Patio Cover Handout

Total Page:16

File Type:pdf, Size:1020Kb

Patio Cover Handout Community Development 16000 N. Civic Center Plaza Surprise, AZ 85374 Ph. 623-222-3000 Fax 623-222-3001 TTY: 623-222-1002 Patio Covers Patio covers are one-story, roofed or lattice structures not exceeding 12’ feet in height. Patio covers shall be used only for recreational outdoor living purposes and not as carports, garages, storage rooms, or habitable rooms. A building permit is required for all patio covers. Patio covers shall be permitted to be detached from or attached to a dwelling. Detached patio covers may require engineered design. Patio covers must be located a minimum of 5’ from the property line. Patio covers must also comply with the required zoning setbacks for the subdivision. For zoning information call 623-222-3183. If the project is located within a subdivision that has a homeowners association (HOA), it is recommended to secure architectural review prior to proceeding with the application. The City does not enforce or review provisions of the covenant, conditions, and restrictions (CC&Rs) of the HOA. Construction Specifications Footings Patio covers may require footings. Patio cover columns that carry 750 pounds or less can be placed on an approved 3.5” concrete patio slab. Patio cover columns that carry loads in excess of 750 pounds will require footings. Concrete footings must have a minimum compressive strength of 2500 psi and the minimum footing size for each post location is 12" x 12” x 6” and placed a minimum of 12" below the undisturbed ground surface. o Specify the footing size for each post location. Lumber and Connectors Commonly used lumber is Douglas Fir-Larch No. 2 or better and Hem-Fir No. 2 or better. Lumber must be grade marked and all exposed wood shall be protected from the weather by an exterior paint or varnish. The minimum height from the finished floor to the bottom of any beam is 6 feet 8 inches. Rafters must be sized according to tables in the 2018 International Residential Code, and beams must be sized to carry the calculated roof loads. Laminated beams may not be used in exposed locations unless they are approved for exterior use. Rafters may not be attached directly to the existing fascia or to roof truss tails. CD 11/2019 1 Community Development 16000 N. Civic Center Plaza Surprise, AZ 85374 Ph. 623-222-3000 Fax 623-222-3001 TTY: 623-222-1002 Rafters must bear on the existing wall top plate or attach directly to the house by a ledger board that butts directly against vertical framing. Any stucco or gypsum board covering the framing must be removed. The ledger board shall be at least the same size as the rafters and must be secured directly to the existing wall framing. From the ledger to the wall framing; a 3/8” x 5 1/2” minimum steel lag bolt and washer is required at each framing member. For masonry construction; a 1/2” x 7” minimum expansion bolt and washer spaced at 32” on center into a grouted cell is required. All connectors must be an approved type. o Specify the species, grade and dimensions for all wood framing members. o Specify which method the rafters will be attached to the existing wall of the house. o Specify all connectors; include the manufacturer and part number. Roof Slope and Material The minimum roof slope varies depending on the type of roofing material used. Minimum required roof slope: Material Slope Asphalt Shingles 2” per foot Clay Tile 2.5” per foot Mineral-Surfaced Roll Roofing 1” per foot o Specify the type of roofing material, underlayment, and roof slope. Ceiling Finishes Ceiling finish materials must be specified. Ceiling finishes utilizing gypsum board must comply with 2018 International Residential Code table R702.3.5. o Specify finish material type and dimension. o Specify fastener type, gauge and spacing. CD 11/2019 2 Community Development 16000 N. Civic Center Plaza Surprise, AZ 85374 Ph. 623-222-3000 Fax 623-222-3001 TTY: 623-222-1002 Ventilation Enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters shall have cross ventilation for each separate space. Existing attic ventilation shall be maintained where ceilings are applied directly to the underside of the roof rafters. o Specify Ventilation Method Electrical Electrical information is required if receptacle outlets, lights or ceiling fans will be installed. Lights and Fans must be listed for exterior use. o Specify wire type and gauge, conduit type and diameter. o Specify power source. Patio Cover Details Please refer to the patio cover details on the following pages. You may copy these and use them as part of your submittal. CD 11/2019 3 SITE PLAN EXAMPLE REQUIRED DIMENSION PROPERTY LINE INDICATE OVERHEAD POWER LINE LOCATION DIM. Indicate North REQUIRED REQUIRED DIM. 8' P.U.E. 8' PROPOSED PATIO COVER REQUIRED DEM. REQUIRED DIMENSION REQUIREDDIM. REQUIRED DIMENSION RESIDENCE PROPERTY LINE PROPERTY PROPERTY LINE PROPERTY Include the location of all structures located within the property boundary. REQUIRED DIMENSION PROPERTY LINE Address: Parcel Number: Subdivision: Lot: Zoning: CD 11/2019 4 SEE DETAILS ON FOLLOWING SHEETS RAFTER ____X____X____@____O.C. ROOFING SHEATHING_________ OVERHANG UNDERLAYMENT_________ SLOPE_________ POST ____X____X____ BEAM ____X____X____ CD 11/2019 5 w -- \Jy/ " I � TAIL 1"1S SHEET - / I \ \ I " -- / PATIO KEY SECTION CENlERLINE OF POST AND FOOTING POST BASE ___> 4" CONCRETE SLAB 4" ABC OR SAND FILL EB PATIO POST FOOTING CD 11/2019 6 00 00 �- 0 0 0 0 5 CUT OVERHANG OFF, FLUSH W/ TOP PLATE G) GALVANIZED IRON DRIP EDGE G) @ 2 X ___ FASCIA G) N/A DOUBLE TOP PLATE G) PATIO BEAM, SEE PLAN FOR SIZE G) NEW JOISTS BEARING ON TOP G) POST BASE G) PLATE, SEE PLAN FOR SIZE @ POST, SEE PLAN FOR SIZE @ EXISTING STUD WALL @ UPLIFT CONNECTOR @ EA. ROOF RAFTER UPLIFT CONNECTOR @ EA. ROOF RAFTER G) PATIO RAFTER, SEE PLAN FOR SIZE & SPACING @ @ 1/2" SHEATHING G) 1/2" SHEATHING G) 2 x ___ SOLID BLOCKING @ 2 x ___ SOLID BLOCKING @ EDGE NAILING 8d @ 6" 0/C MIN. G) EDGE NAILING 8d @ 6" 0/C MIN. @ 3-16d/BAY TOENAILING TO TOP PLATE @ 3-16d/BAY TOENAILING TO TOP PLATE @ MINIMUM 2-10d NAIL PATIO BEAM W PATIO ROOF TO CONNECTION 0 EXISTING HOUSE CD 11/2019 7 o/4" MINIMUM DEPTH MINIMUM :2b GAUGE FLASHING/ COUNTER FLASHINGS CAULK AND SEAL LAP b" MINIMUM EACH V'IAY - PROVIDE DETAILS TO SHOV'I COMPLIANCE I /1 ROOF SHEATHING ROOF .JOIST I )-- / I I I \ I I SOLiD V'IOOD �I ______MET AL HANGER MEMBER OR SOLID GROUTED I CELL __ x __ CONTINUOUS LEDGER I I [REMOVE STUCCO LATH 4 FOAM FOR V'IOOD TO V'IOOO CONNECTION] I ATTACH LEDGER TO EXISTING V'IALL I WITH o/b" X S 1/2" LONG LAG BOLTS / AT lb" 0/C IN PRE DRILLED HOLES IN � FRAMED WALLS 1/2" X 1" LONG EXPANSION BOLTS AT EXISTING WALL A55EMBLIE5 ---( 32" 0/C INTO SOLID GROUTED CELLS -t FOR MASONRY WALLS PATIO ROOF TO EXISTING HOUSE CD 11/2019 8 Nailing Schedule Include the Nailing Schedule in the Final Plans. Building Elements # and Type of Fastener Spacing of Fasteners Joist to sill or girder, toe nail 3-8d Sole plate to joist or blocking, face nail 16d 16 - o.c. Top or sole plate to stud, end nail 2-16d Stud to sole plate, toe nail 3-8d or 2-16d Double studs, face nail 10d 24 – o.c. Double top plates, face nail 10d 24 – o.c. Sole plate to joist or blocking at braced wall panels 3-16d 16 – o.c. Double top plates, minimum 48-inch offset of end joints, face nail in lapped area 8-16d Blocking between joists or rafters to top plate, toe nail 3-8d Rim joist to top plate, toe nail 8d 6 – o.c. Top plates, laps at corners and intersections, face nail 2-10d Built-up header, two pieces with ½ - spacer 16 – o.c. each Edge 16d Ceiling joists to plate, toe nail 3-8d Continuous header to stud, toe nail 4-8d Ceiling joist, laps over partitions, face nail 3-10d Ceiling Joist to parallel rafters, face nail 3-10d Rafter to plate, toe nail 2-16d 1x brace to each stud and plate, face nail 2-8d Built-up corner studs 10d 24 – o.c. Roof rafters to ridge, valley to hip rafters toe nail 4-16d face nail 3-16d Rafter ties to rafters, face 3-8d Wood structural panels, subfloor, roof and wall sheathing to framing Fastener edges intermediate 5/16 – ½ 6d common nail (subfloor, wall) 6 12 8d common nail (roof) 6 12 19/32 – 1 8d common nail 6 12 1 1/8 – 1 ¼ 10d common nail or 8d deformed nail 6 12 Celluloisc fiberbd Sheathing 1 ½ galv. Roofing nail 3 6 a. All nails are smooth-common, box or deformed shanks except where otherwise stated. b. Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches or greater c. Four-foot-by-8-foot or 4-foot-by-9 foot panels shall be applied vertically. CD 11/2019 9.
Recommended publications
  • Flier: Deck Connection and Fastening Guide (F-DECKCODE13)
    Deck Connection and Fastening Guide RECOMMENDATIONS FOR THE CONSTRUCTION OF CODE-COMPLIANT DECKS 800-999-5099 | www.strongtie.com Contents Introduction — Improperly Built Decks Can Be Dangerous .............3 Code Concerns ..............................................4 Critical Deck Connections ......................................5 Existing Decks: Retrofit or Replace .............................6–7 Ledger Attachment ...........................................8 Lateral Load Connection .......................................9 Footings ...................................................10 Visit the Deck Center at Post Bases ..............................................11–12 Beam-to-Post Connections ....................................13 www.strongtie.com/deckcenter Joists Terminating into Beam/Ledger. 14 Everything You Need in One Place Joists Bearing on a Beam .....................................15 Railing Post-to-Deck Framing .................................16 We have brought together all of our Stair Stringers & Treads ......................................17 information and training on building Selecting Connectors and Fasteners ............................18 stronger, safer decks in one location Stainless-Steel Connectors ...................................19 Correct Fasteners for Use with Simpson Strong-Tie Connectors .......20 to make learning easier than ever. Structural Wood Fastening ....................................21 Corrosion-Resistant Fasteners for Decking ....................22–23 Quik Drive Auto-Feed Screw Driving
    [Show full text]
  • 15 – Construction Vocabulary
    CONSTRUCTION VOCABULARY ABC (Aggregate Base Course): used in mixing with concrete and placed below concrete prior to the pouring of sidewalks, driveways, etc. It serves as a compacted solid base. Air return: A series of ducts in air conditioning system to return used air to air handler to be reconditioned. Ameri-mix: Maker of the pre-blended bag mixes we use in masonry work. Anchor Bolts: (also called J-bolts) Bolts embedded in concrete foundation used to hold sills in place. Anchor Straps: Straps embedded in concrete foundation used to hold sills in place, most commonly MASAs in our houses. Apron: A piece of driveway between sidewalk and curb. Back Fill: The replacement of dirt in holes, trenches and around foundations. Backing (aka blocking): a non-structural (usually 2x) framed support (i.e. for drywall). Balloon Framing: A special situationally required type of construction with studs that are longer than the standard length. Bay: The space between two parallel framing members (i.e. trusses). Beam: A horizontal structural member running between posts, columns or walls. Bearing wall (aka partition): A wall which carries a vertical structural load in addition to its own weight. Bevel: To cut an angle other than a right angle, such as on the edge of a board. Bird block (aka frieze board): An attic vent located between truss tails. Bird’s Mouth: A notch cut in the underside of a rafter to fit the top plate. Blocking (aka backing): A non-structural 2x framing support (i.e. for drywall) Board: Lumber less than 2” thick. Board Foot: The equivalent of a board 1’ square and 1” thick.
    [Show full text]
  • Itening Guide
    itening Guide There are three essential tasks involved in the making of any woodwork project. The first is to cut out and shape the components; the second is the joining of those components; and the third and final task is the finishing of the article. This appendix provides you with information about the best ways to fasten your workpieces together, to ensure your project's long life. The options are between adhesives, nails, screws and bolts. NAILS Nailing is a quick, efficient and economical way of joining timber. lf the correct nails are chosen, there is no reason why the joints should not be durable. Timber framed houses, with most of the framing just nailed together, have stood the test of time. The listing of nail types that follows provides an overview of commonly used nails. This listing is not complete - nails exist for specific purposes such as boat-building, but these are outside the requirements of the normal handyman. _ Nail Types: Gommon Bullet Head: Used for hardwood framing and general fixing. Flat Head: Used for softwood framing, fixing softwoods or anywhere bullet heads would tend to pull through. Wire Brads: Small bullet head nails, used for attaching decorative mouldings. Clouts: Small nails with a relatively large flat head, used for attaching thin sheet material. Nail Types: Special Purpose Tacks: Used principally for upholstery; commonly blue- black in colour. Panel Pins: Used for fixing plywood panelling to timber framing; "brown" plated. Hardboard Nails: Used to attach hardboard ("masonite"); generally zinc plated. Plaster Board Used for fixing plasterboard to timber framing; Nails: zinc plated.
    [Show full text]
  • Wood Identification and Chemistry' Covers the Physicalproperties and Structural Features of Hardwoods and Softwoods
    11 DOCUMENT RESUME ED 031 555 VT 007 853 Woodworking Technology. San Diego State Coll., Calif. Dept. of Industrial Arts. Spons Agency-Office of Education (DHEA Washington, D.C. Pub Date Aug 68 Note-252p.; Materials developed at NDEA Inst. for Advanced Studyin Industrial Arts (San Diego, June 24 -Au9ust 2, 1968). EDRS Price MF -$1.00 He -$13.20 Descriptors-Curriculum Development, *Industrial Arts, Instructional Materials, Learning Activities, Lesson Plans, Lumber Industry, Resource Materials, *Resource Units, Summer Institutes, Teaching Codes, *Units of Study (Sublect Fields), *Woodworking Identifiers-*National Defense Education Act TitleXIInstitute, NDEA TitleXIInstitute, Woodworking Technology SIX teaching units which were developed by the 24 institute participantsare given. "Wood Identification and Chemistry' covers the physicalproperties and structural features of hardwoods and softwoods. "Seasoning" explainsair drying, kiln drying, and seven special lumber seasoning processes. "Researchon Laminates" describes the bending of solid wood and wood laminates, beam lamination, lamination adhesives,. andplasticlaminates."Particleboard:ATeachingUnitexplains particleboard manufacturing and the several classes of particleboard and theiruses. "Lumber Merchandising" outhnes lumber grades andsome wood byproducts. "A Teaching Unitin Physical Testing of Joints, Finishes, Adhesives, and Fasterners" describes tests of four common edge pints, finishes, wood adhesives, and wood screws Each of these units includes a bibhography, glossary, and student exercises (EM) M 55, ...k.",z<ONR; z _: , , . "'zr ss\ ss s:Ts s , s' !, , , , zs "" z' s: - 55 Ts 5. , -5, 5,5 . 5, :5,5, s s``s ss ' ,,, 4 ;.< ,s ssA 11111.116; \ ss s, : , \s, s's \ , , 's's \ sz z, ;.:4 1;y: SS lza'itVs."4,z ...':',\\Z'z.,'I,,\ "t"-...,,, `,.
    [Show full text]
  • 2011-066.Pdf
    Lowes Deck Design For Bob Print this document and take it to your local Lowe's. One of our associates will help you find the materials you need. All rights reserved copyright ©2011 DIY Technologies Deck layout diagram Top view without planks Bottom view with planks Top view with planks All rights reserved copyright ©2011 DIY Technologies Page 2 Deck Part Identification Baluster The vertical pieces of a railing spaced at regular intervals between posts. Beam A horizontal framing piece, which rests on posts and supports joists. Decking The boards used to make the walking surface of the deck Joist A horizontal frame piece that supports the decking and spreads the weight over the beams Ledger A horizontal strip that connects the deck to the house. Concrete Pier A vertical piece of concrete, used as a footing to support a post. Post A vertical framing piece, used to support a beam or a joist. Riser The board attached to the verticcal cut surface of a stair stringer. Stringer The diagonal board used to support treads and risers on a stairway. Tread The horizontal surface of a stair, perpendicular to the riser. Bottom Rail The lower horizontal piece that connects rail posts Top Rail The upper horizontal piece that connects rail posts Cap Rail The top horizontal trim on railing. Rail Post The vertical posts connected to the deck framing, to which railing is secured. All rights reserved copyright ©2011 DIY Technologies Page 3 Installation Checklist Building code and zoning requirements Check deed restrictions, building codes and/or zoning laws to make sure your deck complies.
    [Show full text]
  • I-^ UNITED STATES DEPARTMENT of AGRICULTURE FOREST SERVICE
    HOUSE i-^ UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE AGRICULTURE HANDBOOK NO.73 (,■ ^ By L. O. ANDERSON and O. C. HEYER, engineers Forest Products Laboratory • Forest Service Agriculture Handbook No. 73, February 1955 U. S. DEPARTMENT OF AGRICULTURE • WASHINGTON, D. C. For sale by the Superintendent of Documents, U. S. Government Printing Office Washington 25, D. C. - Price 65 cents (Paper cover) ACKNOWLEDGMENT THIS publication was prepared by the Forest Products Laboratory as a project under the housing research program of the Office of the Administrator, Housing and Home Finance Agency, authorÍ2;ed by Title III of the Housing Act of 1948, as-amended, through agree- ment with the Forest Products Laboratory, Forest Service. Special acknowledgment is made to W. A. Russell, structural engineer, technical staff, Housing and Home Finance Agency- The preparation of this manual was under the direct supervision of L. V. Teesdale and the overall supervision of R. F. Luxford of the Laboratory staff. Other staff members who contributed mate- rially were M. E. Dunlap, who made valuable review suggestions; F. L. Browne, author of the section on paints; the late Arthur Van Kleeck, author of the section on fire preventive measures; and C. S. Moses, author of the section on decay and termites. (II) CONTENTS Page Page Introduction 1 Wall sheathing 47 Location and excavation 1 Types of sheathing 48 Condition at site 1 Corner bracing 49 Placement of the house 2 Installation of sheathing 49 Height of foundation walls 3 Roof sheathing 53 Excavation
    [Show full text]
  • Carpentry II EN5156
    SUBCOURSE EDITION EN5156 B CARPENTRY II CARPENTRY II Subcourse EN5156 EDITION B United States Army Engineer School Fort Leonard Wood, Missouri 65473 6 Credit Hours Edition Date: November 1995 SUBCOURSE OVERVIEW Carpentry is the art or science of measuring, cutting, fitting, and assembling wood and other materials to construct buildings or other structures. Many people associate carpenters with wood and other building materials and tools. They assume carpenters build only homes and other relatively small structures. Of course, this is not true. Carpenters work not only with wood but also with metals, plastic, and other synthetic materials. The carpentry trade includes skills required to construct buildings, bridges, docks, and wharf. Work must be accomplished in a manner consistent with environmental laws and regulations There are no prerequisites for this subcourse. This subcourse reflects current doctrine when this subcourse was prepared. In your own work, always refer to the latest publications. Unless otherwise stated, the masculine gender of singular pronouns is used to refer to both men and women. TERMINAL LEARNING OBJECTIVE: The Carpentry II subcourse, (Carpentry/Masonry Specialist, Military Occupational Specialty (MOS) 51B, Skill Levels 1 and 2), will provide you with enough knowledge to construct floor systems, stairs, wall systems (including the installation of windows and door), and roof systems of wooden structures. This subcourse is presented in three lessons. At the end of these lessons, you will be able to take a set of construction drawings and construct a wood-frame building ACTION: You will describe the construction of floor, wall, stair, and roof systems and the installation of doors and windows.
    [Show full text]
  • Wood Connections That Typically Use Nails, Bolts, and Some Specialty Hardware
    CHAPTER 7 Connections 7.1 General The objectives of connection design are • to transfer loads resisted by structural members and systems to other parts of the structure to form a “continuous load path”; • to secure nonstructural components and equipment to the building; and • to fasten members in place during construction to resist temporary loads during installation (i.e., finishes, sheathing, etc.). Adequate connection of the framing members and structural systems covered in Chapters 4, 5, and 6 is a critical design and construction consideration. Regardless of the type of structure or type of material, structures are only as strong as their connections, and structural systems can behave as a unit only with proper interconnection of the components and assemblies; therefore, this chapter is dedicated to connections. A connection transfers loads from one framing member to another (i.e., a stud to a top or bottom plate) or from one assembly to another (i.e., a roof to a wall, a wall to a floor, and a floor to a foundation). Connections generally consist of two or more framing members and a mechanical connection device such as a fastener or specialty connection hardware. Adhesives are also used to supplement mechanical attachment of wall finishes or floor sheathing to wood. This chapter focuses on conventional wood connections that typically use nails, bolts, and some specialty hardware. The procedures for designing connections are based on the National Design Specification for Wood Construction (NDS) (AF&PA, 1997). The chapter also addresses relevant concrete and masonry connections in accordance with the applicable provisions of Building Code Requirements for Structural Concrete (ACI-318) and Building Code Requirements for Masonry Structures (ACI-530)(ACI, 1999a; ACI 1999b).
    [Show full text]
  • Deck Framing Connection Guide
    Deck Framing Connection Guide RECOMMENDATIONS FOR THE CONSTRUCTION OF CODE-COMPLIANT DECKS 800-999-5099 | www.strongtie.com Contents Introduction – Improperly Built Decks Can Be Dangerous. 3 Critical Deck Connections. 4 Existing Decks: Retrofit or Replace. .5 Selecting Connectors and Fasteners: Corrosion Issues. .6 Stainless-Steel Connectors and Fasteners . 7 Ledger Attachment. .8 Lateral Load Connection. .9 Footings. .10 Post Bases. .12 Beam-to-Post Connections. 13 Joists Terminating into Beam/Ledger . .14 Joists Bearing on a Beam. .15 Railing Post-to-Deck Framing . .16 Stair Stringers & Treads. 17 Fastening Deck Boards. .18 A Word About Building Codes This guide recommends connectors and fasteners for deck for details. Check with your local building department to verify construction that may meet the requirements of the 2006 what building codes have been adopted in your area. International Building Code® and the 2006 International Selection of products based upon performance and/or Residential Code®. The information contained here is a suitability for a specific application should be made by a summary of the requirements of these codes as they pertain qualified professional. Simpson Strong-Tie recommends that to the connections highlighted in this guide. The building codes contain other requirements regarding aspects of deck deck designs are approved by the local building department construction that are not addressed here, check the codes before construction begins. International Building Code and International Residential Code are registered trademarks of their respective organizations. LIMITED WARRANTY Simpson Strong-Tie Company Inc. warrants catalog products to be free from defects in and the condition of the soils involved, damage may nonetheless result to a structure material or manufacturing.
    [Show full text]
  • Nail Gun Injuries in Residential Carpentry: Lessons from Active Injury Surveillance H J Lipscomb, J M Dement, J Nolan, D Patterson, L Li
    20 ORIGINAL ARTICLE Inj Prev: first published as 10.1136/ip.9.1.20 on 1 March 2003. Downloaded from Nail gun injuries in residential carpentry: lessons from active injury surveillance H J Lipscomb, J M Dement, J Nolan, D Patterson, L Li ............................................................................................................................. Injury Prevention 2003;9:20–24 Objective: To describe circumstances surrounding injuries involving nail guns among carpenters, cal- culate injury rates, identify high risk groups and preventive measures. Methods and setting: Active injury surveillance was used to identify causes of injury among a large cohort of union residential and drywall carpenters. Injured carpenters were interviewed by experienced journeymen; enumeration of workers and hourworked were provided by the union. The combined data allowed definition of a cohort of carpenters, their hours worked, detailed information on the circumstances surrounding injuries, and identification of preventive measures from the perspectives of the injured worker and an experienced investigator. See end of article for Results: Nail guns were involved in 14% of injuries investigated. Ninety percent of these injuries were authors’ affiliations ....................... the result of the carpenter being struck, most commonly by a nail puncturing a hand or fingers. The injury rate among apprentices was 3.7 per 200 000 hours worked (95% confidence interval (CI) 2.7 Correspondence to: to 4.9) compared with a rate of 1.2 among journeymen (95% CI 0.80 to 1.7). While not always the Dr Hester J Lipscomb, sole contributing factor, a sequential trigger would have likely prevented 65% of the injuries from tools Division of Occupational and Environmental with contact trip triggers.
    [Show full text]
  • Installation Instructions PAINT GRADE STOCK WOOD COLUMNS INSTALLATION
    Stock Wood Column Installation Instructions PAINT GRADE STOCK WOOD COLUMNS INSTALLATION A. STORAGE, PAINTING and VENTILATION FOR PAINT GRADE STOCK WOOD COLUMNS • For exterior applications, ONLY use oil or alkyd exterior paint on wood columns. • For interior applications, latex paint can be used. 1. Storage of columns must be in a cool, dry and well-ventilated area. Storage on a porch or under plastic outdoors will void the warranty. CUTTING TO OVERALL LENGTH: Columns can be field trimmed or ordered from the factory trimmed to a specified length. When trim- Note: Interior applications can use latex paint. ming a wood column shaft to length, make sure to always trim from the bottom end only. A circu- 2. Before exterior installations, wood columns must be primed with a minimum of one coat of ONLY lar saw with a carbide blade can be used to make this cut. (Make sure to always wear personal pro- oil or alkyd primer followed by two coats of ONLY oil or alkyd paint. After installation, a final coat tective equipment.) It is not recommended to trim more than the bottom 1/2 of any Colonial tapered of oil or alkyd paint should be applied. Make sure to prime and paint the ends of column and no more than 1/3 on any Classical tapered column. The Classical wood columns have the wood column shaft. a true architectural taper. (The bottom 1/3 is non-tapered, the top 2/3 is tapered.) Note: Spray painting is not recommended. Paint should be applied ALTERING FLUTES: with a brush to adequately protect the column from moisture.
    [Show full text]
  • View Chapter
    GFCAHFH March 15, 2021 Construction Manual Version 21.0 Chapter 3. Wall Layout 3.1 LAYING OUT EXTERIOR WALLS 3.2. CREATING PLATE LAYOUT DRAWING 3.3 CUTTING EXTERIOR WALL PLATES 3.4 MARKING WINDOW AND DOOR LOCATIONS ON EXTERIOR WALL PLATES 3.5 MARKING STUDS ON EXTERIOR WALL PLATES 3.6 LAYING OUT INTERIOR WALLS 3.7 CUTTING INTERIOR WALL PLATES 3.8 MARKING DOOR LOCATIONS ON INTERIOR WALL PLATES 3.9 MARKING STUDS ON INTERIOR WALL PLATES Tools needed by volunteers: Materials needed: Hammer 2x6 Plate lumber Nail apron 2x4 Plate lumber Tape measure 16d Nails Square 8d Nails Utility knife 16d Duplex nails Pencil Spray varnish ¼”x3”x5” Spacers Tools and equipment needed: Personal Protection Equipment: Generator Safety glasses (required) Extension cord Circular saw Chop saw Reference Materials: 50’ Steel tape Framing square House Plan Red & blue chalk lines Plate Layout Drawing String line Felt tip marker NOTE: All exterior and interior walls are framed 24” o.c. Safety First! Review the Safety Checklist before performing tasks in this chapter. 3-1 GFCAHFH March 15, 2021 Construction Manual Version 21.0 3.1. LAYING OUT EXTERIOR WALLS 3.1.1. Deck Preparation 1. Before laying out any walls on the deck, clean the deck of excess dirt or glue that may interfere with chalk lines. Also, trim any decking that hangs over the edges of the deck or around the stair opening (but be sure to leave the 1¼” overhang where the top of the stairs will be attached). 3.1.2. Laying Out Exterior Walls On a Rectangular Deck 1.
    [Show full text]