Remote Desktop Redirected Printer

Total Page:16

File Type:pdf, Size:1020Kb

Remote Desktop Redirected Printer %650% %650% Page 1 of 7 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 74 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2012 Sgy - Pedestrian 650(1) Each 4 1,000.00 2,334.76 4,100.00 404,660 06 Improvements Aluminum Interpretive 6,000.00 1,904.29 1,000.00 4,100.00 (30593/69304/0) Sign Frame and 5.59% 1.88% 0.95% 3.72% 3 Bids Tendered Footing 2015 Olympic Mountain Loop 650(1) Square 6,100 5.50 8.05 11.00 2,364,890 01 Improvements - Girdwood Grass Pavers Foot 6.00 10.25 6.00 5.95 (44236/59766/0) 1.93% 2.64% 1.36% 1.30% 8 Bids Tendered 2010 King Cove Access Road 650(1) LUMP 1 1,500,000.00 2,361,061.85 2,874,068.00 14,459,880 12 Completion RELOCATE SUM 2,200,000.00 2,874,068.00 1,800,000.00 2,503,674.24 (32716/59791/7843) HOVERCRAFT 14.94% 19.88% 11.69% 15.29% 12 Bids Tendered TERMINAL 2009 Psg Falls Creek Fish 650(1) Each 2.0 12,000.00 12,604.00 13,000.00 141,900 02 Ladder Repairs (18352) Sluice Gate (Alt) 22,000.00 13,000.00 12,812.00 12,000.00 3 Bids Tendered 31.34% 18.32% 18.00% 13.75% 2009 Psg Falls Creek Fish 650(1) Lump 1 24,000.00 25,208.00 26,000.00 141,900 02 Ladder Repairs Sluice Gate Sum 44,000.00 26,000.00 25,624.00 24,000.00 (18352/68399/0) 31.34% 18.32% 18.00% 13.75% 3 Bids Tendered 2014 Annette Bay Ferry 650(1) Lump 1 22,774.05 22,774.05 22,774.05 781,909 11 Terminal Improvements TERO Fee Sum 21,899.40 22,774.05 0.00 0.00 (43416/68135/0) 2.91% 2.91% 0.00% 0.00% 1 Bids Tendered 2010 Annette Bay Ferry 650(1) Lump 1 244,614.96 254,148.93 266,237.10 8,577,504 11 Terminal (28833/69200/0) TERO Fee - 3 % of Sum 197,286.30 249,830.22 255,913.44 266,237.10 4 Bids Tendered Basic Bid 2.91% 2.91% 2.91% 2.91% 2016 Fairbanks Noble Street 650(101) Lump 1 6,000.00 6,295.06 6,500.00 9,545,573 12 Upgrade (45722/61725/0) Interpretive Kiosk and Sum 3,500.00 6,200.00 6,500.00 6,000.00 4 Bids Tendered Signs 0.03% 0.06% 0.07% 0.06% 2016 Fairbanks Noble Street 650(101) Each 1.0 6,000.00 6,295.06 6,500.00 9,545,573 12 Upgrade (45722) Interpretive Kiosk and (Alt) 3,500.00 6,200.00 6,500.00 6,000.00 4 Bids Tendered Signs 0.03% 0.06% 0.07% 0.06% 2017 Steese Expressway to 650(105) Each 3 12,000.00 14,170.00 15,680.00 858,231 03 Front Street Wayfinding Signs 14,000.00 12,000.00 15,000.00 14,000.00 Bicycle/Pedestrian Path 4.62% 4.19% 4.84% 4.22% (45878/62836/0) 4 Bids Tendered 2016 Fairbanks Noble Street 650(105)-A Each 2 16,000.00 17,599.58 19,248.33 9,545,573 12 Upgrade (45722/61725/0) Wayfinding Sign, Dx-2 16,500.00 16,750.00 18,400.00 16,000.00 4 Bids Tendered 0.31% 0.35% 0.38% 0.30% 2016 Fairbanks Noble Street 650(105)-B Each 3 12,000.00 14,188.69 15,454.74 9,545,573 12 Upgrade (45722/61725/0) Wayfinding Sign, Dx-3 15,000.00 14,500.00 14,800.00 12,000.00 4 Bids Tendered 0.42% 0.46% 0.46% 0.34% 2016 Fairbanks Noble Street 650(105)-C Each 5 12,000.00 13,261.88 14,547.50 9,545,573 12 Upgrade (45722/61725/0) Wayfinding Sign, Gx-1 10,000.00 13,500.00 13,000.00 12,000.00 4 Bids Tendered 0.47% 0.71% 0.67% 0.56% 2015 H S I P: Parks Hwy Rest 650(1A) Each 2 1,450.00 1,990.00 3,000.00 1,113,107 04 Areas (44045/61074/7507) Accessible Picnic Table 2,000.00 2,500.00 1,500.00 1,450.00 5 Bids Tendered 0.25% 0.45% 0.22% 0.21% %650% %650% Page 2 of 7 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 74 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2015 H S I P: Parks Hwy Rest 650(1B) Each 2 1,450.00 1,680.00 2,500.00 1,113,107 04 Areas (44045/61074/0) Picnic Table 2,000.00 2,500.00 1,500.00 1,450.00 5 Bids Tendered 0.25% 0.45% 0.22% 0.21% 2009 Alaska Highway: Tanana 650(2) Lump 1 20,000.00 43,375.00 100,000.00 30,650,414 02 River Bridge #505: Bids Interpretive Kiosk and Sum 40,000.00 100,000.00 35,000.00 40,000.00 Opened 02/26/2009 Signs 0.13% 0.33% 0.11% 0.12% (18134/61637/61253/0) 8 Bids Tendered 2012 Sgy - Pedestrian 650(2) Lump 1 5,000.00 7,666.19 11,700.00 404,660 06 Improvements Wood Interpretive Sign Sum 18,000.00 6,298.57 5,000.00 11,700.00 (30593/69304/0) Frames and Footings 4.19% 1.56% 1.19% 2.65% 3 Bids Tendered 2015 H S I P: Parks Hwy Rest 650(21) Each 22 500.00 725.00 1,400.00 1,113,107 04 Areas (44045/61074/0) Barrier Rock 450.00 500.00 1,400.00 550.00 5 Bids Tendered 0.62% 0.99% 2.29% 0.87% 2012 Sgy - Pedestrian 650(3)-12 Each 1 8,000.00 10,428.64 15,000.00 404,660 06 Improvements Circular Concrete 7,000.00 8,285.93 8,000.00 15,000.00 (30593/69304/0) Bench, 12'-0" Diameter 1.63% 2.05% 1.91% 3.40% 3 Bids Tendered 2012 Sgy - Pedestrian 650(3)-14 Each 1 8,285.93 12,795.31 21,600.00 404,660 06 Improvements Circular Concrete 6,000.00 8,285.93 8,500.00 21,600.00 (30593/69304/0) Bench, 14'-4" Diameter 1.40% 2.05% 2.03% 4.90% 3 Bids Tendered 2011 Hyder-Causeway 650(30A) Each 1 6,000.00 11,000.00 15,000.00 7,842,000 10 Reconstruction & Interpretive Kiosk, 6,000.00 6,000.00 12,000.00 15,000.00 Extention (Concrete Type A 0.07% 0.08% 0.14% 0.17% Trestle) (33912/69070/1673) 3 Bids Tendered 2015 H S I P: Parks Hwy Rest 650(7) Each 4 1,800.00 2,480.00 3,000.00 1,113,107 04 Areas (44045/61074/0) Trash Can 2,000.00 2,500.00 2,500.00 1,800.00 5 Bids Tendered 0.50% 0.90% 0.74% 0.52% 2018 Seward Highway, MP 650(9) Each 2 1,500.00 9,392.94 16,071.76 51,418,510 02 75-90 Road and Bridge Double Entrance Gate 15,000.00 15,000.00 5,000.00 1,500.00 Rehabilitation, Phase I 0.04% 0.06% 0.02% 0.00% (48081//7842) 4 Bids Tendered 2014 Koliganek Airport P-650a Each 12 600.00 787.25 1,050.00 7,994,086 09 Reconstruction Aircraft Tie-down 900.00 600.00 600.00 786.24 (43353/59276/4889) 0.16% 0.09% 0.08% 0.10% 5 Bids Tendered 2015 Hooper Bay Airport P-650a Each 40 530.00 607.50 700.00 25,767,875 08 Improvements Aircraft Tie-down 900.00 600.00 530.00 600.00 (44980/57419/4889) 0.14% 0.09% 0.08% 0.08% 4 Bids Tendered 2009 Tuluksak Airport P-650a Set 3 1,100.00 1,641.67 3,000.00 17,533,365 07 (24079/51795/0) Soil Anchor Tie Down, 1,000.00 1,100.00 1,900.00 1,500.00 6 Bids Tendered Buried Plate 0.02% 0.02% 0.03% 0.02% %650% %650% Page 3 of 7 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 74 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2015 Pilot Station Airport P-650a Set 4 1,000.00 3,425.00 8,300.00 19,784,261 08 Relocation Soil Anchor Tie Downs 500.00 8,300.00 3,000.00 5,000.00 (44341/62581/54) 0.01% 0.17% 0.06% 0.09% 6 Bids Tendered 2017 Lake Hood Seaplane Base P-650a Set 11 1,000.00 1,665.14 2,100.00 2,947,832 03 Lake Hood Lakeshore Soil Anchor Tie-down 1,500.00 1,500.00 2,000.00 1,842.40 Taxilane Reconstruction 0.45% 0.56% 0.73% 0.67% (46714//4889) 10 Bids Tendered 2018 Kiana Airport P-650a Set 7 700.00 1,880.00 4,600.00 15,596,020 02 Improvements Soil Anchor Tie-down 1,500.00 1,550.00 900.00 700.00 (46994/63179/2668) 0.07% 0.07% 0.03% 0.03% 7 Bids Tendered 2009 Allakaket Airport P-650a Set 3 2,000.00 2,700.00 3,600.00 8,080,460 06 Improvements Soil Anchor Tie-down 1,022.79 2,500.00 3,600.00 2,000.00 (23512/62595/54) 0.04% 0.09% 0.13% 0.04% 3 Bids Tendered 2010 Nulato Airport P-650a Set 3 500.00 2,865.91 7,000.00 5,989,180 06 Improvements Soil Anchor Tie-down 1,500.00 1,200.00 6,700.00 5,000.00 (17512/62603/54) 0.05% 0.06% 0.33% 0.23% 11 Bids Tendered 2012 HNH-Airport Runway P-650a Set 20 425.00 462.50 500.00 3,937,958 08 Extension (27654/68303/0) Soil Anchor Tie-down 300.00 500.00 425.00 0.00 2 Bids Tendered 0.19% 0.25% 0.20% 0.00% 2016 Golovin Airport P-650a Set 3 550.00 1,625.00 3,200.00 8,839,335 09 Improvements (43457//54) Soil Anchor Tie-down 1,000.00 1,000.00 1,500.00 2,000.00 6 Bids Tendered 0.03% 0.03% 0.04% 0.05% 2015 Lake Hood A-B Parking P-650a Set 150 1,150.00 1,542.50 2,000.00 5,589,266 03 Rehabilitation Soil Anchor Tie-down 1,300.00 2,000.00 1,150.00 1,420.00 (44353/54465/4889) 3.52% 5.37% 2.88% 3.53% 4 Bids Tendered 2009 Fort Yukon Airport P-650a Set 3 420.00 1,320.00 2,500.00 11,250,000 05 Resurfacing Soil Anchor Tie-Down 1,200.00 2,500.00 1,700.00 1,000.00 (20553/62650/0) 0.03% 0.07% 0.04% 0.02% 6 Bids Tendered 2013 KTN Airport Taxiway and P-650a Set 26 300.00 803.33 1,300.00 5,547,913 12 Apron Rehabilitation & Soil Anchor Tie-Down 300.00 1,300.00 300.00 810.00 FY14 Various Airports 0.13% 0.61% 0.14% 0.34% Surface Preservation Maintenance (41752/67946 & 68016/0) 3 Bids Tendered 2011 Alakanuk Airport P-650a Set 4 400.00 1,194.29 2,000.00 6,767,130 03 Relocation, Stage I V Soil Anchor Tie-Down 500.00 400.00 1,000.00 960.00 (32334/62325 & 0.02% 0.02% 0.06% 0.05% 61823/4889) 7 Bids Tendered %650% %650% Page 4 of 7 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref.
Recommended publications
  • Remote Desktop Redirected Printer
    %F-% %F-% Page 1 of 26 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 286 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2017 Sitka Perimeter Fencing & F-162a Linear 20 245.00 612.50 980.00 692,400 08 Gate Upgrades (47258//0) (8 Foot) Chain-Link Foot 250.00 980.00 245.00 0.00 2 Bids Tendered Fence 0.87% 2.83% 0.62% 0.00% 2010 King Cove Airport Fencing F-162a Linear 7,700 0.00 27.50 55.00 1,395,100 06 Improvements (8 Foot) Chain-Link Foot 59.00 55.00 0.00 0.00 (28973/51335/64) Fence 30.37% 30.36% 0.00% 0.00% 2 Bids Tendered 2014 Cold Bay Airport Fencing F-162a Linear 1,126 0.00 100.04 244.00 192,264 01 and Gates [8'] High Chain-Link Foot 59.00 55.23 61.80 73.00 (42046/14-25-1-013/56779/4572) Fence 28.31% 32.35% 31.65% 26.44% 7 Bids Tendered 2010 Lake Hood Seaplane Base F-162a Linear 648 0.00 21.79 30.05 384,465 09 Lake Hood Strip 4 Foot Chain-Link Foot 25.00 30.05 30.00 27.12 Improvements Fence 4.39% 5.06% 4.82% 4.20% (31273/52597/4572) 4 Bids Tendered 2011 Kodiak Airport F-162a Linear 576 40.00 45.00 50.00 22,758,321 06 Improvements, 2011 6' Chain-Link Fence Foot 50.00 50.00 40.00 45.00 (33348/52739/4572) 0.09% 0.13% 0.10% 0.09% 3 Bids Tendered 2013 Girdwood Airport 2012 F-162a Linear 13 54.55 171.93 320.00 415,812 02 Flood Permanent Repairs 6-Foot Chain-Link Foot 20.00 115.00 87.00 315.00 DMVA/DHS Fence 0.07% 0.36% 0.00% 0.00% (39936/55713/4572) 6 Bids Tendered 2009 Northern Region F-162a
    [Show full text]
  • Helicopter-Supported Commercial Recreation Activities in Alaska
    HELICOPTER-SUPPORTED COMMERCIAL RECREATION ACTIVITIES IN ALASKA Prepared for Alaska Quiet Rights Coalition Prepared by Nancy Welch Rodman, Welch & Associates and Robert Loeffler, Opus Consulting Funded by a grant from Alaska Conservation Foundation October 2006 Helicopter-Supported Commercial Recreation Activities in Alaska Helicopter-Supported Commercial Recreation Activities in Alaska TABLE OF CONTENTS Executive Summary.................................................................................................................. ES-1 1. Introduction ........................................................................................................................1-1 1.1. Purpose of this report...............................................................................................1-1 1.2. What is not covered by this report ...........................................................................1-1 2. Laws, Regulations and Policies..........................................................................................2-1 2.1. Legal Authority to Regulate.....................................................................................2-1 2.2. Strategies to Regulate Impacts.................................................................................2-5 2.3. Limitations on Authorities, Permit Terms, and Strategies.......................................2-7 2.4. Summary..................................................................................................................2-8 3. Types and Consumers of Helicopter-Supported
    [Show full text]
  • Aviation Advisory Board Meeting Minutes August 5-6, 2010 in Unalakleet, Alaska
    Aviation Advisory Board Meeting Minutes August 5-6, 2010 in Unalakleet, Alaska Chairman Lee Ryan called meeting to order at 9:05am. PRESENT: Lee Ryan, Jim Dodson, Tom George, Tom Nicolos, Mike Salazar, Mike Stedman, Judy McKenzie, Frank Neitz, Steve Strait EXCUSED ABSENCE: Al Orot, Ken Lythgoe OTHERS IN ATTENDANCE: Marc Luiken (DOT&PF), Rebecca Cronkhite (DOT&PF), Jeff Roach (DOT&PF), Linda Bustamante (DOT&PF), Commissioner Leo von Scheben (DOT&PF), Harry Johnson, Jr. - Unalakleet Airport Manager, Laura Lawrence – Staff to Senator Donny Olson, Representative Neal Foster, Chuck Degnan, Jim Tweto. MINUTES: Approved by the board prior to meeting – via email. Agenda Addition – Add time for public comments to agenda which could happen throughout the day as the public stops in for the meeting. Announcement from Deputy Commissioner: Deputy Commissioner Luiken thanked Chairman Lee Ryan for hosting the meeting in Unalakleet and welcomed new board members, Tom Nicolos and Mike Stedman. AGENDA: Alaska International Airports System (AIAS) and Statewide Aviation Update: Deputy Commissioner Luiken provided an overview of the AIAS. Marketing efforts of the Anchorage Airport include: 1. Plans to hire two key positions - marketing and air service development. 2. Interview with Supply Chain Management for an online story 3. Air Cargo Summit – International carriers invited to meet with representative from U.S. DOT to better understand the unique cargo transfer rights available in Alaska and to review fuel supply issues. The State is conducting a study to review fuel storage and all aspects of fuel availability at the international airports. Public Comment: Junior Johnson, Unalakleet Airport Manager expressed concern over Emmonak Airport not having a village contractor.
    [Show full text]
  • (Asos) Implementation Plan
    AUTOMATED SURFACE OBSERVING SYSTEM (ASOS) IMPLEMENTATION PLAN VAISALA CEILOMETER - CL31 November 14, 2008 U.S. Department of Commerce National Oceanic and Atmospheric Administration National Weather Service / Office of Operational Systems/Observing Systems Branch National Weather Service / Office of Science and Technology/Development Branch Table of Contents Section Page Executive Summary............................................................................ iii 1.0 Introduction ............................................................................... 1 1.1 Background.......................................................................... 1 1.2 Purpose................................................................................. 2 1.3 Scope.................................................................................... 2 1.4 Applicable Documents......................................................... 2 1.5 Points of Contact.................................................................. 4 2.0 Pre-Operational Implementation Activities ............................ 6 3.0 Operational Implementation Planning Activities ................... 6 3.1 Planning/Decision Activities ............................................... 7 3.2 Logistic Support Activities .................................................. 11 3.3 Configuration Management (CM) Activities....................... 12 3.4 Operational Support Activities ............................................ 12 4.0 Operational Implementation (OI) Activities .........................
    [Show full text]
  • June 30 Final DOT Layout.Indd
    Alaska Department of Transportation and Public Facilities 2010 Department Overview June 30, 2011 THE MISSION of the Department of Transportation and Public Facilities is to provide for the safe and effi cient movement of people and goods and the delivery of state services. Table of Contents Letter from Commissioner Luiken . 3 Introduction . 4 Challenges in Alaska Transportation . .5-7 Long Range Transportation Policy Plan . 8 Statewide Transportation Improvement Plan (STIP) . 9-11 Budget . 12 Divisions and Responsibilities . 13 Statewide Aviation . 13 International Airports . 14 Marine Highway System . 15 Surface Transportation . 16 Transportation Operations . 17-18 Bridge Section . 19 Ports and Harbors . 20 Resource Roads. 21 Transportation Safety . 22 Statewide Systems . 23 Bicycle and Pedestrian Program . 24 Data Services . 25 Buildings and Facilities . 26 Measurement Standards . 27 The Road Ahead . 28 The 2010 Department Overview was produced by the Alaska Department of Transportation and Public Facilities in Juneau, Alaska, at a cost of $9.96 per copy. Cover and inside cover photos (Kodiak roads), back cover (M/V Columbia, Auke Bay), and this page (Dutch Harbor bridge), by Peter Metcalfe 2 Waterfront construction, Kotzebue, by Peter Metcalfe June 30, 2011 Dear Fellow Alaskan, As the Commissioner of the Department of Transportation and Public Facilities, it is my pleasure to present the 2010 Department Overview. All Alaskans use the state’s transportation system, whether they are driving to work, headed for the outdoors, meeting the ferry, or catching a fl ight at the local airport. We use these transportation systems daily, and often take them for granted, unaware of the effort that happens behind the scenes to keep the systems working.
    [Show full text]
  • Notice of Adjustments to Service Obligations
    Served: May 12, 2020 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. CONTINUATION OF CERTAIN AIR SERVICE PURSUANT TO PUBLIC LAW NO. 116-136 §§ 4005 AND 4114(b) Docket DOT-OST-2020-0037 NOTICE OF ADJUSTMENTS TO SERVICE OBLIGATIONS Summary By this notice, the U.S. Department of Transportation (the Department) announces an opportunity for incremental adjustments to service obligations under Order 2020-4-2, issued April 7, 2020, in light of ongoing challenges faced by U.S. airlines due to the Coronavirus (COVID-19) public health emergency. With this notice as the initial step, the Department will use a systematic process to allow covered carriers1 to reduce the number of points they must serve as a proportion of their total service obligation, subject to certain restrictions explained below.2 Covered carriers must submit prioritized lists of points to which they wish to suspend service no later than 5:00 PM (EDT), May 18, 2020. DOT will adjudicate these requests simultaneously and publish its tentative decisions for public comment before finalizing the point exemptions. As explained further below, every community that was served by a covered carrier prior to March 1, 2020, will continue to receive service from at least one covered carrier. The exemption process in Order 2020-4-2 will continue to be available to air carriers to address other facts and circumstances. Background On March 27, 2020, the President signed the Coronavirus Aid, Recovery, and Economic Security Act (the CARES Act) into law. Sections 4005 and 4114(b) of the CARES Act authorize the Secretary to require, “to the extent reasonable and practicable,” an air carrier receiving financial assistance under the Act to maintain scheduled air transportation service as the Secretary deems necessary to ensure services to any point served by that air carrier before March 1, 2020.
    [Show full text]
  • Annual Traffic Volume Report 2012 2013 2014
    Annual Traffic Volume Report 2012 2013 2014 State of Alaska Department of Transportation and Public Facilities Northern Region STATE OF ALASKA Bill Walker, Governor DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES Marc Luiken Commissioner DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES Northern Region David J. Miller Regional Director Prepared by DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES NORTHERN REGION PLANNING AND SUPPORT SERVICES Judy Chapman Chief of Planning and Support Services Data Preparation by Northern Region Traffic Data Section Scott Vockeroth Randi Motsko Ryan Pierce Hayden Nilson NORTHERN REGION ANNUAL TRAFFIC VOLUME REPORT Volume I 2015 Prepared by State of Alaska Department of Transportation and Public Facilities Northern Region Planning and Support Services In cooperation with U.S. Department of Transportation Federal Highway Administration TABLE OF CONTENTS PART I Introduction Definitions and Terms Functional Class System PART II State Route Index for Northern Region Road Listings by Route Description PART III Fixed Recorder Index Permanent Traffic Recorder Summaries PART IV Vehicle Classification Summary PART V Vehicle Mile Tables PART I Introduction Introduction The Northern Region Highway Traffic Data and Forecasting Because summer traffic is generally much higher than other section within the Department of Transportation and Public times of the year, the counts are adjusted for weekday and Facilities compiles the region’s Annual Traffic Volume Report. seasonal variations by using one or more associated CCS’s to Engineers, planners, administrators, local governments, and the obtain an estimated Annual Average Daily Traffic (AADT). public use the information within this report for work that The calculated AADT then represents the traffic on the specific requires information related to urban planning, construction of traffic link on which the count was taken.
    [Show full text]
  • APPENDIX a Document Index
    APPENDIX A Document Index Alaska Aviation System Plan Document Index - 24 April 2008 Title Reference # Location / Electronic and/or Paper Copy Organization / Author Pub. Date Other Comments / Notes / Special Studies AASP's Use 1-2 AASP #1 1 WHPacific / Electronic & Paper Copies DOT&PF / TRA/Farr Jan-86 Report plus appendix AASP #2 DOT&PF / TRA-BV Airport 2 WHPacific / Electronic & Paper Copies Mar-96 Report plus appendix Consulting Statewide Transportation Plans Use 10 -19 2030 Let's Get Moving! Alaska Statewide Long-Range http://dot.alaska.gov/stwdplng/areaplans/lrtpp/SWLRTPHo 10 DOT&PF Feb-08 Technical Appendix also available Transportation Policy Plan Update me.shtml Regional Transportation Plans Use 20-29 Northwest Alaska Transportation Plan This plan is the Community Transportation Analysis -- there is 20 http://dot.alaska.gov/stwdplng/areaplans/nwplan.shtml DOT&PF Feb-04 also a Resource Transportation Analysis, focusing on resource development transportation needs Southwest Alaska Transportation Plan 21 http://dot.alaska.gov/stwdplng/areaplans/swplan.shtml DOT&PF / PB Consult Sep-04 Report & appendices available Y-K Delta Transportation Plan 22 http://dot.alaska.gov/stwdplng/areaplans/ykplan.shtml DOT&PF Mar-02 Report & appendices available Prince William Sound Area Transportation Plan 23 http://dot.alaska.gov/stwdplng/areaplans/pwsplan.shtml DOT&PF / Parsons Brinokerhoff Jul-01 Report & relevant technical memos available Southeast Alaska Transportation Plan http://www.dot.state.ak.us/stwdplng/projectinfo/ser/newwave 24 DOT&PF Aug-04
    [Show full text]
  • 2005 June (Recovered)
    THE OFFICIAL NEWSLETTER OF THE ALASKA 99s THE FLYPAPER JUNE 2005 OFFICERS Chair Melanie Hancock 694.4571 From the Chair Vice Chair We had a great time at the Trade Show! Thanks to every- Clarissa Quinlan 248.5530 one who helped by manning the booth, setting up, taking down or just stopping by to say hello. I did get to go to Secretary Janet Oxford 696.7888 McCarthy and then on to Long Lake for the Memorial Day weekend breakfast on Sunday. The Park Service is doing a Treasurer great job of renovating the buildings at the Kennicott Mine, Michelle Williamson 345.3431 so there are new things every year. COMMITTEES It’s going to be a busy summer. Keep your eye on the calen- Chapter News dar. Here’s what’s up and coming. Scholarships NEXT MEETING Helen Jones 222.9977 FAA Pilot Safety Seminar on Sat. June 11, at Take Flypaper Flight Alaska, Merrill Field. Subjects to be covered are op- When: Wednesday, June 08 Michelle Bartleman 868.4736 erations at controlled airports, VFR operation in controlled What: Chapter elections airspace, Merrill Field arrival and departure procedures - Sunshine FAR 93, and an overview of the Medallion Program. As Louise Gettmann 243.5643 Where: Peggy’s Cafe space is limited, you are requested to register online at Flying Companion faasafety.gov or call Tony Fischer at 271-2006. Time: 6:00 p.m. Melanie Hancock 694.4574 The Ultralight Flyers of Alaska Summer Solstice Fly- Melanie and Clarissa are willing to Membership in and BBQ will be held at Birchwood Airport June 23 - continue in their present positions Mio Johnson 696.3580 25.
    [Show full text]
  • Summer 2012 FAA TOURS ALASKA’S RURAL AIRPORTS
    Summer 2012 FAA TOURS ALASKA’s RURAL AIRPORTS May 9, 2012 at the Hooper Bay Airport—(L to R) FAA Rick Neff, DOT&PF Commissioner Luiken, FAA Mike McNerney, FAA Frank Smigelski, FAA Associate Administrator Christa Fornarotto, FAA Assistant Administrator Victoria Wassmer, FAA Airports Division Mgr. Byron Huffman, FAA Regional Administrator Bob Lewis, DOT&PF Deputy Commissioner-Aviation Steve Hatter and DOT&PF Roger Maggard. DOT&PF was very pleased to welcome back FAA Associate Administrator Christa Fornarotto and join her in a field inspection of Alaska’s rural airports. The inspection included many flyovers and landings at airports in the Y-K Delta. Conditions were challenging as many airports were still managing record snowfall conditions. There are 257 airports in Alaska funded by the FAA airport improvement program (AIP) with 166 classified as general aviation airports having less than 2,500 passenger enplanements annually. These airports may be small in size but are huge in the services they provide to villages where aviation is the only mode of transpor- tation. The FAA works with aviation stakeholders and local communities to ensure that our airports remain safe and efficient and meet the needs of the public. DOT&PF receives approximately $150M annually in AIP funding to help meet the needs of rural airports. The role of aviation in Alaska is huge, contributing $3.5 billion to the state economy and 47,000 jobs—that represents 10% of all jobs in our state. The “Alaska’s Aviation Lifeline” video recently released by the De- partment truly captures what aviation is all about in our state and can be viewed at these links: www.vimeo.com/39894638 or http://www.youtube.com/watch?v=TDGw09IuApE Message From Deputy Commissioner We were able to sponsor another American Associa- tion of Airport Executives (AAAE) Certified Member (CM) training class and exam—the 2012 CM Acad- emy—and we’re very proud and honored to an- nounce 14 new Certified Members including our own DOT Commissioner, Marc Luiken.
    [Show full text]
  • Airport Diagram Airport Diagram
    10266 JUNEAU INTL (JNU) (PAJN) AIRPORT DIAGRAM AL-1191 (FAA) JUNEAU, ALASKA ATIS 135.2 JUNEAU TOWER 118.7 278.3 GND CON 121.9 CLNC DEL 121.9 VAR 21.7^ E 1514 JANUARY 2010 ANNUAL RATE OF CHANGE 0.3^ W 58 22'N AK, 13 JAN 2011 to 10 MAR TERMINAL & TWR ELEV FIRE STATION 21 B1 8 B A B2 8W 083.1^ D1 C1 C H A D D2 E1 8457 X 150 E A FIELD F1 ELEV F A ELEV 21 4900 X 450 20 G 26W 263.2^ SEAPLANE AK, 13 JAN 2011 to 10 MAR 26 LANDING AREA 58 21'N RWY 08-26 S-75, D-200, 2D-340, 2D/2D2-500 CAUTION: BE ALERT TO RUNWAY CROSSING CLEARANCES. READBACK OF ALL RUNWAY HOLDING INSTRUCTIONS IS REQUIRED. 134 36'W 134 35'W 134 34'W 134 33'W JUNEAU, ALASKA AIRPORT DIAGRAM JUNEAU INTL (JNU) (PAJN) 10266 (JNU4.JNU) 10210 JUNEAU INTL (JNU) (PAJN) JUNEAU FOUR DEPARTURE SL-1191 (FAA) JUNEAU, ALASKA ATIS 135.2 GND CON HAINES 121.9 245 HNS H 318^ SN JUNEAU TOWER N59^12.73' 118.7 (CTAF) 278.3 W135^25.85' ANCHORAGE CENTER L-1 133.9 JUNEAU RADIO 122.2 9000 318^ (54) LOCALIZER 109.9 For Haines Transition only. I * I-JDL LDJ BARLO COGHLAN ISLAND Chan 36 N58^21.63' 212 CGL C N58^21.53'-W134^38.17' W134^53.35' LG 4000 * N58^21.56'-W134^41.98' 1000 SISTERS ISLAND 114.0 SSR RS 8 2 Chan 87 248^ N58^10.66' 312^ 276^ W135^15.53' L-1, H-1 113^ 5500 046^ 198^ (21) AK, 13 JAN 2011 to 10 MAR (16) R-046 RADKY A15 R-018 SSR N58^16.00' 197^ W134^37.01' 5500 7000 127^ LEVEL ISLAND (119) 116.5 LVD DVL Chan 112 ELEPHANT N56^28.06' W133^04.99' 391 EEF E F L-1, H-1 N58^10.26'-W135^15.48' L-1 128^ R-220 CAUTION: Rapidly rising terrain to above 3000' MSL north, east and south of airport.
    [Show full text]
  • State of Alaska Itb Number 2515H029 Amendment Number One (1)
    STATE OF ALASKA ITB NUMBER 2515H029 AMENDMENT NUMBER ONE (1) AMENDMENT ISSUING OFFICE: Department of Transportation & Public Facilities Statewide Contracting & Procurement P.O. Box 112500 (3132 Channel Drive, Room 145) Juneau, Alaska 99811-2500 THIS IS NOT AN ORDER DATE AMENDMENT ISSUED: February 9, 2015 ITB TITLE: De-icing Chemicals ITB OPENING DATE AND TIME: February 27, 2015 @ 2:00 PM Alaska Time The following changes are required: 1. Attachment A, DOT/PF Maintenance Stations identifying the address and contact information and is added to this ITB. This is a mandatory return Amendment. Your bid may be considered non-responsive and rejected if this signed amendment is not received [in addition to your bid] by the bid opening date and time. Becky Gattung Procurement Officer PHONE: (907) 465-8949 FAX: (907) 465-2024 NAME OF COMPANY DATE PRINTED NAME SIGNATURE ITB 2515H029 - De-icing Chemicals ATTACHMENT A DOT/PF Maintenance Stations SOUTHEAST REGION F.O.B. POINT Contact Name: Contact Phone: Cell: Juneau: 6860 Glacier Hwy., Juneau, AK 99801 Eric Wilkerson 465-1787 723-7028 Gustavus: Gustavus Airport, Gustavus, AK 99826 Brad Rider 697-2251 321-1514 Haines: 720 Main St., Haines, AK 99827 Matt Boron 766-2340 314-0334 Hoonah: 700 Airport Way, Hoonah, AK 99829 Ken Meserve 945-3426 723-2375 Ketchikan: 5148 N. Tongass Hwy. Ketchikan, AK 99901 Loren Starr 225-2513 617-7400 Klawock: 1/4 Mile Airport Rd., Klawock, AK 99921 Tim Lacour 755-2229 401-0240 Petersburg: 288 Mitkof Hwy., Petersburg, AK 99833 Mike Etcher 772-4624 518-9012 Sitka: 605 Airport Rd., Sitka, AK 99835 Steve Bell 966-2960 752-0033 Skagway: 2.5 Mile Klondike Hwy., Skagway, AK 99840 Missy Tyson 983-2323 612-0201 Wrangell: Airport Rd., Wrangell, AK 99929 William Bloom 874-3107 305-0450 Yakutat: Yakutat Airport, Yakutat, AK 99689 Robert Lekanof 784-3476 784-3717 1 of 6 ITB 2515H029 - De-icing Chemicals ATTACHMENT A DOT/PF Maintenance Stations NORTHERN REGION F.O.B.
    [Show full text]