TRACKING the BLUE LINE EXTENSION Issue 4 December 2015 for News Updates, Project Visit Us Online at Information and Events 3

Total Page:16

File Type:pdf, Size:1020Kb

Load more

BROOKLYN PARK | CRYSTAL | ROBBINSDALE | GOLDEN VALLEY | MINNEAPOLIS Tracking the Blue Line Extension Issue 4 | December 2015 www.BlueLineExt.org Metropolitan Council approves refined 11-station scope and $1.496 billion cost estimate for Blue Line Extension project Metropolitan Council members in early December approved a project scope with 11 stations and a $1.496 billion cost esti- Next step for Blue Line Extension is local mate for the planned METRO Blue Line Extension. approval of line’s physical design The updated project scope includes necessary infrastructure In mid-December, staff will submit municipal consent adjustments, focused on addressing safety concerns, as well plans for the planned Blue Line Extension LRT for review as potential traffic and floodplain impacts for the 13-mile line, and approval by Hennepin County and the corridor cities which promises to connect thousands of residents in the cor- of Minneapolis, Golden Valley, Robbinsdale, Crystal and ridor with jobs. Brooklyn Park. Plans will be available for public view in the Blue Line Ex- tension Project Office on the second floor of the Crystal Gallery Shopping Center at 5514 West Broadway Ave. in Crystal as well as libraries on the corridor and on the project’s website, www.bluelineext.org. APPROVAL continued on next page tice for estimating and revising the cost of large public works projects. The updated cost estimate also adds two years of inflation at a 3 percent escalation factor per year, due to the more accurate timeline for construction of the project. The previous cost estimate and scope developed by the Henne- pin County Regional Railroad Authority in 2012 was based off very early and limited information available at just 1 percent of engineering work. At this point, project partners have not committed funding for construction of the line. Above: The revised project scope includes a park-and-ride When completed, the expanded METRO Blue Line will offer at the Golden Valley Road Station. a one-seat ride from the Target Northern Campus in Brook- lyn Park to the Mall of America in Bloomington, with stops The project’s Corridor Management Committee approved throughout Minneapolis and at the VA and MSP International the $1.496 billion updated cost estimate on Nov. 12. The Airport. With its cross-metro reach, the Blue Line Extension elected officials and public representatives on the committee will assist residents from Minneapolis and the northwest recommended including a park-and-ride at Golden Valley communities in getting to work and school. About half of the Road Station, reconstructing the intersection of Golden Val- corridor’s residents are people of color, and the project area ley Road and Theodore Wirth Parkway and improving trail communities are some of the region’s most rapidly diversify- connections to the station. ing areas. The project updates and cost estimates are based on a 15 The map on the next page shows route and proposed sta- percent level of detail, which is a standard engineering prac- tions for the Blue Line Extension. for news updates, project Visit us online at 2 www.BlueLineExt.org information and events Cost estimate in line with peer projects around the country The updated cost estimate of $1.496 billion for the 13-mile, San Diego’s 10.9-mile, nine-station Mid Coast Corridor LRT 11-station Blue Line Extension is at the low end of peer Project, which is also in the Project Development phase like projects around the country. Blue Line Extension, has a $2.112 billion cost estimate. The 7.3-mile, 10-station Milwaukie LRT Project in Portland, Projects have cost estimates until receiving an FFGA, which Ore., has a $1.49 billion budget after receiving its Full is when their budgets are set. Funding Grant Agreement (FFGA), the federal govern- ment’s contract to pay half of the capital costs. The cost estimate for the revised project scope is based on a review of the $1 billion cost estimate included in the Houston’s 11.3-mile, 19-station University Corridor LRT Proj- project’s Draft EIS in light of additional engineering and en- ect, which is in the Engineering phase, has a $1.563 billion vironmental work. For more about this process, see page 4. cost estimate. APPROVAL from previous page METRO Blue Line Extension (Bottineau LRT) A guide to reading the plans will be produced and avail- Operation and Maintenance able on the website, and outreach staff will be available by Facility (OMF) December 2015 Oak Grove Parkway appointment to help understand the documents, which are E V engineering blueprints for the line. To contact them, see: A http://bit.ly/1S9ltQo. 93rd Avenue 93RD AVE Y 610 E A V Connecting LRT / Rail A W D OS S E O E A N Planned Station O A Z R Light Rail B A Minnesota state law (473.3994) requires municipal con- Alignment 85th Avenue 85TH AVE Existing Station T C sent, which means local approval of an LRT system’s physical S O E Light Rail Stations R M A P L E W D 8 B R O OK LY N PAR K GR O V E 1 design components including tracks, bridges, stations, roads 0 0.5 1 2 B and support structures. R O O Miles Brooklyn Blvd. K L Y N B B N L S V F D C The municipal consent process allows for public input on the O R Eagle R 94 I D O preliminary design plans. Input from the public can come 169 R B R O OK LY N C EN T E R 63rd Avenue at the public hearings that each city and Hennepin County B will hold, by email, online submissions or written comments. ASS LA K E RD T w For each city, comments from the public should focus on the i n Bass Lake Road C L O R A D physical design of the LRT alignment within the municipal NE W H O P E T 8 1 S E 100 V Y A boundaries. R A 44TH AVE K R OB B IN S - C T 42ND AVE E N DA L E N I C r W yst R a Robbinsdale E On Jan. 19, 2016, the Metropolitan Council, Hennepin D l V S A A E L L 94 G A County Board of Commissioners and Hennepin County Re- U D O N D Y L gional Railroad Authority will hold a joint public hearing at 6 M IN NE A P OM LI S I S S I p.m. at Hennepin County’s Minneapolis Central Library at 300 S S I P . GOLDEN VAL LEY RD P d Golden Valley Road I lv Nicollet Mall, in Minneapolis. The meeting will follow a public y e B n e e e ite ld w v h e l S A i ai W F r R open house beginning at 5 p.m. n t sta n n e rth Plymouth Ave a g No Pe V ar OLSON MEM. THWY R GO L DE N IV 55 ER VAL L E Y 5 35W ion TH GLENWOOD AVE ns By early March 2016, the five corridor cities and the county e ST xt E RO e MET in en L Downtown Gre n M would need to act on plans for their jurisdictions. Each city re e Line G Minneapolis E 394 T R O B and the county will announce the dates, times and locations l u e L i Cedar n e of their municipal consent meetings on their websites. Above: The revised project scope includes 11 stations. Then, in August 2016, staff will finalize 30 percent design plans and specifications and apply with the Federal Transit V:\0010_GIS\CommunicaCitiestions\BlueLineExten sialongon\BlueLineExt_Bas ic_theDec2015sc opproposede_LgType.mxd route will review detailed plans during the municipal consent process. Administration to enter the Engineering phase of the project. TRACKING THE BLUE LINE EXTENSION Issue 4 December 2015 for news updates, project Visit us online at www.BlueLineExt.org information and events 3 Necessary infrastructure includes more bridges, retaining walls, additional station Within the updated scope, project staff now recommend eight additional bridges for a total of 14 (eight LRT, five roadway and one pedestrian), more retaining walls, full reconstruction instead of partial reconstruction of Highway 55, an additional 11th station (Plymouth Avenue), freight rail requirements and soil mitigation. Also recommended are two additional light rail vehicles and a park-and-ride at Bass Lake Road Station in Crystal. Intersection of Highway 55 and North Seventh Street looking east toward downtown Minneapolis. Blue Line Extension LRT These adjustments are based on engineering work and envi- trains would operate in the middle of Hwy. 55. ronmental studies over the past year by project staff; project advisory committees made up of community and business representatives; county and city public works; planning and community development staff; and elected officials. Scope changes in each city include: Minneapolis: The Blue Line Extension’s route down Highway 55 will also include the reconstruction of the highway, along with pedestrian improvements. The project office is work- ing closely with the city of Minneapolis and MnDOT on the design of these new elements. Golden Valley: The Plymouth Avenue Station, including a structure for an elevator and stairs, is now part of the design. There are also notable changes at the Golden Valley Road Station. Those include a park-and-ride facility, reconstruc- tion of the intersection of Golden Valley Road and Theodore Looking west toward Golden Valley, Blue Line Extension Wirth Parkway, and improved trail connections.
Recommended publications
  • Bus State of the System Report STATE of the SYSTEM

    Bus State of the System Report STATE of the SYSTEM

    BusBus StateState of of the the System System Report Report Title Page STATE OF THE SYSTEM Moving Together - 2015 1 What is ? MBTA Program for Mass Transportation (PMT) – Develops the long-term capital investment plan for the MBTA – Required by statute every 5 years and will fulfill requirement for Fiscal Management and Control Board 20 year capital plan – Priorities to be implemented through the annual Capital Investment Program (CIP) 2 Historic CIP & PMT Disconnect There has been a disconnect due to a perception that the CIP is about State of Good Repair and the PMT is about projects. What’s needed is a unified capital investment strategy based on a clear-eyed understanding of the physical and financial capacity of the MBTA and the transit needs of the future 3 STATE OF THE SYSTEM REPORTS An overview of the MBTA’s capital assets, their age and condition, and how their condition impacts system capacity and performance. 4 SYSTEM OVERVIEW The MBTA’s five modes function as an integrated system, however they differ in terms of the types of service provided, the costs of the service, and the number of passengers served. MBTA Annual Metrics by Mode - 2013 Operating Expenses Fare Revenues Passenger Miles (%) (%) (%) Passenger Trips (%) Bus 29.8 17.8 15.4 29.8 Commuter Rail 26.4 29.9 40.4 8.9 Rapid Transit 35.1 49.9 42.8 60.4 Ferry 0.8 1.1 0.6 0.3 Paratransit 7.9 1.3 0.8 0.5 Source: 2013 NTD Transit Profile 5 SYSTEM OVERVIEW The demographics of customers also varies by mode… Low- Minority income Rapid Transit 27.5% 24.1% Bus 46.5% 41.5% Commuter
  • Comparative Analysis of Coffee Franchises in the Cambridge-Boston Area

    Comparative Analysis of Coffee Franchises in the Cambridge-Boston Area

    Comparative Analysis of Coffee Franchises in the Cambridge-Boston Area May 10, 2010 ESD.86: Models, Data, and Inference for Socio-Technical Systems Paul T. Grogan [email protected] Massachusetts Institute of Technology Introduction The placement of storefronts is a difficult question on which many corporations spend a great amount of time, effort, and money. There is a careful interplay between environment, potential customers, other storefronts from the same franchise, and other storefronts for competing franchises. From the customer’s perspective, the convenience of storefronts, especially for “discretionary” products or services, is of the utmost importance. In fact, some franchises develop mobile phone applications to provide their customers with an easy way to find the nearest storefront.1 This project takes an in-depth view of the storefront placements of Dunkin’ Donuts and Starbucks, two competing franchises with strong presences in the Cambridge-Boston area. Both franchises purvey coffee, coffee drinks, light meals, and pastries and cater especially well to sleep-deprived graduate students. However, Dunkin’ Donuts typically puts more emphasis on take-out (convenience) customers looking to grab a quick coffee before class whereas Starbucks provides an environment conducive to socializing, meetings, writing theses, or studying over a longer duration. These differences in target customers may drive differences in the distribution of storefronts in the area. The goal of this project is to apply some of the concepts learned in ESD.86 on probabilistic modeling and to the real-world system of franchise storefronts and customers. The focus of the analysis is directed on the “convenience” of accessing storefronts, determined by the distance to the nearest location from a random customer.
  • Appendix a Northeast Corridor: Mobility Problems and Proposed Solutions

    Appendix a Northeast Corridor: Mobility Problems and Proposed Solutions

    Appendix A Northeast Corridor: Mobility Problems and Proposed Solutions BACKGROUND EXISTING CONDITIONS The Northeast Corridor extends from the Boston Harbor to Merrimac, Amesbury, and Salisbury bor- dering New Hampshire north of the Merrimack River. The corridor includes eight cities, 24 towns, and East Boston (a neighborhood of Boston), including Logan Airport. In the Northeast Corridor is found the historic factory city of Lynn, as well as the maritime communities of Salem, Marblehead, Beverly, Gloucester, and Newburyport. Large swaths of the corridor north of Cape Ann are protected marine estuaries. The MBTA offers rapid transit, bus, and commuter rail services across much of this corridor. The Blue Line has eight stations from Maverick Square in East Boston to Wonderland in Revere. The Blue Line also has a stop serving Logan Airport, from which dedicated free Massport shuttle buses circulate to all air terminals. MBTA Blue Line service to Logan Airport has recently been supplemented by the popular Silver Line bus rapid transit service from South Station. Maverick and Wonderland Stations both serve as major bus hubs, though some important services operate from other stations, notably buses to Winthrop from Orient Heights operated by Paul Revere Transportation under contract to the MBTA. MBTA buses also serve the corridor communities of Chelsea, Saugus, Lynn, Swampscott, Marblehead, Salem, Peabody, Beverly and Danvers. Many MBTA buses in this corridor operate all the way to Haymarket Station, in Boston Proper. These routes use the I-90 Ted Williams Tunnel, Route 1A Sumner Tunnel, or U.S. Route 1 Tobin Bridge. Because these routes use the regional express highways, they are able to provide a high level of service.
  • Annual Report to the Legislature 2015 Results

    Annual Report to the Legislature 2015 Results

    This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Annual Report to the Legislature 2015 Results Submitted: February 1, 2016 1 Annual Report to the Legislature: 2015 Results Submitted February 1, 2016 TABLE OF CONTENTS 1.0 Letter From Board Chair ...................................................................................................................................3 2.0 Executive Summary ..........................................................................................................................................5 3.0 Authority: Legislation and Joint Powers Agreement ......................................................................................11 4.0 Organizational Structure: Board and Committees .........................................................................................12 5.0 Transit investment Framework: Vision and Policies.......................................................................................15 6.0 Program of Projects Investment Strategy ......................................................................................................19 7.0 Funding Commitments ...................................................................................................................................25 8.0 Transit Sales Tax Revenues Received .............................................................................................................29
  • Rapid Transit State of the System Report

    Rapid Transit State of the System Report

    December 2015 1 TABLE OF CONTENTS Overview……………….….……………………………………………………………………………………………4 Assets..………………………………………………………………………………………………………………….15 Service Performance……………………….………………………………………………………………….… 27 Asset Performance………………………………………………..……………………………………….….… .33 Summary…………………………………………………………………………………………………………..…. 58 2 ABOUT THE STATE OF THE SYSTEM These State of the System reports lay the foundation for the development of Focus40, a financially responsible 25-year capital plan for the MBTA, to be released in 2016. Planning for the future requires a clear understanding of the present. These reports describe that present: the condition, use, and performance of the MBTA bus, rapid transit, commuter rail, ferry, and paratransit systems. In addition, these reports describe how asset condition and age influence service performance and customer experience. The next phase of Focus40 will consider how a range of factors – including technological innovation, demographic shifts, and climate change – will require the MBTA to operate differently in 2040 than it does today. With the benefit of the information provided in these State of the Systems reports, the Focus40 team will work with the general public and transportation stakeholders to develop and evaluate various strategies for investing in and improving the MBTA system in order to prepare it for the future. SUMMARY OF THE STATE OF THE SYSTEM: RAPID TRANSIT Carrying 60 percent of total MBTA ridership, the rapid transit system plays a critical role as the region’s primary mover of people into Boston’s central business district. However, the aging system and its infrastructure are not able to fully meet the current, let alone future, needs of its customers for reliability, efficiency, and carrying capacity. 3 RAPID TRANSIT OVERVIEW Rapid transit service is the MBTA’s high-capacity backbone, connecting downtown Boston with the rest of the urban core.
  • Bus State of the System Report

    Bus State of the System Report

    BusBus StateState of of the the System System Report Report Title Page Newton In Motion – February 5, 2016 1 What is ? MBTA Program for Mass Transportation (PMT) – Develops the long-term capital investment plan for the MBTA – Required by statute every 5 years and will fulfill requirement for Fiscal Management and Control Board 20 year capital plan – Priorities to be implemented through the annual Capital Investment Program (CIP) 2 STATE OF THE SYSTEM REPORTS An overview of the MBTA’s capital assets, their age and condition, and how their condition impacts system capacity and performance. Website: mass.gov/massdot/focus40 3 SYSTEM OVERVIEW The MBTA’s five modes function as an integrated system, however they differ in terms of the types of service provided, the costs of the service, and the number of passengers served. MBTA Annual Metrics by Mode - 2013 Operating Expenses Fare Revenues Passenger Miles (%) (%) (%) Passenger Trips (%) Bus 29.8 17.8 15.4 29.8 Commuter Rail 26.4 29.9 40.4 8.9 Rapid Transit 35.1 49.9 42.8 60.4 Ferry 0.8 1.1 0.6 0.3 Paratransit 7.9 1.3 0.8 0.5 Source: 2013 NTD Transit Profile 4 BUS Nearly 1,000 buses and a range of other infrastructure keep the system running. 5 BUS SERVICE MAP Most bus service operates within Route 128. Source: MBTA 6 BUS SERVICE PERFORMANCE The MBTA offers a range of bus services that carry 446,700 passengers per weekday constituting over one third of MBTA ridership. However, a number of issues preclude higher ridership and high ridership satisfaction: – Buses are often overcrowded during peak times.
  • Appendix F Southeast Corridor: Mobility Problems and Proposed Solutions

    Appendix F Southeast Corridor: Mobility Problems and Proposed Solutions

    Appendix F Southeast Corridor: Mobility Problems and Proposed Solutions BACKGROUND EXISTING CONDITIONS The Southeast Corridor consists of the Boston neighborhoods of South Boston, Dorchester, and Mattapan, the cities of Quincy and Brockton, and 31 towns stretching from Milton to the Taunton Riv- er and Buzzard’s Bay. These communities range from dense urban neighborhoods, to older industrial cities, to agricultural towns dating back to the Plymouth Colony (later referred to as the “Old Colony”), as well as a very diverse assortment of suburban communities. The most extensive MBTA rapid transit services are offered in this corridor. The Boston neighbor- hoods, city of Quincy, and towns of Milton and Braintree have MBTA rapid transit service provided by the Braintree and Ashmont branches of the Red Line, as well as the Mattapan High Speed Line. There is also an expanding set of commuter rail services in the Southeast Corridor. Those parts of Dorchester and Mattapan not near the Red Line have some commuter rail service provided by the Fairmount Line, which is currently being upgraded. Southeast of Quincy and Braintree, the Middle- borough/Lakeville and Plymouth/Kingston Lines, as well as the recently completed Greenbush Line, provide commuter rail service and lie entirely within the Southeast Corridor. The MBTA also operates 15 local bus routes and provides commuter boat service to Quincy, Hingham, and Hull. In addition to the MBTA, the Brockton Area Transit Authority (BAT) also provides public transportation services in the Southeast Corridor, operating 11 bus routes, one of which connects with the Red Line at Ashmont. The Plymouth & Brockton Street Railway Company and JBL Bus Lines operate private-carrier bus service in the corridor as well.
  • BLRT FEIS Appendix G Response to Comments on Draft

    BLRT FEIS Appendix G Response to Comments on Draft

    Appendix G Response to Draft EIS Comments Guide to the Draft EIS Response to Comments 1. Response to Comments – Agencies 2. Response to Comments – Businesses 3. Response to Comments – Civic and Community Organizations 4. Index of Comments and Response to Comments – General Public Written Comments 5. Index of Comments and Response to Comments – General Public Verbal Testimony 6. Comments Received on Draft EIS – Agencies 7. Comments Received on Draft EIS – Businesses 8. Comments Received on Draft EIS – Civic and Community Organizations 9. Comments Received on Draft EIS – General Public 10. Transcript – Brooklyn Park Hearing 11. Transcript – Crystal Hearing 12. Transcript – Golden Valley Hearing 13. Transcript – Minneapolis Hearing July 2016 This page intentionally left blank July 2016 G Guide to the Draft EIS Response to Comments Appendix G contains the comments received on the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project Draft Environmental Impact Statement (Draft EIS). A total of 191 communications were received during this time. Many of the communications contained multiple comments. For example, a resident in Golden Valley may have written a letter expressing concern about noise from LRT operations, impacts to parks and wildlife, and the need for a park-and-ride serving the proposed BLRT Extension project to be built in the city. G.1 Draft EIS Comment Period The Draft EIS comment period began on April 11, 2014, when notice of the availability of the document was published and ended on May 29, 2014. Comments were transmitted in several ways including written communications (letters, e-mail communications, comment cards filled out at public hearings) and by people testifying at public hearings.
  • Title Vi Program in Compliance with Fta Circular 4702.1B

    Title Vi Program in Compliance with Fta Circular 4702.1B

    TITLE VI PROGRAM IN COMPLIANCE WITH FTA CIRCULAR 4702.1B January 2017 The Council’s mission is to foster efficient and economic growth for a prosperous metropolitan region. Metropolitan Council Members Adam Duininck Chair Edward Reynoso District 9 Katie Rodriguez District 1 Marie McCarthy District 10 Lona Schreiber District 2 Sandy Rummel District 11 Jennifer Munt District 3 Harry Melander District 12 Deb Barber District 4 Richard Kramer District 13 Steve Elkins District 5 Jon Commers District 14 Gail Dorfman District 6 Steven T. Chávez District 15 Gary L. Cunningham District 7 Wendy Wulff District 16 Cara Letofsky District 8 Page - 2 Metropolitan Council Title VI Program 2017 The Metropolitan Council is the regional planning organization for the seven-county Twin Cities area. The Council operates the regional bus and rail system, collects and treats wastewater, coordinates regional water resources, plans and helps fund regional parks, and administers federal funds that provide housing opportunities for low- and moderate-income individuals and families. The 17-member Council board is appointed by and serves at the pleasure of the governor. This publication printed on recycled paper. On request, this publication will be made available in alternative formats to people with disabilities. Call Metropolitan Council information at 651-602-1140 or TTY 651-291-0904. Page - 4 Metropolitan Council Title VI Program 2017 Contents Definitions .............................................................................................................................................