Partners Healthcare International and Innovation

Total Page:16

File Type:pdf, Size:1020Kb

Partners Healthcare International and Innovation Directions to 100 Cambridge Street, 20th Floor, Suite 2002 Partners HealthCare Boston, MA 02114 USA Tel: +1 (617) 535-6400 International and Innovation Fax: +1 (617) 535-6410 www.partners.org/innovation 100 CAMBRIDGE STREET OFFICE www.partners.org/international Upon entering the Saltonstall Building at 100 Cambridge Street, all visitors are required to check-in at the Security Desk to receive a visitor badge/sticker. You will be asked to show a form of photo identification upon check-in. Our offices are located on theth 20 Floor. From the North GREEN LINE Take I-93 S to exit 26/Storrow Drive. Turn Right on Nashua • Take the B, C, D or E Line to the Government Center stop Street. Turn Left on Lomasney Way. Bear Right on Staniford • Exit the train to the Government Center plaza Street. Turn Left on Cambridge Street. Arrive at 100 • Walk down Cambridge Street to the West (taking a right) with Boston City Hall on your right and a series of small shops on Cambridge Street, Boston, on the Right. your left • We are the building directly across the street from the Bowdoin From the South Blue Line T stop at the intersection of Bowdoin and New Take I-93 N to Boston. Take exit 23/Gov’t Ctr onto North St. Chardon Streets toward Gov’t Center/Faneuil Hall/Financial Dist/Aquarium. Turn Right on Congress St. Veer Left on New Chardon BLUE LINE VIA THE GREEN LINE • Take the B, C, D or E Green Line to the Government Center stop St. Continue on Bowdoin Sq. Turn Left on Cambridge St. • Transfer to the Blue Line heading inbound towards Bowdoin Arrive at 100 Cambridge Street, Boston. • Exit the train at Bowdoin Station and we are the building directly From the West across the street Take I-90 E/Mass Pike. Take exit 16/W. Newton/Wellesley Parking onto Washington St (Rt-16 E) toward West Newton. Turn For your convenience, 100 Cambridge Street provides Left to take ramp onto I-90 E toward Mass. Turnpike/ accessible underground parking. The garage entrance is Boston. Take Left exit 18/Brighton/Cambridge onto located at 20 Somerset Street, Boston, MA Cambridge St toward Cambridge/Somerville. Bear Right on Other local garages include: Cambridge St toward Gov’t. Center/Downtown. Arrive at • Government Center Garage (corner of New Chardon and 100 Cambridge Street, Boston, on the right. Congress Streets), 50 New Sudbury Street, Boston MA From Logan International Airport Hotels near 100 Cambridge Start going toward TERMINAL C. Take ramp onto RT-1A S. (listed according to proximity) Continue on Sumner Tunl (Rt-1A S). Take Left ramp toward Wyndham Boston Beacon Hill Government Center (I-93 N) /Govt’t Center/Faneuil Hall. 5 Blossom St, Boston, MA 02114 Turn Left on New Chardon St. Turn Left on Cambridge St. Tel: 617-742-7630 Arrive at 100 Cambridge St, Boston, on the right. The Liberty Public Transportation 215 Charles St, Boston, MA 02114 RED LINE Tel: 617-224-4000 • Take the Red Line to the Charles/MGH stop The Boxer Boston Hotel • Exit the train and follow Cambridge St. East towards 107 Merrimac St, Boston, MA 02114 Government Center (the opposite direction from the river) Tel: 617-624-0202 • When you reach the Bowdoin Blue Line T stop on your left (at the intersection of Bowdoin/New Chardon Streets), we are the Kimpton Onyx Hotel building directly across the street 155 Portland St, Boston, MA 02114 Tel: 617-557-9955 ORANGE LINE • Exit the train at State Street and walk across City Hall Plaza to Cambridge Street West, or • Exit the train at North Station and walk down Valenti Way to Merrimac Street, take a right on New Chardon Street to Bowdoin, and 100 Cambridge Street will be on the left.
Recommended publications
  • 2011-Summer.Pdf
    BOWDOIN MAGAZINE ­ VOL. 82 NO. 2 SUMMER 2011 BV O L . 8 2 ­ N Oow . 2 ­ ­ S UMMER ­ 2 0 1 1­ ­ doi­n STANDP ­U WITH ­A­SOCIAL­ FOR ­THE­CLASS­OF­1961,­ BOWDOIN­IS­FOREVER CONSCIENCE JILL­SHAW­RUDDOCK­’77 HARI KONDABOLU ’04 SLICING­THE­PIE­FOR­ THE POWER OF COMEDY AS AN STUDENT­ACTIVITIES INSTRUMENT FOR CHANGE SUMMER 2011­ CONTENTS BowdoinMAGAZINE 24 A­Great­Second­Half PHOTOGRAPHS BY FELICE BOUCHER In an interview that coincided with the opening of an exhibition of the Victoria and Albert’s English alabaster reliefs at the Bowdoin College Museum of Art last semester, Jill Shaw Ruddock ’77 talks about the goal of her new book, The Second Half of Your Life—to make the second half the best half. 30 For­the­Class­of­1961,­Bowdoin­is­Forever BY LISA WESEL • PHOTOGRAHS BY BOB HANDELMAN AND BRIAN WEDGE ’97 After 50 years as Bowdoin alumni, the Class of 1961 is a particularly close-knit group. Lisa Wesel spent time with a group of them talking about friendship, formative experi- ences, and the privilege of traveling a long road together. 36 Stand­Up­With­a­Social­Conscience BY EDGAR ALLEN BEEM • PHOTOGRAPHS BY KARSTEN MORAN ’05 The Seattle Times has called Hari Kondabolu ’04 “a young man reaching for the hand-scalding torch of confrontational comics like Lenny Bruce and Richard Pryor.” Ed Beem talks to Hari about his journey from Queens to Brunswick and the power of comedy as an instrument of social change. 44 Slicing­the­Pie BY EDGAR ALLEN BEEM • PHOTOGRAPHS BY DEAN ABRAMSON The Student Activity Fund Committee distributes funding of nearly $700,000 a year in support of clubs, entertainment, and community service.
    [Show full text]
  • Building a Better T in the Era of Covid-19
    Building a Better T in the Era of Covid-19 MBTA Advisory Board September 17, 2020 General Manager Steve Poftak 1 Agenda 1. Capital Project Updates 2. Ridership Update 3. Ride Safer 4. Crowding 5. Current Service and Service Planning 2 Capital Project Updates 3 Surges Complete | May – August 2020 Leveraged low ridership while restrictions are in place due to COVID-19 directives May June July August D Branch (Riverside to Kenmore) Two 9-Day Closures C Branch (Cleveland Circle to Kenmore) E Branch (Heath to Symphony) Track & Signal Improvements, Fenway Portal Flood 28-Day Full Closure 28-Day Full Closure Protection, Brookline Hills TOD Track & Intersection Upgrades Track & Intersection Upgrades D 6/6 – 6/14 D 6/20 – 6/28 C 7/5 – 8/1 E 8/2 – 8/29 Blue Line (Airport to Bowdoin) Red Line (Braintree to Quincy) 14-Day Closure Harbor Tunnel Infrastructure Upgrades On-call Track 2, South Shore Garages, Track Modernization BL 5/18 – 5/31 RL 6/18 -7/1 4 Shuttle buses replaced service Ridership Update 5 Weekday Ridership by Line and Mode - Indexed to Week of 2/24 3/17: Restaurants and 110 bars closed, gatherings Baseline: limited to 25 people Average weekday from 2/24-2/28 100 MBTA service reduced Sources: 90 3/24: Non-essential Faregate counts for businesses closed subway lines, APC for 80 buses, manual counts at terminals for Commuter Rail, RIDE 70 vendor reports 6/22: Phase 2.2 – MBTA 6/8: Phase 2.1 60 increases service Notes: Recent data preliminary 50 5/18-6/1: Blue Line closed for 40 accelerated construction Estimated % of baseline ridership
    [Show full text]
  • 2013-0583-3S Massachusetts Bay Transportation Authority (MBTA)
    Official Audit Report – Issued June 16, 2014 Massachusetts Bay Transportation Authority For the period January 1, 2005 through December 31, 2012 State House Room 230 Boston, MA 02133 [email protected] www.mass.gov/auditor June 16, 2014 Dr. Beverly Scott, General Manager Massachusetts Bay Transportation Authority State Transportation Building 10 Park Plaza, Suite 3910 Boston, MA 02116 Dear Dr. Scott: I am pleased to provide this performance audit of the Massachusetts Bay Transportation Authority (MBTA). This report details the audit objectives, scope, methodology, findings, and recommendations for the audit period, January 1, 2005 through December 31, 2012. My audit staff discussed the contents of this report with management of the MBTA, and their comments are reflected in this report. I would also like to express my appreciation to the MBTA for the cooperation and assistance provided to my staff during the audit. Sincerely, Suzanne M. Bump Auditor of the Commonwealth 2013-0583-3A TABLE OF CONTENTS TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................................... 1 OVERVIEW OF AUDITED AGENCY ........................................................................................................................... 3 AUDIT OBJECTIVES, SCOPE, AND METHODOLOGY ................................................................................................. 4 DETAILED AUDIT RESULTS AND FINDINGS WITH AUDITEE’S RESPONSE ................................................................
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • Bus State of the System Report STATE of the SYSTEM
    BusBus StateState of of the the System System Report Report Title Page STATE OF THE SYSTEM Moving Together - 2015 1 What is ? MBTA Program for Mass Transportation (PMT) – Develops the long-term capital investment plan for the MBTA – Required by statute every 5 years and will fulfill requirement for Fiscal Management and Control Board 20 year capital plan – Priorities to be implemented through the annual Capital Investment Program (CIP) 2 Historic CIP & PMT Disconnect There has been a disconnect due to a perception that the CIP is about State of Good Repair and the PMT is about projects. What’s needed is a unified capital investment strategy based on a clear-eyed understanding of the physical and financial capacity of the MBTA and the transit needs of the future 3 STATE OF THE SYSTEM REPORTS An overview of the MBTA’s capital assets, their age and condition, and how their condition impacts system capacity and performance. 4 SYSTEM OVERVIEW The MBTA’s five modes function as an integrated system, however they differ in terms of the types of service provided, the costs of the service, and the number of passengers served. MBTA Annual Metrics by Mode - 2013 Operating Expenses Fare Revenues Passenger Miles (%) (%) (%) Passenger Trips (%) Bus 29.8 17.8 15.4 29.8 Commuter Rail 26.4 29.9 40.4 8.9 Rapid Transit 35.1 49.9 42.8 60.4 Ferry 0.8 1.1 0.6 0.3 Paratransit 7.9 1.3 0.8 0.5 Source: 2013 NTD Transit Profile 5 SYSTEM OVERVIEW The demographics of customers also varies by mode… Low- Minority income Rapid Transit 27.5% 24.1% Bus 46.5% 41.5% Commuter
    [Show full text]
  • Chapter 4: Systemwide Context of The
    CHAPTER 4 Systemwide Context for the PMT TRANSIT SYSTEM: EXISTING CONDITIONS OVERVIEW The Boston metropolitan area is served by an extensive transit system comprising several comple- mentary components. One component is a hub-and-spoke radial network of rapid transit, express bus, commuter rail, and commuter boat lines that is geared, during peak operations, to efficiently move large volumes of people into and out of the urban core for weekday commutes. Local bus and trackless trolley services fill in gaps and connect the radial “spokes” by offering line haul service in heavily congested urban areas, feeder service to rail, and some inter-suburban linkages. Demand- responsive transportation for people with disabilities and the elderly is also provided. The MBTA is the primary transit provider in the Boston region. The MBTA district is made up of 175 cities and towns and includes communities outside of the 101 municipalities of the Boston Region Metropolitan Planning Organization area. The MBTA also provides commuter rail service to Provi- dence, Rhode Island, which lies outside the MBTA district. As can be seen in the following table, almost 99% of daily boardings are on the MBTA’s primary modes: rapid transit (heavy rail and light rail), bus rapid transit (BRT), bus/trackless trolley, and commuter rail. SY S TEMWIDE CONTEXT FOR THE PMT 4-1 TABLE 4-1 operating between Wonderland Station in Re- Typical Weekday Boardings by Mode vere and Bowdoin Station in the Government (Federal Fiscal Year 2007) Center area of Boston. MODE BOARDINGS • Green Line: A 23-mile light rail line over four Rapid transit 730,525 branches: Boston College (B Line), Cleveland Bus (including trackless 355,558 Circle (C Line), Riverside (D Line), and Heath trolley and BRT) Street (E Line).
    [Show full text]
  • Red / Blue Line Connector Assessment – Land Use, Population, and Ridership Memo 2 2
    SUMMARY MEMORANDUM: POPULATION, LAND USE, AND RIDERSHIP CHANGES UPDATE TO THE 2010 DEIR FOR THE RED LINE/BLUE LINE CONNECTOR Published October 2018 1. Introduction In 2010, Massachusetts Department of Transportation (MassDOT) conducted a study to evaluate the connection of the Massachusetts Bay Transportation Authority’s (MBTA’s) Red Line and Blue Line in Boston. The Red/Blue Line Connector Project consisted of extending the Blue Line beyond its current terminus at Bowdoin Station along Cambridge Street to the Red Line at Charles/ MGH Station. In March 2010, MassDOT submitted a Draft Environmental Impact Report (DEIR) pursuant to the Massachusetts Environmental Policy Act (MEPA). In May 2010, MEPA approved the DEIR. At the time, MassDOT had not identified funding for the construction of the Project. Recent changes in development and growth in Revere, East Boston, and Cambridge, as well as advancements in construction technologies, have generated a renewed interest in revisiting the need for the Red/Blue Line Connector. MassDOT’s Office of Transportation and Planning (OTP), working with the MBTA, has initiated a study to reassess the Project by revisiting previous assumptions developed during the 2010 DEIR. The purpose of this memorandum is to update the data and assumptions regarding population, land use, and ridership from the 2010 DEIR’s Purpose and Need. The 2010 DEIR focused primarily on four Census tracks surrounding the Cambridge Street corridor project area. However, due to their current access to the Blue and Red lines, the communities in this area would likely not have a large effect on demand for and use of the connection.
    [Show full text]
  • FY20-24 Capital Investment Plan Overview of Final FY20-24 CIP
    FY20-24 Capital Investment Plan Overview of Final FY20-24 CIP 6/10/2019 Final FY20-24 CIP Agenda 1. Recap of the FY20-24 CIP process and where we are today 2. Summary and analysis of public input process and comments received 3. Review overall FY20-24 CIP by funding source, priority, program and mode 4. Discuss CIP programming as compared to MBTA spend targets 5. FY20 Capital Program Key Performance Indicators 6. Next Steps Draft for Discussion & Policy Purposes Only 2 Final FY20-24 CIP FY20-24 CIP Process Recap • Develop initial estimates of capital funding sources January • Collect project proposals from MBTA Departments • Begin scoring and evaluation process • Set initial program sizes (presented to FMCB 2/4) February • Continue scoring and evaluation of new proposals • Update cash flow forecasts for existing projects • Prioritize new projects based on scoring and evaluation March • Develop initial project list – combine existing and new projects • Refine sources and sequencing for draft project list April • Present updated funding sources and draft uses to FMCB • Finalize draft FY20-24 Capital Investment Plan May • Present to FMCB on May 13, CPC May 15, Joint Bd May 20 • Post draft CIP for comment; engage public through multiple avenues • Incorporate public comment in CIP June • Present final CIP for vote: FMCB June 10, CPC June 12, Joint Bd June 17 Draft for Discussion & Policy Purposes Only 3 Final FY20-24 CIP: Public Input Public Input Process and CIP Public Meeting Schedule CIP Public Meeting Schedule (MBTA Service Area) • BOSTON
    [Show full text]
  • T Announces That Government Center Station Will Close in March - Metro - the Boston Globe
    T announces that Government Center Station will close in March - Metro - The Boston Globe Participate in GRANT, a free subscriber benefit. Mail in your voucher today or email your favorite nonprofit to [email protected]. | CLASSIFIEDS TEXT SIZE MANAGE ACCOUNT LOG OUT : Metro SECTIONS TODAY’S PAPER 52 MY SAVED NEWS METRO ARTS BUSINESS SPORTS OPINION LIFESTYLE MAGAZINE INSIDERS TODAY'S PAPER LOTTERY OBITUARIES GLOBE NORTH GLOBE SOUTH GLOBE WEST TERROR AT THE MARATHON 68 BLOCKS Metro Government Center Station will close in March By Matt Rocheleau | GLOBE STAFF FEBRUARY 13, 2014 ARTICLE COMMENTS ( 1 ) PRINT REPRINTS E-MAIL SHARE SAVE The MBTA announced Wednesday that March 22 will mark the start date for the planned two-year closure of Government Center Station — part of a $90 million project to rebuild the busy station at City Hall Plaza. MBTA personnel began posting signs Wednesday at Government Center and other stations to alert riders, spokesman Joe Pesaturo said. The T has also posted details online — including recommendations for navigating the system during the construction. http://www.bostonglobe.com/...014/02/13/announces-that-government-center-station-will-close-march/TsVi9OomCqotBqtVrTkcFJ/story.html[3/8/2014 2:42:15 AM] T announces that Government Center Station will close in March - Metro - The Boston Globe A transfer point for the Green and Blue lines, Government Center Station is the 13th-busiest in the system and the third-oldest, according to the Massachusetts Bay Transportation Authority. On average, 11,315 people enter the station on weekdays. Work on the project began in the fall while the station remained opened.
    [Show full text]
  • View Driving and Parking Directions To
    Directions and Parking Information 50 Staniford Street, Boston, MA 02114 PARKING LOCATIONS Parking at 50 Staniford Street Mass General shuttle to 50 Staniford Street: The garage is located under the building and the entrance is on Staniford Street. Before Mass General operates a free shuttle that runs from the Jackson Building to returning to your vehicle, pay for parking at the pay station in the garage. They accept 50 Staniford Street, North Station and the Charlestown Navy Yard. most major credit cards. Cash is not accepted. Parking rates are subject to change. • The shuttle operates Monday through Friday and arrives/departs approximately Please note, Massachusetts General Hospital does not own or operate this garage, every 15 minutes between 5:30 am and 7:15 pm which may not offer free or discounted parking. • If you park at a Mass General garage, go to the Jackson Building for shuttle 50 Staniford Street parking garage rates: #2 (Charlestown Navy Yard/North Station shuttle), which will take you to 50 Staniford Street Hours Fees • If you take public transportation, go to North Station. The shuttle heading to Up to 1 hour ...................$12.00 Mass General stops on Causeway Street in front of the TD Garden directly 1 to 2.5 hours..................$24.00 across from Canal Street 2.5 to 12 hours................$36.00 • The next stop is 50 Staniford Street 12 to 24 hours.................$48.00 • Contact the Mass General Transportation Department at 617-726-2250 for all shuttle inquiries Parking at Mass General Patients may park at the Mass General garages and receive discounted patient rates.
    [Show full text]
  • Transit Committee Agenda March 2014
    CITY OF CAMBRIDGE Community Development Department BRIAN P. MURPHY Transit Advisory Committee Meeting Assistant City Manager for Community Development March 5, 2014 from 5:30 PM – 7:30 PM Citywide Senior Center, 806 Massachusetts Avenue Final Agenda 5:30 PM Committee updates Handouts: Current committee schedule 5:45 PM Presentation: "Public Transit and Youth in the MBTA" Committee member Zach Spitz will give a brief summary of a meeting he attended last week with youth leaders from the Youth Affordability Coalition working on a universal “Youth Pass” campaign. 6:00 PM Discussion: The Future of Transit and Development We will discuss findings from the 2012 report Hub & Spoke: Core Transit Congestion and the Future of Transit And Development in Greater Boston. “Three real estate development trends have contributed to the recent rise in MBTA ridership and are likely to continue generating riders: transit-oriented development, more intensive use of existing built space in urban core neighborhoods, and promotion of transit use by regulators, building owners and employers in transit-served locations.” How do these challenges specifically affect Cambridge? Handouts: Report: “Hub & Spoke” report (2012, NEU Dukakis Center and ULI) Globe: “Surging MBTA ridership could overwhelm system, report warns” 6/14/12 6:20 PM Workshop: Developing planning objectives for Goal 1: Mobility. Goal 1: Mobility. Ensure that the transit system provides for the mobility needs of those who live, work, and play in Cambridge, including origin/destination work trips, school trips, all other trip purposes, and the future regional growth vision and development potential. 7:20 PM Public comments 7:30 PM ADJOURN Upcoming meetings (generally the first Wednesday of each month): 2014: April 2, May 7, June 4, Sept 3, Oct.
    [Show full text]
  • Open PDF File, 501.12 KB, for 2016 SIP Annual Report
    Charles D. Baker, Governor Karyn E.. Polito, Lieutenant Governor massDOT Stephanie Pollack, MassDOT Secretary & CEO Massachusetts Department of Transportation June 30, 2016 Mr. Martin Suuberg Commissioner Department of Environmental Protection 1 Winter Street Boston, MA 02108 Dear Commissioner Suuberg: The Massachusetts Department of Transportation (MassDOT), in conjunction with the Massachusetts Bay Transportation Authority (MBTA), is submitting the attached report to_ the Department of Environmental Protection (DEP) in order to fulfill the requirements of 310 CMR 7.36, Transit System Improvements. This annual report provides a project description and status information for each of the outstanding public transit projects required under the amended State Implementation Plan (SIP). Please do not hesitate to contact me at (857) 368-8865 if you would like to discuss further. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Christine Kirby, DEP Ten Park Plaza, Suite 4150.Boston.MA 021 16 Tel: 857-368-4636, TIY:857-368-0655 www.mass.gov;massdot Massachusetts Department of Transportation Massachusetts Bay Transportation Authority State Implementation Plan – Transit Commitments 2016 Status Report Submitted to the Massachusetts Department of Environmental Protection June 30, 2016 For questions on this document, please contact: Massachusetts Department of Transportation Office of Transportation Planning 10 Park Plaza, Boston, Massachusetts 02116 [email protected] MassDOT Office of Transportation Planning June 30, 2016 INTRODUCTION This report is submitted by the Massachusetts Department of Transportation (MassDOT), in conjunction with the Massachusetts Bay Transportation Authority (MBTA), to the Massachusetts Department of Environmental Protection (DEP) in order to fulfill the requirements of 310 CMR 7.36(7), Transit System Improvements.
    [Show full text]