EOI) for Consulting Services for Power Transmission System Planning, Feasibility Study and Project Preparation for Major Cities of Nepal
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020)
Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020) Editor-In-Chief Shree Ram Bajagain Editor Aarya Adhikari Editorial Team Govinda Prasad Tripathee Ramesh Prasad Timalsina Data Analyst Anuj KC Cover/Graphic Designer Gita Mali For Human Rights and Social Justice Informal Sector Service Centre (INSEC) Nagarjun Municipality-10, Syuchatar, Kathmandu POBox : 2726, Kathmandu, Nepal Tel: +977-1-5218770 Fax:+977-1-5218251 E-mail: [email protected] Website: www.insec.org.np; www.inseconline.org All materials published in this book may be used with due acknowledgement. First Edition 1000 Copies February 19, 2021 © Informal Sector Service Centre (INSEC) ISBN: 978-9937-9239-5-8 Printed at Dream Graphic Press Kathmandu Contents Acknowledgement Acronyms and Abbreviations Foreword CHAPTERS Chapter 1 Situation of Human Rights in 2020: Overall Assessment Accountability Towards Commitment 1 Review of the Social and Political Issues Raised in the Last 29 Years of Nepal Human Rights Year Book 25 Chapter 2 State and Human Rights Chapter 2.1 Judiciary 37 Chapter 2.2 Executive 47 Chapter 2.3 Legislature 57 Chapter 3 Study Report 3.1 Status of Implementation of the Labor Act at Tea Gardens of Province 1 69 3.2 Witchcraft, an Evil Practice: Continuation of Violence against Women 73 3.3 Natural Disasters in Sindhupalchok and Their Effects on Economic and Social Rights 78 3.4 Problems and Challenges of Sugarcane Farmers 82 3.5 Child Marriage and Violations of Child Rights in Karnali Province 88 36 Socio-economic -
NEPAL: Preparing the Secondary Towns Integrated Urban
Technical Assistance Consultant’s Report Project Number: 36188 November 2008 NEPAL: Preparing the Secondary Towns Integrated Urban Environmental Improvement Project (Financed by the: Japan Special Fund and the Netherlands Trust Fund for the Water Financing Partnership Facility) Prepared by: Padeco Co. Ltd. in association with Metcon Consultants, Nepal Tokyo, Japan For Department of Urban Development and Building Construction This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. TA 7182-NEP PREPARING THE SECONDARY TOWNS INTEGRATED URBAN ENVIRONMENTAL IMPROVEMENT PROJECT Volume 1: MAIN REPORT in association with KNOWLEDGE SUMMARY 1 The Government and the Asian Development Bank agreed to prepare the Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP). They agreed that STIUEIP should support the goal of improved quality of life and higher economic growth in secondary towns of Nepal. The outcome of the project preparation work is a report in 19 volumes. 2 This first volume explains the rationale for the project and the selection of three towns for the project. The rationale for STIUEIP is the rapid growth of towns outside the Kathmandu valley, the service deficiencies in these towns, the deteriorating environment in them, especially the larger urban ones, the importance of urban centers to promote development in the regions of Nepal, and the Government’s commitments to devolution and inclusive development. 3 STIUEIP will support the objectives of the National Urban Policy: to develop regional economic centres, to create clean, safe and developed urban environments, and to improve urban management capacity. -
Duty Station: Kathmandu, Nepal
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE (International Consultant – Human Rights Expert) UNDP/PN/31/2017 Date: 31 July 2017 Country: Nepal Description of the assignment: SPSP project needs a Human Rights Expert. He/She will be responsible to provide day-to-day management and technical support to implement the Project activities and ensure that the Project objectives are met as set out in the Project document. The expert will report directly to the Deputy Country Director (Programme) and be responsible to the secretary of the NHRC. Number of consultant required: 1 Project name: Strategic Plan Support Project for the National Human Rights Commission (SPSP) Period of assignment/services (if applicable): 01 September – 31 December 2017 (not to exceed 87 days in total) Duty Station: Kathmandu, Nepal Proposal should be submitted at the following address: Procurement Unit, UNDP (Ref.: UNDP/PN/31/2017: Human Rights Expert, UN House, Pulchowk, PO Box 107, Kathmandu, Nepal or by email to [email protected] not later than 1730 hours (Nepal Standard Time) of 09 August 2017. Any request for clarification must be sent in writing, or by standard electronic communication to the e- mail: [email protected] mentioning Procurement Notice Ref: UNDP/PN/31/2017: Human Rights Expert, on or before 03 August 2017. The procurement unit will respond in writing, including an explanation of the query without identifying the source of inquiry, to all consultants or via bulletin published on the UNDP website: http://www.np.undp.org/content/nepal/en/home/operations/procurement.html. Inquiries received after the above date and time shall not be entertained. -
Download File
Sr. No. ShHolderNo Name Address: TotalKitta 1 1301090000809141 AADI DEV RAUNIAR WARD NO 13 10 2 2372 ABHISHEK BERIWAL MOTI LAL VINOD KUMAR 10 3 1301090000005587 ACHUT PRASHAD HUMAGAI DUWAKOT 10 4 1301110000038089 ACHYUT BAHADUR HADA TRIPURESHWOR KATHMANDU 30 5 1301560000013169 AJAY KUMAR SHRESTHA WARD NO.17 10 6 1301230000000429 Ajay Kumar Agrawal Dhalko-17 30 7 2098 AJAY KUMAR SHAH MAIN ROAD, BIRATNAGAR-8 50 8 1717 AJAY KUMAR THAKUR POST BOX NO. 12303 30 9 1301320000003292 Ajit Agrawal Pandetol 30 10 883 AJIT KUMAR RATHI MAIN ROAD, BIRATNAGAR-12 30 11 1301080000052552 AMALA SHRESTHA TEKU-12, KATHMANDU 30 12 1301090000306131 AMAR BAHADUR SHRESTHA WARD NO-6,SHANTICHOWK 30 13 1301120000755997 Ambika Pant Chapagain Bagmati 50 14 1301080000193438 AMBIKA TULADHAR LAZIMPAT, KATHMANDU-02 30 15 311 AMBIKA SHRESTHA BALAJU 30 16 1301060000015321 AMIR DAS RANJIT JAISIDEWAL-20 10 17 1301230000020711 AMIT KUMAR AGRAWAL WARD NO.-10 50 18 1301090000451207 AMIT KUMAR AGRAWAL DHARAN-2 40 19 570 AMIT MAN SHRESTHA 20/8 GHA-PULCHOWK 30 20 1910 AMITA MALLA GHA 484, DURBAR MARG 30 21 1301090000763004 AMRESH NARAYAN JHA BALKHU-14, KATHMANDU 30 22 1301240000061861 AMRIT NATH REGMI 34 20 23 1301070000023129 Amulya Gyawali W.n 3 30 24 1301370000019842 Amulya Man Thaiba Butwal-08 30 25 1301080000038886 ANAND KUMAR AGARWAL J.K WATCH HOUSE BRT-12 30 26 1301040000036728 ANAND KUMAR RUNGTA 12 100 27 1683 ANAND MARU SURYA PRAKASH TRADING CO.THAKURBARI ROAD 30 28 1301300000012459 ANAND RAJ ACHARYA WARD NO 34 30 29 1301090000809350 ANAND SHAH RAUNIAR WARD NO 13 10 30 -
BIRATNAGAR, 18–20 March 2014 Prepared by ADB Consultant Team
Technical Assistance Consultant’s Report Project Number: 44140 Date: March 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard Systems (Nepal) CAPACITY ENHANCEMENT TRAINING ON SOCIAL SAFEGUARDS SYSTEM BIRATNAGAR, 18–20 March 2014 Prepared by ADB Consultant Team This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Training Report Capacity Enhancement Training On Social Safeguards System. 18-20 March 201 Biratnagar TA 7566 REG: Strengthening and Use of Country Safeguards System. NEP Subproject: Strengthening Involuntary Resettlement Safeguard Systems in Nepal niri CET Report Biratnagar 18-20-3-014 – Table of Contents 1 Background: ............................................................................................................................................... 4 1.1. Objectives of the training ................................................................................................................... 4 1.2. Training Schedule: .............................................................................................................................. 4 2. Commencement of the training ................................................................................................................ 4 2.1.Output of the day: ............................................................................................................................. -
Docusign Envelope ID: 3F71DABF-9E5D-4742-9D5D-E477C06C49A4 Docusign Envelope ID: 3F71DABF-9E5D-4742-9D5D-E477C06C49A4
DocuSign Envelope ID: 3F71DABF-9E5D-4742-9D5D-E477C06C49A4 DocuSign Envelope ID: 3F71DABF-9E5D-4742-9D5D-E477C06C49A4 IMPORTANT INFORMATION or at Phuentsholing check post. Further advice from Customs authorities in the US At Greaves Tours LLC we strongly hope that your information on Visas for Bhutan may be before departing on your tour. When shopping holiday lives up to your expectations. Our years discussed with your travel consultant or for expensive items such as precious stones, of experience in dealing with the Indian through the Bhutan Mission to the United carpets etc, the shopkeepers may guarantee the Subcontinent has gone into formulating the tour Nations in New York Tel: 1-212-682-2268 authenticity of the item, however expert programs on offer. Due care has been taken to knowledge is essential to ascertain their true put the best possible ground arrangements in TIBET: value. Please note that Greaves Tours LLC place for you to have a memorable holiday. Visas for Tibet will be processed by Greaves cannot be held responsible for any purchase that Tours LLC. The cost of the Visa for Tibet is you make and nor can we take up However, we seek your patience and included in your tour price. Visa applications correspondence on your behalf if you are not understanding while travelling in the and documentation will be completed by you satisfied with the item purchased or if goods are Subcontinent. Sometimes minor problems may on tour whilst in Kathmandu, en route to Tibet. not delivered in time. We pride ourselves on the occur, but our ground staff will always be on Only once the Visa has been cleared can quality of our sightseeing guides, however if at hand to try and solve such occurrences. -
Existing Environmental Conditions
Draft EIA Report of the Sunsari River Irrigation Project Existing Environmental Conditions CHAPTER EXISTING ENVIRONMENTAL CONDITIONS 3. EXISTING ENVIRONMENTAL CONDITIONS This chapter documents existing environmental conditions, particularly in the areas of physical, biological, socio-economic and cultural resources in relation to the Project activities. 3.1. Physical Environment 3.1.1. Topography and Climate The Sunsari River Irrigation Project (SRIP) area is located in the south-western part of the Sunsari District located between 26°24′N to 26°30′N in latitude and 87°04′E to 87°12′E in longitude. The elevation ranges from 64 meters to 80 meters above the mean sea level. The study area is rectangular in shape with E-W width varying from 4 to 8 kilometres and N-S length of about 22 kilometres. The western and southern part of the project area is bordered with India. The Project area is located at the eastern bank of the Sapta Koshi River. The terrain starts from foothills of the Siwalik range and slopes gently down to south with an inclination of 5 degrees on an average and is formed by alluvium of old and present rivers. The Project area is dominated by sandy soils having low to moderate water holding capacity. The climate in the project area is sub-tropical. Temperatures are high between March and October, the hottest month being the April, during which the mean daily maximum temperature is about 340C. During the cool period from November to February, mean monthly temperatures are in the range of 16 to 220C. The annual average rainfall between 1970 and 1993 was 1,867mm, raining intensively in the monsoon period, from late May to September. -
JOURNEY to the END of the EARTH BY-TISHANI DOSHI CLASS XII ENGLISH [CORE] VISTAS PRESENTED by MRS LILY KUMAR DELHI PUBLIC SCHOOL RANCHI Akademik Shokalskiy
JOURNEY TO THE END OF THE EARTH BY-TISHANI DOSHI CLASS XII ENGLISH [CORE] VISTAS PRESENTED BY MRS LILY KUMAR DELHI PUBLIC SCHOOL RANCHI Akademik Shokalskiy • MV Akademik Shokalskiy (Russian: Академик Шокальский) is an Akademik Shuleykin-class ice- strengthened ship, built in Finland in 1982 and originally used for oceanographic research.In 1998 she was fully refurbished to serve as a research ship for Arctic and Antarctic work; she is used also for expedition cruising. She is named after the Russian oceanographer Yuly Shokalsky. • For two weeks from 25 December 2013 Akademik Shokalskiy was trapped in thick ice in Commonwealth Bay, Antarctica, while operating an expedition for the Australasian Antarctic Expedition 2013-2014. The scientists and passengers were evacuated on 2 January. Introduction to the author: tishani doshi Tishani Doshi (9 December 1975) is an Indian poet, journalist and a dancer based in Chennai. Born in Madras, India, to a Welsh mother and Gujarati father, she graduated with a Master’s degree in Creative Writing from the Johns Hopkins University. She received Eric Gregory Award in 2001. Her first poetry collection Countries of the Body won the 2006 Forward Poetry Prize for the best first collection. Her First novel The Pleasure Seekers was published by Bloomsbury in 2010 and was long-listed for the Orange Prize in 2011 and shortlisted for The Hindu Best Fiction Award in 2010. She works as a freelance writer and worked with choreographer Chandralekha. Her poetry collection Everything Begins Elsewhere was published by Copper Canyon Press in 2013. Her most recent book of poetry, Girls Are Coming Out Of the Woods, was published by HarperCollins India in 2017. -
FINAL REPORT.Pdf
Government of Nepal Ministry of Federal Affairs and Local Development Ilam Municipality Ilam Preparation of GIS based Digital Base Urban Map Upgrade of Ilam Municipality, Ilam Final Report Submitted By: JV Grid Consultant Pvt. Ltd, Galaxy Pvt. Ltd and ECN Consultancy Pvt. Ltd June 2017 Government of Nepal Ministry of Federal Affairs and Local Development Ilam Municipality Ilam Preparation of GIS based Digital Base Urban Map Upgrade of Ilam Municipality, Ilam Final Report MUNICIPALITY PROFILE Submitted By: JV Grid Consultant Pvt. Ltd, Galaxy Pvt. Ltd and ECN Consultancy Pvt. Ltd June 2017 Table of Content Contents Page No. CHAPTER - I ..................................................................................................................................................... 1 1.1 NAMING AND ORIGIN............................................................................................................................ 1 1.2 LOCATION.............................................................................................................................................. 1 1.3 SETTLEMENTS AND ADMINISTRATIVE UNITS ......................................................................................... 3 CHAPTER - II.................................................................................................................................................... 4 2.1 PHYSIOGRAPHY......................................................................................................................................4 2.2 GEOLOGY/GEOMORPHOLOGY -
Micro Cottage and Small Entrepreneur Refinancing
l;4fy{ a}+s lnld6]8 != n3' 3/]n tyf ;fgf pBd shf{ s| g zfvf C0fLsf] gfd k||b]z s| g zfvf C0fLsf] gfd k||b]z . 1 Fikkal Sarita Pradhan 1 2101 JANAKPU CHAND TAILORS 2 2 Fikkal Navin Katuwal 1 2102 HETAUD RADHA SUPPLIERS Bagmati 3 Fikkal Rita Shrestha 1 2103 AAMCHO HIMAL FENCY KAPADA PASAL 1 4 Fikkal Pramesh Lamichhane 1 2104 SURKHET TIKA KHADYA TATHA KIRANAPASAL Karnali 5 RAJMARGA CHOWK KANKAI SUPPLIERS 1 2105 DHANGA KARUNA ELECTRONICS Sudurpashchim 6 Sindhuli unique electronic pasal 4 2106 DHANGA ANKIT NASTA PASAL Sudurpashchim 7 Sindhuli Kamal Bahadur khadka 5 2107 BUDIGAN TU FURNITURE UDHOG Sudurpashchim 8 Farsatikar New Kharel Order Suppliers 5 2108 BUDDHA SHUBHECHCHHA FANCY PASAL Gandaki 9 Taplejung Chandani Hotel 1 2109 TULSIPU NEW DANGI PLUMBINGSUPPLIERS 5 10 Taplejung Tej Bir Limbu 1 2110 HETAUD AMRITA KIRANA AND COLDSTORES Bagmati 11 Taplejung Dipak Gurung 1 2111 YASHOD SHUBHAM MOBILE CENTER 5 12 Taplejung Ganga Bahadur Limbu 1 2112 GADHI RAMU WORKSHOP 1 13 Taplejung Som Bimali 1 2113 DHANGA SANJAY AND YAMAN TRADERS Sudurpashchim 14 Taplejung Hari Kumar Limbu 1 2114 GOKULG G.N. ELECTRONICS AND MOBILECENTER Bagmati 15 Taplejung Chhowang Sherpa 1 2115 AAMCHO LOK BAHADUR KIRANA PASAL 1 16 Taplejung Gopal Neupane 1 2116 GHORAHI NEW SABINA HOTEL 5 17 Birauta Prashidddi Tours and Travels Pvt Ltd. Gandaki 2117 BUDIGAN NAUBIS GENERAL STORE Sudurpashchim 18 Chandragadi Sagarmatha Treders 1 2118 BIRATCH KANCHHA BAHUUDESHYAKRISHI FIRM 1 19 Chandragadi Hotel Grindland 1 2119 AAMCHO NANGANU NUYAHANG TRADERS 1 20 Chandragadi Bina books and Stationery 1 2120 AAMCHO SAKENWA PHALPHUL TA. -
35173-013: Third Small Towns Water Supply and Sanitation Sector Project
Initial Environmental Examination Project Number: 35173-013 Loan Numbers: 3157 and 8304, Grant Number:0405 July 2020 Nepal: Third Small Towns Water Supply and Sanitation Sector Project - Enhancement Towns Project Prepared by the Government of Nepal for the Asian Development Bank This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Updated Initial Environmental Examination July 2020 NEP: Third Small Towns Water Supply and Sanitation Sector Project – Phidim, Khandbari, Duhabi, Belbari, Birtamod DasarathChanda, Mahendranagar, Adarshnagar-Bhasi, Tikapur, Sittalpati, Bijuwar and Waling Enhancement Town Projects Prepared by Small Towns Water Supply and Sanitation Sector Project, Department of Water Supply and Sewerage Management, Ministry of Water Supply, Government of Nepal for the Asian Development Bank. Updated Initial Environmental Examination (IEE) of 12 Enhancement Small Town Projects Government of Nepal Ministry of Water Supply Asian Development Bank Updated Initial Environmental Examination (IEE) Of Phidim, Khandbari, Duhabi, Belbari, Birtamod, DasarathChanda, Mahendranagar, Adarshnagar-Bhasi, Tikapur, Sittalpati, Bijuwar, and Waling Enhancement Town Projects Submitted in July 2020 PROJECT MANAGEMENT OFFICE (PMO) Third Small Town Water Supply and Sanitation Sector Project Department of Water Supply and Sewerage Management Ministry of Water Supply Updated Initial Environmental Examination (IEE) of 12 Enhancement Small Town Projects Table of Contents ABBREVIATIONS EXECUTIVE SUMMARY 1. -
Nepal Orthodox Tea: Analysis of Industry, Production, and Market Potential
Nepal Orthodox Tea: Analysis of industry, production, and market potential By Rudra Bahadur Baral M.S., University of Hohenheim, Germany, 2008 A THESIS submitted in partial fulfillment of the requirements for the degree MASTER OF SCIENCE Department of Agricultural Economics Collage of Agriculture KANSAS STATE UNIVERSITY Manhattan, Kansas 2019 Approved by: Major Professor Dr. Aleksan Shanoyan Copyright © Rudra Baral 2019. Abstract This study covers industry analysis, financial analysis and market analysis of Nepal orthodox tea. It aims to evaluate the industry forces, analyze the financial performance of firms, and assess market potential. The study is based on field survey, key informants’ interviews, and participant observation in combination with data from secondary sources. The financial information of 65 tea processing firms was collected using standard financial formats. The production and trade related statistical data were obtained from National Tea and Coffee Development Board Nepal, Trade and Export Promotion Center Nepal, FAOSTAT, International Trade Center and STATISTA. The results of industry analysis indicate that in general, tea processors have low bargaining power against input suppliers and tea buyers. The processing industry was found to be less attractive for new entrants. The threat of substitutes was found to be low. But there is intense internal competition among processing firms for resources and markets. Limited and inefficient production, low economies of scale, unorganized supply chain system, limited access to global market are the major binding constraints identified by this study. The results of the financial analysis found positive returns of investment and increasing returns to scale. However, the average capacity utilization of the processing firms is found to be 33 percent.