Prasarana Malaysia Berhad Notice of Tender

Total Page:16

File Type:pdf, Size:1020Kb

Prasarana Malaysia Berhad Notice of Tender PRASARANA MALAYSIA BERHAD (Company No.: 467220-U) (A Company Fully Owned by Minister of Finance Incorporated) Prasarana Malaysia Berhad (“Prasarana”) is a wholly Government owned company established to facilitate, undertake and expedite public infrastructure projects approved by the Government. Prasarana and its group of companies are the asset owners and operators of Ampang Line, Kelana Jaya Line, KL Monorail and bus operations in Klang Valley, Penang, Kuantan, Bus Rapid Transit (“BRT”) Sunway Line and Operator for Mass Rapid Transit (“MRT”) Kajang Line and Putrajaya Line. NOTICE OF TENDER PRICE OF TENDER TENDER TITLE PLACE & START DATE PLACE FOR DOCUMENT, FORM OF & QUALIFICATION OF SELLING OF SUBMISSION & CLOSING PAYMENT & PAYMENT TENDER NO. DOCUMENT DATE OF TENDER IN FAVOUR OF Registered with Via SAP Ariba Portal RM5,000.00 per Tender “THE OPERATION AND (Ringgit Malaysia Five MAINTENANCE (O&M) Construction Industry and/or Thousand Only) SERVICES OF HIGH Development Board (non-refundable) VOLTAGE POWER (CIDB) - G7, ME at the following address: DISTRIBUTION SYSTEM In the form of FOR KELANA JAYA and Prasarana Malaysia LINE” Berhad, Bank Draft or Banker’s Energy Commission Group Procurement, Cheque or Online Transfer PRASARANA/GPD/RS(S)/ Class: A Level 3, Kompleks Rapid to the account number 358/1027/2021 Rail Subang, below and No. 1 Jalan PJU 1A/46, Off Jalan Lapangan made payable to Electrical Service Terbang Sultan Abdul Aziz “THE OPERATION AND Contractor registered Shah, Prasarana Malaysia Berhad MAINTENANCE (O&M) with Energy Commission 47301 Petaling Jaya, Via SAP Ariba Portal SERVICES OF HIGH for 33kV system Selangor Darul Ehsan. for online transfer VOLTAGE POWER Account No.: 8002187952 on DISTRIBUTION SYSTEM Bank: CIMB Bank Berhad FOR AMPANG LINE” 3 September 2021 1 October 2021 PRASARANA/GPD/RS(S)/ (Friday) (Friday) 356/1025/2021 until before 17 September 2021 5.00 pm (Friday) “THE OPERATION AND MAINTENANCE (O&M) from SERVICES OF HIGH VOLTAGE POWER 9.00 am until 5.00 pm DISTRIBUTION SYSTEM during office hours FOR MRT KAJANG LINE” (Except Saturday, Sunday & Public PRASARANA/GPD/RS(S)/ Holidays) 357/1026/2021 RM1,500.00 Construction Industry (Ringgit Malaysia One Development Board Thousand Five Hundred (CIDB) - G6, ME Only) (non-refundable) and “THE OPERATION AND In the form of MAINTENANCE (O&M) Energy Commission SERVICES OF HIGH Class: A Bank Draft or Banker’s VOLTAGE POWER Cheque or Online Transfer DISTRIBUTION SYSTEM and to the account number FOR MONORAIL LINE” below Electrical Service PRASARANA/GPD/RS(S)/ Contractor registered made payable to 359/1028/2021 with Energy Commission for 11kV system Prasarana Malaysia Berhad for online transfer Account No.: 8002187952 Bank: CIMB Bank Berhad 1. Experienced Tenderer registered with the specified registration details as per the above table and its registration is still valid shall be invited to participate in the tender. Below are the MANDATORY requirements for Tenderer: a. Fulfilled the criteria and qualifications as specified in the above table; and b. Tenderers are COMPULSORY to attend BOTH Electronic Tender Briefing & Site Visit scheduled as below; c. For Electronic Tender Briefing, please scan the QR code below for registration for the tender briefing invitation not later than 9.00 am, 2 September 2021 (Thursday). d. Electronic Tender Briefing schedule: Date Time Venue/Medium 2 September 2021 (Thursday) 10.00 am Microsoft Teams 1. The Representative from interested tenderer shall be qualified personnel with sound technical Note and contract knowledge and duly authorized by the company. 2. Kindly complete the pre-registration at https://forms.office.com/r/ikDiFZswCw or scan the QR code for invitation purpose before 9.00 am, 2 September 2021 (Thursday). e. Site Visit schedule: PRASARANA/GPD/RS(S)/ PRASARANA/GPD/RS(S)/ PRASARANA/GPD/RS(S)/ PRASARANA/GPD/RS(S)/ Tender Ref. No. 356/1025/2021 (AMG) 358/1027/2021 (KJL) 357/1026/2021 (MRT) 359/1028/2021 (Monorail) 6 September 2021 7 September 2021 8 September 2021 9 September 2021 Date (Monday) (Tuesday) (Wednesday) (Thursday) Time 9.00 am 9.00 am 9.00 am 9.00 am Monorail (old) Depot Ampang Depot Subang Depot Sg. Buloh Depot Assembly point: Assembly point: Assembly point: Assembly point: Location Guard House Admin Building Guard House Admin Building (GPS: 3.1300235836159556, (GPS: 3.150127, 101.760329) (GPS: 3.113186, 101.585346) (GPS: 3.182242, 101.566327) 101.68903941991346) All Representative from the interested Tenderer shall fulfill the following MANDATORY requirements: i. Limited to two (2) representatives only and qualified personnel with sound knowledge in Tender & Contract for the above said works and duly authorized by the company; ii. MUST have at least received their First Dose of Covid-19 Vaccine (Sinovac, AstraZeneca or Pfizer). iii. MUST undergo Covid-19 RTK Antigen test and obtain negative result is within 14 days validity; Note iv. MUST fill in the Safety Declaration Form provided by Prasarana Security Department; v. MUST wear Personal Protective Equipment (Safety Vest, Safety Shoe and Safety Helmet) for the Site Visit; vi. MUST wear double face mask and a face shield; and vii. MUST always maintain social distancing. Interested Tenderer MUST present the Negative Result of RTK Antigen test to qualify for the participation in the Briefing and Site Visit Session. Prasarana SHALL NOT entertain any requisition from the Tenderer who does not comply with all requirements stipulated above. 2. The Tender Document will be displayed during the Site Visit and will only be sold to Tenderers who have attended both Electronic Tender Briefing and Site Visit. Prasarana SHALL NOT entertain any requisition for the purchase of Tender Document before and/or after the stipulated time. 3. The Tender Document will only be sold to a “bona fide” representative of the Tenderer. For this purpose, a letter of authorization to purchase the Tender Document MUST be produced by the Tenderer’s representative together with the valid ORIGINAL AND CERTIFIED TRUE COPY (Company Secretary/Group “A” Government Officer) of the Construction Industry Development Board (CIDB) Certificate, Energy Commission Certificate and Electrical Service Contractor Certificate based on the above to confirm the Tenderers’ qualification. 4. If the Tenderer is part of a group of related companies, the companies which are related to the Tenderer within the meaning of the Companies Act 1965 shall not submit any proposal for the supply of equipment/machine which is of the same brand or make as that offered by the Tenderer. Any contravention may result in the rejection or disqualification of the Tenderer’s submission. 5. All Tenderers are reminded that certificates which are certified true copies by the Commissioner for Oaths will NOT be accepted in line with the instruction issued vide Mahkamah Persekutuan Malaysia circular [Ruj.(44) dlm JK/MP 53/WP(140/97), 23 June 2005]. 6. Should there be any queries or clarification needed, Tenderers/Consultants are advised to contact Group Procurement at 03-7885 2600 ext. 1535 (Luqman) / 1572 (Nurul Izzani) / 1547 (Kamarudin) or e-mail to [email protected] / [email protected] / [email protected]. For more information on this advertisement or The Group’s profile, kindly access our website at www.myrapid.com.my. .
Recommended publications
  • Sunway Berhad Maintain BUY Wins BRT Job As Expected; Stock Valuation to Improve on Revised Target Price (TP): RM3.50 Sentiment (Previously RM2.96)
    12 March 2013 | Corporate Update Sunway Berhad Maintain BUY Wins BRT job as expected; stock valuation to improve on Revised Target Price (TP): RM3.50 sentiment (previously RM2.96) INVESTMENT HIGHLIGHTS RETURN STATS • Wins RM453m BRT job on PPP with Prasarana Price (11 Mar 13) 2.76 • Completion in 24 months, Sunway to contribute RM99m in works, under CSR Target Price 3.50 • Target price increased to reflect lower discount to SOP Expected Share Price 26.81% valuation on better sentiment towards property Return Expected Dividend Yield 2.18% Bus Rapid Transit: In a public-private partnership (PPP), Sunway Expected Total Return +28.99% Berhad (Sunway) has been awarded contracts worth RM452.5m from Syarikat Prasarana Negara Berhad (Prasarana) for the Design, Construction, Completion and Commissioning of: 1) Guideway & Halts; STOCK INFO 2) Depot; 3) Park n Ride; and 4) Mechanization of Oxidation Pond of the Bus Rapid Transit (BRT) - Sunway Line (refer to appendix). KLCI 1657.96 5211/ Bus on elevated track: The BRT- Sunway Line will provide eco-friendly Bursa / Bloomberg SWB MK bus services connecting the future station of the LRT extension and Setia Jaya KTM station. At a length of approximately 5.4 km, the BRT Board / Sector Main/ Property will link up key commercial areas in Bandar Sunway and Subang Jaya Syariah Compliant YES through 7 stations. Social responsibility: In addition to funding from Prasarana, Sunway Issued shares (mil) 1292.50 will additionally and separately contribute works estimated to cost Par Value (RM) 1.00 approximately RM99.0m as part of its continuous corporate social responsibility initiative.
    [Show full text]
  • EY KL Calling 2020
    KL calling: dynamic, digital, diverse Investors guide Foreword The next phase of Kuala Lumpur’s growth is pivoting towards next-gen industries, including Industry 4.0. In recent years, Kuala Lumpur has garnered investments from high-tech multinational corporations in advanced medical technologies, digital e-platforms, Internet of Things, robotics and higher-value Global Business Services. Malaysia’s world-class infrastructure, supportive government policies and agencies Dato’ Abdul Rauf Rashid and future-ready digital talent proficient in EY Asean Assurance Leader English and Asian languages continue to Malaysia Managing Partner attract international businesses to establish Ernst & Young PLT their regional headquarters and centers in Kuala Lumpur. Beyond 2020, I envision that Kuala Lumpur will holistically evolve to become a smart digital city, driven by a balanced community purpose, i.e., to serve its residents’ needs and systemically improve common facilities and amenities for the well-being of Malaysians, business residents, expatriates and international visitors. Malaysia welcomes investors to recognize Kuala Lumpur’s 3 D strengths: dynamic, digital, diverse, and participate in Kuala Lumpur’s next exciting transformation! Selamat datang ke Kuala Lumpur! KL calling: dynamic, digital, diverse | 1 Our strategy is to be as close as “possible to our customers to understand their needs and to Malaysia’s fundamentals remain develop suitable products and “ solutions to fulfil their strong and attractive to investors. requirements. As the region’s most competitive manufacturing Despite the COVID-19 pandemic, powerhouse, Kuala Lumpur we remain in active discussions emerged as a natural favorite. with potential investors. Although some investors are ABB taking a wait-and-see approach, others remain committed to their investments as they hold a long- About 16 months into our term view.
    [Show full text]
  • Service Disruption on Mrt Kajang Line Due to Signalling Problems
    MEDIA STATEMENT FOR IMMEDIATE RELEASE SERVICE DISRUPTION ON MRT KAJANG LINE DUE TO SIGNALLING PROBLEMS KUALA LUMPUR, 16 August 2021- MRT Kajang Line is experiencing a service disruption due to signalling problems that were detected at 9.15am today that caused all trains that were in operations along the MRT Kajang Line to be held at platforms along its entire alignment starting from MRT Sungai Buloh Station to MRT Kajang Station. “The signalling problems are believed due to a technical issue and Rapid KL’s Engineering Department, together with BT Alstom who is the system’s manufacturer and Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), are working to resolve this so that MRT Kajang Line could operate normally as soon as possible,” said a statement issued by the rail operator today. When the signalling problems were detected, all trains that were in operations switched to manual mode and were driven by Transit Officers to the nearest station, at a speed of not more than 25km/hour. Passengers were advised to disembark and take alternative transport in order to continue with their journey. Then, MRT Kajang Line suspended its operations from 11.15am to 3.45pm to allow for diagnostic work and full system reboot to be performed. It has since resumed operations at 3.45pm in revised service mode. “We deeply regret the inconvenience and would like to apologise to our passengers for this service disruption. For the safety of all involved, MRT Kajang Line is currently operating on revised service mode where trains would be moving slower and dwelling at platforms longer,” it added.
    [Show full text]
  • The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in the Klang Valley and Kuala Lumpur, Malaysia
    JOURNAL OF SOCIAL TRANSFORMATION AND REGIONAL DEVELOPMENT VOL. 2 NO. 2 (2020) 1-10 © Universiti Tun Hussein Onn Malaysia Publisher’s Office Journal of Social Transformation JSTARD and Regional Journal homepage: http://publisher.uthm.edu.my/ojs/index.php/jstard Development e-ISSN : 2682-9142 The Development and Distribution Pattern of Railway Network for Urban Public Transport Using GIS from 1990 Until 2019 in The Klang Valley and Kuala Lumpur, Malaysia Mohd Sahrul Syukri Yahya1*, Edie Ezwan Mohd Safian1, Burhaida Burhan1 1Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, MALAYSIA *Corresponding Author DOI: https://doi.org/10.30880/jstard.2020.02.02.001 Received 20 July 2020; Accepted 30 October 2020; Available online 30 December 2020 Abstract: The development and distribution pattern of the railway network has significantly increased in urban public transport with the current situation to move fast towards the fourth industrial revolution (4IR). In Malaysia, the problem issues are related to traffic congestion and many user cars on the roadway in daily lives. One alternative mode of using a rail network is commuter, LRT, Monorail, MRT and ETS. Therefore, the Geographic Information System (GIS) technology is then used to map and produce the railway networks history and developments in urban public transportation (UPT). The goal of this research is to identify the heatmap trends of the Klang Valley railway stations which included Kuala Lumpur as urban public transport sectors. It was based on the OSM image layer from the year 1990 to 2019 and studied the growth of railway networks through a polyline pattern analysis.
    [Show full text]
  • NOTICE MASS RAPID TRANSIT SUNGAI BULOH – KAJANG LINE UPDATES on CONSTRUCTION WORKS ALONG LEBUHRAYA DAMANSARA-PUCHONG (LDP) 1 June 2014 – 31 December 2014
    NOTICE MASS RAPID TRANSIT SUNGAI BULOH – KAJANG LINE UPDATES ON CONSTRUCTION WORKS ALONG LEBUHRAYA DAMANSARA-PUCHONG (LDP) 1 June 2014 – 31 December 2014 Please be informed that below are the construction updates for works along the LDP Highway for the next six months from 1 June 2014 to 31 December 2014. This stretch along the LDP Highway (Kepong-bound) will be from Damansara Utama (Jalan SS21/23) until the 1 Utama shopping centre. The MRT-related works will include the construction of the special span crossing across the LDP Highway from Jalan Damansara and MRT 1U Station works. The construction activities are as follows: Construction of riverbank RC (reinforced concrete) wall, bore pile and caisson works, piers construction, concreting and launching of segmented box girders (SBGs) which will form the guideway for the MRT elevated line. Special span crossing across the LDP Highway from Jalan Damansara – Launching of SBGs (starting July 2014 onwards) Station works – bore piling, piers construction, launching of SBGs, launching of cross beam and T- beam, and station floor works. Working hours will be from 8am to 10pm, Monday to Sunday (including Public Holidays). Boring works will stop at 7pm and concreting works will continue until 10pm. At times, night works may go beyond 10pm due to unforeseen circumstances. Night works are subjected to Authorities’ approval and advance notice will be given to residents/ establishments via mail drops for night works involving lane closures or traffic diversions. Together with this notice is a MRT Community Info board for display on your Notice Board. As part of MRT Corp’s Standard Operating Procedure, safety barriers, traffic cones and traffic flagman will be placed at the work site to ensure road users are pre-warned of on-going works.
    [Show full text]
  • Leaflet First Announcement FA 20 Oct 2016
    FIRST ANNOUNCEMENT ITS Seminar and Exhibition 2017 Driving ITS to a New Normal Connexion@Nexus, Bangsar South Kuala Lumpur, Malaysia Organised by In Collaboration 21-23 February 2017 INTELLIGENT TRANSPORT SYSTEM MINISTRY OF WORKS PUBLIC WORKS DEPARTMENT MALAYSIAN HIGHWAY ASSOCIATION OF MALAYSIA MALAYSIA MALAYSIA AUTHORITY Supported by CHARTERED INSTITUTION ROAD ENGINEERING ASSOCIATION OF HIGHWAY OF HIGHWAYS & TRANSPORTATION ASSOCIATION OF MALAYSIA CONCESSIONAIRES MALAYSIA (MALAYSIA BRANCH) About The Seminar The theme chosen for this Seminar is “Driving ITS to a New Normal”. Various emerging and disruptive tech- nologies have changed the normal mode of business, strategies and traditional approaches to ITS solutions. ITS professionals now work in a signicantly changed landscape and are faced with new challenges. This Seminar provides a platform for continuing and expanding dialogue between public and private sectors; to exchange ideas and needs and an opportinity to close key information gaps. This Seminar brings together international & local experts from the various areas to meet & discuss issues impacting & promoting our industry, identity opportunities, address common challenges, share their experiences, build networks and in the process, enrich themselves. We are pleased to extend an invitation to your organization to participate in this important Seminar which oers exciting opportunities to increase your presence in the market, whether it is through being a sponsor, exhibitor or just advertising your services & products. Sponsorship & showcasing are the cornerstone of an integrated marketing programme that can translate into partnership and networking opportunities during and after the Seminar. The Seminar is designed to attract all those who are in the industry, be it concessionaires , expressway regulators, related government authorities, project managers, engineers, contractors, consultants , nanciers, bankers, lawyers, and a wide range of public and private organizations from Malaysia & The Asian Pacic Region.
    [Show full text]
  • Klang Valley Rail Transit Map April 2020
    Klang Valley Rail Transit Map April 2020 2 P Tanjung Malim 5 P Kuala Kubu Baru Gombak P 1 P Rasa Taman Melati P Batu Caves P Batang Kali Wangsa Maju P P P P Serendah Taman Wahyu P P Sri Rampai P 3 Sri Sri P Metro P Rawang Damansara Damansara Kepong Sri Prima Ampang P Sentral Timur Baru Jinjang Delima 4 3 Setiawangsa P P Kuang Sentul Cahaya Kampung P Jelatek P Sri Batu P Timur P Damansara Kepong Sentral P Barat P Kentonmen Dato’ Keramat Kepong Damansara Batu Kentomen Damai Cempaka P Sentul P Jalan Damai Ipoh *Sungai Sentul P P P Segambut Sentul Buloh Pandan Indah P Barat Hospital Raja Ampang *Kampung Titiwangsa Kuala Lumpur Uda Park Selamat *Rubber Research Institute 8 KLCC Pandan Jaya P *Kwasa Chow Kit P Damansara 9 12 Putra PWTC Medan Tuanku Kampung Baru Persiaran KLCC Kwasa P Sentral Sultan Ismail Dang Wangi Bukit Nanas Kota Conlay Damansara Raja Chulan Surian Bank Negara Bandaraya Tun Razak Mutiara Exchange (TRX) Damansara Bukit Bintang Cochrane Maluri P Bandar Bukit Bintang P Masjid Utama Jamek Imbi S01 P Miharja P Plaza Hang Rakyat Tuah Pudu S02 Taman Tun 11 Dr Ismail Taman Pertama Chan Phileo P Merdeka Sow Lin Damansara Taman Midah P S03 P Kuala Lumpur Cheras Taman Mutiara Bukit Kiara Bandar Malaysia P Muzium Negara Pasar Utara Seni Maharajalela Taman Connaught S04 Salak Selatan P KL Sentral P Bandar Malaysia Taman Suntex Selatan P P Tun Sambanthan Semantan KL Sentral 8 Pusat Bandar Sri Raya P S05 Damansara P Mid Valley Seputeh Salak Selatan Bandar Tun Bandar Tun Razak P Hussein Onn 10 Bangsar P P P P P S06 Batu 11 Cheras Skypark
    [Show full text]
  • Mainx Alc 0207 Klang Valley Train Route
    Klang Valley Rail Map Batu Caves Batu Caves–Tampin Tanjung Malim KTM Komuter Kuala Kubu Baru Rasa Tanjung Malim–Port Klang Batang Kali KTM Komuter Taman Wahyu Serendah Gombak Rawang LRT Ampang Line Kuang Taman Melati Wangsa Maju Kg Batu Sungai Buloh LRT Sri Petaling Line Sri Rampai Setiawangsa LRT Kelana Jaya Line Kepong Jelatek Sentral Sentul Timur Batu Kentonmen Dato Keramat Kampung Kepong Selamat ERL Klia Express Sentul Sentul Ampang Damai Kwasa Damansara Cahaya ERL Klia Transit Segambut Titiwangsa Ampang Park Cempaka KLCC Chow Kit KL Monorail Pandan Indah Kwasa Sentral Medan Putra PWTC Tuanku Kampung Baru MRT Sg Buloh-Kajang Line Pandan Jaya Kota Damansara Dang Bukit Nanas Wangi Sultan Ismail Raja Chulan Surian BRT Sunway Line Bukit Bintang Maluri Mutiara Damansara Tun Razak Cochrane Taman Note: The proposed MRT2, LRT3 and Bank Negara Bandaraya Exchange Pertama Klang BRT are not in this map Taman Bandar Utama Imbi Masjid Merdeka Midah ©The Star Graphics Miharja Taman Tun Jamek Hang Tuah Pudu Taman Dr Ismail Chan Sow Lin Mutiara Plaza Phileo Rakyat Taman Damansara Kuala Lumpur Pasar Maharajalela Cheras Seni Connaught Pusat Bandar Semantan Muzium Taman Tun Sambanthan Damansara Negara Salak Selatan Suntex KL Sentral Sri Raya Midvalley Bandar Tun Hussein Onn Bangsar Seputeh Abdullah Bandar Tun Razak Batu 11 Cheras KL Eco City (future) Salak Hukum Lembah Kelana Taman Taman Selatan Subang Jaya Bahagia Paramount Kerinchi Angkasapuri Bukit Dukung Bandar Tasik Terminal Pantai Dalam Bersepadu Skypark Terminal Asia Taman Selatan Ara Petaling
    [Show full text]
  • Users' Preferences on The
    PLANNING MALAYSIA: Journal of the Malaysian Institute of Planners VOLUME 19 ISSUE 1 (2021), Page 150 – 161 USERS’ PREFERENCES ON THE PROVISION OF FACILITIES FOR MASS RAPID TRANSIT SUNGAI BULOH – SUBANG – PUTRAJAYA LINE (MRT2) STATIONS Ainina Azizan1, Mariana Mohamed Osman2, Noor Suzilawati Rabe3, Nuranisa Huda Ramlan4, Nurul Ardila Azmi5 & Suraya Amiruddin6 1-6 Kulliyyah of Architecture and Environmental Design INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA Abstract National Transport Policy (2019-2030) strives to improve the transportation sector towards a conducive and competitive sector while fulfils the demands of people. The new development of Mass Rapid Transit (MRT2) Sungai Buloh – Subang – Putrajaya Line is expected to complete in 2022 and would benefit 529,000 users. This paper analyses the preferences of users on the facility provision at mass rapid transit stations in the local context. This paper was based on secondary and primary data sources such as official documents, websites and data collected for the Integrated MRT2 Land Use Masterplan. Document analysis method was employed to review official sources from public transport providers across selected benchmarked countries. Six categories of facility at mass rapid transit stations were evaluated using 40 criteria. Results suggested improvements are needed in barrier-free considerations and convenient facilities. Statistical analyses, involving descriptive and inferential analyses, were conducted. The results show that gender and travel time to station influenced users’ preferences on facilities needed at stations. This paper suggests that certain criteria of facilities must be considered based on universal needs of the population to encourage usage of MRT2 as public transport as well as to provide convenient travel experiences.
    [Show full text]
  • Planning for Transit-Oriented-Development (TOD) in Malaysia
    Japan-OECD Policy Forum on Urban Development and Green Growth Tokyo . 14-16 October 2014 Planning for Transit-oriented-development (TOD) in Malaysia Mr. Zainuddin Ahamad Deputy Director-General (Development) Federal Department of Town & Country Planning Ministry Of Urban Wellbeing, Housing & Local Government Malaysia Policies Related to TOD 1. 10th Malaysia Plan (RMK-10) - Chapter 6: Building an Environment that Enhances Quality of Life. 2. National Physical Plan (NPP) – NPP 16: High priority shall be given to achieve energy efficient ‘compact cities’. 3. National Urbanisation Policy (NUP) – • Thrust 1: An Efficient and Sustainable Urban Development. • Thrust 3: An Integrated and Efficient Urban Transportation System. • Thrust 5: Creation of A Conducive Liveable Urban Environment With Identity. 2 TOD Related Definition In Malaysia, the draft Planning and Design Guidelines for Compact and Liveable Development defines compact development as: “… a method that places a mix of high intensity uses within 400m radius of rail or bus-based transit station. Public transportation, walking and cycling are the main modes in this development.” 3 Proposed Planning Standards for TOD in Malaysia TOD Types Regional/Urban Urban Sub-urban Neighbourhood Neighbourhood Plot Ratio • Housing • Job • Population Plinth Area (max.) • Housing KL Sentral (Regional/Urban TOD) Kajang Komuter (+ MRT) (Sub-urban TOD) • Commercial • Office Parking • Housing • Commercial Open Space Sri Rampai LRT (Urban Neighbourhood TOD) Subang Jaya Komuter (Neighbourhood TOD) 4 Proposed Elements of Liveability at TOD Namba Parks, Osaka Cheonggyecheon, Seoul Central Market, KL http://holidaysinmalaysia.org/kuala-lumpur/central- market/ Pavillion, KL 5 Kuala Lumpur City Public Transportation at Densely Populated Areas Kuala Lumpur Structure Plan 2020 6 KL Sentral – Malaysia’s Own TOD • Kuala Lumpur Sentral is an exclusive urban centre built around Malaysia’s largest transit hub.
    [Show full text]
  • MRT-Progressreport2016-ENG.Pdf
    PB Mass Rapid Transit Corporation Sdn Bhd 2016 Annual Progress Report 1 i Content 3 1 Mass Rapid Transit Corporation Sdn Bhd 63 4 MRT Sungai Buloh - Serdang - Putrajaya Line 6 Vision, Mission and Guiding Principles 66 Construction 8 Chairman’s Message 68 Procurement 10 Chief Executive Officer’s Review 69 Land 14 The Year at A Glance 70 Centralised Labour Quarters 18 Board of Directors 71 Bumiputera Participation 24 Board Committees 73 Industrial Collaboration Programme 26 Organisational Structure 74 Safety, Health and Environment 28 Leadership Team 75 Stakeholder and Public Relations 30 Heads of Department 36 Integrity 79 5 Commercial 80 Introduction 37 2 The Klang Valley MRT Project 81 Property 38 Klang Valley Integrated Urban Rail Network 81 Advertising 82 Retail 41 3 MRT Sungai Buloh - Kajang Line 82 Multi-Storey Park and Ride 44 Construction 83 Commercial Telecommunications 46 Operations Readiness 83 New Technology and Events 48 Feeder bus 49 Procurement 85 6 Financial Report 52 Land 53 Centralised Labour Quarters 89 7 Awarded Work Packages 54 Bumiputera Participation 90 MRT Sungai Buloh - Kajang Line 55 Industrial Collaboration Programme 100 MRT Sungai Buloh - Serdang - Putrajaya Line 57 Safety, Health and Environment 58 Stakeholder and Public Relations 2 Mass Rapid Transit Corporation Sdn Bhd 2016 Annual Progress Report 3 i Abbreviations KVMRT Klang Valley Mass Rapid Transit MRT Corp Mass Rapid Transit Corporation Sdn Bhd PDP Project Delivery Partner Prasarana Prasarana Malaysia Berhad SBK Line MRT Sungai Buloh-Kajang Line SPAD Suruhanjaya Pengangkutan Awam Darat SSP Line MRT Sungai Buloh-Serdang-Putrajaya Line 2 Mass Rapid Transit Corporation Sdn Bhd 2016 Annual Progress Report 3 Mass Rapid 1 Transit Corporation Sdn Bhd 4 Mass Rapid Transit Corporation Sdn Bhd 2016 Annual Progress Report 5 Mass Rapid Transit Corporation Sdn Bhd TESTS: View of the Kota Damansara Station with an MRT train undergoing test runs.
    [Show full text]
  • A Review of Recent Developments in Bus Rapid Transit System
    MRR No. 327 A Review of Recent Developments in Bus Rapid Transit System Afiqah Omar Fauziana Lamin Kak D Wing Ahmad Noor Syukri Zainal Abidin Mohd Rasid Osman Khairil Anwar Abu Kassim A Review of Recent Developments in Bus Rapid Transit System Afiqah Omar Fauziana Lamin Kak D Wing Ahmad Noor Syukri Zainal Abidin Mohd Rasid Osman Khairil Anwar Abu Kassim _______________________________________________________________________________________ ©MIROS, 2020. All Rights Reserved. Published by: Malaysian Institute of Road Safety Research (MIROS) Lot 125-135, Jalan TKS 1, Taman Kajang Sentral, 43000 Kajang, Selangor Darul Ehsan, Malaysia. Perpustakaan Negara Malaysia Cataloguing-in-Publication Data Afiqah Omar A Review of Recent Development in Bus Rapid Transit System / Afiqah Omar, Fauziana Lamin, Kak D Wing, Ahmad Noor Syukri Zainal Abidin, Mohd Rasid Osman, Khairil Anwar Abu Kassim. (Research Report ; MRR No. 327) ISBN 978-967-2078-74-6 1. Bus rapid transit--Research--Malaysia. 2. Urban transportation--Research--Malaysia. 3. Government publications--Malaysia I. Fauziana Lamin. II. Kak D Wing. III. Ahmad Noor Syukri Zainal Abidin. IV. Mohd Rasid Osman. V. Khairil Anwar Abu Kassim. VI. Title. VII. Series. 388.413220720595 Printed by: Malaysian Institute of Road Safety Research (MIROS) Typeface: Calibri Size: 11 pt. DISCLAIMER None of the materials provided in this report may be used, reproduced or transmitted, in any form or by any means, electronic or mechanical, including recording or the use of any information storage and retrieval system, without written permission from MIROS. Any conclusion and opinions in this report may be subject to reevaluation in the event of any forthcoming additional information or investigations.
    [Show full text]