Eco Park, Land at M5 Junction 13, West of Stonehouse

Total Page:16

File Type:pdf, Size:1020Kb

Eco Park, Land at M5 Junction 13, West of Stonehouse Ecotricity Eco Park, Land at M5 Junction 13, West of Stonehouse Desk Based Utility Report Project no. 191199 OCTOBER 2015 RSK GENERAL NOTES Project No.: 191199-R01 (00) Title: Desk Based Utility Report, Land at M5 Junction 13, West of Stonehouse Client: RSK Environment Ltd Date: 20th October 2015 Office: RSK, 18 Frogmore Road, Hemel Hempstead, Herts, HP3 9RT Tel: +44 (0)1442 416652 Fax: +44 (0)1442 437550 www.rsk.co.uk Status: Final Project manager Stephen Owen Jessica Western Signature Date: 20/10/2015 RSK Environment (RSK) has prepared this report for the sole use of the client, showing reasonable skill and care, for the intended purposes as stated in the agreement under which this work was completed. The report may not be relied upon by any other party without the express agreement of the client and RSK. No other warranty, expressed or implied, is made as to the professional advice included in this report. Where any data supplied by the client or from other sources have been used, it has been assumed that the information is correct. No responsibility can be accepted by RSK for inaccuracies in the data supplied by any other party. The conclusions and recommendations in this report are based on the assumption that all relevant information has been supplied by those bodies from whom it was requested. No part of this report may be copied or duplicated without the express permission of RSK and the party for whom it was prepared. Where field investigations have been carried out, these have been restricted to a level of detail required to achieve the stated objectives of the work. This work has been undertaken in accordance with the quality management system of RSK Environment. Ecotricity Desk Based Utility Report – Land at M5 Junction 13, West of Stonehouse 191199 R02 (00) i Reproduced from Google Maps OSGR – 377947, 206658 with the permission of the Controller of Her Majesty’s Stationery Office, Crown Copyright. Licence No. 100014807 RSK Group Limited, 18 Frogmore Road, Hemel Hempstead, Hertfordshire, HP3 9RT. Client: Ecotricity Figure No: 1 1.1 SITE Site: Land at M5 Junction 13, Job No:191199 LOCATION West of Stonhouse PLAN Scale: Source: OS Ecotricity Desk Based Utility Report – Land at M5 Junction 13, West of Stonehouse 191199 R02 (00) i Preliminary Utilities Statement Background The site in question is being considered for development as an Eco Park, comprising of: The Green Technology Hub (the northern area north of A419 and east of the M5); The Sports Complex (the southern area south of the A419 and east of the M5); The Nature Conservation Area (the western area west of the M5). This preliminary utilities statement contains details of existing services and a high level overview of potential constraints associated with providing utilities to the proposed development. A full feasibility study is beyond the scope of this document. Where relevant, information has been sourced from a Preliminary Risk Assessment (PRA) undertaken by RSK in October 2015. Site Location and description The site comprises three parcels of agricultural land and is approximately 39.5 ha in total, with two parcels of land located to the east of the M5 north and south of the A419, having areas of 18.9 and 13.5 ha respectively. The third parcel is 4.6 ha in area and is located to the west of the M5, south of the A419 and linked to the most southerly land parcel via an underpass. The site is generally flat with a slight fall from 20m AOD (above ordinance datum) in the north to 15m AOD in the south. The Sports Complex is bordered by the M5 motorway to the northwest, with the Nature Conservation Area land parcel, the Highways England Depot and agricultural land beyond. The A419 and The Green Technology Hub are located to the northeast and residential properties and the villages of Churchend and Chipmans Platt are located to the southeast. To the south is the in filled former Stroud Canal and the Easington Trading Estate and to the southwest is further agricultural land and the River Frome. The Green Technology hub is bordered by a road and the village of Westend to the east and northeast. The M5 motorway borders the site to the northwest with agricultural land beyond and the other two areas of site are located to the south-west and south, beyond the A419 and the M5 respectively. Grove Lane forms part of the northern boundary of the eastern parcel of land. The Nature Conservation Area is generally surrounded by agricultural land to the north and west, with the River Frome along its south-western boundary. A Highways England Depot is located to the east and the M5 motorway is adjacent to the southeast with the southerly land parcel beyond. Environmental Setting and Sensitive Land Uses The site is in a generally low environmental setting with respect groundwater, being situated above a mixture of Secondary A and Secondary B aquifers, the site does not lie within a currently designated groundwater Source Protection Zone. No national or internationally designated sensitive land uses such as sites of special scientific interest (SSSI) were identified within a 1.5km radius of the site. Contamination The site has remained agricultural land with no history of development; hence the likelihood of there being contamination issues that could affect buried services is low. Desk Based Utilities Search A desk based utility survey was completed for the site and this is included at Appendix A All known service providers were contacted to ascertain whether they have any plant situated within the confines of the site. Utility companies that provided positive responses have supplied scale drawings of the plant they own. For the avoidance of doubt, negative responses are also included within the utilities report. The utilities companies that have plant in the area are summarised in Table 1, below. Ecotricity Desk Based Utility Report – Land at M5 Junction 13, West of Stonehouse 191199 R02 (00) ii Table 1: Utilities present within search area Provider Utility Type Comment A 500mm main is present in the Nature Conservation Area (western part of the site), running in a roughly south west to north east orientation. Potable water Eastington Maintenance Compound is served by a 3 inch diameter PVC supply. Severn Trent None identified. Anecdotal reports that residential properties to the east Foul Water of the site discharge foul water on to fields within the site boundary. It is presumed that neighbouring properties discharge via soakaway. Surface water None identified. 11kV overhead present within the western land parcel, running SE-NE providing supply to the depot located to the north of the site. Western power Electricity distribution 11kV overhead runs through both eastern land parcels (crossing the A419) serving off site residential properties and the Oldbury service area to the east of the site High Pressure Main runs roughly N-S close to the western border of the western land parcel. Wales and the Gas West Low pressure main runs roughly S-N through both eastern land parcels with feeds off serving residential properties to the east of the site. Tele- BT Present along A419 and adjacent properties. communications Note: The desk based utilities search does not include details of private supplies to neighbouring properties Future Connections The proposed development will require connection to existing utilities infrastructure in the area. The demands imposed by the development will need to be determined and relevant utilities providers will need to be consulted to determine capability of the existing utilities networks to cope with the increased demand. Eco Park aspires to be a green low carbon development, employing the very best, innovative and most recent practices in :- Sustainable construction; Exemplar innovative sustainable building design, orientation and landscape works, including an aim for buildings to meet Passivhaus standards; Sustainable operation and green practices to reduce carbon footprints; For the Green Technology Hub, incentives for building occupancy by companies from the “green economy”, either directly involved with manufacture and supply of, or developing sustainable products and services; Use of “green” infrastructure and retention and enhancement of woodlands and hedgerows; Ecotricity Desk Based Utility Report – Land at M5 Junction 13, West of Stonehouse 191199 R02 (00) iii Integration species rich grassland into no sporting areas throughout the site; Use of SuDs where practicable throughout the development; and For the Nature Conservation Area and green corridors, adoption of best practice ecological management and enhancement, and reinstatement of former habitat types. The principal benchmark for the Eco Park is to set the standard for best practice in sustainable building design, construction and operation. It will encourage designers, clients and others to think about low carbon and low impact design, minimising the energy demands created by a building before considering energy efficiency and low carbon technologies. Potable Water There are existing mains within the site area and there are no perceived issues that would prevent connection to the existing network, subject to consultation. Foul Drainage The desk based utilities report indicates that there is no existing foul drainage network within or close to the site. Appropriate ground investigations and infiltration would be required to establish whether a soak away drainage solution could be adopted for the proposed site. Surface Water It is understood that surface water from the proposed development will be managed via SuDS. As with the foul drainage, a programme of ground investigation/ infiltration testing will be required to determine whether it will be possible to discharge surface water to ground. It is also understood that surface water currently drains via a network of ditches that lead to the River Frome.
Recommended publications
  • Download Original Attachment
    Operator Name Location Name Address Name Address Street Address Town Address County Address Postcode 1 Address Postcode 2 Incumbent Duty Type Text Previous Name LA Code Local Authority Country AMG Superalloys UK Limited Rotherham Fullerton Road Rotherham South Yorkshire S60 1DL COMAH Upper Tier Operator (was London & Scandinavian Metallurgical Co Ltd) 4415 Rotherham England Anglian Water Services Limited Wing Water Treatment Works Morcott Road Oakham Rutland LE15 8SA COMAH Upper Tier Operator 2470 Rutland UA England Arch Timber Protection Limited Huddersfield Huddersfield Works Leeds Road Huddersfield West Yorkshire HD2 1YU COMAH Upper Tier Operator (was Arch UK Biocides Ltd) 4715 Kirklees England Argenta Dundee Limited Dundee Dunsinane Industrial Estate Kinnoull Road Dundee Angus DD2 3XR COMAH Upper Tier Operator (was Vericore Limited) 9059 Dundee UA Scotland Associated British Ports Immingham Dock Immingham Dock Immingham Lincolnshire DN40 2NS COMAH Upper Tier Operator 2002 North East Lincolnshire England Associated Petroleum Terminals (Immingham) Limited Immingham Main Terminal Queens Road Immingham North East Lincolnshire DN40 2PN COMAH Upper Tier Operator 2002 North East Lincolnshire England Avanti Gas Limited Ellesmere Port Britannia Road Ellesmere Port Cheshire CH65 4HB COMAH Upper Tier Operator (was Shell Gas Limited) 4325 Wirral England Avara Avlon Pharma Services Limited Avlon Works Severn Road Bristol South Gloucestershire BS10 7ZE COMAH Upper Tier Operator (was AstraZeneca UK Limited) 0119 South Gloucs UA England BAE Systems
    [Show full text]
  • Burnley Road, Blackburn, Bb1 3Hn
    Burnley Road Whitebirk Blackburn BB1 3HN 20/02/2019 PROJECT NO. 605028 ISSUE NO. 1 STATUS For Information Burnley Road Introduction This report assesses the potential constraints presented by the existing utility infrastructure both within the boundary and in the vicinity of the search area. The report is based on the information provided by the client about the location of the search area and the information provided by the utilities about their existing plant and networks. The information contained in this report is based on desk research only. What is a utility constraint? We use the term constraint to indicate that there may be limitations or prohibitions on designs and planned works due to the presence of utility apparatus. To overcome these can be costly and time-consuming. Depending on the legal rights and statutory powers of the utility the costs may have to be borne by the applicant/developer. Report interpretation We have developed a simple traffic light mechanism to present site constraints based on a red/amber/green evaluation; Red – site constraints exist due to the presence of utility apparatus. Amber – site constraints may exist due to the proximity of utility apparatus. Green – site constraints do not appear to exist. This report confirms to QL-D of PAS 128:2014 - Specification for Underground Utility Detection, Verification and Location. To obtain further detail on utility locations consider site reconnaissance (QL-C), detection (QL-B) and verification (QL-A) as recommended under ‘Important Information’. Prepared by Signed off by Celeste Imthurn Martin Darlison Premier Energy Services Ltd has taken all reasonable steps, within the timescales, to obtain the most robust information in this report but accepts no liability for the accuracy of such information or report and in addition to any limitation of liability under its Standard Terms and Conditions.
    [Show full text]
  • REGISTER of SPONSORS (Tiers 2 & 5 and Sub Tiers Only)
    REGISTER OF SPONSORS (Tiers 2 & 5 and Sub Tiers Only) DATE: 09-January-2017 Register of Sponsors Licensed Under the Points-based System This is a list of organisations licensed to sponsor migrants under Tiers 2 & 5 of the Points-Based System. It shows the organisation's name (in alphabetical order), the sub tier(s) they are licensed for, and their rating against each sub tier. A sponsor may be licensed under more than one tier, and may have different ratings for each tier. No. of Sponsors on Register Licensed under Tiers 2 and 5: 29,794 Organisation Name Town/City County Tier & Rating Sub Tier ?What If! Ltd London Tier 2 (A rating) Tier 2 General Tier 2 (A rating) Intra Company Transfers (ICT) @ Home Accommodation Services Ltd London Tier 2 (A rating) Tier 2 General Tier 5 (A rating) Creative & Sporting ]performance s p a c e [ london london Tier 5 (A rating) Creative & Sporting 01 Telecom Limited Brighton Tier 2 (A rating) Tier 2 General 0-two Maintenance London Tier 2 (A rating) Tier 2 General 1 Stop Print Ltd Ilford Tier 2 (A rating) Tier 2 General 1 Tech LTD London Tier 2 (A rating) Tier 2 General 10 Europe Limited Edinburgh Tier 2 (A rating) Tier 2 General Tier 2 (A rating) Intra Company Transfers (ICT) 10 GROUP LTD T/A THE 10 GROUP LONDON Tier 2 (A rating) Tier 2 General 10 Minutes With Limited London Tier 2 (A rating) Tier 2 General Page 1 of 1952 Organisation Name Town/City County Tier & Rating Sub Tier 1000heads Ltd London Tier 2 (A rating) Tier 2 General 1000mercis LTD London Tier 2 (A rating) Tier 2 General 100Starlings Ltd
    [Show full text]
  • Special Requirements for Safe Working in Close Proximity to High Pressure Pipelines
    Revision No. 19.11 Note: This manual supersedes all previous issues, which should now be sent for recycling. special requirements for safe working in close proximity to high pressure pipelines For pipelines owned IGas and or operated by: INEOS O&P BPA Mainline Pipelines Limited CATS Manchester Jetline Limited EP Langage Ltd Marchwood Power MAINLINE ConocoPhillips National Grid (Gas PIPELINES E-ON Transmission) LIMITED Essar Oil (UK) Ltd Oikos Esso Petroleum Company Petroineos Limited SABIC CLH Pipeline System Total LOR Humbly Grove Energy UNIPER Awareness and preparation is the key to safe excavation Linewatch Products Available Markerpost leaflet Safe Digging leaflet Landowner Brief leaflet Linewatch Presentations Free Linewatch presentations are available to any group involved in planning and undertaking work near Linewatch members pipelines. These presentations can be arranged through the Linewatch website www.linewatch.org.uk What to do in an emergency Signs of a possible pipeline leak may include: pools of fuel, dirt or dust blowing in the air, hissing sounds, gas or petroleum odours, bubbles in standing water, dead or discoloured vegetation and ice on the ground. If you notice any of these in the vicinity of a pipeline, treat as an emergency. In the event of an emergency • Remove all personnel immediately from the vicinity of the incident • Extinguish any sources of ignition and shut down all working plant from the immediate area (remember, vapours will travel downwind). • Inform the emergency services. Dial 999 and alert the Fire Brigade and Police. • If known, call the Pipeline Operator. There will be a pipeline marker nearby with emergency contact information.
    [Show full text]
  • Safe Working in Close Proximity to High Pressure Pipelines
    Revision No. 17.06 Note: This manual supersedes all previous issues, which should now be sent for recycling. special requirements for safe working in close proximity to high pressure pipelines For pipelines owned IGas and or operated by: Ineos BPA Mainline Pipelines Limited CATS Manchester Jetline Limited Centrica Energy Marchwood Power MAINLINE ConocoPhillips National Grid (Gas PIPELINES E-ON Transmission) LIMITED Essar Oil (UK) Ltd Petroineos Esso Petroleum Company SABIC Limited Total LOR CLH Pipeline System UNIPER Humbly Grove Energy WINGAS Linewatch Products Available Markerpost Brochures Toolbox Talk Handouts Linewatch Presentations Landowner Brief Awareness and preparation is the key to safe excavation What to do in an emergency Signs of a possible pipeline leak may include: pools of fuel, dirt or dust blowing in the air, hissing sounds, gas or petroleum odours, bubbles in standing water, dead or discoloured vegetation and ice on the ground. If you notice any of these in the vicinity of a pipeline, treat as an emergency. In the event of an emergency Remove all personnel immediately from the vicinity of the incident Extinguish any naked flames and shut down all working plant from the immediate area (remember, vapours will travel downwind). Inform the emergency services. Dial 999 and call the Fire Brigade and Police. If known, call the Pipeline Operator. There will be a pipeline marker nearby with emergency contact information. Exclude all vehicles and personnel from the vicinity. Do not attempt to seal any leaks. Do not attempt to extinguish the flame if the leak has ignited. Action to be taken if the pipeline has been damaged but has not caused leakage: a) Contact the Pipeline Operator or his Agent.
    [Show full text]
  • Making Cheshire Safer Annual Action Plan for 2018/19 (IRMP 15) Report on Public, Staff and Partner Consultation February 2018
    Making Cheshire Safer Annual Action Plan for 2018/19 (IRMP 15) Report on public, staff and partner consultation February 2018 Draft Annual Action Plan 2018/19 (IRMP 15) Consultation Report Page 1 of 147 Contents Page 1. Introduction 3 2. Executive summary 4 3. The programme of consultation 8 4. Consulting with the public 10 5. Consulting with staff and internal stakeholders 14 6. Consulting with stakeholders 16 7. Feedback, evaluation and communicating outcomes 19 8. Detailed results 21 9. Profile of respondents 31 Appendices Appendix 1: Social media and press release 43 Appendix 2: Summary, survey and Firelink newsletter 47 Appendix 3: Partners and stakeholders communicated with 50 Appendix 4: Additional public responses 53 Appendix 5: Public comments 58 Appendix 6: Staff comments 115 Appendix 7: Responses from partners and stakeholders 130 Draft Annual Action Plan 2018/19 (IRMP 15) Consultation Report Page 2 of 147 1. Introduction This report sets out the results of the programme of public, staff and partner consultation on Cheshire Fire Authority’s draft annual action plan for 2018/19 (IRMP 15), titled Making Cheshire Safer, between October 2nd 2017 and January 2nd 2018. The purpose of this report is to enable the Authority to understand the differing level of opinion among all groups to the proposals set out in the draft plan, in order to assist the Authority in giving consideration to the results of the consultation in its decision making process. This feedback will be among the issues considered by the Fire Authority prior to approval of the final version of the annual action plan.
    [Show full text]
  • The Economic Contribution of the Uk Downstream Oil Sector
    THE ECONOMIC CONTRIBUTION OF THE UK DOWNSTREAM OIL SECTOR FEBRUARY 2019 Petroleum_Word_cover.indd 1 05/02/2019 16:21 The Economic Contribution of the UK Downstream Oil Sector February 2019 All data shown in tables and charts are Oxford Economics’ own data, except where otherwise stated and cited in footnotes, and are copyright © Oxford Economics Ltd. This report is confidential to UKPIA and may not be published or distributed without their prior written permission. The modelling and results presented here are based on information provided by third parties, upon which Oxford Economics has relied in producing its report and forecasts in good faith. Any subsequent revision or update of those data will affect the assessments and projections shown. To discuss the report further please contact: Andrew P Goodwin: [email protected] Oxford Economics Broadwall House, 21 Broadwall, London, SE1 9PL, UK Tel: +44 203 910 8000 2 20190205 UKPIA PRESS.pdf 2 06/02/2019 11:08 The Economic Contribution of the UK Downstream Oil Sector FOREWORD Stephen Marcos Jones Director General, UKPIA The UK’s downstream oil sector is going through a transformation. The long-term trends—shifting product demand, misalignment of supply and demand, and ensuring the UK remains an attractive place to do business— continue to challenge the UK Petroleum Industry Association (UKPIA) and our membership. But there is change ahead for all elements of the sector, as the government rightly pursues its ambitions to reduce carbon emissions and those of other pollutants. We are firmly behind these goals, which benefit the communities in which we want to continue to work and prosper.
    [Show full text]
  • Thank You for Your Enquiry Dated 11/01/2021. We Confirm That Our Client CLH-PS’S Apparatus Will Be Affected by Your Proposals As Indicated on the Attached Plan(S)
    Our Ref: BA/BR/BR/0020/L.1/211094 Your Ref: 20/06082/X 13 January 2021 FISHER GERMAN LLP CLH Pipeline System Ltd PO Box 7273 Ashby de la Zouch Development Management (CH) Leicestershire Bristol City Council, LE65 2BY PO Box 3399, Bristol BS1 9NE Tel: 0845 0701245 Email: [email protected] www.fishergerman.co.uk Dear Sirs/Madam CLH Pipeline System (CLH-PS) Ltd (‘CLH-PS’) – Objection – Planning Application Thank you for your enquiry dated 11/01/2021. We confirm that our client CLH-PS’s apparatus will be affected by your proposals as indicated on the attached plan(s). The plan(s) supplied are intended for general guidance only and should not be relied upon for excavation or construction purposes. No guarantee is given regarding the accuracy of the information provided and in order to verify the true location of the pipeline you should contact CLH-PS to arrange a site visit. It appears from the plans submitted by the applicant that their proposed development is to be constructed within close proximity to CLH-PS apparatus. Such works would require consent from CLH-PS and, in this instance, consent would not be granted as the proposed development would restrict access to the pipeline, both for routine maintenance and in an emergency situation. We must therefore object to the planning application. My client must be consulted to ensure the proposal has no impact on their apparatus. Their contact details are: Central Services Email: [email protected] Ashdon Road Tel: 01799 564101 Saffron Walden Essex, CB10 2NF When contacting CLH-PS, please quote our unique reference 211094 , which is specific to this enquiry.
    [Show full text]
  • Chair, Public Accounts Committee House of Commons London SW1A 0AA 04 December 2020
    Ms Meg Hillier MP Chair, Public Accounts Committee House of Commons London SW1A 0AA 04 December 2020 Dear Ms Hillier, HS2 Ltd and Non-Disclosure Agreements I write further to the letter you received in November 2020 from DfT Permanent Secretary Bernadette Kelly with respect to Non-Disclosure Agreements (NDAs) in place on the HS2 project. Following the Committee’s hearing I wrote to Ms Kelly in response to the questions raised around the number and use of NDAs. In that letter I set out that these agreements do not diminish our commitment to being transparent about the programme. We are very aware of the commitment the Government have made to Parliament regarding HS2 and we take that responsibility seriously. NDAs are only entered into by mutual consent and are primarily for the following purposes: to avoid releasing information that could place homes and businesses in unnecessary blight; to protects commercially sensitive information; to protect the personal information of those potentially affected by any proposed changes to the HS2 scheme; to allow appropriate parties, such as Local Authorities, to provide feedback on the design and operation of the new railway, with consideration of local development aspirations and any statutory planning consents. It is also important to explain that no staff, currently or previously directly employed by HS2 Ltd, have signed NDA agreements with HS2 Ltd. However, confidentiality obligations form a standard part of HS2 Ltd employment contracts, consistent with other publicly funded organisations. These obligations do not prevent employees, current or former, from raising wider questions about the scope, cost, or implication of the project.
    [Show full text]
  • Strategic Assessment of Risk 2019
    OFFICIAL ESSEX COUNTY FIRE & RESCUE SERVICE STRATEGIC ASSESSMENT OF RISK 2019 A SAFER ESSEX Eighth Edition Version 10.1 20 August 2019 OFFICIAL Contents DISTRIBUTION ........................................................................................................................................ 4 EXECUTIVE SUMMARY ........................................................................................................................... 6 INTRODUCTION ...................................................................................................................................... 8 AIM 10 OBJECTIVES .......................................................................................................................................... 10 CHAPTER 1: RISK – GENERAL ................................................................................................................. 12 1.1 THE STRATEGIC MANAGEMENT OF RISK ....................................................................................... 12 1.2 NATIONAL SECURITY RTISK ASSESSMENT 2019 ............................................................................. 14 1.3. RISK MANAGEMENT ....................................................................................................................... 14 1.4 INTEGRATED RISK MANAGEMENT PLANNING GUIDANCE ............................................................ 14 1.5 STRATEGIC RISKS ............................................................................................................................ 15
    [Show full text]
  • VPI Immingham OCGT Project Applicant's Comments on Relevant Representations Examination Deadline 2
    VPI Immingham OCGT Project Document Ref: 7.3 PINS Ref: EN010097 The Immingham Open Cycle Gas Turbine Order Land to the north of and in the vicinity of the VPI Immingham Power Station, Rosper Road, South Killingholme, Lincolnshire, DN40 3DZ Applicant’s Comments on Relevant Representations Examination Deadline 2 The Planning Act 2008 GX Applicant: VPI Immingham B Ltd Date: September 2019 Document Ref: 7.3 Applicant’s Comments on Relevant Representations DOCUMENT HISTORY Document Ref 7.3 Revision 1.0 Author Clara Rands (CR) Signed CR Date 12.09.19 Approved By Jake Barnes-Gott (JBG) Signed JBG Date 12.09.19 Document Owner DWD GLOSSARY Abbreviation Description Access Work No. 2 – access works comprising access to the OCGT Power Station Site and access to Work Nos. 3, 4, 5 and 6; Access Site The land required for Work No.2. AGI Above Ground Installation AONB Area of Outstanding Natural Beauty APFP The Infrastructure Planning (Applications: Prescribed Forms and Regulations Procedures) Regulations 2009 Applicant VPI Immingham B Ltd Application The Application for a Development Consent Order. Application The documents that make up the Application (as defined above). Documents BEIS Department for Business, Energy and Industrial Strategy. CCR Carbon Capture Ready CCS Carbon Capture and Storage CEMP Construction Environmental Management Plan CHP Combined Heat and Power CO2 Carbon Dioxide COMAH Control of Major Accident Hazards CTMP Construction Traffic Management Plan CWTP Construction Workers Travel Plan DCO A Development Consent Order. EA Environment Agency EIA Environmental Impact Assessment Electrical Work No. 5 – an electrical connection of up to 400 kilovolts and controls Connection systems.
    [Show full text]
  • Energy Policies of IEA Countries: United Kingdom 2019 Review
    ENERGY POLICIES OF IEA COUNTRIES United Kingdom 2019 Review Secure Sustainable Together ENERGY POLICIES OF IEA COUNTRIES United Kingdom 2019 Review INTERNATIONAL ENERGY AGENCY The IEA examines the IEA member IEA association full spectrum of energy countries: countries: issues including oil, gas and coal supply and Australia Brazil demand, renewable Austria China energy technologies, Belgium India electricity markets, Canada Indonesia energy efficiency, access Czech Republic Morocco to energy, demand side Denmark Singapore management and much Estonia South Africa more. Through its work, Finland Thailand the IEA advocates policies France that will enhance the Germany reliability, affordability and Greece sustainability of energy in Hungary its 30 member countries, Ireland 8 association countries Italy and beyond. Japan Korea Luxembourg Mexico Netherlands New Zealand Norway Poland Portugal Slovak Republic Spain Sweden Switzerland Turkey United Kingdom United States The European Commission also participates in the work of the IEA Please note that this publication is subject to specific restrictions that limit its use and distribution. The terms and conditions are available online at www.iea.org/t&c/ Source: IEA. All rights reserved. International Energy Agency Website: www.iea.org Foreword The International Energy Agency (IEA) has conducted in-depth peer reviews of its member countries’ energy policies since 1976. This process not only supports energy policy development but also encourages the exchange of and learning from international best practices and experiences. In short, by seeing what has worked – or not – in the “real world”, these reviews help to identify policies that achieve objectives and bring concrete results. Recently, the IEA has moved to modernise the reviews by focusing on some of the key energy challenges in today’s rapidly changing energy markets.
    [Show full text]