Taoyuan Aerotropolis Infrastructure Project and Taoyuan International Airport Terminal 3 Project TAIWAN Advantages of Taoyuan

Total Page:16

File Type:pdf, Size:1020Kb

Taoyuan Aerotropolis Infrastructure Project and Taoyuan International Airport Terminal 3 Project TAIWAN Advantages of Taoyuan Taoyuan Aerotropolis Infrastructure Project and Taoyuan International Airport Terminal 3 Project TAIWAN The Taoyuan Aerotropolis Infrastructure Project, seen as a prime driver of Taiwan’s future economic development, is one of the biggest and most daring infrastructure projects ever conceived. It is designed to take full advantage of the island’s commercially strategic location with the Asia Pacific. The Aerotropolis will be a brand new city built on more than 4,000 hectares of land surrounding the Taoyuan International Airport. Dubbed the Gateway of Taiwan and to Asia, the Aerotropolis will serve as a logistics and trading hub to attract people, capital, goods and information. Advantages of Taoyuan The city Taoyuan is home of Taiwan Taoyuan International Airport and serve sas the national portal. Taiwan is ideally located in East Asia, being within four hours’ flight time to almost all major East Asian destinations such as Beijing, Shanghai, Singapore, Seoul and Tokyo. Taoyuan International Airport has seen steady growth in both inbound and transiting air passengers, and freight volumes as well. Arriving visitors will enjoy easy access to all cities with the High Speed Rail system and the new Airport Metro (MRT) linking Taipei Metropolitan area. Another advantage is that Taoyuan is home to nearly 30 industrial parks, and is in close proximity to Hsinchu’s vast high-tech manufacturing centers as well as New Taipei City’s industrial might. Combined with the nearby Port of Taipei, the Aerotropolis will be ideally located as a hub for logistics, transshipment, and time-sensitive manufacturing in the adjacent industrial parks. It is also one of the designated Free Economic Pilot Zones (FEPZ), allowing it to enjoy liberalized trade, immigration, and tax regulations to encourage investment and stimulate trade. Besides, Taoyuan will become the 6th city in Taiwan to have special lmunicipality status, after Taipei, Kaohsiung, New Taipei (Xinpei), Taichung, and Tainan, leaving 16 second-tier cities on the island. As a special municipality, Taoyuan will gain over NT$8 billion (US$267 million0 of additional income a year in the form of a higher allocation of tax revenue and subsidies from the central government. That will boost its annual budget to over NT$70 billion (US$2.33 billIion). Besides, with its population of over 2 million, Taoyuan is now the second highest source of tax revenue in Taiwan, after Taipei. It has led all other cities and counties in industrial output for the past nine years. The Taoyuan Aerotropolis Project http://www.tycg.gov.tw/aerotropolis/main.html Covering a total area of about 685 square kilometers and involving an estimated investment of NT$600 billion (US$20 billion), the Taoyuan Aerotropolis project now under planning is considered Taiwan’s biggest infrastructure project in half a century. Surrounding and including the existing Taiwan Taoyuan International Airport, the project calls for the construction of a wide variety of facilities, such as convention centers, theme parks, hottels, financial centers, and R&D centers, as wll as homes for 300,000 people. A new MRT line will connect the Aerotropolis with Taipei, greatly increasing travel conveniences, while another line will join the Aerotropolis with the MRT system being planned for Taoyuan City and Zongli city. At the same time, the addition of a third runway and third terminal on coastal marsh lands will significantly upgrade the airport itself. The project is expected to double Taoyuan’s economic output and expand Taiwan’s overall GDP by 10%. Project developers: Ministry of Transportation and Communications and the Taoyuan County Government Executive force: Taoyuan Aerotropolis Corp. (formed by Taoyuan Government) Supervisor: Ministry of Interior Total land area: 4,000 hectares with five districts: 1. Gateway of Taiwan: A transportation, entertainment center for the MICE industry (meetings, incentive, conferences and exhibitions); 2. An Administration and Financial Center; 3. A Culture, Creativity, Science and R&D District; 4. A Logistics and Trading Hub; 5. A LOHAS Quality Residences area with housings for up to 300,000 people. Financing: Public and Private Investment from domestic and foreign investors Milestone: Aug. 2014: Tender offer for consultancy contracts Mitsubishi-Japan, Toshiba-Japan, ARUP-UK have involved in the urban planning part.) Dec. 2016: completion of land acquisition and start of construction Completion: 2023 Taoyuan International Airport Terminal 3 Project http://www.taoyuan-airport.com/english/terminal3 The Taiwan Taoyuan International Airport Terminal 3 Project (hereinafter referred to as T3 project) is one of the major Aerotropolis development projects. Based on construction scale and investment cost, it is the single largest project since decades. The "Implementation Plan for Taiwan Taoyuan International Airport Park" drafted by the Taoyuan Airport Corporation (hereinafter referred to as TAC) was approved by the Ministry of Transportation and Communications (MOTC) on June 28, 2012. The T3 project aims to create a world-class passenger terminal in Taiwan, and to provide the best quality services and passenger experiences. A consortium of Netherlands Airport Consultants B.V. (NACO), TY Lin International Taiwan, and Parsons Brinckerhoff International, Inc. was established in the beginning of 2013. The consortium’s Taiwan Branch has been selected to perform the planning and project management of the Terminal 3 Area Development. The initial planning features of T3 Project include: ●Design capacity of 45 million in Terminal 3 are planned to accommodate future total passenger capacity of 86 million (together with Terminal 1 & 2) in year 2042. ●26 Boarding Gates. ●Efficient taxiway and airside service road design. ●Convenient and clearly-indicated road traffic access. ●Terminal 2 and Terminal 3 are connected by MFB to create a mega terminal concept. ●A whole new commercial service concept. ●Design guideline based on Smart, Green, and Re-culture concept. The detailed design tendering process will commence upon approvals by the competent supervising and financing authorities, Ministry of Transportation and Communications. The plan is to start the tendering procedure in mid-2015. The project is slated for design and construction completion within 5 years. Request for Information (RFI) Seminar T3 project is currently undergoing review process for its Environment Impact Assessment (EIA) and the Key Construction Plan. To provide the most updated status of T3 planning to all interested parties and to facilitate the follow-up design tendering process, TAC will arrange a Request for Information (RFI) seminar for Detailed Design/Construction Supervision Consultant of Terminal 3 Development Project. Time and Venue Time:September 25, 2014 Chinese Session:09:30~12:00 English Session :13:30~16:00 Venue:Briefing Room 1019 (1st Floor at Terminal 2 in Taoyuan International Airport) Agenda: Subject Description Time Opening Speech Opening speech from TAC 5 minutes Presentation T3 Planning and Schedule 50 minutes Coffee Break 15 minutes Participants are welcomed to offer suggestions in the Feedback seminar or provide the 80 minutes written comments after the seminar. All consulting companies with experiences in design/construction supervision work of international airport projects are welcomed to attend with maximum 3 registrations. (TAC reserves the right of final approval of the applications.) Download Agenda and Registration Form: http://www.taoyuan-airport.com/english/terminal3 RSVP by September 5, 2014(Friday): Registration email : [email protected]‐airport.com Contact : Ms. Nancy N.T. Hsu, Specialist of Engineer Department, TAC Ltd. email : [email protected]‐airport.com phone no. : +886‐3‐27‐33266 For more information: Contact : Mr. Bryan Yang, Staff of Engineer Department, TAC Ltd. email : [email protected]‐airport.com phone no. : +886‐3‐27‐33230 fax no. : +886‐3‐27‐33268 .
Recommended publications
  • Optimizing EEC Development Via the Aerotropolis Strategy
    Presentation to EEC Stakeholders Bangkok, Thailand 20 December 2018 Optimizing EEC Development via the Aerotropolis Strategy U-Tapao Airport City John D. Kasarda, Director Center for Air Commerce BUSINESS CONCEPTS LLC TM Kenan-Flagler Business School JOHN D. KASARDA, PRESIDENT University of North Carolina – Chapel Hill aerotropolisbusinessconcepts.aero© Dr. John D. Kasarda, 2018 Setting the Competitive Context • Thailand and its Eastern Economic Corridor are at an industrial development crossroads as an increasingly fast-paced, globally networked economy is changing the rules of competition and business location. • Strategic decisions and development initiatives being taken today will determine the 21st-century direction the EEC and the entire nation will go in terms of industrial mix, business competitiveness, foreign investment, job creation, and citizen prosperity. © Dr. John D. Kasarda, 2018 2 Four Critical Challenges 1. Will Thailand and the EEC continue to successfully develop “new economy” high-tech (S-Curve) industries and high-value business services sectors complementing their traditional agriculture, manufacturing, and tourist sectors? 2. Will the EEC’s S-Curve industries and modern business services sectors be able to compete effectively throughout Asia and worldwide in the decades ahead? © Dr. John D. Kasarda, 2018 3 Critical Challenges (cont’d) 3. Will job creation in the EEC over the next ten years achieve the goals in quantity, quality, and equitable opportunity set by government leaders? 4. Will logistics, industrial, and commercial development at and around U-Tapao International Airport be economically efficient, attractive, and environmentally sustainable presenting a positive first and last impression to air travelers and becoming an enduring magnet for new economy businesses and their talented workers? How these four interwoven challenges are met will go a long way in determining the EEC’s future economic success and its leadership role in executing Thailand 4.0 policies.
    [Show full text]
  • Colorado Aerotropolis Visioning Study Infrastructure Development for the Colorado Aerotropolis Study Area
    Colorado Aerotropolis Visioning Study Infrastructure Development for the Colorado Aerotropolis Study Area Prepared by May 2016 Table of Contents Introduction and Overview ................................................................................. 1 Study Vision ................................................................................................ 1 Study Objectives .......................................................................................... 1 Study Area .................................................................................................. 2 Working Paper Organization ............................................................................. 2 Infrastructure Needs Assessment .......................................................................... 3 Purpose for Infrastructure Development .............................................................. 3 Support for Infrastructure Development .............................................................. 4 Aerotropolis Scenario Infrastructure Needs ........................................................... 5 Utilities .................................................................................................. 5 Water Supply ......................................................................................... 5 Wastewater ........................................................................................... 7 Power Utilities ....................................................................................... 8 Communications
    [Show full text]
  • An All-Time Record 97 Buildings of 200 Meters Or Higher Completed In
    CTBUH Year in Review: Tall Trends All building data, images and drawings can be found at end of 2014, and Forecasts for 2015 Click on building names to be taken to the Skyscraper Center An All-Time Record 97 Buildings of 200 Meters or Higher Completed in 2014 Report by Daniel Safarik and Antony Wood, CTBUH Research by Marty Carver and Marshall Gerometta, CTBUH 2014 showed further shifts towards Asia, and also surprising developments in building 60 58 14,000 13,549 2014 Completions: 200m+ Buildings by Country functions and structural materials. Note: One tall building 200m+ in height was also completed during 13,000 2014 in these countries: Chile, Kuwait, Malaysia, Singapore, South Korea, 50 Taiwan, United Kingdom, Vietnam 60 58 2014 Completions: 200m+ Buildings by Countr5,00y 0 14,000 60 13,54958 14,000 13,549 2014 Completions: 200m+ Buildings by Country Executive Summary 40 Note: One tall building 200m+ in height was also completed during ) Note: One tall building 200m+ in height was also completed during 13,000 60 58 13,0014,000 2014 in these countries: Chile, Kuwait, Malaysia, Singapore, South Korea, (m 13,549 2014 in these Completions: countries: Chile, Kuwait, 200m+ Malaysia, BuildingsSingapore, South byKorea, C ountry 50 Total Number (Total = 97) 4,000 s 50 Taiwan,Taiwan, United United Kingdom, Kingdom, Vietnam Vietnam Note: One tall building 200m+ in height was also completed during ht er 13,000 Sum of He2014 igin theseht scountries: (Tot alChile, = Kuwait, 23,333 Malaysia, m) Singapore, South Korea, 5,000 mb 30 50 5,000 The Council
    [Show full text]
  • Project References
    PROJECT REFERENCES RIFENG ENTERPRISE GROUP CO. LTD. No.16, Zumiao Road, Foshan, Guangdong, PR China 528000 T: +86 757 8223 1137 E: [email protected] www.rifeng.com 03 67 Multilayer Plumbing Pex Plumbing System System 49 51 Multilayer Air- PPR Plumbing conditioning System System ABOUT RIFENG CHINA PLASTIC PIPE INDUSTRY INNOVATOR Established in 1996, Rifeng Enterprise Group Co. Ltd has been committed to developing high quality and environmental- friendly piping products that cover the plumbing, indoor climate, drainage, and gas applications etc. Until now, Rifeng's multilayer plumbing system, gas system, PP-R system, underfloor heating system, air-conditioning system and other products have been promoted and used in various parts of the world, bringing new vitality to the global pipeline industry and winning recognition from users in various countries. 37 69 Gas Piping Underfloor Heating System System Project Reference-Multilayer Plumbing System Multilayer Plumbing Kazakh region, Azerbaijan Project: Gazakh Olympic Sports Complex System Type: Sport Year: 2007 Product: Multilayer Plumbing System The total area of the complex is 15.50 ha and the main building of the complex consists of hand games room, gymnastics, wrestling, boxing halls.The Area has a swimming complex, an open type of football square and tennis court. Baku, Azerbaijan Project: International Central Bus Station Type: Public Buildings Year: 2009 Product: Multilayer Plumbing System Baku, Azerbaijan Baku International Bus terminal Complex Project: Supreme Court of Azerbaijan rendering services as a bus terminal Type: Public Buildings since the above mentioned date year by Year: 2009 year raised its service level in this field Product: Multilayer Plumbing System and broadened a range of its activities.
    [Show full text]
  • The Analysis of Critical Success Factors for In-Town Check-In in Taiwan
    sustainability Article The Analysis of Critical Success Factors for In-Town Check-In in Taiwan Cheng-Hua Yang 1 , Huei-Ju Chen 2,* , Li-Chu Lin 3 and Alastair M. Morrison 4 1 Department of Airline and Transport Service Management, National Kaohsiung University of Hospitality and Tourism, Kaohsiung City 812, Taiwan; [email protected] 2 Department of Leisure and Recreation Management, National Kaohsiung University of Hospitality and Tourism, Kaohsiung City 812, Taiwan 3 Department of Tourism and Hospitality, Private Chung-Hsin High School, Hsinchun County 304, Taiwan; [email protected] 4 Department of Marketing, Events and Tourism, Business School, University of Greenwich in London, London SE10 9LS, UK; [email protected] * Correspondence: [email protected]; Tel.: +886-7806-0505 (ext. 31405) Abstract: The Taoyuan International Airport in Taiwan encountered service capacity bottlenecks for insufficient facilities before COV-19 break. In order to increase the service capacity efficiency on check-in, security checks, and customs clearance, the Ministry of Transportation and Communications R.O.C. (MOTC), Taiwan, rerouted the airport traffic flow by implementing the in-town check-in (ITCI) concept to decrease crowding in the airport waiting hall. This research examined the structure of critical success factors (CSFs) for ITCIs, deriving three hierarchies of three dimensions, eight criteria, and 18 evaluation indexes from the previous literature, expert interviews, and analysis results from Analytic Network Process (ANP) via Super Decisions software. The three CSF dimensions were: first- level hierarchy “advantageous environments,” followed by “marketing” and “service value,” which is a second-level hierarchy. The study concluded that the third level item of “transferred vehicles system and management” can play an important key role in ITCTs and “users’ usage preference” has a high correlation to ITCT management strategy.
    [Show full text]
  • Assessing the Feasibility of an Aerotropolis Around Cleveland Hopkins International Airport
    Prepared for: Assessing the Berea Community Development Corporation Feasibility of Prepared by: an The Center for Public Management Aerotropolis Maxine Goodman Levin College of Urban Affairs Cleveland State University Around Cleveland August 2010 Hopkins International Airport: Executive Report Feasibility of an Aerotropolis ACKNOWLEDGEMENTS The Center for Public Management would like to acknowledge the contribution of the advisory group who provided valuable input during all phases of the project. Michelle Boczek Economic Development Commissioner, City of Brook Park Rebecca Corrigan Executive Director, Berea Community Development Corporation Shelley Cullins Economic Development Officer, Grant Writer, City of Parma John Hoose Manager, Policy and Research/Acting Development Manager, City of Cleveland, Department of Port Control Roseann Jones Economic Development Director, City of Olmsted Falls Tom Lehman Manager, Real Estate and Noise Abatement, Cleveland Airport System Tracey Nichols Economic Development Director, City of Cleveland We also thank Robert Peterson and Jeremy Levine with the IX Center for hosting the stakeholder discussion sessions, and the many participants of these sessions for sharing their time, input, and ideas toward this project. The Center for Public Management 2 Feasibility of an Aerotropolis TABLE OF CONTENTS Assessing the Feasibility of an Aerotropolis ..............................................................5 The Aerotropolis Concept .............................................................................................6
    [Show full text]
  • Global Aerotropolis Versus Local Aqua-Community: Conflicting Landscapes in the Extended Bangkok Metropolitan Region, Thailand
    The Sustainable World 205 Global aerotropolis versus local aqua-community: conflicting landscapes in the extended Bangkok Metropolitan Region, Thailand S. Nasongkhla1 & S. Sintusingha2 1Department of Landscape Architecture, Faculty of Built Environment, University Technology Malaysia, Malaysia 2Landscape Architecture Program, Faculty of Architecture Building and Planning, University of Melbourne, Australia Abstract Samutprakan province, located in the alluvial flood plain that once formed part of the pre-existing mangrove forests of the lower Chao Phraya River, has been affected by rapid urbanization from Bangkok since the 1980s, which has had significant impacts upon the hydrological system. Today, Samutprakan could be further transformed by the discourse of global city branding through the initiative of the Suvarnabhumi Aerotropolis. We conducted a time-series analysis of aerial photographs of the Bang Pli and Bang Pla districts of Samutprakan province to investigate how the landscape has been changed over time and the results indicate that the intensified industrial and higher density residential developments exacerbated the deteriorating ecological conditions of the waterway. Despite the proposal of an environmentally friendlier alternative of aquatic modern living, the strong tendency is that traditional aquatic cultural livelihoods and urban agriculture are being displaced and gentrified by the new town development. Keywords: environmental sustainability, landscape change, local livelihoods, city branding, urban expansion. WIT Transactions on Ecology and the Environment, Vol 142, © 2010 WIT Press www.witpress.com, ISSN 1743-3541 (on-line) doi:10.2495/SW100191 206 The Sustainable World 1 Introduction Panitchpakdi [8] noted that the ribbon development in the eastern region of Bangkok is highly significant in terms of population, industrial growth and national economic development that link to the Eastern Sea Board Project further down the Gulf of Thailand’s east coast.
    [Show full text]
  • UNITED STATES BANKRUPTCY COURT Southern District of New York *SUBJECT to GENERAL and SPECIFIC NOTES to THESE SCHEDULES* SUMMARY
    UNITED STATES BANKRUPTCY COURT Southern District of New York Refco Capital Markets, LTD Case Number: 05-60018 *SUBJECT TO GENERAL AND SPECIFIC NOTES TO THESE SCHEDULES* SUMMARY OF AMENDED SCHEDULES An asterisk (*) found in schedules herein indicates a change from the Debtor's original Schedules of Assets and Liabilities filed December 30, 2005. Any such change will also be indicated in the "Amended" column of the summary schedules with an "X". Indicate as to each schedule whether that schedule is attached and state the number of pages in each. Report the totals from Schedules A, B, C, D, E, F, I, and J in the boxes provided. Add the amounts from Schedules A and B to determine the total amount of the debtor's assets. Add the amounts from Schedules D, E, and F to determine the total amount of the debtor's liabilities. AMOUNTS SCHEDULED NAME OF SCHEDULE ATTACHED NO. OF SHEETS ASSETS LIABILITIES OTHER YES / NO A - REAL PROPERTY NO 0 $0 B - PERSONAL PROPERTY YES 30 $6,002,376,477 C - PROPERTY CLAIMED AS EXEMPT NO 0 D - CREDITORS HOLDING SECURED CLAIMS YES 2 $79,537,542 E - CREDITORS HOLDING UNSECURED YES 2 $0 PRIORITY CLAIMS F - CREDITORS HOLDING UNSECURED NON- YES 356 $5,366,962,476 PRIORITY CLAIMS G - EXECUTORY CONTRACTS AND UNEXPIRED YES 2 LEASES H - CODEBTORS YES 1 I - CURRENT INCOME OF INDIVIDUAL NO 0 N/A DEBTOR(S) J - CURRENT EXPENDITURES OF INDIVIDUAL NO 0 N/A DEBTOR(S) Total number of sheets of all Schedules 393 Total Assets > $6,002,376,477 $5,446,500,018 Total Liabilities > UNITED STATES BANKRUPTCY COURT Southern District of New York Refco Capital Markets, LTD Case Number: 05-60018 GENERAL NOTES PERTAINING TO SCHEDULES AND STATEMENTS FOR ALL DEBTORS On October 17, 2005 (the “Petition Date”), Refco Inc.
    [Show full text]
  • Taiwan's Taoyuan Aerotropolis Project on Track to Begin in 2018
    Taiwantrade News Taiwan's Taoyuan Aerotropolis Project on track to begin in 2018 The Taoyuan International Airport and the government are gearing up for a massive infrastructure expansion project set to begin in 2018; The Taoyuan Aerotropolis project. The massive infrastructure development plan is set to receive final approval in March, and then the Taoyuan City Government will have the clear to begin seeking contractors to start construction. Located in Taoyuan City in northwestern Taiwan, the Taoyuan Aerotropolis will essentially create a modern industrial logistics center, development zone as well as a modern urban residential neighborhood, all surrounding the current Taoyuan International Airport. Concept plans for the massive 4,500 hectare project have been in the works since as early as 2009, and the project will possibly be the largest infrastructure project in Taiwan’s history. Promoted as a “Gateway to Taiwan and to Asia,” the project calls for new rail lines, including a new MRT line for the Aerotropolis zone itself. In addition to the Taoyuan International Airport, the new complex will include the following five key zones; a Green Innovation Zone, a Logistics and Trading Zone, a LOHAS Residential Zone, a Passenger Transportation and Retail Zone, and an Administration and Business Service Zone. Taiwantrade News The current plans are also being promoted in step with the government’s “5+2" Industrial Innovation program, and will be integrated into the Asia Silicon Valley Development initiative. The entire project will also be a fertile ground for investment in smart technologies, Internet of Things, and the development of “green” technology and design.
    [Show full text]
  • Governing Airport Cities
    Global Airport Cities Spring 2009 Governing the aerotropolis How are today’s airport regions being administered? The Kenan Institute’s Dr Stephen Appold and Dr John Kasarda investigate. Aviation-linked commercial development, once confined largely to airport property and its immediate environs, is rapidly spreading outward. In the process, a new airport- anchored urban economic region is forming – the aerotropolis. The aerotropolis encompasses the airport city and the air commerce driven areas surrounding it. Some of these airport-linked developments primarily serve passenger-driven retail, restaurants, accommodations, and conference and exhibition facilities. Other airport areas have a heavy concentration of freight-handling facilities, while others are oriented towards filling regional office space needs. Indeed, most large airports now anchor an extensive region with multiple aviation- oriented functions. Given that these functions often encompass multiple jurisdictions, planning and co- ordinating aerotropolis development is frequently intertwined with issues of governance (administrative control). A successful aerotropolis requires co-ordinated investments in land use and ground transportation that leverage each other to the economic and environmental benefit of businesses, land owners, local governments, and the broader region. Three types of governance structures have evolved over time. These can be categorised as market, hierarchy and network. In practice, hybrid forms are most common. Market-driven The earliest aerotropolis forms to appear were market-based. That is, individual firms located near airports to maximise their own economic benefit given the evolving real estate supply and demand situation. In the US, airport cities surrounding Atlanta, Dallas/Fort Worth (DFW) and Chicago O’Hare international airports typify marked-based processes.
    [Show full text]
  • A Game-Theoretic Analysis of Skyscrapers
    Centre for Urban Economics and Real Estate Working Paper 2007-01 A Game-Theoretic Analysis of Skyscrapers Robert W. Helsley Sauder School of Business University of British Columbia and William C. Strange Rotman School of Management University of Toronto August 7, 2007 Centre for Urban Economics and Real Estate Sauder School of Business University of British Columbia 2053 Main Mall Vancouver, BC V6T 1Z2 Tel : 604 822 8399 or e-mail : [email protected] Web: http://cuer.sauder.ubc.ca/index.html A Game-Theoretic Analysis of Skyscrapers Robert W. Helsley Sauder School of Business 2053 Main Mall University of British Columbia Vancouver, BC, V6T 1Z2 Canada and William C. Strange* Rotman School of Management 105 St. George St. University of Toronto Toronto, ON M5S 3E6 Canada Revised: August 7, 2007 *Helsley is Watkinson Professor of Environmental and Land Management. Strange is RioCan Real Estate Investment Trust Professor of Real Estate and Urban Economics. We gratefully acknowledge the helpful suggestions of Jan Brueckner, who handled the paper as editor. We also gratefully acknowledge comments made by Gilles Duranton, Ig Horstmann, Yves Zenou, and two anonymous referees. In addition, we thank the Social Sciences and Humanities Research Council of Canada and the UBC Center for Urban Economics and Real Estate for financial support. Abstract Skyscrapers are urbanism in the extreme, but they have received surprisingly little direct attention in urban economics. The standard urban model emphasizes differentials in access across locations, which determine land price differentials and building heights. This explanation leaves out an important force that appears to have historically influenced skyscraper construction: an inherent value placed on being the tallest.
    [Show full text]
  • Environmental Sustainability Measures for Airports By
    Environmental Sustainability Measures for Airports by Maha Mousavi Sameh & Juliana Scavuzzi Occasional Paper Series: Sustainable International Civil Aviation The attached Occasional Papers have been prepared by a group of scholars associated with the Institute of Air and Space Law (IASL) at McGill University. They are the result of a collaborative effort between the IASL and the Centre for International Sustainable Development Law and are designed to be part of a book prepared by authors from both groups which will eventually be published by the Cambridge University Press under the title Sustainable International Civil Aviation. As the title of the book suggests, bringing together these various scholars and papers is the central theme of the sustainable development of international aviation. In particular, the work of the International Civil Aviation Organization (ICAO), the primary United Nations body tasked with regulating the environmental aspects of international aviation, and the provisions of the Chicago Convention which lays down powers of the Organization and the fundamental rules of international air law, form the primary focus of this collection. At the next ICAO Assembly in September-October of 2016, ICAO has the ambitious mandate to finalise a global scheme to limit CO2 emissions from international aviation. As many of the articles contained in the book are of immediate relevance to the discussions due to take place at ICAO, publishing and disseminating these draft chapters will contribute to the growing interest and debates on the issue of the environmental impact of aviation. It is hoped that these papers will contribute to the work of the Assembly and that informed readers and delegates participating at the ICAO Assembly will have constructive comments to share with the authors.
    [Show full text]