Train de l’Ouest Project

September 2010 Changing needs

+ 74,000 Pierrefonds more inhabitants added to the current population of 370,000 CUSM over the next 15 years

Vaudreuil-Soulanges

September 2010 2 Changing needs

Roadwork + 27% commutes by train since 1998 Road traffic + 36% commutbtes by publi blitc transit since 1998

September 2010 3 Transport issues

Ridership increase 3,565,000 for commuter train services since 2005

3,076,000 An average o f 26% Progressive saturation of commuters have to stand on the of commuter train services trains during morning rush hour

September 2010 4 Transport issues

Sharing infrastructure with CP Priority given to freight trains

Limited capacity Constraints on outbound service of rail infrastructure (westbound) and outside peak hours

September 2010 5 Impact of roadwork

• Highway 40 :  Much roadwork to come in the next few years  The only major east -west axis that crosses region  175,000 cars daily  Serves many industrial parks and highly populated areas

Circle:  Work up until 2013  Major role in the strategic road system in terms of transporting passengers and goods

September 2010 6 Impact of road work

• Décar ie ItInterch ange:  First phase of the redevelopment project completed in 2013  280,000 users daily

• Turcot Complex:  Work starting in 2010, to continue until 2016  More than 290 , 000 cars da ily  Important artery linking highways 20, 720 and 15  Relocating rail tracks northward  Many stakeholders (including the City of Montreal) determined to reduce capacity

Resu lt: The road work paral yzes road t raffi c

Challenge: Measures must be taken during roadwork to keep traffic flowing

September 2010 7 Vaudreuil-Hudson line

• The current network serving the :  18 stations  51. 17 kftkkm of track  More than 3,565,000 commutes annually  Second most popular commuter train line Lucien-L’Allier station  1 hour  26 departures per weekday . 13 toward Montreal • 9 during morning peak hours • 2tidkh2 outside peak hours . 13 toward Hudson • 2 during morning peak hours Vendôme station • 3 outside peak hours  14 departures during the weekend

Dorval station Lachine station Montréal-Ouest station

VdVaudreuil

September 2010 8 Lucien-L’Allier station

Lucien-L’Allier station  Terminal station at downtown  Linked to two metro stations and Montreal’s Underground City  Possible transfer with 11 bus lines and 3 commuter train lines allowing intermodality

September 2010 9 Increase of service

Number of departures Currently After project

43 Peak hours 21 (including 12 express and9d 9 mi nut es l ess)

Outside peak hours 5 43

Weekend 14 26

Total per week 144 456

Annual ridership Currently After project

Metropolitan service 3,6M 9,2M

Estimated cost: $676M*

(construction cost only , of which $77M already invested) *cost of 2008

September 2010 10 Combined process by ADM and AMT

September 2010 11 Three proposals

Airport shuttle without stops No. 1 (()no train to the west)

Airport shuttle and metropolitan shuttle separated No. 2 + (two networks called “hybrid”)

No. 3 Shared airport and metropolitan shuttle (CP3) (one network)

September 2010 12 Proposal No.1 (airport only)

Airppport shuttle without stops Service every 20 minutes Transit time: 21 minutes Central Station

No public transit service to the west Cost: $600M

Pointe-Saint-Charles

Montréal-Trudeau station

CN CP

September 2010 13 Proposal No.1 (airport only)

• Dedicated shuttle service, without intermediate stops or public transit service toward west

• Announced cost: $600M  $200M in the provincial budget (April 2010)

• Annual operating cost $24.4M

• Bfit/ttilth1Benefit/cost ratio less than 1

• Predicted ridership:  3.4 million passengers per year (rate: $8)  High market share (28%) in comparison with other airports (Reagan 12%, Vancouver 5%, Portland 6%, Minneapolis 5%)

September 2010 14 Proposal No.2 (hybrid)

Airport shuttle without stops Metropolitan shuttle

Service: every 20 minutes Service: 12 minutes during peak hours Central Station Transit time: 21 minutes 30 minutes outside peak hours

Luci en L’Alli er s ta tion

Cost: 1.3 billion* Vendôme station

Pointe-Saint-Charles CP CN Montréal-Trudeau station Montréal-Ouest Station Lachine station

To Sainte-Anne-de-Bellevue

*cost of 2008

September 2010 15 Proposal No.2 (hybrid)

• Two networks needed:  Sharing the infrastructure of CN freight trains

• Airport shuttle only to Central Station:  CN rejected the proposal of metropolitan service to Central Station

• Longer route:  Three more minutes

• Higher electrification cost:  23 km of additional track and higher complexity

September 2010 16 Proposal No.2 (hybrid)

• HitHeritage issues:  Authorization required from the federal Environment Department for necessary modifications to Central Station  Authorizations required from Parks Canada and Fisheries and Oceans Canada

• Expropriation and acquisition issues:  Land reconveyance to CN

September 2010 17 Proposal No.3 (CP3)

Airport shuttle Metropolitan shuttle Centrale Station Service: every 20 minutes Service: 12 minutes during peak hours Transit time: 18 minutes 30 minutes outside peak hours LiLucien-L’Allier s ta tion

Cost: $874M* Vendôme station (of which $77M already invested in rail infrastructure)

Pointe-Saint-Charles CP CN Montréal-Trudeau station Montréal-Ouest station Lachine station

To Sainte-Anne-de-Bellevue

*cost of 2008

September 2010 18 Proposal No.3 (CP3)

• One network (easier and more reliable) • Shared infrastructure for passenger services (ADM and AMT) • Shorter transit time (- three minutes) • Total cost of $874M* , including $77M already invested by the AMT • Lower cost of electrification (- 23 km of track)

*cost of 2008

September 2010 19 Proposal No.3 (CP3)

“The CP route is the most efficient, from the financial as well as the benefit/cost aspect. ”

((gaccording to the PricewaterhouseCoop pp,p)ers report, p. 14)

September 2010 20 The advantages of AMT's route

• Use of a single network (easier and more reliable) • Shared infrastructure for ppgassenger services ( ADM and AMT) • Shorter transit (-3.9 miles, -6 minutes) • Dedicated shuttles (airport shuttle and metropolitan shuttle are separated) • Total cost of $874M* • Lower cost of electrification • Additional service for local population

*cost of 2008

September 2010 21 Summary

Proposal 1. Train de 2. Airport only 3. Airport/metropolitan 4. Airport/metropolitan shared l’Ouest AMT separated (CP3)

Supported by + +

Route

Transit time 18 minutes 21 minutes 21 minutes 18 minutes (airport)

Cost $676M* $600M $1.3B* $874M* ($77M already ($200M announced in ($77M already invested by the AMT) ($77M already invested by the AMT) invested by the AMT) 2010 provincial budget)

Benefit/cost 2282.28 <1 151.5 181.8

Passengers/ 9.2M 3.4M 13M 12M year

*cost of 2008

September 2010 22 Major findings

• YES to increased public transit services in the West Island • YES to an integrated project with shared infrastructure by ADM and AMT  $240M (CP scenario) more than the airport shuttle alone, $77M already invested by the AMT on CP (2010)  9.2 million passengers annually (additional 5 million new passengers compared to the airport shuttle alone, which will serve 3.4 million passengers annually)

• The metropolitan service generates most benefits:  75% of total benefits  The airport shuttle alone has a ratio of less than 1  The metropolitan service has a ratio of 2

September 2010 23 Question period

September 2010 24