Urban Transportation Strategy in Hyderabad
Total Page:16
File Type:pdf, Size:1020Kb
Urban Transportation Strategy in Hyderabad CTS : Existing Scenario • Population Size – 94 lakhs (GHMC: 66 lakhs, Outside GHMC:28 lakhs) • Salient Points on Travel Demand o Total Person Trips – 1.12 crores (PCTR: 1.19) o Total Person Trips by Vehicles – 89 lakhs o Person km – 11.8 crores (Average TL: 13.25 km) o Share of Bus Passenger Trips – about 36% • Total Registered Vehicles 40 Lakhs,growth 11% p.a 2 HMA Population Forecast (in million) Doubling of Population Over Next 30 years - Adding a “London” 19m 15m 12m 9.4m 7.6m 5.7m 3 Study Objectives and Parameters • To evolve a long transportation plan for Hyderabad Metropolitan region (2041) besides Capacity Building. Year MMTS Bus Metro Car 2W Auto Taxi Total Person Trips (millions/day) 2011 2.7% 43.0% 6.1% 36.4% 8.3% 3.6% 100% 8.9 2021 2.5% 26.6% 26.5% 2.5% 28.2% 8.4% 5.3% 100% 12.1 +36% 2031 2.6% 24.2% 31.1% 3.2% 26.1% 7.7% 5.2% 100% 16.5 +85% 2041 2.6% 21.7% 34.8% 3.9% 25.3% 6.8% 4.8% 100% 22.5 +153% 2011 Public Transport Travel 2041 Public Transport Travel 2041 AM Peak Hour Transit Systems Proposed up to 2041 Metro Length: 417 km BRTS Length: 438 km MMTS Length: 428 km 6 Metro rail plan Code 2021 Proposed Corridors Length M1 Miyapur - Patancheruvu 8.45 M2 Faluknama - Shamshabad Airport 15.98 M3 Nagole - LB Nagar 5.07 M6 L B Nagar-Owaisi Hospital-Aramghad 15 M8 Tarnaka - Keesara 18.11 M7 Balanagar Y Junction-Balanagar-Bowenpalli-JBS 9.53 M14 M9 M4 JNTU-Shilparamam-Financial Dist. 15.56 L B Nagar-Vanastalipuran M10 M5 3 M1 Code 2031 Proposed Corridors Length Lakdikapul-Mehdipatnam- M13 21.85 M4 Gachiboli- Lingampally- BHEL M7 MGBS-Ramanthpur-Uppal- M11 22.41 M8 Ghatkesar Kapra - Gandi Maisama - M14 37.22 M13 Thumukunta -BHEL MGBS-Umdanagar -Shamsabad M11 M12 25.67 Airport Vanastalipuram - Pedda M3 M5 9 M18 Amberpet M6 Aramghad - Rethibowli 10 M9 Patancheruvu - Sangareddy 24 M5 M10 Bowenpalli-Medchal 16.66 Legend M6 M17 M5 MetroUnderMetro UnderConstruction Construction M2 Planned M15 Code 2041 Proposed Corridors Length ProposedPlanned Metro forupto 20212031 M12 M5 Pedda Amberpet - Chotuppal 27 Gachibowli - Shamshabad Proposed Metro for 20312041 M17 (along the ORR) 22.62 M15 Owaisi Hospital-Begumpet 29.13 Nanal Nagar - Langar House - M18 APPA Junction 10.27 BRTS plan Code 2021 Proposed Corridors Length Lakdikapul-Mehdipatnam-Gachiboli- B2 22 Lingampally- BHEL B1 Aramghar-Rethibowli 10 MGBS-Umdanagar -Shamshabad B3 26 Airport B7 Code 2031 Proposed Corridors Length B4 JBS-Mulugu 39 B11 B5 Pedda Amberpet-Choutuppal 27 B6 Owaisi Hosp.-Begampet 29 B4 B11 B3 B1 Code 2041 Proposed Corridors Length B10 Biramal Guda-Aghapalli 29 B9 B7 Bharat nagar-Narsapur 42 B2 B9 Kapra-Kokapet 60 B5 Outer Ring Road (Excluding B11 136 Gachibowli - Shamshabad Stretch) B12 Kuramalguda-Kothur 18 B10 Legend B6 ProposedProposedProposed BRTS BRTS BRTS for upto for 2021 20212031 B12 Planned ProposedProposed BRTS BRTS for for 2041 2031 MMTS plan MT12 Code 2021 Proposed Corridors Length MT1 Falaknuma-Umdanagar-Airport 18 MT2 Tellapur-Patancheru 12 MT3 Secunderabad-Bollaram 14 MT4 Sanathnagar-Moula Ali 19 MT5 MoulaAli-Malkajgiri-Sitaphalmandi 10 MT10 MT6 Bollaram-Medchel 14 MT7 Moulaali-Ghatkesar 14 MT13 MT6 MT2 MT3 MT11 MT16 MT7 MT8 MT15 MT4 MT5 Code 2031 Proposed Corridors Length Code 2041 Proposed Corridors Length MT9 Umdanagar-Shadnagar 35 MT14 Shadnagar - Jedcherla 24 MT10 Medchel-Topran 34 MT1 MT12 Topran - Ramayampet 21 MT11 Telapur- Ravulapalli 21 MT15 Ravulapalli - Vikarabad 24 MT8 Ghatkesar-Bhongir 26 MT13 Bhongir-Jangaon 23 MT16 Bibinagar-Nalgonda 72 MT9 Legend Existing/PlannedPlanned MMTS Proposed MMTS MT14 Potential Right of Way Requirements ROW(m) 1992 SRDP Distributors/Collectors Local/Access Roads Sub-Arterials Arterials Hierarchical Road Network Road Network Plan for 2041 Regional Commuter Rail System Summary of Cost Estimates Amount (INR Crores) System 2021 2031 2041 Highway System 12,080 21,915 39,620 Metro System 24,810 63,630 84,520 MMTS 1,360 3,280 BRTS 935 2,490 6,415 Intra-city Bus System 2,190 3,265 4,750 Terminals 1,590 2,230 3,390 Traffic Management Measures 5,945 8,985 11,390 Total 47,550 1,03,875 1,53,365 Government Initiations ✓ Metro Rail corridors Extensions/ New corridors ✓ Hyderabad Road Development Corporation Ltd (HRDCL) ✓ Strategic Road Development Plan (SRDP) ✓ Charminar Pedestrianization Project HRDCL PRORITY ROADS 16 An ISO 9001:2008 Certified Company Phase-1 AS for Rs 2631Crs for 20 works Charminar Pedestrianization Project Charminar Pedestrianization Project Phase-1 Charminar to Gulzar Houze Phase-2 Gulzar Houze to Madina An ISO 9001:2008 Certified Company New Generation Tram for Hyderabad Metro Corridor 1 Proposed NGT line 2.3km Further routes for Ext.