Merrill Field Airport Master Plan Update and Noise Study

Total Page:16

File Type:pdf, Size:1020Kb

Merrill Field Airport Master Plan Update and Noise Study MERRILL FIELD AIRPORT MASTER PLAN UPDATE AND NOISE STUDY Prepared by: Prepared for: HDR, Inc. Merrill Field Airport with Municipality of Anchorage Harris Miller Miller & Hanson Inc. (HMMH), Final December 2016 Hattenburg Dilley & Linnell LLC (HDL), and McClintock Land Associates (MLA), Inc. This page intentionally left blank. Table of Contents 1.0 OVERVIEW AND BACKGROUND .......................................................................................................................................... 1-1 1.1 Introduction ........................................................................................................................................................................... 1-1 1.2 Purpose of the Plan ................................................................................................................................................................ 1-1 1.3 Airport Setting ........................................................................................................................................................................ 1-2 1.4 Airport Site ............................................................................................................................................................................. 1-3 1.5 History .................................................................................................................................................................................... 1-3 1.6 MRI Mission Statement and Goals......................................................................................................................................... 1-5 1.7 Public Outreach Summary ..................................................................................................................................................... 1-5 1.8 Issues ...................................................................................................................................................................................... 1-5 2.0 INVENTORY EXISTING ......................................................................................................................................................... 2-1 2.1 Introduction ........................................................................................................................................................................... 2-1 2.2 Existing Conditions ................................................................................................................................................................. 2-1 2.2.1 Airfield ........................................................................................................................................................................ 2-1 2.2.2 Runways ..................................................................................................................................................................... 2-1 2.2.3 Taxiways ..................................................................................................................................................................... 2-4 2.2.4 Helipads/Helicopter Parking ...................................................................................................................................... 2-5 2.2.5 Pavement Conditions ................................................................................................................................................. 2-5 2.2.6 Runway Utilization ..................................................................................................................................................... 2-7 2.2.7 Signage ....................................................................................................................................................................... 2-8 2.2.8 Airport Access, Circulation, Parking, Security, and Safety ......................................................................................... 2-9 2.2.9 Airport Access Roads ................................................................................................................................................. 2-9 2.2.10 Airport Service Roads ................................................................................................................................................. 2-9 2.2.11 Vehicle Parking Areas ............................................................................................................................................... 2-10 2.2.12 Security Fencing and Gates ...................................................................................................................................... 2-10 Merrill Field Airport Master Plan and Noise Study i Final December 2016 2.2.13 Other Security .......................................................................................................................................................... 2-12 2.2.14 Safety ....................................................................................................................................................................... 2-12 2.3 General Aviation .................................................................................................................................................................. 2-13 2.3.1 Aprons and Tiedowns .............................................................................................................................................. 2-14 2.3.2 Hangars .................................................................................................................................................................... 2-15 2.3.3 Fixed Based Operators/ Commercial Aviation ......................................................................................................... 2-15 2.3.4 Flight Instruction ...................................................................................................................................................... 2-15 2.3.5 Avionics/Instrument Shops ...................................................................................................................................... 2-15 2.3.6 Aircraft Maintenance, Parts, Sales, Supplies and Rentals ....................................................................................... 2-15 2.3.7 Based Aircraft ........................................................................................................................................................... 2-16 2.4 Airport Support Facilities ..................................................................................................................................................... 2-17 2.4.1 Fuel ........................................................................................................................................................................... 2-17 2.4.2 Airport Administration and Maintenance ............................................................................................................... 2-18 2.4.3 Aircraft Rescue and Fire Fighting ............................................................................................................................. 2-18 2.4.4 Federal Aviation Administration .............................................................................................................................. 2-18 2.4.5 Other Facilities ......................................................................................................................................................... 2-19 2.5 Avigation Facilities and Procedures ..................................................................................................................................... 2-19 2.5.1 Airspace and Air Traffic Control ............................................................................................................................... 2-20 2.5.2 Published IFR Procedures ........................................................................................................................................ 2-21 2.5.3 IFR Operations.......................................................................................................................................................... 2-22 2.5.4 VFR Operations ........................................................................................................................................................ 2-22 2.5.5 FAR Part 77 Objects Affecting Navigable Airspace .................................................................................................. 2-24 2.5.6 Obstructions ............................................................................................................................................................. 2-25 2.5.7 Runway Protection Zones ........................................................................................................................................ 2-27 2.5.8 Navigational and Landing Aids ................................................................................................................................. 2-28 2.6 Utilities ................................................................................................................................................................................. 2-29 Final December 2016 ii Merrill Field Airport Master Plan and Noise Study 2.7 Airport Maintenance and Operations (M&O) ....................................................................................................................
Recommended publications
  • 4910-13 DEPARTMENT of TRANSPORTATION Federal
    This document is scheduled to be published in the Federal Register on 09/21/2020 and available online at federalregister.gov/d/2020-20567, and on govinfo.gov 4910-13 DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2020-0823; Airspace Docket No. 20-AAL-49] RIN 2120-AA66 Proposed Technical Amendment to Separate Terminal Airspace Areas from Norton Sound Low, Woody Island Low, Control 1234L, and Control 1487L Offshore Airspace Areas; Alaska AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). SUMMARY: This action proposes to amend the following Offshore Airspace Areas in Alaska: Norton Sound Low, Woody Island Low, Control 1234L, and Control 1487L. The FAA found an error with the Offshore Airspace Legal Descriptions containing airspace descriptions not related to the need to apply IFR en route Air Traffic Control services in international airspace. This action would correct that error by removing terminal airspace, airspace associated with geographic coordinates, and airspace associated with NAVAIDs from the Offshore Airspace legal descriptions. DATES: Comments must be received on or before [INSERT DATE 45 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. ADDRESSES: Send comments on this proposal to the U.S. Department of Transportation, Docket Operations, 1200 New Jersey Avenue SE, West Building Ground Floor, Room W12-140, Washington, D.C. 20590; telephone: 1(800) 647-5527, or (202) 366-9826. You must identify FAA Docket No. FAA-2020-0823; Airspace Docket No. 20-AAL-49 at the beginning of your comments. You may also submit comments through the Internet at https://www.regulations.gov.
    [Show full text]
  • (Asos) Implementation Plan
    AUTOMATED SURFACE OBSERVING SYSTEM (ASOS) IMPLEMENTATION PLAN VAISALA CEILOMETER - CL31 November 14, 2008 U.S. Department of Commerce National Oceanic and Atmospheric Administration National Weather Service / Office of Operational Systems/Observing Systems Branch National Weather Service / Office of Science and Technology/Development Branch Table of Contents Section Page Executive Summary............................................................................ iii 1.0 Introduction ............................................................................... 1 1.1 Background.......................................................................... 1 1.2 Purpose................................................................................. 2 1.3 Scope.................................................................................... 2 1.4 Applicable Documents......................................................... 2 1.5 Points of Contact.................................................................. 4 2.0 Pre-Operational Implementation Activities ............................ 6 3.0 Operational Implementation Planning Activities ................... 6 3.1 Planning/Decision Activities ............................................... 7 3.2 Logistic Support Activities .................................................. 11 3.3 Configuration Management (CM) Activities....................... 12 3.4 Operational Support Activities ............................................ 12 4.0 Operational Implementation (OI) Activities .........................
    [Show full text]
  • Federal Register/Vol. 83, No. 241/Monday, December 17, 2018
    Federal Register / Vol. 83, No. 241 / Monday, December 17, 2018 / Proposed Rules 64491 airspace. This regulation is within the Hillwood Parkway, Fort Worth, TX List of Subjects in 14 CFR Part 71 scope of that authority as it would 76177. Airspace, Incorporation by reference, establish Class E airspace extending Availability and Summary of Navigation (air). upward from 700 feet above the surface Documents for Incorporation by at Farington Field Airport, Auburn, NE, The Proposed Amendment Reference in support of standard instrument Accordingly, pursuant to the This document proposes to amend approach procedures for IFR operations authority delegated to me, the Federal FAA Order 7400.11C, Airspace at the airport. Aviation Administration proposes to Designations and Reporting Points, amend 14 CFR part 71 as follows: Comments Invited dated August 13, 2018, and effective Interested parties are invited to September 15, 2018. FAA Order PART 71—DESIGNATION OF CLASS A, participate in this proposed rulemaking 7400.11C is publicly available as listed B, C, D, AND E AIRSPACE AREAS; AIR by submitting such written data, views, in the ADDRESSES section of this TRAFFIC SERVICE ROUTES; AND or arguments, as they may desire. document. FAA Order 7400.11C lists REPORTING POINTS Comments that provide the factual basis Class A, B, C, D, and E airspace areas, supporting the views and suggestions air traffic service routes, and reporting ■ 1. The authority citation for 14 CFR presented are particularly helpful in points. part 71 continues to read as follows: developing reasoned regulatory decisions on the proposal. Comments The Proposal Authority: 49 U.S.C. 106(f), 106(g); 40103, 40113, 40120; E.O.
    [Show full text]
  • Notice of Adjustments to Service Obligations
    Served: May 12, 2020 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. CONTINUATION OF CERTAIN AIR SERVICE PURSUANT TO PUBLIC LAW NO. 116-136 §§ 4005 AND 4114(b) Docket DOT-OST-2020-0037 NOTICE OF ADJUSTMENTS TO SERVICE OBLIGATIONS Summary By this notice, the U.S. Department of Transportation (the Department) announces an opportunity for incremental adjustments to service obligations under Order 2020-4-2, issued April 7, 2020, in light of ongoing challenges faced by U.S. airlines due to the Coronavirus (COVID-19) public health emergency. With this notice as the initial step, the Department will use a systematic process to allow covered carriers1 to reduce the number of points they must serve as a proportion of their total service obligation, subject to certain restrictions explained below.2 Covered carriers must submit prioritized lists of points to which they wish to suspend service no later than 5:00 PM (EDT), May 18, 2020. DOT will adjudicate these requests simultaneously and publish its tentative decisions for public comment before finalizing the point exemptions. As explained further below, every community that was served by a covered carrier prior to March 1, 2020, will continue to receive service from at least one covered carrier. The exemption process in Order 2020-4-2 will continue to be available to air carriers to address other facts and circumstances. Background On March 27, 2020, the President signed the Coronavirus Aid, Recovery, and Economic Security Act (the CARES Act) into law. Sections 4005 and 4114(b) of the CARES Act authorize the Secretary to require, “to the extent reasonable and practicable,” an air carrier receiving financial assistance under the Act to maintain scheduled air transportation service as the Secretary deems necessary to ensure services to any point served by that air carrier before March 1, 2020.
    [Show full text]
  • WINGS of SILVER PIPER J-3 Cub OPERATIONS MANUAL &
    WINGS OF SILVER PIPER J-3 Cub OPERATIONS MANUAL & POH (this Manual and POH is not intended for flight and is intended only for flight simulation use) Written by Mitchell Glicksman, © 2009 i Table of Contents Introduction..............................................................................................................................................................................................................1 The 747 Captain Who Forgot How to Fly................................................................................................................................................................8 A Short History of a Small Airplane......................................................................................................................................................................13 Quick Start Guide...................................................................................................................................................................................................18 System Requirements........................................................................................................................................................................................18 Installation.........................................................................................................................................................................................................20 Settings..............................................................................................................................................................................................................20
    [Show full text]
  • 2005 June (Recovered)
    THE OFFICIAL NEWSLETTER OF THE ALASKA 99s THE FLYPAPER JUNE 2005 OFFICERS Chair Melanie Hancock 694.4571 From the Chair Vice Chair We had a great time at the Trade Show! Thanks to every- Clarissa Quinlan 248.5530 one who helped by manning the booth, setting up, taking down or just stopping by to say hello. I did get to go to Secretary Janet Oxford 696.7888 McCarthy and then on to Long Lake for the Memorial Day weekend breakfast on Sunday. The Park Service is doing a Treasurer great job of renovating the buildings at the Kennicott Mine, Michelle Williamson 345.3431 so there are new things every year. COMMITTEES It’s going to be a busy summer. Keep your eye on the calen- Chapter News dar. Here’s what’s up and coming. Scholarships NEXT MEETING Helen Jones 222.9977 FAA Pilot Safety Seminar on Sat. June 11, at Take Flypaper Flight Alaska, Merrill Field. Subjects to be covered are op- When: Wednesday, June 08 Michelle Bartleman 868.4736 erations at controlled airports, VFR operation in controlled What: Chapter elections airspace, Merrill Field arrival and departure procedures - Sunshine FAR 93, and an overview of the Medallion Program. As Louise Gettmann 243.5643 Where: Peggy’s Cafe space is limited, you are requested to register online at Flying Companion faasafety.gov or call Tony Fischer at 271-2006. Time: 6:00 p.m. Melanie Hancock 694.4574 The Ultralight Flyers of Alaska Summer Solstice Fly- Melanie and Clarissa are willing to Membership in and BBQ will be held at Birchwood Airport June 23 - continue in their present positions Mio Johnson 696.3580 25.
    [Show full text]
  • ARTICLE 5 Assigned-Space Aircraft Parking
    ARTICLE 5 Assigned-Space Aircraft Parking Section 500. Assigned-space aircraft parking designation. 510. Assigned-space use and fees. 520. Assigned-space permit application. 530. Assigned-space permit. 540. Cancellation of an assigned-space permit. 550. Assigned-space permit lottery. 560. Assigned-space switch list. 570. Assigned-space wait list. 580. Birchwood airport transitional compliance requirements. 590. Definitions. 17 AAC 45.500. Assigned-space aircraft parking designation. (a) The commissioner will designate an airport for assigned-space aircraft parking if the commissioner determines in writing that the designation is in the best interest of the state. In making this determination, the commissioner will consider the applicable factors set out at 17 AAC 45.900 and the following: (1) the number of aircraft based at the airport, other than those based on leased premises, the demand for transient aircraft fee parking, and the amount of space available for assigned-space aircraft parking at the airport; (2) the potential impact of assigned-space aircraft parking fees on airport users; and (3) the department's estimate of the cost to implement the requirements of 17 AAC 45.500 - 17 AAC 45.590 at the airport compared to the potential revenue the department would receive for assigned-space aircraft parking at the airport. (b) The department will inform the public that the commissioner has designated an airport for assigned-space aircraft parking by giving notice in accordance with 17 AAC 45.400. The notice will include (1) the name
    [Show full text]
  • Alaska Region (AAL) Runway Safety Plan, FY 2020
    COMMITTED TO CONTINUOUSLY IMPROVING SURFACE SAFETY. Alaska Region (AAL) Runway Safety Plan FY20 2019-2020 RUNWAY SAFETY COUNCIL (RSC) #45 www.faa.gov Executive Summary The Federal Aviation Administration’s (FAA) top data, development of new safety metrics, and priority is maintaining safety in the National leveraged organizational capabilities in support TABLE Airspace System (NAS). The goal for runway of meeting this goal. safety is to improve safety by decreasing the OF CONTENTS FAA Safety Management System (SMS) 4 number and severity of Runway Incursions (RI), In support of the NRSP, and in support of Runway Excursions (RE) and serious Surface Air Traffic Organization (ATO) Safety and Incidents. FAA’s 2018- 2020 National Runway Technical Training (AJI) FY2018 Business Plan, the Alaskan Region (AAL) has developed this Regional Runway Safety Plan (RRSP) Methodology Safety Plan (NRSP) outlines the FAA’s strategy 6 to adapt its runway safety efforts through Regional Runway Safety Plan (RRSP) to provide enhanced collection and integrated analysis of a roadmap with regional emphasis for FY2020. 7 FY20 RRSP Initiatives 8 Safety Assurance 10 Safety Risk Management (SRM) 12 Safety Policy 16 Safety Promotion 4 Alaskan Region (AAL) Runway Safety Plan FY20 Alaskan Region (AAL) Runway Safety Plan FY20 5 FAA Safety Management FY18-FY20 NRSP Objectives System (SMS) SAFETY FAA is employing and evolving a Safety The National Runway Safety Plan 2018-2020 ASSURANCE Identify Operating Hazards Management System (SMS), which provides a aligns our strategic priorities with established Program Data formalized and proactive approach to system Safety Risk Management principles. The plan Remain the global leader in assuring Voluntary Safety Reporting safety in order to find, analyze and address defines how the FAA, airports, and industry runway safety enhancement initiatives Investigations risk in the NAS.
    [Show full text]
  • Alaskan Region AAL-5 701 C St
    January 26, 1981 81-3 Public Affairs Office FAA -Alaskan Region AAL-5 701 C St . , Box 14 Anchorage, AK 99513 (907) 271 - 5296 Alaskan US Deportrnenl of Tronsporlahon Federal Avlollon Intercom Administration NATIONAL HONORS 2 COVER STORY Though we're a bit late in publishing Pacific Contractors and NANA have moved tnese photos, we just got them--and we in more double-wide trailers for two have a new opportunity to pay additional camps to house 120 more men each. crazy tribute to the accomplishments of Horse Camp at Deadhorse has reopended and Joan M. Gillis and Frank Babiak, shown will house 150 men. ARCO and SOHIO each receiving Departmental national honors at plan to build new 500 man camps in the the 13th Annual DOT Awards Ceremony in area. Washington. Making the presentations was former Secretary of Transpor tation Increased activity has already been borne Neil Goldschmidt. The awards were for out by Fairbanks relief specialists outstanding performance in the region. already being put on standby by Wien for Babiak, Manager of the Anchorage Airway January flights, even though reservations Facilities Sector, was honored for are made a month in advance. Additional exceptional effort in the EEO field. flights are planned by Wien. Gillis, Administrative Assistant at the Anchorage _ Sector was given a special The Fairbanks FSS is care fully watching commendation for helping to set the this buildup in order to anticipate a office in order following its almost need for increased watch coverage due to total destruction in a fire in January traffic increases. o f 1979.
    [Show full text]
  • Mid-Twentieth Century Architecture in Alaska Historic Context (1945-1968)
    Mid-Twentieth Century Architecture in Alaska Historic Context (1945-1968) Prepared by Amy Ramirez . Jeanne Lambin . Robert L. Meinhardt . and Casey Woster 2016 The Cultural Resource Programs of the National Park Service have responsibilities that include stewardship of historic buildings, museum collections, archeological sites, cultural landscapes, oral and written histories, and ethnographic resources. The material is based upon work assisted by funding from the National Park Service. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author and do not necessarily reflect the views of the Department of the Interior. Printed 2018 Cover: Atwood Center, Alaska Pacific University, Anchorage, 2017, NPS photograph MID-TWENTIETH CENTURY ARCHITECTURE IN ALASKA HISTORIC CONTEXT (1945 – 1968) Prepared for National Park Service, Alaska Regional Office Prepared by Amy Ramirez, B.A. Jeanne Lambin, M.S. Robert L. Meinhardt, M.A. and Casey Woster, M.A. July 2016 Table of Contents LIST OF ACRONYMS/ABBREVIATIONS ............................................................................................... 5 EXECUTIVE SUMMARY ........................................................................................................................... 8 1.0 PROJECT DESCRIPTION ..................................................................................................................... 9 1.1 Historic Context as a Planning & Evaluation Tool ............................................................................
    [Show full text]
  • Summer 2012 FAA TOURS ALASKA’S RURAL AIRPORTS
    Summer 2012 FAA TOURS ALASKA’s RURAL AIRPORTS May 9, 2012 at the Hooper Bay Airport—(L to R) FAA Rick Neff, DOT&PF Commissioner Luiken, FAA Mike McNerney, FAA Frank Smigelski, FAA Associate Administrator Christa Fornarotto, FAA Assistant Administrator Victoria Wassmer, FAA Airports Division Mgr. Byron Huffman, FAA Regional Administrator Bob Lewis, DOT&PF Deputy Commissioner-Aviation Steve Hatter and DOT&PF Roger Maggard. DOT&PF was very pleased to welcome back FAA Associate Administrator Christa Fornarotto and join her in a field inspection of Alaska’s rural airports. The inspection included many flyovers and landings at airports in the Y-K Delta. Conditions were challenging as many airports were still managing record snowfall conditions. There are 257 airports in Alaska funded by the FAA airport improvement program (AIP) with 166 classified as general aviation airports having less than 2,500 passenger enplanements annually. These airports may be small in size but are huge in the services they provide to villages where aviation is the only mode of transpor- tation. The FAA works with aviation stakeholders and local communities to ensure that our airports remain safe and efficient and meet the needs of the public. DOT&PF receives approximately $150M annually in AIP funding to help meet the needs of rural airports. The role of aviation in Alaska is huge, contributing $3.5 billion to the state economy and 47,000 jobs—that represents 10% of all jobs in our state. The “Alaska’s Aviation Lifeline” video recently released by the De- partment truly captures what aviation is all about in our state and can be viewed at these links: www.vimeo.com/39894638 or http://www.youtube.com/watch?v=TDGw09IuApE Message From Deputy Commissioner We were able to sponsor another American Associa- tion of Airport Executives (AAAE) Certified Member (CM) training class and exam—the 2012 CM Acad- emy—and we’re very proud and honored to an- nounce 14 new Certified Members including our own DOT Commissioner, Marc Luiken.
    [Show full text]
  • Recreational Flyer January - February 2010 Elevated: Angus Watt’S Ch-750
    January - February 2010 Recreational Aircraft Association Canada www.raa.ca The Voice of Canadian Amateur Aircraft Builders $6.95 Elevated: Angus Watt's CH-750 Elevated: The original Zenith 701 was designed as an Angus Watt’s Ch-750 ultralight go-anywhere all metal bush plane that could be plans built by anyone with a 4 ft tabletop bending brake and a pair of snips. It was rarely described as a thing of beauty but so well does it fulfill its mission that these planes are found all over the world. They are inexpensive to construct, and because of their leading edge slats they can get in and out of extremely short patches of clear ground. 22 Recreational Flyer January - February 2010 Elevated: Angus Watt’s Ch-750 WITH THE ADVENT of the Light Sport category in and the only part interchangeable with the 701 is the US, Chris Heintz saw the need for an updated the signature Zenith all-flying rudder. Formerly the version, something with a larger cabin, greater skins were all .016” and they are now .020 to handle payload, and the ability to use an array of four the greater mass of the range of possible four stroke stroke engines. The CH 750 was the result and its engines and the 1320 pound gross weight on wheels, lineage is visually apparent but while the new plane 1430 on floats. resembles the 701 it is almost completely different in Chris Heintz correctly surmised that the US construction. CNC fabrication methods have made Light Sport category would be attractive to aging it possible to simplify the design, speed up the con- American pilots who wanted to bargain down to struction, and end up with a larger and faster plane their Sport Pilot category that allows a valid driver’s at only a slight weight penalty.
    [Show full text]