The Mineral Industry of Cambodia in 2017-2018

Total Page:16

File Type:pdf, Size:1020Kb

The Mineral Industry of Cambodia in 2017-2018 2017–2018 Minerals Yearbook CAMBODIA [ADVANCE RELEASE] U.S. Department of the Interior January 2021 U.S. Geological Survey The Mineral Industry of Cambodia By Ji Won Moon In 2017 and 2018, the production of mineral commodities— the mineral industry of Cambodia can be found in previous primarily cement, gravel, salt, sand, and stone—represented editions of the U.S. Geological Survey Minerals Yearbook, only a minor part of the economy of Cambodia (Open volume III, Area Reports—International—Asia and the Pacific, Development Cambodia, 2018). The legislative framework which are available at https://www.usgs.gov/centers/nmic/ for the mineral sector in Cambodia is provided by the Law asia-and-pacific. on Mineral Resource Management and Exploitation of July 13, 2001, and the Sub-Decree on Management of Mineral Reference Cited Exploration and Industrial Mining Licenses of May 5, 2016. Open Development Cambodia, 2018, Mining: Phnom Penh, Cambodia, Open Data on mineral production are in table 1. Table 2 is a list of Development Cambodia, September 30. (Accessed October 25, 2018, at major mineral industry facilities. More-extensive coverage of https://opendevelopmentcambodia.net/topics/mining/.) TABLE 1 CAMBODIA: PRODUCTION OF MINERAL COMMODITIES1 (Thousand metric tons, gross weight) Commodity2 2014 2015 2016 2017 2018 INDUSTRIAL MINERALS Cement, hydraulic 1,400 1,700 e, r 2,100 e, r 3,400 4,900 e Salt, sea salt 150 170 140 32 10 e Sand and gravel, industrial, silicae 130 540 820 930 930 Stone, sand and gravel, construction:e Sand and gravel: Gravel 50 50 55 89 130 Unspecified 9,000 9,000 10,000 16,000 23,000 Stone, crushed, unspecified 6,000 6,000 6,500 11,000 15,000 eEstimated. rRevised. 1Table includes data available through September 18, 2019. All data are reported unless otherwise noted. Estimated data are rounded to no more than three significant digits. 2In addition to the commodities listed, clay, gemstones, gold, iron ore, and limestone may have been produced, but available information was inadequate to make reliable estimates of output. CAMBODIA—2017–2018 [ADVANCE RELEASE] 8.1 TABLE 2 CAMBODIA: STRUCTURE OF THE MINERAL INDUSTRY IN 2018 (Thousand metric tons unless otherwise specified) Main operating companies and Annual Commodity main equity owners Location of main facilities capacitye Cement Battambang Conch Cement Co. Ltd. [Conch Rattanak District, Battambang Province 1,800 International Holdings (HK) Ltd., 60%, and Battambang KT Cement Co. Ltd., 40%] Do. Cambodia Cement Chakrey Ting Factory Co. Chakrei Ting plant, Phnom Tatung, Touk 1,220 Ltd. (Huaxin Cement. Co. Ltd., 68%, and Meas District, Kampot Province others, 32%) Do. Chip Mong Insee Cement Co. Corp. (Chip Mong Touk Meas Plant in Toul Meas, Banteay Meas 2,000 Group, 60%, and Siam City Cement Public District, Kampot Province Co. Ltd., 40%) Do. Kampot Cement Co. Ltd. (Siam Cement Public Plant in Touk Meas District, Kampot Province 2,210 Co. Ltd., 94%, and Khaou Chuly Group, 6%) Gold kilograms Cambodia WS Mining Industry Holding Ltd. Mine in Tropeang Tontem, Rovieng District, NA Preah Vihear Province Do. do. Delcom Cambodia Pte. Ltd. (Deleum Service do. NA Holdings Ltd., 100%) Do. do. Mesco Gold (Cambodia) Co. Ltd. (Mesco Steel Phum Syarung Mine in O'yadav District, 525 Ltd., 100%) Ratanakkiri Province Do. do. Phou Yang (Cambodia) Co. Ltd. Mine in Phnom Prek District, Battambang NA Province Do. do. Xing Yuan Kang Yeak, Co. Mine in Kbal Darmrey commune, Sambor NA District, Kratie Province Limestone Kampot Cement Co. Ltd. (Siam Cement Public Touk Meas District, Kampot Province 1,500 Co. Ltd., 94%, and Khaou Chuly Group, 6%) Do. Thai Boon Roong Cement Co. Ltd. Phnom Laang Laan Commune, Donghtung NA District, Kampot Province Salt Confirel Co. Ltd. Small salt farmers in Kampot and Kep 100 Provinces Sand: Construction LYP Croup Co. NA 1,920 Do. Udom Seima Peanikch Industry and Mine Co. NA 950 Industrial Mong Reththy Group Co. Ltd. NA NA Do. Sibelco Cambodia Co. Ltd. NA NA eEstimated. Do., do. Ditto. NA Not available. 8.2 [ADVANCE RELEASE] U.S. GEOLOGICAL SURVEY MINERALS YEARBOOK—2017–2018.
Recommended publications
  • Evaluation Report on ECHO Funded Humanitarian Mine Action Pilot Projects in North-West of Cambodia
    James Madison University JMU Scholarly Commons Center for International Stabilization and Global CWD Repository Recovery Fall 10-2003 Evaluation Report on ECHO Funded Humanitarian Mine Action Pilot Projects in North-West of Cambodia Marcel Durocher Agim Hoti Mok Tonh Keo Vut Follow this and additional works at: https://commons.lib.jmu.edu/cisr-globalcwd Part of the Defense and Security Studies Commons, Peace and Conflict Studies Commons, Public Policy Commons, and the Social Policy Commons Recommended Citation Durocher, Marcel; Hoti, Agim; Tonh, Mok; and Vut, Keo, "Evaluation Report on ECHO Funded Humanitarian Mine Action Pilot Projects in North-West of Cambodia" (2003). Global CWD Repository. 1132. https://commons.lib.jmu.edu/cisr-globalcwd/1132 This Article is brought to you for free and open access by the Center for International Stabilization and Recovery at JMU Scholarly Commons. It has been accepted for inclusion in Global CWD Repository by an authorized administrator of JMU Scholarly Commons. For more information, please contact [email protected]. EVALUATION REPORT ON ECHO FUNDED HUMANITARIAN MINE ACTION PILOT PROJECTS IN NORTH-WEST OF CAMBODIA th October 6 2003 Marcel Durocher Agim Hoti Mok Tonh Keo Vuthy TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS.......................................................................................................... 5 ACKNOWLEDGEMENTS .............................................................................................................................. 6 INTRODUCTION............................................................................................................................................
    [Show full text]
  • Collaborative Exploration of Capsicum Genetic Resources in Northern Cambodia, 2016
    〔AREIPGR Vol. 33: 207-221, 2017〕 Original Paper Collaborative Exploration of Capsicum Genetic Resources in Northern Cambodia, 2016 Toru SUGITA 1)*, Hiroshi MATSUNAGA 2), Sim THEAVY 3), Sakhan SOPHANY 3) 1) Miyazaki Agricultural Research Institute, Shimonaka 5805, Sadowara, Miyazaki, Miyazaki 880- 0212, Japan 2) Institute of Vegetable and Floriculture Science, NARO, Kusawa 360, Ano, Tsu, Mie 514-2392, Japan 3) Cambodian Agricultural Research and Development Institute, National Road 3, Prateahlang, Dangkor, P.O. Box 01, Phnom Penh, Cambodia *Present affiliation: Faculty of Environmental and Horticultural Science, Minami Kyushu University, Tateno 3764-1, Miyakonojyo, Miyazaki 885-0035, Japan Communicated by K. EBANA (Genetic Resources Center, NARO) Received May 7, 2017, Accepted Jan. 20, 2018 Corresponding author: H. MATSUNAGA (e-mail: [email protected]) Summary The National Agriculture and Food Research Organization (NARO) and the Cambodian Agricultural Research and Development Institute (CARDI) have collaborated under the Plant Genetic Resources in Asia project to survey the vegetable genetic resources available in Cambodia, since 2014. As part of this project, two field surveys of solanaceous crops were conducted in November 2014 and 2015 in western and eastern Cambodia, respectively. In November 2016, we conducted a third field survey in northern Cambodia, in Kampong Thom, Siem Reap, Oddar Meanchey, and Preah Vihear provinces. We collected 46 chili pepper fruit samples from markets and farmer yards, including 13 Capsicum annuum and 33 Capsicum frutescens fruits. Harvested seeds were evenly transferred to the CARDI and the NARO gene banks. KEY WORDS: Capsicum annuum, Capsicum frutescens, chili pepper, genetic resources, Cambodia Introduction There are abundant vegetable genetic resources available in Southeast Asia, many of them within Solanaceae (Yamamoto and Nawata 2005; Matsunaga et al.
    [Show full text]
  • Index Map 2-14. Districts and Communes in Prey Veng Province
    Index Map 2-14. Districts and Communes in Prey Veng Province 07 04 03 Code of Province / Municipality, 10 District, and Commune 05 02 05 08 14 PREY VENG 1412 09 01 09 11 08 05 04 1401 Ba Phnum 1406 Peam Chor 1410 Krong Prey Veng 06 02 1404 140101 Boeng Preah 140601 Angkor Angk 141001 Sangkat Baray 11 07 140102 Cheung Phnum 140602 Kampong Prasat 141002 Sangkat Cheung Tuek 03 02 01 1408 01 140103 Chheu Kach 140603 Kaoh Chek 141003 Sangkat Kampong Leav 01 140104 Reaks Chey 140604 Kaoh Roka 10 05 06 07 04 140105 Roung Damrei 140605 Kaoh Sampov 1411 Kampong Leav 08 08 08 140106 Sdau Kaong 140606 Krang Ta Yang 141104 Pou Rieng 03 02 03 140107 Spueu Ka 140607 Preaek Krabau 141105 Preaek Anteah 10 140108 Spueu Kha 140608 Preaek Sambuor 141106 Preaek Chrey 04 07 06 04 140109 Theay 140609 Ruessei Srok 141107 Prey Kanlaong 06 07 03 02 1411 05 01 1402 140610 Svay Phluoh 141108 Ta Kao 1402 Kamchay Mear 05 02 08 140201 Cheach 1407 Peam Ro 1412 Sithor Kandal 04 1413 140202 Doun Koeng 140701 Ba Baong 141201 Ampil Krau 03 06 07 06 140203 Kranhung 140702 Banlich Prasat 141202 Chrey Khmum 01 1410 140204 Krabau 140703 Neak Loeang 141203 Lve 09 140205 Seang Khveang 140704 Peam Mean Chey 141204 Pnov Ti Muoy 06 08 140206 Smaong Khang Cheung 140705 Peam Ro 141205 Pnov Ti Pir 07 140207 Smaong Khang Tboung 140706 Preaek Khsay Ka 141206 Pou Ti 11 1407 1405 140208 Trabaek 140707 Preaek Khsay Kha 141207 Preaek Changkran 09 140708 Prey Kandieng 141208 Prey Daeum Thnoeng 01 04 02 04 1403 Kampong Trabaek 141209 Prey Tueng 03 140301 Ansaong 1408 Pea Reang 141210 Rumlech
    [Show full text]
  • Community Self-Reliance and Flood Risk Reduction (Financed by the Poverty Reduction Cooperation Fund)
    Technical Assistance Consultant’s Report Project Number: 37290 September 2007 Kingdom of Cambodia: Community Self-Reliance and Flood Risk Reduction (Financed by the Poverty Reduction Cooperation Fund) Prepared by Asian Disaster Preparedness Center Bangkok, Thailand For Ministry of Water Resources and Meteorology This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Table of Contents A Background of the TA………………………………………………………………………...03 B Executive Summary of significant activities under the project……………………....05 C Details for each activity under the two phases of the TA………………………………08 1. Designing the community participation model…………………………………………09 1.1 Understanding NGO interventions in Flood Risk Reduction 1.1.1 Description of NGO projects in Cambodia 1.1. 2 NGO projects on flood risk reduction in 4 TA target provinces 1.1. 3 NGO approaches to flood risk reduction 1.1.4 Typical constraints to effectiveness of NGO interventions 1.2 Developing a simple GIS……………………………………………………………………21 1.2.1 Development of a Flood Vulnerability GIS Application 1.2.2 Flood vulnerability GIS – Atlas Interpretation Guide 1.2.3 GIS Maps for ready reference 1.3 Undertaking a brief survey within target provinces for identifying key community needs in flood and drought risk reduction………………………………………………………26 1.4 Identification of target areas and prioritizing areas for future interventions……..27 1.5 Selecting NGOs for undertaking pilot community based flood risk reduction action in the target areas identified………………………………………………………………………28 1.6 Developing a Community Based Disaster Risk Reduction (CBDRR) Strategy……29 1.7 Workshop on CBDRR Strategy…………………………………………………………….33 1.7.1 Consultative workshop on CBDRR Strategy 1.7.2 6th Meeting of the Cambodia Disaster Risk Reduction Forum 2.
    [Show full text]
  • Report on Power Sector of the Kingdom of Cambodia
    ELECTRICITY AUTHORITY OF CAMBODIA REPORT ON POWER SECTOR OF THE KINGDOM OF CAMBODIA 2013 EDITION Compiled by Electricity Authority of Cambodia from Data for the Year 2012 received from Licensees Electricity Authority of Cambodia ELECTRICITY AUTHORITY OF CAMBODIA REPORT ON POWER SECTOR OF THE KINGDOM OF CAMBODIA 2013 EDITION Compiled by Electricity Authority of Cambodia from Data for the Year 2012 received from Licensees Report on Power Sector for the Year 2012 0 Electricity Authority of Cambodia Preface The Annual Report on Power Sector of the Kingdom of Cambodia 2013 Edition is compiled from informations for the year 2012 availble with EAC and received from licensees, MIME and other organizations in the power sector. The data received from some licensees may not up to the required level of accuracy and hence the information provided in this report may be taken as indicative. This report is for dissemination to the Royal Government, institutions, investors and public desirous to know about the situation of the power sector of the Kingdom of Cambodia during the year 2012. With addition of more HV transmission system and MV sub-transmission system, more and more licensees are getting connected to the grid supply. This has resulted in improvement in the quality of supply to more consumers. By end of 2012, more than 91% of the consumers are connected to the grid system. More licensees are now supplying electricity for 24 hours a day. The grid supply has reduced the cost of supply and consequently the tariff for supply to consumers. Due to lower cost and other measures taken by Royal Government of Cambodia, in 2012 there has been a substantial increase in the number of consumers availing electricity supply.
    [Show full text]
  • For: Review Kingdom of Cambodia Country Strategy and Programme Evaluation
    Document: EC 2018/100/W.P.2/Rev.1 Agenda: 3 Date: 23 Feburary 2018 E Distribution: Public Original: English Kingdom of Cambodia Country strategy and programme evaluation Note to Evaluation Committee members Focal points: Technical questions: Dispatch of documentation: Oscar A. Garcia Alessandra Zusi Bergés Director Senior Governing Bodies Officer Independent Office of Evaluation of IFAD Governing Bodies Tel.: +39 06 5459 2274 Tel.: +39 06 5459 2092 e-mail: [email protected] e-mail: [email protected] Fumiko Nakai Senior Evaluation Officer Tel.: +39 06 5459 2283 e-mail: [email protected] Evaluation Committee — 100th Session Rome, 23 March 2018 For: Review EC 2018/100/W.P.2/Rev.1 Contents Executive summary ii Appendix I. Agreement at Completion Point 1 II. Main report Kingdom of Cambodia – Country strategy and programme evaluation 7 i EC 2018/100/W.P.2/Rev.1 Executive summary A. Background 1. In 2017, the Independent Office of Evaluation of IFAD (IOE) undertook the first country strategy and programme evaluation (CSPE) for the Kingdom of Cambodia. The CSPE reviewed the evolution of the strategy, results and performance of the partnership between IFAD and the Royal Government of Cambodia since the Fund started operations in 1997, but with a focus on the last decade, particularly with respect to the investment portfolio. The CSPE covers the investment portfolio (seven projects that were approved between 2000 and 2016), complementary (non-lending) activities (knowledge management, partnership-building and policy dialogue, including grants), as well as country programme strategy and management. 2. Objectives. The CSPE had two main objectives: (i) to assess the results and performance of the IFAD-financed strategy and programme; and (ii) to generate findings and recommendations for the future partnership between IFAD and the RoyalGovernment of Cambodia for enhanced development effectiveness and rural poverty eradication.
    [Show full text]
  • GCC States' Land Investments Abroad
    GCC States’ Land Investments Abroad The Case of Cambodia Summary Report About the Georgetown University School of Foreign Service in Qatar The Georgetown University School of Foreign Service in Qatar, opened in August 2005, is a branch campus of Georgetown University, the oldest Catholic and Jesuit university in America, founded in 1789. The program builds on Georgetown University’s long tradition of educating future leaders for careers in the international arena through a liberal arts undergraduate program focused on international affairs. For more information about the School of Foreign Service in Qatar, please visit http://qatar.sfs.georgetown.edu. About the Center for International and Regional Studies Established in 2005, the Center for International and Regional Studies at the Georgetown University School of Foreign Service in Qatar is a premier research institute devoted to the academic study of regional and international issues through dialogue and exchange of ideas, research and scholarship, and engagement with national and international scholars, opinion makers, practitioners, and activists. Guided by the principles of academic excellence, forward vision, and community engagement, the CIRS mission revolves around five principal goals: • To provide a forum for scholarship and research on international and regional affairs • To encourage in-depth examination and exchange of ideas • To foster thoughtful dialogue among students, scholars, and practitioners of international affairs • To facilitate the free flow of ideas and knowledge through publishing the products of its research, sponsoring conferences and seminars, and holding workshops designed to explore the complexities of the twenty-first century • To engage in outreach activities with a wide range of local, regional, and international partners About the Qatar Foundation for Education, Science and Community Development Founded in 1995, Qatar Foundation is a private, non-profit, chartered organization committed to the principle that a nation’s greatest resource is its people.
    [Show full text]
  • Cambodia Status and Trends in Environmental Management and Options for Future Action
    Final Report submitted to the United States Agency for International Development Environmental Review: Cambodia Status and Trends in Environmental Management and Options for Future Action Including Interim Environmental Strategic Plan (IESP) And FAA 118/119 Assessment USAID Contract No. LAG-I-00-99-00013-00, Task Order No. 805 Submitted by: ARD-BIOFOR IQC Consortium 159 Bank Street, Suite 300 Burlington, Vermont 05401 telephone: (802) 658-3890 fax: (802) 658-4247 email: [email protected] October 2001 Table of Contents Executive Summary.............................................................................................................. iii Acronyms ............................................................................................................................. vii 1. Purpose and Approach .................................................................................................. 1 2. The Cambodian Context................................................................................................ 2 2.1 Biophysical.................................................................................................................. 2 2.2 Socioeconomic............................................................................................................. 2 2.3 Value of Natural Resources to the Nation and Rural People ......................................... 3 3. Status and Trends in Natural Habitats and Agricultural Ecosystems......................... 5 3.1 Forests ........................................................................................................................
    [Show full text]
  • 42361-013: Medium-Voltage Sub-Transmission Expansion
    Initial Environmental Examination - Updated Project Number: 42361-013 Loan 2979-CAM/Loan 8264-CAM September 2019 CAM: Medium-Voltage Sub-Transmission Expansion Sector Project (former name: Rural Electrification Project) Package 2 Prepared by the Electricity du Cambodge for the Asian Development Bank. This updated initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. KINGDOM OF CAMBODIA Nation Religion King ELECTRICITÉ DU CAMBODGE Medium Voltage Sub-Transmission Expansion Sector Project, Package 2 ADB Loan N° 2979 CAM (SF) Subproject 1: Kampong Thom Province (extension) Subproject 3: Siem Reap Province (extension) Subproject 4: Kandal Province Subproject 5: Banteay Meanchey Province UPDATED INITIAL ENVIRONMENTAL EXAMINATION (IEE) August 2019 Korea Electric Power Corporation in association with Cheang Engineering Consultants Co., Ltd CURRENCY EQUIVALENTS (Official exchange rate of the National Bank of Cambodia as of 24 November 2014) Currency unit – Cambodian Riel (KHR) KHR1.00 = $0.000246 $1.00 = KHR 4,063 ABBREVIATIONS
    [Show full text]
  • Project Implementation Manual, October 7, 2017 ROYAL GOVERNMENT of CAMBODIA
    LASED II P150631 - Project Implementation Manual, October 7, 2017 ROYAL GOVERNMENT OF CAMBODIA Land Allocation for Social and Economic Development Project II (P150631) Project Implementation Manual Guidelines for Project Management and Administration April 20, 2016 LASED II P150631 - Project Implementation Manual, April 20, 2016 ACKNOWLEDGEMENTS The development of this Project Implementation Manual is a joint effort of the LASED II Project Management Team, Project Staff and its national and international consultants. The present manual has been drawn up in accordance with the Standard Operational Procedures agreed upon by the Royal Government of Cambodia, The World Bank and the Asian Development Bank also incorporating suitable processes and procedures tested during the pilot phase of Land Allocation for Social and Economic Development implemented from September 2008 to March 2015. The Project Implementation Manual harmonizes with the WB’s Operational Policies and Guidelines and leans on similar implementation manuals governing Cambodian WB-financed development initiatives. During the drafting process comprehensive documentation on good practice in community demand and driven development and empowerment of poor people within the pilot phase of LASED II was discussed, and in particular project implementation manuals from similar World Bank funded projects. This Project Implementation Manual is designed under the visionary guidance of Samdech Krolar Hoam Sar Kheng, Deputy Prime Minister and Minister of Interior; H.E Im Chhun Lim, Senior Minister, Ministry of Land Management Urban Planning and Construction; H.E Ouk Rabun, Minister of Agriculture, Forestry and Fisheries; and H.E Aun Pornmoniroth, Minister of Economy and Finance. H.E Dr. Sareth Boramy, Project Director of LASED II, Deputy General Director of GDLMUPC, Permanent Deputy General Secretary of NSLC, and Director of Land Distribution Sub-Sector Program (LDSSP), Ministry of Land Management, Urban Planning and Construction (MLMUPC); H.E.
    [Show full text]
  • 42361-013: Medium-Voltage Sub-Transmission Expansion
    Initial Environmental Examination November 2014 CAM: Medium-Voltage Sub-Transmission Expansion Sector Project (Package 2) Subproject 1: Kampong Thom Province (extension) Subproject 3: Siem Reap Province (extension) Subproject 4: Kandal Province Subproject 5: Banteay Meanchey Province Prepared by Electricité du Cambodge, Royal Government of Cambodia for the Asian Development Bank. CURRENCY EQUIVALENTS (Official exchange rate of the National Bank of Cambodia as of 24 November 2014) Currency unit – Cambodian Riel (KHR) KHR1.00 = $0.000246 $1.00 = KHR 4,063 ABBREVIATIONS ADB Asian Development Bank AP Affected person APSARA Authority for the Protection and Management of Angkor and the Region of Siem Reap CEMP Construction Environmental Management Plan CMAA Cambodian Mine Action and Victim Assistance Authority DCFA Department of Culture and Fine Arts DMC Developing member country DoE Department of Environment EA Executing Agency EAC Electricity Authority of Cambodia EARF Environmental Assessment and Review Framework EDC Electricité du Cambodge EIA Environmental Impact Assessment EMoP Environmental Monitoring Plan EMP Environmental Management Plan GRM Grievance Redress Mechanism IA Implementing agency IBA Important Bird Area IEC International Electrotechnical Commission IEE Initial Environmental Examination IEIA Initial Environmental Impact Assessment IFC International Finance Corporation IUCN International Union for Conservation of Nature LV Low voltage MARPOL Marine Pollution Convention MCFA Ministry of Culture and
    [Show full text]
  • Cover English
    Preface We, member of Cambodia Children and Young People Movement for Child Rights ( CCYMCR ) facilitated by Child Rights Foundation, are pleased inform you‐adults, and boys and girls who are working for the best interests of children and youth‐ that we have noticed that there are a significant number of organizations, associations, groups or clubs led by children and youth across Cambodia. We first published a directory in 2005. As a result, we had learned that there were 217 child or youth‐led organizations and clubs. We second published a directory in 2006. We had learned that there were 290 child or youth‐led organizations and clubs across Cambodia. However, we were not sure whether the number of these organizations, associations, groups and children and youth clubs was increasing or decreasing in 2010. In respond to lack of the above information, we have redone a research to find out the clear‐ structured organizations and children and youth clubs led by children and youth under 24 years of age, still in operation across Cambodia and having contact address in order to compile a directory of child and youth‐led organizations, associations, groups or clubs the third time. The result of this third research indicates that there are 717 organizations, associations, groups, children and youth clubs operating in Cambodia. CCYMCR will update this book in the coming year, and we do hope that children and youth clubs, which have not been listed in the book, will send us their information once the book is to compile again. The main objective of this research is to identify activities implemented by children or youth clubs so as to facilitate our future collaboration.
    [Show full text]