PROGRAMMES at a GLANCE: MAY 2018 • 18 Programmes Updated

Total Page:16

File Type:pdf, Size:1020Kb

PROGRAMMES at a GLANCE: MAY 2018 • 18 Programmes Updated PROGRAMMES AT A GLANCE: MAY 2018 • 18 Programmes updated Sponsored by: www.soldiermod.com SoldierMod 27 PROGRAMMES AT A GLANCE MAY 2018 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Australia Land 53 Procurement of L-3 L-3 awarded a contract worth night vision goggles, $208 million by the Australian helmet mounts and Defence Force under Phase other equipment 1BR of the programme in approved. mid-November 2016. It will UPDATED provide a range of systems, such as binocular night vision goggles and miniature laser rangefinders. The equipment is set to be delivered between 2017 and 2023, with the final materiel release set for March 2023 and final operational capability to be declared in September of that year. Australia Land 125 Phase 2 completed. Includes Elbit Craig International Ballistics This phase is focused Phase 3 Phase 3 being Systems, has secured a major long- on an upgrade of the acquired; 3A C4I, Harris, Thales term contract under Land 125 Austeyr F-88 bullpup 3B Soldier Combat & Selex. Phase 3B to supply advanced assault rifle to EF-88 Ensemble and 3C is protective body armour to the specification overseen Enhanced Austeyr Australian Defence Force. by Thales, which is and STA. The contract involves the now in the process of manufacture of around 20,000 selecting suppliers for sets of body armour for the a range of accessories Australian Army at a value of that must fit the approximately $49 million. The weapon’s STANAG 4694 contract is for four years with a rail system. three year extension option. The delivery of rifles and ancillary devices to North Queensland under phase 3C has been completed, and deliveries were scheduled for South Queensland for the second half of 2017. Australia Land 125 To be managed TBC All personnel in Land 125-4 will Strategy has not been Phase 4 (Army by Diggerworks. already have L53-1BR - Night fully scoped. Cost High Priority Equipping the Fighting Equipment technology estimated at A$500m- Capability Gaps soldier after 2020. re-fresh L125-3B – Survivability $1500m although - Next Soldier Programme likely to – the Soldier Combat Ensemble expected to be towards Enhancement) be renamed. (Protection, Platform, Pouches, the lower end. $7.5 Packs) L125-3C – Enhanced F88 million of Phase 4 with ‘open architecture’ Army funding allocated to Minors, Force Protection Review, new DMTC to develop Sustainment – F88SA2 and 3, new technology. 7.62mm MG, 7.62mm Marksman Rifle. 28 Volume 21 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity Australia Land 200 LAND 200 Tranche Elbit Systems LAND 200 Tranche 2 was LAND 200 will undergo 1 was endorsed endorsed by Government its greatest challenge LAND 200 is made by Government in in August 2013 and will between 2013 and 2018 up of phases from November 2009. New continue with PMV and in delivering a holistic three projects: Land radios and systems G-Wagon installations, Land Networking solution 125, Land 75 and JP commenced delivery as well as installation of to two Army formations, UPDATED 2072. across Defence in radios and systems into enabling Brigades, training May 2011. the M113AS4s, LAND 121 establishments, Special LAND 200 Tranche Medium Heavy Trucks, Forces and other Services. has reached and PMV-Light. LAND 200 Tranche 3, full operational planned for 2017 – 2021-22, Invisio S10 v and S60 will complete deliveries to capability with the ordered. Thales MBITR final delivery of all the remainder of Defence and Harris Falcon II and and provide technical equipment. Under 111 ordered. this Tranche, Army refresh of equipment will receive digital previously delivered in Battle Management Tranche 1 and 2. Systems for the soldier, Protected Mobility Vehicles, Unimog and G Wagon. Austria Soldat der Zukunft 90 Million Euro Elbit Systems Glock P80 Pistols investment. New ordered. OPS-Core Sentry visor system to be XP mid cut helmets evaluated. ordered. Radio Conrad PNR 500. UPDATED Austria Soldat 2018 Combined with Elbit Systems Madritsch delivered first Soldat der Zukundt batch of its AG77 A1/ procurement. ML40. UPDATED Belgium BEST Fielding is planned Elbit Selected Elbit Systems The first joint purchase to begin in 2017. Smart Vest System. under agreement between Combined Budgets Benelux countries has of €150 million. been made for under USD150 million contract UPDATED for the provision of Elbit’s Smart Vest systems for the Benelux nation’s future solider programmes. These are Belgium’s BEST programme, the Netherlands’ VOSS programme, and Luxembourg’s COMPASS. Brazil Combatente The project is AMBINDE $14m award for Harris The contract involves the Brasileiro (COBRA) expected to continue Systems Falcon II&III radios in supply of radios to the until 2021. The Integrator RF-7800V in Feb. 2011. Brazilian army´s center system will influence First 86 VBTP-MR Guarani for communications and the decisions but 6x6 IFVs delivered electronic warfare. Both UPDATED will not be copied requirement for 2130. the RF-7800V and RF-7800S 100,000 troops by Impec’s TPP-1400 systems are essential to 2021. ordered. the COBRA modernization program, as they will provide secure voice and high-bandwidth data applications, including video combat chat. There are a number of other types of equipment being supplied in the programme, such as the IA2 assault rifle. www.soldiermod.com SoldierMod 29 PROGRAMMES AT A GLANCE MAY 2018 Country Programme Schedule Contractor Team Recent Notes Name Procurement Activity Canada Integrated Rheinmetall Rheinmetall Rheinmetall Canada Soldier System Canada awarded is supplying the ISS Project (ISSP) a four-year in cooperation with contract in July Saab AB. The Canadian 2015. government has UPDATED As of July 2017 awarded Rheinmetall the qualification two major orders review for the for army technology, new system whose total volume to ensure it could reach CAD 493 meets army million (about €350 requirements had million). Serving as been completed. prime contractor, The government Rheinmetall Canada exercised its Inc. option for the Harris 7800s Radios production of And Invisio ear the first 1632 protection ordered. systems. Croatia ‘Future Soldier’ EDA/LCG/1 Procurement New uniform and load New sniper rifles demo-ed: participation only for Afghanistan carriage procured. Berta Projekt BP 08 M in .338 on C4I. deployment inc. First 1000 VHS 5.56mm Lapua and .300 Win Mag and Motorola GP300, assault rifle delivered. Agencija Alan’s MACS M4 Kroko ballistic 12.7mm. vest, Sestan Busch helmet. Czech Voják 21 ‘V21’ V21 2004-6 single VOP-026 led V21 and Plans to acquire 10,000 CZ Republic or Soldier 21 demonstrator ‘Sesedak’. 805 Bren assault rifles, 7,000 Squad level CZ 75 Phantom pistols and ‘Sesedak’ 500 CZ Scorpion SMGs from experimentation 2014-2020. in 2007-9. Denmark ‘Danish Army May procure As equipment. Tenders for CBRN Contracted with Harris for Network systems up clothing, sensor 3500 SPRs with Invisio V60 Enabled Soldier’ to 2020. Hard sytems for handheld, ancillaries. (DANES) systems by late headworn and weapon 2018. mounted optics, hand UPDATED launched UAVs. Finland Now known as The system TP2010 includes Tactical Headgear SAVOX has begun delivery Warrior 2020 should be fielded Savox as integrator for Operational of THOR Headgear for by the end of and Millog, Nethawk Requirements (THOR) FDF. The initial order is for 2019. and Insta. has been adopted by an undisclosed number the Finnish Defense of THOR tactical combat UPDATED Elbit Systems has been selected to Forces as the helmet headgear systems destined supply “soldier component of their for the FDF. These units will systems” to Soldier Modernization go into acceptance testing Finnish infantry Program: Warrior 2020. and approvals. The initial commanders.. A multi-year contract delivery is part of a rolling This acquisition is was recently let by contract, which will see a the first phase of the Finnish Defense steady ramping up of volume a comprehensive Forces Logistics towards mass production ISTAR (Intelligence, Command, with initial later this year, with further Surveillance, Target deliveries being used options continuing for an Acquisition and for acceptance testing. undisclosed number of Reconnaissance) Savox is the prime years. The FDF procurement program known as contractor of the has been handled by the STAR. consortium behind FDF’s joint procurement THOR, along with organisation, the Finnish industry partners, Defence Forces Logistics Millog Oy (night vision) Command, which manages and Fy-Composites Oy all contracts for the Finnish (ballistic protection). Air Force, Army and Navy. 30 Volume 21 Country Programme Schedule Contractor Recent Procurement Notes Name Team Activity France FELIN The programme Safran FELIN V.13 is being (Fantassin à is subject to an delivered. Equipements upgrade with et Liaisons more modern Intégrés) equipment. UPDATED France Arme Procurement Heckler & Koch The tender called for a The bid request required the Individuelle for new assault total of 90,000 weapons to AIF standard to be integrated Future (AIF) rifle. be purchased, comprised with the other aspects of of 45,000 assault rifles France’s FELIN future soldier and 45,000 carbines, all system modernisation chambered in 5.56 mm programme. x 45 NATO ammunition. Heckler & Koch’s HK416F was Under France’s Military selected in September 2016 Programming Law 2014- to fulfill the requirement. This 19, more than 100,000 marks the first time that a weapons – with the France will acquire a standard- associated accessories, issue rifle from a foreign ammunition and services manufacturer. – will be delivered. A first batch of 400 rifles was received in May 2017. Germany ‘Gladius’ Rheinmetall Rheinmetall New Equipment to Looking to equip a further 70 IdZ-2/ES formally reduce weight to 3.9kg infantry platoons. transferred by removing INS, new its new IdZ-ES integrated tablet and future soldier squad leader display and UPDATED system to upgrading C2 software. the German New 30% more battery Bundeswehr on capacity.
Recommended publications
  • ^`Nrfpfqflk=Obpb^O`E= `~Ëé=Ëíìçó= =
    NPS-AM-11-205 ^`nrfpfqflk=obpb^o`e= `~ëÉ=ëíìÇó= = The Nett Warrior System: A Case Study for the Acquisition of Soldier Systems 15 December 2011 by Maj. Joseph L. Rosen, U.S. Army, and Maj. Jason W. Walsh, U.S. Army Advisors: Michael W. Boudreau, Senior Lecturer, and Dr. Keith F. Snider, Associate Professor Graduate School of Business & Public Policy Naval Postgraduate School Approved for public release, distribution is unlimited. Prepared for: Naval Postgraduate School, Monterey, California 93943 = = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v k^s^i=mlpqdo^ar^qb=p`elli The research presented in this report was supported by the Acquisition Chair of the Graduate School of Business & Public Policy at the Naval Postgraduate School. To request Defense Acquisition Research or to become a research sponsor, please contact: NPS Acquisition Research Program Attn: James B. Greene, RADM, USN, (Ret.) Acquisition Chair Graduate School of Business and Public Policy Naval Postgraduate School 555 Dyer Road, Room 332 Monterey, CA 93943-5103 Tel: (831) 656-2092 Fax: (831) 656-2253 E-mail: [email protected] Copies of the Acquisition Sponsored Research Reports may be printed from our website, www.acquisitionresearch.net = = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v k^s^i=mlpqdo^ar^qb=p`elli THE NETT WARRIOR SYSTEM: A CASE STUDY FOR THE ACQUISITION OF SOLDIER SYSTEMS ABSTRACT This project provides an analysis of the Army’s acquisition of the Nett Warrior (NW) soldier system. Its objectives are to document the legacy of the system and provide an overview of how acquisition strategy has adapted with respect to key acquisition elements since its inception on September 8, 1993.
    [Show full text]
  • Nett Warrior
    1 Soldier Modernization Market Segment Report February 2021 Copyright © 2021 Jane's Group UK Limited. All Rights Reserved. 2 Introduction As part of Janes’ support of the New Hampshire Aerospace and Defense Export Consortium (NHADEC), Janes will provide a series of ten high-level market reports on subjects of NHADEC’s choosing as well as two in-depth market segment reports. This market segment market report focuses on the soldier modernization market and is comprised of the following elements: 1. Overview of the main aspects of soldier modernization 2. Ongoing programs 3. Market forecast 2021-2025 Copyright © 2021 Jane's Group UK Limited. All Rights Reserved. Soldier modernization evolution 3 1990s-2000 2000s-2010 2010s-2020 2030s • Future soldiers programs have been in the making for decades, although the concept only started reaching maturity in the 1990s with the advent of France’s FELIN or the US Land Warrior and Objective Force Warrior. In the 1990s, most projects were still heavily influenced by Cold War type engagement scenarios with a strong focus on mechanized infantry. Technological ambitions were huge and envisioned the use of airburst type combined weapons by “super soldiers” fully networked, heavily armed, capable of dissimulating through adaptive camouflage and holograms and able to live of the land thanks to genetically altered seeds able to turn into edible vegetables in hours. • Of the different programs launched in the 1990s, only FELIN reached maturity, albeit in a much different form than originally conceived. The system started to be fielded by the end of the 2000s and made its debut in operations in Afghanistan in 2011.
    [Show full text]
  • ISSUE 12 C4ISH-12 OFC+Spine.Indd 1 SATCOM ON-THE-MOVE-SOLUTIONS CONNECT, COLLABORATE, COMMUNICATE
    C4I SYSTEMS C4I HANDBOOK – ISSUE 12 ISSUE 12 HANDBOOK PUBLISHED SEPTEMBER 2018 THE CONCISE GLOBAL INDUSTRY GUIDE C4I SYSTEMS C4ISH-12_OFC+spine.indd 1 9/6/2018 12:35:28 PM SATCOM ON-THE-MOVE-SOLUTIONS CONNECT, COLLABORATE, COMMUNICATE Use of U.S. DoD visual information does not imply or constitute DoD endorsement. L3 Communication Systems provides turn-key SATCOM On-The-Move (SOTM) solutions that enable mobile and halted forces to collaborate, access Department of Defense Information Network (DoDIN) resources, and exchange voice, data and video in a tactical environment. We developed the MPM-1000 modem product family, which, when combined with an antenna system, provides an off-the-shelf SOTM solution for both military and commercial applications. L3T.COM C4ISH-12_IFC_L3T.indd 2 9/6/2018 12:36:45 PM CONTENTS Director Analysis 3 Introduction Matthew Smith [email protected] Digital Battlespace Editor Grant Turnbull welcomes readers to Issue 12 of Shephard Media’s C4I Systems Handbook. Reference Editor Karima Thibou [email protected] 4 Major networking projects Advertising Executive Revised and updated sample of the world’s major efforts to improve the Louis Puxley interoperability of armed forces through tactical and strategic digital networks. [email protected] Arranged alphabetically by manufacturer or main sponsoring organisation. Production and Circulation Manager David Hurst 28 Data links Deputy Production Manager Cross-section of the most important data link standards, data links, gateways and Georgina Smith other equipment that enables net-centric operations. Listed alphabetically by Production Editor manufacturer or main sponsoring organisation. Elaine Effard Graphic Designer 57 SDRs, modems and ancillaries Georgina Kerridge Updated selection of the latest military software-defined digital and Digital Development Manager IP-capable radios, modems and related equipment.
    [Show full text]
  • Customize Proven Head-Mounted Displays for Your National Ground Forces
    SOLDIER DISPLAY SYSTEMS INTERNATIONAL Customize proven head-mounted displays for your national ground forces. Deployed with some of the world’s elite forces. A complete line of display systems customizable right down to the eyes on the target. A platoon of U.S. forces conducts nighttime raids through an embattled Afghan city. Mounted and dismounted soldiers encounter constant Designing a soldier display system around your program’s distinct Our custom soldier display systems are serving armed forces skirmishing and ambushes with improvised explosive devices. The ability to coordinate personnel and assets quickly and strategically is a set of needs requires an array of options that seamlessly integrate and programs such as the: key element to keeping the enemy off balance, especially in combat situations where hostile forces can outnumber the soldiers. in any configuration. That means every element in your system > United States Army Land Warrior, NETT Warrior, must perform to exacting standards. When those elements come and Mounted Soldier System programs Fortunately, these troops – along with soldiers in other national militaries around the world – have precisely this kind of coordination. from Rockwell Collins, you benefit from the expertise of one of the Head- or vehicle-mounted displays from Rockwell Collins deliver digital, expanded situational awareness and effective networking world’s leading innovators and suppliers of soldier display systems, > United States Marine Corps SIMP program through a single compact eyepiece. Combat proven, built for ease of use and extended wear, these soldier display systems are also highly including our deep experience with helmet-mounted displays for > Spanish Army Future Soldier System (COMFUT) customizable.
    [Show full text]
  • Escola De Aperfeiçoamento De Oficiais Cap Eng Tiago
    ESCOLA DE APERFEIÇOAMENTO DE OFICIAIS CAP ENG TIAGO UMEHARA TANIGUTI ERGONOMIA, LAYOUT E FUNCIONALIDADES PARA UM TABLET ROBUSTECIDO CONDUZIDO PELOS COMANDANTES DE SUBUNIDADE OU PELOTÃO EM AÇÕES TÁTICAS Rio de Janeiro 2017 ESCOLA DE APERFEIÇOAMENTO DE OFICIAIS CAP ENG TIAGO UMEHARA TANIGUTI ERGONOMIA, LAYOUT E FUNCIONALIDADES PARA UM TABLET ROBUSTECIDO CONDUZIDO PELOS COMANDANTES DE SUBUNIDADE OU PELOTÃO EM AÇÕES TÁTICAS Trabalho acadêmico apresentado à Escola de Aperfeiçoamento de Oficiais, como requisito para a especialização em Ciências Militares com ênfase em Gestão Operacional Rio de Janeiro 2017 MINISTÉRIO DA DEFESA EXÉRCITO BRASILEIRO DECEx - DESMil ESCOLA DE APERFEIÇOAMENTO DE OFICIAIS (EsAO/1919) DIVISÃO DE ENSINO / SEÇÃO DE PÓS-GRADUAÇÃO FOLHA DE APROVAÇÃO Autor: Cap Eng TIAGO UMEHARA TANIGUTI Título: ERGONOMIA, LAYOUT E FUNCIONALIDADES PARA UM TABLET ROBUSTECIDO CONDUZIDO PELOS COMANDANTES DE SUBUNIDADE OU PELOTÃO EM AÇÕES TÁTICAS APROVADO EM _________/________/_________CONCEITO:_________ Trabalho Acadêmico, apresentado à Escola de Aperfeiçoamento de Oficiais, como requisito parcial para a obtenção da especialização em Ciências Militares, com ênfase em Gestão Operacional, pós- graduação universitária lato sensu. BANCA EXAMINADORA Membro Menção Atribuída ____________________________________ ANDRÉ LUIZ VIEIRA CASSIANO – Ten Cel Presidente da Comissão _______________________ DAN MILLI PEREIRA - Maj Orientador e 1º Membro ________________________________ RUY FERRAZ E SILVA JÚNIOR - Maj 2º Membro ______________________________ TIAGO UMEHARA TANIGUTI – Cap Aluno ERGONOMIA, LAYOUT E FUNCIONALIDADES PARA UM TABLET ROBUSTECIDO CONDUZIDO PELOS COMANDANTES DE SUBUNIDADE OU PELOTÃO EM AÇÕES TÁTICAS Tiago Umehara Taniguti1 Dan Milli Pereira2 RESUMO Este trabalho de conclusão de curso aborda as questões de ergonomia, layout e funcionalidades relativas a um tablet robustecido com a finalidade de ser empregado por comandantes de frações táticas nível pelotão e subunidade do Exército Brasileiro em ações táticas.
    [Show full text]
  • The Land Warrior Soldier System: a Case Study for the Acquisition of Soldier Systems
    Calhoun: The NPS Institutional Archive Theses and Dissertations Thesis Collection 2008-12 The Land Warrior Soldier System: a case study for the acquisition of soldier systems Clifton, Nile L., Jr. Monterey, California, Naval Postgraduate School http://hdl.handle.net/10945/38046 NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT The Land Warrior Soldier System: A Case Study for the Acquisition of Soldier Systems By: Nile L. Clifton Jr. Douglas W. Copeland December 2008 Advisors: Keith Snider Michael W. Boudreau Approved for public release; distribution is unlimited THIS PAGE INTENTIONALLY LEFT BLANK REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED December 2008 MBA Professional Report 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS The Land Warrior Soldier System: A Case Study for the Acquisition of Soldier Systems 6. AUTHOR(S) Major Nile L. Clifton; Major Douglas W. Copeland 7. PERFORMING ORGANIZATION NAME(S) AND 8. PERFORMING ORGANIZATION ADDRESS(ES) REPORT NUMBER Naval Postgraduate School Monterey, CA 93943-5000 9.
    [Show full text]
  • Pharmacological Supersoldiers in the US Military
    Chemical Heroes Pharmacological Supersoldiers in the US Military andrew bickford Chemical Heroes andrew bickford Chemical Heroes Pharmacological Supersoldiers in the US Military Duke University Press ​| Durham and London ​| ​2020 © 2020 Duke University Press All rights reserved Printed in the United States of Amer i ca on acid- free paper ∞ Designed by Matthew Tauch Typeset in Whitman and Helvetica Neue lt Std by Westchester Publishing Ser vices Library of Congress Cataloging- in- Publication Data Names: Bickford, Andrew, [date] author. Title: Chemical heroes : pharmacological supersoldiers in the US Military / Andrew Bickford. Other titles: Global insecurities. Description: Durham : Duke University Press, 2020. | Series: Global insecurities | Includes bibliographical references and index. Identifiers: lccn 2020018849 (print) | lccn 2020018850 (ebook) isbn 9781478009726 (hardcover) isbn 9781478011354 (paperback) isbn 9781478010302 (ebook) Subjects: lcsh: United States. Army— Safety mea sures. | United States. Army— Medical care. | Military art and science— Technological innovations. | Soldiers— Protection— United States. | Soldiers— Performance— United States. | Biological warfare— Research— United States. | Phar ma ceu ti cal industry— Military aspects. Classification: lcc u42.5 .b535 2020 (print) | lcc u42.5 (ebook) | ddc 355.3/45— dc23 lc rec ord available at https:// lccn . loc . gov / 2020018849 lc ebook rec ord available at https:// lccn . loc . gov / 2020018850 Cover art: Design and illustration by Matthew Tauch For Arwen Heroism is endurance for one moment more. » George F. Kennan, Letter to Henry Munroe Rogers, July 25, 1921 It is impossible to strive for the heroic life. The title of hero is bestowed by the survivors upon the fallen, who them- selves know nothing of heroism. » Johan Huizinga, The Spirit of the Netherlands, 1968 Death is but a moment; cowardice is a lifetime of affliction.
    [Show full text]
  • PROGRAMMES at a GLANCE: JANUARY 2020 • 5 Programmes Updated • 2 New Programmes
    PROGRAMMES AT A GLANCE: JANUARY 2020 • 5 Programmes updated • 2 New Programmes Sponsored by: www.soldiermod.com SoldierMod 1 PROGRAMMES AT A GLANCE JAN 2020 Country | Programme Name Schedule | Contractor Team Recent Procurement Activity | Notes Australia: Land 53 Procurement of night vision goggles, L-3 awarded a contract worth $208 million by the helmet mounts and other equipment Australian Defence Force under Phase 1BR of the approved. programme in mid-November 2016. It will provide | L-3 a range of systems, such as binocular night vision goggles and miniature laser rangefinders. The equipment is set to be delivered between 2017 and 2023, with the final materiel release set for March 2023 and final operational capability to be declared in September of that year. Australia: Land 125 Phase 3C Thales Australia is the prime This project is delivering a weapon system based contractor manufacturing the on the Enhanced F88 rifle comprising a Grenade Enhanced F88 rifle and supplying the Launcher Attachment (GLA) and a suite of surveillance Steyr Mannlicher-produced GLA. and target ancillaries, including an enhanced day sight and thermal and image-intensifier sights. UPDATED A contract for the production of 30,000 Enhanced F88 rifles, 2,277 GLAs, repair parts and training aids was signed in July 2015. Deliveries commenced in August 2015 and will continue through to 2021. Surveillance and target ancillaries have been fully delivered. Deliveries of weapon systems into Queensland have been completed. Deliveries to units of the readying brigade primarily located in South Australia and the Northern Territory have commenced and will be completed in April 2019.
    [Show full text]
  • A Brief Overview of Digital Military Systems Used in the Armies of NATO Member Countries
    NEMZETBIZTONSÁGI SZEMLE 9. évfolyam (2021) 1. szám 56–70. • doi: 10.32561/nsz.2021.1.4 Péter Török1 A Brief Overview of Digital Military Systems Used in the Armies of NATO Member Countries A NATO-tagországok által alkalmazott digitális katonai rendszerek rövid áttekintése Today’s wars have undergone significant change. These changed military operations have changed the way armies are deployed, including the role and responsibilities of soldiers. New tools are needed to overcome the new challenges. 21st century soldiers n1 e e d 2 st century equipment to perform their duties. A project is present in several NATO (North Atlantic Treaty Organisation) member states army to develop individual equipment systems for dismounted soldiers equipped with modern military equipment, which are in the pilot phase, under introduction or authorised. I present these briefly in my publication. Keywords: C4I, digital soldier, DSS, NATO, soldier modernisation program A ma háborúi jelentős változáson mentek át. Ezek a megváltozott katonai műveletek megváltoztatták a hadseregek alkalmazásának módját, ezen belül a katonák szerepét és feladatait. Az új kihívások leküzdéséhez új eszközökre van szükség. A ­21. század katonáinak 21. századi felszerelésre van szükségük feladataik végrehajtásához. Több NATO-tagország haderőiben van jelen kísérleti fázisban lévő, bevezetés alatt álló vagy rendszeresített, modern hadeszközökkel felszerelt gyalogos katonák egyéni eszközrendszereinek fejlesztésével foglalkozó projekt. Ezeket mutatom be röviden a publikációmban. Kulcsszavak: C4I, digitális katona, DSS, NATO, modernizációs program 1 Péter Török is a PhD student at the University of Public Service Doctoral School of Military Engineering – Török Péter a Nemzeti Közszolgálati Egyetem Katonai Műszaki Doktori Iskola doktori hallgatója. E-mail: torok. [email protected], ORCID: https://orcid.org/0000-0002-7960-8945 56 57 Péter Török: A Brief Overview of Digital Military Systems Used in the Armies… 1.
    [Show full text]
  • PROGRAMMES at a GLANCE | December 2020 | 10 Updates
    PROGRAMMES AT A GLANCE: DECEMBER 2020 • 10 Programmes updated • 2 New Programmes The full programme section is available online Sponsored by: www.soldiermod.com SoldierMod 1 PROGRAMMES AT A GLANCE DEC 2020 Country | Programme Name Schedule | Contractor Team Recent Procurement Activity | Notes Country | Programme Name Schedule | Contractor Team Recent Procurement Activity | Notes Australia: Land 53 Procurement of night vision goggles, L-3 awarded a contract worth $208 million by the Australia: Land 200 The Australian Federal Government The Department of Defence has sought to delay helmet mounts and other equipment Australian Defence Force under Phase 1BR of the LAND 200 is made up of phases announced that Eylex Pty Ltd has first pass approval for Battlefield Command approved. programme in mid-November 2016. It will provide from three projects: Land 125, Land been selected to supply critical Systems under Land 200 Phase 3. a range of systems, such as binocular night vision equipment to the $5.2 billion Land | L-3 75 and JP 2072. The pause is until ‘at least’ February 2022. The goggles and miniature laser rangefinders. 400 Phase 2 Commonwealth defence Department attributes the delay to ‘overall The equipment is set to be delivered between 2017 program, including Racal Acoustics movement in committee processes and Covid-19’. and 2023, with the final materiel release set for March RA4000 Magna and RA5001 Raptor headsets for Boxer 8×8 Combat The Land 200 program is designed to transition 2023 and final operational capability to be declared in Army command from paper to digital, providing September of that year. UPDATED Reconnaissance Vehicles (CRV) with deliveries later this year.
    [Show full text]