backward blocks of the North 24 Parganas district. Keywords Indicators; Factor analysis; Composite index score; Level of development; Socio-economic development Introduction Socio-economic development is a multidimensional phenomenon, which brings changes in society (Kundu & Mondal, 2012). Proper socio-economic development can improve the overall condition of the citizen. Socio-economic development planning includes policies, programs, plans and strategies for the location of different amenities or conveniences and services (Rishi &Roy, 2020).
    [Show full text]
  • North 24 Parganas
    Present Place of District Sl No Name Post Posting DPMU, DH&FWS, CMOH OFFICE N 24 Pgs 1 PRATAP MAJUMDER DPC NORTH 24 PARGANAS, Barasat DPMU, DH&FWS, CMOH OFFICE N 24 Pgs 2 JAYANTA KUMAR PAL DAM NORTH 24 PARGANAS, Barasat DPMU, DH&FWS, CMOH OFFICE N 24 Pgs 3 Goutam Maity DSM NORTH 24 PARGANAS, Barasat DPMU, DH&FWS, CMOH OFFICE N 24 Pgs 4 SAMIRAN KARMAKAR Account Assistant NORTH 24 PARGANAS, Barasat DPMU, DH&FWS, CMOH OFFICE N 24 Pgs 5 APAN SEN Computer Assistant NORTH 24 PARGANAS, Barasat DPMU, DH&FWS, NORTH 24 N 24 Pgs 6 KRISHNA BISWAS AE PARGANAS, Barasat DPMU, DH&FWS, NORTH 24 N 24 Pgs 7 PRONAB HALDER SAE PARGANAS, Barasat N 24 Pgs 8 Dr.Sudip Sarkar GDMO Amdanga BPHC N 24 Pgs 9 Dr.Mudhusudhan Mirdha GDMO Jogeshgunj PHC N 24 Pgs 10 Dr.Mahuya Saha GDMO Goshpur BPHC N 24 Pgs 11 Dr Mannaf Ali GDMO Nazat PHC Dr.Kushik Das GDMO Madhayam Gram N 24 Pgs 12 RH Dr. Surendra Nath Mondal GDMO Bagbon Saiberia N 24 Pgs 13 PHC N 24 Pgs 14 Dr.Debansu Sarkar GDMO Nataberia PHC N 24 Pgs 15 Dr.Soumyajit Chakrabarti GDMO PallaPHC N 24 Pgs 16 Dr.Pusun kr Ghosh GDMO Bandipur BPHC N 24 Pgs 17 Dr.Asim Sarkar GDMO Bandipur BPHC N 24 Pgs 18 Dr.Santunu Sarkar GDMO Barunhat PHC N 24 Pgs 19 Dr.Partha Sarathi Biswas GDMO Routara PHC N 24 Pgs 20 Dr.Shamol Kanta Kundu GDMO Chad para BPHC N 24 Pgs 21 Dr.Pradip Kr Dutta GDMO Chad para BPHC N 24 Pgs 22 Dr.Manoj Mondal GDMO Dharampur PHC N 24 Pgs 23 Dr.Dilip Biswas GDMO Minakha RH N 24 Pgs 24 Dr.Indranil Khatua GDMO Rajarhat BPHC N 24 Pgs 25 Dr.Dilip Patra GDMO Harowa BPHC N 24 Pgs 26 Dr.
    [Show full text]
  • Conveyance-HIG
    S. Jalan & Co. CONVEYANCE 1. Date : 2. Nature of document : 3. Parties : Collectively the following which will include their respective successors-in-interest. 3.1. Owner: West Bengal Housing Board, a statutory body corporate constituted under the West Bengal Housing Board Act, 1972 (W.B Act XXXII of 1972 together with up-to-date amendments of the Act) having its office at 105, Surendra Nath Banerjee Road, Kolkata-700014 hereinafter referred to as the “Board” (which expression shall include its successors-in-interest). 3.2 Developer: Bengal Shrachi Housing Development Limited, a joint sector company having its registered office at ‘Shrachi Tower’, 8th Floor, 686, Anandapur, E.M.Bypass – R.B.Connector Junction, Kolkata – 700 106 hereinafter referred to as the “Company” (which expression shall include its successors-in-interest). 3.3 Purchaser : --------------------------------------------------------------------- ………………………………………………………………………………… ……………….……………………………………………………………… ………. 4. Subject matter : The “Composite Unit” being collectively the following : 4.1. Apartment : Apartment No………..complete with all fixtures and fittings (sanitary and electrical), having a super built up area of ………….. square feet of the …………floor, described in Part-I of the 2nd Schedule hereto and delineated on Plan B annexed hereto and bordered in colour Green thereon (Said Apartment) at Block……. (Building), Sector…….. within a cluster of buildings forming High 2 S. Jalan & Co. Income Group Zone on a portion of land (Emerald Isle Extension - HIG), being a part of the complex commonly known as ‘Greenwood Park Extension’ (Greenwood Park Extension Complex) constructed on the land within Block IB in Mouza-Ghuni and Mouza-Jatragachi, Police Station Rajarhat, District-24 Parganas North, West Bengal (Said Land) described in the First Schedule below and delineated on Plan-A annexed hereto and bordered in Red thereon.
    [Show full text]
  • Bidhan Nagar Non Executives
    BIDHAN NAGAR NON EXECUTIVES SL NAME DESIGNATION D.O.B AREA TELE.NO(R) RESIDENTIAL ADDRESS YEAR 1 KANAILAL NATH TELE/ MECH. 30.05.1948 BDN 2572-0414 78/2, Dakshina Bash(Jhill Bagan), P.O- Ghuni, Kolkata-59,Dist-24Pgs(N) 2008 2 RAMA BHATTACHARYA SR. TOA(P) 02.03.1951 BDN 2334-9475 AD 141, Sector-I, Salt Lake, Kolkata- 700064 2011 3 SUKHENDU BIKASH DUTTA SR.TECHNICAL 03.07.1948 BDN 2567-0334 11/12 A, Nabapally, East Kodalia, P.O- New Barrackpore, Kolkata- SUPVR. 700131 2008 4 SUNIL KUMAR ROY R/M-III 13.01.1947 BDN 2543-7434 37B, Shyam Bazar Street, Kolkata-700004 2007 5 ABADHESH PRASAD TELE / MECH 13.03.1949 BDN 2358-4586 P & T Qtr. CC Block, Bldg. No. G 1/5, Room No. 6, Kolkata- 700064 2009 6 ABANI KUMAR MAHATA SR.TOA(P) 05.01.1952 BDN 2564-8899 88/1,Purba Sinthee Bye Lane, Maidan Pally, P.O - Ghughudanga,P.S- DumDum,Kolkata- 700030. 2012 7 AJIT KUMAR DE SR.TOA(G) 03.06.1947 BDN 2579-2636 30/11, Nayapatty Road, Kol--55 2007 8 AJOY KUMAR MONDAL TELE / MECH 14.04.1952 BDN 2566-6969 Matikol, P.O- RabindraNagar, Kolkata- 700065 (Panchaboti Tala) 2012 9 AJOY KUMAR SEN TELE / MECH 28.01.1952 BDN 2356-1631 20/15, Uzir Chowdhury Road, Kolkata- 67 2012 10 ALOK KUMAR MITRA T.M BDN 25-06- 9432242888 206,KALIKA ASHRAM ROAD,MASUNDA,WARD NO:- 6, P.S:- 1953 GHOLA,KOLKATA:- 700131. 2013 11 AMAL KR. DEY BARMAN SR. T.S.(O).
    [Show full text]
  • North 2 4 Parganas N a D
    87°30'0"E 87°40'0"E 87°50'0"E 88°0'0"E 88°10'0"E 88°20'0"E 88°30'0"E 88°40'0"E 88°50'0"E 89°0'0"E 89°10'0"E 89°20'0"E 89°30'0"E 89°40'0"E GEOGRAPHICAL AREA ! Madhugari NADIA (EXCEPT AREA ALREADY AUTHORIZED ! Andhar Kotha AND NORTH 24 PARGANAS (EXCEPT AREA N N " ! Dogachhi ! ! " 0 Kechua Danga 0 ' ! CA-01 ' 0 ! 0 ALREADY AUTHORIZED) DISTRICT ° ° 4 ! (!! ! 4 2 Saguna! Pipulk!hola (! KARIMPUR-I 2 Karimpur ± ! ! ! ! ! Mahish Bathan KEY MAP ! C! A-02 !KARIM!PUR-II ! Dakshin ! ! Sadi!pur Gopalpur N ! Mrigi N " " 0 ! 0 ' Binodnagar ! Mobarakpur ' 0 0 5 5 ° ° 3 ! Gopinathpur 3 2 ! 2 ! Betai Molamdi Bara ! ! 14 ! ! Palasi! Naldaha ¤£ ! ! Bara ! (!! ! ! CA-03! ÁMira Chandghar ! CA-04 Bara ! Gabindapur ! TEHATTA-I ! TEHATTA-II ! Kulberia Natipota ! Jamalpur ! Baraia ! ! ! Á! Tehatta ! Sajapur ! Barnia ! Hanspukuria ! CA-05 ! ! Parkula ! ! ! Chanderghat Area Excluded N KALIGANJ!Á! Bilkumari N " ! ! Taranipur " 0 Dhaparia 0 (Part Nadia and North 24 ' ! ! ! ' 0 ! Rautara 0 Parganas District) 4 ! Dhubinagadi 4 ° ! Sibpur ° 3 ! 3 2 Bikrampur ! Radhan!agar 2 Matiari ! ! Chenga ! (! Á ! ! Hridaypur ! ! ! ! Birpur ! Bara Andulia C(!!A-06 ! !Á ! (! W E S T B E N G A L NAKASH! IPARA ! Hatra ! Bangaria ! ! Bilwagram Hatkhola ! Mota ! ! Sikra ! Chandanpur ! ! ! CA-07 Dogachhia ! ! Gachha ! ! Á! Saligram CHAPRA Muragachha Chapra (! N N " ! " Noapara ! ! 0 Bangaljhi 0 ' ' 0 (! 0 3 ! ! 3 ° ! ° C!A-08 ! Á! Gede 3 Á 3 ! 2 KRISHNAGAR-II N A D I A Á! 2 ! ! Sonadanga !Á! ! Matiari Bamanpukur (! ! CA-11 ! Naldaha ! Á!Bahadurpur ! Tiorkhali ! ! K!RISHNAGANJ Kulgachhi ! ! (! ! ! ! (! ! Krishnanagar ! 8Á! Majhdia ¤£6 Á( (! Á! (! Gadig!achha ! Dafarpota ¤£ CÁ(!A-09 Á (! !.
    [Show full text]
  • Zone Wise Division of Containment Zones in North 24 P 20.06.2020
    Containment Zones in North 24 Parganas |as on 20-06-2020| SL No Muni/Block Ward/GP Affected Zone Police Station 1 3 1287/15, KALYANGAR ASHOKNAGAR,743223 ASHOKNAGAR 1. NALANDA, TARUNPALLY, Asokenagar 2 8 ASHOKNAGAR ASHOKNAGAR- 2. Kalyangarh 3 KALYANGARH 14 ASHOK NAGAR HABRA KOLKATA 747222 ASHOKNAGAR 4 18 184/4 ASHOKNAGAR, PO & PS- ASHOKNAGAR, PIN-743222 ASHOKNAGAR 26 P W D ROAD ALAMBAZAR BARANAGAR 5 3 Baranagar kolkata - 700035 H/O Prabudhya Sen, 43 17 KUMAR PARA LANE 6 Baranagar 4 ALAMBAZAR VILLAGE 700035 7 23 KALI KRISHNA TAGORE ROAD BARANAGAR 700035 Baranagar Chinikuthi Lane, Alambazar, Baranagar, SP Banerjee Road, Alambazar 284 M N K ROAD BARANAGAR 8 5 Baranagar kolkata - 700035 2/1 kelvin ghat road Kol 35 9 6 H/O RAM SAGAR YADAV, COSSIPUR , Kolkata - 700002 Baranagar H/O Ranjit Kumar Pain, 117 r k Mukherjee road 10 7 Baranagar 87 DESHBANDHU ROAD West Alambazar,kolkata - 700035 H/O Mridula Sen Sharma , Deshbandhu Road(West) 11 8 Baranagar 83 dhirendranath chatterjee road Kolkata 35 H/O Saragmoy Sen Sharma, DESH BANDHU ROAD EAST 12 9 BARANAGAR ALAMBAZAR Baranagar 68 NC Maitra rd. kol-35 284 RAJKUMAR MUKHERJEE ROAD, PS- BARANAGAR, KOL- 13 11 Baranagar 700035 H/O Nishilal Biswakarma, 284 M N K ROAD BARANAGAR 14 11 Baranagar kolkata - 700035 MATILAL MULLICK LANE 15 12 Baranagar Baranagar kolkata - 700035 Banhoogly , Rabindranagar 16 14 Subhas Pally Park, Bonhooghly Government Colony, Baranagar Baranagar, West Bengal 700108 RAMGARH DAKSHINESWAR BARANAGAR 700076 19/1 e rabin chandra das road 17 17 Baranagar Kolkata - 700090 207/62 BT road, Kol-700036.
    [Show full text]