World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Private Participation in the Indian Power Sector in the Indian Participation Power Private Public Disclosure Authorized Public Disclosure Authorized DIRECTIONS IN DEVELOPMENT Energy and Mining Private Participation in the Indian Public Disclosure Authorized Power Sector Mukherjee Lessons from Two Decades of Experience Mohua Mukherjee WORLD BANK GROUP BANK WORLD Public Disclosure Authorized Private Participation in the Indian Power Sector DIRECTIONS IN DEVELOPMENT Energy and Mining Private Participation in the Indian Power Sector Lessons from Two Decades of Experience Mohua Mukherjee © 2014 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved 1 2 3 4 17 16 15 14 This work is a product of the staff of The World Bank with external contributions. The findings, interpreta- tions, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved. Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) http:// creativecommons.org/licenses/by/3.0/igo. Under the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Attribution—Please cite the work as follows: Mukherjee, Mohua. 2014. Private Participation in the Indian Power Sector: Lessons from Two Decades of Experience. Directions in Development. Washington, DC: World Bank. doi:10.1596/978-1-4648-0339-0. License: Creative Commons Attribution CC BY 3.0 IGO. Translations—If you create a translation of this work, please add the following disclaimer along with the attribution: This translation was not created by The World Bank and should not be considered an official World Bank translation. The World Bank shall not be liable for any content or error in this translation. Third-party content—The World Bank does not necessarily own each component of the content contained within the work. The World Bank therefore does not warrant that the use of any third-party-owned individual component or part contained in the work will not infringe on the rights of those third parties. The risk of claims resulting from such infringement rests solely with you. If you wish to re-use a component of the work, it is your responsibility to determine whether permission is needed for that re-use and to obtain permission from the copyright owner. Examples of components can include, but are not limited to, tables, figures, or images. All queries on rights and licenses should be addressed to the Publishing and Knowledge Division, The World Bank, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: pubrights@ worldbank.org. ISBN (paper): 978-1-4648-0339-0 ISBN (electronic): 978-1-4648-0340-6 DOI: 10.1596/978-1-4648-0339-0 Cover photo: NOAA. This photograph is in the public domain and available for public use. Please credit NOAA. Library of Congress Cataloging-in-Publication data has been requested. Private Participation in the Indian Power Sector • http://dx.doi.org/10.1596/978-1-4648-0339-0 Contents Foreword xi Acknowledgments xiii About the Author xv Abbreviations xvii Overview 1 Lessons Learned from Two Decades of Efforts to Attract Private Investment in the Power Sector 8 General Observations and a View Ahead 15 Notes 16 References 17 Chapter 1 Introduction to Private Sector Participation in the Indian Power Sector 19 The Prereform Period: From Independence to 1991 19 Phase 1 (1991–95): The Opening of the Sector to Private Investment in Generation—Independent Power Producer Policy 21 Phase 2 (1996–2003): Restructuring of SEBs, Introduction of Sector Regulators, and Initial Attempts at Privatization in Orissa and Delhi 24 Phase 3 (2003–12): Enactment of the Electricity Act and Subsequent Policy Initiatives to Introduce Competition and Create a Market in Generation, Transmission, and Distribution 25 Phase 4: Investor Uncertainty at the Start of the 12th Five-Year Plan 28 Private Participation in Generation, Transmission, and Distribution 29 Notes 29 Reference 30 Private Participation in the Indian Power Sector • http://dx.doi.org/10.1596/978-1-4648-0339-0 v vi Contents Chapter 2 Private Sector Participation in Thermal Generation 31 Key Messages 31 Importance of Power Generation 32 Placing the Indian Power Sector in an International Context 32 Growth of Private Sector Participation in Power Generation in India 33 Independent Power Projects Policy of the Early 1990s 35 Key Issues in Implementation of the IPP Policy 36 Intermediate Policy Initiatives for Private Sector Participation in Generation 37 Post–Electricity Act of 2003: Tariff-Based Competitive Bidding 38 Response of the Private Sector to Case 1 and Case 2 Procurement through Competitive Bidding 41 Comparison of Case 1 and Case 2 Bids with Noncompetitively Awarded (by Memorandum of Understanding) Projects 44 Prospects for Future Private Participation in Power Generation: What Is Holding Back Private Investors? 46 The Coal Crunch and Choices Facing Policy Makers 47 Logistical Difficulties with Physical Pooling of Imported and Domestic Coal 47 Notes 50 References 50 Chapter 3 Private Sector Participation in Transmission 51 Key Messages 51 Chronology of Private Sector Participation in Transmission 52 Legal Framework for Transmission Business 52 Private Participation Experiences 53 Current Models for Private Participation 55 Chapter 4 Private Sector Participation in Distribution 59 Key Messages 59 Distribution Performance and Chronology of Private Sector Participation in Distribution 60 Comparative Highlights of the Privatization Experience of Orissa and Delhi 64 DF Models 67 Review of Rural Franchisee Experiences 75 Review of Urban Franchisee Experiences 77 Lessons Learned for Improvement of the DF Approach: What Are the Key Variables That Must Be Properly Understood and Addressed in the Bid Process? 79 Private Participation in the Indian Power Sector • http://dx.doi.org/10.1596/978-1-4648-0339-0 Contents vii Notes 94 References 94 Chapter 5 Private Sector Participation in the Indian Solar Energy Sector 97 Key Messages 97 Progress to Date 99 Potential Bottlenecks to Meeting Commissioning Schedule Deadlines 104 Note 105 References 106 Chapter 6 Financing of the Power Sector 107 Key Messages 107 Distribution Sector Losses and Their Effects 107 Macroeconomic Outlook 109 Central Government Approach 109 Recommended Holistic Approach 111 Reference 113 Chapter 7 Emerging Issues and Proposed Approaches for the Indian Power Sector 115 Emerging Issue: The Need for Better Partnership Mechanisms with the Private Sector 115 Final Thought 118 Note 118 Chapter 8 Update 119 Review of Progress on Selection of DFs 119 Issuance of SBDs for the Appointment of DFs 122 Finalization of Key Terms of the Public-Private Partnership Model for Distribution 123 Impending Segregation of Wheeling and Supply License(s) 124 Review of Progress on Generation PPP 125 Review of Progress on Transmission PPP 127 Notes 128 Reference 128 Appendix A Organization of the Power Sector in India 129 Appendix B Dabhol–Enron: The First Lesson Learned under the New Independent Power Producer Policy 131 Appendix C Summary Case Studies of Distribution Privatization 133 Highlights of the Orissa Reform Experience 133 Private Participation in the Indian Power Sector • http://dx.doi.org/10.1596/978-1-4648-0339-0 viii Contents Highlights of the Delhi Distribution Privatization Experience 134 Appendix D Post-2012 Generation and Uncertainties Related to Domestic and Imported Fuel Supply 137 Domestic Coal-Related Uncertainties 137 Imported Coal Uncertainties 139 Improvement in CERC Indexation 140 Note 141 Appendix E Emerging Challenges for Private Investment in Transmission 143 Issues and Challenges for Private Transmission Line Developers 143 Experience in Private Projects Being Implemented versus the Transmission Framework 143 The Way Forward 145 Appendix F Comparison of Privatization to the Distribution Franchisee Approach 147 Privatization versus Distribution Franchisee 147 Appendix G Recommendations for the Way Forward on Distribution Franchisee Selection 151 Appendix H Standardization of the Distribution Franchise Process 157 Post-award Contract Management 160 Note 160 Boxes 1.1 The Green Revolution: Genesis of Free Power to the Agricultural Sector 20 2.1 What If the Coal Availability Projections Are Too Optimistic and There Is Still a Coal Shortage in 2018? 48 4.1 Shunglu Committee versus B. K. Chaturvedi Report 74 H.1 Bhiwandi Distribution Franchisee: A Success Story 157 Figures O.1 Bank Exposure to Power Sector 5 O.2 Growth Rate of Bank Credit to Select Sectors 5 O.3 Summary of Electricity Value Chain under Pressure 14 2.1 Growth of Private Sector in Power Generation Segment 33 2.2 Evolution of Ownership of Power Generation Assets, 2007–12 34 Private Participation in the Indian Power Sector • http://dx.doi.org/10.1596/978-1-4648-0339-0
Recommended publications
  • Cover 1 the Enron Story
    Cover 1 The Enron Story: Controversial Issues and People s Struggle Contents Preface I. The Project and the First Power Purchase Agreement II. Techno-economic and Environmental Objections III. Local People“s Concerns and Objections IV. Grassroots Resistance, Cancellation of the Project and It“s Revival V. The Renegotiated Enron Deal and Resurgence of Grassroots Resistance VI. Battle in the Court VII. Alternatives to Enron Project Conclusions Appendices I Debate on Techno-economic objections II The Merits of the Renegotiated Project III Excerpts from the Reports of Amnesty International IV Chronology of Events Glossary The Enron Story, Prayas, Sept. 1997 Cover 3 Cover 4 The Enron Story, Prayas, Sept. 1997 (PRAYAS Monograph Series) The Enron Story: Controversial Issues and People s Struggle Dr. Subodh Wagle PRAYAS Amrita Clinic, Athavale Corner Karve Road Corner, Deccan Gymkhana Pune, 411-004, India. Phone: (91) (212) 341230 Fax: (91) (212) 331250 (Attn: # 341230) PRAYAS Printed At: The Enron Story, Prayas, Sept. 1997 For Private Circulation Only Requested Contribution: Rs. 15/- The Enron Story, Prayas, Sept. 1997 Preface cite every source on every occasion in such a brief monograph. But I am indebted for the direct and indirect help from many The Enron controversy has at least four major categories individuals (and their works) including, Sulbha Brahme, Winin of issues: techno-economic, environmental, social, and legal or Pereira and his INDRANET group, Samaj Vidnyan Academy, procedural. In the past, the Prayas Energy Group has concentrated Abhay Mehta, and many activists especially, Yeshwant Bait, its efforts mainly on the techno-economic issues. Many Ashok Kadam, and Arun and Vijay Joglekar.
    [Show full text]
  • Request for Arbitration
    REQUEST FOR ARBITRATION UNDER THE INVESTMENT INCENTIVE AGREEMENT BETWEEN THE GOVERNMENT OF THE UNITED STATES OF AMERICA AND THE GOVERNMENT OF INDIA 19 NOVEMBER 1997 - BETWEEN - THE GOVERNMENT OF THE UNITED STATES OF AMERICA (Claimant) THE GOVER1NMENT OF INDIA 0~espondent) November 4, 2004 UNDER THE INVESTMENT INCENTIVE AGREEMENT BETWEEN THE GOVERNMENT OF THE UNITED STATES OF AMERICA AND TIRE GOVERNMENT OF INDIA ) Govermnent of tile ) UNITED STATES OF AMERICA ) c/o Office of the Legal Adviser ) U.S. Department of State ) Washington, D.C. 20520 ) United States of America ) ) Claimant, ) ) and ) ) GOVERNMENT OF INDIA ) Honorable Mamnohan Singh ) Prime Minister ) c/o Ministry of External Affairs ) South Block ) New Delhi 110001 ) Republic of India ) ) Respondent. ) ) REQUEST FOR ARBITRATION 1. Pursuant to Article 6 of the Investment Incentive Agreement ("Bilateral Agreement" or "Agreement")t between the Govenwaent of tbe United States of America and the Government ~ Signed on November 19, 1997 and entered into force on April 16, 1998. A copy of the Bilateral Agreement is atlached hereto as Exhibit 1. Article 7(a) of the Bilateral Agreement provides that the Bilateral Agreement shall "replace and supersede the agreement between the United States of America and India on the Guaranty of Private Investments effected by exchange of notes signed at Washington on September 19, 1957 as supplemented by exchanges of notes signed at Washington on December 7, 1959 and at New Delhi on February 2, 1966 (the ’Prior Agreement’)." Article 7(a) further provides that any matter related to Investment Support provided under the Prior Agreement shall be resolved under the Bilateral Agreement, unless raised prior to entry into force of the Bilateral Agreement.
    [Show full text]
  • Exploring Corruption in Public Financial Management 267 William Dorotinsky and Shilpa Pradhan
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 39985 The Many Faces of Corruption The Many Faces of Corruption Tracking Vulnerabilities at the Sector Level EDITED BY J. Edgardo Campos Sanjay Pradhan Washington, D.C. © 2007 The International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved 2 3 4 5 10 09 08 07 This volume is a product of the staff of the International Bank for Reconstruction and Development / The World Bank. The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgement on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development / The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www.copyright.com.
    [Show full text]
  • Electricity in India
    prepa india 21/02/02 12:14 Page 1 INTERNATIONAL ENERGY AGENCY ELECTRICITY IN INDIA Providing Power for the Millions INTERNATIONAL ENERGY AGENCY ELECTRICITY IN INDIA Providing Power for the Millions INTERNATIONAL ORGANISATION FOR ENERGY AGENCY ECONOMIC CO-OPERATION 9, rue de la Fédération, AND DEVELOPMENT 75739 Paris, cedex 15, France The International Energy Agency (IEA) is an Pursuant to Article 1 of the Convention signed in autonomous body which was established in Paris on 14th December 1960, and which came November 1974 within the framework of the into force on 30th September 1961, the Organisation for Economic Co-operation and Organisation for Economic Co-operation and Development (OECD) to implement an Development (OECD) shall promote policies international energy programme. designed: It carries out a comprehensive programme of • To achieve the highest sustainable economic energy co-operation among twenty-six* of the growth and employment and a rising standard OECD’s thirty Member countries. The of living in Member countries, while maintaining basic aims of the IEA are: financial stability, and thus to contribute to the development of the world economy; • To maintain and improve systems for coping • To contribute to sound economic expansion in with oil supply disruptions; Member as well as non-member countries in • To promote rational energy policies in a global the process of economic development; and context through co-operative relations with • To contribute to the expansion of world trade non-member countries, industry and on
    [Show full text]
  • PPAC's Snapshot of India's Oil & Gas Data
    PPAC's Snapshot of India’s Oil & Gas data Abridged Ready Reckoner May, 2021 Petroleum Planning & Analysis Cell (Ministry of Petroleum & Natural Gas) As on 18.06.2021 Petroleum Planning & Analysis Cell (PPAC), an attached office of the Ministry of Petroleum & Natural Gas (MoPNG), Government of India, collects and analyses data on the Oil and Gas sector. It disseminates many reports on the Oil & Gas sector to the various stakeholders. The data is obtained from the Public Sector companies, Government agencies as well as the Private companies. Given the ever-increasing demand for energy and transition of energy demand to renewables and Biofuels, Policy makers and Analysts need to be well informed about the updated trends in the Oil & Gas industry. The PPAC’s Snapshot of India’s Oil & Gas data (Abridged Ready Reckoner) provides a comprehensive compilation of the latest data/information in a single volume for the latest month and historical time series. The Snapshot of India’s Oil & Gas data is also published on PPAC’s website (www.ppac.gov.in) and is accessible on mobile app-PPACE. This publication is a concerted effort by all divisions of PPAC. The cooperation of the oil and gas industry is acknowledged for their timely inputs. Table of contents Table Description Page No. Highlights for the month 2-3 ECONOMIC INDICATORS 1 Selected indicators of the Indian economy 5 2 Crude oil, LNG and petroleum products at a glance; Graph 6-7 CRUDE OIL, REFINING & PRODUCTION 3 Indigenous crude oil production 9 4 Domestic oil & gas production vis-à-vis overseas
    [Show full text]
  • Dabhol Power Company
    DABHOL POWER COMPANY The Challenges of Developing and Financing An LNG-Fired Power Project in India William D. Gathmann Executive Vice President Enron India GASTECH 2000 Conference Houston, Texas November 2000 PROJECT HIGHLIGHTS —Largest project in India —Largest foreign investment in India —Largest non-recourse project financing in India —Largest LNG-fired power plant in the world —First LNG regassification facility in India —First long term sale of LNG to non-investment grade, emerging market country —First project financing of an LNG ship 2 DABHOL TIMELINE May 1992 Enron invited to India December 1993 Dabhol PPA signed March 1995 Financial closure of Dabhol Phase I Construction starts August 1995 Project cancelled Construction stopped Arbitration in London starts September 1995 Re-negotiations commence November 1995 Re-negotiations complete Nov-Aug 1995 New approvals obtained December 1996 Phase I financial closure (again) Construction restarts Arbitration dropped 3 DABHOL TIMELINE January 1997 Phase II Development commences December 1998 Start construction of regas terminal May 1999 Financial close of Phase II Construction begins on all Phase II Commercial operation of Phase Third Quarter 2001 Power Block B on line Fourth Quarter 2001 Power Block C on line Phase II operational on liquid fuels First Quarter 2002 LNG vessel arrives Regas facility and tanks complete Entire project switches to natural gas 4 PROJECT OVERVIEW G Project Owner Dabhol Power Company G Project Location Dabhol, Maharashtra, India G Project Sponsors Enron, Bechtel
    [Show full text]
  • Energy News Monitor
    28 December 2018, Volume XV, Issue 29 Energy News Monitor UJJWALA YOJANA INCREASES SUBSIDY BILL Monthly Oil News Commentary: November - December 2018 India figures. Due to increased migration, some of the states like Delhi and Punjab end up having population that’s ccording to the government, nine out of 10 Indian higher than the estimates, resulting in an LPG coverage homes now use cleaner cooking gas according to A ratio of more than 100%. Overall, Goa has the highest the government. State oil companies, pushed by the oil coverage ratio of 139%. Telangana, Puducherry, Kerala ministry, have added record 100 million consumers since and Mizoram are other states with higher than 100% April 2015, expanding the active consumer base by two- coverage. Southern states together have a coverage of thirds. This has increased access to cooking gas, or LPG 99.7% while western states have 81.9%. With 74.6% to 89% of the country’s households by October end, a coverage, the eastern states are at the bottom of the pile sharp jump from 56.2% on 1 April 2015. A subsidy for although they have come a long way from their fresh LPG connection to poor families helped fuel traditionally poor access to clean energy. The worst demand. Rural areas still have untapped potential with among major states are Jharkhand (65.4%), Bihar (67%) more than half of all consumers, or about 136 million and Odisha (66.9%). In Gujarat too, the LPG coverage residing in urban areas. India has a total of 249 million ratio is 66.6% but that’s more because the state is already active customers, of which 229 million receive subsidy.
    [Show full text]
  • Answered On:31.07.2003 Dabhol Power Project Bhawana Gawali (Patil);Prakash V
    GOVERNMENT OF INDIA POWER LOK SABHA UNSTARRED QUESTION NO:1629 ANSWERED ON:31.07.2003 DABHOL POWER PROJECT BHAWANA GAWALI (PATIL);PRAKASH V. PATIL Will the Minister of POWER be pleased to state: (a) whether the Government have allowed NTPC to operate controversial Dabhol Power Plant; (b) whether dispute of tariff structure between Maharashtra State Electricity Board and State Government has been finalized; (c) whether all the legal complications with Enron of USA have been taken care before starting the Dabhol Phase-I; and (d) if so, the details thereof? Answer THE MINISTER OF STATE IN THE MINISTRY OF POWER ( SHRIMATI JAYAWANTI MEHTA ) (a) : The Dabhol Power Plant (Ph.I) has been shut down since 29.05.2001 aftert he Maharashtra State Electricity Board (MSEB) stopped taking power following contractual disputes with M/s. Dabhol Power Company (DPC) and subsequentr escissions of the Power Purchase Agreement (PPA) by MSEB.T he PPA was entered into between MSEB and DPC.T hus, the responsibility to restart Phase-I and complete Phase-II of the Dabhol project lies with the main stakeholders viz. MSEB and DPC asw ell as the Government of Maharashtra (GOM), who had guaranteed the obligations of MSEB under the PPA.T he Indian Financial Institutions (IFIs) led by the Industrial Development Bank of India (IDBI), having substantial stakes in the Dabhol Power Project, have been trying to restructure and revive the Dabhol Plant. Government of India has agreed to facilitate any amicable solution to the various issues in order to revive/restructure the project. Any scheme finalized for revival of the Dabhol Project would come as a comprehensive package and would have to resolve complex, legal, financial and technical issues.
    [Show full text]
  • Central Electricity Regulatory Commission, New Delhi
    CENTRAL ELECTRICITY REGULATORY COMMISSION, NEW DELHI Petition No. 126/MP/2017 Coram: Shri P.K. Pujari, Chairperson Shri A.K. Singhal, Member Shri A.S. Bakshi, Member Dr. M. K. Iyer, Member Date of Order: 4th May, 2018 In the matter of: Petition under Section 79(1) (c) and (d) of the Electricity Act, 2003 read with Regulations 20 and 21 of the Central Electricity Regulatory Commission (Sharing of inter State transmission charges and losses) Regulations, 2010 for declaration and direction with regard to the status of the 400kV D/C Transmission Line from Indira Gandhi Super Thermal Power Station (Aravali Power Station) to Daulatabad owned, operated and maintained by Haryana Vidyut Prasaran Nigam Limited (HVPNL). And In the matter of 1. Uttar Haryana Bijli Vitran Nigam Limited C-6, Vidyut Sadan, Sector-6, Panchkula, Haryana 2. Dakshin Haryana Bijli Vitran Nigam Limited Vidyut Sadan, Vidyut Nagar, Hissar Both represented by Haryana Power Purchase Centre A joint forum set up by Uttar Haryana Bijli Vitran Nigam and Dakshin Haryana Bijli Vitran Nigam Room No. UH 305, 2nd floor, Shakti Bhawan Sector 6 Panchkula 3. Haryana Vidyut Prasaran Nigam Limited Shakti Bhawan Sector-6 Panchkula - Petitioners Versus 1. Power System Operation Corporation Limited, B-9, First Floor, Qutab Industrial Area, Order in Petition No. 126/MP/2017 Page 1 of 34 Katwaria Sarai, New Delhi – 110 016 2. Central Transmission Utility, Powergrid Corporation of India Limited, „Saudamini‟, Plot No. 2, Sector-29, Gurgaon-122001, Haryana 3. Aravali Power Company Pvt Limited NTPC Bhawan, Scope Complex, 7, Institutional area, Lodhi Road, New Delhi 110003 - Respondents Parties present: Shri M.G.
    [Show full text]
  • (India) Pvt. Ltd. Petro Mag Petroleum Bazaar Page 1
    Petroleum Bazaar.com (India) Pvt. Ltd. Issue No. :111 01, Monday, 17th March 2020 P e t r o M a g Petroleum Bazaar P a g e 1 | 50 Petroleum Bazaar.com (India) Pvt. Ltd. NEWS National News Exploration News International News Crude Oil News PRICES International Prices National Prices Retail Selling Prices STOCK PRICES Crude oil Stock Daily Share Price MCX Bhav copy DATA Import & Export – Port wise Data Industry Sales Pipeline Transfers Natural Gas Import, Sale And Production OMC-HSD Consumption OMC HSD DIRECT Consumption OMC MS DIRECT Consumption OMC-MS Consumption Import / Export Tankers Position - Petroleum Tankers Position - LPG PRODUCTION DATA Crude Oil production Natural Gas Production Refinery Production UPDATES Projects Update P e t r o M a g Petroleum Bazaar P a g e 2 | 50 Petroleum Bazaar.com (India) Pvt. Ltd. Minister Of Petroleum And Natural Gas NATIONAL NEWS Shri Dharmendra Pradhan ➢ French energy giant Total acquires 37.4% in Adani Gas for Rs 5,152 crore Secretary Dr. M M Kutty ➢ Indian refiners plan to wind down Venezuelan oil buys in April: Sources EXPLORATION NEWSNATIONAL NEWS ➢ Haldia Petrochemicals, ExxonMobil keen to set up shop in AP Additional Secretary Shri Rajiv Bansal ➢ India’s gas demand projected to rise by 66% in 5 yrs ➢ Price hike on BS-VI won't hurt consumers, will meet April deadline: IOC Joint Secretary(Refineries) Shri Sunil Kumar ➢ Hindustan Petroleum Sets up 1st EV Charging Station in Vadodara ➢ LPG penetration is 100 % in Karnataka, says IOC official Dir (Admn./Fp) Shri Mrityunjay Jha ➢ Petronet launches India’s first commercial LNG bus ➢ How falling crude prices are helping India manage inflationary, fiscal pressure Additional Secretary & Financial Adviser, ➢ 36 bottlenecks faced by 17 infra projects reviewed by Goyal-led panel Shri.
    [Show full text]
  • Gas Pricing Reform in India: Implications for the Indian Gas Landscape
    April 2015 Gas Pricing Reform in India: Implications for the Indian gas landscape OIES PAPER: NG 96 Anupama Sen The contents of this paper are the authors’ sole responsibility. They do not necessarily represent the views of the Oxford Institute for Energy Studies or any of its members. Copyright © 2015 Oxford Institute for Energy Studies (Registered Charity, No. 286084) This publication may be reproduced in part for educational or non-profit purposes without special permission from the copyright holder, provided acknowledgment of the source is made. No use of this publication may be made for resale or for any other commercial purpose whatsoever without prior permission in writing from the Oxford Institute for Energy Studies. ISBN 978-1-78467-026-9 i April 2015: Gas Pricing Reform in India Contents Acknowledgements ............................................................................................................................. iv 1. Introduction ....................................................................................................................................... 5 2. The Structure of Gas Prices in India ............................................................................................... 7 2.1 Pricing under the Nomination and Discovered Fields (Pre NELP) Regimes ................................ 8 2.2 Pricing under the NELP Regime ................................................................................................... 9 2.3 Pricing of LNG Imports ...............................................................................................................
    [Show full text]
  • Citizen's Charter Is to Improve the Quality of Public Services
    Citizen’s Charter GAIL (India) Limited 16 Bhikaiji Cama Place, New Delhi GAIL (India) Limited – Citizen’s Charter The main objective of the Citizen's Charter is to improve the quality of public services. This is done by letting people know the mandate of the Corporation, how one can get in touch with its officials, what to expect by way of services and how to seek a remedy if something goes wrong. The Citizen’s Charter does not by itself create new legal rights, but it surely helps in enforcing existing ones. GAIL (India) Limited – Citizen’s Charter GAIL (India) Limited – Citizen’s Charter Mission To accelerate and optimize the effective and economic use of Natural Gas and its fractions for the benefit of the national economy Vision To be the leading company in Natural Gas and Beyond, with Global Focus, Committed to Customer Care, Value Creation for all Stakeholders and Environmental Responsibility. Key Elements of GAIL's Vision Ethics: We are transparent, fair and consistent in dealing with all people. We insist on honesty, integrity and trustworthiness in all our activities. Customer: We strive relentlessly to exceed the expectations of our customers, both internal and external. Our customers prefer us. People: We believe our success is driven by the commitment and excellence of our people. We attract and retain result-oriented people who are proud their work and are satisfied with nothing less than the very best in everything they do. We encourage individual initiative by creating opportunities for our people to learn and grow. We respect the individual rights and dignity of all people.
    [Show full text]