GOVERNMENT OF FINANCE PLANNING & INVESTMENT DEPARTMENT (PLANNtNG AND TNVESTMENT DtvtSION) ARUNACHAL PRADESH CIVL SECRETARIAT: ITANAGAR

No. PD/BADP-09/ 201 8-19/Nov-1 Dated ltanagar the 20ft November' 2018

To The Deputy Commissioner, TawangMest Kameng / East Kameng / Kurung Kumey / Kra Daadi/ Upper SubansiriMest Siang/Siang/Upper Siang/ Dibang Valley / Anjaw /Changlangi Tirap and . Arunachal Pradesh.

Sub: Release / Transfer of fund under BADP during 201g-19 through PFMS.

Sir, I am directed to convey the approval for placement of Rs. 4232.505g3 takh (Rupees Forty Two Crore Thirty Two Lakh Fifty Thousand Five Hundred Ninety Three) only under BADp during 2018-19 through PFMS for implementation of the approved BADP schemes for the year 2017-18 and 2018-19.

The district 2. wise details of fund to be transferred to the respective bank accounts of the concerned districts are given below:- (Rs. in lakh) st. Name of the BADP Bank Account Details Fund recommended No District for Release / transfer 1 2 3 4 1 Tawang A/C No.36782077056, SBI t Tawang Branch t 498.884 Code No.005844; FSC code SBI N0005844; MICR code = 784O0ZS2} 2 West Kameng A/C No.367260311 21, SBt, Bomdila Branch, 570.00 Code No.001394; |FSC code = SB1N0001394; MICR code = 784002518 3 East Kameng A/C No 36725252777 t SB Seppa Branch 136.63 Code No.005738; I FSC code SB N0005738 M CR code 78400252'7 4 Kurung A/C No.3688771 1 474, SB t Koloriang Branch 307.0222 Kumey Code No. 0 1 1 622: FSC code SBI N00 1 1 622; MICR code 79 1 002504 5 Kra Daadi A/C No.361 64994395, SBI Pa n ranch Code 20.88 No. 007874; FSC code SBtN0007874; MICR code = 791002502 o Upper A/C No.36724850653 , SB DaLporijo Bran ch 161.99445 Subansiri Code No.0058 1 8; FSC code sBlN00058 1 8; MICR code = 7BTO0ZS04 7 West Siang A/C No 36880981 22 1 t SB Aalo Branch Code 524.85111 No.00 1 677; FSC code SB N 0001 677 MIC R code = 787002501 8 Siang A/C No.367 43825737 SBI t Pangin Branch 76.854M Code No.007685; FSC code SB N 0007685 MICR code = 787002511 9 Upper Siang A/C No.368 1 2207496, SB Yingkiong Branch, 78.256 Code No.007228 FSC code SBtN0007228; MICR code = 787002515 10 Dibang Valley A/C No.3559531 3776, SBt , Branch, Code 529.2233s 115; IFSC code = SBINO009115; M|CR code = 786002501

Contd...2/P -2-

11 Anjaw A/C No.36782684299, SBl, Hawai 303.23721 Branch, Code No.015393; IFSC code = s8tN0015393 MICR code = 786002536 12 Changlang AIC No.36809177713, SBt Changlang 105.60 Branch, Code No.006007; I FSC code = S MICR code = 786002506 13 Tirap A/C No.3687 5006793, SBl, Khonsa 459.239 Branch, Code No.001584; IFSC code = sBtN0001 MICR code = 786002510 14 Longding A/C No.36844163628, SBl, Longding 459.83417 Branch, Code No.00601 3; IFSC code = S81N0006013; tvtllCR code = 786002519 Grand Total= 4232.50593 4. The details of block / schemes against which funds are now transferred is given at Annexure-l

The concerned 5' Deputy commissioners shall further release fund to the implementing agencies through PFMS only after ensuring that the following points are have been stricly complied with:-

i' This release in subject to the following : All codal formalities, financial rules and regulations and all conditions laid down in GFR, DFRP etc. financial rules and regulations, circulars, directions & guidelines etc issued by the Govt. of lndia, MHA, Ministry of Gil, CVC and Govt. of Arunachal Pradesh from time to time should be followed in ietter and spirit without fail in this regard. This shall squarely be responsibility of the District Administration and implementing department. subsequent release will provided be upon utilisaiion orfte previous'ieleases through pFMS platform only after obtaining expenditure sanction thiough the competent authority. ii' The execution of works / sihemes I projects ano-pro"rr"r"nt of items / materials, furniture, etc should be done strictly as per the provision of GFRi orpn guidelines etc. financirinrillr"j ,"Lgrh','io.n=; th" and directives issued by tle Govt. of tniia, Ministry of Finance, Gol / Administrative of Gol' cVC and Govt. of Arunachil Pradesh in tNs'regard irom time to time. The process of tendering and competitive bidding should be manditorily toiloweo ano complied with as envisaged in the GFR, DFPR, CPWD naanuii etc, alt tne rinanciriiur"s and regulations, the guidelines and directives issued by the gofi. or iniir, Ministry of Finance, Gol / Administrative Ministry of Gol, cVC and Govt of pooern-in Arunacial tnis regard. All th" conditions prescribed and specified by the Planning Department, Govt. of Arunachlt praoesn should be followed letter and spirit without fail. in iii' Further' necessary instruction issued by MHA, planning Gol, Finance and Department from to time resarding implementation oJ .ln"r"" ;il time adhered to whire $;i;; ffi;ffi;"il.rud are to be shicry imprementing schemes at the district rever. iv' The contractors / suppliers /-Vendot" p"yr"ni *r.t'b" made through Expenditure, Advance Transfer (EAT) Module and the beneficiary & p"vrr".t inrough DBT mJdut". rn" department deposit the deductions made to shall the respeciive head of accounts through RTGS and intimate the same to office / cheque / DD concerned for making necessary entries and v' Asset Register and Album updating the record. containing pnotog;pn's in the three phases as guidelines (before, during . indicated in the & after impl6mentati6n i compretion) for all schemes BADP should be taken- up properly sanctioned under and maint"in"l for record ,no rutrr" uploading software' The date, longitude & utituie rnorro in the vi' Further' shown in the photographs. regular monitoiing of the schemes uv "i""il;"tn" guidelines dirtrict Level comritt"" as mentioned in the must be carried out and report of the same must be suumitteJit planning Department iommittee i' *i"iv responsibre X;#fltrji,llli;rffi Bf:f'Lever ror proper impr6mentation or vii' Geo tagging of all projects is compulsory. change permissible. in location of any project will not be viii De ix. No revised estimates/sanction will be entertained and no expenditure outside approved scheme is permissible the scope of the 6 This issue with the approval of the competent authority. Yours faithfully, Enclo : As stated above.

ndu Director Co ) 3/P -3-

No. PDiBADP-09/ 201 8-1 9/Nov-1 Dated ltanagar the 20h Novembei 2018 Copy to:- 1. The PPS to HCM, Govt. of Arunachal Pradesh, ltanagar. 2. The PS to the HDCM, Govt. of Arunachal Pradesh, ltanagar. 3. The DS to Chief Secretary, Govt. of Arunachal Pradesh, ltanagar. 4. The PS to the Commissioner (Finance), Govt. of Arunachal Pradesh, ltanagar. 5. The Deputy Secretary (Budget), Govt. of Arunachal Pradesh, ltanagar. 6. District Planning officers, Tawang / Bomdila / seppa / Koloriang / Kra Daadi /Daporijo /Aalo /Siang / Anini / Anjaw / Changlangi Longding ,Khonsa and Longding, Arunachal pradesh. 7. The DDO, Planning Department, Govt. of Arunachal pradesh, ltanagar.

U Director ( Co ordinat Annexure - I LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved o/o of fund Fund now No. & date of sanction order No Schem6s / Project Village outlay to be transferred transferred

1 , 3 4 5 6 7 Tawang Dlstrlct: Mukto-Bongkhar CD Block VKV Proposal(Additlonal Sch€m6) 1 Establishment of Vivokananda Kendra Vidyalaya at Mukto 400.00 100o/o 400.00 PD/BADP/Scheme-16/2018-19 dtd 15/09/20'18 Mukto Block Total 400.00 400.00

Jang-Thingbu CD Block 1 Developmont of Mago vlllago as lrodel vlllago(Additional Scheme) 1 C/o CC Foot Path in between Duri and Nuri(400 m), Mago 19.44 100Yo 19.44 PD/BADP/Scheme-1 1/201 8-1 I dtd 08/1 0/201 8 .

2 lnstallation of Solar Streot light at Lungur (for Mago 10.00 100Yo 10.00 TDP/BADP-03(Pa ft-lv )l 20 17 -1 819340-44 Development of Model villag6 Mago) dtd 08/08/2018 Block Total 29.44 29.4

Lumla CD Block 1 Development of Lumla village as Model village(Additional sch€me) a) C/o CC step cum footpath within Baghar village from Baghar 10.00 100% 10.00 TDP/BADP-03(Part-lVy20 1 7-1 8/9381 -85 Ber to Baghar Chimroh (330 mtrs) dtd 08/08/2018 - b) C/o CC step cum footpath within Baghar village from Baghar 10.00 100Yo 10.00 TDP/BADP-03(Pa n-N ) I 20 1 7 1 I I 937 1 -7 5 Baghar Meith to Toth Baghar (330 mhs) dtd 08/08/2018 c) C/o CC step cum footpath within Phomang village Phomang 10.00 100Yo 10.00 TDP/BADP-03(Part-lVy20 1 7-1 8/9376-80 (800 mtrs) drd 08/08/2018 d) C/o CC drainage within Baghar village (500 mtrs) Baghar 10.00 100% 10,00 TDP/BADP-03(Part-lVy20 I 7-1 8/9366-70 dtd 08/08/2018 e) C/o CC drainage within Phomang village (55.00 cum) Phomang 10.00 100% 10.00 TDP/BADP-03(Part-lVy201 7- 1 8/936 1 -65 dtd 08/08/2018 0 C/o MIC at Phomang village Phomang 10.00 100% 10.00 TDP/BADP-03(Part-lVy20 1 7-1 8/9356-60 drd 08/08/2018 s) C/o Toilet at Baghar village (6 unit) Baghar 4.722 100% 4.722 TDP/BADP-03(Part-lVy20 1 7-1 8/9350-55 dtd 08/08/2018

Page 1 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred I 2 3 4 5 6 7

h) C/o Toilet at Phomang village (6 unit) Phomang 4.722 100% 4.722 TDP/BADP-03(Pa rt-tv ll 20 17 - 1 819345-49 dtd 08/08/2018 Block Total 69.444 69.444

District Total 498.884 498.884

\

Page 2 Annexure - I LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUNO IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be tra nsferred transferred

1 2 3 4 5 t) 7

Wost Kameng Distric-t: Kalaktang CD Block 1 C/o Road from Malaichur to Betchilling/Lungdur Betchilling 50.00 IOOYo 50.00 PD/BADP/Scheme-06/201 8-1 I dtd 1 SlOg 1201 I (Ph-l), West Kameng Sub Total 50.00 50.00

VKV proposal(Additional schem€)

2 Upgradation of Vivekananda Kendra Vidyalaya at Shergaon 100.00 lO0Yo 100.00 PD/BADP/Schem e-1 2201 8-19 dtd 1 5/09/201 8 Shergoan Sub Total 100.00 100.00

Block Total 't 50.00 150.00

Nafra CD Block 1 Development of model villag€ at Dibrick village

(a) C/o Community Hall at Dishing Nafra 20.00 100% 20.00 PD/BADP/Scheme-36/1 /201 8-1 9 dtd 221 1 1 l2O1 I Sub Total = 20.00 20.00

VKV Proposal(Additional Scheme) 2 Establishment of Vivekananda Kendra Vidyalaya at Nafra 400.00 1000/" 400.00 PD/BADP/Scheme-17 12018-19 dtd 15/09/201 8 Nafra Sub Total 400.00 400.00

Block Total = 420.00 420.00

District Total 570.00 570.00

Page 1 Annexure - | LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERREO THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved o/o of fund Fund now No. & date of sanction order No. Schemes / Prqect Village outlay to be transferred transferred I 3 4 5 6 7

East Kameng Dlstrict: Bameng GD Block 1 Providing Water Supply at Kampa, Lada HQ Kampa (Lada) 15.00 100% 15.00 PD/BADP/Scheme-49/201 8-1 9 Dtd 30/1 0/201 I 2 C/o MIP at Dayangjen, Lada HQ Dayangjen 15.25 IOOYo 15.25 PDi BADP/Schem e-4912018-19 Dtd 30/102018 (Lada) 3 C/O MIP at Sekong village Sekong 11.00 100Yo 1 1.00 PD/BADP/Schem e-4912019-19 Dtd 30/1 0/201 I 4 Development of Modol village at Drakshi villag€

e) Construction of additional School building at Govt Drakshi villag6 15.00 100% 15.00 PD/BADP/Scheme49l2018-19 Dtd 30/'1 0/201 I primary school, Drakshi (3 rooms) Sub Total = 56.25 56.25

D€velopment of B€sal villag€ as Mod€l vlllage(Additional Sch€m€) 1 C/o Community Hall at Besai village, East Kameng. Besai 19.44 100o/o 19.44 PD/BADP/Scheme-09/04/20 1 8-1 I dtd 0711012018 Sub Total ,t9.4 19.4

Block Total 75.69 75.69

Khenewa CD Block 1 Dovelopment of Mod€l vlllage at Soplllyang e) Construction of additional School building at Govt Sepiliyang 15.00 100% 15.00 PD/BADP/Scheme-49/201 8-'1 9 Dtd 30/1 0/201 8 primary school, (3 rooms) tt Block Total 15.00 15.00 Chayangtajo CD Block I Developm€nt of Model village at Wada Bagang b) C/o 1 unit T-ll Teach€r quarter with toilet & Water Wada Bagang 10.50 100Yo 10.50 PD/BADPischem e-361212018-1 I dtd 221 1 1 12018 facility c) C/o Multipurpose Community Hall Wada Bagang 16,00 100% 16.00 PD/BADP/Scheme-36/3201 0-1 I dtd 221 1 1 l2O1 I

Page 1 Rs. ln lakh st. Name of the Sector and Location/ Approved o/" of fund Fund now No. & date of sanction order No Schemes / Prgect Village outlay to be transferred transferred A 1 2 3 4 6 7

Sub Total 26.50 26.50

2 Development of Tagampu village as Mod€l village(Additional Scheme) 1 C/o SPT Teachers Barrack (3 unit), East Kameng. Tagampu 19.44 1000h 19.44 PD/BADP/Scheme-09/05/201 8-1 9 dtd 07 I 1 0D018

Sub Total 19.4 19.4 Block Total 45.94 45.94

District Total 136.63 136.63

Page 2 Annexure - | LIST OF SANCTIONED SCHEMES UNOER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Pro.ject Village outlay to be tra nsferred transferred

1 2 3 4 5 6 7

Kurung Kumey Dlstrict: Parcl-Parlo CD Block 1 Dev€lopment of Model villago at Langbang

a) C/o CC Steps within the village Langbang 10,75555 1000k 10.75555 PD/BADP/Scheme-36/9/20 1 8-1 9 dtd 221 1 1 12018 b) C/o Community Centre Langbang 20.00 100% 20.00 PD/BADP/Scheme-36/1 0/201 8-1 9 dtd 221 1 I 120 18

e) Community vegetable garden cum mixed Langbang 20.00 100% 20.00 PD/BADP/Scheme-36/1 1 /201 8-1 9 dtd 221 1 1 120 18 farming(piggery, fishery, banana, kiwi and large cardamom) Block Total 50.75555 50.75555

Sarli CD Block ,| Dovolopment of Mod€l village at Sat€

a) C/o CC Steps within the village Sate '10.75555 100% 10.75555 PD/BADP/Schem e-361 121201 8-19 dtd 221 1 1 120 18 b) C/o Community Centre Sate 20.00 100o/o 20.00 PD/BADP/Soheme-36/1 3/201 8-1 9 dtd 221 1 1 12018 e) Community vegetable garden cum mixed farming Sate 20.00 100% 20.00 PD/BADP/Scheme-36/1 4/201 8-1 9 dtd 221 1 1 12018 (piggery, fishery, banana, kiwi and large cardamom)

Securlty related prolect 2 CONSTRUCTION OF STAGING HUT AT CP - 1O Gane = K2 15.00 lOOo/o 15.00 PD/BADP/Scheme-36/1 5/201 8-1 I dtd 221 1 1 120 18 LRP ROUTE K.1 CHAITO SQ 1552 M/S NO.82 D/16 (kawachvi) Ghaito

Block Total 65.75555 65.75555

Damin CD Block 1 Developm6nt of Model villago at Nisuk a) C/o CC Steps within the village Nisuk 10.75555 100% 10.75555 PD/BADP/Scheme-36/1 6/201 8-1 I dtd 221 1 1 120 18

Children amusement park Nisuk 16.00 100% 16.00 PD/BADP/Schem e-361 17 1201 8-19 dld 221 1 1 120 18 Block Total 26.75555 26.75555

Page 1 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 3 4 6 7

Kolorlang CD Block 1 Development of Model vlllage at Yumlam a) C/o CC Steps within the village Yumlam 23.75555 100% 23.75555 PD/BADP/Scheme-36/1 8/201 8-1 9 dld 221 1 1 12018

b) Clo Community Centre Yumlam 20,00 100% 20,00 PD/BADP/Scheme-36/1 9/2018-1 I dtd 2211 1 12018 d) Community vegetable garden cum mixed farming Yumlam 20.00 100% 20.00 PD/BADP/Schem e-3612012019-19 dtd 221 I 1 120 1g (piggery, fishery, banana, kiwi and large cardamom) Sub Total 63.75555 63.75555

Vl(V Proposal (Additlonal Sch€mo) 2 Upgradation ofVivekananda Kendra Vidyalaya at Koloriang 100.00 100% 100.00 PD/BADP/Scheme-15/2018-19 dtd 15/09/201 8 Koloriang Sub Total 100.00 100.00 Block Total 163.75555 163.75555

District Total 307 .0222 307 .0222

Page 2 Annexure - I LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred 1 2 J 4 6 7

Kra Daadl Dl3trict: Plprorang CD Block

1 C/o Porter Track from Raha to Sangchap (2.00 Km). Raha 5.00 100k 0.50 PD/BADP/Scheme43/201 8-1 9 dtd 31 I 1 01201 I 2 C/o Porter Track from Rashik Hogu to Tongbia village Bikya 5.00 lOYo 0.50 PD/BADP/Soheme-43/201 8- 1 9 dtd 31 I 1 012018 via Lenering (2.00 Km).

3 C/o Porter Track from Gyapin to Tali (2.00 Km). Gyapin 5.00 10% 0,50 PD/BADP/Scheme-43/201 8-1 I dtd 31t10t2018

4 C/o Porter Track from Hania to Rikung (2.00 Km). Hania 5.00 10% 0.50 PD/BADP/Scheme43/201 8-'1 9 dtd 31t10t2018

5 C/o Porter Track from Sangio to Tawle (2.00 Km). Sangio 5.00 1OYo 0.50 PD/BADP/Scheme43/201 8-1 9 dtd 31t10t2018 6 C/o Porter Track from Tawle to Tahyi (3.20 Km) Karsang 7.75 10% 0.775 PD/BADP/Scheme43/201 8-1 I dtd 3M012018

7 C/o Porter Track from Middle School Pipsorang Hq to Pipsorang 7.75 10% 0.775 PD/BADP/Scheme-43/20'l 8-1 I dtd 31t10t2018 Tahyi (3.20 Km).

I C/o Porter Track from Raha to Bikya (2.00 Km). Raha 5.00 1lYo 0.50 PD/BADP/Scheme43/201 8-'1 I dtd 31 I 101201 I 9 C/o Porter Track from Sepaha to Tedung (4.00 Km). Sepaha 9.00 1lYo 0.90 PD/BADP/Scheme-43/201 8-1 9 dtd 31 I 101201 I

10 C/o Porter Track from Keba to Panyong (2.80 Km). Keba 7.00 1lYo 0.70 PD/BADP/Scheme-43/201 8-1 I dtd 31 I 1 01201 8

11 C/o Porter Track from Nlobia to Zara village (2.00 Nyobia 5.00 1lYo 0.50 PD/BADP/Scheme-43/201 8-1 9 dtd 31 I 1 01201 g Km). 12 C/o Porter Track from Zarato Keba (2.00 Km). Zan 5.00 100h 0.50 PD/BADP/Scheme43/20'1 8-1 9 dtd 31 I 101201 I

13 Construction of WRSB at Tawle over Hamma river in Tawle (Sangio) 10.00 10% 1.00 PD/BADP/Scheme-43,/201 8-1 9 dtd 31 I 1 01201 8 between Sangio to Karsang (80.00 m Span).

14 Construction of WRSB at Ragha over Hamma river in Ragha (Samba 10.00 10% 1.00 PD/BADP/Scheme-43/201 8-1 9 dtd 31 I 1 Ol2O18 between Sangio to Karsang (75.00 m Span) Karsang) 15 Construction of WRSB at Taai over Hamma river in Tahyi (Samba 10.00 10% 1.00 PD/BADP/Scheme-43/201 8-1 I dtd 3 1 I 1 012018 between Sangio to Karsang (80.00 m Span). Karsang) to Maintenance of Suspension bridge at upper Pare river Gyapin 7.00 10% 0.70 PD/BADP/Scheme-43/201 8-1 I dtd 3 1 I 1 0120 18 at Gyapin village.

17 C/o Super structure for WRSB over Sullu river at Tami 9.00 10% 0.90 PD/BADP/Schem e-4312018-19 dtd 31 I 101201 I Lukte Hate in between Bagjam to Lukbia.

Page 1 Rs. ln lakh sl- Name of the Sector and Location/ Approved Y" ol fund Fund now No. & date of sanction order No. Schemes / Prolect Village outlay to be transferred transferred

1 2 3 4 6 7

18 Training on Basic Compute(for ten youths) Pipsorang Hq. 4.50 10% 0.45 PD/BADP/Scheme43/201 8-1 I dtd 3111012018

19 C/o Toilet and Bathroom at Govt. Girls Residential Pipsorang Hq. 7.00 1lYo 0.70 PD/BADP/Scheme-43i201 8-1 9 dtd 31 I I 0l2U A School Pip-sorang.

20 Training on River Rafting (For five youths) Pipsorang Hq. 5.00 10% 0.50 PD/BADP/Scheme43/201 8-1 9 dtd 3 1 I I 0l2UA

21 Training on Para gliding (for five youths) Pipsorang Hq. 5.00 10% 0.50 PD/BADP/Scheme-43/201 8-1 I dtd 3 1 I 1 012018 22 Development of Model village at Sangio village a) lnstallation of Solar Street Lights at Songio Smart Sangio 10.00 10% 1.00 PD/BADP/Scheme-43/201 8-1 9 dtd 31 I 1 012018 Village Hub. b) lnstallation of Solar Home Lighting System for rural Sangio 17 .25555 10% 1.725555 PD/BADP/Schem e-4312018-19 dtd 31i 10/2018 households. c) C/o Teacher's Quarter Sangio 10.00 1lYo 1.00 PD/BADP/Soheme43/2018-19 dtd 31l1O|2UA d) C/o Classroom Building Sangio 25.00 lOYo 2.50 PD/BADP/Scheme-43/201 8-1 9 dtd 31 I 1 012018 e) lnstallation of satellite phone(DSPT) for inter-village Sangio 7.50 10% 0.75 PD/BADP/Scheme{3/201 8-1 9 dtd 31 I 1 012018 communication District cum Block Total 208.75555 20.88

Page 2 Annexure - I LIST OF SANCTIONEO SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Proj6ct Village outlay to be transf6rred transferred

1 2 3 4 5 6 7

Upp€r Subanslrl Dlstrict: Siyum CD Block 1 D€velopment of Modsl vlllage at Eyum d) Mulltipurpose Community Hall with all basic faciliti6s Eyum 23.7 4445 100Y0 23.74445 PD/BADP/Scheme-37 I 1 12018-19 dtd 231 1 1 12018 c) C/o Community Playground at Eyum. Eyum 24.00 1000/0 24.00 PD/BADP/Schem e-37 12120 18-1 I dtd 231 1 1 l2U A a) C/o Tsachres Bachelor Barrack at Eyum Eyum 16.00 1000k 16.00 PD/BADP/Scheme-37/3/2018-1 9 dtd 231 I I 12018 Block Total 63.74445 63.7 4445

Nacho CD Block 1 Development of Model vlllage at Koba b) Providing Water Supply at Koba village. Koba 25.00 100% 25,00 PD/BADP/Schem e-37 I 4120 18-19 dtd 231 1 1 l2O1 I a) C/o Multipurpose Community Hall with all basic Koba 25.00 100% 25.00 PD/BADP/Schem e-37 I 5120 18-1 g dtd 231 1 I l2U A facilities. Block Total 50.00 50.00

Llm€king - Taksing CD Block 1 C/o Wire Suspenslon bridge over rivgr Tsherichu at Gelomo 25.00 1lOYo 25.00 PD/BADP/Schem e-37 17 120 18-1 I drd 231 1 1 1201 I Taw Segu(Bidak) under Gelomo villag6 of Limeking circle.

2 C/o Approach road from BRTF Road to Karpajobe Lingbing 23.25 100% 23.25 PD/BADP/Schem e-37 1612018-19 dtd 231 1 1 12018 community sand and stone quarry at Lingbing village

Block Total 48.25 48.25

District Total 161 .9944s 1 61 .9944s

Page 1 Annexure - | LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved o/o ol lund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred I 2 4 b 7

Weet Slang Dlstrlct: Monlgong CD Block

1 C/o Link road from Namashibo to Chengo village Namashibo - Chengo 20.00 1lYo 2.00 PD/BADP/Schem e-461201 8-1 I dtd 31 /1 0/201 8 (900mtr)

2 C/o FSB at Yomding over Yomgo River Saji-ll 10.00 10% 1.00 PD/BADP/Scheme46/201 8-'1 I dtd 31 I 1 01201 I 3 C/o Rural Link Road from Remang village to ITBP Remang Saji lV 15.00 10o/o 1.50 PD/BADP/Schem e-461201 8-19 dtd 31 /1 0/201 8 Gate, Monigong (300 mtrs)

4 C/o FSB over Dechosokong (river ) at Lusingyingbe Monigong HQ 10.00 10% 1.00 PD/BADP/Soheme-46/201 8-19 dtd 31/10/2018 village

5 C/o CC road from BRTF Road to Holidsubung Monigong HQ 10.00 10% 1.00 PD/BADP/Sohem e-46 1201 8-19 dtd 31 /1 0/20 1 8 Anganwadi Centre Monigong (1 10 mtrs) 6 C/o approach road from BRTF road to Govt. Papikrung 9.00 10% 0.90 PD/BADP/Sohem e-4612018-19 dtd 31/10/201 8 Residential School Papikrung (50 mtrs) 7 C/o CC step from BRTF road to Upper colony at Monigong HQ 5,00 1lYo 0.50 PD/BADP/Scheme-4612018-19 dtd 31/10/201 8 Monigong Township(65 mtrs)

8 Cio CC step from BRTF road to Bapsengang at Monigong HQ 6.00 10% 0.60 PD/BADP/Scheme-46/201 8-1 I dtd 31 /1 0/201 8 Solorgong village under Saji- ll Gram panchayat (70 mtrs) I C/o CC step from Lower Bazar Line via SIB to PHE Monigong HQ 7.00 10% 0.70 PDi BADP/Sohem e-4612018-19 dtd 31/10i2018 Colony (80 mtrs)

10 C/o CC drainage from Primary School Chengo to Chengo 9.50 10% 0.95 PD/BADP/Scheme-46/201 8-1 I dtd 31 I I 01201 I BRTF road (350 mtrs) 11 C/o CC Drain at Upper Bazar Line, Monigong Monigong HQ 7.00 1lYo 0.70 PD/BADP/SCheme-46/2018-1 I dtd 31 11012018 (Tapox80 mtrs)

12 C/o CC Drain at boye colony Monigong (120 mtrs) Monigong HQ 8.00 lOYo 0.80 PD/BADP/Scheme46/201 8-1 I dtd 31 I 1 012018

13 C/o CC Drain at Korle village (60 mtrs) Korle 5.00 10% 0.50 PD/BADP/Scheme-46/201 8-1 I dtd 31 I 1 01201 I g 14 C/o CC Drain from Road to Holy Angel English Monigong HQ 9.00 10% 0.90 PD/BADP/Scheme-46/20 1 8-1 I dtd 31 I 1 01201 School , Monigong (1 10 mtrs)

15 C/o Community Hall at Yorkodom Yorkodom 10.00 10% 1.00 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 1 01201 I

Page L Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transfarred

1 2 3 4 5 6 7

16 C/o Daily tvlarket Shed at Monigong Township Monigong HQ 10.00 10/o 1 .00 PD/BADP/Scheme46/20'1 8-1 9 dtd 31 I 1 01201 I

17 Basic computer course for youth of -Tato Monigong 7.50 10% 0.75 PD/BADP/Scheme-46/20'1 8-1 I dtd 31 I 1 01201 8 block

18 Carpet Making Monigong 7.00 19Yo 0.70 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 1 01201 g 19 C/o Teacher's Qtr at Govt. Primary School Chengo Chengo 10.00 lOYo 1.00 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 101201 I 20 Providing of Solar street light for Namashibo & Namashibo 7.00 l OYo 0.70 PD/BADP/Schem e-461201 8-19 dtd 31 I 101201 I Monigong Town. 21 Development of Model village at Namashibo

a) lnternal road connectivity within village including Namashibo 51.75555 1jYo 5.18 PD/BADP/Scheme-4612018-19 dtd 31 I 1012018 drain/culvert

b) Power transmission and distribution withln village(Mini Namashibo 18.00 10% 1.80 PD/BADP/Scheme-46/20'1 8-1 I dtd 31 I 1 01201 8 hydel likely to be commission during the year 201 7- 18) Proposals Rocomm€nd6d by BGFs 22 CONSTRUCTION OF NEW IRON PLATE BRIOGE Monigong 50.00 1lYo 5.00 PD/BADP/Scheme-46/2018-1 I dtd 31 11012018 AT RH|NO-1 (SO 2120) M/S NO.-82 H/14. z5 HENKAR FSB TO BE CHANGED INTO IRON PLATE Monigong 70.00 1lYo 7.00 PD/BADP/Scheme-46/201 8-1 I dtd 31 I 101201 I BRIDGE, SO THAT PORTERS CAN CARRY LOGISTICS TO HENKAR POST.

24 CONSTRUCTION OF HUT AT RHINO . 02 (SQ Monigong 15.00 10% 1.50 PD/BADP/Schem e-461201 8-19 dtd 31 /'1 0/201 I 2421lMtS NO.82 H/14 25 CONSTRUCTION OF HUT AT MODUM ENROUTE Monigong 15.00 1jYo 1.50 PD/BADP/Schem e-461201 8-19 dtd 31 /1 0/201 8 MIKE - 7 Block Total = 40't.75555 40.17 556

Iti€chuka CD Block C/o CC step from PWD road to Cultural Centre at Manegang 5.00 10% 0.50 PD/BADP/Scheme-46/201 8-1 I dtd 31 I 1 01201 I Manegang (85 mtr)

2 C/o Link Road from Tourist Lodge to PMGSY, Barangang 7.00 1lYo 0.70 PD/BADP/Scheme-46 1201 8-19 dtd 31 /1 0/20 1 8 Barangang (60 mks)

Page 2 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Prolect Village outlay to be transferred transferred

1 3 4 5 6 7

3 C/o of flood protection wall at Doromba near Bumjipanga 6.00 1lYo 0.60 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 1 01201 8 Bumjipanga bridge ( 50 mtrs & hight 4 ft) 4 C/o CC drain at Lower Barangang (120 mtrs) Barangang 5.00 10% 0.50 PD/BADP/Scheme-46/201 8-1 I dtd 31 I 101201 I g 5 C/o CC drain at Sona sa, Bumjipanga (120 mtrs) Bumjipanga 7.00 10% 0.70 PD/BADP/Scheme46/201 8-1 I dtd 31 I I 01201

b C/o CC drain at khangsar (Lhallung) (120 mks) Lhallung 5.00 10v" 0.50 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 1 01201 I

7 C/o CC drain at Tataksha (lower gyananang) ('1 35 Pharge 7.00 10% 0.70 PD/BADP/Soheme-46/201 8-1 I dtd 31 I I 0120 1 I mtrs)

I C/o Compound wall around CHC , Mechukha (650 Mechukha HO 32.50 10% 3.25 PD/BADP/Schem e-461201 8-19 dtd 31 I I 01201 8 mtr) I C/o X -ray room at CHC Mechuka Mechukha HO 15.00 10% 1.50 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 1 01201 I 10 Ci o Barbed wire fencing at Govt. Higher Secondary Mechukha HQ 20.00 10% 2.00 PD/BADP/Schem e-4612018-19 dtd 31 I 1 0120 1 I School , Mechuka (350 mtrs) 11 C/o Recreational park near Chorten, Mechukha Mechukha HQ 6.00 10% 0.60 PD/BADP/Scheme46/201 8-1 9 dtd 31 I 1 Ol2O1 I

12 C/o Cultural Centre at singbir Singbir 25.00 10% 2.50 PD/BADP/Scheme-46/201 8-1 9 dtd 31 I 1 01201 I 13 Basic computer course for youth of Mechuka-Tato Mechuka 7.50 1lYo 0.75 PD/BADP/SCheme-46/201 8-'1 9 dtd 31 I 101201 I block 14 Carpet Making Mechuka 7,00 10% 0.70 PD/BADP/Scheme46/201 8-1 I dtd 31 I 1 01201 I 15 C/o additional classroom at Lower Primary School, Dechengthang 7 .00 100k 0.70 PD/BADP/Scheme-46/201 8-1 I dtd 31 I 1 01201 I Dechenthang.

16 C/o ILCT 03(three) additional classroom at Pharge Pharge 10.00 10% 1.00 PD/BADP/Scheme46/20'l 8-1 9 dtd 31 I 1 012018 Middle School. 17 Development of Model village at Baranggang

a) lnternal road connectivity within village including Barangang 40.00 10% 4.00 PD/BADP/SChem e-461201 8-19 dtd 31 I 1 Ol20 18 drain/culvert

b) Development of Pisci-Culture (fishpond) include C/o Bara nga ng 29.75555 10% 2.98 PD/BADP/SChem e-46 1201 8-19 dtd 31 I 1 0120 18 shed/store room/fencin g etc

Page 3 Rs. ln lakh st. Name of the Sector and Location/ Approved To ol lund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred c I 2 4 5 6 7

Proposals Rocommonded by BGF8 '18 REPAIR OF FSB (80 MTR APPX) ENROUTE MIKE-1 Mechukha 25.00 1lYo 2.50 PD/BADP/Schem e-461201 8-19 dtd 31 /1 0/20 1 8 BETWEEN YORLUNG TO SHASTRI CAMP (SO 3116) M/S NO.- 82 H/14. (APPX- 80 MTR)

19 REPAIR OF WOODEN BRIDGE ENROUTE MIKE-1 Mechukha 20.00 1lYo 2.00 PD/BADP/SCheme-46/20'18-19 dtd 31/10/201 8 BETWEEN TRIJUNC. AND SERUPTANGLA (SO 2420)MlS NO.82 Hi14. Sub total i 286.75555 28.675555 20 Development of Model village at Singbir village, West

(i) C/o lntra-village motorable link road within Singbir Singbir 100.00 40Yo 40.00 PD/BADP/Scheme-46/2018-19 dtd 31 I 10l2UA village. (ii) C/o CC footpaths and footsteps within the village. Singbir 27 .10 40Yo 10.84 PD/BADP/Schem e-4612018-19 dtd 31/10/201 I (iii) Providing Safe Drinking Water Supply to all Singbir 160.00 40% 64.00 PD/BADP/Scheme-4612018-19 dtd 31/101201 8 household within the village (iv) Flood protection/Anti erosion work along Andachu Singbir 400.00 40% 160.00 PD/BADP/Scheme-46/2018-19 dtd 31 11012018 nallah. (v) C/o Drainage system within the village. Singbir 27.10 40% 10.84 PD/BADP/Scheme-46/201 8-1 I dtd 31t10t2018 (vi) C/o Health Sub-Centre in Singbir village. Singbir 70.00 40o/o 28.00 PD/BADP/Scheme-46/201 8-1 I dtd 31t1012018 (vii) C/o s(five) nos. of Quarters for HSC staffs. Singbir 100.00 40% 40.00 PD/BADP/Scheme46/201 8-1 I dtd 31t10t2018

(viii) C/o Water mill in Singbir village. Singbir 40.00 400k 16.00 PD/BADP/Scheme-46/201 8-1 9 dtd 31t1012018

(ix) C/o Community Dairy centre. Singbir 30.00 40% 12.00 PD/BADP/Scheme-46/201 8- 1 I dtd 31t10t2018 (x) C/o Community Fish ponds in Singbir village Singbir 40.00 40% 16.00 PD/BADP/Scheme-46/201 8-1 I dtd 31t10t2018 (xi) C/o Community Hall/ Auditorium (500 capacity) in Singbir 80.00 40% 32.00 PD/BADP/Scheme*46/201 8-1 I dtd 31t1012018 Singbir.

(xii) Providing Wind Solar hybrid lighting / electrification. Singbir 20.00 40Yo 8.00 PD/BADP/Schem e461201 8-19 dtd 31 /1 0/201 8

(xiii) C/o Cultural centre in the village. Singbir 25.00 400k 10.00 PD/BADPischem e4612018-1 9 dtd 31 I I 01201 I (xiv) C/o Backyard Poultry for the villagers Singbir 5.00 40Yo 2.OO PD/BADP/Scheme-46/2018-19 dtd 31/10/201 8

Page 4 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 2 3 4 o 7

(xv) C/o Community Vermi-compost. Singbir 5.00 40% 2.OO PD/BADP/Scheme-46/2018-19 dtd 3111012018

(xvi) C/o Piggery in Singbir village. Singbir 5.00 40% 2.00 PD/BADP/Scheme-46/201 8-1 I dtd 31 I 101201 8

(xvil) C/o Communily toilets in the village. Singbir 5.80 4OYo 2.32 PD/BADP/Scheme-46/201 8-1 9 dtd 31 I 1 01201 I lrJ-b total = 1140.00 4s6.00 Block Total = 1426.7 5555 484.67556

District Total = 't.828.5111 524.85111

Page 5 Annexure - | LIST OF SANCTIONED SCHEMES UNDER BAOP AGAINST WHICH FUND IS NOW TRANSFERREO THROUGH PFMS

Rs. ln lakh SI. Nam6 of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be tra nsferred transferred

1 ? 4 5 6 7

Upper Siang District: CD Block lmprovement of FSB Over Siang River at Kongu area Palling 10.00 1jyo 1.00 PD/BADP/Schem e-47 12018-19 dtd 31/10/2018 of Palling village

2 lmprovement .of FSB Over Siang River at Betet area Singging 10.00 100k 1.00 PD/BADP/Sohem e47 1201 8-19 dtd 31 I 1 01201 I of Singging village 3 C/O CC Steps from Nompang to Angging Village Angging 10.00 100k 1.00 PD/BADP/Schem e47 12018-19 dtd 31 I 1Ol2O1 I

4 C/O Link Road from BRTF Road to Nasing area at Migging 7.00 10% 0.70 PD/BADP/Schem e-47 12018-19 dtd 31 I 1 0120 18 Migging

5 C/O CC Steps from BRTF Road to Power House at Migging 5.00 100k 0.50 PD/BADP/Scheme-47 12018-19 dld 31 I 10i2018 Migging

6 C/O CC Steps from Moso village to Nyanyi lidung Mosso 6.00 lOYo 0,60 PD/BADP/Scheme47 12018-19 dld 31 I 1012018

7 C/O CC Drain near the Teacher quarter of GHSS Tuting 5.00 10% 0.50 PD/BADP/Sohem e-47 1201 8-19 dtd 31 I I 012018 Tuting

I C/O CC drain at Pl Line Tuting Tuting 5.32 100k 0.53244 PD/BADP/Scheme47 1201 8-19 dtd 31 I I 01201 8

I Development of Cardamom Garden at Mikong, Likor 10.00 10% 1.00 PD/BADP/Soheme47 12018-19 dtd 31 I 1 0120 18 Hardong, Pirme and Balek area at Likor village.

10 Development Cardamom Plantation at Potlek area at Tuting 5.00 10% 0.50 PD/BADP/Scheme-47 1201 8-1 I dtd 31 I 1 012018 Tuting 11 Development of Cardamom Garden at Lune and Migging 9.00 10% 0.90 PD/BADP/Scheme-47 12018-19 dld 31 I 1012018 Soyang area at Migging

12 C/O MIC for Kinuk area at Zido Zido 5.00 100 0.50 PD/BADP/Schem e47 12018-19 dld 31 I 1 01201 I 13 C/O Treatment Shed at Veterinary Dispensary at Tuting 5.00 10% 0.50 PD/BADP/SCheme-47 1201 8-19 dtd 31 I 1 012018 Tuting

14 C/O Multipurpose Community Hall at Migging-ll Migging 12.00 100k 1.20 PD/BADP/Schem e-47 12018-1 9 dld 31 I 1 0120 18 Village 1E C/O Waiting shed at 'O' point at Panggo Panggo 5,00 1lYo 0.50 PD/BADP/Schem e47 1201 8-19 dtd 31 I 1 01201 I

16 C/O Stone fencing at Kumkong Water Field areas of Likor 8.00 10% 0.80 PD/BADP/Schem e-47 1201 8-19 dtd 3 1 I 1 012018 Likor village

Page 1 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be tra nsferred transferred

1 2 3 4 5 r, 7

17 C/O 2(Two) Unit Bachelor Barrack for Education Staff Migging '16.00 10% 1.60 PD/BADP/Schem e-47 1201 8-19 dtd 31 I 1 Ol20 18 at Migging CO Hqk

18 C/O Boundary wall around Girls Residential School at Tuting 9.18 10% 0.917556 PD/BADP/Schem e-47 120 1 8-1 I dtd 31 I 1012018 Tuting

19 C/O Boundary wall around Community Hall at Tuting Tuting 10.00 100 1.00 PD/BADP/Scheme47/201 8-1 I dtd 31 I 1 01201 I 20 lmprovement .of MHP at Panggo Panggo 5.00 10% 0.50 PD/BADP/Schem e47 1201 8-19 dld 31 I I 01201 I 21 Skill Developm6nt and Training Tuting 14.50 10% 1.00 PD/BADP/Scheme47/2018-19 dtd 3111012018

Proposals Recommend€d bv BGFs 22 RENOVATION OF FSB AT GR- 966391 RAYANG Panggo 10.00 10% 1.00 PD/BADP/Schem e-47 12018-19 dtd 31 I 101201 I ASI. GR- 966391 M/S NO.- 82 L/9 ENROUTE TANGO.I BETWEEN KIGOT TO UNE LENGTH. (APPX- 40 MTRS).

23 RENOVATION OF FSB AT GR- 819560 Panggo 12.00 1lYo 1.20 PD/BADP/Scheme-47 12018-19 dld 31 11012018 DTGEKORONG. GR- 819560 M/S NO.- 82 Kt12 ENROUTE TANGO.I BETWEEN KIGOT TO UNE LENGTH. (APPX- 40 MTRS).

24 RENOVATION OF FSB AT GR.861471 BARAK ASI. Panggo 14.00 1lyo 1 .40 PD/BADP/Sohem e-47 1201 8-19 dtd 31 I 1 01201 I GR- 861471 M/S NO.- 82 U9 ENROUTE TANGO-1 BETWEEN K|GOT TO UNE LENGTH. (AppX- 40 MTRS). ,E CiO NEW FSB GR- 786720 NAPE ASI. GR- 786720 Panggo '14.00 10% 1 .40 PD/BADP/SCheme-47 12018-19 dtd 31/10/201 8 M/S NO.- 82 I(8 ENROUTE TANGO.2 BETWEEN JORGTNG TO DtLELtPUtK LENGTH. (APPX- 30 MTRS). zo c/o NEw FSB GR- 779725 S|MU ASt. GR- 779725 Panggo 15.00 1.50 PD/BADP/Schem e-47 1201 8-1 9 dtd 31 /1 0/201 I M/S NO.. 82 I(8 ENROUTE TANGO-2 BETWEEN JORGING TO DILELIPUIK LENGTH. (APPX. 20 MTRS).

27 CiO NEW STAGING HUT AT TUDODILE. SQ- 7170 Panggo 15.06 1lYo 1.506 PD/BADP/Schem e-47 12018-19 dld 31 I 1 01201 I M/S NO.. 82 I(8 ENROUTE TANGO.I BETWEEN JORGING TO SHOKLA. (APPX-40x40 MTRS).

Page 2 ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Prolect Village outlay to be transferred transferred I J 4 5 6 7

28 C/O NEW STAGING HUT AT NAPE. SQ.7072 M/S Panggo 11.00 10% 1.10 PD/BADP/Sch6m e-47 12018-19 dtd 31 /1 0/201 8 NO.- 82 I(8 ENROUTE TANGO-2 BETWEEN JORGING TO DILELIPUIK. (APPX-40x40 MTRS).

29 Development of Mod€l vlllage at Mosslng e) C/o CC drain within Mossing village(Phase-l)(400 m) Mosing 20.00 10oo/o 2 0.00 PD/BADP/Scheme-38/1 /20 1 8-1 9 dtd 231 1 1 1201 8

Block Total = 283.060 45.856

Slnga Gelling CD Block

1 C/O FSB Over Pihutu river at Singa. Singa 10.00 lOYo 1.00 PD/BADP/Schem e47 1201 8-1 I dtd 31 I I 01201 I 2 C/O CC Culvert Over Murong Nallah at Bishing Bishing 10.00 10% 1.00 PD/BADP/Schem e47 120 1 8-19 dtd 31 I 1 01201 I

3 C/O CC Footpath from Medical to Yangsang Bridge at Singa 8.00 1Oo/o 0,80 PD/BADP/Scheme-47 1201 8-1 I dtd 31 I 1 012018 Singa 4 C/O FSB over Athoyi Aggu River at Simuling Simuling 7.00 10% 0.70 PD/BADP/Scheme47 12018-19 dtd 31 I 101201 I

5 C/O Foot Track at Gawa Chuling at Simuge Simuge 5.00 10% 0.50 PD/BADPischeme4T 1201 8-19 dld 31 I I 01201 8

t) C/O CC Slab over Achisino Nallah at Simuge Simuge 5.00 10% 0.50 PD/BADP/Schem e47 1201 8-1 I dld 31 I 1 01201 I

7 C/o Guest House at Kugging Kugging 15.00 10% 1.50 PD/BADP/Schem e47 1201 8-19 dtd 31 I 1 01201 I qtr 8 C/o Chain link fencing around teacher at GPS Simuge 8.00 1lYo 0.80 PD/BADP/Schem e47 1201 8-1 9 dtd 31 I 1 01201 I Simuge

9 Establishment of Cardamom Garden at Yamewo Singa / Yameling 8.00 10o/o 0.80 PD/BADP/Schem e47 120 1 8-1 I dtd 31 I 1 01201 I Anggo Area at Singa lfameling 10 Establishment at of Cardamom Garden Singa 7.00 1)Yo 0.70 PD/BADP/Schem e-47 1201 8-19 dld 3 1 I 1 01201 I Sillipu,Simuge,Old Singa, Anghachi, Simuling and Silage

11 C/O MIC from Chara chu to Khando chingkha at Tashrgao 5.00 10% 0.50 PD/BADP/Scheme47 1201 8-1 9 dtd 31 I I 01201 I Tashigaon

12 Community hall at Mankota Mankota 12.00 10% 1 .20 PD/BADP/Scheme47 1201 8-19 dtd 31/1 0/201 8 IJ Community hall at Silipu Sillipu 10.00 10% 1.00 PD/BADP/Scheme47 12018-19 dtd 31 I I 01201 I 14 Community hall at Singa Hq Singa 15.00 10Yo 1.50 PD/BADP/Scheme47 1201 8-1 I dtd 31 I 1 01201 I

Page 3 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Prqect Village outlay to be transferred transferred

1 2 3 4 5 6 7

C/o Community Thaptsang at Gawa Chuling at Simuge 10.00 1lvo 1 .00 PD/BADP/Scheme47/201 8-1 9 dtd 31 I 1 012018 Simuge village

16 lmprovement of MHP at Bishing Bishing 5.00 100k 0.50 PD/BADP/Scheme47 12018-19 dtd 31 I 1012018

17 Skill Development and Training Singa- Galling 14.50 10% 1.00 PD/BADP/Scheme47/201 8-1 9 dtd 31 I 1 012018 Block Total = 154.50 15.00

C/O Link Road from BRTF road to Muying area at Janbo 20.00 10% 2.00 PD/BADP/Scheme-47/2018-19 dtd 31 11012018 Janbo village

C/O Approach Road from PWD road to Community Pu buk 7.00 10% 0.70 PD/BADP/Schem e-47 1201 8-19 dld 31 I I 01201 I hall at Pubuk village

C/O CC Pavement BRTF Road to Community Hall at Gossang 7.00 10% 0.70 PD/BADP/Schem e-47 1201 8-19 dtd 31 I I 01201 I Gossang (ph-lll)

4 C/O Land Protection work at Bolung area at Janbo Janbo 5.00 1lYo 0.50 PD/BADP/Scheme47 1201 8-19 dtd 31 I 1 01201 I 5 C/O CC Drain within Janbo Village. Janbo 5.00 10% 0.50 PD/BADP/Scheme47 1201 8-19 dtd 31 I I 01201 I 6 C/O Drainage at Tapong Korong at Ramsing village Ramsing 5.32 10o/o 0.53 PD/BADP/Scheme47 12018-19 dtd 31 I 1 01201 I 7 C/O CC Drain at Ramtum Nallah at Moying village Moying 5.00 10% 0.50 PD/BADP/Schem e47 1201 8-19 dtd 31 I 101201 I

I C/O CC Drain at Lekong Nallah at Moying (Ph-ll) Moying 5.00 100h 0.50 PD/BADP/Scheme47201 8-1 9 dtd 31 I 1 01201 I

I C/O CC Lining for Tayit MIC at Janbo village Janbo 5.18 lOo/o 0.52 PD/BADP/Sch6me47/201 8-1 I dtd 31 I 1 01201 I 10 C/O CC Drain of Upper Ngoung WRC field area at Gossang 15.00 10% 1.50 PD/BADP/Schem e-47 1201 8-19 dtd 31 I 1 01201 I Gossang 11 C/O CC MIC for Dumbang MIC at Janbo Janbo 15.00 10% 1.50 PD/BADP/Scheme{7/201 8-1 9 dtd 31 I I 01201 I 12 C/O Protection work at Lisin Sinrak Lower Kolek Gossang 7.00 10% 0.70 PD/BADP/Schem e-47 1201 8-19 dld 31 I 1 01201 I WRC field area at Gossang.

IJ C/O Kebang Ghar at Jengging Jengging 10.00 1lYo 1.00 PD/BADP/Schem e47 12018-19 dtd 31 I 1 01201 I 14 C/O Chain link Fencing at WRC field at Tako, Ramsing 20.00 1lYo 2.00 PD/BADP/Scheme-47/201 8-1 I dtd 31 I 1 012018 Loksing, Deki, Geying and Ngeyi area at Ramsing village.

Chain Link Fencing around WRC field at Kinying are Karko 13.00 1lYo 1.30 PD/BADP/Schem e-47 1201 8-19 dtd 31 l1 012018 at Karko ph-l

Page 4 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Prolect Village outlay to be transferred transferred 1 2 4 6 7

t I O lCnain Link Fencing around WRC field at Mitpak area Karko 10.00 10% 1.00 PD/BADP/Schem e-47 120 1 8-19 dtd 31 I 1 012018 I lat Karko 't, Playground at Janbo viltage Janbo tt| l"ro 5.00 11Yo 0.50 PD/BADP/Schem e47 1201 8-1 I dtd 31 I 1 01201 I 18 Development and Training Jengging 14.50 10% 1,45 PD/BADP/Schem e47 1201 8-1 I dtd 31 I 1 01201 I | lSkill Block Total E 174.00 17.40

District Total = 611 .56 78.256

Page 5 Annexure - I LIST OF SANCTIONEO SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transierred

1 2 3 4 5 o 7

Siang District: Kaying-Payum CD Block

1 C/O Concrete CC Steps at Sikong and Rigu area(120 Gasheng 10.00 1lYo 1,00 PD/BADP/Scheme-44/201 8-1 9 dtd 301 I 0120 1 I m).

2 Strenghtening of Foot Suspension Bridge over Sike Gasheng 10.00 10% 1.00 PD/BADP/Schem e-441201 8-19 dtd 3Ol 1 012018 river at Gasheng(span 60m)

3 Renovation of Foot Suspension Bridge over Kibung Gasheng 10.00 10% 1.00 PD/BADP/Schem e-44 1201 8-19 dtd 301 1 012018 Stream at Gasheng(35 m).

4 C/O CC Steps at Sirging area of Gasheng village (300 Gasheng 10.00 10Yo 1.00 PD/BADP/Soheme-44/201 8-'1 9 dtd 30/1 0/20 1 8 m).

Renovation of Foot Suspension Bridge over Sikong Gasheng 10.00 1lYo 1.00 PD/BADP/Schem e-44 120 1 8- 1 I dtd 30 I 1 0 I 20 1 I river at Gasheng village (span 30 m). 6 Renovation of Foot Suspension Bridge over Yupbung Payum 10.00 10% 1.00 PD/BADP/Scheme-4412018-19 dtd 30/10/2018 river at Payum. (span 45m)

7 Establishment of Community Orange Garden at Molo 10.00 10% 1.00 PD/BADP/Schem e-44 1201 8-1 9 dtd 30/1 0/20 1 8 Pedetengo Area under Molo (10 Hect.)

8 C/O Separate Toilet for Ladies & Gents of Community Gasheng 10.00 10% 1.00 PD/BADP/Sohem e-44 l2U A-1 I dtd 301 1 0120 1 I Hall(Dere) at Gasheng village.

I Skill Development & Training Kaying-Payum 14.50 1Oo/o 1 .45 PD/BADP/Schem e441201 g-19 dld 3Ol I 0120'18

10 Renovation of 2 (Two) Teacher Quarters at Pame lV Pame 10.00 100 1.00 PD/BADP/Schem e4 4 120 1 8- 1 I dld 3Ol 1 0 120 1 I School

11 Renovation of Pame lV School Pame 10.00 lOYo 1.00 PD/BADP/Schem e 4 4 I 20 1 8- 19 dtd 301 1 0120 1 I

12 C/O RCC Two(2) Rooms Godown at Payum HQ. Payum (HQ) 10.00 10v" 1.00 PD/BADP/Scheme{4/201 8-1 9 dtd 3Ol 1 01201 I

13 E/o Organic Large Cardamom Garden at Takong Row 18.24444 100% 18.24444 PD/BADP/Schem e-37 1912118-19 dtd 231 1 1 1201 I area of Row village. 14 Development of Model village at Bogne a) Maintenance of Primary Health Centre, Bogne Bog 15.00 1000/. 15.00 PD/BADP/Schem e-37 I 1 1 1201 8-19 dtd 231 1 1 12018

Page 1 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No, & date of sanction order No Schemes / Pro.lect Village outlay to be transferred transferred E 1 2 3 4 6 7

d) Maintenanc6, Electrification, drinking and hand Bogne 19.40 1000/0 19.40 PD/BADP/Scheme-37 I 1 012018-19 dld 231 1 1 12018 washing galleries, separato sanitary toilets for Boys and Girls of Govt. Upper Primary School, Bogne.

f) lnternal drainage Bogne 1 1.75555 100% tt./o PD/BADP/Scheme-37/8/20 1 8-1 I dtd 231 1 1 120 1 I Distrct cum Block Total = 188.90 76.85444

Page 2 Ann€xure - | LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Namo of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 2 4 6 7

Dibang Valley Dlstrlct: Anlnl.Mlpl-Allny6 CD Block

1 C/o Upgradation of Echito Hydel at Acheso Village. Acheso 15.74445 100% 15.74445 PD/BADP/Schem e-3812120 1 8-1 I dtd 231 1 1 12018 3 Cio Link road to new habitation road at Angrim Valley Angrim Valley 15.00 100% 15 PD/BADP/Scheme-38/3/201 8-1 9 dtd 231 1 1 1201 I village.

4 C/o Community Hall (Rekho) at Angrim Valley Village. Angrim Valley Village 15.00 100o/o 15 PD/BADP/Scheme-38/4/20 1 8-1 9 dtd 231 1 I 120 1 I

Sub Total 45.74445 45.74445

VKV Proposal(Additlonal Schem€) g-1 5 Establishment of Vivekananda Kendra Vidyalaya at Anini 400.00 100Yo 400.00 PD/BADP/Schem e-l 81201 I dtd 1 5/09/201 8 Anini Sub Total 400.00000 400.00000

Block Total 445.7 4445 445.74445 Etalln-Mallnye CD Block

'1 C/o Protection wall at Aunli. Aunli 12.4789 1000k 12.4789 PD/BADP/Scheme-38/5/20 1 8-1 I dtd 231 1 1 l2O1 I 2 C/o RCC boys hostel for Govt. Primary Residential Athunli 23.00 100% 23.00 PD/BADP/Schame-38/6/20 1 8-1 9 dtd 231 I 1 l2O1 I School with Toilets at Athunli Village. 3 Clo RCC Girls hostel for Govt. Primary School with Athunli 23.00 100% 23.00 PD/BADP/Schem e-3817 120 18-1 I dtd 231 I 1 1201 I toilets at Athunli Village.

Block Total 58.47890 58.47890

Anelieh Azoo CD Block 1 C/o RCC double unit type-ll quarter for Medical Sub New Anaya 25.00 100% 25.00 PD/BADP/Scheme-38/8/20 I 8-1 9 dtd 231 1 1 1201 I Health Centre at New Anaya Village. Block Total 25.00 25.00 District Total 529.22335 529.22335

Page 1 Annexur€ - | LIST OF SANCTIONED SCHEMES UNDER BAOP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Pro.ject Village outlay to be transferred transferred

1 2 4 5 6 7

AnJaw District: -Goiliang CO Block

I C/o CC step at Nilang village. Nilang 5.00 10% 0.50 PD/BADP/Scheme-53/2018-1 I dtd 01 l1 I 12018

2 C/o CC st6p in between Braigong and Brailaing Braigong, Palang, 5.00 10o/o 0.50 PD/BADP/Scheme-53/2018-'1 9 dtd 01 l1 I 12018 village. Brailiang 3 C/o CC step at Challang village under Dav valley. Challang 5.00 10% 0.50 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018

4 C/o CC step from Braigong village to Palang village. Braigong, Palang 6.00 10% 0,60 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018

5 C/o RCC Culvert and CC step at Chiphal Nallah in Ch iran glat,Palalang 5.00 10% 0.50 PD/BADP/Scheme-53/2018-1 9 dtd 0111 I 12018 between Chiranglat to Palalang villag6.

6 Maintenanc6 of school building at Nilang village. Nilang 5.00 1lYo 0.50 PD/BADP/Soheme-53/2018-19 dtd 01 l1 1 12018

7 Maintenance of water supply at Palaliang village. Palaliang 5.00 10% 0.50 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12019 I Extension of water supply at Chiranglat village. Chiranglat 5.00 1lYo 0.50 PD/BADP/Scheme-53/2018-1 I dtd 01 l1 1 12018

I C/o Drainage Channel at Supliang village, Supliang 6.00 lOYo 0.60 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 1201 I

10 C/o Boundary wall at VKV, Amliang (Phase-ll). Am liang 10.00 lOYo 1.00 PD/BADP/Scheme-53/20'1 8-1 9 dtd 01 I I 1 1201 I

11 C/o Boundarywall at Govt. Middle school, Goiliang. Goiliang 10.00 10o/o 1.00 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 1201 8

12 Skill Development and capacity building (Weaving, Hayuliang-Goiling 14.50 10% 1 .45 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018 Mobile phone & two wheeler repairing) 13 Development of Model village at Nilang village

a) Transmission and Distribution (T&D) with transformer Nilang 29.75555 10% 2.975555 PD/BADP/Scheme-53/2018-19 dtd 0111 1 12018

b) C/o Two Unit teacher quarter for GRS, Nilang Nilang 20,00 10% 2.00 PD/BADP/Scheme-53/20'18-1 I dtd 01 l1 I 12018

c) C/o Health Sub-Centre. Nilang 20.00 lOYo 2.00 PD/BADP/Scheme-53/2018-19 dtd 01 l1 1 nO18

14 C/o School boundarywall at Goiliang Ph ll Goiliang 14.00 100o/o 14.00 PD/BADP/Scheme-38/9/20 1 8-1 I dtd 231 1 1 120 1 I Sub Total = 165.25555 29.125555

Page 1 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 2 3 4 5 6 7

Proposals for 2016-17 agalnst whlch no fund was released durlng that year and fund was roleased durlng 2017-19

15 C/o Health Staff quarter at Supljang Supliang 10.00 10o/o 1.00 PD/BADP/Scheme-53/20 1 8-1 9 dtd 01 I 1 1 l2O1 I

Sub Total = 10.00 1.00 VKV Proposal(Additional Scheme) 16 Upgradation ofVivokananda Kendra Vidyalaya at Amliang 100.00 1lOYo 100.00 PD/BADP/Scheme-13/2018-19 dtd 1510912018 Amliang Sub Total = 100.00 100.00

Block Tolal 275.25555 130.125555

Chaglagam CD Block

1 C/o Drainage system at Khatemna and Khatemna, Tablaiko 10.00 10% 1.00 PD/BADP/Scheme-53/20 1 8-1 9 dtd 01 I 1 1 1201 I Tablaiko.

2 C/o Drainage system at . Chaglagam 10.00 lOYo 1.00 PD/BADP/Scheme-53/2018-1 I dtd 01 l1 1 l2UA

3 C/o Concrete drainage system at Tegamna village. Tegamna 5.00 10% 0.50 PD/BADP/Sohem6-53/2018-19 dtd 01 l1 1 12018

4 C/o Mule track from Aphumna to Taflagam village. Taflagam 6.00 1lYo 0.60 PD/BADP/Scheme-53/201 8-1 9 dtd 01 I 1 1 l2O1 I

5 C/o CC step at Khalega village. Khalega 5.00 100k 0.50 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 1201 I

6 Skill Development and capacity building(Weaving, Chaglagam 4.80 10% 0.48 PD/BADP/Scheme-53/20 1 8-'1 I dtd 01 I 1 1 12018 Two & four wheeler repairing) 7 Extension of Classroom at Aphumna School. Aphumna 9.00 10o/o 0.90 PD/BADP/SCheme-53/2018-19 dtd 0111 I 12018

8 Extension of classroom at Chagalagam school. Chaglagam 9.50 10% 0.95 PD/BADP/Soheme-53/2018-19 dtd 01 l1 1 12018

I C/o Boundary wall at School, Mithumna village. Mithumna 9.00 10Yo 0.90 PD/BADP/Scheme-53/201 8-1 9 dtd 01 I 1 1 l2U A

10 C/o Boundary wall at Govt. Primary school, Bomna. Bomna 9.00 10% 0.90 PD/BADP/Scheme-53/20 1 8-1 I dtd 0 1 I 1 1 l2O1 I

11 C/o Boundarywall at Kromna school. Kromna 8,00 10% 0.80 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 l2O1 I 12 Development of Model village at Taflagam village a) Water Supply at Taflagam Taflagam 19.00 'loo/o 1.90 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018 b) Agriculture Promotion Centre. Taflagam 10.00 10% 1,00 PD/BADP/Scheme-53/2018-19 dtd 0111 1 12018 c) Avenue Plantation. aflagam 0.50 10% 0.05 PD/BADP/Scheme-53/201819 dtd 0111 1 12018

Page 2 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 3 4 5 o 7 d) C/o Health Sub.Centre Taflagam 20.00 1lYo 2.00 PD/BADP/Scheme-53/201819 dtd 01 l1 1 12018 e) Up gradation of School building & Play ground. Taflagam 20.25555 10Yo 2.02555 PD/BADP/Scheme-53/201 8-1 I dtd 0 I I 1 1 1201 I Proposals Recommended bv BGFs 13 CONSTRUCTION OF NEW FSB ON KASHINALA Taflangam 40.00 10% 4.00 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 l2O1 I GR - MT 990989 CHAGLOHAGAM BLOCK (APPX 30 MrRS) 14 HELIPAD AT RACHCHOM POST (100 x 30Mtr) CHINUING LA 40.00 1lYo 4.00 PD/BADP/Scheme-53/2018-1 I dtd 01 l1 1 12018 GRASSY WITH CEMENTED "H" AND CORNER IN Taflangam CHAGLOHAGOM BLOCK (100 x 30 Mtrs) (PHASE - il) 15 CONSTRUCTION OF HELIPAD AT KAPAPU POST KAPAPU Taflangam 12.00 10% 1 .20 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 1201 I (100x30 MTRS AND DZ OF 330 X 150 MTRS DIMENSION) GRASSY WITH CEMENTED'H' AND CORNER IN CHAGLAGAM BLOCK (PHASE II) to C/O MICRO HYDEL AT ROCHACHAM (PHASE - II) ROCHACHAM 73.28 10% 7.33 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018 (Taflagam)

Sub Total = 320.33555 32.03355

Proposals for 2016-'17 against which no fund was released during that year and fund was released during 2017-18 17 C/o RCC culverts on different border tracks within the Chaglagam 10.00 10% 1.00 PD/BADP/Scheme-53/2018-1 I dtd 01 l1 1 12018 Chaglagam CD-Block 18 C/o Hostel building at GRS Mailiang Mailang 10.00 10% 1.00 PD/BADP/Soheme-53/2018-19 dtd 01 l1 1 12018

Sub Total = 20.0 0 2.O0

Block Total 340.33555 34.03355

Hawai- CD Block I Provision of water supply at lower Pranju village L/Pranju 5.00 10% 0.50 PD/BADP/Scheme-53/20 1 8-1 9 dtd 01 I 1 1 1201 I 2 Water supply at Kaho village 6.00 10% 0.60 PD/BADP/Scheme-53/2018-19 dtd 01l1 I D018

Page 3 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be tra nsferred transferred

1 2 J 4 5 6 7

? C/o Drainage system at Chequinty. Chequinty 7.00 10% 0.70 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 12018 4 Development of Model village at Musai village

a) C/o Teacher quarter two unit Musai 20.00 1lYo 2.00 PD/BADP/Soheme-53/2018-1 I dtd 0111 112018 b) Extension of classroom at Musai Musai 10.00 100 1.00 PD/BADP/Soh em e-53/201 8-1 I dtd 0111112018

c) Street Light (D & T) & Transformer. Musai 16.00 10Yo 1.60 PDi BADP/Scheme-53/2018-1 I dtd 0111112018

d) Skill development activiti6s centre Musai 18.75555 1lYo 1.875555 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 12018

6) C/o Play ground at Govt.primary School, Musai Musai s.00 10o/o 0.50 PD/BADP/Scheme-53/20 1 8-1 I dtd 0 1 I 1 I l2O1 I

5 C/o Community Hall at Yakung village. Yakung 20.00 100o/o 20.00 PO/BADP/Scheme-38/1 5/201 8-1 9 drd 231 1 1 12018 Proposals R€commond€d by BGFs b C/O MICRO HYDEL AT HOT SPRING (PHASE.II) HOT 58.47 10% 5.847 PD/BADP/Scheme-53/2018-1 I dtd 0111 1 12018 SPRING

Sub Total = 166.22555 34.622555

Proposals for 2016-17 against whlch no fund was reloased durlng that yoar and fund 14.622555 was rclea36d during 2017.'18 7 C/o RCC culverts on different border tracks within the Hawai Walong '10.00 1lYo 1.00 PD/BADP/Scheme-53/2018-1 I dtd 0111 1 12018 Hawai-Walong CD-Block 8 Plantation of large Cardamumi at Hawai-Walong CD Hawai Walong 9.50 10% 0.95 PD/BADP/SCheme-53/2018-19 dtd 0111 1 12018 Block

Sub Total = 't9.50 1.95 I I Spill over proj6ct of 201$.16 I Providing Avenue lighting using cables and dome Hawai-Walong 13.06 42.573% 5.56 PD/BADP/Scheme-53/201 8-1 9 dtd 01 I I I 1201 I type fittings with other accessories as required in the circular pavement in Urban area under Walong CD Block in . Sub Total = 13.06 5.56

Page 4 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 2 3 4 5 6 7 10 Dev€lopm€nt of Kaho villago as Model villago(Additional Scheme)

1 Development of community Pine nut gardsn at Kaho Kaho 5.00 100o/o 5.00 APLG/BADp-1 4/201 7-1 8/21 6 dtd 04 I 09 t20 1 I

2 Development of community fish pond at Kaho Kaho 5.00 100% 5.00 APLG/BADp-14/2017 -18t217 dtd 04/09/2018 Sub Total = 10.00 10.00 Block Total 208.78555 52.132555

Manchal CD Block C/o RCC culvert over Tisong Pani in between Towangong, Kropma 5.00 11Yo 0.50 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 1201 I Towangong and Kropma village.

2 C/o CC step from BRTF road to Khuiliang village. Khuiliang 5.00 10% 0.50 PD/BADP/Scheme-53/20 1 8-1 9 dtd O1 I 1 1 1201 I 3 C/o CC step at Upper Tehuliang village. Tehuliang 5.00 100k 0.50 PD/BADP/Scheme-53/2018-1 9 dtd 0111 I 12018 4 C/o CC step at Kaning village. Kaning 6.00 100k 0.60 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018

5 Maint6nance of School building at Khuiliang. Khuiliang 5.50 10% 0.55 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018

6 C/o CC Culvert over Chiraat Nallah in between Zong Zong, Krosam 5,00 1lYo 0.50 PD/BADP/Scheme-53/2018-19 dtd 01 l1 1 12018 and Krosam village.

7 Extension of water supply at Supliang. Supliang 5.00 10% 0.50 PD/BADP/Scheme-53/20'1 8-'1 9 dtd 01 I I I l2O1 I

8 Provision for water supply at Plotong village. Plotong 5.00 1lYo 0.50 PD/BADP/Scheme-53/20 1 8-1 I dtd 01 I 1 1 l2O1 I I Providing street light at Tehuliang. Tehu liang 10.00 1lYo 1.00 PD/BADP/Scheme-53/20 1 8-1 9 dtd 01 I 1 I 1201 I

10 C/o CC Steps at Misitong Misitong 5.00 lOYo 0.50 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018 11 Providing Street light at Krosam. Krosam 10.00 11Yo 1.00 PD/BADP/Scheme-53/2018-1 9 dtd 01 l1 1 12018

12 Capacity Building & Skills Development(Training on Kundong and all 13.50 1lYo 1.35 PD/BADP/Scheme-53/20 1 8-1 9 dtd 0 1 I 1 I 1201 I herbal medicinal plant for the unemployed of villages within 0-10 Kundong, Misitong, Khuiliang, Suplang, Cheretong, km of lB Kanning, Tehuliang, Krosam, Chiliang, Dhanbari, Towangong, Towa, Chikruliang, Plotong etc.)

13 C/o Community Hall with Toilet at Chillang village. Chillang 16.24 100o/o 16.24 PD/BADP/Scheme-38/1 0/201 8- 1 9 dtd 231 1 1 120 18

14 Street Light (D & T) & Transformer Khuliang 16.00 100% 16.00 PD/BADP/Scheme-38/1 1 /201 8-1 I dtd 231 1 1 120 18

Page 5 . ln lakh SI. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 z c 4 6 7 15 Developm€nt of Model Vlllag€ at Khuiliang b) C/o Health Sub- Centre Khuliang 20.00 lOOo/o 20.00 PD/BADP/Schem e-381 121201 8-1 9 dtd 231 1 1 120 18 c) Up-gradation of school building at lV school. Khuliang 13.00 100o/o '13.00 PD/BADP/Schem e-381 1 412018-19 dtd 231 1 1 120 18 e) Extension of Middle School building at Khuliang Khuliang 't0.75555 100ok 10.75555 PD/BADP/Soheme-38/1 3/201 8-1 I dtd 231 1 1 12018 Sub Total = 155.99555 83.99555

Propo8als for 2016-17 against which no fund was released during that year and fund was released during 2017-18 16 Special maintenace of Foot Suspension Bridges on Manchal 10.00 10o 1.00 PD/BADP/SCheme-53/2018-1 I dtd 0111 1 12019 different border tracks within the CD-Block 17 Plantation of Kiwe and Orange under Manchal Block Manchal 9.50 lOYo 0.95 PD/BADP/Scheme-53/201 8-1 I dtd 01 I I 1 1201 I

18 C/o Boundary wall at GRS, Krapma Krapma 10.00 10% 1.00 PD/BADP/Scheme-53/201 8-1 9 dtd 01 I 1 1 1201 8

Sub Total = 2S.50 2.95

Block Total = 185.49555 86.94555 District Total = 1,009.87220 303.23721

Page 6 Annexure - I LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 2 4 5 6 7

Changlang District: Khimiyang CD Block(2018-19) 1 Development of Model Village at Khlmiyang d) Cardamum Plantation in Khimiyang Village(7 units) Khimiyang 14.00 100o/o 14.00 PD/BADP/Scheme-39/1/2018-19dtd2511012018 Block Total 14.00 14.00 Nampong CD Block(2018-'19) 1 Development of Model Village at Nongk€y a) C/o Guest house at Model village Nongkey(l64 Sqm) Nonkey 25.00 100% 25.00 PO/BADP/Scheme-391212018-19dtd2511012018

Block Total 25.00 25.00

Manmao CD Block(201 8-19) 1 D€velopment of Mod6l Vlllage at New Kamlao b) MS Steel fencing boundary of the donated area for New Kamlao 15.00 100Yo 15.00 PD/BADP/Scheme-39/3/2018-19dtd25l10l2UA Model village infrastructure at New Kamlao(1 000 m)

Block Total 15.00 15.00

Khagam CD Block(2018.19) 1 Provn of waiting shed with attachod two toilet block for Vijaynagar 12.00 100o/o 12.00 PD/BADP/Scheme-391412018-19dtd2511012018 ladies and gents at ALG Vijaynagar. Block Total 12.00 12.00

Changlang CD Block(201 8-19) 1 Extension of Teacher Bachellor Barrack at Govt. Panlom, Motong & 19.60 1000k 19.60 PD/BADP/Scheme-39/5/2018-19dtd2511012019 Primary school in Panlom, Motong and Phungsa Phungsa Village(21 Sqm x 3 unit)

Page L Rs. ln lakh st. Name of the Sector and Location/ Approved To ol lund Fund now No. & date of sanction order No Schemes / Project Village outlay to be tra nsferred transferred 1 2 3 4 5 6 7

2 Development of Model village at Phangtip village

e) C/o School Buildjng at Phangtip Phangtip 20.00 100o/o 20.00 PD/BADP/Scheme-39/6/2018-19dtd2511012018 (1 unit) Block Total 39.60 39.60

District Total 105.60 105.60

Page 2 Annexure - I LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh st. Name of the Sector and Location/ Approved o/o of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be transferred transferred

1 2 3 4 5 6 7 Tirap Dlstrict: Khonsa CD Block 1 C/O C.C steps at Thinsa Village Thinsa 5.00 lOYo 0.50 PD/BADP/Scheme-56/201 8-1 9 dtd 30t10t2018 2 C/O protection wall on Nallah in between DC's Office Khonsa 5,36305 lOYo 0,54 PD/BADP/Scheme-56/201 8-1 9 dtd 30t1012018 & District General Hospital, Khonsa. 3 C/O reataining wall and C.C steps at Tirathju (lat Khonsa 5.18695 10% 0.52 PD/BAOP/Scheme-56/201 8-1 9 dtd 30t1012018 27'l5,long 95'1341 4 C/o Additional classroom at Primary school, Kheti Kheti 10.00 10% 1.00 PD/BADP/Scheme-56/201 8-1 I dtd 30t10t2018 village 5 Skill development in (a) Automic mobile mechanic- All village of Khonse 8.32145 10% 0.82895 PD/BAOP/Scheme-56/201 8-1 9 dtd 30t10i2018 cum-driving-4 trainess 3montha/600hrs outside state. Block (b) Beauty Culture and Hari Dressing. 4trainess(3months) 600hrs outsida stats. (c) Basic Computer, 10 trainess. (4 weeks). (d) Embroidry and Piko, 4 (four) trainess. o Extension of water supply to adjoining areas of Khonsa 50.00 1lYo 5.00 PD/BADP/Scheme-56/2018-19 dtd 30/10/2018 Khonsa township with 03 Nos Zonal Tanks of 70000 Itrs each and their connection with WTP & institutions at GHSS, Khonsa, 2 Mile Khonsa & Bank Colony Khonsa. (lat 2775, long 95'/34) Block Total = 83.87145 8.3839s

Dadam CD Block C/O C.C step at Old Kothin Village. (lat 26'/56, long Old Kothin 5.18695 10% 0.52 PD/BADP/Scheme-56/201 8-1 I dtd 301 I 012018 95',/25) 2 C/O CC steps at main road to Primary School at Chinkoi 7.80805 10% 0.78 PD/BADP/Scheme-56/201 8-1 9 dtd 30/'1 0/201 I Upper & Lower Chinkoi. (lat 26'l , long 95'127) 3 C/o CC steps within Laho village Laho 5.00 10% 0.50 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1 01201 I 4 Procurement & installation of Large Cardamom Dadam 15.00 1lYo 1.50 PD/BADP/Scheme-56/201 8-1 I dtd 301 1 01201 I Drying Unit with brick wail Warehouse a am. (lat 26'l55, long 95'/28)

Page 1 Rs. ln lakh SI, Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Prolect Village outlay to be transferred transferred

1 2 3 4 5 6 7

5 C/o wet rice cultivation at Bera village Bera 10.00 10% 1,00 PD/BADP/Scheme-56/201 8-1 I dtd 301 1 012018 6 C/O 02 Nos. class rooms at Primary School, Hukan Hukan 10.00 1.00 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1012018 (As per SSA Normsl. (lat 26'/04, long 95'/28)

7 C/O 02 Nos smart classes at Govt. Secondary Dadam 7.555 10o/" 0.76 PD/BADP/Scheme-s6/201 8-1 I dtd 3Ol 1 01201 I School, Dadam (againstState Sharcl. (lat 26'/55, long 95'/28) 8 Procurement of Solar LED light for each household of Moktowa-l & ll 5.00 10% 0.50 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1 012018 Moktowa I & ll villages. ( at 26'/4, long 95'/25)

I Skill development in (a) Automic mobile mechanic- All village of Dadam 8.3'1145 1lYo 0.81895 PD/BADP/Scheme-56/20 1 8-1 I dtd 301 1 012018 cum-driving-4 trainess 3montha/600hrs outsido stato Block (b) Beauty Culture and Hari Dressing. 4trainess(3months) 600hrs outside state. (c) Basic Computer, 10 trainess. (4 weeks). (d) Embroidry and Piko, 4 (fou0 trainess. 10 Development of Mod€l Villag€ at Dadam village b) C/o Boundary wall at Girls Hostel at Dadam (200 m) Dadam 19.75555 100Yo 19.75555 PD/BADP/Scheme-38/1 6/201 8-1 I dld 231 I 1 120 1 I

I Block Total = 93.61700 27 .1295

Lazu CD Block 1 Extension of approach road from main road to Lonyan 10.00 1 .00 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1 0120 18 Lonyan village. (lat 26'/52, long 95736\ 2 C/O Foot suspension bridge connecting Lazu & Old Lazu & Old Kothung 10.00 1lYo 1.00 PD/BADP/Scheme-56/2018-19 dtd 30/1 0/2018 Kothung over Sumhak River. (lat 26732, long 95'/33\

? C/O approach road connecting Old Kothung & New Old Kothung & New 10.00 10% 1.00 PD/BADP/Scheme-56/201 8-19 dtd 30/10/2018 Kothung. (lat 26'/55, long 95'/37) Kothung 4 Provision of an Ambulance fot Lazu Village.(lat Lazu village 8.00 1lYo 0.80 PD/BADP/Scheme-56/2018-1 I dtd 30/10/2018 26'/54, long 95'/35 )

Page 2 ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Pro.ject Village outlay to be transferred transferred I 2 3 4 b 7

5 Procurement of large cardamom suckers from Spices UChinhan 5.00 10% 0.50 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1 0120 18 Board Certified Nurseries and their Plantation at Lower Chinhan villago. (lat 26'/52, long 95'/37)

6 Procurement of large cardamom suckers from Spices Liangchan 7 .82444 lOYo 0.7824444 PD/BADP/Scheme-56/201 8-1 9 dtd 30/1 0/201 8

I Board Certified Nurseries and their Plantation at Liangchan. ( lat 26'/52, long 95733 ) 7 Procurement & installation of Large Cardamom Lazu 20.00 1lYo 2.00 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1 0 12018 Drying Unit with brick wall Warehouse at Lazu. (at 26'/54, long 95'/35) I C/O Model Anganwadi Centre at Lazu Village. Lazu village 10.00 10% 1.00 PD/BADP/Soheme-56/201 8-19 dtd 30/10/2018

(lat 26' 1 54, long 95'/35)

o Extension of L.T Line at New Tutnyu village. Tutnyu 15.00 10% 1.50 PD/BADP/Scheme-s6/20'1 8-1 I dtd 301 1 0120 1 I (lat 26'/57, long 95'/36 ) 10 C/O school building (SH: 02 Nos. class rooms) at Lower Chinhan 1 5.1 7556 10% 1.s17556 PD/BADP/Scheme-56/20 1 8-1 I dtd 3Ol 1 01201 I Primary School, Lower Chinhan (As per SSA Norms). (at 26'/52, tong 95'/37)

11 C/O toilet blocks and bathrooms for Girls Hostel at Lower Sinnu 10.00 1lYo 1.00 PD/BADP/Scheme-56/201 8-1 9 dtd 301 1 012018 Govt Residential School, Barap. (lat 26'/52,95y33) (Lower Sinnu)

12 Procurement of Solar LED Light for each household Lazu village 5.00 10% 0.50 PD/BADP/Scheme-56/20 1 8-1 9 dtd 30/1 0/201 8 of Lazu Village. (lat 26'/il, long 95'/35) En IJ C/O Community Toilet with water supply and Lazu o 0.95 PD/BADP/Scheme-56/201 8-1 9 dtd 3Ol 1 012018 overhead tank at Lazu Village. (lat 26'154, long 95'/35)

14 C/O Hostel building for Girls at Secondary School, Upper Kolam 32.00 10% 3.20 PD/BADP/Scheme-56/201 8-1 I dtd 301 1 0 12018 Upper Kolam. (at 26'/52,95737) 15 Development of Mod€l Village at Lazu village

a) C/o CC road from PMGSY road to Lazu village entry Lazu 69.75555 10% 6.97555 PD/BADP/Scheme-56i20 1 8-1 9 dtd 30/10/2018 point (600 mk) Sub Total = 237.25555 23.72555

Page 3 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be tra nsferred transferred

1 2 3 4 5 6 7 VKV Proposal (Additional Scheme)

16 Establishment of Vivekananda Kendra Vidyalaya at lazu 400.00 10Oo/o 400.00 PD/BADP/Scheme-1 9/201 8-1 I dtd 1 5/09/201 8 Lazu Sub Total 400.00 400.00 Block Total 637.2555s 423.72555

Dislrict Total = 8'14.744004 459.239

Page 4 Annexure - I LIST OF SANCTIONED SCHEMES UNDER BADP AGAINST WHICH FUND IS NOW TRANSFERRED THROUGH PFMS

Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No Schemes / Project Village outlay to be tra nsfer16d transferred 1 3 4 6 7 Longding Distrct: Pongchau CD Block(2017-18) 1 C/o 03 Nos RCC slab culverts at Votnu village Votn u '10.00 10% 1.00 PD/BADP/Scheme-55/201 8-1 9 dtd 31/1 0/201 I 2 C/o RCC concrete cement step at l(Noksa village Kamhua Noksa 8.00 10% 0.80 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I 3 quarter C/o type-l for Medical staffs, Kamhua Noknu, Kamhua Noknu 15,00 1lyo 1.50 PD/BADP/Scheme-55/201 8-1 9 dtd 3 1 I 1 0120 18 Pongchau 4 Repair and maintenance of Sub-centre, Konnu & Konnu / Pongchau 9.00 0.90 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I construction of water tank for CHC Pongchau 5 Procurement of composite portable diagnostic lab Pongchau 7.50 10% 0.75 PD/BADP/SCheme-55/201 8-1 I dtd 31/1 0/201 8 including battery backup with rechargeble solar power, BMI Kit, ECG and data management laptop

6 Cultivation of Large cardamom in Pongchau village Pongchau 6.00 10o/o 0.60 PD/BADP/Scheme-55/20'1 8-1 I dtd 31 I I 0 1201 I 7 in Cultivation of Large Cardamom Bonia village Bonia 6.00 10% 0.60 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I 8 large Cultivation of Cardamom in Kamhua-Noknu Kamhu Noknu 6.00 10% 0.60 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I village I Cultivation of large Cardamom in Kamhua-Noksa Kamhua Noksa 6.00 1lYo 0.60 PD/BADP/Scheme-55/201 8-19 dtd 31/10/201 8 village 10 Cultivation of large Cardamom in Konnu village Konnu 6.00 10% 0.60 PD/BADP/Scheme-55/201 8-1 I dtd 31t10t2018 11 Cultivation of large Cardamom in Konsa villag6 Konsa 6.00 100/o 0.60 PD/BADP/Scheme-55/201 8-1 I dtd 31t10t2018 12 Cultivation of large Cardamom in Khasa village Khasa 6.00 lOo/o 0.60 PD/BADP/Scheme-55/201 8-1 I dtd 31110t2018 IJ Cultivation of large Cardamom in Votnu village Votnu 6.00 1lYo 0.60 PD/BADP/Scheme-55/201 8-1 9 dtd 31t10t2018 14 C/o For6st nursery at Pongchau Pongchau 6.00 1lYo 0.60 PD/BADP/Scheme-s5/201 8-1 I dtd 31t1012018 15 Computer training in all border blocks Upper Primary Pongchau 14.50 10% 1 .45 PD/BADP/Scheme-55/201 8-1 9 dtd 31t10t2018 School and Secondary School of Pongchau block and Bead making training to lnstallation of 100 kv transformer at Konnu & Konnu / Pongchau 9.00 10% 0.90 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 0120 18 installation of Solar street lights in Govt. Hr. sec School, Pongchau 17 quarter C/o teachers at Govt. Hr. Sec. School , Pongchau.. 20.00 1lYo 2.00 PD/BADP/Scheme-55/201 8-1 I dtd 31/1 0/201 8 Ponchau

Page 1 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 2 J 4 6 7

'10.00 18 C/o Semi RCC teachors quarter in Khonsa Konsa 10% 1.00 PD/BADP/Scheme-551201 8-1 I dtd 31 I 1 01201 I 19 Repair and maintenenace of boys and girls hostal and Kamhu Noknu 8.00 10% 0.80 PD/BADP/Scheme-55/2018-19 dtd 311 1012018 providing of computer/printer/Solar inverters/PA system/Projector at Upper Primary School, Pongchau, Kamhua-Noknu & Khasa 20 D€velopment of Model vlllage at Jagan vlllage

a) C/o 1(one) teachers quarter at Jagan Jagan 20.25555 1lYo 2.03 PD/BADP/Soheme-55/201 8-1 I dtd 31 I 1 012018

b) Procurement of electrical poles at Jagan Jagan 2.00 100k 0.20 PD/BADP/Scheme-55/201 8- 1 I dtd 31 I 101201 8 c) C/o Community Hall at Jagan Jagan 20.00 10% 2.00 PD/BADP/Scheme-55/2018-19 dtd 31 I 1012018 0 Providing of Computor i printor / Generator / PA Jagan 5.00 10% 0.50 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 101201 I system / Projector with electrical connection and renovation of Lower Pry. School Jagan s) C/o CC bridge at Chingdan Colony Jagan 5.50 10% 0.55 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I Block Total = 217.75555 21.77556

Longdlng Dlstrct: Pongchau CD Block(2018-19)

1 Extension of Power supply lines and installation of Bonia 9.30 100% 9.30 LDG/pLG/BADp-p CHl20 1 8- 1 I 131 27 -29 electricity poles at Bonia dtd 04i09/2018

2 C/O RCC Bachelor Barrack for Nurse 1 (ono) unit with Konnu 10.00 1000k 10.00 LDG/PLG/BADP-PCH/20 1 8-1 9/3596-98 water supply and electrification at Konnu village. dtd26t0912018

3 C/O RCC Morgue at PHC Pongchau HQ Pongchau 10.00 100% 10.00 LDG/pLG/BADp-pCH/20 1 8-1 9/3593-95 HQ dtd 26/09i2018 4 C/o RCC Anganwadi centre 1 (one) no. at Khasa Khasa 10.00 100% 10.00 LDG/pLG/BADP-PCH/20 1 8- 1 9/31 03-05 village dtd 03/09/2010

5 C/o carpentry workshop & Training Centre at Pongchau 9.36 1000/0 9.36 LDG/PLG/BADP.PC H/20 1 8- 1 9/3 1 06.08 Pongchau HQ HO dtd 03/09/2018

6 C/O I (One) unit RCC Bachelor barrack with water Pongchau 10.00 100% 10.00 LDG/pLG/BADP-PCH/20 1 8- 1 9/3590-92 supply and electrification al Pongchau village dtd26togt2018 7 C/o RCC teacher quafter 1 (one) unit with water Votnu 10.00 100% 10.00 LDG/PLG/BADP-PCH/2o1 8-1 9/31 00-02 supply and electrification at Votnu village drd 03/09/20'18

8 C/o RCC 2 (two) nos. additional classroom at Kamhua Noksa 10.00 100% 10.00 LDc/pLG/BADp-pCH/20 1 8-1 9/3097-99 Primary School, Kamhua Noksa dtd 03/09/2018

Page 2 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 2 3 4 5 6 7

I lnstallation of Solar Street lights with LED Lamps for Konsa 5.00 100Y0 5.00 LDG/PLG/BADP-PCH/201 8-1 9/31 33-35 COB Konsa dtd 04/09/2018 10 Development of Model villageatJagan c) Skill development training on bead making and 5.00 1000/o 5.00 LDG/PLG/BADP-PCH/201 8-1 9/3094-96 weaving training. dtd 03/09/2018 Block Total 88.66 88.66

Block Total 306.42 1',to.44 (2017-18 + 2018-191

wakka CD Block(2017-'18)

Land d6velopment at Kaimoi village for shifting hilltop Kaimoi 10.00 100k 1.00 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I colony

2 Cultivation of large Cardamom in Wakka village Wakka 6.00 100/o 0.60 PD/BADP/Soheme-55/201 8-1 9 dtd 31 I I Ol20 18

J Cultivation of large Cardamom in Nginu village Nginu 6.00 1lYo 0.60 PD/BADP/Soheme-55/201 8-1 I dtd 31 I 1 012018 4 Cultivation of large Cardamom in Ngissa village Ngissa 6.00 10% 0.60 PD/BADP/Scheme-55/2018-19 dtd 3111012018 5 Cultivation of large Cardamom in Kaimoi village Kaimoi 6.00 1lYo 0.60 PD/BADP/Schem+55/201 8-1 9 dtd 31 /1 0/2018

o Cultivation of large Cardamom in Longkai village Longkai 6.00 10Yo 0.60 PD/BADP/SCheme-55/201 8-1 I dtd 31 /1 0/20 1 I 7 Cultivation of large Cardamom in Khanu village Khan u 6.00 100 0.60 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 101201 I I Cultivation of large Cardamom in Chop village Chop 6.00 0.60 PD/BADP/Soheme-55/201 0-1 I dtd 31 I 1 012018 9 Cultivation of large Cardamom in Khogla village & Khogla / Kampong 9.00 100k 0.90 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I I 0D018 Kampong village

10 Distribution of shed tree in large cardamom plantation Wakka, Nginu 5.00 10% 0.50 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 0120 18 area

11 C/o Transit camp in Wakka near Police Station , Wakka 10.00 10% 1.00 PD/BADP/Scheme-s5/201 8-1 I dtd 31 I I 012018 Wakka 12 Computer training in all border blocks students of Wakka 14.50 1lYo 1 .45 PD/BADP/Scheme-s5/201 8-1 I dtd 31 I 1 012018 upper primary and secondary school and bead making of wakka block

13 C/o one semi RCC teachers quarter, toilet set and Khanu 10.00 10% 1.00 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 0120 18 kitchen at Upper Pry. School, Khanu

14 Teachers quarter , toilet set and kitchen at Govt. Hr. Wakka 20.00 10% 2.00 PD/BADP/Scheme-55/20 1 8-1 9 dtd 31 I 1 01201 I Sec, School, Wakka

Page 3 Rs. ln lakh Dt. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 2 3 4 5 6 7

15 C/o Boxing Ring Contre in Nginu village Nginu 10.00 10% 1.00 PD/BADP/Scheme-55/2018-19 dtd 31/10/2018

16 Provision of Solar Home Iighting syst6m for Chop Chop 4.50 10% 0.45 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I village 17 Development of Model vlllage at Chongkhaw villag€ a) C/o 5 unit bachelor barrack for Teachers in Chongkhaw 20.75555 1lYo 2.08 PD/BADP/Soheme-55/201 8-1 I dtd 3 1 I 1 0120 1 I Chongkhaw

b) Construction of Community Hall for Chongkhaw Chongkhaw 20.00 2,00 PD/BADP/Scheme-s5/201 8-1 I dtd 31 I 1 01201 I village

d) Cardamom cultivation at Chongkhaw village Chongkhaw 5.00 1lyo 0.50 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I e) Terrace farming in Chongkhaw village Chongkhaw 10.00 10% 1.00 PD/BADP/Scheme-s5/201 8-1 I dtd 31 I 1 01201 I 0 Afforestation in catchment area of water source Chongkhaw 2.00 100/o 0.20 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I graveyard s) C/o CC footpath to Chongkhaw 2.00 10% 0.20 PD/BADP/Scheme-s5/20'1 8-1 9 dtd 31 I 1 01201 I Proposals Recommended by BGFs

18 PROVISION OF 18 WATT SOLAR STREET LIGHT WAKKA s.00 1lYo 0.50 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I ALONG APPROACH ROAD AND PERIPHERY OF COB WAKKA 19 PROVISION OF WATER SUPPLY SCHEME AT WAKKA 9.30 lOYo 0.93 PD/BADP/Scheme-55/201 8-1 I dtd 31 /'1 0i201 I WAKKA VILLAGE TO BE EXTENDED UPTO COB WAKKA Block Total = 209.05555 20.905555 Wakka CD Block(20'18-19)

1 C/o RCC Anganwadi centre with toilet at Ngissa Ngissa 10.00 100% 10.00 LDG/PLG/BADP-WKN 20 1 8- 1 9 I 3620-22 village dtd 26109/2018

2 C/o RCC Anganwadi centre with toilet at Wakka Wakka 10.00 100Y0 10.00 LDG/PLG/BADP-WKAJ2O 1 8-1 9/361 7-1 9 village dtd 26t09t2018

3 C/o RCC Anganwadi centre with toilet at Longkai Longkai 10.00 IOOYo 10,00 LOG/PLG/BADP-WKA/20 1 8-1 9/36 1 4-1 6 village dtd 26109/2018

4 C/o Carpentry workshop & Training Centre at Wakka Wakka Circle HQ 9.36 100% v. Jb LDG/PLG/BADP.WKAJ2O1 8.1 9/3 1 1 3.1 5 HQ. (Skill Development) dtd 03/09/2018

5 C/O 1 (one) unit RCC Bachelor barrack with water Nginu 10.00 100% 10.00 LDG/PLG/BADP-WKAJ2O 1 8-1 9/36 1 1 -1 3 supply and electrification at Nginu village dtd 26109t2018

Page 4 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 2 3 4 5 6 7

6 C/o 1 (one) unit RCC teacher barrack with water Khanu 10.00 100Yo 10.00 LDG/PLG/BADP-Wt0J20'1 8-'1 9/3608-1 0 supply and electrification at Khanu village drd 26i09/2018

7 C/O RCC Bachelor barrack with water supply and Chop 10.00 100o/o 10.00 LDG/PLG/BADP-WKA/20 1 8- 1 9/3605-07 electrification at Chop village dtd 26/09/2018 8 Clo 2 (two) additional RCC classrooms at Primary Khogla 9.00 1000k 9,00 LDG/PLG/BADP-W KA/201 8.1 9/3602.04 School, Khogla dtd26109t2018 I Dev€lopment of Mod€l village at Chongkhaw

c) Bead making and weaving training 5.00 100% 5.00 LDG/PLG/BADP.W KN2O1 8-1 91 31 1 O-1 2 Security Related Projoct

10 Provision of Water Storage tank including pipe line for Kaimoi 5.30 100% 5.30 LDG/PLG/BAD P.WKA/20 1 8. 1 9/359940 1 Kaimoi. (BGF) dtd 26109/2018 11 Provn of Solar street lights COB Wakka & 5.50 100Yo 5.50 LDG/PLG/BADP-WKI'/201 8-'1 9/31 30-32 with LED lamps for COBs at Walla & Kunsa Kunsa dtd 04/09/2018 Block Total 94.'t6 94.16

Block Total 303.215s5 'l 1 5.065555 (2017.,t8 + 2018-19) Niuasa CD Block(2017-18)

1 C/o Water tank at Pamsa Tikhot, Niausa village Niausa 5.00 10% 0.50 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I 2 C/o additional room for X-ray facilities in CHC, Longding 5.00 10o/o 0.50 PD/BADP/Scheme-55/201 8-'1 I dtd 31 I 1012018 Longding and prourement of generator

3 Procurement of composite portable diagnostic lab Longding 7 .50 100k 0.75 PD/BADP/Scheme-55/201 8-1 9 dtd 3 1 I 1 012018 including batt6ry backup with rechargeablo solar power, BMI kit, ECG and data management laptop

4 Clo Boundarywall at Govt.secondary school, Londing Longding 5.00 10% 0.50 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 8

5 Renovation of agriculture shed in Longding Longd ing 6.05 10% 0.61 PD/BADP/Scheme-55/201 8-1 I dtd 3 1 /1 0/201 I 6 C/o forest nursery at Tissa Tissa 6.00 10% 0.60 PD/BADP/Schem6-55/2018-19 dtd 31 11012018

7 Two wheeler training at Longding Longding 8.325 10o/o 0.83 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I 8 Procurement of LED Highmast lighting system and Longding 8.00 10% 0.80 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 012018 LED (23 W) lights for Longding Township C/o One teachers quarter at Maihua Maihua 15.00 1iYo '1.50 PD/BADP/Scheme-55/201 8-1 I dtd 31/1 0/201 I

\ Page 5 Rs. ln lakh sl. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Village outlay to be transferred transferred

1 2 J 4 5 6 7

10 Renovation of Old School building, GHSS, Longding Longding 10.00 10% 1.00 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 101201 8

11 Developm€nt of Model vlllage at Longkhaw village

a) C/o additional classroom at Longkhaw Primary School Longkhaw 30.25560 10% 3.03 PD/BAOP/Scheme-55/201 8-1 I dtd 31 I I 01201 I

b) C/o community centro at Longkhaw Longkhaw 19.50 1lYo 1.95 PD/BADP/Scheme-55/201 8-1 I dtd 31 I 1 01201 I c) C/o bachelor barrack for Teachers at Longkhaw Longkhaw 20.00 100h 2.00 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I

Proposals Rocommend€d by BGFs

12 PROVISION OF 15OMM THICK PCC FOOTPATH NIUSA 7,10 10o/o 0.71 PD/BADP/Scheme-55/201 8-1 9 dtd 31 I 1 01201 I (2X4 OF 2OMM GRADED STONE AGGREGATE INCLUDING EARTHWORK ETC COMPLETE) AT

I ROAD APPROACHING TO COB NIUSA, Sub Total 152.73060 15.27306

VKV Proposal(Additlonal scheme) 13 Upgradation of Vivekananda Kondra Vidyalaya at Niausa '100.00 100o/o 100.00 PD/BADP/Scheme-1412018-19 dtd 15/10/2018 Niausa. Sub Total 't 00.00 100.00

Block Total 252.7306 115.27306

Niussa CD Block(2018-19) 1 C/o 1 (one) unit RCC bachelor barrack with electricity Tissa 10.00 1000/0 10.00 LDG/PLG/BADP-NSFJ2O1 8-1 9/3623-25 and water supply for medical staffs at Tissa Camp Camp dtd 26/09/2018

2 Renovation of Health Sub- centre and staff qtrs. at Mintong 5,00 1000h 5.00 LDG/PLG/BADP-NSN2O 1 8.1 9/3626.28 Mintong village dtd 2610912018

3 C/o RCC Anganwadi centre with toilet at Longphong Longphong 10.00 100Yo 10.00 LDG/PLG/BADP-NSAJ201 8-1 9/3629-3 1 village dtd 26109/2018 4 Skill development training on tailoring for Longding & Longding H.Q 4.06 100% 4.06 LDG/PLG/BADP-NSA'/201 &1 9/3635-37 Pumao circle at Longding. dtd 26t09t2018

Page 6 Rs. ln lakh st. Name of the Sector and Location/ Approved % of fund Fund now No. & date of sanction order No. Schemes / Project Vlllage outlay to be transferred transferred

1 2 J 4 5 6 7

5 C/o RCC Anganwadi centre with toilet at Maihua Maihua 10.00 100% 10,00 LDG/PLG/BADP-NSAi/201 8-1 9/3632-34 villag6 dtd 26109/2018 o Development of Mod6l villag€ at Longkhaw a) C/o RCC Health Sub-Centre at Longkhaw village, Longkhaw 25.00 100% 25.00 PD/BADP/Scheme-09/9/20 1 8- 1 I Longding. dtd 08/09/2018 b) Development of Football field at Longkhaw village, Longkhaw 25.00 100Yo 25.00 PD/BADP/Soheme-09/1 0/201 8-1 9 Longding. drd 08/09i2018 c) C/o RCC Anganwadi centre with toilet at Longkhaw Longkhaw 10.00 100yo 10.00 LDG/PLG/BADP.NSA/201 8.1 9/363840 village dtd 26t09t2018 d) C/o RCC bachelor barrack 1 (one) unit with elechicity Longkhaw 10.00 100yo 10.00 LDG/PLG/BADP-NSA/2o 1 8-1 9/364 1 42 and water supply for mBdical staffs at Longkhaw dtd 26109/2018

e) Bead making and weaving training.(Model village Longkhaw 5.00 100Yo s.00 LDG/PLG/BADP-NSIi/20 1 8-1 9/3643-45 Longkhaw) dtd 26109/2018 Securlty Relat6d Proposal 7 Provision for development of foot track for BPl56, Longding 5.00 1OlYo 5.00 LDG/PLG/BADP.NSTV2O,l 8-1 9/3646.48 BP-'l57, BP-159 & BP-160 of Longding district Dist. dtd 26/09/2018

Block Total 119.06 119.06

Block Total 371.7906 234.33306 (2017..t8 + 20.t 8-19)

District Total 981.4217 459.83417

PageT