Concept Plan for Hastings Park

Total Page:16

File Type:pdf, Size:1020Kb

Concept Plan for Hastings Park 1 RACECOURSE BARNS 20 NEW BRIGHTON PARK • Double-decker barns with approximately 300 stalls to replace existing • Safer and more convenient connections to Hastings Park makes this barns place great for biking, running, dog walking, or hanging out at the beach 2 RACECOURSE INFIELD 21 SALT WATER MARSH • Infield repurposed for surface parking for up to approximately 1100 cars • Mouth of the daylighted stream set below grade of racetrack in order to maintain views and reduce noise • Landscaped with marsh plants, pathways and boardwalks impact 3 NORTHWEST PARKING 22 TUNNEL CONNECTION • Either surface or structured parking with approximately 700 to 2000 • Retrofitted existing tunnel for daylighted creek and pedestrian-only stalls to replace spaces removed during park redevelopment access 4 MILLER PLAZA 23 CREEKWAY PARK • Day-to-day vehicle access and passenger drop-off area • Greenway trail alongside meandering day-lighted stream • A pedestrian-only space for performances and displays during festivals • Additional parking and events 24 LONG TERM PEDESTRIAN / CYCLIST OVERPASS 5 FESTIVAL PLAZA • Pedestrian and cyclist overpass spanning McGill Street • A new urban heart of the park featuring: comfortable seating, public art, high-quality paving and lighting where on can grab a coffee, access Wi-Fi, 25 SHORT TERM TUNNEL RETROFIT read a book, chat with friends, or play in the water fountain • Vehicle lanes reduced to accommodate both pedestrians and bicyclist • Flexible indoor and outdoor space for community festivals, special events • Enhanced pathways, lighting and signage and markets • Built in festival and event infrastructure to shorten set-up and tear down 26 DAYLIGHTED STREAM time • Natural habitat and landscaped stream corridor varying between 45 - 70 • Daylighted stream flows along eastern edge of the plaza meters in width • Greenway runs along east side of stream for cycling, strolling, and bird LIVESTOCK BUILDING 6 watching • Building upgraded for seasonal use and retrofitted with large overhead doors allowing activities in the Livestock Building to spill out onto the 27 PERIMETER PARK GREENWAY Festival Plaza • 3-km separated path for pedestrians and cyclists - a great place for long • Ideal space for markets, shows, events, or cultural/arts production walks, rollerblading, running, dog walking, learning to ride a bike and 7 PNE OPERATIONS AND ADMINISTRATION commuting • Consolidated functions in new building attached to Coliseum BACK OF HOUSE 8 28 MAIN ENTRANCE TO FLAT FLOOR BUILDING • Discretely located service area with good access to Bridgeway FLAT FLOOR BUILDING BELOW GRADE 9 29 PLAYLAND • Multi-purpose building for year-round commercial and community use • Most of the current rides and retained as Playland gradually expands 10 THE ALLÉE north with new rides and attractions to an ultimate size of 24 acres • Existing double row of London Plane trees becomes a major pedestrian • Interconnected series of paths and plazas with shaded seating and patio corridor cafes • Rides and attractions surrounded by trees and vegetation 11 THE ITALIAN GARDENS • Retained and integrated into the new park design 30 DUNDAS CONNECTOR • Link to Vancouver Heights and Burnaby’s bike routes 12 THE SKATEBOARD PARK 31 THE AMPHITHEATRE 13 RENFREW STREET • Upgraded with covered stage and landscaping for festivals and shows • Restructured to slow traffic and increase safety with corner bulges and • Great views to Racecourse, Burrard Inlet, and the North Shore enhanced crosswalks Mountains • Removed lane of traffic added to the park edge for the Perimeter WINDERMERE BELVEDERE Greenway 32 • Located at top of Windermere Hill, café seating allows for panoramic • Traffic calming and landscaping to create mini park gateways from the views of the Burrard Inlet and North Shore Mountains neigbourhood into the park • Food service and washrooms – a great place to grab a coffee or snack 14 THE PARADE and enjoy the view • The East/West Greenway through the park • Designed for community events, performances, sitting, people watching, 33 OFF-SEASON CONNECTOR walking and cycling • Greenway connection through Playland during months when Playland is • Views opened up over the Sanctuary closed • Playful water features extend from Italian Gardens 34 EMPIRE FIELDS 15 THE GREEN • Community sports field use restored and accompanied by field lights, • Large gently sloping lawn as a park connection between the Italian running track, and washrooms after temporary stadium is removed Gardens and the Sanctuary • Lawn area for playing and picnicking 35 NATURALIZED AREAS • A diversity of native plants to enhance habitat and food for wildlife 16 THE SANCTUARY • Invasive species management program • Existing Sanctuary retained and connected to new day-lighted stream • Landscaped to increase safety and enhance inward views to the pond 36 THE PLATEAU • Youth focused park between rollercoaster and Empire Fields includes 17 the garden’s gardens a Dirt Jumps, Bike Trials Area and hard surface sport courts for ball • Demonstration and experimental gardens showcasing local food, hockey and basket ball horticulture, ecology and art • Alternate connection to perimeter greenway route along The Plateau • Small amphitheatre and terraced seating for enjoying performances is located on the north end of the Garden Auditorium 37 LEESIDE TUNNEL • Skateboarding features retained 18 FESTIVAL MEADOW • Open space for flying kites, playing games, picnics and relaxing • Improved connection to neighbourhoods south of Hastings Street • Opportunity for smaller community festivals and events 38 PARK CORRIDOR • Festival and event infrastructure is built-in to shorten set-up and tear- • Playland moved off Hastings Street to create a continuous park down time connection between Empire Fields, Festival Meadows, and the Sanctuary 19 NEW HASTINGS COMMUNITY CENTRE • Enhanced perimeter greenway path • An anchor for Hastings Community Park and a gateway to the shopping area along Hastings Street 39 OLD PLAYLAND ENTRANCE • Highly visible location enhances the pedestrian experience on Hastings • Enhanced park gateway at the junction of the Park Perimeter and North/ Street South Greenways ... a day at the park Hastings Park / PNE Master Plan www.vancouver.ca/hastingspark 1 RACECOURSE BARNS 20 NEW BRIGHTON PARK 2 RACECOURSE INFIELD 21 SALT WATER MARSH • Infield repurposed for surface parking for up to approximately 1100 cars set below grade of racetrack in order to maintain views and reduce noise impact 22 TUNNEL CONNECTION 3 NORTHWEST PARKING • Either surface or structured parking with approximately 700 to 2000 stalls to replace spaces removed during park redevelopment 23 CREEKWAY PARK 4 MILLER PLAZA • A pedestrian-only space for performances, displays and events during the Fair 24 LONG TERM PEDESTRIAN / CYCLIST OVERPASS • Pedestrian and cyclist overpass spanning McGill Street 5 FESTIVAL PLAZA • A new urban heart of the Fair designed to accommodate events, exhibits 25 SHORT TERM TUNNEL RETROFIT and performances 26 DAYLIGHTED STREAM 6 LIVESTOCK BUILDING • Showcase for agriculture, livestock and other events during the Fair 27 PERIMETER PARK GREENWAY • Greenway open to the public during Fair-time 7 PNE OPERATIONS AND ADMINISTRATION 28 BACK OF HOUSE • Discretely located service area with good access to Bridgeway 8 MAIN ENTRANCE TO FLAT FLOOR BUILDING 29 PLAYLAND 9 FLAT FLOOR BUILDING BELOW GRADE • Most of the current rides and retained as Playland gradually expands • Exhibitions and other events during the Fair north with new rides and attractions to an ultimate size of 24 acres • Interconnected series of paths and plazas with shaded seating and patio 10 THE ALLÉE cafes • Rides and attractions surrounded by trees and vegetation 30 DUNDAS CONNECTOR 11 THE ITALIAN GARDENS • Programmed for performances and special events during the Fair 12 THE SKATEBOARD PARK 31 THE AMPHITHEATRE • Great views to Racecourse, Burrard Inlet, and the North Shore Mountains • Programmed with theatrical and musical performances during the Fair 13 RENFREW STREET 32 WINDERMERE BELVEDERE • New main entrance to Playland • Food service and washrooms – a great place to grab a coffee or snack 14 THE PARADE and enjoy the view • The ‘Main Line’ during the Fair with excellent layout for concessionaire tents and Fair-time PNE parade route 33 OFF-SEASON CONNECTOR 34 EMPIRE FIELDS 15 THE GREEN • Large lawn configured for day-time stage and beer garden during the Fair 35 NATURALIZED AREAS 16 THE SANCTUARY • Programmed quieter, educational or contemplative activities 36 THE PLATEAU 17 the garden’s gardens • Demonstration and experimental gardens showcasing local food, horticulture, ecology and art 37 LEESIDE TUNNEL 18 FESTIVAL MEADOW • New programmed space for the Fair • Festival and event infrastructure is built-in to shorten set-up and tear- 38 PARK CORRIDOR down time • Enhanced perimeter greenway path 19 NEW HASTINGS COMMUNITY CENTRE 39 OLD PLAYLAND ENTRANCE • Enhanced park gateway at the junction of the Park Perimeter and North/ South Greenways • Entrance to the Playland during Fair-time only ... a day at the fair Hastings Park / PNE Master Plan www.vancouver.ca/hastingspark.
Recommended publications
  • Empire Stadium, Located on 14 Acres at the Pacific National Exhibition at Hastings Park in East Vancouver, Is One of Them
    AN EMPIRE LEGACY For Immediate Release (June 22, 2010) Vancouver, British Columbia: In the timeline of any city there are places that become immortal in its growth, locations that become legend in the fabric of its local culture. Empire Stadium, located on 14 acres at the Pacific National Exhibition at Hastings Park in East Vancouver, is one of them. For 39 years, Empire Stadium captured the collective imagination of Vancouverites experiencing the thrill of a football game held outdoors on a warm September afternoon; or the hysteria of a once-in-a-lifetime concert; or the pageantry of a visit by royalty. The allure of Empire spanned several generations, and nostalgia for the memory of the open-air stadium that was once the grandest in the country continues today. Arguably one of the Top 10 wonders of the Canadian sports world, Empire Stadium was the setting of many historic milestones. Empire Stadium is the site of one of the most important moments in sports history – the August 7, 1954 ‘Miracle Mile’ during the British Empire and Commonwealth Games. The most famous event of the Games was the One Mile Race in which both John Landy and Roger Bannister ran the distance in under four minutes (Bannister 3.58.8; Landy 3.59.6). The race's end is memorialized in a statue of the two (with Landy glancing over his shoulder, thus losing the race) that stood outside the stadium until its demolition. The statue is now located near the south-west corner of Hastings Park at the intersection of Renfrew and Hastings Streets.
    [Show full text]
  • We Returned. Now He Mouth. Our Older Relatives Are Gone Mouths. Now a Rocket of Words Bursts Dress, Our Dress of More Shape
    returned. We went: we returned. Now he mouth. Our older relatives are gone mouths. Now a rocket of words bursts dress, our dress of more shape. Now eople who donate faces and tongues. ow we run our fingers over their fingers uins we’ve burst too from the terrestri- rstand cloth, home, anything. Are we ister? We can’t yet participate in lost g. Now we were born complex, messy, ards and mats. Our faces now model ves. Now we have or own a shelf. We ches out in a continual thin plane. Our ns dirty water, plants, coins, unraveled e necessary. We’re speaking for the air e black branches, the objects covered the metal fence, some spatial confu- ve gently as the prepositions. What is s better than this. Deep in our doubt a in one place yet move like blackbirds. Occasional Work and Seven Walks from the Office for Soft Architecture Lisa Robertson clear cut press Astoria © 2003 Clear Cut Press and Lisa Robertson All rights reserved. Designed by Tae Won Yu Production and layout by Robin Mitchell Copyedited by Viola Funk and Allison Dubinsky Color Separations by Scan Lab Printed and Bound by Toppan Printing Company America OCCASIONAL WORK AND SEVEN WALKS FROM THE OFFICE OF SOFT ARCHITECTURE / Lisa Robertson ISBN 0-9723234-3-0 Library of Congress Control Number: 2003111519 Photographs not otherwise cited in the text are reproduced with permis- sion from the following sources: pp. 6-11: © Andreas Pauly. Photos of Petra Blaisse’s curtains for the Mick Jagger Centre, Dartford Grammar School for Boys, Kent, England.
    [Show full text]
  • George Black — Early Pioneer Settler on the Coquitlam River
    George Black — Early Pioneer Settler on the Coquitlam River Researched and written by Ralph Drew, Belcarra, BC, December 2018. The ‘Colony of British Columbia’ was proclaimed at Fort Langley on November 19th,1858. In early 1859, Colonel Richard Clement Moody, RE, selected the site for the capital of the colony on the north side of the Fraser River where the river branches. The Royal Engineers established their camp at ‘Sapperton’ and proceeded to layout the future townsite of ‘Queensborough’ (later ‘New Westminster’). On July 17th, 1860, ‘New Westminster’ incorporated to become the first municipality in Western Canada. During the winter of 1858–59, the Fraser River froze over for several months and Colonel Moody realized his position when neither supply boat nor gun-boat could come to his aid in case of an attack. As a consequence, Colonel Moody built a “road” to Burrard Inlet in the summer of 1859 as a military expediency, in order that ships might be accessible via salt water. The “road” was initially just a pack trail that was built due north from ‘Sapperton’ in a straight line to Burrard Inlet. In 1861, the pack trail was upgraded to a wagon road ― known today as ‘North Road’. (1) The ‘Pitt River Road’ from New Westminster to ‘Pitt River Meadows’ was completed in June 1862. (2) In the summer of 1859, (3)(4) the first European family to settle in the Coquitlam area arrived on the schooner ‘Rob Roy’ on the west side of the Pitt River to the area known as ‘Pitt River Meadows’ (today ‘Port Coquitlam’) — Alexander McLean (1809–1889), his wife (Jane), and their two small boys: Alexander (1851–1932) and Donald (1856–1930).
    [Show full text]
  • Limited Phase 1 ESA and Phase 2 ESA, Eastern Portion of New
    Limited Phase 1 Environmental Site Assessment and Phase 2 Environmental Site Assessment Eastern Portion of New Brighton Park, Vancouver, BC Prepared for: Port Metro Vancouver, Habitat Enhancement Program 100 The Pointe – 999 Canada Place Vancouver, BC V6C3T4 Prepared by: Hemmera Envirochem Inc. 18th Floor, 4730 Kingsway Burnaby, BC V5H 0C6 File: 302-035.04 August 20, 2015 PMV – Habitat Enhancement Program Hemmera Limited Phase 1 and 2 ESA – New Brighton Park - i - August 2015 EXECUTIVE SUMMARY Hemmera Envirochem Inc. (Hemmera) was retained by Port Metro Vancouver (PMV) Habitat Enhancement Program (HEP) to conduct a limited Phase 1 Environmental Site Assessment (ESA) and a Phase 2 ESA for the eastern portion of New Brighton Park, in Vancouver, BC (the ‘Site’). Based on information provided by PMV, an opportunity exists to create fish and wildlife habitat by creating a wetland habitat feature on the east side of the New Brighton Park (the ‘Project’). The majority of the current Project area falls within a single parcel. The portion of the park for which the Project is planned for is leased to the City of Vancouver by PMV, under lease reference 1-01-00444. A Stage 1 Preliminary Site Investigation (PSI) was completed at the Site by Keystone Environmental Ltd (Keystone) in May 1997. Based on those findings, a subsequent Stage 2 PSI was completed by Keystone in July 1997. Both phases of work were completed for the City of Vancouver. The objectives of this limited Phase 1 ESA was to update the environmental conditions at the Site since the previous PSIs were completed in May/July 1997, and identify areas of potential environmental concern (APECs) and potential contaminants of concern (PCOCs) associated with present and/or historical on and off-Site activities that may have impacted environmental media at the Site.
    [Show full text]
  • 2019 Fair Exhibit Planning January 8, 2019
    Hastings Park-PNE Public Board Meeting March 4, 2019 Agenda 1. Review of Projects to date 2. Update on Master Plan Projects • Playland Redevelopment • Amphitheatre Renewal 3. Hastings Park Technical Studies 4. Next Phase Projects Review of Projects to Date Completed Greening Projects to Date Creekway Park Previously a gravel parking lot Completed September 2013 Includes day lighted stream, pathway, bike way, natural landscaping HP Identity and Signage Plan Hastings Park Branding and wayfinding to venues and greenspaces Completed 2014/2015 HastingsCompleted Greening Park Projects / toPNE Date Master Empire Fields Plan Two community sports fields & Track Lighting for evening use Plateau Sports Park- includes playground, sport courts, bike park, parkour Completed July 2015 Temporary Greenways East/West connector linking Renfrew, Empire Field & New Brighton Park Future plans incorporate permanent greenways Completed 2013-2014 HastingsCompleted Projects Park to Date / PNE Master Livestock building Phase 1 PlanRoofing and seismic upgrades to ensure safety Feasibility Study is next step Completed 2014 Garden Auditorium Asbestos Abatement Completed 2014 Update on Master Plan Projects Playland Redevelopment Phase 1 Phase 2 Phase 3 Phase 4 2011-2013 2017-2020 2020-2022 2022-2028 MASTER PLAN & DETAILED PLANNING & Phase BUSINESS CASE CONSTRUCTION PROJECT FEASIBILITY DESIGN Determine if there is a Clearly define the Plan and design the Construct asset and Purpose redevelopment redevelopment delivery of the project handover to operations opportunity & screen opportunity and delivery various scenarios approach Key Phase 2 Outcomes: • Refresh market analysis • Confirm redevelopment scenario • Identify project delivery strategy and funding strategy • Progress design to 30% • Develop more reliable cost estimates (-15 to +20%) Playland Redevelopment – Progress Update 1.
    [Show full text]
  • Hastings Park
    NEW BR IGH TO N RO AD Burrard Inlet CO MM I SS IO N E R PORTSIDE BIKEWAY S T R E E T New Brighton Park PORTSIDE BIKEWAY NEW BR IGHT ON R RACECOURSE OAD TO PORTSIDE BIKEWAY GATE MCGILL STREET 8 TO PORTSIDE BIKEWAY MCGILL STREET CREEKWAY PARK Lot 8 RENFREW ST PNE Tech Services GATE 7 ETON STREET Lot 7 PACIFIC COLISEUM GATE 6 CAMBRIDGE STREET Childcare Centre Horseman’s Lot Callister BRIDGEWAY ST Park Hastings Racecourse GATE Pacific & Slots 9 OXFORD STREET Coliseum GATE STREET BRIDGEWAY PNE OPERATIONS & VANCOUVER GIANTS 5 PNE Operations PNE Human Resources Lot 9 TO SUNRISE ROLLERLAND BIKEWAY TO BURNABY MILLER BIKEWAYS DUNDAS STREET DRIVE 4 AGRODOME GATE LIVESTOCK BUILDING Celebration (HIGHWAY 1) (HIGHWAY Plaza PNE AMPHITHEATRE TRANS-CANADA HWY TRANS-CANADA TRIUMPH STREET Italian Lot 12 GATE Gardens THE PARADE TO CASSIAR 11 BIKEWAY THE GREEN TO SUNRISE BIKEWAY PANDORA STREET CASSIAR BIKEWAY EE PLATEAU PNE FORUM 2 GATE ALL PARK Empire E PNE Administration TH Lot 2 HIGHWAY 1 EASTBOUND Fields > PNE The FRANKLIN STREET Forum Garden Sanctuary Auditorium CASSIAR STREET REFNREW STREET PLAYLAND ENTRANCE MOMIJI GARDEN > HIGHWAY 1 WESTBOUND TO CASSIAR BIKEWAY 1 MAIN THE SANCTUARY 15 EAST HASTINGS STREET 14 HASTINGS ST PLAYLAND 13 EMPIRE FIELD 12 EAST HASTINGS STREET GATE GATE GATE GATE GATE Hastings Community TO ADANAC Centre BIKEWAY Hastings Community Park Lot 16 WINDERMERE ST LILLOOET STREET LILLOOET EAST PENDER STREET ADANAC BIKEWAY CASSIAR STREET Welcome to Hastings Park LEGEND CONTACT Connecting City Bikeways Parking Slots Soccer PNE General Inquiries/Reception Phone: 604.253.2311 Park Greenways–Permanent Pacific National Exhibition Oces Gardens Swimming Pool Park Greenways–Temporary Washroom Amphitheatre Playground After Hours: Trans Canada Trail Restaurant Volleyball Fitness/Training City of Vancouver Park Board: 3-1-1 vancouverparks.ca Translink Bus Stop Racecourse Tennis Pump Track.
    [Show full text]
  • Hastings Park - PNE Master Plan Program: Amphitheatre Renewal
    REPORT Report Date: June 9, 2021 Contact: Harry Khella Contact No.: 604-829-2087 RTS No.: 14537 VanRIMS No.: 08-2000-20 Meeting Date: June 23, 2021 Submit comments to Council TO: Standing Committee on Policy and Strategic Priorities FROM: City Manager, City of Vancouver President and CEO, Pacific National Exhibition SUBJECT: Hastings Park - PNE Master Plan Program: Amphitheatre Renewal RECOMMENDATION A. THAT Council approve in principle the Amphitheatre Renewal project as outlined in this report. B. THAT Council direct staff to proceed to the planning and design phase of the Amphitheatre Renewal project, and provide Council an update prior to construction. C. THAT, subject to approval of Recommendations A and B, Council approve the addition of $7.1M to the Multi-Year Capital Project Budgets and Annual Expenditure Budgets; sources of funding to be: i. $6.0M from the Capital Financing Fund to be added to the 2019-2022 Capital Plan for the planning and design work and preliminary project infrastructure upgrades associated with the Amphitheatre Renewal Project; and ii. $1.1M from the approved 2019-2022 Capital Plan funding (Hastings Park Reserve) for implementation of Hastings Park Master Plan for site-wide infrastructure renewal. Hastings Park - PNE Master Plan Program: Amphitheatre Renewal – RTS14537 2 REPORT SUMMARY The Hastings Park-PNE Master Plan seeks to renew and transform a great City space, and create a destination area for the residents and visitors of Vancouver. The renewal and upgrade of the Amphitheatre venue will create a world-class outdoor space enabling growth of community and commercial events, establish a vibrant, year-round cultural space, and increase revenues to make the site financially sustainable.
    [Show full text]
  • New Brighton Park Shoreline Habitat Restoration Project
    HABITAT ENHANCEMENT PROGRAM: NEW BRIGHTON PARK SHORELINE HABITAT RESTORATION PROJECT Project Description Submitted to: Port Metro Vancouver Planning and Development 100 The Pointe, 999 Canada Place Vancouver, BC V6C 3T4 Prepared by: Port Metro Vancouver Habitat Enhancement Program 100 The Pointe, 999 Canada Place Vancouver, BC V6C 3T4 Revised: December 2015 (REV 1) Port Metro Vancouver - HEP Habitat Enhancement Program New Brighton Park – Project Description - i - December 2015 TABLE OF CONTENTS INTRODUCTION .............................................................................................................................. 1 PROPONENT INFORMATION ........................................................................................................ 2 RATIONALE .................................................................................................................................... 3 3.1 HABITAT BANKING ................................................................................................................. 3 PROJECT LOCATION .................................................................................................................... 4 SITE HISTORY ................................................................................................................................ 5 CURRENT SITE CONDITIONS ....................................................................................................... 6 6.1 LAND USE AND NAVIGATION SETTING ....................................................................................
    [Show full text]
  • Historic Japanese Canadian District Paueru-Gai Map Guide
    HISTORIC JAPANESE CANADIAN DISTRICT PAUERU-GAI MAP GUIDE 1 VANCOUVER’S HISTORIC JAPANESE CANADIAN DISTRICT Katelyn Yuen, Satsuki-kai odori, PSF. 2017 Satsuki-kai odori, PSF. Katelyn Yuen, Powell Street Festival, 2017 The Powell Street area has a unique historical tie with the Nikkei (people of Japanese descent), who commonly referred to the district as Paueru-gai, literally translated as Powell Street. Though this has always been a culturally diverse neighbourhood, Japanese Canadians made up the majority ethnic group from the 1890s until 1942, when the Canadian government forcibly removed the entire community. CVA 300 -136 CVA Parade on Powell Street, 1937. HOW TO USE THIS GUIDE This map guide focuses on some of the key heritage buildings and sites related to Japanese Canadian history that still exist around Powell Street. We have numbered stops as a suggested route to explore the area but you do not need to follow the numbers to enjoy the sites. A full walking tour will take about 1-2 hours. It is a short walk from Gastown, Chinatown and Strathcona. 2 THE EARLY YEARS A significant Japanese Canadian community established in this area starting in the 1890s. Access to jobs at nearby Hastings Mill was a key factor, as well as the presence of labour brokers who helped individuals find jobs on the railroads or in remote lumber industries. In spite of immigration restrictions placed on Japanese men in 1908, the population grew when men were able to bring family and sponsor workers, including many ‘picture brides’—women chosen by an extension of the arranged marriages in Japan.
    [Show full text]
  • Inspired by Nature
    AUGUST 2018 SITELINESLandscape Architecture in British Columbia Inspired by Nature Inspired by Nature | MVRP : Protecting natural areas and connecting people to nature | We Must Remember The Importance oƒ Native Plants | Nature as Culture: increasing access to nature in Vancouver | How Nature can change the Urban Environment | CSLA Fellows Profile: Bruce Hemstock, Kim Perry Landscape Structures’ unique design and manufacturing capabilities allow them to combine the adventure and wonder of nature with the durability, safety, and low maintenance of high-quality inclusive play equipment. Nature-themed playgrounds keep kids active and engaged while they are learning about the beauty and complexities of the natural world around them. At Habitat Systems our mission is to create a play experience that jibes with your vision. With incredible themed capabilities, countless colour options, and dedicated in-house designers, we’re ready to assist on your next project. Contact Habitat Systems today to start your project. habitat-systems.com | [email protected] | Toll Free 1 (866) 422-4828 450–355 Burrard St. Vancouver, BC V6C 2G8 T 604.682.5610 TF 855.682.5610 (Canada and US) E [email protected] I [email protected] W www.bcsla.org I www.sitelines.org PRESIDENT Stephen Vincent Inspired PRESIDENT ELECT Yolanda Leung BY NATURE PAST PRESIDENT Scott Watson Guest Editor — Margot Long, MBCSLA, FCSLA REGISTRAR Patrick Harrison Principal, PWL Partnership Landscape TREASURER Wai-Sue Louie Architects Inc. DIRECTORS Debra Barnes Teri Cantin , our office did a Katherine Dunster Some years ago Illarion Gallant visioning session to help define our Liane McKenna office and our direction.
    [Show full text]
  • BCMEA President & CEO Terry Duggan Announces March 2019
    BCMEA President & CEO Terry Duggan Announces March 2019 Retirement BCMEA President and CEO Terry Duggan and BCMEA Senior Vice President Mike Leonard Following a well respected and distinguished 31-year career with the British Columbia Maritime Employers Association (BCMEA) President and CEO, Terry Duggan, has announced his retirement effective March 31, 2019. Devoted to the BCMEA and the marine industry, Terry leaves a legacy of leadership that focused on collective bargaining with both longshore and foremen unions, pension and benefit administration, finance and audit, labour legislation and regulations, corporate governance and risk, employment equity and government relations. The Board of Directors for the BCMEA is pleased Follow the BCMEA to announce that after the conclusion of a rigorous selection and succession planning process, current on social media Senior Vice President Employee Relations, Dispatch and Corporate Secretary, Mike Leonard, has been selected as Terry’s successor. Mike is a highly effective Industrial Relations executive with over 25 years of diverse experience. (continued) We’re looking for your good news stories to share! Please submit to Lauren Chan: [email protected] 500 – 349 Railway Street, Vancouver, British Columbia V6A 1A4 604.688.1155 www.bcmea.com November 15, 2018 The BCMEA Bulletin November 15, 2018 BCMEA President & CEO Terry Duggan Announces March 2019 Retirement (continued) He was recruited in 2001 and has been an active participant in industry bargaining since 2002 and Association spokesperson since 2008 where he also became Vice President, Labour Relations. Mike’s 18 years of extensive experience at the BCMEA and deep understanding as to where the Association needs to go, position him to successfully lead the organization into the future.
    [Show full text]
  • New Brighton Park Shoreline Habitat Restoration Project Discussion Paper
    Port Metro Vancouver and Vancouver Board of Parks and Recreation Proposed New Brighton Park Shoreline Habitat Restoration Project Preliminary Design Public Consultation, November 2 –16, 2015 Discussion Paper and Feedback Form View of New Brighton Park facing west Learn More And Provide Feedback Engagement Process – The purpose of this discussion paper is to provide information about the proposed New Brighton Park Shoreline Habitat Restoration Project. It is designed to gather feedback from communities, stakeholders What We’ve Heard and the public and includes a feedback form with questions about preliminary design options for the So Far proposed project. There were 285 participant The Engagement Program Includes: interactions during Conceptual Design Public Consultation • Discussion Paper and Feedback Form (August 26 to September 9, 2015). • Online Feedback Form Participants expressed support • Two Public Information Sessions for, and interest in, the project, particularly related to recreational How to Participate access, wildlife, and educational features. Many participants indicated Attend a Public Date Tuesday, November 3, 2015 Saturday, November 7, 2015 the importance of the dog off- Information Session Time 5:00 PM – 8:00 PM 1:00 PM – 3:00 PM leash area, and of keeping dogs Hastings Room, PNE New Brighton Park (2901 E. Hastings Street) Biologist-led tours of the separate from the habitat. Input Location Enter Gate 2 (Renfrew Street), walk proposed project site at from Conceptual Design Public 1:30 PM and 2:30 PM. east past the Forum. The Hastings Consultation has been considered in Room will be on the right. design refinements included in this Read the Discussion Paper and Online at vancouver.ca/newbrightonsaltmarsh discussion paper.
    [Show full text]