FACT SHEET The United States Environmental Protection Agency (EPA) Plans To Reissue A National Pollutant Discharge Elimination System (NPDES) General Permit To: Small Suction Dredge Miners in Idaho and the State of Idaho Department of Environmental Quality Proposes to Certify under Clean Water Act (CWA) § 401 Public Comment Start Date: December 13, 2017 Public Comment Expiration Date: January 29, 2018 Technical Contact Name: Cindi Godsey Phone: (206) 553-1676 Email:
[email protected] EPA Proposes NPDES Permit Reissuance EPA proposes to reissue an NPDES General Permit (GP) to small suction dredgers operating in Idaho. Small suction dredges are limited to an intake nozzle size of 5 inches in diameter or less (or the diametrical equivalent defined in the GP) and equipment rated at 15 horsepower or less. The draft GP sets conditions on the discharge - or release - of pollutants from these operations into waters of the United States. This Fact Sheet includes: - Information on public comment, public hearings, and appeal procedures - a description of the industry - a description of draft GP conditions - background information supporting the conditions in the draft GP The State of Idaho CWA § 401 Certification Upon EPA’s request, the Idaho Department of Environmental Quality (IDEQ) has provided a draft certification of the permit under CWA § 401. Persons wishing to comment on State Certification should submit written comments by the public notice expiration date to Nicole Deinarowicz, Idaho Department of Environmental Quality, 1410 N. Hilton Boise, Idaho 83706. Ms. Deinarowicz may be reached by phone at (208) 373-0591 or by e-mail at
[email protected].