ADANSI SOUTH DISTRICT MEDIUM TERM DEVELOPMENT PLAN (2014 – 2017)

CHAPTER ONE

PERFORMANCE REVIEW REVIEW OF DISTRICT MEDIUM TERM PLAN (2010-2013) UNDER SHARED GROWTH AND DEVELOPMENT AGENDA USING SEVEN THEMATIC AREAS The Assembly, as the highest political and planning authority, is charged with the preparation of the District Medium Term Development Plan that would guide the District Development to meet the goals and aspirations of the people. Such goals and aspirations should however meet the National Policy Framework within the Ghana Share Growth and Development Agenda II

Ghana’s Development Policy Framework (2010-2013) was guided by the Ghana Shared Growth and Development Agenda I with the following thematic Areas:

. Enhancing and Sustaining Macro-Economic Development . Ensuring Competiveness in Ghana Private Sector . Accelerated Agriculture Modernization and Sustainable Natural Resource Management . Oil and Gas Development . Infrastructure, Energy and Human Settlement . Human Development, Productivity and Employment . Transparent and Accountable Governance

The above thematic areas formed the basis for the preparation of the Medium –Term Development plan (2010 -2013); the plan was however rolled over to 2014

REVIEW OF THE DMTDP (2010-2013)

The Ghana Shared Growth and Development Agenda I (2010-2013) was followed by the Ghana Shared Growth and Development Agenda II (2014-2017), which has seven broad thematic areas namely:

1

. Ensuring and Sustaining Macroeconomic Stability; . Enhancing Competiveness of Ghana’s Private Sector; . Accelerated Agricultural Modernization and Sustainable Natural Resource Management; . Oil and Gas Development; . Infrastructure and Human Settlement; . Human Development, Productivity and Employment; . Transparent and Accountable Governance

The Seven major thematic Areas would form the basis for the preparation of the District Medium Term Plan (2010-2014).

REVIEW PROCESS

An assessment of the performance of the Adansi South District Medium Term Development plan (2010-2013) was undertaken to review the previous performance to serve as a guide for the preparation of 2014-2017 Development Plan.

The review was done taken into account the following indicators on the programmes and projects:

- Fully implemented - Abandoned/Suspended - On-going - Not implemented - Implemented but not in the MTDP The District Assembly also took into account the following:

i. The extent of the achievement of the planned goals and objectives

ii. Reasons for the non-achievement of the goals and objectives

iii. Problems /constraints encountered during implementation

iv. Lessons learnt which have implications for DMTDP (2010-2017)

2

The Adansi South District earmarked about One Hundred and (101) programmes and projects for implementation in the Medium Term Development Plan (2010-2013).The Programmes and Projects were outlined in Seven Thematic Areas (7) Thematic Areas, namely;

. Enhancing and Sustaining Macro-Economic Development . Ensuring Competivenes in Ghana Private Sector . Accelerated Agriculture Modernization and Sustainable Natural Resource Management . Oil and Gas Development . Infrastructure, Energy and Human Settlement . Human Development, Productivity and Employment . Transparent and Accountable Governance

The interventions in these sectors when implemented were to help achieve the target set in the District’s Monitoring and Evaluation Plan. The table below indicate the Policy objectives set, programming, indicators, targets level of achievement.

3

Table 1.1 PERFORMANCE REVIEW OF ADANSI SOUTH DISTRICT ASSEMBLY FROM 2010 - 2013

Level of Thematic Remarks Policy Objective Programme Indicator Target Achievement Area 2010-2013

Ensuring - Improve access Train management No. of Management 8 management staff and 4 Fully implemented and to financial members and member and accounting staff to be Sustaining services accounting staff Accounting staff trained Macroecono - Improve fiscal trained mic resource Revaluation of Properties revaluated Revaluate properties in Completed Stability mobilization Properties five communities the - Improve public municipality by 2013 expenditure Train Area Council Area Council Members 21 Area Council Staff to be Not implemented In adequate management by staff on basic office trained on basic trained funding equipping the practices, revenue revenue mobilization offices of mobilization and and management Accounts and management Internal Audit Submit quarterly Financial management 12 quarterly financial Fully implemented unit Financial management reports submitted reports to be submitted reports to appropriate quarters Equip offices of Equipped Accounts Fully equip offices Fully implemented Accounting staff and offices and Internal Internal Audit Audit Unit

Procure Vehicle for No. of Vehicle supplied Procure a vehicle Fully revenue mobilization Implemented

4

Update the records/data Data on item updated Revenue items to be Fully implemented on all revenue items updated

Train Revenue staff Number of Revenue 20 revenue staff to be Fully implemented on effective revenue Staff equip with trained mobilization revenue mobilization Conduct refresher Consultant engage to Refresher course on PP to Fully implemented courses on Public train Assembly’s be conducted procurement procurement practitioners Establish revenue task Ensure effective 10 member revenue task On-going The task force force revenue mobilization force to be formed comprise of five members

Establish database on Create Data base for Establish data base on all Fully completed all private sectors private sector operators operators operators Organize Public for at Fora organized for the 7 Public fora to be Not Implemented Inadequate funding Area Councils on private sector organized in all Area 1. Improve Private Private sector Councils sector Organize District Trade Number of trade fairs 2 District fairs to be Not implemented Inadequate Competivenes Fair organized organized Funding Enhance 2. Expand the Encourage the FM station stations Local FM stations to be Not Implemented A private person Competiven opportunities for establishment of Local established established has begun the es in Job Creation FM Stations. establishment of Ghana’s 3. Promote Public FM Station at New Private Private Edubiase Sector Partnership towards Prepare Service Delivery Charter Service Delivery Charter to Fully development Delivery Charter prepared be prepared Implemented Procure Wireless Wireless Internet Wireless internet facility to Fully The service Internet facility established be procured Implemented Agreement Elapsed and efforts are being made to renew it

5

Conduct Capacity Knowledge of Private Improve the capacity of Not implemented Private sector not building programme for Sector Improved private sector fully organized the private Sector Inadequate funding Update District District Assembly Access to information from On-going Updates is done by Assembly Website Website prepared the Assembly improved Marks Publication Establish Business BAC established BAC to be established Not implemented Application was Advisory Centre within sent to NBSSI but the District the Assembly is yet to receive response Register all Galamsay Galamsay operators All Galamsey operators to Ongoing Operators registered be registered Monitor the Activities Activities of Galamsay Activities of operators to be On-going Inadequate funding of Galamsay operator operators monitored monitored has been a great challenge to activity

Encourage Improve the value of 3 oil palm processing Not implemented Inadequate establishment of Oil Agricultural Produce in machines to be established Funding Palm Processing the District Donors also folded 1.Create Conjugal Machine at up their activities environment for Wuruyie,Kotwea and alternative livelihood Accelerate Atwereboana programme Agricultural Encourage Improve the quality of Gari processing machines Not Implemented Inadequate 2. Reverse forest and land Modernizati Establishment of Gari Agricultural Produce to be established Funding degradation on and Processing Machines in Donors also folded 3. Enhance community Sustainable needy communities up their activities participation in the Natural Encourage formation of Farmers formed groups Farmer based groups to be On-going There several environmental and Resource farmer based groups for to access credit formed farming groups but natural resource Managemen access to credit only two were able management by t to access credit awareness Encourage the Farmers encouraged to Credit unions to be formed Not Implemented Lack of 4. Improve agricultural formation of Credit form credit unions commitment from productivity Unions by farmers the farmers Encourage Agro- Farmers encourage to Agro-forestry encouraged Not implemented Inadequate Forestry by Farmers form Agro Forestry Funding

6

Educate farmers in Reduced the incidence 5000 farmers to be On-going proper harvesting and of post-harvest losses educated storage practices To increase extension Access to Extension 40 Extension officers to be Not implemented The extension officers from officers improved available officers reduced by One

Increase Cocoa Improved the yield of Cocoa spraying gangs to be Not implemented The Spraying Gang spraying gangs Cocoa produce in the increased to 300 had remain 134 district from 2010 -2013 Organize sensitization Fish output increased Sensitization and training Not implemented Fisheries and training programs to be organized Department have programmes on fish supported 5 Youth farming and animal to establish 8 ponds rearing Conduct sensitization Access to alternative 200 benefited from the Not Implemented Lack of Funds and training for 200 livelihood improved training programme communities on alternative livelihood Encourage Agricultural Output 10 youth in agricultural On-going The acceptance establishment of Youth increased programmes to be establish level is very low in agriculture Programme Create access roads to Access to Tourist sites Access roads to tourist sites Not implemented Bridge in the road tourist Centres improved created leading the site currently under construction

To publicize tourist Knowledge on the Tourist Centres to be Implemented Centres Availability of tourism publicized improved

7

Provision of training Improved the skills of The youth to be Not implemented Inadequate for the youth in skills the youth in oil and gas conscientized on the Funding related to the oil and importance of oil and gas gas industry industry Zone area for oil and Areas for the oil Gas Areas to be demarcated for Not implemented Inadequate gas industries Industry zoned the establishment of oil and Funding 1. Create enabling gas firms Oil and Gas environment for Capacity building for Capacity for Oil and The youth to be train on Not implemented Inadequate Developme establishment of nt oil and gas operators Gas operator Built skills related to the oil and Funding oil and gas gas industry

Ensure environmental Improved Environmental impact Not implemented Inadequate sustainability for oil environmental assessment for oil and gas Funding and gas condition firms to be undertaken

1. Ensure Construct Silos at Reduce Post Harvest 3 Silo to be constructed Not Implemented Inadequate sustainable Strategic Location Loses Funding development in transport Embark on routine Improved road routine mentainance of 300 Fully implemented 2. Promote the use maintenance transportation km of roads to be embarked of ICT in all on sectors of the Undertake surfacing Improved Roads 30km of road Surfaced Fully implemented Infrastructur economy feeder roads Transportation e, 3. Create enabling Undertake periodic Improved road 150 km of existing road Fully implemented Energy and environment that maintenance of existing transportation maintained Human will ensure the roads settlement development Supply Electricity to Improved access to Electricity to be extended Ongoing 5 communities Urban and Rural communities and energy to 20 additional Areas extension in New communities 4. Minimize the Edubiase,Akrofuom,Pr impact of and aso,Ampunyase, develop adequate Apagya and Atobiase response Provide Drainage Control erosion Drainage facilities in needy Not implemented strategies to facilities in needy communities to be provided disaster communities

8

5. Accelerate the Encourage the Access to financial financial institutions Not implemented Financial provision and establishment of institution improved established institution not improvement of Financial institutions willing to establish environmental at rural sanitation communities Encourage mass Mass acquisition Farming inputs to be On-going acquisition of farming farming inputs acquired inputs through farmers encouraged association Provide proper layout Layout prepared Proper layout for sectors to On-going for sectors be provided

Support NADMO NADMO supported NADMO to be supported On-going

1. Increase Provide 20 educational Educational 20 Educational Fully implemented 31 additional access to and infrastructure at all infrastructure provided infrastructure to be educational participation level constructed facilities were in education executed outside at all levels the previous frame 2. Improve work Human quality Developme teaching and nt, Learning Increase school feeding School feeding School Feeding On-going 12 schools are Productivity 3. bridge the programme increase Programmes to be increase benefiting from and gender gap in to 20 GSP Employmen access to enforce FCUBE Access to education FCUBE programme to be On-going Inadequate funding t education. programme increased enforce 4. improve management of education Ensure effective Support needy but Effective implementation On-going Inadequate funding service implementation of brilliant students of scholarship scheme to be delivery scholarship scheme ensured 5. improve Support Non-formal Education of the aged Non-Formal Education On-going

9

governance Education Division improved Division to be supported and Ensure effective Programmes and Effective monitoring and Fully implemented strengthen monitoring and projects monitored supervision in schools to be efficiency supervision in schools ensured and Organize periodic in- The skills of teachers Periodic in-service training Not implemented Inadequate funding effectiveness service training for improved for teachers to be organize in health teachers service Supply furniture and Schools provided with Adequate furniture and On-going delivery other learning materials adequate furniture other learning materials for 6. prevent the for schools schools to be supplied spread of Promote Girl- Child Improved Girl Child Girl child education Fully implemented communicabl education in the District education promoted in the District e disease and Provide friendly school Schools are user Friendly school Fully implemented promote infrastructure for friendly infrastructure for schools to healthy schools be provided lifestyle Support the STME organized The organization of STME Fully implemented 7. develop organization of STME annually clinics to be supported targeted clinics social Educate citizens on Maternal health The populace to be Fully implemented interventions family planning issues improved educated on family for planning vulnerable Support HIV/AIDS access to health HIV/AIDS programmes On-going and programmes and improved and victim to be supported marginalized victims groups

Facilitate malaria Malaria control Malaria control programme On-going control programmes by programme supported by AngloGold Ashanti to AngloGold Ashanti be facilitated Promote good Environmental Good environmental On-going environmental cleanliness supported cleanliness to be promoted cleanliness Support District District Sporting District sporting activities Fully implemented sporting activities activities supported to supported Support the District sports stadium Construction of sports On-going construction of District constructed stadium to be supported

10

Sports Stadium Provide health facilities Access to health Health Facilities in Not implemented in selected facilities improved selected communities to be communities provided Renovate and extend Access to health Health Facilities in selected Not implemented existing health facilities facilities improved communities to be in needy communities renovated Provide additional Additional health additional health personnel On-going health personnel and personnel provided and logistics to be provided logistics

Sensitize the public on NHIS sentizisation Sensitization Fully implemented the importance of intensified National Health Insurance

Support the needy to Needy supported to The needed to be supported Fully implemented register DHMIS register NHIS to register for the District Mutual Health Insurance Scheme Provide 90 boreholes Improved access to 90 boreholes provided On-going Only 18 boreholes portable water constructed Provide institutional Access to toilet 20 institutional latrines Not implemented latrines facilities improved constructed Facilitate the Access to toilet The construction of 300 Not implemented Inadequate funding construction of facilities improved household latrines to be household latrines facilitated Provide additional Access to toilet 10 additional public toilets Fully implemented Been awarded public toilets facilities improved to be constructed Rehabilitate existing Access to toilet 15 existing renovated Not implemented Inadequate funding toilet facilities facilities improved toilets to be rehabilitated Acquire final disposal Final disposal sites Final disposable for Fully implemented site acquired communities acquired Provide refuse Ensure good 20 additional refuse Fully implemented containers environmental containers to be provided cleanliness

11

Ensure effective Ensure good Effective management of Fully implemented management of environmental sanitation facilities to be sanitation facilities cleanliness ensured Support income Income generating The income generating Fully implemented generating activities of activities supported activities of the poor and the poor and the vulnerable to be supported vulnerable Ensure the provision of PLWAs provided with Provision of antiretroviral On-going antiretroviral drugs antiretroviral drugs drugs to PLWAs to be ensured Support PWDs in their PWD supported in their 50 PWD provided with On-going activities activities antiretroviral drugs 1. enhance civil and Facilitate the creation Facilitate electoral Creation of additional Not implemented private sector of additional electoral process electoral and polling station partnership in an polling stations for Dove and Odumase to governance be facilitated 2. strengthen and Provide capacity Capacity building for Capacity building Not implemented Inadequate funding operationalize the building programme for District Assembly programmes for District sub-district District Assembly Sub- provided Assembly Sub-structures to structure and Structure be provided ensure Provide additional staff Additional staff to run Additional staff to run sub Not implemented consistency with to run sub-structure sub structure provided structures to be provided Transparent local government Motivate Area Council Provide incentives to Area council staff to be Not implemented and 3. ensure efficient staffs Area Council staff motivated accountable internal revenue Provide motor bikes for Sub-structures Motorbikes for revenue Fully implemented governance generation and Revenue collectors at operationalize and collectors at the Area transparency in Area Council level functioning Council level to be local resource provided management Effectively monitor the Performance of area The activities of Area Fully implemented 4. improve activities of Area councils improved Councils to be monitored transparency in Councils effectively public access to Support the NCCE in Citizen participation in NCCE’s sensitization Not implemented information their sentizisation governance improved programmes to be 5. impose upon the programmes supported logistics and Organized management Capacity of assembly Management training for Fully implemented human resource training for District staff improved District Assembly staff to

12

management of Assembly Staff be organized the District Acquire 4WD and other Ensure effective A 4WD and other logistics Fully implemented 6. provide efficient logistics for DPCU functioning of DPCU for activities of the DPCU and residential activities to acquired accommodation Ensure involvement of Women groups Involvement of women in Fully implemented to staff women in decision involved in decision decision making process to good governance making process making be ensured enhanced by Prepare District District assembly District Assembly by-laws Fully implemented strengthening the Assembly By-laws operational and to be prepared administration set functioning up of the Ensure the provision of Security services The provision of police On-going 3 stations were assembly Police station/post for supported station/post for establish selected communities Ampunyase, Atwereboana, Wuruyie, Akutreso, Afiaso and Brekete to be ensured

Gazzet District District assembly District Assembly by-laws Not implemented Assembly by laws operational and to be gazzetted functioning

Support District District Cultural activities Cultural Activities to be supported Encourage Improved Communication service Fully implemented communication service communication in the providers to extend providers to extend District coverage coverage Support decentralized Decentralized Decentralized departments Fully implemented departments in their departments being to be supported in their yearly activities functional and yearly activities operational

13

Renovate existing staff Office and residential 3 residential Not implemented bungalows accommodation accommodation provided improved Provide adequate Assembly bungalows Furnished 5 residential Not implemented furnishing of Assembly furnished bungalows bungalows

From the above table it was realize that a total of 10 Programmes earmarked for implementation from 2010-2013 under Ensuring and Sustaining Micro-economic Stability. 8 programmes were fully implemented, 1 on-going and 1 not implemented. On the thematic area of Enhancing Competitiveness in Ghana’s Private Sector, 3 out of eleven programmes were fully implemented, five were not implemented and three on-going. Accelerate Agricultural Modernisation and Sustainable Natural Resource Management had 13 Programmes to be implemented. However only one was implemented with 3 on-going and 9 not implemented at all. Oil and Gas Development had 5 programmes and they were all not implemented. While Infrastructure, Energy and Human Settlement Development had 10 programmes, 3 fully implemented, 3 not implemented and 4 on-going. Human Development, Productivity and Employment had the highest number of programmes totaling 33 with 14 fully implemented, 13 on-going and 6 not implemented. Transparent and Accountable Governance also had 18 programmes. 7 were fully implemented and, 8 not implemented and 3 on-going.

In all a total of 101 programmes were earmarked for implementation. Out of this 38 were fully implemented representing 38.6%, 27 on-going representing 26.7% and 36 not implemented representing 35.6%

14

PROGRAMMES IMPLEMENTED BUT NOT IN MTDP

The Assembly however implemented certain programmes not in MTDP and they are captured in the various Thematic Areas as follows:

1. Human Development, Productivity and Employment. 30 additional educational infrastructures were implemented. a. teachers quarters - 6 b. dormitories - 6 c. 3 unit classroom - 9 d. 6 unit classroom - 9 Total 30 2. Transparent and Accountable Governance.

The Fire Service Tender bay was rehabilitated and it was not captured in the MTDP.

15

FINANCIAL PERFORMANCE FROM 2010 -2013

The table below examine the financial performance from 2010-2013

Table 1.2 FINANCIAL PERFORMANCE

APPROVED ACTUAL APPROVED ACTUAL APPROVED APPROVED BUDGET BUDGET BUDGET 2010 2010 2011 2012

REVENUE HEAD Rates 114,900.00 65,344.95 106,900.00 28,381.07 39,300.00 40,010.83 Lands 227,300.00 219,402.82 216,700.00 161,412.82 227,370.00 197,961.06 Fees & Fines 31,820.00 15,432.00 28,935.00 27,632.60 26,365.00 25,956.77 Licenses 15,782.00 17,326.40 15,204.00 21,538.80 26,908.00 35,106.77 Assets, Property/ Rent 9,690.00 7,743.00 8,304.00 8,354.50 6,414.00 5,287.00 Grant- In-Aid 3,151,845.00 1,160,239.06 2,948,240.15 1,656,363.59 3,366,202.00 1,024,836.85 Investment Income 3,800.00 0.00 7,100.00 8,361.00 10,100.00 7,359.00 Miscellaneous 3,200.00 5,286.61 20,200.00 25,813.70 4,000.00 5,077.15 TOTAL 3,558,337.00 1,526,033.21 3,351,583.15 1,937,858.08 3,706,659.00 1,460,899.42

16

Table 1.3 EXPENDITURE PATTERN

APPROVED ACTUAL APPROVED ACTUAL APPROVED ACTUAL BUDGET BUDGET BUDGET

EXPENDITURE 2010 2010 2011 2012

Personal Emolument 284,214.40 204,633.68 289,214.40 148,402.48 254,402.00 124,675.68 Travelling & Transport 96,024.00 84,412.14 101,566.00 65,797,03 84,456.00 77,272.72 General Expenses 30,580.00 15,567.17 31,950.00 20,605.89 30,830.00 26,071.07 Maint./ Repairs & Renewals 6,500.00 2,084.09 18,000.00 6,212.00 16,500.00 13,251.50 Miscellaneous 71,550.00 44,800.64 80,500.00 66,828.75 58,815.00 70,708.03 Capital Expenditure 1,492,567.73 983,423.83 1,991,395.15 1,456,073.28 1,986,395.15 791,639.64 Mps Projects 200,000.00 32,469.84 100,000.00 86,859.61 100,000.00 105,441.11

Interventions 200,000.00 158,641.82 100,000.00 58,573.23 100,000.00 251,839.67 Excess of Revenue over expenditure 1,176,900.87 638,957.60 1,075,260.85 TOTAL 3,558,337.00 1,526,033.21 3,351,583.15 1,843,555.24 3,706,659.00 1,460,899.42 The table above shows the Revenue and Expenditure performance from 2010-2012, however the chart of accounts was changed in 2013 and the table shows the revenue performance for 2013.

17

Table 1.4: Revenue and Expenditure for the year 2013

Revenue Head 2013 Expenditure Head 2013 BUDGETED ACTUAL BUDGETED ACTUAL Income on Property 70,100.16 123,093.89 Compens. Of Employees 853,457.76 506,393.75 Lands & Royalties 226,700.16 84,972.91 National Insurance Con. 42,619.08 3,547.74 Fees 43,200.24 57,120.57 Travel & Transport 97,200.12 113,905.85 Licenses 30,985.56 36,677.10 Utilities 227,383.08 10,305.00 Rent Income 72,400.08 27,266.00 Repairs- Maintenance 143,251.32 50,859.30 Grants 3,120,368.16 1,622,843.21 Mat. Office Supplies 121,185.36 48,387.97 Fines & Penalties 3,600.12 3,172.00 General Cleaning 5,000.04 2,701.00 Misc.& Unidentified Revenue 2,500.08 1,557.80 Rentals 7,200.00 1,830.00 Other Sources 864,011.28 438,037.21 Special Services 34,400.04 20,028.00 Other Charges 1,200.00 1,545.36 Work in Progress 543,248.04 7,620,25 Infrastructure Assets 60,162.12 18,504.00 Materials Supplies 00.00 Transport-Equipment 0 0.00 Emergency Services 0 0.00 Grants 1,551,016.08 1,383,280.73 General Expenses 154,274.04 125,476,35 Dwellings 603,497.16 83,489.93 Non Residential Buildings 846,680.40 267,868.93 Other Structures 78,762.00 75,348.00 Other Machinery-Equip 100,000.08 54,601.83 Training-Seminars 101,010.12 80,416.11 Consulting Services 0 0.00 TOTAL 4,433,865.84 2,394,740.00 5,571,546.84 2,723,013.50

18

ANALYSIS OF REVENUE AND EXPENDITURE PERFORMANCE

The Assembly budgeted a total amount of GHȼ 3,558,339.00 but was able to generate GHȼ 1,526,033.21 representing 42.88% in 2010. In 2011, the total approved revenue estimated was GHȼ 3,351,583.15 and an amount of GHȼ 1,937,858.08 representing 57.82% while 2012 had an approved revenue estimate of GH₵ 3,706,659.00 with GH₵1,460,899.42 generated representing 39.41%. In 2013 total revenue of GH₵ 4,433,865.84 was estimated and Assembly was able to generate an amount of GHȼ 2,394,740.00 representing 54.01%.

On the part of expenditure a total amount of GHȼ 3,558,337.00 was approved for spending but GHȼ1,526,033.21 was actually spent representing 42.87% in 2010. GH₵ 3,351,583.15 was the approved expenditure for 2011 and out of this; an amount of GHȼ 1,843,555.24 was spent representing 55.01%. 2012 also had an approved expenditure of GHȼ 3,706,659.00 and GHȼ 1,460,899.42 representing 39.41% was spent. The Assembly in 2013 approved an expenditure of GHȼ 5,571,546.80 and GHȼ2, 723,013.50 spent represents 48.87%.

The implication for the about financial analysis is that the Assembly was able to achieve an average of 48.53% of its projected revenue, this went a long way to attract programmes and projects implementation. Shortfalls of the revenue were basically due to the non-release of Grants especially DACF on time. Serious efforts must be put in place to generate more IGF for development from 2014-2015. Realistic revenue targets must also be set during budgeting.

On the part of expenditure an average of 46.54% was achieved means that most of the programmes and projects were not started at all while those started were not completed on time due to delay in the payments of certificates or activity expenditure.

REASONS FOR THE NON-ACHIEVEMENT OF GOALS AND OBJECTIVES i. Unreliable and untimely release of Development Budget (DACF) and Development Partners Funds for project implementation.

19

ii. Some of the goals and objectives were not achievable within the short period set for the plan. The goals and objectives had long gestation period. iii. The Vastness of the district makes programmes and projects implementation had little impact on the lives of the people. iv. The goals and objectives set were not directly targeted at poverty reduction (unemployment). v. Absence of periodic review of the Development Plan.

PROBLEMS/CONSTRIANTS ENCOUNTERED DURING PLAN IMPLEMENTATION. i. Insufficient and reliable data for planning purposes. ii. Non-functioning of the sub-structures to provide inputs for the plan preparation. iii. High level of expectations from the electorate for service delivery within a short plan period iv. Delay in the release of funds for project implementation v. Too many directives from the ministries as to the use of DACF which affect the Assembly’s focus and vision on development agenda vi. Plan not targeted at direct job and wealth creation but rather mainly on infrastructure provision. vii. Cumbersome procurement process which delays the implementation of physical programmes and projects.

LESSONS LEARNT i. The need for the nation to review the Procurement Act (Act 663) after 4 –years of implementation. ii. Periodic review of the plan to see if the Assembly is on course in its implementation. iii. The Assembly should look for other sources of funding for project implementation other than DACF, DDF and GETFUND. The Assembly should step up its IGF to enable them use some for minor projects execution .Other sources are Public Private Partnership (PPP) iv. The 2014-2017 Development plans should focus also on job/wealth creation for Local Economic Development. v. Decentralised departments should study the plan and implement their programmes and projects in line with the district and national goals and aspirations. vi. Shortfalls in DACF releases greatly affect development projects undertaken by such funding. Revenue Mobilization would have to be stepped up to fill in the gap

20

vii. The Assembly would focus on the human capacity building which deals with the training of the people to build their capacity. Such training would empower them economically and financially to establish jobs on their own to reduce employment pressure on the formal sector. viii. Operations and maintenance of programmes and projects should be given the needed attention to sustain the investment for a long time. ix. The programmes and projects not implemented in the last plan must be evaluated to ascertain their relevance for inclusion in the next Development Plan. x. Adequate provision must also be made to complete all on-going programmes and projects.

21

CHAPTER TWO DISTRICT PROFILE 2.0 THE DISTRICT ASSEMBLY Adansi South District Assembly (ASDA) is one of the thirty (30) administrative Metropolitan, Municipal and District Assemblies (MMDAs) in the of Ghana. It was carved out of the erstwhile and Adansi East District Assemblies in the year 2004 with Legislative Instrument (LI 1752). The Assembly’s revised vision and mission statements are as follows:

 Vision

To transform the local economy through the creation of a vibrant agro-based sector, training of the youth in employable skills, while giving the people access to basic services and bringing the vulnerable and excluded to the mainstream of development.

 Mission

The Adansi South District exist to improve the standard of living of the people in the District through the provision of economic, social and political facilities with the enabling environment for private participation and investment in the District with qualified human resource. .

2.1 ADANSI SOUTH DISTRICT ASSEMBLY AND ITS OBJECTIVES

The Adansi South District Assembly is the highest political and administrative body of the District and therefore exercises deliberative, legislative and executive functions. It has the mission and responsibility to improve the quality of life of the people through sustainable development.

To achieve this mission, the Assembly has set the following objectives:

 To facilitate the effective functioning of the local government institutions in the District Assembly  To ensure efficiency and effectiveness in the mobilization and utilization of resources in the District Assembly and its decentralized departments  To monitor, co-ordinate and harmonize the implementation of development plans and activities in the District Assembly  To facilitate the provision of basic social and economic infrastructure and services in the District  To facilitate community-based and private sector development in the District.

22

2.2 THE STATE AND FUNCTIONS OF AREA COUNCILS The District has one Town Council and Six Area councils. They are Town Council, Akrofuom Area Council, Ampunyasi Area Council, Wuruyie Area Council, Atobiase/Apagya Area Council, Praso Area Council and Akutreso Area Council. All Councils have chairpersons and secretaries together with revenue collectors. They also have offices for their daily activities.

2.3 PHYSICAL AND NATURAL ENVIRONMENT The Adansi South District is one of the thirty (30) Districts in the Ashanti Region of Ghana. The District lies within Latitude 40” North and 6 degrees 22” North and Longitude 1 degree West and 1 degree 38” West. It is on the Southern part of the region. Other Districts in the region sharing boundaries with it are Municipal and Adansi North Districts to the North and North East respectively. The District also shares boundaries with Assin District in the to the South and to the East by Birim North and South Districts of the . The position of the District in both national and regional context is shown on their respective maps (Fig 1 and 2). The District has a total land representing an area of 899sq.km, which is approximately 4% of the total land area of the Ashanti Region. About 24% (334.5sq km) of this total land area is made up of forest reserves.

Fig 1: Adansi South District in National Context

23

Fig. 2.2 Adansi South District in Regional Context

24

2.3.1 Relief and Drainage The land ranges from flat to gentle undulating with average elevation of about 350 metres above sea level. Generally, the District is hilly with several rivers and streams. Major rivers such as Pra, Fum, Muma, Subin, Menso, Subri, Supong, Krodua , Offin and Aprapo are in the District and serve as major drainage channels. Minor streams also drain into the major rivers.

Fig. 2.3 Relief and Drainage Map of Adansi South District

2.3.2 Climate The Climatic condition in the District is generally, favourable with mean monthly temperatures ranging between 26 degrees Celsius and 29 degrees Celsius. February and March are the hottest months of the year. The extensive nature of the forest reserves in the District ensures a very good rainfall distribution pattern, which is characterized by two rainy seasons with peak periods around May – June and October. The average annual rainfall figures are between 160 mm and 180mm with an average of 150 rainy days recorded every year.

2.3.4 Vegetation and Forest Reserves The Adansi South District is within the rain forest belt and it is characterized by moist semi-deciduous forest with thick vegetative cover and growth. In some parts of the District, the natural vegetation is steadily degenerating into secondary forest. Relatively, little virgin forest remains outside the main forest reserves

25 and this condition can be attributed to persistent slash and burn methods as well as the incidence of bush fires in the dry season. Despite these improper environmental practices with their detrimental effects on the vegetation of the District, forest reserves still exist and they cover approximately 188sq.km in the total land area of the District.

Fig. 2.4 Map Showing Vegetation and Forest Reserves of Adansi South District

The Forestry Services Division of the Forestry Commission continues do its work in the District. Protection of forest reserves, boundary maintenance and inspection, of the following forests reserves is still ongoing; Onuem Nyamebe, Kunsimoa, Cheremoase, Nyamebe Bepo, Afia Shelter Belt, Onuem Bepo, Kototintin, Numia all covering a total perimeter of 188.03 km square. Also contract boundary cleaning, boundary planting, greenbelt maintenance, wildfires/bush fire education, enrichment planting was carried out during the year. The main offence which is illegal felling and sawing of trees such as Wawa, Danta, Edinam, Mahogany, Sapele however continues to hamper the work of the division.

26

2.3.5 Soil Types Knowledge of soil types in an area is an important pre-requisite for planning since it helps to advise on the type of crops the soil can support. This is particularly true for the District since more than half of the population depend on farming for their livelihood. The Agricultural Extension Department of the District describes the soil as very fertile with a high humus content, which have the capacity to support tree crops such as cocoa, oil palm, cola nuts as well as staples such as cassava, plantain and a variety of vegetables. The types of soils in the District are: a) – Morso Association These are mainly found in the northern parts of the District. They have been developed over Tarkwaian rocks. They support crops such as cocoa, coffee, citrus, oil palm, maize, cassava and other root crops. b) Swedru – Nsaba Simple Association These are found in the eastern parts of the District, especially around Subriso. They have been developed over granite and associated rocks. They support crops such as Cocoa, oil palm, plantain, cocoyam, cassava and maize. c) – Oda Compound Association This association of soil type has been developed over upper and lower Biriman rocks and is found around New Edubiase and Akutreso. They support tree crops such as cocoa, oil palm as well as staples such as cassava, plantain, cocoyam, maize and vegetables. d) Awaham – Kakum - Kyekyerewere Association These are mainly found around Adansi Praso. They have been developed over alluvium rocks. Crops that thrive very well in this soil type include maize, cassava, etc. The various soil types are illustrated on the soil map.

2.3.6 Agricultural Land Use

Out of the total land area of the District, that is 899sq.Km, 60% (802.8sq.km) is under tree and food crop production. About 90% of this 802.8 square kilometers land is cultivated by peasant farmers using the traditional farming implements and methods that is slash and burn and shifting cultivation. The 10% of the arable land area is cultivated by individuals or organizations whose cultivated acreage is larger (16 acres to over 25 acres) than the peasant farmers. However, most of these people also practice the slash and burn system.

27

The cropping pattern in the District is the mixed cropping systems where one parcel of cleared land contains most, if not all, of the staples produced in the District. Tree crops are also mixed with other crops, especially during the first two years of planting.

2.3.7 Geology and Minerals

Most of the North Western parts of the District lie within the gold belt. Towns such as Akrofuom, Sikaman, and Nyankomase have been identified as having gold and diamond deposits.

Fig. 2.5 Geology Map of the District

2.3.8 Surface Accessibility

Surface accessibility in the District is basically in the form of road network/transport system. It has a first class asphalt road from Amudurase to Adansi Praso on the Cape-Coast – trunk road. In addition to this, there are about 176km network of second and 69km third class roads respectively. Footpath or tractor paths are a common feature in the District and most of these foot/tractor paths are motorable during the dry season. However, when the rains set in, due to the numerous streams, these paths become unmotorable.

28

Fig. 2.6 Map showing roads in the District

2.4 CULTURE

Cultural activities in the District are very diverse as a result of the many migrants in the District. There are two main festivals that are celebrated by the people in the District namely, Akwasidae and Afahyea. Since the people are predominantly Akans, Akwasidae is usually celebrated on every 40th day in a year in the District and Afahyea festival is also celebrated from the second week in November to first week in December annually. There is a vibrant cultural troupe in the District that entertains guests during special occasions.

Adansi South District is made up of multi-ethnic communities, inhabited by many of the country’s ethnic groups, including the indigenous Asantes, Ga-Damgbes, Fantis, Ewes, Akwapims, Akims as well as Mole- Dagbani and other ethnic groups from the North. These multi-ethnic settlers have come from far and near to engage in production of cocoa crops which is the principal economic activity of the District. The Asantes constitutes the majority constituting 33 percent.

29

2.4.1 Religious Affiliation The main religious groups in the District are Christianity, Islam and Traditional Religion. Analysis of religious composition indicates that about 82 percent of the population are Christians while about seven percent and two percent are Islam and Traditionalists respectively.

The data from the 2010 PHC revealed that various forms of religious affiliations exist in the District. These religious affiliations include Catholic, Protestant (Anglican/Lutheran) Pentecostal/Charismatic, Other Christians, Islam and Traditionalist. As presented in Table 1 Catholic, Protestant, Pentecostal and other Christians form the larger Christian group (94,259) of the total population 115,378. Islam represents 6.8 percent, Traditionalists represent 1.6 percent while other religions constitute 0.9 percent. The populations that belong to non-religion however constitute 9.0 percent of the entire District population.

The table further shows that Pentecostal/Charismatic (31.2%) is the highest of the Christian denomination, followed by Protestants (17%) and then Catholics (8.7%) as well as all the others being 24.7. Proportion (6.8%) of Islam faith is much lower in the District than in the entire Ashanti Region (15.2%) and in the country (17.6%).

Moreover all Christian denominations have higher proportion of males than females, except “Other Christians” (28,479), where the proportion of female (25.6%) is higher than male (23.7%). The figure for the males belonging to Islam (7.5%) is also higher than the female (6.0%). In the case of Traditionalist and “Other religion”, the proportion of male and female is 1.6 percent and 0.9 percent respectively).

Table 2.1: Population by religion and sex

Religion Both sexes Male Female Number Percent Number Percent Number Percent Total 115,378 100.0 58,039 100.0 57,339 100.0 No Religion 10,373 9.0 6,846 11.8 3,527 6.2 Catholic 10,032 8.7 5,011 8.6 5,021 8.8 Protestant (Anglican Lutheran 19,711 17.1 9,500 16.4 10,211 17.8 etc.) Pentecostal/Charismatic 36,037 31.2 17,064 29.4 18,973 33.1 Other Christians 28,479 24.7 13,772 23.7 14,707 25.6 Islam 7,804 6.8 4,377 7.5 3,427 6.0 Traditionalist 1,896 1.6 952 1.6 944 1.6 Other (Specify) 1,046 0.9 517 0.9 529 0.9 Source: Ghana Statistical Service, 2010 Population and Housing Census.

30

2.5 SETTLEMENT SYSTEMS

The largest settlement in the District in terms of population is New Edubiase with a population of 19,974. It has most of the facilities indicated in the scalogram analysis. This makes the community occupy the first position in terms of settlement hierarchy. The next settlement of importance in terms of facilities is Akrofuom, which has a population of 10,399. The communities, which follow Akrofuom in terms of settlement hierarchy, are Atobiase, Apagya, Praso, Ataase , Sikaman, Amudruase, Kubi Kwanto, Tweapease, Fenaso Nkwanta, Atwereboana and Subriso.

The rest of the communities have a centrality score below 100. These settlements lack a lot of facilities as indicated in the scalogram analysis. It is worth noting that most of the big communities are found along the main Kumasi to Cape-Coast road. And this shows the importance of good road network in the development of communities, as most of the facilities are located in the communities along the major road.

31

Fig. 2.7 Adansi South District Map

32

Table 2.2 Scalogram Analysis

POP

Facilities

f

Primary Sch. Primary JHS SHS TABS Clinic Centre Health Hospital Well Dug Hand Boreholes Water Borne Pipe Latrine Pit KVIP W.C. Tribunal Station Police Station Fire Ambulance Office Post Telephone House Guest Station Filling Park Lorry Bank Rural Bank Commercial Road Primary Road Secondary Road Feeder Ext. Agric. Market Daily Market Weekly o No. Score Centrality Total WEIGHT (W) 1 2 3 1 2 3 4 1 2 3 1 2 3 1 1 1 1 1 1 1 1 1 2 3 2 1 1 1 2 New Edubiase 12,046 X X X X X X X X X X X X X X X X X X X X X X X X X X X X 2 1 8 , 8 8 6 Akrofuom 6,477 X X X X X X X X X X X X X X X X X X X X X 2 7 1 1 3 Wamase 1,590 X X X X X X X X X X 1 6 0 7 Sikaman 1,516 X X X X X X X X X X X X X X X 1 2 5 2 5 Apagya 3,312 X X X X X X X X X X X X X X X 1 2 5 2 5 Atobiase 2,948 X X X X X X X X X X X X X X 1 1 4 7 8 Praso 3,069 X X X X X X X X X X X X X X 1 1 4 7 8 Fahiakobo 1,205 X X X X X X X X X X X 1 1 1 4

33

2 Subriso 1,122 X X X X X X X X X X X 1 1 1 4 2 Mensonso No1 1,547 X X X X X X X X X X X 1 1 1 4 2 Ataase Nkwanta 1,626 X X X X X X X X X X X X 1 1 2 5 0 Wamasi 1,590 X X X X X X X X X 9 4 3 Obonsu 1,017 X X X X X X X X X X 1 6 0 7 Amudurase 1,618 X X X X X X X X X X X X X 1 1 3 5 1 Owusukrom 1,029 X X X X X X X X X 9 4 3 Menang 1,387 X X X X X X X X X 9 4 3 Wuruyie 1,603 X X X X X X X X X X 1 6 0 7 Ampunyase 1,786 X X X X X X X X X X 1 6 0 7 Subin Camp 1,110 X X X X X X X X X X 1 6 0 7 Akutreso X X X X X X X X X X 1 6 0 7 Kramokrom 999 X X X X X 7 3 1 Number of facilities in the 20 2 2 1 4 5 1 1 1 2 2 1 1 1 4 1 1 2 8 1 3 1 3 1 8 3 2 8 1 5 District 0 9 9 9 0 8 0 0 9

34

2.6 HOUSEHOLD SIZE / CHARACTERISTICS

The average household size of the District is about 4.4. This compared with the average household size of 5.2 in 2000 indicates a decline in household size in the District. The predominant household heads are men. It can be seen from Table 8.1 that the total stock of houses in the District is 20,541 comprising 87 percent in the rural areas and 13 percent in the urban. Population per house is the proportion of the total population to the number of houses. It can further be seen that the average household per house for the District is 1.2 and that of rural and urban areas are1.2 and 1.8 respectively. The population per house in the District is 5.5, while that of rural and urban areas are 5.3 and 6.9 respectively.

The average household size in the District is 4.4 which is same as that of the country (4.4) and slightly higher than that of the region (4.1). In rural areas, the average household size is 4.6 whereas 3.8 is for urban areas.

Table 2.3: Stock of houses and households by type of locality Categories Total country Region District Urban Rural Total population 24,658,823 4,780,380 115,378 18,966 96,412 Total household population 24,076,327 4,671,982 113,145 18,440 94,705 Number of houses 3,392,745 574,066 20,541 2,663 17,878 Number of households 5,467,054 1,126,205 25,626 4,881 20,745 Average households per house 1.6 2.0 1.2 1.8 1.2 Population per house* 7.1 8.1 5.5 6.9 5.3 Average household size 4.4 4.1 4.4 3.8 4.6 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.6.1 Economic Status of Population

The 2010 PHC classified the population as economically active and economically inactive population. Economically active population describes population as employed and unemployed. It also takes into consideration the reasons why a population is unemployed. Economically inactive population on the other hand is the population, which can neither be classified as employed nor unemployed. This category of population was either engaged with household chores, full time education, disable/sick or is on pension/ retired, and for that matter did not seek job within seven days preceding the Census Night.

35

Table 4 and Figure 6 present the population 15years and older by activity status and sex. The total number of the population that is economically active is 52,919. This figure comprises of 26,512 males and 26,407 females. The population is dominated by employed population (97.2%) which is slightly higher for the males (97.6%) compared to females (96.9%). This proportion is also mainly (94.8%) for those who work within seven days preceding Census Night. Majority of those who are unemployed (65.9%) are those seeking work for the first time and available for work comprising 69.0 percent males and 63.5 percent females. Whereas the total population 15years and older that are economically not active is 19.8 percent of the population, proportion of the male is 18.9 percent whiles that of the females is 20.7 percent. The Census outcome also reveals that, the figure for economically not active population is mostly pertaining to those who are in full time education (51.1%).

Table 2.4: Population 15 years and older by activity status and sex

Total Male Female Activity status Number Percent Number Percent Number Percent Total 65,974 100.0 32,682 100.0 33,292 100.0 Economically active 52,919 80.2 26,512 81.1 26,407 79.3 Employed 51,461 97.2 25,877 97.6 25,584 96.9 Worked 48,767 94.8 24,728 95.6 24,039 94.0 Did not work but had job to go back to 2,441 4.7 1,021 3.9 1,420 5.6 Did voluntary work without pay 253 0.5 128 0.5 125 0.5 Unemployed 1,458 2.8 635 2.4 823 3.1 Worked before, seeking work and available 497 34.1 197 31.0 300 36.5 Seeking work for the first time and available 961 65.9 438 69.0 523 63.5 Economically not active 13,055 19.8 6,170 18.9 6,885 20.7 Did home duties (household chore) 3,123 23.9 955 15.5 2,168 31.5 Full time education 6,672 51.1 3,867 62.7 2,805 40.7 Pensioner/Retired 181 1.4 118 1.9 63 0.9 Disabled/Sick 923 7.1 409 6.6 514 7.5 Too old/young 1,288 9.9 430 7.0 858 12.5 Other 868 6.6 391 6.3 477 6.9

Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.6.2 Rural – Urban Split

During the 2000 population census the rural population was 63,895 representing 79.9 percent of the population. According to the District Data base 2006 the rural population totaled 76,905 representing 78.1% while the urban population was 21,532 representing 21.9%. The Urban population for 2010 is estimated at 36,667 forming 32.5%. The urban population has been increasing since 1996. The 36 indication for development is that social amenities need to be provided for the ever increasing urban population.

2.6.3 Housing Stock It can be seen from Table 8.1 that the total stock of houses in the District is 20,541 comprising 87 percent in the rural areas and 13 percent in the urban.

Population per house is the proportion of the total population to the number of houses. It can further be seen that the average household per house for the District is 1.2 and that of rural and urban areas are 1.2 and 1.8 respectively. The population per house in the District is 5.5, while that of rural and urban areas are 5.3 and 6.9 respectively.

The average household size in the District is 4.4 which is same as that of the country (4.4) and slightly higher than that of the region (4.1). In rural areas, the average household size is 4.6 whereas 3.8 is for urban areas.

Table 2.5: Stock of houses and households by type of locality Categories Total country Region District Urban Rural Total population 24,658,823 4,780,380 115,378 18,966 96,412 Total household population 24,076,327 4,671,982 113,145 18,440 94,705 Number of houses 3,392,745 574,066 20,541 2,663 17,878 Number of households 5,467,054 1,126,205 25,626 4,881 20,745 Average households per house 1.6 2.0 1.2 1.8 1.2 Population per house* 7.1 8.1 5.5 6.9 5.3 Average household size 4.4 4.1 4.4 3.8 4.6 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.6.4 Type of Dwelling, Holding and Tenancy Arrangement Table 6 shows that there are 25,626 occupied dwelling units in the District out of which 18,083 have male headed households and 7,543 female headed. And there are more occupied dwelling units in rural areas (20,745) than in urban areas (4,881). Moreover, 17,414 dwelling units were owned by household members in the District, followed by those owned by other private individual (3,823) and relative not a household member (3,459), while other (83) had the lowest share.

37

In rural areas, most dwelling units were owned by household members (15,447) followed by those owned by relative not a household member (2,408) and other private individual, while other (68) had the lowest share. On the other hand, in urban areas, 1,967 dwelling units were owned by household member, and then those owned by other private individual (1,740) and relative not a household member while those being purchased (6) are the lowest.

Table 2.6: Ownership status of dwelling by sex of household head and type of locality District Total Male Female Ownership status country Region Total headed headed Urban Rural Total 5,467,054 1,126,205 25,626 18,083 7,543 4,881 20,745 Owned by household member 2,883,236 471,623 17,414 12,456 4,958 1,967 15,447 Being purchased (e.g. mortgage) 45,630 13,648 91 67 24 6 85 Relative not a household member 851,630 218,145 3,459 2,227 1,232 1,051 2,408 Other private individual 1,439,021 370,415 3,823 2,636 1,187 1,740 2,083 Private employer 83,610 20,482 395 359 36 18 377 Other private agency 21,123 5,113 101 88 13 15 86 Public/Government ownership 118,804 22,126 260 193 67 69 191 Other 24,000 4,653 83 57 26 15 68 Source: Ghana Statistical Service, 2010 Population and Housing Census.

The type of occupied dwelling unit by sex of household head and type of locality is presented in Table 2.7. Out of a total of 25,626 occupied dwelling units in the District compound houses (43.7%) constitute the highest proportion, followed by separate house (40.1%) and semi-detached house (8.4%).

It can further be seen from Table 8.3 in rural areas, separate house (44.7%) had the highest proportion of the total occupied dwelling units, followed by compound house (rooms) (38.2%) and semi-detached house (8.7%). In urban areas, compound house (66.7%) forms the greatest percentage, followed by separate house (20.2%) and semi-detached house. More so, in separate house, there are more male household heads (42%) than their female counterparts (35.3%), while in compound house, more females (50.5%) than males (40.8%) were household heads, (Table 2.7).

Table 2.7: Type of occupied dwelling unit by sex of household head and type of locality District Male Female Total Total headed headed Urban Rural Type of dwelling country Region N % % % % % Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 100.0 100.0 Separate house 1,471,391 266,516 10,264 40.1 42.0 35.3 20.2 44.7 Semi-detached house 391,548 89,485 2,161 8.4 8.8 7.6 7.3 8.7 Flat/Apartment 256,355 91,227 378 1.5 1.4 1.6 3.2 1.1

38

Compound house (rooms) 2,942,147 605,025 11,188 43.7 40.8 50.5 66.7 38.2 Huts/Buildings (same compound) 170,957 22,399 1,121 4.4 4.8 3.4 1.0 5.2 Huts/Buildings (different compound) 36,410 4,176 324 1.3 1.4 0.8 0.1 1.5 Tent 10,343 1,791 27 0.1 0.1 0.1 0.0 0.1 Improvised home (kiosk/containeretc) 90,934 16,304 35 0.1 0.1 0.2 0.1 0.1 Living quarters attached to office/shop 20,499 4,046 80 0.3 0.3 0.3 0.7 0.2 Uncompleted building 66,624 23,285 40 0.2 0.2 0.1 0.6 0.1 Other 9,846 1,951 8 0.0 0.0 0.1 0.0 0.0 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.6.5 Construction Materials The types of construction materials used for dwelling units in the country, region and the District are presented in Table 8.4. The most common construction material used for outer wall in the District is mud brick/earth (69.4%), followed by cement blocks/concrete (24.1%) and wood (1.5%), while stone (0.1%) and bamboo (0.1%) constitute least used.

Cement blocks (70.4%) were mostly used for outer wall in urban areas followed by mud brick (26.2%) and burnt bricks (1.0%). On the other hand, in rural areas, mud bricks (79.1%) had the greatest proportion, followed by cement blocks (13.7%) and landcrete (2.9%) while stone (0.1%) and bamboo (0.1%) were least used for outer wall.

Table 2.8: Main construction material for outer wall of dwelling units by type of locality District Total Urban Rural Material for Outer wall Total country Region N % % % Total 5,817,607 1,169,030 27,985 100.0 100.0 100.0 Mud brick/Earth 1,991,540 250,238 19,429 69.4 26.2 79.1 Wood 200,594 27,438 423 1.5 0.8 1.7 Metal sheet/Slate/Asbestos 43,708 10,549 160 0.6 0.7 0.5 Stone 11,330 2,014 23 0.1 0.1 0.1 Burnt bricks 38,237 7,580 328 1.2 1.0 1.2 Cement blocks/Concrete 3,342,462 840,519 6,737 24.1 70.4 13.7 Landcrete 104,270 19,878 702 2.5 0.6 2.9 Bamboo 8,206 1,381 23 0.1 0.1 0.1 Palm leaf/Thatch (grass)/Raffia 38,054 1,768 120 0.4 0.1 0.5 Other 39,206 7,665 40 0.1 0.0 0.2

Source: Ghana Statistical Service, 2010 Population and Housing Census.

39

It is further observed that cement (68.5%) was mostly used for the floor of dwelling units in the District. This was followed by the use of mud (29.1%), whereas burnt brick, terrazzo and other were least used (0.1%).

In urban areas, the use of cement for floor (85.3%) had the highest proportion, followed by mud (11.7%) while other materials (0.0%) formed the least. Similarly, in the rural areas, cement (64.5%) was the most common material used for the floor, followed by mud (33.2%) while burnt brick and terrazzo had 0%. (Table 2.9)

Table 2.9: Main construction material for the floor of dwelling units by type of locality District Total Urban Rural Materials for the floor Total country Region N % % % Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Earth/Mud 872,161 164,333 7,462 29.1 11.7 33.2 Cement/Concrete 4,255,611 875,714 17,550 68.5 85.3 64.5 Stone 32,817 8,731 317 1.2 1.1 1.3 Burnt brick 6,537 1,365 14 0.1 0.1 0.0 Wood 52,856 6,032 70 0.3 0.1 0.3 Vinyl tiles 57,032 15,120 48 0.2 0.5 0.1 Ceramic/Porcelain/Granite/Marble tiles 88,500 19,826 98 0.4 0.6 0.3 Terrazzo/Terrazzo tiles 85,973 32,460 36 0.1 0.6 0.0 Other 15,567 2,624 31 0.1 0.0 0.1 Source: Ghana Statistical Service, 2010 Population and Housing Census.

Table 10 shows that metal sheet was mostly used for roofing of dwelling units in the District accounted for 81.9 percent, followed by raffia (9.2%) and bamboo (5.8%) while roofing tile (0.1%) was least used. The distribution by type of locality revealed that in both urban and rural areas, metal sheet was the main roofing material accounting for 96.2 percent and 78.7 percent respectively.

Table 2.10: Main construction material for roofing of dwelling unit by type of locality District Total Urban Rural Main Roofing material Total country Region N % % % Total 5,817,607 1,169,030 27,985 100.0 100.0 100.0 Mud/Mud bricks/Earth 80,644 4,885 330 1.2 0.3 1.4 Wood 45,547 10,933 156 0.6 0.4 0.6 Metal sheet 4,152,259 1,046,820 22,914 81.9 96.2 78.7 Slate/Asbestos 759,039 12,990 116 0.4 0.2 0.5 Cement/Concrete 141,072 36,284 92 0.3 0.4 0.3 Roofing tile 31,456 4,381 32 0.1 0.0 0.1

40

Bamboo 71,049 13,921 1,637 5.8 0.9 7.0 Thatch/Palm leaf or Raffia 500,606 33,299 2,562 9.2 1.5 10.9 Other 35,935 5,517 146 0.5 0.1 0.6 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.6.6 Room Occupancy The distribution of household size and the number of sleeping rooms they occupied is presented in Table 11. On the whole, single room constitutes the highest percentage (55.9%) of all the types of rooms occupied, followed by double rooms (24.3%) and three rooms (10.6%). The proportion of households with size one occupying a single room is 89.0 percent as against 7.5 percent of households with ten or more members.

Table 2.11: Households by size and number of sleeping rooms occupied in dwelling unit Number of sleeping rooms Nine Household One Two Three Four Five Six Seven Eight rooms size Total room rooms rooms rooms rooms rooms rooms rooms or more Total 25,626 100.0 55.9 24.3 10.6 4.8 2.3 1.1 0.5 0.2 0.4 1 4,494 100.0 89.0 6.7 2.0 1.0 0.5 0.2 0.3 0.1 0.2 2 3,056 100.0 73.0 20.1 3.3 1.5 0.9 0.7 0.3 0.1 0.2 3 3,327 100.0 63.7 24.5 7.6 2.0 0.9 0.6 0.2 0.1 0.4 4 3,406 100.0 57.9 27.1 9.2 3.8 1.0 0.5 0.3 0.1 0.2 5 3,265 100.0 50.2 31.1 11.9 4.1 1.6 0.5 0.3 0.2 0.2 6 2,767 100.0 41.5 34.4 14.8 5.3 2.0 1.2 0.4 0.1 0.4 7 1,875 100.0 33.0 33.5 18.4 8.8 3.7 1.4 0.5 0.2 0.5 8 1,342 100.0 25.8 32.8 21.8 10.4 5.3 2.3 0.6 0.6 0.4 9 795 100.0 17.6 30.2 24.0 14.0 7.9 3.5 1.4 0.5 0.9 10+ 1,299 100.0 7.5 22.0 24.6 18.2 12.2 6.4 4.1 2.0 3.0 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.6.7 Access to Utilities and Household Facilities The main source of lighting used by the household is presented in Table 8.8 by type of locality. The use of flashlight is the most commonly used source of lighting of dwelling units in the District representing 53 percent. Electricity (mains) (29.1%) and kerosene lamp (15.5%) had the next higher proportions, while crop residue was least used (Figure 8.1)

In urban areas, electricity (mains) accounts for the highest percentage (77%), followed by flashlight (13.8%) and kerosene lamp (8.2%), whereas crop residue represents the lowest share (0%). On the other hand, flashlight (62.3%) was mostly used in rural areas, followed by electricity (mains) and kerosene lamp with 17.9 percent. Private generator (0.1%) and crop residue (0.1%) were least used as source of lighting in rural communities. (Table 2.12)

41

Table 2.12: Main source of lighting of dwelling units by type of locality District Total Urban Rural Main source of light Total country Region N % % % Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Electricity (mains) 3,511,065 828,924 7,463 29.1 77.0 17.9 Electricity (private generator) 36,142 6,343 44 0.2 0.3 0.1 Kerosene lamp 971,807 78,756 3,975 15.5 8.2 17.2 Gas lamp 9,378 1,881 57 0.2 0.2 0.2 Solar energy 9,194 1,693 196 0.8 0.1 0.9 Candle 41,214 9,472 42 0.2 0.2 0.2 Flashlight/Torch 858,651 195,345 13,593 53.0 13.8 62.3 Firewood 13,241 1,484 77 0.3 0.2 0.3 Crop residue 4,623 414 16 0.1 0.0 0.1 Other 11,739 1,893 163 0.6 0.1 0.8 Source: Ghana Statistical Service, 2010 Population and Housing Census.

Figure 2.8: Source of energy

Firewood Other Crop 0% 1% residue 0%

Electricity (mains) 29%

Flashlight/Torc Electricity h (private Kerosene lamp 53% generator) 16% 0%

Gas lamp Solar energy Candle 0% 1% 0%

Source: Ghana Statistical Service, 2010 Population and Housing Census.

Table 2.13 contains the distribution of main source of cooking fuel, and cooking space used by households in the District. It can be seen from the Table, that 76.4 percent of households use wood as the major source of cooking fuel, followed by charcoal (15.2%) and gas (3.4%). In urban areas, charcoal (48.3%) is mostly used, followed by wood (32.4%) and gas (10.7%), while animal waste is

42

least used by households. Conversely, wood accounts for the highest proportion (86.8%), followed by charcoal (7.4%) in the rural areas, with those who do not cook constituting 3.5 percent.

Moreover, it can be observed from Table 8.9 that households that use separate room exclusively for cooking has the highest percentage (47.4%) in the District, followed by veranda users (15.3%) and households using open space in compound (10.9%).The use of bedroom and other spaces for cooking constitute the lowest share (0.3%).

Table 2.13: Main source of cooking fuel, and cooking space used by households

Source of cooking fuel/ cooking space District Total Total Urban Rural country Region N % % % Main source of cooking fuel for household Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 None /no cooking 306,118 91,717 1,108 4.3 7.8 3.5 Wood 2,197,083 335,439 19,577 76.4 32.4 86.8 Gas 996,518 237,251 874 3.4 10.7 1.7 Electricity 29,794 7,952 34 0.1 0.2 0.1 Kerosene 29,868 4,263 65 0.3 0.4 0.2 Charcoal 1,844,290 443,144 3,891 15.2 48.3 7.4 Crop residue 45,292 2,573 61 0.2 0.1 0.3 Saw dust 8,000 1,545 5 0.0 0.1 0.0 Animal waste 2,332 427 3 0.0 0.0 0.0 Other 7,759 1,894 8 0.0 0.1 0.0 Cooking space used by household Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 No cooking space 386,883 105,491 1,654 6.5 8.9 5.9 Separate room for exclusive use of household 1,817,018 319,235 12,158 47.4 21.1 53.7 Separate room shared with other household(s) 410,765 165,781 2,521 9.8 9.7 9.9 Enclosure without roof 117,614 14,147 337 1.3 1.4 1.3 Structure with roof but without walls 349,832 52,530 2,095 8.2 5.1 8.9 Bedroom/Hall/Living room) 74,525 4,918 77 0.3 0.5 0.3 Verandah 1,173,946 304,294 3,912 15.3 38.9 9.7 Open space in compound 1,115,464 155,848 2,795 10.9 14.2 10.1 Other 21,007 3,961 77 0.3 0.3 0.3 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.7 WATER AND SANITATION

The purpose of good drinking water is to a large extent to minimize the prevalence of water borne diseases among household members. The source of drinking water is important because water borne diseases are common in Ghana and members of households are better off if they have access to good drinking water (Eastern Region PHC report, 2013).

43

Table 14 and Figure 8.2 present information on main source of drinking water and water for other domestic use, of dwelling unit at the District, regional and national level. The available information from the 2010 PHC reveals that, a greater proportion (50.8%) of the household use Bore- hole/Pump/Tube well as their main source of drinking water. This is also true for both regional and national level. Furthermore, households also derive their drinking water from River/Stream (16.0%) and protected well (15.3%). These followed Bore-hole/Pump/Tube well in highest order. The table further shows that, only few of the households have access to pipe-borne water inside dwelling unit(0.8%) and outside dwelling unit (4.2%). The 2010 Census information also indicates that, 4.3 percent of households drink from Unprotected well and 0.1 percent drinks from Unprotected spring and Dugout/Pond/Lake/Dam/Canal each. Whereas a higher proportion of the urban households use Protected well (37.7%) as their main source of drinking water, the rural households derive their main source of drinking water mainly from Bore-hole/Pump/Tube well (54.7%).

Information on sources of water for other domestic use on the other hand shows that about half of households use Bore-hole/Pump/Tube well (48.7%) for domestic purposes in the District. This is followed by Protected well (18.4%) and River/Stream (17.0%). The main source of water for other domestic use at the regional level is Bore-hole/Pump/Tube well (354,585). It can also be inferred from Table 8.10 that, the largest proportion of the District urban households (81.4%) uses Bore- hole/Pump/Tube well or Protected well as their main source of water for domestic use, while more than half of the rural household (52.3%) derive their main source of water for other domestic use from Bore-hole/Pump/Tube well.

Table 2.14: Main source of water of dwelling unit for drinking and other domestic purposes District Rura Total Total Urban l Sources of water country Region N % % % Main source of drinking water for household Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Pipe-borne inside dwelling 790,493 247,769 195 0.8 2.9 0.3 Pipe-borne outside dwelling 1,039,667 210,802 1,072 4.2 8.7 3.1 Public tap/Standpipe 712,375 113,626 1,669 6.5 9.1 5.9 Bore-hole/Pump/Tube well 1,267,688 348,433 13,018 50.8 34.2 54.7 Protected well 321,091 80,800 3,928 15.3 37.7 10.1 Rain water 39,438 1,457 24 0.1 0.1 0.1 Protected spring 19,345 4,692 72 0.3 0.1 0.3 Bottled water 20,261 2,958 20 0.1 0.2 0.1 Sachet water 490,283 41,265 382 1.5 5.9 0.4

44

Tanker supply/Vendor provided 58,400 4,676 0 0.0 0.0 0.0 Unprotected well 112,567 7,652 1,095 4.3 0.9 5.1 Unprotected spring 12,222 1,451 22 0.1 0.0 0.1 River/Stream 502,804 58,333 4,112 16.0 0.2 19.8 Dugout/Pond/Lake/Dam/Canal 76,448 1,441 13 0.1 0.0 0.1 Other 3,972 850 4 0.0 0.0 0.0 Main source of water for other domestic use of household Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Pipe-borne inside dwelling 905,566 257,088 200 0.8 2.8 0.3 Pipe-borne outside dwelling 1,089,030 205,678 913 3.6 6.4 2.9 Public tap/Standpipe 704,293 112,574 1,548 6.0 7.4 5.7 Bore-hole/Pump/Tube well 1,280,465 354,585 12,490 48.7 33.5 52.3 Protected well 465,775 101,863 4,703 18.4 47.9 11.4 Rain water 39,916 2,376 27 0.1 0.1 0.1 Protected spring 18,854 4,323 89 0.3 0.2 0.4 Tanker supply/Vendor provided 100,048 5,110 15 0.1 0.0 0.1 Unprotected well 152,055 10,674 1,153 4.5 0.9 5.4 Unprotected spring 15,738 1,797 35 0.1 0.1 0.2 River/Stream 588,590 65,730 4,357 17.0 0.7 20.8 Dugout/Pond/Lake/Dam/Canal 96,422 2,547 19 0.1 0.0 0.1 Other 10,302 1,860 77 0.3 0.1 0.4 Source: Ghana Statistical Service, 2010 Population and Housing Census. Figure 2.9: Source of drinking water

100.0 0.9 5.9 16.0 Other 90.0 19.8 Pond 80.0 4.3 5.1 1.5 River/stream 37.7 0.4 70.0 10.1 15.3 Unprotected spring2 Unprotected spring 60.0 Tanker supply 50.0 Percentage Sachet water

40.0 Bottled water 34.2 54.7 50.8 Protected spring 30.0 Rain water 20.0 Protected well 9.1 Borehole 10.0 6.5 8.7 5.9 4.2 Public tap 2.9 3.1 0.0 0.3 0.8 Urban Rural Total Pipe-borne outside dwelling Sources of Drinking Water Pipe borne inside dwelling

Source: Ghana Statistical Service, 2010 Population and Housing Census.

45

Table 2.15: Communities in the District with bore holes

TOWN/AREA COUNCIL COMMUNITY NAME WURUYIE Canada Aboabo No 3 Kotwea Ababio Atwereboana Akoroso Odumase Suminamu Kponyokrom Kyerembebi Nyamebekyere – Odumase Achiasewa Dzobokrom Wuruyie Edwenase ADANSI PRASO Quansahkrom Brodikro Breku – Praso Mankatah Asonkore Ahomahama Adansi Kenya Ayaa Adansi Obonsu Komfokrom Lawyerkrom Domeabra Adjoam Opare Kwadwo Adansi Hwidiem Owusukrom Sarfokrom Dwendama Agya Mensah Aniampam Bepoase Fete Nkrankese

Kofi Tutu Kwabena Essuom Fremu AKUTRESO Maniepe Agravi Offeikrom Bonkuro Appiahkrom Breku – Akutreso Akwa Atwereboana Akutreso Sasakrom Tonkoase No 1 Kapre No 3 (Kwarkyekrom) Tonkoase No 2 Kapre No 1 Takyi Ntumi Kapre No 2 Ahinakwa Kojo Yentumi Kojo Awu Abankwa AKROFUOM Sikaman Dunkwawfuom Esswonkrom Gyeasehenekrom Pantinpa Mprakyire Kramekrom Agyir /Boakyekrom Adjeikrom Anorkrom Amoakokrom Yaadome Adwafo (Mensonso No 1) Yawowukrom Brong/ Yeboakrom Agyaatakrom Nyamebekyere/Master Nkwanta Nkoransah Brofoyedru Alata Addoosu Pewodie Mensonso No 2 Kakraba Anokyekrom Akrofuom Betenase Pompom Benkumhene Okyerekrom Kofi Gyaame Danpoase Asiedukrom Carowner 46

Komfokrom Akuaku Botwe Mintakrom ADANSI PRASO Denyase(Akwaku) Nkranfo Nkwanta Fetefo Kojo Mankrong Subin Camp Agyarko Asarekrom(Obonsu) Essuom Kwasu Ataasi Nkwanta Adansi Praso ATOBIASE /APAGYA Oseikrom(Treso) Sakyikrom Kwame Nkyi Tweapease Apagya Yaw Tawiah Apagya Abaase Atobiase Ankaase NEW EDUBIASE Memendafuom Breparo Abusahenekrom Nyamebekyere Awuroso Nyamebekyere Nkwanta Kawitirwhe Bronikrom Krobowanchie Kwame Asare Dotom Kwame Agyei Samamkro Afedie Oyan Adomwuwim Menang Mpenteembua Kwabena Sam New Edubiase Abrosakro Amudurasi Source: Adansi South CW&SA, 2014

2.7.1 Bathing and Toilet Facilities This section discusses the use of bathing and toilet facilities in the Adansi South District. The total number of household using one form of toilet facility or the other is 24,046, representing 98.8 percent of the entire household in the District. As presented in Table 16 and Figure 8.3, the proportion of the household population that use public toilet (51.6%) is the highest compared to the national average of 34.6percent and regional proportion of 43.3 percent. The total of 1,580 households representing 6.2 percent however does not have access to any toilet facility and therefore resort to the use of bush, field or beach. The proportion of household in the rural locality with no access to toilet facility (6.2%), and those with pit latrine (34.3%) and public toilet facilities (52.9%) are relatively higher compared to those for urban locality ( 6.1%, 20.6% and 46.0% respectively).

Table 2.16: Type of toilet facility and bathing facility used by households by type of locality District Total Urban Rural Toilet facility/Bathing facility Total country Region N % % % Toilet facility used by household Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 No facilities (bush/beach/field) 1,056,382 71,322 1,580 6.2 6.1 6.2

47

W.C. 839,611 261,106 636 2.5 8.1 1.2 Pit latrine 1,040,883 200,798 8,129 31.7 20.6 34.3 KVIP 572,824 98,434 1,956 7.6 18.3 5.1 Bucket/Pan 40,678 3,082 44 0.2 0.6 0.1 Public toilet (WC/KVIP/Pit/Pan etc) 1,893,291 487,596 13,222 51.6 46.0 52.9 Other 23,385 3,867 59 0.2 0.3 0.2 Bathing facility used by household Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Own bathroom for exclusive use 1,535,392 280,657 7,864 30.7 18.8 33.5 Shared separate bathroom in the same house 1,818,522 501,675 6,290 24.5 38.3 21.3 Private open cubicle 381,979 65,409 2,751 10.7 5.3 12.0 Shared open cubicle 1,000,257 158,985 4,473 17.5 27.8 15.0 Public bath house 140,501 16,648 110 0.4 0.9 0.3 Bathroom in another house 187,337 31,329 2,298 9.0 3.7 10.2 Open space around house 372,556 67,321 1,763 6.9 5.0 7.3 River/Pond/Lake/Dam 14,234 1,320 48 0.2 0.1 0.2 Other 16,276 2,861 29 0.1 0.1 0.1

Source: Ghana Statistical Service, 2010 Population and Housing Census.

Figure 2.10: Toilet facilities

Both Urban Rural

51.6 52.9 46.0

31.7 34.3 Percentage 20.6 18.3

6.26.16.2 8.1 7.6 5.1 2.5 1.2 0.20.60.1 0.20.30.2

Toilet

2.7.2 Method of Waste Disposal

Analysis of method of solid and liquid waste disposal in the District reveals that most of the households dispose off their solid waste in open space public dumb (61.8%) and also throw their liquid waste onto the compound (54.3%). At the regional level, a higher proportion of the households 48

(472,344), representing 41.9 percent dumb their solid waste in the public dumb (open space) whilst 29.4 percent (330,818) throw their liquid waste onto the compound. Comparably, at the national level, the majority (37.7%) of households dispose off their solid waste in the public dumb (open space) whilst 1,924,986 (35.2%) households throw their liquid waste onto their compound. The proportion also varies for both solid and liquid waste disposal in urban and rural households.

Table 2.17: Method of solid and liquid waste disposal of households by type of locality District Total Total Urban Rural Method of waste disposal country Region N % % % Solid waste Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Collected 785,889 102,035 410 1.6 0.6 1.8 Burned by household 584,820 59,303 1,083 4.2 8.9 3.1 Public dump (container) 1,299,654 399,121 2,799 10.9 53.6 0.9 Public dump (open space) 2,061,403 472,344 15,832 61.8 28.9 69.5 Dumped indiscriminately 498,868 55,647 4,082 15.9 3.0 19.0 Buried by household 182,615 30,215 887 3.5 4.3 3.3 Other 53,805 7,540 533 2.1 0.7 2.4 Liquid waste Total 5,467,054 1,126,205 25,626 100.0 100.0 100.0 Through the sewerage system 183,169 35,882 346 1.4 0.3 1.6 Through drainage system into a gutter 594,404 223,451 619 2.4 7.8 1.1 Through drainage into a pit (soak away) 167,555 28,885 263 1.0 1.0 1.0 Thrown onto the street/outside 1,538,550 258,473 8,205 32.0 31.5 32.1 Thrown into gutter 1,020,096 245,146 2,182 8.5 22.7 5.2 Thrown onto compound 1,924,986 330,818 13,904 54.3 36.3 58.5 Other 38,294 3,550 107 0.4 0.3 0.4 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.8 SERVICES

2.8.1 Tourism

There are a couple of tourist sites identified in the District and some of these include a Birds Sanctuary at Bonkro (White -Necked Picathartes), a Snake Palm Tree at Pra- Birim Aboi, the Nkabom festival which is celebrated every three years by Adansi Chiefs, the confluence of rivers Birim and Pra at Birim Aboye and Hwidiem respectively.

2.8.2 Agro-Based Industry

49

Small scale agro-based processing activities are carried out in the District. Those involved concentrate their activities on cassava and rice processing, Akpeteshie Distillery and palm oil extraction, honey production.

2.8.3 Financial Institutions

The District capital has four main banks namely the Ghana Commercial Bank, Agricultural Development Bank, the Atobiase Rural Bank and the Adansi Rural Bank. The other rural bank in the District can be found at Atobiase. The banks are highly patronized by cocoa farmers and the few salaried workers. The cocoa farmers are mostly seen at the bank during the cocoa seasons and for the salaried workers during the last week of every month.

There exist quite a good number of Susu collectors and money lenders. Their services are highly patronized due to easy accessibility.

2.8.4 Information, Communication and Technology

Information Communication Technology (ICT) has played transformational roles in the development of economies worldwide. Due to the important of ICT in socio-cultural and economic development, several efforts have been made by the government to enhance ICT in the country. Some of these efforts include the establishment of Community Information Centre (CIC) under ICT4AD programme. This is to spread ICT infrastructure in the communities and to ensure that Ghana and its people fully participate in information age, to enjoy the benefits of emerging information revolution.

This charter therefore explores ICT information on mobile phone ownership, access to computer and internet as well as household ownership of fixed telephone lines. Information on ICT was recorded for persons 12years and older for the purpose of 2010 Census. This is however the first time such questions were asked in national Census.

Apart from the land line telephone service the District also has access to all the other communication mobile service providers namely MTN, Vodafone, TIGO and AIRTEL. It is believed another mobile network would be joining very soon. There is one private internet facility in the District which is at New Edubiase. Due to the pressure on this facility, the few users of internet move to nearby Districts to seek for information when the need arises. The District Assembly however has plans of increasing the provision of this important service in the District.

50

2.8.4.1 Ownership of Mobile Phones Ghana has experienced a rapid increase in mobile phone penetration and usage in recent times. The use of mobile phones has been an important mode of communication for social and business activities for the majority of Ghanaian since as far back as 2003. Table 18 presents information on mobile phone ownership and internet usage by population 12years and older in the District. The information from Table 5.1 reveals a total of 21,679 mobile phone owners in the District. This is less than a third (29.0%) of the population 12 year and older from which the information on ICTs was collected. Also, 62.2 percent representing the majority of mobile phone owners are male while female owners represent 37.8 percent.

Table 2.18: Population 12 years and older by mobile phone ownership, internet facility usage, and Sex Population 12 Population having Population using years and older mobile phone internet facility I C T Indicators Number Percent Number Percent Number Percent Total 74,608 100.0 21,679 100.0 1,046 100.0 Male 37,268 50.0 13,486 62.2 758 72.5 Female 37,340 50.0 8,193 37.8 288 27.5 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.8.4.2 Use of Internet Just as mobile phone usage, the use of internet facility as a mode of communication provides varieties of opportunity for business owners as well as public and other private organisations, and even at the individual level. The use of internet cut across population, sex, rural-urban locality and all levels of education, from basic to tertiary. There are as low as 1,046 internet users, representing 1.4 percent of population 12years and older in the District. This is about one (1) out of seventy-four (74) of the referred population.

2.8.4.3 Household Ownership of Fixed Telephone Lines Fixed telephone line refers to a telephone lines connecting a customer’s terminal equipment (e.g telephone set, facsimile machine) to the public switch telephone network. So far as 2010 census is concerned, information on fixed telephone lines was collected at the household level. 2010 PHC recorded a very low fixed telephone lines usage in the District. Only 47 households (0.2%) own a fixed telephone lines. Male headed households (78.7%) own fixed telephone lines while female headed

51 household owners represent 21.3 percent (Table 2.19). The low usage of fixed line is associated with the increasing usage of mobile phones with its conveniences.

Table 2.19: Households having desktop/laptop computers, fixed telephone lines and Sex of head Number of Households having Households having fixed household desktop/laptop computers telephone lines Number Percent Number Percent Number Percent Total 25,626 100.0 335 100.0 47 100.0 Male 18,083 70.6 269 80.3 37 78.7 Female 7,543 29.4 66 19.7 10 21.3 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.8.4.5 Household Ownership of Desktop or Laptop Computer Access to information and internet becomes easier with ownership of desktop/laptop computer in modern society. The use of desktop/laptop computer is therefore vital for processing information for both public and private organisations.

Ownership of desktop/laptop computers were examined at the household level during the 2010 PHC, to find out the extent to which household members have access to internet and other forms of social media. As depicted in Table 19, there are as low as 335 households (1.3%) owing desktop/laptop computer in the District. In relation to sex of household head of the households having desktop/laptop computer, the figure for male headed household owing desktop/laptop computer stands at 269 while that of female headed household stands at 66.

2.8.4.6 Postal Service There are two main postal centres in the District. One is in the District capital, New Edubiase and the other one at Akrofuom. The revenue generated by the post centres per month has fallen for some time now due to the high use of mobile phones in the District.

There is however the plan for introducing instant money transfers and Expedited Mails Services in the District hopefully by the end of the year.

2.9 AGRICULTURE

52

2.9.1 Households in Agriculture Agriculture employs about 78.5% ( 56 %male and female 44 %) of the active population who are engaged in the production of various crops such as; Cocoa, Oil palm, Maize, Cassava, Rice, Cocoyam, Plantain and Vegetables. There is no clear cut distinction between farmers who produce either cash or food crops. Farmers combine food crops, cash crops and rearing of animals e.g. pigs, small ruminants, cattle, local birds in small scale.

Cocoa: Production of cocoa is dominant. It substantially employs greater number of people in the district and thus a determinant in the income distribution in the area.

Oil Palm: Oil palm production is also carried out by most of these farmers and termed as both food and cash crop. Currently a lot of farmers have gone into oil palm production which makes it next to cocoa. The land is fertile and is suitable to oil palm production.

Cassava: Cassava is more widely grown and has comparative advantage over the other food crops. It is sold in the raw form or processed into Gari or ‘Agbelima’ (cassava dough). RTIMP has introduced high yielding varieties (Afisiafi, Bankyehemaa, Abasafitaa, etc) through MoFA.

Plantain: Plantain production is carried out by most farmers and is mostly done as backyard garden than on the field. Plantain is not grown solely in the district. It’s mostly cultivated on the field to shade cocoa seedlings and also during the first year of establishing plantation crops.

Rice: Rice production is on the increase; the undulating nature of the terrain and numerous valley bottoms has given rise to the production of rice. Currently, JICA in collaboration with MOFA are training farmers in the district on sustainable rainfed rice production and have now increased production from 4-8 bags per acre to 30 bags per acre. Rice farmers are now producing good quality grain and rice seed.

Maize: Maize production has potential but not being exploited. Maize is not grown solely in the district as in the Northern sector of Ghana and in the transitional zone hence optimum yield is never realized. Farmers in the district still prefer cultivation of local variety to the improved varieties like Obatampa which by far yields higher than other local varieties. MoFA is encouraging farmers to adopt improve maize variety in order to obtain higher produce compared to the local variety.

53

Livestock: Majority of the total population are into crop production to the detriment of livestock which is poorly patronized. Farmers in the livestock production are also in crop production. They are engaged in small ruminants like sheep and goats, cattle, pigs and grasscutter. Sheep and goats are on the free range. Low level in livestock production is due to high incidence of diseases and pests associated with the rain forest ecology coupled with the fact that there is only one veterinary officer within the district.

Poultry: There is one large scale farm and two medium scale farms with a total of about 10,000 birds, using deep litter system technology, whilst local birds are on the free range. Table 2.20 below shows a breakdown of farming methods and the average output for different crops cultivated in the District and their output.

Table 2.20: Farming methods and the average output/ hectare Crop Current practice Current output Recommended Recommended output (ton/ha) practice (ton/ha) Cocoa Mono 1.48 Mono 1.562 tons Oil palm Mono 8 tons/ha/yr Mono 12-15 tons/ha/yr Cassava Mixed 12.73 Mono 17.3 tons Plantain Mixed 9.35 Mono 10.50 tons Maize Mixed 1.50 Mono 2.5 tons Pepper Mono 7.5 (max bag) Mono 20 (max bag) Rice Mono 3.5 Mono 5.55 tons Yam Mixed 2.36 Mono 10.72 tons Source: DADU 2014

Table 2.21: Production estimates 2008- 2014

54

Crops 2008 2009 2010 2011 2012 2013 2014 Maize 6,430 5,173 5,505 3,597 3,618 5,462 5,399 Rice 1,540 2,145 4,250 4,283 4,495 4,590 4,756 Cassava 59,258 78,733 110,580 113,575 114,716 114,399 114,699 Yam 7,437 10,012 8,635 8,870 7,960 7,590 7,386 Cocoyam 21,254 17,644 16,368 15,600 14,724 14,446 14,212 Plantain 35,324 36,387 29,400 30,210 29,978 30,125 30,188 Source: DADU 2014

Table 2.22: Yield (Metric tonnes/ hectare)

Crops 2008 2009 2010 2011 2012 2013 2014 Maize 1.20 1.40 1.50 1.00 1.00 1.50 1.50 Rice 1.10 1.30 2.50 2.47 2.50 2.50 2.55 Cassava 12.22 12.22 17.00 17.30 17.30 17.26 17.30 Yam 9.79 12.79 11.00 11.20 10.86 10.75 10.72 Cocoyam 6.82 6.82 6.82 6.50 6.33 6.27 6.19 Plantain 10.66 10.66 10.50 10.60 10.50 10.50 10.50 Source: DADU 2014

Table 2.23: Cocoa Production for Adansi South District

2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 Major Minor Major Minor Major Minor Major Minor Major Minor 184,378 19,856 152,171 10,586 278,259 16,303 232,269 11,656 266,066 5,190

Source: QCD 2014

55

Table 2.24: Levels of Post- Harvest Losses

Crop Current Level of Post -Harvest Losses Target By 2015 Maize 38.05 25 Cassava 34.6 20 Yam 24.37 12 Rice 6.93 4 Source: DADU 2014

2.9.2 Food Security

According to the Food and Agriculture Organization (FAO) of UN, food security is a condition that exist when all people, at all times, have physical and economical access to sufficient, safe and nutritious food preferences for an active healthy life. About 1.3 million people, representing 5 percent of Ghana’s population, are food insecure.

Food security is defined by MoFA as good quality nutritious food hygienically packaged and attractively presented, available in sufficient quantities all year round and located at appropriate places at affordable prices.

2.9.2.1 Effect of Climate Change on Food Security

Over the past 5 years the district has experienced a highly variable and unpredictable climate. Weather predictions have evaded us on several occasions. Currently floods and droughts can occur in the same area within months. This poses a serious threat to food productivity where production is mainly rain fed. It is projected that agricultural production and access to food in many households would be severely affected, if nothing is done about it, food security would seriously be affected and the problem of malnutrition would be exacerbated.

Other possible impact of the climate change on food security in the district will be decrease in yield due to loss of land, uncertainty about what and when to plant, increase in the number of people at risk from hunger and fall of net revenues from crops which will eventually affect growth and income levels of farmers.

56

Therefore food security programs in the district should therefore consider incorporating climate change adaptation and mitigation aspects in order for farmers to cope with the prevailing increase in the frequency and intensity droughts and floods.

2.9.3 Coping Mechanism

As mentioned above, farmers are not able to produce enough to last throughout the year and also unable to store enough produce for home consumption throughout the year. The crucial question is: how are they able to survive? There are coping strategies adopted by famers during periods of food insecurity.

They reduce the number of meals served each day, reduce the size of meals, eat less preferred foods and sell livestock (goats, pigs, sheep, cattle, and poultry).

Other strategies to sustain food security in district include shifting to less expensive and less preferred foods, borrowing money to buy food, purchasing food on credit, seeking assistance from friends and relatives, and purchasing food from hawkers and vendors.

2.9.4 Measures to ensure food security in the district

MoFA has embarked on various Food Security programs in collaboration with other institutions in the district.

The current Block Farm Program implemented by MoFA was to ensure food security. By this program improved seeds, fertilizer, herbicides and other inputs are provided to farmers who pay the total amount involved in kind or cash after harvesting.

The Program was initiated by the Government to address three (3) main objectives. The objectives include;

 Support farmers to increase production to ensure food security  Generate employment in rural communities especially among the youth  Increase income of small farm households.

57

The target crops for the program are Rice and Maize which are the main staples and hence increase in the production of these crops offer a sure way of addressing food security issues in the district.

Japanese International Cooperation Agency (JICA) in collaboration with MoFA have encouraged farmers in the district to adopt sustainable rainfed lowland rice which has boosted rice production in the district from 8 bags per acre to 30 bags per acre of paddy rice for the past four years.

The district has not set up any storage facilities to ensure food security thus to purchase and preserve excess produce from all farmers in order to reduce post-harvest losses, and to insulate farmers against losses resulting from anticipated increases in production. For that matter, we depend on farmers produce stored in their cribs and imported rice and local maize from higher growing areas like and Abofour, and Kumasi a sales point.

The district faces food insecurity problem on yams since the area is not conducive for its cultivation and as such, middle women or traders purchase them from and Techiman into the district.

The insecurity on cassava is mostly experienced 3months after planting the vegetative parts.

Table 2.25: Estimated Average Food Consumption Within The District (2014)

CROP AV. CONSUMPTION (MT) PRODUCTION ESTIMATE (MT) MAIZE 5,197.5 5,399 RICE 9,135 4,756 CASSAVA 39,241.12 114,699 YAM 21,186 7,386 PLANTAIN 13,880 30,188 COCOYAM 6,548.6 14,212 Source: DADU 2014

58

Table 2.26: Fertilizer Subsidy Programme

Type of Fertilizer Quantity Distributed Outcome 2009 2010 2011 2012 Yield increase for Maize, NPK 0 52 0 503 Rice and Vegetables SOA 0 50 0 200 UREA 0 112 0 0 SULFAN 0 0 47 0 TOTAL 0 214 47 703 Source: DADU 2014

Table 2.27: MoFA/JICA Sustainable Lowland Rice Project

Activity Target Achievement Outcome Challenge -Establishment of Trial 70 35 Farmers Most farmers not and Demonstration plots. Demonstrations Demonstrations establish ready to work in -Form groups in Rice to be carried out. were carried nursery, select groups. communities. 35 communities out. seed, transplant Unfavorable 21 communities in row. weather conditions. Manual ploughing with hoes. Train DDOs, AEAs Rice 6 DDOs, 18 4 DDOs, 6 DDOs, AEAs & farmers in; AEAs & 1200 AEAs & 414 farmers adopted - Land farmers. farmers. improved development practices in Rice techniques cultivation. - Rice cultivation activities - Post-harvest management activities - Preparation of Action plan - Farm record keeping - Rice quality improvement promotion. Source: DADU 2014

INFRASTRUCTURE DEVELOPMENT

 Farmers’ Business Service Centre established in 2011

59

 Private public / private partnership between MOFA/ACDI-VOCA (NGO) and B.Kaakyire Agrochemicals (Private company)

Table 2.28: Agro-Processing Industries in the District

Name Product Location

Mark & B’ face Ltd Akrofoum Gari Akrofoum Anidaso Cooperative Palm Oil New Edubiase Ataase Cooperative Palm Oil Ataase Bepoase Rice Growers Rice Bepoase Kroye Women Process. Gari Tonkoase Abetingo Rice and Palm Oil Asarekrom Palm Oil Extraction Kojo Yentumi Palm Oil and Kennel Oil Extraction New Edubiase Gari processing Tonkoase No. 2 Palm Oil Extraction Apagya “ Amudruase “ Ataasi ‘’ Atobiase Source: DADU 2014

COCOA DISEASE AND PEST CONTROL ( CODAPEC)

The District has 99 capsid gangs with 7 members in a group comprising 6 gang members and a supervisor. There are also 37 blackpod gangs with 11 members in a group comprising 10 gang members and a supervisor.

Below is the average performance for Capsid and Blackpod programme from 2008 to 2013

Table 2.29: CAPSID gang and their output Year Hectareage Sprayed No. of farms sprayed No. of farmers covered 2008 44,352 12,161 12,061 2009 54,961 12,282 12,221 2010 56,631 12,659 12,592 2011 50,493 11,567 11,417 2012 50,562 11,547 11,235 2013 44,361 10,433 10,199 Source: DADU 2014

60

Table 2.30: BLACKPOD gang and their output Year Hectareage Sprayed No. of farms sprayed No. of farmers covered 2008 10,843 2,079 2,056 2009 10,854 2,167 2,117 2010 12,363 2,183 2,125 2011 13,678 2,208 2,137 2012 14,223 2,198 2,127 2013 15,591 2,124 2,172 Source: DADU 2014

Table 2.31: Staff Situation and Analysis Type of Staff No. Needed No. at Post Additional Staff Required Total MALE FEMALE TOTAL DDA 1 1 0 1 0 DDOs 8 5 1 6 2 AEAs 40 20 0 20 20 SUPPORTING STAFF 9 3 1 4 5 TOTAL 58 29 2 31 27 Source: DADU 2014.

Table 2.32: Agriculture Extension Capacity 3rd Quarter - 2014 Total Average Min. Maxi. New Praso Asarekrom Akrofoum Overall (District) (Zone) (Zone) (Zone) Edubiase District Human Resources Number of AEAs 36 9.0 8 12 8 8 8 12 36 required per Zone Number of AEAs at post 19 4.8 4 7 4 4 4 7 19 % AEAs at post compared to 52.8% 52.1% 50.0% 58.3% 50.0% 50.0% 50.0% 58.3% 52.8% required Mobility Number of running 13 3.3 2 4 4 3 4 2 13 motorbikes per Zone Ratio running 0.684210 0.2857 motorbike/AEA 0.8 1 1.0 0.8 1.0 0.3 0.7 53 1429 at post Extension coverage Number of farming 270 67.5 50 96 63 61 50 96 270 communities 61

Total number of farming communities 157 39.3 27 50 50 36 27 44 157 covered by extension services this quarter % of farming communities 58.1% 59.6% 45.8% 79.4% 79.4% 59.0% 54.0% 45.8% 58.1% covered Source: DADU 2014

2.10 GOVERNANCE

2.10.1 Key Decentralized Departments in the District The Adansi South District had not got the full complement of decentralized departments. The following departments exist to carry out specialized functions.

. Department of Social Welfare and Community Development . Ghana National Fire Service . Forestry Services Division . District Education Service . District Health Service . District Ambulance Service . CHRAJ . National Commission for Civic Education . Electoral Commission . Department of Agriculture . Environmental Health Department . National Disaster Management Organization . Department of Co-operatives . Non-Formal Education Division . Births and Deaths . Ghana Water Company . Physical Planning Department . Information Services Department . Stool Lands

2.10.2 Non-Governmental Organisations (NGOs)

The following NGOs with their respective functions operate in the District.

62

TABLE 2.33: List of NGOs Operating in the District

NAME OF NGO OBJECTIVES CEDEP Supporting of mental health issues Care International Supporting of education in areas of capacity building Save Life Foundation To assist the District in Child Labour, Child Protection and assist in developmental projects like building of classrooms Ashanti African Tours Tourism Promotion Positive Footprints Tourism Promotion Action For Human Building women capacity and support. Source: SW&CD 2014. 2.10.3 Land Tenure System

The system of land Tenure prevalent in the District is principally the “Abunu” and “Abusa” systems. Whereas in the case of “Abunu”, the farmer shares his produce equally with the land owner or Lander, in the case of the “Abusa”, the land owner takes two-thirds of the farm produce. This system does not serve as motivation for increase productivity on the part of the farmers.

In some instances, the land owner dictates the types of crops to be produced irrespective of the suitability of the land to the crop in question. One possible advantage of the system is the permanence of land holding, settler farmers are allowed to hold their farms for a long period of time, creating a situation of security and permanent settlement in areas like Tweapease, Nkrankese and Menang.

2.10.4 Disaster

The Adansi South District has six disaster management zones namely, Asokwa, Fumso, Praso, Apagya, Akutreso and New Edubiase. Each zone is being manned by two (2) Zonal Coordinators. A District Co-coordinator and two supporting members of staff head the District office. With respect to disaster management at the District level, two main committees are responsible for major management decisions. The committees are District Disaster technical committee and District Disaster management committee.

Though some zones are now under but since the District has no coordinator, zones like Fumso and Asokwa are still under the management of Adansi South District.

2.10.4.1 Rain/Wind Storm

63

This is one of the most recurring disasters in the District. For instance, between January and December 2005, the District recorded (20) cases in (20) communities namely Birim Aboye, Akroso, Aboabo III etc. The damage caused to personal and physical property of the victims and their dependants runs into several millions of Cedis. The basic cause of this disaster is the absence of trees to serve as wind breaks in the communities.

2.10.4.2 Floods

Flooding in its sense has not been recorded in the District some time now. What the District normally experienced have been pools of stagnant water witnessed after any heavy rainfall in the communities. Though personal property destroyed in times like this are minimal, the damage done to the buildings cannot be under estimated. Indiscriminate situating of physical structures, the nature of the soil and refuse dumps are responsible for this.

2.10.4.3 Domestic Fire

In the year 2002, 2004/2005 seventeen cases were recorded with estimated cost of ¢850,000,000.00. Four cases were received from Adansi Kenya, Edwinase, Obonsu, Anhwiaso, Nyankomase, Akrofuom and Amudurase. The number of cases in this disaster seems insignificant but the cost of damage to personal property was very high. It was only at Amudurase where one of the fire fighters sustained slight burns on the left arm. These cases also came about through indiscriminate handling of marked flames.

2.10.4.4 Natural/Bush Fire

Each year, between January and April, bush fire becomes rampant due to the start of new farming season. The hills opposite Nyankomase are engulfed in smoke leading to fire-outbreak, which destroy farms and other flora. The actual cause is not yet scientifically known. But it has been widely explained that the fire emanates from the rocks on the hill, which sparkle when rolling stones rub one another.

Bush fires caused by individuals have been on the low side. For instance, only three incidences were recorded at Praso, Edwinase, and Adansi Kenya in 2010. This could be attributed to the intensive educational campaign made by NADMO in conjunction with the National Fire Service.

64

2.10.4.5 Chain Saw Operation

Indiscriminate logging and the unethical use of machines have caused substantial damage to the vegetation in the District. Efforts made to discourage this activity have not been very effective as a result, several wood felted are not cart and therefore, remain at the mercy of termites.

2.10.4.6 Drought

Many rivers and streams in the District dry up few weeks after the rainy season. This is because falling of trees, especially along river courses and on mountains, continues to be a major problem in the District. Water therefore becomes very scarce for both domestic and on-farm activities during greater part of the year.

2.10.4.7 Conflict

As far as conflict is concerned, the District is among the most peaceful Districts in the country, though it is predominantly multi-tribal residence. The most conspicuous hazard in the District is the impasse between stool land lords and the tenant settler farmers on the payment of annual land tribute. There have been occasional isolated cases of conflict between individuals or small groups. The complaints and Arbitration sub-committee of the Assembly or by the NADMO Technical committee however, dispose-off these cases peacefully.

2.11 SOCIAL SERVICES

2.11.1Education

The Adansi South District Assembly Education Directorate seeks to expand and promote access to quality education and effective management at all levels of education through collaboration with Civil Society Organizations and stakeholders. The vision of the Directorate is to effectively improve education management and planning efficiency across all levels. The enrolment level of pupils at the KG level is presented in Table 2.34 below.

Table 2.34: Kindergarten Enrolment A. PUBLIC K.G. Number of Pupils 8,878 65

Males: 4,416 Females: 4,462 No. of Schools 99 No. of Classes 84 No. of Teachers 220 Males : 60 Females: 160 B. PRIVATE Number of Pupils 1,651 Males : 815 Females : 836 No. of Schools 26 No. of Teachers 41 Males : 8 Females: 33 Source: Ghana Education Service, ASDA, 2013. Enrolment at the KG level for the District has more females than the males. This shows a commitment of parents towards girl child education. The number of classrooms however is inadequate to cater for the population of KG pupils. From the KG level the next level for school pupils is primary school. Their enrolment level is presented in Table 2.35 below.

Table 2.35: Primary School Enrolment C. PUBLIC Primary Number of Pupils 22,046 Males: 11,506 Females: 10,540 No. of Schools 103 No. of Teachers 681 Males : 496 Females 185 D. PRIVATE Number of Pupils 2,727 Males: 1,427 Females: 1,300 No. of Schools 24 No. of Teachers 97 Males: 72 Females: 25 Source: Ghana Education Service, ASDA, 2013

Enrolment at the primary level of education is seen to be much higher than the KG level. This can be attributed to the situation where most children are left at home until they are much older to walk to and back from school on their own.

66

Table 2.36: Junior High School Enrolment E. PUBLIC JHS No. of Pupils 6,397 Males: 3,611 Females : 2,786 No. of Schools 51 No. of Teachers 434 Males: 353 Females: 81 F. PRIVATE No. of Pupils 607 Males: 324 Females: 283 No. of Schools 10 No. of Teachers 37 Males : 36 Females: 1 Source: Ghana Education Service, ASDA, 2013

The enrolment levels at the JHS level are lower than that of the primary level indicating the inability of pupils to continue their education. Others may have also migrated from the District to other areas. The numbers of teachers are also inadequate to cater for the pupils. Additional infrastructure is required to cater for the pupils and help improve their learning conditions. The Senior High School enrolment is detailed in the table 2.37 below.

Table 2.37: SHS ENROLMENT LEVEL G. PUBLIC S.H.S No. of Students 3,173 Males: 1,702 Females : 1,471 No. of Schools 2 No. of Teachers 125 H. PRIVATE No. of Student 409 Males: 231 Females : 178 No. of Schools 2 No. of Teachers 27 Source: Ghana Education Service, ASDA, 2013 The District has four (4) SHS two being public (2) and two (2) private. At the Senior High School level, the number of females is also less than the males. The student population in the public schools far exceeds that of the private school together with the teachers. Enrolment levels are also lower than

67 that recorded at the JHS level thus showing a dropout of students along the educational ladder.

Table 2.38: Gender Parity Index Level of Educ. KG PRIMARY JHS SHS

Item GPI 1.02 0.97 0.89 0.98 Source: Ghana Education Service, ASDA, 2013

The GPI clearly shows the decrease in the number of females as they climb the educational ladder. Efforts have to be made to help sustain the pupils especially the females so that they can stay in school.

 Subject Grades

The BECE candidates for 2013 wrote the under listed papers. The grades scored by the candidates ranging between aggregates 1-5 are also detailed in the table 2.39.

Table 2.39: BECE Results for 2013.

Total No. Of Candidates Total No. Of Candidates Overall Total For Grades 1 – 5 Subjects Obtaining Grade 1-3 Obtaining Grade 4-5 Boys Girls Total Boys Girls Total Boys Girls Total English Language 47 28 75 220 139 359 267 167 434 Social Studies 22 4 26 221 114 335 243 118 361 Mathematics 72 35 107 344 236 580 416 271 687 Integrated Science 26 7 33 177 105 282 203 112 315 French 0 0 0 29 25 54 29 25 54 Ghanaian Language 27 13 40 247 149 396 274 162 436 RME 44 19 63 288 166 454 332 185 517 ICT 63 26 89 221 124 345 284 150 434 Basic Design & Tech. 54 20 74 327 209 536 381 229 610 Table 40: Subjects and the grades BECE candidates scored Source: Ghana Education Service, ASDA, 2013

From the total number of pupils presented for the BECE, the best performing subject was Mathematics followed by ICT then English with 107, 89 and 75 students respectively scoring between grades 1-3. The least performing subject was French which recorded 0 as no student scored between grades 1-3.

68

Between aggregates 1 and 5, the highest scoring subject was Mathematics (687) followed by Basic Design &Tech (610) while the least was French (54). It is however important to note that the total number of pupils presented for French was four-hundred and one (401) as indicated in the table below.

Table 2.40: Languages BECE candidates were assessed on

NO. OF CANDIDATES PRESENTED SUBJECT BOYS GIRLS TOTAL FRENCH 218 183 401 GHANAIAN LANG. 1,006 687 1,693 Source: Ghana Education Service, ASDA, 2013

Table 2.41:No. of students and their aggregates obtained

CANDIDATES 6 7 – 10 11 - 24 25 - 40 TOTAL PERCENTAGE BOYS 0 0 59 432 491 49% GIRLS 0 0 16 275 291 43% Source: Ghana Education Service, ASDA, 2013  Science, Technology, Mathematics and Innovation (STMI)

The Assembly supported GES to sponsor 30 girls to attend annual STMI. A total amount of GHȼ3,900.00 was used to support the programme.

 The School Feeding Programme

The District continues to enjoy the benefits of the school feeding program. For the year 2013, GHȼ374,329.04 was spent on schools on the government’s list. A total number of twelve schools are currently benefiting from the program. These schools are New Edubiase Exp. School, Akrofuom D/A Primary, Kojo Yentumi D/A Primary, Nkontem D/A Primary, Fahiakobio D/A Primary, Wuruyie D/A Primary, Atwereboana D/A Primary, Mprikyire D/A Primary, Mensonso D/A Primary, Menang D/A Primary, Prekese D/A Primary and Ahomahoma D/A Primary Schools.

TRANSITION RATE

69

The transition rate, which is the proportion of P6 pupils who enter JSS 1 in the year 2003/2004, was 91.4% for the District. By gender, the rate was higher for girls (93.5%) than boys (89.8%). On the whole, the transition rate ranged between 85.5% and 98.4% in the District by circuits.

Table 2.42: P6-Jss1 Transition Rate by Circuit 2010 BOYS GIRLS DISTRICT AVERAGE CIRCUIT 2009 P6 2010 Jhs 1 Transition 2009 P6 2010 JHS 1 Transition 2009 P6 2010 JHS1 Transition Enrl. Enrl. Rate Enrl. Enrl. Rate Enrl. Enrl. Rate Adamso 150 101 67 96 68 71 246 169 69 Akrofuom 169 158 93 115 106 92 284 264 93 Akutreso 170 97 57 120 62 52 290 159 55

Grumesa 88 99 113 77 66 86 165 165 100

Mensonso 126 125 99 83 85 102 209 210 100 N/Edubiase 337 378 112 305 312 102 642 690 107 Praso 229 201 88 200 178 89 429 379 88 Subin-Camp 233 149 64 159 104 65 392 253 65

Dist. Average 1502 1308 87 1155 981 85 2657 2289 86 Source; GES, Adansi South District, 2010

The data above explains the percentage of 2009 P6 pupils who entered JHS 1 for the year 2010 (transition). The District’s transition rate for P6 and JHs 1 ranges from 69% to 86%. By gender, the rate was higher for both Boys which was 87% and for Girls which was 85%. Grumesa, Mensonso and New Edubiase had 113% boys; 102% girls, 112% boys and 102% girls respectively. This means that students who entered Junior High School were more than those who completed Primary 6 as shown in the data. Some of the main causes of such situations are; some dropouts were re-admitted to those Junior High Schools, and also some other pupils were from different schools but not the supply schools.

Table 2.43: Availability of Teachers for Basic School 70

Publc Schools Private Schools Trained Untrained Trained Untrained Levels Grand Total Circuits Teachers Teachers Teachers Teachers M F T M F T M F T M F T M F T Adamso 1 3 4 2 8 10 1 0 1 3 1 4 7 12 19 Akrofuom 0 6 6 0 15 15 0 0 0 2 5 7 2 26 28 Akutreso 4 3 7 15 19 34 0 0 0 0 1 1 19 23 42 Grumesa 0 0 0 3 3 6 0 0 0 3 3 6 6 6 12 Mensonso 1 2 3 2 2 4 0 0 0 14 19 33 17 23 40

N/Edubiase 6 12 18 32 38 70 0 0 0 2 5 7 40 55 95 Praso 1 4 5 2 16 18 0 0 0 0 1 1 3 21 24

School

- Subin Camp 2 0 2 5 7 12 0 0 0 0 0 0 7 7 14

Pre Total 15 30 45 61 108 169 1 0 1 24 35 59 101 173 274 Adamso 19 14 33 24 1 25 0 0 0 2 0 2 45 15 60 Akrofuom 23 20 43 12 3 15 0 0 0 14 6 20 49 29 78 Akutreso 15 11 26 47 9 56 0 0 0 0 9 9 62 29 91 Grumesa 21 0 21 6 3 9 0 0 0 6 2 8 33 5 38 Mensonso 14 8 22 11 4 15 1 0 1 15 13 28 41 25 66 N/Edubiase 50 50 100 24 4 28 0 0 0 11 6 17 85 60 145 Praso 28 12 40 40 6 46 0 0 0 2 2 4 70 20 90 Subin Camp 15 5 20 61 2 63 0 0 0 0 0 0 76 7 83

Primary Total 185 120 305 225 32 257 1 0 1 50 38 88 461 190 651 Adamso 13 6 19 5 0 5 0 0 0 0 0 0 18 6 24 Akrofuom 25 15 40 8 1 9 0 0 0 0 0 0 33 16 49 Akutreso 6 4 10 23 2 25 0 0 0 0 0 0 29 6 35 Grumesa 12 0 12 7 1 8 0 0 0 0 0 0 19 1 20

Mensonso 10 7 17 8 0 8 0 0 0 0 0 0 18 7 25 N/Edubiase 64 31 95 13 2 15 0 0 0 8 7 15 85 40 125 Praso 26 10 36 14 2 16 0 0 0 1 2 3 41 14 55 Subin Camp 19 1 20 33 3 36 0 0 0 4 0 4 56 4 60

Junior High Sch. High Junior TOTAL 175 74 249 111 11 122 0 0 0 13 9 22 299 94 393 GRAND TOTAL 375 224 599 599 599 548 2 0 2 87 82 169 861 457 1318

Source; GES, Adansi South District, 2010

Table 2.43 shows Teacher Population of Basic Schools (Public and Private). From the data, the District has a total number of 1,318 Teachers made up of 861 males which is 65% of total teacher population 71 with 457 females making up to 35% of the total teacher population. Pre-school has 274 (i.e. 14%) of teachers, Primary has 651(i.e. 33%) and Junior High School 393 (20%). Currently the District has student population of 39,469 against a total teacher population of 1,318. This implies that the Pupil- Teacher Ratio for the District is therefore 30 students (pupils) to one teacher (30:1) which is far below the National Norm (45:1). This has come about because of the inclusion of the Youth Employment teachers swelling up the total number of teachers in the District. Percentage of Trained teachers forty- six (i.e. 46%) and Pupil-Teacher ratio is 66 pupils to 1 trained teacher (i.e. 66:1). The Directorate is therefore making every effort to improve the above mentioned Ratios for Quality Education in the District. For the Senior High School the data is shown below.

Table 2.44: AVAILABILITY OF TEACHERS IN THE S. H. S Trained Trs. Untrained Trs Grand Total Analysis % Trained Pupil /Trn. Sch. Trs Tr. Ratio Pupil Tr. S/No Name of School Enrol M F T M F T M F T Ratio NEW EDUBIASE 1 SHS 1059 34 6 40 30 17 47 64 23 87 46 26 12 AKROFUOM 2 SHS 389 18 6 24 2 2 4 20 8 28 86 16 14

TOTAL 1448 52 12 64 32 19 51 84 31 115 56 23 13 Source: GES, Adansi South District, 2010

From the data above total teachers for the SHS is 155 made up of 84 (i.e. 54%) males and 31 (i.e. 46%) females. The SHS level is having a total student population of 1,448 against 115 teachers. The SHS PTR is therefore 13:1. The percentage of trained teachers is 56%. This implies that the Pupil-Trained Teacher ratio is 22:1 which is far below the national norm which is 35:1.

Fig. 2.11 Location of educational facilities in the District

72

73

Table 2.45: List of Basic Schools (KG level) Who Runs the Type of Type of Population of Students Teachers S/No. Name of School School i.e Building Roofing Church/DA Etc. Material Used Material Male Female Total Male Female Total 1 ADAMSO D/A PRIMARY DA Mud Aluminium 49 40 89 1 3 4 2 ADOM NYAME D/A PRIMARY DA Under tree Under tree 23 23 46 0 1 1 3 ADUBENSASO D/A PRIMARY DA Under tree Under tree 20 21 41 1 0 1 4 ADUKROBA D/A PRIMARY DA Under tree Under tree 24 20 44 1 0 1 5 AMPUNYASE-NKWANTA D/A PRIMARY DA Under shed Undershed 33 42 75 0 2 2 6 ASASEBOMBESEA D/A PRIMARY DA Under shed Aluminium 23 31 54 0 2 2 7 FENASO NKWANTA D/A PRIMARY DA Under shed Aluminium 56 29 85 1 1 2 8 KUBI-KWANTO D/A PRIMARY DA Under shed Aluminium 31 34 65 1 1 2 9 TAKYIKROM D/A PRIMARY DA Cement Aluminium 12 7 19 0 2 2 AMPUNYASE ST. JESOPH CATHOLIC 10 PRIMARY R/C Cement Aluminium 53 48 101 0 3 3 11 AKROFUOM D/A PRIMARY DA Cement Aluminium 65 63 128 0 5 5 12 AKROFUOM METHODIST PRIMARY METH. Cement Aluminium 44 64 108 0 4 4 13 AKROFUOM R/C PRIMARY 'A' DA Cement Aluminium 77 78 155 0 4 4 14 BETENASE D/A PRIMARY SCHOOL DA Under shed Aluminium 28 30 58 0 3 3 15 KOKOTENTEN D/A PRIMARY DA Cement Aluminium 30 29 59 0 2 2 16 OKYEREKROM D/A PRIMARY DA Under shed Aluminium 44 38 82 0 4 4 17 WAMASE D/A PRIMARY DA Cement Aluminium 48 52 100 0 4 4 18 YAADOME D/A PRIMARY DA Under shed Aluminium 30 31 61 0 1 1 19 ADANSI SWEDRU D/A PRIMARY DA Under tree Under tree 22 29 51 1 1 2 20 AKUTRESO D/A PRIMARY DA Under tree Under tree 33 27 60 1 2 3 21 AKWA-ATWEREBOANA D/A PRIMARY DA Under tree Under tree 55 40 95 2 0 2 22 KAPERKROM D/A PRIMARY DA Under tree Under tree 18 22 40 1 0 1 23 KOJO YENTUMI D/A BASIC SCHOOL DA Under tree Under tree 31 47 78 1 3 4 24 KWAKU ADU D/A KG/PRIMARY DA Under tree Under tree 19 18 37 1 1 2 25 NKOTEM D/A PRIMARY DA Cement Aluminium 37 35 72 3 1 4 26 NSATA MANGOASE D/A DA Under shed Aluminium 25 23 48 1 1 2 27 OBUOBIKROM D/A PRIMARY DA Under shed Aluminium 25 25 50 1 1 2 74

28 SUBRISO D/A PRIMARY DA Cement Aluminium 53 40 93 2 2 4 29 SUMUOSO METHODIST PRIMARY METH. Under shed Aluminium 10 31 41 1 1 2 30 TONKOASE No.1 D/A PRIMARY DA Under shed Aluminium 33 30 63 0 2 2 31 TONKOASE No.2 D/A PRIMARY DA Under shed Aluminium 57 61 118 1 3 4 32 TWEAPEASE D/A KG/PRIMARY DA Under shed Aluminium 61 55 116 1 1 2 33 BONKRO KG/PRIMARY SCHOOL DA Cement Aluminium 17 9 26 0 1 1 34 ADANSI AGRAVE D/A PRIMARY DA Mud Aluminium 32 36 68 2 0 2 35 ADANSI KENYA D/A PRIMARY DA Under tree Under tree 22 20 42 1 0 1 36 APAGYA D/A PRIMARY DA Under shed Aluminium 22 25 47 0 4 4 37 ATAASE NKWANTA METHODIST PRIMARY METH. Under shed Aluminium 60 47 107 1 5 6 38 ATOBIASE R/C PRIMARY R/C. Under shed Aluminium 54 44 98 0 4 4 39 AYAA-MANKATA D/A BASIC SCHOOL DA Under shed Aluminium 39 31 70 2 0 2 40 HWIDIEM D/A PRIMARY SCHOOL DA Under shed Aluminium 35 33 68 1 1 2 41 KOJO MANKRONG D/A PRIMARY DA Under shed Aluminium 27 24 51 0 1 1 42 KRAMOKROM D/A PRIMARY DA Under shed Aluminium 26 28 54 1 1 2 43 NKRANFO NKWANTA D/A KG/PRIMARY DA Under shed Aluminium 20 25 45 1 0 1 44 PREKESEASE D/A BASIC SCHOOL DA Under shed Aluminium 62 59 121 1 3 4 45 APAGYA R/C PRIMARY R/C Cement Aluminium 52 62 114 1 4 5 46 DWENDAMBA-BOTWE D/A PRIMARY DA Under shed Aluminium 21 23 44 1 1 2 47 GRUMESA D/A PRIMARY DA Under shed Aluminium 57 49 106 1 2 3 48 JOHNKROM D/A BASIC SCHOOL DA Under shed Aluminium 33 41 74 0 0 0 49 KOFI-GYAME D/A PRIMARY DA Under shed Aluminium 25 28 53 0 2 2 50 MPIREKYIRE D/A BASIC SCHOOL DA Under shed Aluminium 63 50 113 1 1 2 51 OKAI ABABIO D/A PRIMARY DA Under shed Aluminium 9 16 25 0 1 1 52 KRAMOKROM D/A PRIMARY DA Under shed Aluminium 28 22 50 3 0 3 53 AMOAKOKROM D/A PRIMARY DA Cement Aluminium 48 71 119 0 2 2 54 AVORNYO D/A PRIMARY DA Under shed Aluminium 36 28 64 0 0 0 55 BROFOYEDRO D/A PRIMARY SCHOOL DA Cement Aluminium 51 57 108 1 3 4 56 MENSONSO D/A PRIMARY DA Cement Aluminium 54 50 104 1 2 3 57 NKORANSA D/A PRIMARY DA Cement Aluminium 61 66 127 0 5 5 58 SIKAMAN METHODIST PRIMARY METH. Cement Aluminium 78 64 142 0 2 2

75

59 YAW OWUSUKROM D/A PRIMARY DA Under shed Aluminium 23 14 37 0 1 1 60 NYAMEBEKYERE D/A BASIC SCHOOL DA Under shed Aluminium 25 14 39 0 1 1 61 AMUDURASE D/A BASIC SCHOOL DA Landcrete Aluminium 56 66 122 1 4 5 62 ANKAASE D/A PRIMARY DA Under shed Aluminium 17 25 42 0 2 2 63 AWOROSO D/A PRIMARY DA Under shed Aluminium 45 38 83 3 0 3 64 BRONIKROM D/A KG/PRIMARY DA Under shed Aluminium 30 42 72 2 3 5 65 D/A EXPERIMENTAL PRIMARY DA Under shed Aluminium 66 76 142 0 5 5 66 D/A PRIMARY 'A', NEW-EDUBIASE DA Under shed Aluminium 37 32 69 0 4 4 67 DOTOM D/A PRIMARY BASIC SCHOOL DA Under shed Aluminium 32 31 63 1 1 2 68 FAHIAKOBO D/A PRIMARY SCHOOL DA Under shed Aluminium 59 42 101 2 1 3 69 HIDAAYATUL ISLAMIC BASIC SCHOOL ISLAMIC UNIT Cement Aluminium 64 61 125 0 4 4 70 KWAME ADU D/A PRIMARY DA Under shed Aluminium 17 19 36 0 2 2 71 MENANG D/A PRIMARY DA Under shed Aluminium 79 73 152 2 2 4 72 NEW EDUBIASE METHODIST PRIMARY 'A' DA Under shed Aluminium 89 63 152 0 4 4 73 OYAN D/A PRIMARY DA Under shed Aluminium 24 18 42 1 1 2 74 ST. JOHN THE BAPTIST. R/C PRIMARY R/C Under shed Aluminium 47 49 96 0 5 5 75 ABOABO No.3 D/A PRIMARY DA Under shed Aluminium 51 46 97 2 1 3 76 ACHEASEWA D/A PRIMARY DA Under shed Aluminium 20 21 41 2 1 3 ADANSI PRASO ROMAN CATHOLIC 77 PRIMARY R/C Under shed Aluminium 36 50 86 1 3 4 78 ATWEREBOANA D/A BASIC SCHOOL DA Cement Aluminium 101 92 193 0 4 4 79 BIRIM ABOYE D/A PRIMARY DA Under shed Aluminium 25 35 60 2 0 2 80 DANYAMESO D/A PRIMARY DA Under shed Aluminium 19 10 29 1 0 1 81 EDWINASE D/A PRIMARY DA Under shed Aluminium 27 25 52 0 2 2 82 KAWOTRIHWE D/A PRIMARY DA Under shed Aluminium 16 16 32 3 1 4 83 KOTWEA D/A PRIMARY DA Cement Aluminium 100 65 165 0 1 1 84 KWAME-NKYI D/A BASIC SCHOOL DA Under shed Aluminium 43 26 69 1 1 2 85 KYEREMBABI D/A BASIC SCHOOL DA Under shed Aluminium 50 54 104 0 1 1 86 ODUMASI D/A PRIMARY DA Under shed Aluminium 31 45 76 0 1 1 87 QUANSAKROM D/A PRIMARY DA Under shed Aluminium 31 20 51 1 3 4 88 WURUYIE D/A PRIMARY DA Cement Aluminium 71 77 148 1 0 1 89 AHOMAHOMA D/A PRIMARY DA Under shed Aluminium 26 27 53 1 1 2 76

90 ASAREKROM D/A PRIMARY DA Under shed Aluminium 45 47 92 0 0 0 91 DWENDAMA D/A PRIMARY DA Under shed Aluminium 29 41 70 0 3 3 92 OBONSU D/A PRIMARY DA Under shed Aluminium 42 51 93 1 1 2 93 OPARE KOJO D/ABASIC DA Under shed Aluminium 35 35 70 0 1 1 94 SONKROYUWA D/A PRIMARY DA Under shed Aluminium 23 24 47 1 1 2 95 SUBIN CAMP D/A KG/PRIMARY DA Under shed Aluminium 42 34 76 1 0 1 96 AFRICAN FAITH PRIMARY AFRICAN FAITH Under shed Aluminium 40 42 82 1 0 1 97 OWUSUKROM D/A PRIMARY SCHOOL DA Under shed Aluminium 32 20 52 0 1 1 TOTAL 3846 3737 7583 5 8 13 Source: GES- Adansi South District, 2014.

Table 2.46: List of Basic Schools (Primary Level) Who runs the Type of Type of Population of students Teachers S/NO. Name of school school ie building roofing Church/DA etc. Material material male female Total male female Total 1 ADAMSO D/A PRIMARY DA Cement Aluminium 119 132 251 4 3 7 2 ADOM NYAME D/A PRIMARY DA Cement Aluminium 40 30 70 3 2 5 3 ADUBENSASO D/A PRIMARY DA Cement Aluminium 43 35 78 6 0 6 4 ADUKROBA D/A PRIMARY DA Cement Aluminium 45 55 100 6 0 6 5 AMPUNYASE-NKWANTA D/A PRIMARY DA Cement Aluminium 78 73 151 5 2 7 6 ASASEBOMBESEA D/A PRIMARY DA Cement Aluminium 66 79 145 4 3 7 7 FENASO NKWANTA D/A PRIMARY DA Cement Aluminium 63 79 142 7 0 7 8 KUBI-KWANTO D/A PRIMARY DA Cement Aluminium 117 112 229 3 3 6 9 TAKYIKROM D/A PRIMARY DA Cement Aluminium 24 23 47 4 3 7 AMPUNYASE ST. JESOPH CATHOLIC 10 PRIMARY DA Cement Aluminium 156 154 310 2 3 5 11 AKROFUOM D/A PRIMARY DA Cement Aluminium 160 157 317 5 6 11 12 AKROFUOM METHODIST PRIMARY METH. Cement Aluminium 209 186 395 4 2 6 13 AKROFUOM R/C PRIMARY 'B' R/C. Cement Aluminium 105 89 194 3 4 7 14 AKROFUOM R/C PRIMARY 'A' R/C. Cement Aluminium 126 116 242 3 3 6 15 BETENASE D/A PRIMARY SCHOOL DA Under Shed Aluminium 46 47 93 4 2 6

77

16 KOKOTENTEN D/A PRIMARY DA Cement Aluminium 57 58 115 6 0 6 17 OKYEREKROM D/A PRIMARY DA Cement Aluminium 76 60 136 5 2 7 18 WAMASE D/A PRIMARY DA Cement Aluminium 185 179 364 5 1 6 19 YAADOME D/A PRIMARY DA Cement Aluminium 77 61 138 5 2 7 20 ADANSI SWEDRU D/A PRIMARY DA Cement Aluminium 69 57 126 4 2 6 21 AKUTRESO D/A PRIMARY DA Under tree Under tree 96 85 181 4 3 7 22 AKWA-ATWEREBOANA D/A PRIMARY DA Under tree Under tree 110 38 148 4 1 5 23 KAPERKROM D/A PRIMARY DA Under tree Under tree 70 55 125 2 2 4 24 KOJO YENTUMI D/A BASIC SCHOOL DA Cement Aluminium 91 96 187 6 1 7 25 KWAKU ADU D/A KG/PRIMARY DA Under tree Aluminium 48 46 94 3 1 4 26 NKOTEM D/A PRIMARY DA Cement Aluminium 86 68 154 3 3 6 27 NSATA MANGOASE D/A DA Under Shed Under tree 84 62 146 4 3 7 28 OBUOBIKROM D/A PRIMARY DA Cement Aluminium 44 47 91 4 3 7 29 SUBRISO D/A PRIMARY DA Cement Aluminium 141 93 234 5 1 6 30 SUMUOSO METHODIST PRIMARY METH. Under Shed Aluminium 42 58 100 5 0 5 31 TONKOASE No.1 D/A PRIMARY DA Cement Aluminium 98 84 182 4 2 6 32 TONKOASE No.2 D/A PRIMARY DA Cement Aluminium 109 116 225 4 3 7 33 TWEAPEASE D/A KG/PRIMARY DA Cement Aluminium 100 96 196 4 2 6 34 BONKRO KG/PRIMARY SCHOOL DA Under tree Under tree 22 20 42 1 1 2 35 ADANSI AGRAVE D/A PRIMARY DA Mud Aluminium 62 70 132 4 0 4 36 ADANSI KENYA D/A PRIMARY DA Uncompleted Uncompleted 56 52 108 3 0 3 37 APAGYA D/A PRIMARY DA Cement Aluminium 113 119 232 5 1 6 ATAASE NKWANTA METHODIST 38 PRIMARY METH. Cement Aluminium 101 102 203 2 5 7 39 ATOBIASE R/C PRIMARY R/C. Cement Aluminium 234 194 428 8 3 11 40 AYAA-MANKATA D/A BASIC SCHOOL DA Landcrete Aluminium 89 91 180 4 1 5 41 BEPOASE D/A PRIMARY DA Cement Aluminium 96 72 168 6 1 7 42 HWIDIEM D/A PRIMARY SCHOOL DA Cement Aluminium 66 62 128 2 1 3 43 KOJO MANKRONG D/A PRIMARY DA Cement Aluminium 93 98 191 5 1 6 44 KRAMOKROM D/A PRIMARY DA Cement Aluminium 44 47 91 4 1 5 45 NKRANFO NKWANTA D/A KG/PRIMARY DA Cement Aluminium 70 61 131 4 2 6 46 PREKESEASE D/A BASIC SCHOOL DA Cement Aluminium 134 113 247 6 0 6 78

47 APAGYA R/C PRIMARY DA Cement Aluminium 211 222 433 5 5 10 48 DWENDAMBA-BOTWE D/A PRIMARY DA Landcrete Aluminium 125 88 213 3 2 5 49 GRUMESA D/A PRIMARY DA Cement Aluminium 144 141 285 3 0 3 50 JOHNKROM D/A BASIC SCHOOL DA Cement Aluminium 56 85 141 3 0 3 51 KOFI-GYAME D/A PRIMARY DA Cement Aluminium 65 42 107 5 0 5 52 MPIREKYIRE D/A BASIC SCHOOL DA Cement Aluminium 102 82 184 5 1 6 53 OKAI ABABIO D/A PRIMARY DA Cement Aluminium 37 30 67 5 1 6 54 KRAMOKROM D/A PRIMARY DA Cement Aluminium 92 78 170 3 0 3 55 AMOAKOKROM D/A PRIMARY DA Cement Aluminium 71 91 162 0 4 4 56 AVORNYO D/A PRIMARY DA Under Shed Under Shed 40 40 80 6 0 6 57 BROFOYEDRO D/A PRIMARY SCHOOL DA Cement Aluminium 142 121 263 5 2 7 58 MENSONSO D/A PRIMARY DA Cement Aluminium 154 108 262 6 0 6 59 NKORANSA D/A PRIMARY DA Cement Aluminium 211 165 376 4 1 5 60 SIKAMAN METHODIST PRIMARY METH. Cement Aluminium 133 117 250 5 0 5 61 YAW OWUSUKROM D/A PRIMARY DA Under Shed Aluminium 50 52 102 2 1 3 62 NYAMEBEKYERE D/A BASIC SCHOOL DA Cement Aluminium 94 62 156 4 2 6 63 AMUDURASE D/A BASIC SCHOOL DA Cement Aluminium 199 178 377 4 3 7 64 ANKAASE D/A PRIMARY DA Under Shed Aluminium 43 30 73 6 0 6 65 AWOROSO D/A PRIMARY DA Cement Aluminium 146 113 259 5 0 5 66 BRONIKROM D/A KG/PRIMARY DA Cement Aluminium 88 64 152 2 3 5 67 D/A EXPERIMENTAL PRIMARY DA Cement Aluminium 186 203 389 2 5 7 68 D/A PRIMARY 'A', NEW-EDUBIASE DA Cement Aluminium 106 100 206 6 1 7 69 DOTOM D/A PRIMARY BASIC SCHOOL DA Cement Aluminium 63 82 145 5 0 5 70 FAHIAKOBO D/A PRIMARY SCHOOL DA Cement Aluminium 72 65 137 7 0 7 71 HIDAAYATUL ISLAMIC BASIC SCHOOL ISLAMIC UNIT Cement Aluminium 156 105 261 6 4 10 72 KWAME ADU D/A PRIMARY DA Cement Aluminium 72 45 117 6 0 6 73 MENANG D/A PRIMARY DA Cement Aluminium 129 112 241 4 2 6 74 NEW EDUBIASE METHODIST PRIMARY 'A' METH. Under Shed Aluminium 187 174 361 3 5 8 75 OYAN D/A PRIMARY DA Cement Aluminium 72 49 121 2 1 3 76 ST. JOHN THE BAPTIST. R/C PRIMARY R/C. Cement Aluminium 200 190 390 4 5 9 77 NEW EDUBIASE METHODIST PRIMARY 'B' METH. Under Shed Aluminium 145 157 302 1 6 7

79

78 NEW EDUBIASE D/A PRIMARY DA Cement Aluminium 84 105 189 3 4 7 79 ABOABO No.3 D/A PRIMARY DA Cement Aluminium 70 82 152 6 0 6 80 ACHEASEWA D/A PRIMARY DA Landcrete Aluminium 87 79 166 3 0 3 ADANSI PRASO ROMAN CATHOLIC 81 PRIMARY R/C. Cement Aluminium 214 237 451 8 4 12 82 ATWEREBOANA D/A BASIC SCHOOL DA Cement Aluminium 187 156 343 1 2 3 83 BIRIM ABOYE D/A PRIMARY DA Cement Aluminium 63 52 115 5 0 5 84 DANYAMESO D/A PRIMARY DA Cement Aluminium 30 48 78 5 0 5 85 EDWINASE D/A PRIMARY DA Cement Aluminium 109 92 201 6 0 6 86 KAWOTRIHWE D/A PRIMARY DA Under tree Under tree 23 28 51 1 0 1 87 KOTWEA D/A PRIMARY DA Cement Aluminium 133 124 257 5 2 7 88 KWAME-NKYI D/A BASIC SCHOOL DA Under tree Under tree 45 36 81 2 0 2 89 KYEREMBABI D/A BASIC SCHOOL DA Cement Aluminium 107 87 194 5 0 5 90 ODUMASI D/A PRIMARY DA Cement Aluminium 96 65 161 5 1 6 91 QUANSAKROM D/A PRIMARY DA Cement Aluminium 77 63 140 4 2 6 92 WURUYIE D/A PRIMARY DA Cement Aluminium 242 140 382 5 2 7 93 AHOMAHOMA D/A PRIMARY DA Cement Aluminium 81 61 142 5 0 5 94 ASAREKROM D/A PRIMARY DA Cement Aluminium 85 88 173 3 2 5 95 DWENDAMA D/A PRIMARY DA Cement Aluminium 112 91 203 6 1 7 96 OBONSU D/A PRIMARY DA Cement Aluminium 121 116 237 6 0 6 97 OPARE KOJO D/A PRIMARY DA Cement Aluminium 56 37 93 4 1 5 98 SONKROYUWA D/A PRIMARY DA Under Shed Aluminium 64 36 100 2 0 2 99 SUBIN CAMP D/A KG/PRIMARY DA Cement Aluminium 112 92 204 6 1 7 100 AFRICAN FAITH PRIMARY AFRICAN FAITH Under tree Under tree 78 67 145 5 1 6 101 OWUSUKROM D/A PRIMARY SCHOOL DA Under Shed Aluminium 42 40 82 5 1 6 TOTAL 10069 9040 19109 427 163 590 Source: GES- Adansi South District, 2014

Table 2.47: List of Basic Schools (JHS Level)

80

Population of Students Teachers S/No. Name of School Who Runs the Type Of Type Of School i.e. Building Roofing Church/DA Etc. Material Materials Male Female Total Male Female Total 1 ADAMSO D/A J.H.S DA Cement Aluminium 94 66 160 8 3 11 2 AMPUNYASE D/A J.H.S DA Cement Aluminium 91 89 180 7 1 8 3 KUBI KWANTO D/A J.H.S DA Under Shed Under Shed 58 43 101 5 1 6 4 AKROFUOM D/A J.H.S DA Cement Aluminium 93 99 192 7 8 15 5 AKROFUOM METHODIST J.H.S METH. Cement Aluminium 69 65 134 8 3 11 6 AKROFUOM R/C J.H.S R/C. Cement Aluminium 86 74 160 5 4 9 7 WAMASE D/A J.H.S DA Cement Aluminium 100 76 176 7 1 8 8 YAADOME D/A J.H.S DA Cement Aluminium 42 27 69 7 1 8 9 AKUTRESO D/A J.H.S DA Cement Aluminium 64 34 98 8 2 10 10 SUBRISO D/A J.H.S DA Cement Aluminium 82 55 137 6 2 8 11 TONKOASE D/A J.H.S DA Cement Aluminium 60 37 97 7 1 8 12 TWEAPEASE D/A J.H.S DA Cement Aluminium 40 35 75 6 2 8 13 KOJO YENTUMI D/A JHS DA Under Shed Under Shed 67 52 119 6 1 7 14 APAGYA D/A J.H.S DA Cement Aluminium 72 57 129 7 3 10 15 APAGYA R/C J.H.S R/C. Cement Aluminium 80 86 166 7 2 9 16 ATAASE NKWANTA D/A J.H.S DA Cement Aluminium 71 65 136 8 2 10 17 ATOBIASE D/A J.H.S DA Cement Aluminium 128 102 230 8 3 11 18 AYAA-MANKATA D/A BASIC SCHOOL DA Under Shed Under Shed 17 9 26 4 0 4 19 PREKESEASE D/A BASIC SCHOOL DA Cement Under Shed 50 29 79 5 1 6 20 HWIDIEM D/A J.H.S DA Under Shed Under Shed 30 27 57 5 0 5 21 BEPOASE D/A J.H.S DA Cement Aluminium 36 20 56 3 3 6 22 ADANSI AGRAVE D/A JHS DA Under tree Under tree 47 24 71 5 0 5 23 DWENDAMBA -BOTWE D/A J.H.S DA Under Tree Under tree 49 41 90 3 0 3 24 GRUMESA D/A J.H.S DA Cement Aluminium 105 63 168 4 1 5 25 JOHNKROM D/A BASIC SCHOOL DA Landcrete Aluminium 29 43 72 6 0 6 26 MPIREKYIRE D/A BASIC SCHOOL DA Cement Aluminium 53 29 82 6 0 6 27 AMOAKOKROM D/A PRIMARY DA Cement Aluminium 43 34 77 5 1 6 28 MENSONSO D/A J.H.S DA Cement Aluminium 97 45 142 7 0 7 81

29 NKORANSA D/A J.H.S DA Cement Aluminium 78 56 134 6 0 6 30 SIKAMAN METHODIST J.H.S METH. Cement Aluminium 103 88 191 10 1 11 31 BROFOYEDRU D/A J. H. S. DA Cement Aluminium 91 51 142 4 3 7 32 NYAMEBEKYERE D/A BASIC SCHOOL DA Under tree Under tree 16 10 26 4 1 5 33 AMUDURASE D/A BASIC SCHOOL DA Cement Aluminium 55 57 112 5 2 7 34 D/A EXPERIMENTAL J.H.S DA Cement Aluminium 118 122 240 6 5 11 35 HIDAAYATUL ISLAMIC BASIC SCHOOL ISLAMIC UNIT Under shed Under Shed 29 21 50 2 1 3 36 MENANG D/A J.H.S DA Cement Aluminium 87 23 110 5 3 8 37 NEW EDUBIASE D/A J.H.S 'B' DA Cement Aluminium 107 78 185 11 2 13 38 NEW EDUBIASE D/A J.H.S 'A' DA Cement Aluminium 167 144 311 10 3 13 39 OBUOBI D/A J.H.S DA Cement Aluminium 67 35 102 6 1 7 40 OYAN DOTOM D/A J.H.S DA Under Shed Under Shed 51 26 77 6 0 6 41 ST. JOHN THE BAPTIST. R/C J.H.S R/C. Cement Aluminium 77 83 160 6 3 9 42 NEW EDUBIASE METHODIST J.H.S METH. Cement Aluminium 141 136 277 8 5 13 43 ACHEASEWA D/A J.H.S DA Cement Aluminium 38 22 60 6 0 6 44 ATWEREBOANA D/A BASIC SCHOOL DA Cement Aluminium 70 56 126 5 1 6 45 EDWINASE D/A J.H.S DA Under Shed Under Shed 41 27 68 7 1 8 46 KOTWEA D/A J.H.S DA Under Shed Under Shed 55 36 91 5 0 5 47 KYEREMBABI D/A BASIC SCHOOL DA Under Shed Under Shed 29 30 59 2 2 4 48 ODUMASI D/A J.H.S DA Landcrete Aluminium 54 35 89 7 0 7 49 PRASO D/A J.H.S DA Cement Aluminium 134 107 241 12 2 14 50 WURUYIE D/A J.H.S DA Cement Aluminium 79 51 130 5 3 8 51 DWENDAMA D/A JHS DA Under Shed Aluminium 30 21 51 5 0 5 52 ASAREKROM D/A J.H.S DA Cement Aluminium 33 31 64 5 0 5 53 OPARE KOJO D/ABASIC DA Under Shed Aluminium 12 12 24 0 0 0 54 SUBIN CAMP D/A J.H.S, DA Cement Aluminium 55 50 105 5 0 5 55 OBONSU D/A J.H.S DA Cement Aluminium 67 51 118 7 0 7 TOTAL 3737 2885 6622 330 85 415 Source: GES- Adansi South District, 2014

82

2.11.2 Non Formal Education

The District is current ly having two batches of literacy classes functioning. They are batch 17 which is comprised of eight classes and batch 18 also comprised of eight classes. Batch 17 is located in the following communities: Atobiase, Apagya, Apagya Central, Akwaku, Bepoase, Musa, Afiaso and Tonkoase, batch 18 also operates in : Asarekrom, Kojo Yentumi, Master Nkwanta, Dotom, Kwame Adu, Kwabena Essuon , Twetwebuoso and Nyamebekyere. There is one Nissan pick-up and six motor bikes aiding the work of the staff however the poor nature of the roads continues to hamper the work of the centre.

2.11.3 HEALTH CARE The District has the following health care facilities outlined below, which are accessible to all individuals. New Edubiase Sub-District- New Edubiase Government Hospital Hilltop Maternity Home (Private) Akutreso Sub-District- Akutreso Health Centre Ataase Sub-District- Ataase Health Centre Atwereboana CHPS Compound Hwidiem CHPS Compound Obonsu CHPS Compound Akrofuom Sub-District Akrofuom Health Centre Grumesa CHPS Compound Mensonso CHPS Compound Sikaman/ CHAG CHPS Compound Ampunyase Sub- District Ampunyase Health Centre Wamasi CHPS Compound

83

Fig. 2.11 Shows the location of health facilities in the District

Health Related Issues Some of the cases recorded in the District are summarised in the table below:

Table 2.48: Cases recorded at the New Edubiase District Hospital

S/N Disease No. recorded( Jan- Sept 2014) 1. Acute eye infection 422 2. Cataract 99 3. Otitis media 51 4. Other acute ear infection 34 5. Dental carriers 4 6. Dental swellings 9 7. Acute urinary tract infection 124 8. Skin diseases 287 9. Ulcer 39 10. Kidney related diseases 22 11. Gynaecological 21 12. Pregnancy related complications 61 13. Anaemia in pregnancy 2 14. Genital ulcer 4 15. Vaginal discharge 34 84

16. Urethral discharge 3 17. Other diseases of the male reproductive system 2 18. Other diseases of the female reproduction system 1 19. Malnutrition 26 20. Anaemia 731 21. Hypertension 518 22. Stroke 1 23. Diabetes Mellitus 84 24. Rheumatism and joint pains 334 25. Sickle cell disease 9 26. Asthma 64 Source: District Health Services, 2014.

2.11.4 Health Insurance Table 2.49: Number of Clients Registered In 2010 2010 NEW RENEWALS PREGNANT WOMEN TOTAL REGISTRATION MONTHS NEW EXISTING JANUARY 284 775 188 - 1,247 FEBRUARY 250 394 207 07 858 MARCH 115 874 171 12 1,172 APRIL 200 1,161 184 - 1,545 MAY 162 1,084 302 26 1,574 JUNE 164 1,145 233 35 1,577 JULY 255 1,336 245 21 1,857 AUGUST 330 934 233 42 1,539 SEPTEMBER 224 934 263 51 1,472 OCTOBER 478 1,904 327 77 2,786 NOVEMBER 887 2827 315 36 4,065 DECEMBER 734 1725 236 33 2728 TOTAL 4,083 15,093 2,904 340 22,420 Source: NHIS Office, 2014

Table 2.50: Claims Paid YEAR 2010 2011 2012 2013 MONTHS PAYMENT PAYMENT PAYMENT PAYMENT JANUARY 41,045.15 112,157.71 277,901.77 - FEBRUARY 134,494.41 81,140.66 145,701.09 214,430.68 MARCH 88,783.72 145,951.74 159,878.39 261,584.53 APRIL 85,960.75 132,923.69 - 97,653.31 MAY 107,947.09 98,878.52 78,559.24 - JUNE 125,572.96 126,073.97 73,259.92 140,908.03 JULY 70,132.10 -- 54,628.20 14,071.00 AUGUST - 116,551.57 - - SEPTEMBER 102,958.24 141,617.96 150,547.20 23,553.62 OCTOBER 158,305.54 265,377.02 156,707.16 41,008.29 85

NOVEMBER - 19,127.20 126,430.18 25,225.73 DECEMBER 123,201.74 144,845.94 147,969.51 - TOTAL 1,038,401.70 1,384,645.98 1,371,582.66 1,052,400.90 Source: NHIS Office, 2014

Table 2.51: Number of Clients Registered in 2011

2011 FRESH RENEWALS PREGNANT WOMEN TOTAL REGISTRATION NEW EXISTING JANUARY 527 1,616 259 38 2,440 FEBRUARY 1,665 2,423 213 35 4,336 MARCH 334 955 236 36 1,561 APRIL 570 2,001 182 53 2,806 MAY 547 2,409 195 64 3,215 JUNE 464 1,506 201 88 2,259 JULY 309 1,172 162 51 1,694 AUGUST 587 1,308 214 37 2,146 SEPTEMBER 673 1,485 222 56 2,436 OCTOBER 660 1,735 202 88 2,685 NOVEMBER 1,577 2,582 313 46 3,393 DECEMBER 961 1468 218 34 2,681 TOTAL Source: NHIS Office, 2014

Table 2.52: ID Cards Distribution YEAR 2010 2011 2012 2013 MONTHS JANUARY 1,355 2,565 1,712 5,240 FEBRUARY 863 1,712 1,723 3,475 MARCH 1,156 1,139 1,382 4,983 APRIL 1,512 2,007 993 3,086 MAY 1,180 1,511 840 1,640 JUNE 1,720 1,035 450 697 JULY 1,291 1,045 541 1,101 AUGUST 865 1,143 1,030 1,408 SEPTEMBER 976 819 479 1,355 OCTOBER 1,324 667 931 1,126 NOVEMBER 1,845 1,182 2,029 1,058 DECEMBER 1,276 779 227 1,048 TOTAL 15,848 15,604 12,337 26,217 Source: NHIS Office, 2014

Table 2.53: Number of Clients Registered in 2012 86

2012 NEW RENEWALS PREGNANT WOMEN TOTAL REGISTRATION NEW EXISTING JANUARY 863 1,342 225 64 2,494 FEBRUARY 342 800 169 55 1,366 MARCH 431 996 160 60 1,647 APRIL 273 1,271 203 70 1,817 MAY 575 2,742 210 85 3,612 JUNE 389 1,559 149 60 2,157 JULY 518 1,820 141 90 2,569 AUGUST 752 1,599 259 114 2,724 SEPTEMBER 346 1,247 206 89 1,888 OCTOBER 349 1,001 268 79 1,697 NOVEMBER 389 1,021 140 63 1,613 DECEMBER 176 637 89 51 953 TOTAL 5,403 16,035 2,224 880 214,542 Source: NHIS Office, 2014

Table 2.54: Number of Clients Registered in 2013 2013 NEW RENEWALS PREGNANT WOMEN TOTAL REGISTRATION NEW EXISTING JANUARY 289 1,076 93 84 1,542 FEBRUARY 2,760 4,261 211 79 7,311 MARCH 306 751 105 70 1,232 APRIL 233 803 71 87 1,194 MAY 392 1,743 97 116 2,348 JUNE 676 1,819 141 98 2,734 JULY 282 1,174 128 61 1,645 AUGUST 329 1,251 156 51 1,787 SEPTEMBER 763 1,685 56 65 2,569 OCTOBER 3,546 459 134 70 4,209 NOVEMBER 348 1,340 116 81 1,885 DECEMBER 1,358 3,100 103 81 4,642 TOTAL 11,282 19,462 1,411 943 33,103 Source: NHIS Office, 2014

2.12 VULNERABILITY ANALYSIS Persons with disability (PWD) have been defined as those who are unable to or are restricted in the performance of specific tasks/ activities due to loss of functions of some part of the body as a result of impairment or malformation (Ghana Statistical Service, 2012). As a result, PWDs face a wide range of life challenges because disability in whatever form or type, can reduce an individual’s ability to function to his/her full potential. Disability can limit an individual’s full participation in a number of activities in life. 87

In an attempt to understand the situation of PWDs as a guide for policy formulation, the Ghana Statistical Service, for the first time, collected specific data on PWDs in the 2010 Population and Housing Census. This chapter discusses the socio-economic and demographic characteristics of PWDs from the data. It describes population with disability, type of disability, distribution by type of locality, disability and activity, and disability, education and literacy.

2.12.1 Population with Disability Generally, there are 3, 633 persons with one form of disability or the other in the District. The number of disable persons in the District (3.1%) is relatively higher than the regional and national figure of 2.6 and 3.0 respectively (Table 6.1). Also there are slightly more males persons (51.8%) with disability than females (48.2%).

2.12.2 Types of Disability Table 6.1 and Figure 6.1 present type of disability with their corresponding shares of the population in the District. The population with some form of disability, visual/sight impairment (36.6%) is the most common disability, followed by physical challenges (23.6%) and emotional problems (16.0%). Visual or sight impairment is also the most common form of disability among both males (35.9%) and females (37.4%).

Figure 2.12: Type of disability

Other 9% Emotion Sight 12% 29%

Intellect 9%

Hearing 11% Physical 18% Speech 12% Source: Ghana Statistical Service, 2010 Population and Housing Census.

88

2.12.3 Distribution by Type of Locality In urban communities, there are 704 persons with disability, representing about 19.4 percent, out of which 320 PWDs are males (3.5%) while 384 are females (3.9%). Persons with sight impairment (42.6%) top the list with 42.6percent, followed by those with emotional problems (24.6%), and physical challenges (23.0%). The lowest proportion is persons with other disability.

On the other hand, there are 2,929 persons with disability, representing 80.6 percent of the rural population. The highest disability rate in the rural communities are persons with visual or sight impairment (35.2%), followed by those with physical challenges (23.8%) and speech disorder (16.1%) while the lowest are persons with intellectual malfunctioning (12.3%), as shown in Table 2.55.

Table 2.55: Population by type of locality, disability type and sex Both sexes Male Female Disability Type Number percent Number percent Number Percent All localities Total 115,378 100.0 58,039 100.0 57,339 100.0 Without disability 111,745 96.9 56,157 96.8 55,588 96.9 With disability 3,633 3.1 1,882 3.2 1,751 3.1 Sight 1,330 36.6 676 35.9 654 37.4 Hearing 530 14.6 262 13.9 268 15.3 Speech 560 15.4 325 17.3 235 13.4 Physical 858 23.6 436 23.2 422 24.1 Intellect 420 11.6 222 11.8 198 11.3 Emotion 581 16.0 283 15.0 298 17.0 Other 397 10.9 199 10.6 198 11.3 Urban Total 18,966 100.0 9,047 100.0 9,919 100.0 Without disability 18,262 96.3 8,727 96.5 9,535 96.1 With disability 704 3.7 320 3.5 384 3.9 Sight 300 42.6 137 42.8 163 42.4 Hearing 74 10.5 27 8.4 47 12.2 Speech 89 12.6 42 13.1 47 12.2 Physical 162 23.0 72 22.5 90 23.4 Intellect 61 8.7 29 9.1 32 8.3 Emotion 173 24.6 78 24.4 95 24.7 Other 34 4.8 21 6.6 13 3.4 Rural Total 96,412 100.0 48,992 100.0 47,420 100.0 Without disability 93,483 97.0 47,430 96.8 46,053 97.1 With disability 2,929 3.0 1,562 3.2 1,367 2.9 Sight 1,030 35.2 539 34.5 491 35.9 Hearing 456 15.6 235 15.0 221 16.2 Speech 471 16.1 283 18.1 188 13.8 Physical 696 23.8 364 23.3 332 24.3 89

Intellect 359 12.3 193 12.4 166 12.1 Emotion 408 13.9 205 13.1 203 14.9 Other 363 12.4 178 11.4 185 13.5 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.12.4 Disability and Activity Status The population 15 years and older is 65,974 of which 4.5% are persons with some form of disability while 95.5% are without disability.

The horizontal analysis of Table 6.2 suggests that, about 7 in ten (1,949) disable persons constituting 66.3 percent are economically active, while 33.7 percent (992) are economically not active. Also, there are 1,905 persons with disability that are employed, representing 97.7%, compared to 2.3 percent of unemployed (44). Moreover, a greater percentage of disable persons is by sight (40.0%), followed by physical and hearing (23.6 and 14.1 respectively). 365 persons, representing 12.4 percent, are also disable with speech in the District. Additionally, almost all persons disable by sight (98.2%), physical (96.8%), hearing (98.2%), including those with speech disability (98.8%) are employed in the District. In contrast, 33.9, 50.2, 32.8 and 29.9 percent of these form of disabilities, respectively, are economically not active.

In terms of sex, there are more disabled males (1,525) representing 51.9 percent than their female counterparts, constituting 7.5 percent (1,416). Also, there are greater percentage of disable males that are employed (1,037) representing 97.6 percent than females (97.9%). From Table 6.2, it can also be construed that, the number of unemployed disable males (30.4%) and females (37.4%) that are not available for work (not economically active) are greater than the disable males (2.4%) and females (2.1%) that are unemployed.

Table 2.56: Persons 15 years and older with disability by economic activity status and sex Sex/Disability All Status Employed Unemployed Economically Not type Active Number Percent Number Percent Number Percent Number Percent Total 65,974 100.0 51,461 100.0 1,458 100.0 13,055 100.0 Without disability 63,033 95.5 49,556 96.3 1,414 97.0 12,063 92.4 With disability 2,941 4.5 1,905 3.7 44 3.0 992 7.6 Sight 1,176 1.8 763 1.5 14 1.0 399 3.1 Hearing 415 0.6 274 0.5 5 0.3 136 1.0

90

Speech 365 0.6 253 0.5 3 0.2 109 0.8 Physical 693 1.1 334 0.6 11 0.8 348 2.7 Intellect 322 0.5 177 0.3 4 0.3 141 1.1 Emotion 478 0.7 310 0.6 8 0.5 160 1.2 Other 305 0.5 208 0.4 6 0.4 91 0.7 Male Total 32,682 100.0 25,877 100.0 635 100.0 6,170 100.0 Without disability 31,157 95.3 24,840 96.0 610 96.1 5,707 92.5 With disability 1,525 4.7 1,037 4.0 25 3.9 463 7.5 Sight 605 1.9 407 1.6 8 1.3 190 3.1 Hearing 194 0.6 141 0.5 3 0.5 50 0.8 Speech 216 0.7 151 0.6 2 0.3 63 1.0 Physical 360 1.1 195 0.8 6 0.9 159 2.6 Intellect 172 0.5 97 0.4 2 0.3 73 1.2 Emotion 242 0.7 162 0.6 5 0.8 75 1.2 Other 148 0.5 108 0.4 3 0.5 37 0.6 Female Total 33,292 100.0 25,584 100.0 823 100.0 6,885 100.0 Without disability 31,876 95.7 24,716 96.6 804 97.7 6,356 92.3 With disability 1,416 4.3 868 3.4 19 2.3 529 7.7 Sight 571 1.7 356 1.4 6 0.7 209 3.0 Hearing 221 0.7 133 0.5 2 0.2 86 1.2 Speech 149 0.4 102 0.4 1 0.1 46 0.7 Physical 333 1.0 139 0.5 5 0.6 189 2.7 Intellect 150 0.5 80 0.3 2 0.2 68 1.0 Emotion 236 0.7 148 0.6 3 0.4 85 1.2 Other 157 0.5 100 0.4 3 0.4 54 0.8 Source: Ghana Statistical Service, 2010 Population and Housing Census.

2.12.5 Disability, Education and Literacy Table 6.3 presents the population three years and older with disability by sex, disability type and level of education. Among persons with disability, about 41 percent (41.1%) had never attended school while over 58 percent (58.9%) had obtained some level of education of which 48 percent had basic (Primary, Middle/JSS/JHS) education. Among persons with hearing impairments, 51.4 percent had 91 never attended school, while, out of those who had any form of education, primary school (20.4) is the highest level majority had attended, followed by middle/JSS/JHS (20.0%).

Only 32.1 percent of males with disabilities had never attended school, and for those who had some form of education, 40 percent of males with sight and emotional problems had attended middle/JSS/JHS which is their highest level. On the other hand, a little more than half (50.8%) of females with various type of disabilities had never been to school. Among those with sight impairments, JSS/JHS is the highest level (24.0%) attended by those who had attended school.

2.13 GENDER

Accessibility to land which is one of the basic determinants of economic opportunities favors men due to cultural factors. Inheritance of property in the family usually favors the male folk.

Participation of women in decision making especially at the Unit, Area Council levels and District Assembly is not encouraging. Women are usually relegated to the background. Here again cultural factors are among some of the reasons for preventing participation of women.

The parity of boys and girls in schools is however encouraging at the Primary and JHS levels of the educational ladder. However, the same cannot be said of the SHS and Tertiary levels.

The implication of these is that more women should be encouraged to take up political appointments at all levels of decision making. Girl-Child education at the SHS and Tertiary levels must also be promoted.

2.14 POPULATION

Every population has its important elements such as the size, composition and structure. The statistics from these indicators thus provide the bases for socio-economic planning at District, regional and nation levels. The fertility, mortality and migration trends affect the population dynamics.

2.14.1 Population Size and Distribution The total population for the District according to the 2010 Population and Housing Census is 115,378 comprising 58,039 (50.3%) males and 57,339 (49.7) females. This gives a sex ratio (i.e. number of

92 males to 100 females), of 101.2 (Table 2.1).More so, the share of the population by type of locality, reveals that 18,966 (16.4%) live in the urban areas as against 96,412 (83.6%) who reside in the rural area. The dependency ratio for the District is 90.2 comprising 92.7 for males and 87.8 for females. Urban and rural localities have their age-dependency ratio as 81.5 and 92.0 respectively.

2.14.2 Age-Sex Structure Figure 2.1 shows the relationship between the age structure and the population distribution by sex.

The results show that Adansi South District has a youthful population (Table 58 and Figure 2.1), consisting of a large proportion (15.6%) of children under 15 years, and a small proportion (4.6%) of elderly persons (65 years and older). The age structure of the District’s population is basically shaped by the effects of high fertility and decreasing mortality rate.

Figure 2.13 :Population pyramid of Adansi South District

85+ 80-84 75-79 70-74 65-69 60-64 55-59 50-54 45-49 Age 40-44 35-39 Male 30-34 25-29 Female 20-24 15-19 10-14 5-9 0-4 10,000 5,000 0 5,000 10,000

Population

Source: Ghana Statistical Service, 2010 Population and Housing Census

93

CHAPTER THREE

LOCAL/ COMMUNITY DEVELOPMENT PLANS

3.0 COMMUNITY NEEDS AND ASPIRATIONS

This section of the report presents problems that were outlined after consultation with the people. The following are the problems and key development issues of the people summarised under the seven (7) thematic areas of the GSGDA II.

Problems Identified:

Ensuring and Sustaining Macroeconomic Stability 1. Inadequate financial support from DA for community initiated projects 2. Low income levels 3. Low revenue mobilization

Enhanced competitiveness of Ghana’s private sector 1. Inadequate financial assistance to support farming 2. Inadequate markets 3. Low price for cocoa beans

Accelerated agricultural modernization and natural resource management 1. Land degradation and pollution of water bodies by mining activities 2. Deforestation by chain saw operators 3. Inadequate cocoa spraying gangs 4. Inadequate cocoa inputs for farmers e.g. fertilizer, chemicals 5. Lack of irrigation facilities 6. Inadequate palm oil extraction machines 7. Low access to improved seeds 8. Low interest of youth in agriculture 9. Under development of tourist sites

Infrastructure and Human Settlements Development 1. Poor drainage system 2. Poor nature of roads 3. Inadequate street lights 4. Soil erosion 5. Inadequate planning schemes for communities 6. Inadequate community centers 7. Lack of electricity in some communities 8. Inadequate staff accommodation (including teachers and nurses) 9. Inadequate health facilities and wards 10. Poor telecommunication network service 94

11. Frequent accidents on some roads

Human development, productivity and employment 1. Inadequate doctors and nurses 2. Long distance covered to attend school 3. Teenage pregnancy 4. Inadequate ICT centers 5. Inadequate trained teachers 6. Inadequate provision of food for some children (school feeding programme) 7. Inadequate employment opportunities 8. Inadequate scholarships for children 9. Inadequate water and sanitation facilities

Transparent and accountable governance 1. Inadequate funds to run unit committees 2. Inadequate law courts 3. Inadequate police posts 4. Inadequate security personnel 5. Inadequate training for Assembly members and unit committee members 6. Increase in social vices 7. Inadequate support to the disabled in society 8. Inadequate training for Assembly members and District Assembly Staff

KEY DEVELOPMENT ISSUES The following issues were outlined after a thorough assessment of the problems identified: Ensuring and Sustaining Macroeconomic Stability 1. Improve financial management of District Assembly revenues 2. Improve revenue generation

Enhancing competitiveness of Ghana’s Private sector 1. Establish database on all private sector operations in the District 2. Improve access to credit support for businesses 3. Improve access to marketing for private sector operations

Accelerated Agricultural Modernization and Natural Resource Management 1. Provision of agro-based industries for palm oil processing 2. Promote re-afforestation and protect the forest 3. Improve access to high yielding seedlings for farmers and better farming practices 4. Improve access to farming inputs 5. Expansion of mass spraying for cocoa 6. Encourage establishment of fish farming and animal rearing

95

7. Expand youth employment programmes especially in agriculture 8. Development of tourist sites 9. Protection of land and water bodies from mining activities

Infrastructure and Human Settlements Development 1. Improve drainage systems 2. Preparation of planning schemes for communities 3. Improve staff accommodation( teachers, health care staff) 4. Improve upon road surface conditions and transport infrastructure 5. Improve upon telecommunication network service 6. Provide additional community centers 7. Expansion of electricity supply

Human Development, Productivity and Employment 1. Improve access to doctors and nurses 2. Improve quality and access to educational infrastructure at all levels 3. Provision of sports facilities 4. Promote family planning methods 5. Improve access to water 6. Improve access to sanitary facilities 7. Create employment opportunities 8. Ensure FCUBE 9. Improve road safety education 10. Enhance access to COCOBOD scholarships

Transparent and Accountable Governance 1. Improve revenue generation 2. Strengthening District Assembly Structures to promote good governance and participation 3. Adequately resource District Planning Coordinating Unit (DPCU) to perform its statutory roles 4. Strengthen public awareness and advocacy on civic rights and responsibilities 5. Provide adequate support to the disabled in society 6. Enforcement of District Assembly by-laws 7. Promotion of cultural activities 8. Provision of adequate security 9. Provide training for Assembly members and District Assembly Staff

Community needs and aspirations identified have been harmonized by relating them to the key gaps/ problems or issues identified under the review of performances of the GSGDA I, the profile and other interventions. To ensure coherence, each community’s needs and aspirations is scored against the key gaps/ problems or issues identified under the review of performance. This is outlined in the table below 96

Table 3.1: HARMONISED COMMUNITY NEEDS/ ASPIRATIONS AND IDENTIFIED KEY DEVELOPMENT ISSUES

Community Needs and Aspirations Identified key development gaps/ problems/ issues Score Thematic Area Ensuring and Inadequate financial support from DA for community Improve financial management of District Assembly 2 Sustaining initiated projects revenues 2 Macroeconomic Low income levels Improve revenue generation 2 Stability Low revenue mobilization Enhancing Inadequate financial assistance to support farming Establish database on all private sector operations in the 2 competitiveness Inadequate markets District 2 of Ghana’s Low price for cocoa beans Improve access to credit support for businesses 2 private sector Improve access to marketing for private sector operations

Accelerated Land degradation and pollution of water bodies by Provision of agro-based industries for palm oil 2 agricultural mining activities processing modernization Deforestation by chain saw operators Promote re-afforestation and protect the forest 2 and sustainable Inadequate cocoa spraying gangs Improve access to high yielding seedlings for farmers 2 natural Inadequate cocoa inputs for farmers e.g. fertilizer, and better farming practices resource chemicals Improve access to farming inputs 2 management Lack of irrigation facilities Expansion of mass spraying for cocoa 2 Inadequate palm oil extraction machines Encourage establishment of fish farming and animal 0 Low access to improved seeds rearing Low interest of youth in agriculture Expand youth employment programmes especially in 2 Under development of tourist sites agriculture Development of tourist sites 2 Protection of land and water bodies from mining 2 activities Infrastructure Poor drainage system Improve drainage systems 2 and Human Poor nature of roads Preparation of planning schemes for communities 2 Settlements Inadequate street lights Improve staff accommodation( including teachers, health 2 Development Soil erosion care staff) Inadequate planning schemes for communities Improve upon road surface conditions and transport 2 Poor telecommunication network coverage infrastructure Inadequate community centers 97 Improve upon telecommunication network service 2

Frequent accidents on some roads Provide additional community centers 2 Lack of electricity in some communities Expansion of electricity supply 2 Inadequate health centers and wards Improve road safety education 2 Inadequate staff accommodation( including teachers, Improve access to health facilities 2 health care staff) Provide additional streetlight bulbs 2 Human Inadequate doctors and nurses Improve access to doctors and nurses 2 development, Long distance covered to attend school Improve quality and access to educational infrastructure 2 productivity Teenage pregnancy at all levels 2 and Inadequate trained teachers Provision of sports facilities 2 employment Inadequate provision of food for some children Promote family planning methods 2 (school feeding programme) Improve access to potable water 2 Inadequate employment opportunities Improve access to sanitary facilities 2 Inadequate scholarships for children Create employment opportunities 2 Inadequate water and sanitation facilities Ensure FCUBE 2 High rate of traditional birth attendant deliveries Enhance road safety education 2 Improve access to COCOBOD scholarships 2 Provide maternal waiting homes 2

Transparent Inadequate funds to run unit committees Improve revenue generation 2 and Inadequate law courts Strengthening District Assembly Structures to promote 2 accountable Inadequate police posts good governance and participation governance Inadequate security personnel Adequately resource District Planning Coordinating Unit 2 Inadequate training for Assembly members and unit (DPCU) to perform its statutory roles committee members Strengthen public awareness and advocacy on civic 2 Increase in social vices rights and responsibilities Inadequate support to the disabled in society Provide adequate support to the disabled in society 2 Enforcement of District Assembly by-laws 0 Promotion of cultural activities 0 Provision of adequate security 2 Provide training for Assembly members and District 0 Assembly Staff Definition Score: Strong relationship -2, Weak relationship -1, No relationship- 0

98

Table 3.2 HARMONISE KEY DEVELOPMENT ISSUES UNDER 2010-2013 S/N NMTDPF 2014-2017 ADOPTED ISSUES THEMATIC AREA 1 Ensuring and Sustaining 1. Improve financial management of District Assembly Macroeconomic Stability revenues 2. Improve revenue generation 2 Enhancing 1. Establish database on all private sector operations in the Competitiveness of District Ghana’s Private Sector 2. Improve access to credit support for businesses 3. Improve access to marketing for private sector operations 3 Accelerated Agricultural 1. Provision of agro-based industries for palm oil Modernization and processing Sustainable Natural 2. Promote re-afforestation and protect the forest Resource Management 3. Improve access to high yielding seedlings for farmers and better farming practices 4. Improve access to farming inputs 5. Expansion of mass spraying for cocoa 6. Encourage establishment of fish farming and animal rearing 7. Expand youth employment programmes especially in agriculture 8. Development of tourist sites 9. Protection of land and water bodies from mining activities 4 Infrastructure and Human 1. Improve drainage systems Settlements 2. Preparation of planning schemes for communities 3. Improve staff accommodation( teachers, health care staff) 4. Improve upon road surface conditions and transport infrastructure 5. Improve upon telecommunication network service 6. Provide additional community centers 7. Expansion of electricity supply 8. Improve additional health care facilities and wards 9. Provide maternal waiting homes 10. Improve quality and access to educational infrastructure at all levels 11. Provision of sports facilities

5 Human Development, 1. Improve access to doctors and nurses Productivity and 2. Promote family planning methods Employment 3. Improve access to water 4. Improve access to sanitary facilities 5. Create employment opportunities 6. Ensure FCUBE

99

7. Improve road safety education 8. Improve access to trained teachers 9. Increase access to COCOBOD scholarships

6 Transparent and 1. Improve revenue generation Accountable Governance 2. Strengthening District Assembly Structures to promote good governance and participation 3. Adequately resource District Planning Coordinating Unit (DPCU) to perform its statutory roles Strengthen public awareness and advocacy on civic rights and responsibilities 4. Provide adequate support to the disabled in society 5. Enforcement of District Assembly by-laws 6. Promotion of cultural activities 7. Provision of adequate security 8. Provide training for Assembly members and District Assembly Staff

100

Table 3.3 Adopted issues of the NMTDPF 2014-2017 linked to the harmonized issues of the GSGDA 2010-2013 S/N NMTDPF 2014-2017 Adopted Issues of NMTDPF 2014-2017 Harmonised Issues 2010-2013 Thematic Area 1 Ensuring and  Weak institutional collaboration for fiscal policy . Improve financial management of District Sustaining management Assembly revenues Macroeconomic  Leakages in revenue collection . Improve revenue generation Stability 2 Enhancing  Informal nature of businesses . Establish database on all private sector operations competitiveness of in the District Ghana’s private sector  Limited access to finance . Improve access to credit support for businesses  Lack of adequate market information . Improve access to marketing for private sector operations 3 Accelerated  Low adoption of technology . Provision of agro-based industries for palm oil agricultural  Negative impact of some farm practices processing modernisation and  Forest destruction by chainsaw operators . Promote re-afforestation and protect the forest sustainable natural  Limited multiplication and production of planting . Improve access to high yielding seedlings for resource management materials and certification of seeds farmers and better farming practices  Inadequate dissemination of information on . Improve access to farming inputs business opportunities along the agriculture value . Expansion of mass spraying for cocoa chain . Encourage establishment of fish farming and  Inadequate investment in the tourism sector animal rearing . Expand youth employment programmes especially  Negative impact of mining on the environment and host communities in agriculture . Development of tourist sites . Protection of land and water bodies from mining activities 4 Infrastructure and  Inadequate Investments in infrastructure in support . Improve drainage systems human settlements of hazard prevention and mitigation . Preparation of layouts for communities development  Haphazard land development . Improve upon road surface conditions and  Poor quality and inadequate road transport transport infrastructure network . Improve telecommunication  Inadequate ICT infrastructure base across the . Provide additional community centers country . Expansion of electricity supply  Inadequate community/social centers especially in the urban areas  Inadequate infrastructure to support the delivery of 101

energy service 5 Human development,  Huge gaps in geographical and financial access to . Improve access to doctors and nurses productivity and quality health care (e.g. urban and rural as well as . Improve access to educational infrastructure at all employment rich and poor) levels  Inadequate and inequitable access particularly after . Improve access to education for people with the basic level and for persons with special needs disability improve upon water and sanitation  Inadequate and poor quality infrastructure and . Provision of sports facilities absence of disability-friendly facilities in . Increase the number of teachers quarters communities and schools . Provide additional accommodation for health care  Weak management and capacity for sports personnel development . Provide additional health facilities and wards  Unacceptably high number of untrained teachers at . Increase the numbers of schools the basic level . Promote family planning methods  Low coverage of reproductive health and family . Increase the number of trained teachers planning (FP) services . Improve upon water and sanitation facilities . Create employment opportunities  Inadequate access to quality and affordable water . Ensure FCUBE  Inadequate access to environmental sanitation facilities  High levels of unemployment and under- employment especially among the youth and groups with special needs  Weak management and supervision

6 Transparent and  Weak leadership and managerial capacity at . Strengthening District Assembly Structures to accountable MMDA level promote good governance and participation governance  Non-functioning sub-District structures . Motivation of Area Council Staff  Limited awareness, advocacy and enforcement of . Strengthen public awareness and advocacy on rights and responsibilities civic rights and responsibilities  Inefficient and ineffective implementation of . Improve service delivery of District Assembly development policies and plans . Inadequate support to the disabled in society  Inadequate social intervention and weak . Adequately resource District Planning coordination of programmes for the vulnerable and Coordinating Unit (DPCU) to perform its statutory excluded roles  Inadequate representation and participation of . Build capacities at District Assembly and Area women in public life and governance Council Staff to ensure good governance and transparency  Inadequate support to the disabled in society 102

. Promote Women’s participation in decision  Ineffective enforcement of laws making processes  Inadequate human and institutional capacity . Enforcement of District Assembly by-laws  Prevalence of fires, floods and other disasters . Provide adequate support to the disabled in society  Limited attention to issues of culture in national . Provision of adequate Security development . Promotion of cultural activities

PRIORITIZATION OF OPPORTUNITIES FOR THE PROMOTION OF CROSS- CUTTING ISSUES TO BE ADDRESSED This section of the MTDPF highlights the relationship between the harmonised issues and their ability to :  impact on a large proportion of citizens  have a significant linkage effect i.e with other sectors of the economy  have a significant multiplier effect on the local economy  have a significant effect on reducing poverty levels of citizens

Table 3.4Harmonised Issues and their effects on citizens and the local economy CRITERIA Impact on Significan Significant Significant Total Large t Linkage Multiplier Effect on Proportions Effect Effect on Reducing HARMONIZED ISSUES of the the Local Poverty Citizens Economy 1. Improve financial management of District Assembly revenues 2 2 2 2 8 2. Improve revenue generation 2 2 2 2 8 3. Establish database on all private sector operations in the District 2 2 2 1 7 4. Improve access to credit support for businesses 2 2 2 2 8 5. Improve access to marketing for private sector operations 2 2 2 2 8 6. Provision of agro-based industries for palm oil processing 2 1 1 2 6 7. Promote re-afforestation and protect the forest 2 2 2 1 7 8. Improve access to high yielding seedlings for farmers and better farming 2 2 2 1 7 practices 9. Improve access to farming inputs 2 2 1 1 6 10. Expansion of mass cocoa spraying for cocoa 2 1 2 1 6 103

11. Encourage establishment of fish farming and animal rearing 2 1 1 1 5 12. Expand youth employment programmes especially in agriculture 2 1 2 2 7 13. Development of tourist sites 2 1 1 1 5 14. Protection of land and water bodies from mining activities 2 1 2 1 6

15. Improve drainage systems 2 1 1 0 4 16. Preparation of planning schemes for communities 2 1 2 0 5 17. Improve staff accommodation( teachers, health care staff) 2 2 1 1 6 18. Improve upon road surface conditions and transport infrastructure 2 2 2 1 7 19. Improve upon telecommunication network service 2 2 2 1 7 20. Provide additional community centers 2 1 1 0 4 21. Expansion of electricity supply 2 2 2 1 7 22. Provide additional wards and health facilities 2 1 1 1 5 23. Improve access to doctors and nurses 2 2 2 1 7 24. Improve quality and access to educational infrastructure at all levels 2 2 2 1 7 25. Provision of sports facilities 2 1 1 1 5 26. Promote family planning methods 2 1 1 1 5 27. Improve access to water 2 2 2 1 7 28. Improve access to sanitary facilities 2 2 2 1 7 29. Create employment opportunities 2 2 2 2 8 30. Ensure FCUBE 2 2 2 1 7 31. Improve revenue generation 2 2 2 2 8 32. Strengthening District Assembly Structures to promote good governance 2 2 2 1 7 and participation 33. Adequately resource District Planning Coordinating Unit (DPCU) to 2 2 2 1 7 perform its statutory roles 34. Strengthen public awareness and advocacy on civic rights and 2 2 1 1 6 responsibilities 2 2 2 2 8 35. Provide adequate support to the disabled in society 2 2 2 0 6 36. Enforcement of District Assembly by-laws 2 1 1 1 5 37. Promotion of cultural activities 2 2 2 1 7 38. Provision of adequate security

104

Table 3.5 Potential, Opportunity Constraints and Challenges (POCC) ANALYSIS Program/ Project Potential Opportunities Constraints Challenges Ensuring and sustaining macro-economic stability Improve revenue generation Availability of laid down Training from RCC and Inadequate funds Untimely release of procedures on public NDPC funds from central gov’t spending Availability of skilled personnel Improve financial Availability of laid down External auditors Bureaucratic procedures Untimely release of management of District procedures on public Training by RCC/ NDPC, Inadequate funds for funds from central gov’t assemblies revenues spending etc regular training Availability of skilled personnel Enhancing competitiveness of Ghana’s private sector Establish data base on all Implementation of street Favourable government Inadequate funds Unreliable electricity private sector operations in naming and property policy supply and network for the District addressing system Availability of software communication Availability of skilled developers personnel and logistics

Improve credit support for Presence of banks and Availability of NBSSI Lack of collateral Inflation businesses other financial institutions Absence of business Delay in approval and Presence of cooperative advisory board granting of loans credit union Improve access to Availability of markets Availability of technology Poor nature of roads Inflation marketing for private sector Availability of land for to preserve products High cost of production Low educational levels operations new markets Availability of radio/ TV Inadequate market stalls of producers Patronage of markets by stations and warehouses Competition from other consumers producers Presence of information centres

105

Accelerated agricultural modernization and sustainable natural resource management Availability of labour Availability of export Inadequate potable water Unreliable electricity Provision of agro- based Availability of oil palm opportunity supply industries for palm oil plantations Improved technology for Availability of fertile land production for cultivation of oil palm Support from other trees investors

Promote re-afforestation Presence of Forestry Availability of seedlings for Inadequate funds Illegal timber felling and and protect the forest Services Division tree planting Lack of commitment political influence when Availability of land Availability of improved from forest guards arrests are made Favourable climate technology Inadequate logistics Presence of forest guards Availability of security Presence of community personnel (Military and watchdog committees Police) Improve access to high Presence of Agric. Dept. Availability of seeds Inadequate funds Increment in prices of yielding seedlings for Availability of extension Availability of improved Low technical know-how seeds/ seedlings farmers and better farming officers technology of farmers practices

Improve access to farming Presence of Agric Dept. Availability of chemical Uneven distribution of Untimely supply of inputs Availability of fertilizer shops farm inputs inputs from central collection point in New Collection of inputs from gov’t Edubiase Ansa (Adansi North) Expansion of mass spraying Availability of spraying Availability of chemical Office responsible Untimely supply of for cocoa gangs shops located in Obuasi premix fuel from central Availability of premix fuel Municipal gov’t Inadequate premix fuel Encourage establishment of Availability of land for Availability of animals and Inadequate capital Inflation fish farming and animal farming fishlings Inadequate financial rearing Interest of people in the Availability of drugs and support from banks activity other supplements Availability of pasture Presence of Agric. Dept. 106

and extension officers Expand youth employment Interest of the youth in Availability of books and Inadequate funds for programmes especially in agriculture research materials training agriculture Availability of fertile lands Availability of Agric. for cultivation institutions Presence of Agric. Dept. Availability of books and other materials Development of tourist sites Availability of forest Presence of Wild Life Inadequate budgetary Inadequate funds from reserves, water bodies and Conservation Dept. allocation central gov’t other tourist sites Support from Ministry of Presence of FSD Tourism Presence of skilled Support from other personnel interested organisations Infrastructure and Human Settlements Protection of land and water Presence of DISEC Support from Ministry Inadequate logistics for Interference from bodies from mining Presence of Environmental Support from Minerals monitoring “influential people” activities Health Dept. Commission Inadequate funds for fuel when arrests are made Presence of Immigration Officers Preparation of planning Presence of Physical Improved technology Inadequate logistics “ schemes for communities Planning Dept. Support from TA Available logistics Provide additional staff Presence of Works Dept. Support from Ministry of Inadequate funds “ accommodation (teachers Availability of land Water Resources, Works & and health care staff) Budgetary allocation Housing Improve upon road surface Presence of Engineers Support from Ministry of Inadequate funds to fuel Inadequate funds from conditions and transport ( Feeder Roads and Works) Roads and Highways grader central gov’t and its infrastructure Availability of grader High cost of maintaining untimely release the grader Improve telecommunication Presence of Support from National Poor network coverage “ network service telecommunication Communications Authority networks ICT facility and internet café 107

Provide additional Availability of land Funds from NGOs Inadequate funds community centres Budgetary allocation Availability of skilled personnel Expansion of electricity Presence of ECG District Support from Ministry of Office Energy “ Human Development, Productivity and Employment

Improve access to doctors Willingness of personnel to Support from Ministry of Inadequate Untimely postings of and nurses work in the District Health accommodation and personnel Presence of DHD Support from International other infrastructure Organisations Improve quality and access Budgetary allocation Support from Ministry of Inadequate funds to Inadequate funds from to educational infrastructure Presence of DED Education complete projects on central gov’t at all levels schedule Improve upon water and Presence of Environmental Availability of waste Inadequate funds Untimely release of sanitation Health Office management companies Indiscriminate littering funds from central gov’t Presence of WATSAN in Support from Ministry by inhabitants communities Support from Zoomlion Budgetary allocation Availability of borehole Presence of Zoomlion drilling companies Availability of land for Availability of improved dump sites technology Availability of Small Town Support from NGOs and Water System other donors High water table Promote Family Planning Budgetary allocation Support from Ministry of Inadequate funds Methods Presence of DHD Health and UNFPA “ Provision of sports facilities Presence of a premier Support from Ministry of Inadequate funds division football club Youth & Sports “ Interest of the youth in Support from other sports sponsors/ donors Availability of land for dev’t 108

Create employment Willingness of community Availability of financial Inadequate start-up Inflation opportunities to venture into new areas institutions capital Availability of skilled Availability of NBSSI/ BAS personnel Ensure FCUBE Interest of parents Support from GES Interest of children to stay “ “ in school Presence of DEOC Transparent and accountable governance Strengthening District Availability of skilled Availability of funds Inadequate funds Untimely release of Assembly Structures to personnel Support from central gov’t By-laws yet to be funds promote good governance Budgetary allocation Availability of training gazetted and participation. Enactment of DAs by-laws materials Consultants Improve revenue generation Availability of revenue Favourable government Inadequate revenue Inadequate funds from collectors policies collectors central government Availability of qualifies Availability of revenue Reluctance to pay rates/ Deductions made at staff collection agencies fees source to DACF, DDF, Implementation of street Leakages in revenue etc naming and property collection Untimely release of addressing system Inaccessibility to some funds to DA Availability of rateable communities items Inadequate public education Unwillingness of businesses to register with DA Strengthen public awareness Presence of NCCE, Support from Ministry Inadequate funds and advocacy on civic rights CHRAJ, ISD and Availability of FM stations, and responsibilities. information centres TV stations Budgetary allocation Resource persons Presence of skilled personnel Adequately resource Budgetary allocation Support from MLGRD Inadequate funds Untimely release of District Planning Available logistics and Inadequate logistics funds from central gov’t Coordinating Unit (DPCU) office space including vehicles 109 to perform its statutory roles Skilled personnel

Provide adequate support to Presence of Social Welfare Support from NGOs e.g Inadequate funds Untimely release of the disabled in society and Community Dev’t CEDEP funds Department Support from Ministry Budgetary allocation Enforcement of District Enactment of by-laws Legal backing Inadequate funds to Bureaucratic process in Assembly by-laws Presence of skilled gazette by-laws gazetting by-laws personnel Availability of logistics Budgetary allocation Provision of adequate Interest of security Support from Ministry Inadequate security Untimely postings of Security personnel in working in the Availability of prisons personnel personnel District Availability of other courts Inadequate logistics e.g. Inadequate funds from Availability of logistics Availability of lawyers vehicles central gov’t and its Budgetary allocation untimely release Availability of a magistrate court Presence of community watchdog committees Presence of security personnel (police, immigration, fire service) Promotion of cultural Interest of inhabitants in Centre for National Culture Inadequate funds activities. cultural activities in Kumasi “

Provide training for Availability of venue for Consultants Inadequate funds “ Assembly members and training Support from NDPC/ RCC District Assembly Staff Budgetary allocation

110

Table 3.6 ADOPTED DEVELOPMENTAL ISSUES/ STRATEGIES S/N NMTDPF 2014-2017 Adopted Issues of NMTDPF Harmonised Issues 2010- Adopted Policy Adopted Strategies Thematic Area 2014-2017 2013 Objectives 1 Ensuring and Weak institutional Improve financial Improve public Review the administrative Sustaining collaboration for fiscal management of District expenditure framework for earmarked Macroeconomic policy management Assembly revenues management funds to ensure efficiency in Stability the management of public funds Leakages in revenue Improve revenue generation Improve the legislative and collection institutional framework for budget formulation and implementation 2 Enhancing Informal nature of Establish database on all Improve efficiency Facilitate the provision of Competitiveness of businesses private sector operations in and competitiveness training and business Ghana’s Private the District of MSMEs development services Sector Limited access to finance Improve access to credit Expand access to both Promote regional and intra- support for businesses domestic and regional trade Lack of adequate market Improve access to marketing international markets information for private sector operations 3 Accelerated Inadequate access to Inadequate support for the Improve Agriculture Provide appropriate Agricultural appropriate financial establishment of fish farming Financing framework to ensure Modernisation and products and animal rearing adequate flow of financial Sustainable Natural resources to the agriculture Resource and aquaculture Management Low adoption of technology Provision of agro-based Improve science, Improve the effectiveness of industries for palm oil technology and Research-Extension-Farmer processing innovation application Linkages (REFLs) and integrate the concept into the agriculture research system to increase participation of end users in technology development Forest destruction by Promote re-afforestation and Reverse forest and Intensify implementation of chainsaw operators protect the forest land degradation national forest plantation development programme Negative impact of mining Protection of land and water Promote sustainable Enforce compliance of

111

on the environment and host bodies from mining activities extraction and use of relevant regulations and communities mineral resources guidelines on small scale mining Inadequate investment in the Development of tourist sites Diversify and expand Strengthen collaboration tourism sector the tourism industry and coordination among key for economic stakeholders to develop the development tourism sector 4 Infrastructure and Inadequate Investments in Improve drainage systems Promote proactive Human Settlements infrastructure in support of planning for disaster Development hazard prevention and prevention and mitigation mitigation

Haphazard land Preparation of planning Improve and Review building codes and development schemes for communities accelerate housing planning laws and delivery in the rural strengthen institutions to areas enforce them within urban settlements and rural areas

Promote orderly growth of settlements through effective land use planning and management Huge housing deficit Inadequate staff Increase access to Promote the manufacture accommodation (teachers and adequate, safe, secure and use of standardised health) and affordable shelter local building materials and appropriate technologies in housing including use of bricks, tiles and pozzolana cement in the construction industry Provide support for private sector involvement in the delivery of rental housing Poor quality and inadequate Improve upon road surface Establish Ghana as a Improve and develop the road transport network conditions and transport transportation hub for physical infrastructure infrastructure the West African sub- across all modes for region transport 112

Inadequate ICT Promote rapid Create the enabling infrastructure base across Improve telecommunication development and environment to promote the the country network service deployment of the mass use of ICT national ICT infrastructure Inadequate community/social Provide additional community Develop social, Develop and maintain centres especially in the urban centres community and community and social areas recreational facilities centres countrywide

Inadequate infrastructure to Expansion of electricity Provide adequate, Increase access to energy by support the delivery of energy supply reliable and affordable the poor and vulnerable service energy to meet the national needs and for export

5 Human Huge gaps in geographical and Improve access to doctors and Bridge the equity gaps Strengthen the District and Development, financial access to quality health nurses in access to health care sub-District health systems Productivity and care (e.g. urban and rural as as the bed-rock of the Employment well as rich and poor) national primary health care strategy Inadequate and poor quality Improve quality and access to Increase inclusive and Remove the physical, infrastructure and absence of education at all levels equitable access to, financial and social barriers disability-friendly facilities in and participation in and constraints to access to communities and schools education at all levels education at all levels Unacceptably high number of untrained teachers at the basic level Weak management and capacity Provision of sports facilities Provide adequate and Rehabilitate existing and for sports development disability friendly construct new sports infrastructure for infrastructure and provide sports in communities sports equipment at all and schools levels

Low coverage of reproductive Promote family planning Reinforce family Expand coverage, health and family planning (FP) methods planning as a priority availability and accessibility services in national of reproductive health and 113

development Family Planning services including adolescents/youth Inadequate access to quality and improve access to water Accelerate the Ensure sustainable funding affordable water provision of adequate, for rural water delivery safe and affordable water Inadequate access to Improve access to sanitary Accelerate the Review, gazette and enforce environmental sanitation facilities provision of improved MMDAs bye-laws on facilities environmental sanitation sanitation facilities Facilitate the acquisition of land for the development of engineered land-fill sites for the treatment and disposal of solid and liquid waste in all major cities and towns

High levels of unemployment Create employment Improve the policy, Ensure integration of and under-employment opportunities environment and employment issues in especially among the youth and institutional capacity policies and programmes at groups with special needs for effective human all levels capital development, and employment policy management

Weak management and Advance the supervision Ensure FCUBE implementation of the Ensure the implementation compulsory of the compulsory component of FCUBE component of the Free Compulsory Universal Basic Education (FCUBE) 6 Transparent and Weak financial base and Improve revenue generation Ensure effective and Improve the capacity of Accountable management capacity of the efficient resource finance and administrative Governance District Assemblies mobilisation, internal staff of MMDAs revenue generation and resource management Non-functioning sub-District Strengthening District Ensure effective Enforce compliance of LI. 114 structures Assembly Structures to implementation of the 1967 promote good governance and decentralisation policy participation and programmes Limited awareness, advocacy Strengthen public awareness Strengthen and Intensify and sustain and enforcement of rights and and advocacy on civic rights promote the culture of awareness of rights and responsibilities and responsibilities rights and responsibilities at all levels responsibilities Inefficient and ineffective Adequately resource District Strengthen policy Strengthen engagement implementation of development Planning Coordinating Unit formulation, between Assembly policies and plans (DPCU) to perform its development planning, members and citizens statutory roles and M&E processes Build capacity of MDAs for equitable and and MMDAs in the public balanced spatial and policy and planning socio- economic processes including development considerations for gender and women empowerment Inadequate social intervention Provide adequate support to Ensure equity and Strengthen institutions to and weak coordination of the disabled in society social cohesion at all programme and offer programmes for the vulnerable levels of society support to the vulnerable and excluded and excluded at all levels Enhance coordination and implementation of social protection initiatives for the vulnerable and excluded at all level Ineffective enforcement of laws Enforcement of District Enhance public Strengthen the Assembly by-laws confidence in the administrative structures of justice delivery and the Legal Service administrative systems Limited attention to issues of Promotion of cultural Harness culture for Mainstream culture in the culture in national development activities national development nation’s social and economic development agenda Inadequate human and Provision of adequate Improve internal Improve internal security institutional capacity Security security for protection for protection of life and of life and property property

115

SUSTAINABILITY ANALYSIS OF PROGRAMMES / PROJECTS After a comprehensive analysis of policy objectives, each developed strategy was analysed suing the sustainability test tool. The tool has three criteria for assessment namely; economic, social and environmental sustainability. The table below shows a the various development strategies and their score. S/N Strategy/ Activity Economic Social Environmental Total Average Sustainability Sustainability Sustainability 1 Revalue property 4 4 4 12 4 2 Prepare District Composite Budget 4 4 5 13 4.3 3 Create data base on revenue items 4 4 5 13 4.3 4 Construct market stalls 5 5 3 13 4.3 5 Renovate and expand markets 5 5 3 13 4.3 6 Support street naming exercise 4 4 3 11 3.7 7 Organise training for MSMEs 4 5 4 13 4.3 8 Organise training for farmers in accessing financial support 4 4 4 12 4 9 Facilitate cocoa spraying programme 4 4 3 11 3.7 10 Provide extension services to farmers 4 4 5 13 4.3 11 Organise training for AEA’s annually 4 4 4 12 4 12 Provide extension knowledge and vaccination in livestock 4 4 4 12 4 production 13 Plants trees in affected communities 4 5 5 14 4.6 14 Monitor activities of illegal lumbering/ chainsaw activities 4 4 5 13 4.3 15 Organise training for small scale mining companies in the District 4 4 4 12 4 16 Monitor activities of small scale mining companies 4 4 4 12 4 17 Engage private sector and other stakeholders in development of 5 4 4 13 4.3 tourist sites 18 Support NADMO to perform its functions of disaster prevention and 4 5 4 13 4.3 management annually 19 Renovate and maintain staff quarters 4 5 3 12 4 20 Construct 10No. Teachers Quarters 4 5 3 12 4 21 Construction of Dormitories for Women and Children 4 5 3 12 4 22 Prepare planning schemes for communities 4 4 4 12 4 23 Construct drains to improve upon the drainage system 4 4 4 12 4 24 Construct 2 No. Staff Quarters at New Edubiase 4 5 3 12 4 116

25 Repair and maintain 80 km feeder/ access roads 4 4 3 11 3.7 26 Expansion and maintenance of lorry parks 5 4 3 12 4 27 Construction of culverts 4 4 3 11 3.7 28 Service and repair 14 No. computers and accessories, photocopier 4 4 4 12 4 and intercom annually 29 Provide low tension poles to extend electricity to selected 5 5 3 13 4.3 communities 30 Construct CHPS Compound 4 4 3 11 3.7 31 Construct additional wards for Health Centre 4 5 3 12 4 32 Provide maternal waiting homes 4 5 3 12 4 33 Construct sheds and toilets for NHIS office 4 5 3 12 4 34 Construct 1 No. 6 Unit Classroom Block 4 5 3 12 4 35 Construct 10 No.3 Unit Classroom Block 4 4 3 11 3.7 36 Education fund disbursed to needy students 4 5 3 12 4 37 Construct 1 No.12 Unit Classroom block with ancillary facilities 4 4 3 11 3.7 38 Construct 5 No.6 Unit Classroom Block 4 4 3 11 3.7 39 Construct 1 No. 3 Unit Classroom with ancillary facilities 4 5 3 12 4 40 Rehabilitation of 10 No. Schools 4 5 3 12 4 41 Organise mass education meetings annually 4 4 3 11 3.7 42 Support the development of sports in the District annually 5 4 3 12 4 43 Facilitate school feeding programme 5 5 3 13 4.3 44 Organise workshop on Family Planning Methods 5 5 3 13 4.3 45 Subsidise FP methods 5 5 3 13 4.3 46 Support WATSAN and other agencies in potable water delivery 5 5 3 13 4.3 47 Provide for fumigation and sanitation 4 4 5 13 4.3 48 Clearing of final dump sites 4 4 5 13 4.3 49 Construction of K.V.I.Ps 5 4 4 13 4.3 50 Construct 1 No. 14 Seater Water Closet with mechanised borehole 4 4 3 11 3.7 51 Support District Response Initiative (Malaria Control Programme) 4 4 3 11 3.7 annually 52 Pay transfer grants to officials posted to the District 4 4 3 11 3.7 53 Pay responsibility allowance to staff 4 4 3 11 3.7 54 Ensure minor repair/ maintenance of office machines and furniture 4 4 3 11 3.7 55 Purchase adequate stationary for office use annually 4 4 3 11 3.7 56 Print calendars and other materials annually 4 4 3 11 3.7 57 Procure office facilities and furniture for the Assembly office every 4 4 3 11 3.7 117

year 58 Purchase 10 newspapers and publications to offices and library daily 4 4 3 11 3.7 59 Provide refreshment items to the Assembly office 4 4 3 11 3.7 60 Provide protocol fuel to Assembly officials and official guests for 4 4 3 11 3.7 official duties throughout the year 61 Organise workshops and other training programmes for Assembly 4 5 3 12 4 staff, Assembly members, Heads of Department annually 62 Organise end of year best worker award and staff durbars 4 5 3 12 4 63 Sponsor Assembly staff, Assembly members and others to attend 4 5 3 12 4 workshop and other training programmes throughout the year 64 Provide for travelling and transport for staff who perform official 4 4 3 11 3.7 duties 65 Maintain and repair official vehicle and Assembly grader 4 5 3 12 4 66 Engage consultants to train relevant staff of the Assembly and 4 4 3 11 3.7 Assembly members 67 Screening of food vendors 5 5 3 13 4.3 68 Support DEOC in its activities 4 5 3 12 4 69 Provide adequate value books for revenue collection 5 4 3 12 4 70 Give logistics to revenue collectors 5 5 3 13 4.3 71 Organise revenue mobilisation campaign and education quarterly 4 4 3 11 3.7 each year 72 Revise and gazette fee-fixing resolutions annually 5 4 3 12 4 73 Pay commission to commissioned collectors 5 5 3 13 4.3 74 Organise stakeholders meetings / public fora 4 4 3 11 3.7 75 Ensure effective implementation of DPCU activities 4 5 3 12 4 76 Preparation of District Medium Term Development Framework 4 4 3 11 3.7 77 Pay utility bills for the Assembly 4 5 3 12 4 78 Purchase building materials to support community initiated projects 4 5 3 12 4 79 Support Town/ Area Councils in performing their duties 4 5 3 12 4 80 Implement MP constituency programmes and projects annually 4 5 3 12 4 81 Organise quarterly Heads of Department meetings 4 4 3 13 4.3 82 Publish Assembly activities and gazette by-laws 5 5 3 13 4.3 83 Monitor and evaluate District Assembly projects 4 4 3 11 3.7 84 Support HIV/AIDS (MSHAP) annually 4 4 3 11 3.7 85 Organise site inspections throughout the year 4 4 3 11 3.7 86 Implement Disability Fund 4 5 3 12 4

118

87 Support paupers, children and physically challenged annually 4 5 3 12 4 88 Support Traditional Authorities Allowance 4 4 3 11 3.7 89 Organise 4 Official National Day Celebrations 4 5 3 12 4 90 Construct 1 No.4 Unit Police Staff Quarters 5 5 3 13 4.3 91 Provide legal/security expenses of the Assembly 4 4 3 11 3.7 92 Organise monthly District Security Committee (DISEC) meetings 4 4 3 11 3.7 93 Procure insurance cover for Assembly official vehicles and valuable 4 5 3 12 4 properties 94 Organise a road safety campaign 4 5 3 12 4 95 Support UNFPA Sixth Country Programme 4 4 3 11 3.7 96 Renovation of District Health Directorate Offices 4 5 2 11 3.7 97 Organise a workshop on the role of Judiciary in development 4 5 3 12 4 98 Renovate and maintain Assembly Guest House 5 5 2 12 4 99 Construct community centres 4 5 2 11 3.7 100 Organise a training on fire prevention and management 4 4 3 11 3.7 101 Construct 1 No. 3 Unit teachers quarters 4 4 3 11 3.7 102 Renovate and maintain Assembly centres 5 5 3 13 4.3 103 Provide a quantity of streetlight bulbs 4 4 3 11 3.7 104 Procure septic tank emptier 5 5 4 14 4.6 Total 415 473 321 Average 3.9 4.5 3 3.8 Score: 5- Strongly support the aim 4- Supports the aim 3- On balance. Has a neutral effect on the aim 2- Works against the aim 1- Works strongly against the aim

The results of the sustainability test show an average of 3.8 which shows a strong relationship Thus when the programmes and projects are implemented there will be economic sustainability, social sustainability and environmental sustainability.

119

CHAPTER FOUR

PROGRAMME OF ACTION

This chapter outlines the development programmes under the MTDPF 2014-2017 of Adansi South District Assembly. It shows the programmes/ projects under the various thematic areas of the NMTDPF, the indicative budget, sources of funds and stakeholder responsible. The time frame is also indicated in the table.

SECTOR LOCATION TIME FRAME INDICATIVE INDICATORS SOURCES OF FUNDING IMPLEMENTI BUDGET NG DEPT OF DA 2014 2015 2016 2017 IGF GOG Dono DAC Lead Colla / r F bo. DDF Thematic Area: Ensuring and Sustaining Macroeconomic Stability District Goal: Promoting and Sustaining Efficient Public Expenditure Objective: Improve Public Expenditure Management Re-value property DA 40,000.00 Property √ Central DA revaluation Admin. completed Prepare District Composite DA 20,000.00 District Composite √ Central DA Budget Budget prepared Admin. Create a data base on revenue DA 10,000.00 Data base on √ Central DA items revenue items Admin. created

Thematic Area: Enhancing competitiveness of Ghana’s private sector District Goal: Enhancing Sustained MSMEs Performance Objective :Expand access to both domestic and international markets Construct market stalls/ stores Adansi 300,000.00 Market stalls 10. 10,0 10,00 Works DA Praso, constructed 000 00.0 0.00 Dept. N/E Mk. .00 0 Wuruyie Jun. Akrofuom 120

Renovate and expand Subriso, 100,000.00 Market renovated √ Works DA markets Akrofuom Dept. Support street naming District 80,000.00 Street naming 40, 40,00 Physical DA exercise Wide implemented 000 0.00 Plannin .00 g Dept.

Objective : Improve efficiency and competitiveness of MSMEs Organise Training for District 20,000.00 MSMEs trained √ Central DA MSMEs Wide Admin.

Thematic Area: Accelerated agricultural modernisation and sustainable natural resource management District Goal: Sustained Agricultural Production and Natural Resource Management Objective: Improve Agriculture Financing Organise training for farmers District 10,000.00 Farmers trained on 5,0 5,000 Agric. DA in accessing financial support Wide how accessing 00. .00 Dept. financial support 00 Objective: Improve science, technology and innovation application Facilitate cocoa spraying District 50,000.00 Cocoa spraying 10, 10,0 10,0 20,00 Agric. DA programme Wide facilitated 000 00.0 00.0 0.00 Dept. .00 0 0 Provide extension services to District 20,000.00 Extension services 10,0 10,00 Agric. farmers Wide provided to 00.0 0.00 Dept. farmers 0 Organise training for AEA’s District 20,000.00 Training organised 10, 10,0 Agric. DA annually Wide for AEAs 000 00.0 Dept. .00 0 Provide extension knowledge District 20,000.00 Vaccination given 10,0 10,00 Agric. DA and vaccination in livestock Wide to livestock 00.0 0.00 Dept. production 0 Objective: Reverse forest and land degradation Plants trees in affected District 30,000.00 Trees planted in 10, 20,00 FSD DA communities Wide communities 000 0.00 .00 Monitor activities of illegal District 20,000.00 Forest activities √ FSD DA lumbering/ chainsaw activities Wide monitored

121

Objective: Promote sustainable extraction and use of mineral resources Organise training for small New 10,000.00 Training organised √ Central DA scale mining companies in the Edubiase for small scale Admin. District mining companies Monitor activities of small District 20,000.00 Mining companies 10, 10,00 Central DISE scale mining companies Wide monitored on their 000 0.00 Admin C activities .00

Objective: Diversify and expand the tourism industry for economic development Engage private sector and Bonkro, 30,000.00 Stakeholders 10,0 20,00 Central DA/ other stakeholders in Birim Aboi, consulted in 00.0 0.00 Admin FSD/ development of tourist sites Hwidiem developing tourist 0 NGO sites s/ TA

Thematic Area: Infrastructure and Human Settlements Development District Goal: Objective: Promote proactive planning for disaster prevention and mitigation Support NADMO to perform District 20,000.00 NADMO √ NADMO DA its functions of disaster Wide supported in its prevention and management activities annually Organise a training on fire District 15,000.00 Training on fire √ GNFS DA prevention and management Wide prevention and management organised

Objective: Improve and accelerate housing delivery in the rural areas Renovate and maintain staff New 100,000.00 Staff quarters √ Works DA quarters Edubiase renovated and Dept. maintained Construct 1 No.3 Unit Akrofuom 80,000.00 1No. 3 unit √ Works DA teachers quarters teachers quarters Dept. constructed Construct 10 No. Teachers District 2,000,000.00 10 No. teachers 1,50 500,0 Works DA quarters Wide quarters 0.00 00.00 Dept. constructed 0.00

122

Construction of Dormitories Akrofuom 400,000.00 Dormitories for √ Works DA for Women and Children women and Dept. children constructed Prepare planning schemes for New 80,000.00 Layouts for √ Physical DA/ communities Edubiase, settlements Planning TA Akrofuom, prepared Dept. Apagya, Atobiase, Amudurasi, Praso, etc. Construct drains to improve District 100,000.00 Drains constructed 50,0 50,00 Works DA upon the drainage system Wide in communities 00.0 0.00 Dept. 0 Objective: Increase access to adequate , safe, secure and affordable shelter Construct 2 No. Staff New 200,000.00 2 No. Staff √ Works DA Quarters at New Edubiase Edubiase Quarters Dept. constructed

Objective : Establish Ghana as a transportation hub for the West African sub-region Repair and maintain 80 km District 40,000.00 Feeder and access 200 200,0 Feeder DA feeder/ access roads Wide roads maintained ,00 00.00 Rds. 0.0 Dept. 0 Expansion and maintenance New 80,000.00 Lorry parks 20,0 60,00 Works DA of lorry parks Edubiase, expanded and 00.0 0.00 Dept. Akrofuom maintained 0 Construction of culverts Tonkoase, 120,000.00 Culverts 60,0 60,00 Works DA Boatenkrom constructed 00.0 0.00 Dept. Akrofuom, 0 Denyameso, Old Asaman

Objective: Promote rapid development and deployment of the national ICT infrastructure Service and repair 14 No. DA 10,000.00 Computers and 5,0 5,000 Central DA computers and accessories, accessories, 00. .00 Admin. photocopier and intercom photocopier and 00 123 annually intercom serviced

Objective: Develop social, community and recreational facilities Renovate and maintain New 40,000.00 Assembly Guest √ Works DA Assembly Guest House Edubiase House maintained Dept. Construct community centres District 100,000.00 Community 50, 50,00 Wide centres constructed 000 0.00 .00

Objective :Provide adequate, reliable and affordable energy to meet the national needs and for export Provide low tension poles to District 150,000.00 Electricity √ ECG DA extend electricity to selected Wide extended to communities communities Provide a quantity of street District 60,000.00 Street light bulbs √ Works DA light bulbs to communities Wide provided Dept. Thematic Area: Human Development, Productivity and Employment District Goal: Objective: Bridge the equity gaps in access to health care Construct CHPS Compound Tweapiase, 600,000.00 CHPS Compound √ Works DA Mprechre constructed Dept. and other two communitie s Construct additional wards for Ataase 120,000.00 Additional wards 60,0 60,00 Works DA Health Centre constructed 00.0 0.00 Dept. 0 Provide maternal waiting All health 30,000.00 Maternal waiting 15,0 15,00 Works DA homes centers homes provided 00.0 0.00 Dept. 0 Construct sheds and toilet New 10,000.00 Shed and toilets √ Works DA facilities for NHIS office Edubiase constructed Dept.

Objective: Increase inclusive and equitable access to, and participation in education at all levels Construct 1 No. 6 Unit Akrofuom 100,000.00 1No. 6 Unit √ Works DA Classroom Block Classroom Block Dept. constructed 124

Construct 10 No.3 Unit Ankaase, 1,500,000.0 10 No.3 Unit 1,00 500,0 Works DA Classroom Block Kramokrom 0 Classroom Blocks 0,00 00.00 Dept. , Ataase constructed 0.00 Nkwanta, Samamkro m and other communitie s Education fund disbursed to District 20,000.00 Education fund √ DED DA needy students Wide provided Construct 1 No.12 Unit New 640,000.00 1 No. 12 Unit √ Works DA Classroom block with Edubiase Classroom Block Dep. ancillary facilities Methodist with ancillary facilities constructed Construct 5 No.6 Unit District 1,000,000.0 5 No.6 Unit 600, 400,0 Works DA Classroom Block Wide 0 Classroom Blocks 000. 00.00 Dept. constructed 00 Construct 1 No. 3 Unit Avornyokro 100,000.00 1 No. 3 Unit √ Works DA Classroom with ancillary m Classroom Block Dept. facilities constructed Rehabilitation of 10 No. District 300,000.00 10 No. Schools √ Works DA Schools Wide rehabilitated Dept. Organise mass education District 10,000.00 Mass education 5,0 5,000 SW&CD DA meetings annually Wide meetings 00. .00 organised 00

Objective: Provide adequate and disability friendly infrastructure for sports in communities and schools Support the development of District 20,000.00 Sports √ Central DA sports in the District annually Wide development Admin. supported Facilitate school feeding District 1,772,000.0 School feeding √ NSFP/ DA programme Wide 0 program facilitated DED

Objective: Reinforce family planning as a priority in national development Organise workshop on Family District 20,000.00 Workshop 10,0 10,00 DHD DA Planning Methods Wide organised 00.0 0.00 125

0 Subsidise FP methods District 10,000.00 FP methods 5,00 5,000 DHD DA Wide subsidised 0.00 .00

Objective: Accelerate the provision of adequate, safe and affordable water Support WATSAN and other District 100,000.00 Potable water √ Works DA agencies in potable water Wide provided Dept. delivery

Objective: Accelerate the provision of improved environmental sanitation facilities Provide for fumigation and District 848,000.00 Sanitation and √ Environ DA sanitation Wide fumigation mental. provided Health Dept. Clearing of final dump sites District 100,000.00 Dump sites cleared √ “ DA Wide Construction of K.V.I.P Tonkoase, K.V.I.Ps √ Works DA Hwidiem, constructed Dept. Suminam, Akrofuom 300,000.00 East, Kojo Yentumi, Wuruyie, Nana Okai, Yaa Dome, Anokyekro m Construct 1 No. 14 Seater New 90,000.00 1 No. 14 Seater DDF Works DA Water Closet with Edubiase WC constructed Dept. mechanised borehole Market Procure septic tank emptier DA 120,000.00 Septic tank DDF √ Central DA emptier procured Admin. Support District Response District 25,000.00 Malaria Control √ AGA DA Initiative (Malaria Control Wide Program supported Mal Programme) annually

Objective: Improve the policy, environment and institutional capacity for effective human capital development, and employment policy 126

Pay transfer grants to officials DA 20,000.00 Transfer grants √ Central DA posted to the District provided Admin. Pay responsibility allowance DA 10,000.00 Responsibility √ Central DA to staff allowance paid Admin. Ensure minor repair/ DA 10,000.00 Office machines √ Central DA maintenance of office and furniture Admin. machines and furniture repaired Purchase adequate stationary DA 20,000.00 Stationary √ Central DA for office use annually purchased for use Admin. Print calendars and other DA 10,000.00 Calendars printed √ Central DA materials annually Admin. Procure office facilities and DA 100,000.00 Office facilities √ Central DA furniture for the Assembly and furniture Admin. office every year provided Purchase 10 newspapers and DA 10,000.00 Newspapers and √ Central DA publications to offices and publications Admin. library daily provided Provide refreshment items to DA 10,000.00 Refreshment items √ Central DA the Assembly office procured Admin. Provide protocol fuel to DA 40,000.00 Protocol fuel √ Central DA Assembly officials and provided for Admin. official guests for official official activities duties throughout the year Organise workshops and other DA 40,000.00 Workshops and √ Central DA training programmes for other training Admin. Assembly staff, Assembly organised members, Heads of Department annually Organise end of year best DA 20,000.00 Awards and staff √ Central DA worker award and staff durbars organised Admin. durbars Sponsor Assembly staff, DA 20,000.00 Assembly √ Central DA Assembly members and members and staff Admin. others to attend workshop and supported to attend other training programmes training throughout the year Provide for travelling and DA 20,000.00 Travelling and √ Central DA 127 transport for staff who transport provided Admin. perform official duties Maintain and repair official DA 40,000.00 Office vehicles √ √ Central DA vehicle and Assembly grader and grader Admin. maintained Engage consultants to train DA 100,000.00 Assembly staff and √ Central DA relevant staff of the Assembly members trained Admin and Assembly members by consultant Support UNFPA Sixth DA 100,000.00 UNFPA Sixth √ DED/ DA Country Programme Country SW&CD Programme / DHS supported Screening of food vendors District 10,000.00 Food vendors √ Environ DA Wide screened for mental diseases Health Dept. Renovation of District Health New 30,000.00 DHD offices √ Works DA Directorate Offices Edubiase renovated Dept. Organise a road safety District 15,000.00 Road safety √ Central DA campaign Wide campaign Administ organised ration

Objective: Advance the implementation of the compulsory component of FCUBE Support DEOC in its activities DA 10,000.00 DEOC supported √ DED DA in its activities

Thematic Area: Transparent and Accountable Governance District Goal: Objective: Ensure effective and efficient resource mobilization, internal revenue generation and resource management Provide adequate value books DA 6,000.00 Value books √ Central DA for revenue collection provided to Admin. revenue collectors Give logistics to revenue DA 10,000.00 Logistics provided √ Central DA collectors to revenue Admin. collectors Organise revenue DA 10,000.00 Revenue √ Central DA mobilisation campaign and mobilisation Admin. 128 education quarterly each year campaign and education organised Revise and gazette fee-fixing DA 20,000.00 Fee fixing revised √ Central DA resolutions annually and gazetted Admin. Pay commission to DA 20,000.00 Commission paid √ Central DA commissioned collectors to commissioned Admin. collectors

Objective: Ensure effective implementation of the decentralisation policy and programmes Organise stakeholders DA 20,000.00 Stakeholders 10, 10,00 Central DA meetings / public for a meetings 000 0.00 Admin. organised .00 Ensure effective DA 20,000.00 DPCU activities √ DPCU DA implementation of DPCU implemented activities Preparation of District DA 40,000.00 DMTDF prepared √ DPCU DA Medium Term Development Framework Pay utility bills for the DA 20,000.00 Utility bills paid √ Central DA Assembly Admin. Purchase building materials to DA 60,000.00 Building materials 30, 30,00 Works DA support community initiated purchased to 000 0.00 Dept. projects support .00 community initiated projects Support Town/ Area Councils DA 20,000.00 Town/ Area √ Central DA in performing their duties Councils Admin. supported Implement MPs constituency District 400,000.00 MPs constituency MP MPs DA programmes and projects Wide programmes annually implemented Organise quarterly Heads of DA 10,000.00 Heads of √ Central DA Department meetings Department Admin. meetings organised Organise 10 durbars for DA 60,000.00 10 durbars 3,0 3,000 Central DA 129 official functions annually organised for 00. .00 Admin. official functions 00

Objective: Strengthen and promote the culture of rights and responsibilities Publish Assembly activities DA 30,000.00 Assembly by-laws √ Central DA and gazette by-laws gazetted Admin.

Objective: Strengthen policy formulation, development planning, and M&E processes for equitable and balanced spatial and socio- economic development Monitor and evaluate District District 40,000.00 M&E carried out √ DPCU DA Assembly projects Wide on projects Support HIV/AIDS (MSHAP) DA 20,000.00 MSHAP activities √ Central DA annually supported Admin. Organise site inspections DA 20,000.00 Site inspections 10, 10,00 Works DA throughout the year organised 000 0.00 Dept. .00

Objective: Ensure equity and social cohesion at all levels of society Implement Disability Fund 100,000.00 Disability Fund √ SW&CD DA implemented Support paupers, children and District 20,000.00 Paupers, children 10, 10,0 SW&CD DA physically challenged Wide and physically 000 00.0 annually challenged .00 0 supported Objective: Enhance public confidence in the justice delivery and administrative systems Organise a workshop on role District 10,000.00 Workshop √ Central DA of Judiciary in development Wide organised Admin.

Objective: Harness culture for national development Support Traditional District 20,000.00 Traditional √ Central DA Authorities Allowance Wide Authority Admin. Allowance provided Organise 4 Official National DA 100,000.00 4 Official National √ Central DA Day Celebrations Day Celebrations Admin. organised

130

Objective: Improve internal security for protection of life and property Construct 1 No.4 Unit Police Akrofuom 150,000.00 1 No 4 Unit police √ GPS DA Staff Quarters Staff Quarters constructed Construct Police Post Obonsu, 200,000.00 Police Post 10, 10,00 GPS DA Atwereboa, constructed 000 0.00 Akrofuom .00 West Provide legal/security DA 10,000.00 Legal/ security 5,0 5,000 Central DA expenses of the Assembly services provided 00. .00 Admin. 00 Organise monthly District DA 10,000.00 DISEC meetings √ Central DA Security Committee (DISEC) organised Admin. meetings Procure insurance cover for DA 40,000.00 Insurance cover √ Central DA Assembly official vehicles procured Admin. and valuable items Maintain adequate security in District 20,000.00 Security √ GPS DA the District annually Wide maintained in the District

131

CHAPTER FIVE DISTRICT ANNUAL ACTION PLANS This section of the report presents the Annual Action Plans for the four year period (2014-2017)

Table 5.1 ANNUAL ACTION PLAN 2014 S/ PLANNED LOCATION INDICATOR TIMING RESP. COLLABORATING COST SOURCE RE N PROGRAMME/ START END PERS/DEPT/ PERSON/ OF MA PROJECTS/ AGENCY DEPARTMENT FUNDS RKS ACTIVITY AGENCY 1 Revalue property District Properties Jan Dec Central ASDA 10,000.00 DACF Wide revaluation Admin. done 2 Prepare District DA District Jun Oct Central ASDA 5,000.00 DACF Composite Budget Composite Admin. Budget prepared 3 Create data base on DA Data base on Jan Dec Central ASDA 2,500.00 IGF revenue items revenue Admin. items created 4 Construct market Adansi Market stalls Jan Dec Works Dept. ASDA 100,000.00 IGF, stalls Praso, New constructed DACF, Edubiase, DDF Wuruyie Junction, Akrofuom 5 Renovate and Subriso , Markets Jan Dec Works Dept. ASDA 5,000.00 IGF expand markets Akrofuom renovated and expanded 6 Support street District Street Jan Dec Physical ASDA 40,000.00 DACF naming exercise Wide naming Planning implemented Dept. 7 Organise training for District MSMEs Jan Sept Central ASDA 5,000.00 DACF MSMEs Wide training Admin.

132

organised 8 Facilitate cocoa District Cocoa Jan Dec Agric. Dept. ASDA 12,500.00 IGF, spraying programme Wide spraying DDF, facilitated Donor, DACF 9 Provide extension District Extension Jan Dec Agric. Dept. ASDA 5,000.00 DDF, services to farmers Wide services DACF provided to farmers 10 Organise training for District Training Jan Sept Agric. Dept. ASDA 5,000.00 IGF, AEA’s annually Wide organised for DDF AEAs 11 Provide extension District Vaccination Jan Dec Agric. Dept. ASDA 5,000.00 DDF, knowledge and Wide given to DACF vaccination in livestock livestock production 12 Monitor activities of District Forest Jan Dec FSD ASDA 5,000.00 IGF illegal lumbering/ Wide activities chainsaw activities monitored 13 Support NADMO to District NADMO Jan Dec NADMO ASDA 5,000.00 DACF perform its functions Wide supported in of disaster prevention its activities and management annually 14 Construct 1 No.3 Akrofuom 1 No. 3 Unit Jan Dec Works Dept. ASDA 80,000.00 DACF Unit Teachers Teachers Quarters Quarters constructed 15 Construct 10No. District 10 No. Jan Dec Works Dept. ASDA 20,000.00 DACF, Teachers Quarters Wide Teachers DDF Quarters constructed 16 Construction of Akrofuom Dormitories Jan Dec Works Dept. ASDA 100,000.00 DDF/ Dormitories for for women GOG Women and Children and children constructed 17 Prepare planning New Layouts for Jan Dec Physical ASDA 20,000.00 DACF, 133

schemes for Edubiase, settlements Planning DDF communities Akrofuom, prepared Dept. Apagya, Atobiase, Amudurasi, Praso 18 Repair and maintain District 80km feeder/ Jan Dec Works Dept. ASDA 10,000.00 DACF, 80 km feeder/ access Wide access roads IGF roads repaired 19 Service and repair 14 DA Computers, Jan Dec Central ASDA 2,500.00 DACF, No. computers and accessories, Admin. IGF accessories, photocopier photocopier and and intercom intercom annually serviced 20 Construct CHPS Tweapiase CHPS Jan Dec Works Dept. ASDA 150,000.00 DACF Compound and Compound Mprechre constructed 21 Construct 1 No. 6 Akrofuom 1 No. 6 Unit Jan Dec Works Dept. ASDA 50,000.00 DDF Unit Classroom Classroom Block Block constructed 22 Construct 10 No.3 District 10 No. 3 Jan Dec Works Dept. ASDA 500,000.00 DACF, Unit Classroom Wide Unit DDF Block Classroom Block constructed 23 Construct 1 No.12 New 1 No. 12 Jan Dec Works Dept. ASDA 180,000.00 DDF Unit Classroom Edubiase Unit block with ancillary Classroom facilities Block with ancillary facilities constructed 24 Construct 5 No.6 District 5 No. 6 Unit Jan Dec Works Dept. ASDA 250,000.00 DACF, Unit Classroom Wide Classroom DDF Block Block constructed 134

25 Construct 1 No. 3 Avornyokro 1 No.3 Unit Jan Dec Works Dept. ASDA 50,000.00 DDF Unit Classroom with m Classroom ancillary facilities Block constructed 26 Support the District Sports Jan Dec Central ASDA 2,500.00 DACF development of Wide development Admin. sports in the District supported annually 27 Facilitate school District School Jan Dec NSFP/ GES ASDA 60,000.00 Donor feeding programme Wide feeding program facilitated 28 Organise workshop District Workshop Jan Dec DHD ASDA 5,000.00 Donor, on Family Planning Wide organised DACF Methods 29 Support WATSAN District Potable water Jan Dec CWSA ASDA 25,000.00 DACF, and other agencies in Wide provided DDF, potable water IGF, delivery Donor 30 Provide for District Sanitation Jan Dec Environment ASDA 212,000.00 DACF fumigation and Wide and al Health sanitation fumigation Dept. provided 31 Clearing of final District Dump sites Jan Dec Environment ASDA 25,000.00 DACF dump sites Wide cleared al Health Dept. 32 Construct 1 No. 14 New 1 No. 14 Jan Dec Works Dept. ASDA 20,000.00 DDF Seater Water Closet Edubiase seater WC with mechanised Market constructed borehole 33 Support District District Malaria Jan Dec AGA Mal ASDA 5,000.00 DACF Response Initiative Wide control (Malaria Control program Programme) supported annually 34 Pay transfer grants to DA Transfer Jan Dec Central ASDA 5,000.00 IGF officials posted to the grants Admin 135

District provided 35 Pay responsibility DA Responsibilit Jan Dec Central ASDA 2,500.00 IGF allowance to staff y allowance Admin. paid 36 Ensure minor repair/ DA Office Jan Dec Central ASDA 2,500.00 IGF maintenance of machines and Admin. office machines and furniture furniture repaired 37 Purchase adequate DA Stationary Jan Dec Central ASDA 5,000.00 IGF stationary for office purchased for Admin. use annually use 38 Print calendars and DA Calendars Jan March Central ASDA 2,500.00 IGF other materials printed Admin annually 39 Procure office DA Office Jan Dec Central ASDA 25,000.00 IGF facilities and facilities and Admin. furniture for the furniture Assembly office provided every year 40 Purchase 10 DA Newspapers Jan Dec Central ASDA 2,500.00 IGF newspapers and and Admin. publications to publications offices and library provided daily 41 Provide refreshment DA Refreshment Jan Dec Central ASDA 2,500.00 IGF items to the items Admin. Assembly office provided 42 Provide protocol fuel DA Protocol fuel Jan Dec Central ASDA 10,000.00 IGF to Assembly officials provided for Admin. and official guests official for official duties activities throughout the year 43 Organise workshops DA Workshops Jan Dec Central ASDA 10,000.00 IGF and other training and other Admin. programmes for training Assembly staff, organised Assembly members, 136

Heads of Department annually 44 Organise end of year DA Awards and Jan Dec Central ASDA 5,000.00 IGF best worker award staff durbars Admin. and staff durbars organised 45 Sponsor Assembly DA Assembly Jan Dec Central ASDA 5,000.00 IGF staff, Assembly members and Admin. members and others staff to attend workshop supported to and other training attend programmes training throughout the year 46 Provide for travelling DA Travelling Jan Dec Central ASDA 5,000.00 IGF and transport for and transport Admin. staff who perform provided official duties 47 Maintain and repair DA Office Jan Dec Central ASDA 10,000.00 IGF, official vehicle and vehicles and Admin. DACF Assembly grader grader maintained 48 Engage consultants DA Assembly Jan Dec Central ASDA 25,000.00 DDF to train relevant staff staff and Admin. of the Assembly and members Assembly members trained by consultant 49 Support UNFPA DA UNFPA Jan Dec DED/ ASDA 100,000.00 UNFPA Sixth Country Sixth SW&CD/ Programme Country DHS Programme supported 50 Screening of food District Food vendors Jan Dec Environment ASDA 2,500.00 IGF vendors Wide screened al Health Dept. 51 Support DEOC in its DA DEOC Jan Dec DED ASDA 2,500.00 IGF, activities Supported DACF 52 Provide adequate DA Value books Jan Dec Central ASDA 1,500.00 IGF value books for provided to Admin. 137

revenue collection revenue collectors 53 Give logistics to DA Logistics Jan Dec Central ASDA 2,500.00 IGF revenue collectors provided to Admin. revenue collectors 54 Organise revenue District Revenue Jan Dec Central ASDA 2,500.00 IGF mobilisation Wide mobilization Admin. campaign and campaign education quarterly and each year education organised 55 Revise and gazette DA Fee fixing Jan Dec Central ASDA 5,000.00 IGF fee-fixing resolutions revised and Admin. annually gazetted 56 Pay commission to DA Commission Jan Dec Central ASDA 5,000.00 IGF commissioned paid to Admin. collectors commissione d collectors 57 Organise DA Stakeholders Jan Dec Central ASDA 5,000.00 IGF, stakeholders meeting Admin. DACF meetings / public for organised a 58 Ensure effective DA DPCU Jan Dec Central ASDA 5,000.00 DACF implementation of activities Admin. DPCU activities implementati on 59 Preparation of DA DMTPF Jan March DPCU ASDA 20,000.00 DACF District Medium prepared Term Development Framework 60 Pay utility bills for DA Utility bills Jan Dec Central ASDA 5,000.00 IGF the Assembly paid Admin. 61 Purchase building DA Building Jan Dec Works Dept. ASDA 15,000.00 IGF, materials to support materials DACF community initiated purchased to projects support 138

community initiated projects 62 Support Town/ Area District Town/ Area Jan Dec Central ASDA 5,000.00 DACF Councils in Wide Councils Admin. performing their supported duties Implement MP District MPs Jan Dec MP ASDA 100,000.00 MPs constituency Wide constituency share of programmes and programmes DACF projects annually implemented 63 Organise quarterly DA Heads of Jan Dec Central ASDA 1,500.00 IGF Heads of Department Department Admin. meetings meetings organised 64 Organise 10 durbars DA 10 durbars Jan Dec Central ASDA 2,500.00 IGF, for official functions organised for Admin. DACF annually official functions 65 Publish Assembly DA Assembly Jan Dec Central ASDA 5,000.00 IGF activities and gazette by-laws Admin. by-laws gazetted and activities gazetted 66 Monitor and evaluate DA M&E carried Jan Dec DPCU ASDA 10,000.00 DACF District Assembly out on projects projects 67 Support HIV/AIDS DA MSHAP Jan Dec Central ASDA 5,000.00 DACF (MSHAP) annually activities Admin. supported 68 Organise site DA Site Jan Dec Works Dept. ASDA 5,000.00 IGF, inspections inspections DACF throughout the year organised throughout the year 69 Implement Disability DA Disability Jan Dec SW&CD ASDA 25,000.00 DACF Fund fund 139

implemented 70 Support paupers, District Paupers, Jan Dec SW&CD ASDA 5,000.00 IGF, children and Wide children and GOG physically physically challenged annually challenged supported 71 Support Traditional District Traditional Jan Dec Central ASDA 5,000.00 IGF Authorities Wide authority Admin. Allowance allowance provided 72 Organise 4 Official District 4 official Jan Dec Central ASDA 25,000.00 DACF National Day Wide national day Admin. Celebrations celebrations organised 73 Construct 1 No.4 Akrofuom 1 No. 4 Unit Jan Dec Works Dept. ASDA 50,000.00 DDF Unit Police Staff Police Staff Quarters quarters constructed 74 Provide DA Legal/ Jan Dec Central ASDA 2,500.00 DACF, legal/security security Admin. IGF expenses of the services Assembly provided 75 Organise monthly DA DISEC Jan Dec Central ASDA 2,500.00 DACF District Security meetings Admin. Committee (DISEC) organised meetings 76 Procure insurance DA Insurance Jan Dec Central ASDA 5,000.00 DACF cover for Assembly cover Admin. official vehicle procured

140

Table 5.2 ANNUAL ACTION PLAN 2015 S/ PLANNED LOCATION INDICATOR TIMING RESP. COLLABORATING COST SOURCE RE N PROGRAMME/ START END PERS/DEPT/ PERSON/ OF MA PROJECTS/ AGENCY DEPARTMENT FUNDS RKS ACTIVITY AGENCY 1 Revalue property District Properties Jan Dec Central ASDA 10,000.00 DACF Wide revaluation Admin. done 2 Prepare District DA District Jun Oct Central ASDA 5,000.00 DACF Composite Budget Composite Admin. Budget prepared 3 Create data base on DA Data base on Jan Dec Central ASDA 2,500.00 IGF revenue items revenue Admin. items created 4 Construct market Adansi Market stalls Jan Dec Works Dept. ASDA 150,000.00 IGF, stalls Praso, New constructed DACF, Edubiase, DDF Wuruyie Junction, Akrofuom 5 Renovate and Subriso , Markets Jan Dec Works Dept. ASDA 5,000.00 IGF expand markets Akrofuom renovated and expanded 6 Support street District Street Jan Dec Physical ASDA 40,000.00 DACF naming exercise Wide naming Planning implemented Dept. 7 Organise training for District MSMEs Jan Sept Central ASDA 5,000.00 DACF MSMEs Wide training Admin. organised 8 Organise training for District Farmers Jan Sept Agric. Dept. ASDA 5,000.00 IGF, farmers in accessing Wide training DACF financial support organised 9 Facilitate cocoa District Cocoa Jan Dec Agric. Dept. ASDA 12,500.00 IGF, spraying programme Wide spraying DDF, facilitated Donor, 141

DACF 10 Provide extension District Extension Jan Dec Agric. Dept. ASDA 5,000.00 DDF, services to farmers Wide services DACF provided to farmers 11 Organise training for District Training Jan Sept Agric. Dept. ASDA 5,000.00 IGF, AEA’s annually Wide organised for DDF AEAs 12 Provide extension District Vaccination Jan Dec Agric. Dept. ASDA 5,000.00 DDF, knowledge and Wide given to DACF vaccination in livestock livestock production 13 Plants trees in District Trees planted March Oct FSD ASDA 10,000.00 IGF, affected communities Wide in DACF communities 14 Monitor activities of District Forest Jan Dec FSD ASDA 5,000.00 IGF illegal lumbering/ Wide activities chainsaw activities monitored 15 Organise training for District Training Jan Dec Central ASDA 10,000.00 IGF small scale mining Wide organised for Admin. companies in the small scale District mining companies 16 Monitor activities of District Mining Jan Dec DISEC ASDA 10,000.00 IGF, small scale mining Wide companies DACF companies activities monitored 17 Engage private sector Bonkro, Stakeholders Jan Dec Central ASDA 10,000.00 DDF, and other Birim Aboi, consulted in Admin. DACF stakeholders in Hwidiem developing development of tourist sites tourist sites 18 Support NADMO to District NADMO Jan Dec NADMO ASDA 5,000.00 DACF perform its functions Wide supported in of disaster prevention its activities and management annually 142

19 Renovate and New Staff quarters Jan Dec Works Dept. ASDA 50,000.00 DACF maintain staff Edubiase renovated quarters and maintained 20 Construct 10No. District 10 No. Jan Dec Works Dept. ASDA 600,000.00 DACF Teachers Quarters Wide Teachers Quarters constructed 21 Construction of Akrofuom Dormitories Jan Dec Works Dept. ASDA 200,000.00 DDF/ Dormitories for for women GOG Women and Children and children constructed 22 Prepare planning New Layouts for Jan Dec Physical ASDA 20,000.00 DACF, schemes for Edubiase, settlements Planning DDF communities Akrofuom, prepared Dept. Apagya, Atobiase, Amudurasi, Praso 23 Construct drains to District Drains Jan Dec Works Dept. ASDA 30,000.00 DACF improve upon the Wide constructed drainage system in communities 24 Construct 2 No. Staff New 2 No. Staff Jan Dec Works Dept. ASDA 100,000.00 DACF Quarters at New Edubiase Quarters Edubiase constructed 25 Repair and maintain District 80km feeder/ Jan Dec Works Dept. ASDA 10,000.00 DACF, 80 km feeder/ access Wide access roads IGF roads repaired 26 Expansion and Akrofuom Lorry parks Jan Dec Works Dept. ASDA 40,000.00 DACF, maintenance of lorry expanded DDF parks and maintained Construction of Tonkoase, Culverts Jan Dec Works Dept. ASDA 20,000.00 DACF, culverts Danyeso, constructed DDF Old Asaman 27 Service and repair 14 DA Computers, Jan Dec Central ASDA 2,500.00 DACF, 143

No. computers and accessories, Admin. IGF accessories, photocopier photocopier and and intercom intercom annually serviced 28 Provide low tension District Electricity Jan Dec ECG ASDA 50,000.00 DACF poles to extend Wide extended to electricity to selected communities communities 29 Construct CHPS Tweapiase CHPS Jan Dec Works Dept. ASDA 150,000.00 DACF Compound and Compound Mprechre constructed 30 Construct additional Ataase Additional Jan Dec Works Dept. ASDA 60,000.00 DACF wards for Health wards Centre constructed 31 Provide maternal All health Maternal Jan Dec Works Dept. ASDA 10,000.00 DDF, waiting homes centers waiting DACF homes provided 32 Construct sheds and New Sheds and Jan Dec Works Dept. ASDA 10,000.00 DACF toilets for NHIS Edubiase toilets office constructed 33 Construct 1 No. 6 Akrofuom 1 No. 6 Unit Jan Dec Works Dept. ASDA 50,000.00 DDF Unit Classroom Classroom Block Block constructed 34 Construct 10 No.3 District 10 No. 3 Jan Dec Works Dept. ASDA 400,000.00 DACF, Unit Classroom Wide Unit DDF Block Classroom Block constructed 35 Education fund District Education Jan Dec GES ASDA 10,000.00 DACF disbursed to needy Wide fund students provided 36 Construct 1 No.12 New 1 No. 12 Jan Dec Works Dept. ASDA 460,000.00 DDF Unit Classroom Edubiase Unit block with ancillary Classroom facilities Block with 144

ancillary facilities constructed 37 Construct 5 No.6 District 5 No. 6 Unit Jan Dec Works Dept. ASDA 250,000.00 DACF, Unit Classroom Wide Classroom DDF Block Block constructed 38 Construct 1 No. 3 Avornyokro 1 No.3 Unit Jan Dec Works Dept. ASDA 50,000.00 DDF Unit Classroom with m Classroom ancillary facilities Block constructed 39 Rehabilitation of 10 District 10 No. Jan Dec Works Dept. ASDA 100,000.00 DACF No. Schools Wide Schools rehabilitated 40 Organise mass District Mass Jan Dec SW&CD ASDA 30,000.00 IGF, education meetings Wide education DACF annually meetings organised 41 Support the District Sports Jan Dec Central ASDA 2,500.00 DACF development of Wide development Admin. sports in the District supported annually 42 Facilitate school District School Jan Dec NSFP/ GES ASDA 60,000.00 Donor feeding programme Wide feeding program facilitated 43 Organise workshop District Workshop Jan Dec DHD ASDA 5,000.00 Donor, on Family Planning Wide organised DACF Methods 44 Subsidise FP District FP methods Jan Dec DHD ASDA 3,000.00 Donor, methods Wide subsidised DACF 45 Support WATSAN District Potable water Jan Dec CWSA ASDA 25,000.00 DACF, and other agencies in Wide provided DDF, potable water IGF, delivery Donor 46 Provide for District Sanitation Jan Dec Environment ASDA 212,000.00 DACF fumigation and Wide and al Health 145

sanitation fumigation Dept. provided 47 Clearing of final District Dump sites Jan Dec Environment ASDA 25,000.00 DACF dump sites Wide cleared al Health Dept. 48 Construction of District K.V.I.Ps Jan Dec Works Dept. ASDA 100,000.00 DACF K.V.I.P Wide constructed 49 Construct 1 No. 14 New 1 No. 14 Jan Dec Works Dept. ASDA 70,000.00 DDF Seater Water Closet Edubiase seater WC with mechanised Market constructed borehole 50 Support District District Malaria Jan Dec AGA Mal ASDA 50,000.00 DACF Response Initiative Wide control (Malaria Control program Programme) supported annually 51 Pay transfer grants to DA Transfer Jan Dec Central ASDA 5,000.00 IGF officials posted to the grants Admin District provided 52 Pay responsibility DA Responsibilit Jan Dec Central ASDA 2,500.00 IGF allowance to staff y allowance Admin. paid 53 Ensure minor repair/ DA Office Jan Dec Central ASDA 2,500.00 IGF maintenance of machines and Admin. office machines and furniture furniture repaired 54 Purchase adequate DA Stationary Jan Dec Central ASDA 5,000.00 IGF stationary for office purchased for Admin. use annually use 55 Print calendars and DA Calendars Jan March Central ASDA 2,500.00 IGF other materials printed Admin annually 56 Procure office DA Office Jan Dec Central ASDA 25,000.00 IGF facilities and facilities and Admin. furniture for the furniture Assembly office provided every year 146

57 Purchase 10 DA Newspapers Jan Dec Central ASDA 2,500.00 IGF newspapers and and Admin. publications to publications offices and library provided daily 58 Provide refreshment DA Refreshment Jan Dec Central ASDA 2,500.00 IGF items to the items Admin. Assembly office provided 59 Provide protocol fuel DA Protocol fuel Jan Dec Central ASDA 10,000.00 IGF to Assembly officials provided for Admin. and official guests official for official duties activities throughout the year 60 Organise workshops DA Workshops Jan Dec Central ASDA 10,000.00 IGF and other training and other Admin. programmes for training Assembly staff, organised Assembly members, Heads of Department annually 61 Organise end of year DA Awards and Jan Dec Central ASDA 5,000.00 IGF best worker award staff durbars Admin. and staff durbars organised 62 Sponsor Assembly DA Assembly Jan Dec Central ASDA 5,000.00 IGF staff, Assembly members and Admin. members and others staff to attend workshop supported to and other training attend programmes training throughout the year 63 Provide for travelling DA Travelling Jan Dec Central ASDA 5,000.00 IGF and transport for and transport Admin. staff who perform provided official duties 64 Maintain and repair DA Office Jan Dec Central ASDA 10,000.00 IGF, official vehicle and vehicles and Admin. DACF Assembly grader grader 147

maintained 65 Engage consultants DA Assembly Jan Dec Central ASDA 25,000.00 DDF to train relevant staff staff and Admin. of the Assembly and members Assembly members trained by consultant 66 Screening of food District Food vendors Jan Dec Environment ASDA 2,500.00 IGF vendors Wide screened al Health Dept. 67 Support DEOC in its DA DEOC Jan Dec DED ASDA 2,500.00 IGF, activities Supported DACF 68 Provide adequate DA Value books Jan Dec Central ASDA 1,500.00 IGF value books for provided to Admin. revenue collection revenue collectors 69 Give logistics to DA Logistics Jan Dec Central ASDA 2,500.00 IGF revenue collectors provided to Admin. revenue collectors 70 Organise revenue District Revenue Jan Dec Central ASDA 2,500.00 IGF mobilisation Wide mobilization Admin. campaign and campaign education quarterly and each year education organised 71 Revise and gazette DA Fee fixing Jan Dec Central ASDA 5,000.00 IGF fee-fixing resolutions revised and Admin. annually gazetted 72 Pay commission to DA Commission Jan Dec Central ASDA 5,000.00 IGF commissioned paid to Admin. collectors commissione d collectors 73 Organise DA Stakeholders Jan Dec Central ASDA 5,000.00 IGF, stakeholders meeting Admin. DACF meetings / public organised fora 74 Ensure effective DA DPCU Jan Dec Central ASDA 5,000.00 DACF 148

implementation of activities Admin. DPCU activities implementati on 75 Preparation of DA DMTPF Jan March DPCU ASDA 20,000.00 DACF District Medium prepared Term Development Framework 76 Pay utility bills for DA Utility bills Jan Dec Central ASDA 5,000.00 IGF the Assembly paid Admin. 77 Purchase building DA Building Jan Dec Works Dept. ASDA 15,000.00 IGF, materials to support materials DACF community initiated purchased to projects support community initiated projects 78 Support Town/ Area District Town/ Area Jan Dec Central ASDA 5,000.00 DACF Councils in Wide Councils Admin. performing their supported duties 79 Implement MP District MPs Jan Dec MP ASDA 100,000.00 MPs constituency Wide constituency share of programmes and programmes DACF projects annually implemented 80 Organise quarterly DA Heads of Jan Dec Central ASDA 10,000.00 IGF Heads of Department Department Admin. meetings meetings organised 81 Publish Assembly DA Assembly Jan Dec Central ASDA 10,000.00 IGF activities and gazette by-laws Admin. by-laws gazetted and activities gazetted 82 Monitor and evaluate DA M&E carried Jan Dec DPCU ASDA 10,000.00 DACF District Assembly out on projects projects 83 Support HIV/AIDS DA MSHAP Jan Dec Central ASDA 5,000.00 DACF 149

(MSHAP) annually activities Admin. supported 84 Organise site DA Site Jan Dec Works Dept. ASDA 5,000.00 IGF, inspections inspections DACF throughout the year organised throughout the year 85 Implement Disability DA Disability Jan Dec SW&CD ASDA 25,000.00 DACF Fund fund implemented 86 Support paupers, District Paupers, Jan Dec SW&CD ASDA 5,000.00 IGF, children and Wide children and GOG physically physically challenged annually challenged supported 87 Support Traditional District Traditional Jan Dec Central ASDA 5,000.00 IGF Authorities Wide authority Admin. Allowance allowance provided 88 Organise 4 Official District 4 official Jan Dec Central ASDA 25,000.00 DACF National Day Wide national day Admin. Celebrations celebrations organised 89 Construct 1 No.4 Akrofuom 1 No. 4 Unit Jan Dec Works Dept. ASDA 100,000.00 DDF Unit Police Staff Police Staff Quarters quarters constructed 90 Provide DA Legal/ Jan Dec Central ASDA 2,500.00 DACF, legal/security security Admin. IGF expenses of the services Assembly provided 91 Organise monthly DA DISEC Jan Dec Central ASDA 2,500.00 DACF District Security meetings Admin. Committee (DISEC) organised meetings 92 Procure insurance DA Insurance Jan Dec Central ASDA 5,000.00 DACF cover for Assembly cover Admin. 150

official vehicle procured for official vehicles 93 Organise a road District Road safety Jan Dec Central ASDA 5,000.00 DACF safety campaign Wide campaign Admin. organised 94 Organise training on District Training Jan Dec GNFS ASDA 5,000.00 DACF fire prevention and Wide organised on management fire prevention and management 95 Procure septic tank New Septic tank Jan Dec Central ASDA 40,000.00 DACF emptier Edubiase emptier Admin procured

151

Table 5.3 ANNUAL ACTION PLAN 2016

PLANNED LOCATION INDICATOR TIMING RESP. COLLABORATING COST SOURCE RE PROGRAMME/ START END PERS/DEPT/ PERSON/ OF MA PROJECTS/ AGENCY DEPARTMENT FUNDS RKS ACTIVITY AGENCY 1 Revalue property District Wide Properties Jan Dec Central ASDA 10,000.00 DACF revaluation Admin. done 2 Prepare District DA District Jun Oct Central ASDA 5,000.00 DACF Composite Budget Composite Admin. Budget prepared 3 Create data base on DA Data base on Jan Dec Central ASDA 2,500.00 IGF revenue items revenue Admin. items created 4 Construct market Adansi Market stalls Jan Dec Works Dept. ASDA 50,000.00 IGF, stalls Praso, New constructed DACF, Edubiase, DDF Wuruyie Junction, Akrofuom 5 Organise training for District Wide MSMEs Jan Sept Central ASDA 5,000.00 DACF MSMEs training Admin. organised 6 Organise training for District Wide Farmers Jan Sept Agric. Dept. ASDA 5,000.00 IGF farmers in accessing training financial support organised 7 Facilitate cocoa District Wide Cocoa Jan Dec Agric. Dept. ASDA 12,500.00 IGF, spraying programme spraying DDF, facilitated Donor, DACF 8 Provide extension District Wide Extension Jan Dec Agric. Dept. ASDA 5,000.00 DDF, services to farmers services DACF provided to farmers 9 Organise training for District Wide Training Jan Sept Agric. Dept. ASDA 5,000.00 IGF, AEA’s annually organised for DDF 152

AEAs 10 Provide extension District Wide Vaccination Jan Dec Agric. Dept. ASDA 5,000.00 DDF, knowledge and given to DACF vaccination in livestock livestock production 11 Plants trees in District Wide Trees planted March Oct FSD ASDA 5,000.00 IGF, affected in DACF communities communities 12 Monitor activities of District Wide Forest Jan Dec FSD ASDA 5,000.00 IGF illegal lumbering/ activities chainsaw activities monitored 13 Monitor activities of District Wide Mining Jan Dec DISEC ASDA 10,000.00 IGF, small scale mining companies DACF companies activities monitored 14 Engage private Bonkro, Stakeholders Jan Dec Central ASDA 10,000.00 DDF, sector and other Birim Aboi, consulted in Admin. DACF stakeholders in Hwidiem developing development of tourist sites tourist sites 15 Support NADMO to District Wide NADMO Jan Dec NADMO ASDA 5,000.00 DACF perform its functions supported in of disaster its activities prevention and management annually 16 Renovate and New Staff quarters Jan Dec Works Dept. ASDA 50,000.00 DACF maintain staff Edubiase renovated quarters and maintained 17 Construct 10No. District Wide 10 No. Jan Dec Works Dept. ASDA 600,000.00 DACF Teachers Quarters Teachers Quarters constructed 18 Construction of Akrofuom Dormitories Jan Dec Works Dept. ASDA 100,000.00 DDF/ Dormitories for for women GOG Women and and children 153

Children constructed 19 Prepare planning New Layouts for Jan Dec Physical ASDA 20,000.00 DACF, schemes for Edubiase, settlements Planning DDF communities Akrofuom, prepared Dept. Apagya, Atobiase, Amudurasi, Praso 20 Construct drains to District Wide Drains Jan Dec Works Dept. ASDA 30,000.00 DACF improve upon the constructed drainage system in communities 21 Construct 2 No. New 2 No. Staff Jan Dec Works Dept. ASDA 50,000.00 DACF Staff Quarters at Edubiase Quarters New Edubiase constructed 22 Repair and maintain District Wide 80km feeder/ Jan Dec Works Dept. ASDA 10,000.00 DACF, 80 km feeder/ access access roads IGF roads repaired 23 Expansion and Akrofuom Lorry parks Jan Dec Works Dept. ASDA 20,000.00 DACF, maintenance of lorry expanded DDF parks and maintained 24 Construction of Tonkoase, Culverts Jan Dec Works Dept. ASDA 20,000.00 DACF, culverts Danyeso, constructed DDF Old Asaman 25 Service and repair DA Computers, Jan Dec Central ASDA 2,500.00 DACF, 14 No. computers accessories, Admin. IGF and accessories, photocopier photocopier and and intercom intercom annually serviced 26 Construct District Wide Community Jan Dec Works Dept. ASDA 50,000.00 IGF, community centres centres DACF constructed 27 Renovate and New Assembly Jan Dec Central ASDA 40,000.00 IGF maintain Assembly Edubiase Guest House Admin. Guest House maintained 28 Provide low tension District Wide Electricity Jan Dec ECG ASDA 50,000.00 DACF 154

poles to extend extended to electricity to communities selected communities 29 Provide a quantity of District Wide Street light Jan Dec Works Dept. ASDA 2,500.00 DACF street light bulbs to bulbs communities provided 30 Construct CHPS Tweapiase CHPS Jan Dec Works Dept. ASDA 150,000.00 DACF Compound and Compound Mprechre constructed 31 Construct additional Ataase Additional Jan Dec Works Dept. ASDA 60,000.00 DACF wards for Health wards Centre constructed 32 Provide maternal All health Maternal Jan Dec Works Dept. ASDA 10,000.00 DDF, waiting homes centers waiting DACF homes provided 33 Construct 10 No.3 District Wide 10 No. 3 Jan Dec Works Dept. ASDA 300,000.00 DACF, Unit Classroom Unit DDF Block Classroom Block constructed 34 Education fund District Wide Education Jan Dec GES ASDA 5,000.00 DACF disbursed to needy fund students provided 35 Construct 5 No.6 District Wide 5 No. 6 Unit Jan Dec Works Dept. ASDA 250,000.00 DACF, Unit Classroom Classroom DDF Block Block constructed 36 Rehabilitation of 10 District Wide 10 No. Jan Dec Works Dept. ASDA 100,000.00 DACF No. Schools Schools rehabilitated 37 Organise mass District Wide Mass Jan Dec SW&CD ASDA 30,000.00 IGF, education meetings education DACF annually meetings organised 38 Support the District Wide Sports Jan Dec Central ASDA 2,500.00 DACF 155

development of development Admin. sports in the District supported annually 39 Facilitate school District Wide School Jan Dec NSFP/ GES ASDA 60,000.00 Donor feeding programme feeding program facilitated 40 Organise workshop District Wide Workshop Jan Dec DHD ASDA 5,000.00 Donor, on Family Planning organised DACF Methods 41 Subsidise FP District Wide FP methods Jan Dec DHD ASDA 4,000.00 Donor, methods subsidised DACF 42 Support WATSAN District Wide Potable water Jan Dec CWSA ASDA 25,000.00 DACF, and other agencies in provided DDF, potable water IGF, delivery Donor 43 Provide for District Wide Sanitation Jan Dec Environment ASDA 212,000.00 DACF fumigation and and al Health sanitation fumigation Dept. provided 44 Clearing of final District Wide Dump sites Jan Dec Environment ASDA 25,000.00 DACF dump sites cleared al Health Dept. 45 Construction of District Wide K.V.I.Ps Jan Dec Works Dept. ASDA 100,000.00 DACF K.V.I.P constructed 46 Support District District Wide Malaria Jan Dec AGA Mal ASDA 10,000.00 DACF Response Initiative control (Malaria Control program Programme) supported annually 47 Pay transfer grants DA Transfer Jan Dec Central ASDA 5,000.00 IGF to officials posted to grants Admin the District provided 48 Pay responsibility DA Responsibilit Jan Dec Central ASDA 2,500.00 IGF allowance to staff y allowance Admin. paid 49 Ensure minor repair/ DA Office Jan Dec Central ASDA 2,500.00 IGF 156

maintenance of machines and Admin. office machines and furniture furniture repaired 50 Purchase adequate DA Stationary Jan Dec Central ASDA 5,000.00 IGF stationary for office purchased for Admin. use annually use 51 Print calendars and DA Calendars Jan March Central ASDA 2,500.00 IGF other materials printed Admin annually 52 Procure office DA Office Jan Dec Central ASDA 25,000.00 IGF facilities and facilities and Admin. furniture for the furniture Assembly office provided every year 53 Purchase 10 DA Newspapers Jan Dec Central ASDA 2,500.00 IGF newspapers and and Admin. publications to publications offices and library provided daily 54 Provide refreshment DA Refreshment Jan Dec Central ASDA 2,500.00 IGF items to the items Admin. Assembly office provided 55 Provide protocol DA Protocol fuel Jan Dec Central ASDA 10,000.00 IGF fuel to Assembly provided for Admin. officials and official official guests for official activities duties throughout the year 56 Organise workshops DA Workshops Jan Dec Central ASDA 10,000.00 IGF and other training and other Admin. programmes for training Assembly staff, organised Assembly members, Heads of Department annually 57 Organise end of year DA Awards and Jan Dec Central ASDA 5,000.00 IGF best worker award staff durbars Admin. 157

and staff durbars organised 58 Sponsor Assembly DA Assembly Jan Dec Central ASDA 5,000.00 IGF staff, Assembly members and Admin. members and others staff to attend workshop supported to and other training attend programmes training throughout the year 59 Provide for DA Travelling Jan Dec Central ASDA 5,000.00 IGF travelling and and transport Admin. transport for staff provided who perform official duties 60 Maintain and repair DA Office Jan Dec Central ASDA 10,000.00 IGF, official vehicle and vehicles and Admin. DACF Assembly grader grader maintained 61 Engage consultants DA Assembly Jan Dec Central ASDA 25,000.00 DDF to train relevant staff staff and Admin. of the Assembly and members Assembly members trained by consultant 62 Screening of food District Wide Food vendors Jan Dec Environment ASDA 2,500.00 IGF vendors screened al Health Dept. 63 Renovation of New DHD Offices Jan Dec Works Dept. ASDA 30,000.00 DACF District Health Edubiase renovated Directorate Offices 64 Support DEOC in its DA DEOC Jan Dec DED ASDA 2,500.00 IGF, activities Supported DACF 65 Provide adequate DA Value books Jan Dec Central ASDA 1,500.00 IGF value books for provided to Admin. revenue collection revenue collectors 66 Give logistics to DA Logistics Jan Dec Central ASDA 2,500.00 IGF revenue collectors provided to Admin. revenue 158

collectors 67 Organise revenue District Wide Revenue Jan Dec Central ASDA 2,500.00 IGF mobilisation mobilization Admin. campaign and campaign education quarterly and each year education organised 68 Revise and gazette DA Fee fixing Jan Dec Central ASDA 5,000.00 IGF fee-fixing revised and Admin. resolutions annually gazetted 69 Pay commission to DA Commission Jan Dec Central ASDA 5,000.00 IGF commissioned paid to Admin. collectors commissione d collectors 70 Organise DA Stakeholders Jan Dec Central ASDA 5,000.00 IGF, stakeholders meeting Admin. DACF meetings / public organised fora 71 Ensure effective DA DPCU Jan Dec Central ASDA 5,000.00 DACF implementation of activities Admin. DPCU activities implementati on 72 Pay utility bills for DA Utility bills Jan Dec Central ASDA 5,000.00 IGF the Assembly paid Admin. 73 Purchase building DA Building Jan Dec Works Dept. ASDA 15,000.00 IGF, materials to support materials DACF community initiated purchased to projects support community initiated projects 74 Support Town/ Area District Wide Town/ Area Jan Dec Central ASDA 5,000.00 DACF Councils in Councils Admin. performing their supported duties 75 Implement MP District Wide MPs Jan Dec MP ASDA 100,000.00 MPs constituency constituency share of 159

programmes and programmes DACF projects annually implemented 76 Organise quarterly DA Heads of Jan Dec Central ASDA 1,500.00 IGF Heads of Department Admin. Department meetings meetings organised 77 Publish Assembly DA Assembly Jan Dec Central ASDA 10,000.00 IGF activities and gazette by-laws Admin. by-laws gazetted and activities gazetted 78 Monitor and DA M&E carried Jan Dec DPCU ASDA 10,000.00 DACF evaluate District out on Assembly projects projects 79 Support HIV/AIDS DA MSHAP Jan Dec Central ASDA 5,000.00 DACF (MSHAP) annually activities Admin. supported 80 Organise site DA Site Jan Dec Works Dept. ASDA 5,000.00 IGF, inspections inspections DACF throughout the year organised throughout the year 81 Implement DA Disability Jan Dec SW&CD ASDA 25,000.00 DACF Disability Fund fund implemented 82 Support paupers, District Wide Paupers, Jan Dec SW&CD ASDA 5,000.00 IGF, children and children and GOG physically physically challenged annually challenged supported 83 Organise a District Wide Workshop Jan Dec Central ASDA 5,000.00 IGF workshop on the role organised Admin of the Judiciary in development 84 Support Traditional District Wide Traditional Jan Dec Central ASDA 5,000.00 IGF Authorities authority Admin. Allowance allowance 160

provided 85 Organise 4 Official District Wide 4 official Jan Dec Central ASDA 25,000.00 DACF National Day national day Admin. Celebrations celebrations organised 86 Construct Police Wuruyie Police post Jan Dec Works Dept. ASDA 50,000.00 DDF Post East, constructed Atwereboana , Akrofuom West 87 Provide DA Legal/ Jan Dec Central ASDA 2,500.00 DACF, legal/security security Admin. IGF expenses of the services Assembly provided 88 Organise monthly DA DISEC Jan Dec Central ASDA 2,500.00 DACF District Security meetings Admin. Committee (DISEC) organised meetings 89 Procure insurance DA Insurance Jan Dec Central ASDA 5,000.00 DACF cover for Assembly cover Admin. official vehicle procured for official vehicles

161

5.4 ANNUAL ACTION PLAN 2017

PLANNED PROGRAMME/ LOCATION INDICATOR TIMING RESP. COLLABORA COST SOURCE RE PROJECTS/ Start End PERS/DEPT TING OF MA ACTIVITY / PERSON/ FUNDS RK AGENCY DEPT/ S AGENCY 1 Revalue property District Wide Properties revaluation Jan Dec Central ASDA 10,000.00 DACF done Admin. 2 Prepare District Composite DA District Composite Jun Oct Central ASDA 5,000.00 DACF Budget Budget prepared Admin. 3 Create data base on revenue DA Data base on revenue Jan Dec Central ASDA 2,500.00 IGF items items created Admin. 4 Organise training for District Wide MSMEs training Jan Sept Central ASDA 5,000.00 DACF MSMEs organised Admin. 5 Facilitate cocoa spraying District Wide Cocoa spraying Jan Dec Agric. Dept. ASDA 12,500.00 IGF, programme facilitated DDF, Donor, DACF 6 Provide extension services District Wide Extension services Jan Dec Agric. Dept. ASDA 5,000.00 DDF, to farmers provided to farmers DACF 7 Organise training for AEA’s District Wide Training organised Jan Sept Agric. Dept. ASDA 5,000.00 IGF, annually for AEAs DDF 8 Provide extension District Wide Vaccination given to Jan Dec Agric. Dept. ASDA 5,000.00 DDF, knowledge and vaccination livestock DACF in livestock production 9 Monitor activities of illegal District Wide Forest activities Jan Dec FSD ASDA 5,000.00 IGF lumbering/ chainsaw monitored activities 10 Engage private sector and Bonkro, Stakeholders Jan Dec Central ASDA 10,000.00 DDF, other stakeholders in Birim Aboi, consulted in Admin. DACF development of tourist sites Hwidiem developing tourist sites 11 Support NADMO to District Wide NADMO supported Jan Dec NADMO ASDA 5,000.00 DACF perform its functions of in its activities disaster prevention and management annually 12 Construct 10No. Teachers District Wide 10 No. Teachers Jan Dec Works ASDA 600,000.0 DACF 162

Quarters Quarters constructed Dept. 0 13 Prepare planning schemes New Layouts for Jan Dec Physical ASDA 20,000.00 DACF, for communities Edubiase, settlements prepared Planning DDF Akrofuom, Dept. Apagya, Atobiase, Amudurasi, Praso 14 Construct drains to improve District Wide Drains constructed in Jan Dec Works ASDA 40,000.00 DACF upon the drainage system communities Dept. 15 Construct 2 No. Staff New 2 No. Staff Quarters Jan Dec Works ASDA 50,000.00 DACF Quarters at New Edubiase Edubiase constructed Dept. 16 Repair and maintain 80 km District Wide 80km feeder/ access Jan Dec Works ASDA 10,000.00 DACF, feeder/ access roads roads repaired Dept. IGF 17 Expansion and maintenance Akrofuom Lorry parks expanded Jan Dec Works ASDA 20,000.00 DACF, of lorry parks and maintained Dept. DDF 18 Construction of culverts Tonkoase, Culverts constructed Jan Dec Works ASDA 20,000.00 DACF, Danyeso, Dept. DDF Old Asaman 19 Service and repair 14 No. DA Computers, Jan Dec Central ASDA 2,500.00 DACF, computers and accessories, accessories, Admin. IGF photocopier and intercom photocopier and annually intercom serviced 20 Provide low tension poles to District Wide Electricity extended Jan Dec ECG ASDA 50,000.00 DACF extend electricity to selected to communities communities 21 Provide a quantity of street District Wide Street light bulbs Jan Dec Works ASDA 2,500.00 DACF light bulbs to communities provided Dept. 22 Construct CHPS Compound Tweapiase CHPS Compound Jan Dec Works ASDA 150,000.0 DACF and constructed Dept. 0 Mprechre 23 Construct additional wards Ataase Additional wards Jan Dec Works ASDA 60,000.00 DACF for Health Centre constructed Dept. 24 Provide maternal waiting All health Maternal waiting Jan Dec Works ASDA 10,000.00 DDF, homes centers homes provided Dept. DACF 25 Construct 10 No.3 Unit District Wide 10 No. 3 Unit Jan Dec Works ASDA 300,000.0 DACF, Classroom Block Classroom Block Dept. 0 DDF 163

constructed 26 Education fund disbursed to District Wide Education fund Jan Dec GES ASDA 5,000.00 DACF needy students provided 27 Construct 5 No.6 Unit District Wide 5 No. 6 Unit Jan Dec Works ASDA 250,000.0 DACF, Classroom Block Classroom Block Dept. 0 DDF constructed 28 Rehabilitation of 10 No. District Wide 10 No. Schools Jan Dec Works ASDA 100,000.0 DACF Schools rehabilitated Dept. 0 29 Organise mass education District Wide Mass education Jan Dec SW&CD ASDA 40,000.00 IGF, meetings annually meetings organised DACF 30 Support the development of District Wide Sports development Jan Dec Central ASDA 2,500.00 DACF sports in the District supported Admin. annually 31 Facilitate school feeding District Wide School feeding Jan Dec NSFP/ GES ASDA 60,000.00 Donor programme program facilitated 32 Organise workshop on District Wide Workshop organised Jan Dec DHD ASDA 5,000.00 Donor, Family Planning Methods DACF 33 Subsidise FP methods District Wide FP methods Jan Dec DHD ASDA 4,000.00 Donor, subsidised DACF 34 Support WATSAN and District Wide Potable water Jan Dec CWSA ASDA 25,000.00 DACF, other agencies in potable provided DDF, water delivery IGF, Donor 35 Provide for fumigation and District Wide Sanitation and Jan Dec Environmen ASDA 212,000.0 DACF sanitation fumigation provided tal Health 0 Dept. 36 Clearing of final dump sites District Wide Dump sites cleared Jan Dec Environmen ASDA 25,000.00 DACF tal Health Dept. 37 Construction of K.V.I.P District Wide K.V.I.Ps constructed Jan Dec Works ASDA 100,000.0 DACF Dept. 0 38 Support District Response District Wide Malaria control Jan Dec AGA Mal ASDA 5,000.00 DACF Initiative (Malaria Control program supported Programme) annually 39 Pay transfer grants to DA Transfer grants Jan Dec Central ASDA 5,000.00 IGF officials posted to the provided Admin District 164

Pay responsibility DA Responsibility Jan Dec Central ASDA 2,500.00 IGF allowance to staff allowance paid Admin. 40 Ensure minor repair/ DA Office machines and Jan Dec Central ASDA 2,500.00 IGF maintenance of office furniture repaired Admin. machines and furniture 41 Purchase adequate DA Stationary purchased Jan Dec Central ASDA 5,000.00 IGF stationary for office use for use Admin. annually 42 Print calendars and other DA Calendars printed Jan Mar Central ASDA 2,500.00 IGF materials annually ch Admin 43 Procure office facilities and DA Office facilities and Jan Dec Central ASDA 25,000.00 IGF furniture for the Assembly furniture provided Admin. office every year 44 Purchase 10 newspapers and DA Newspapers and Jan Dec Central ASDA 2,500.00 IGF publications to offices and publications provided Admin. library daily 45 Provide refreshment items DA Refreshment items Jan Dec Central ASDA 2,500.00 IGF to the Assembly office provided Admin. 46 Provide protocol fuel to DA Protocol fuel Jan Dec Central ASDA 10,000.00 IGF Assembly officials and provided for official Admin. official guests for official activities duties throughout the year 47 Organise workshops and DA Workshops and other Jan Dec Central ASDA 10,000.00 IGF other training programmes training organised Admin. for Assembly staff, Assembly members, Heads of Department annually 48 Organise end of year best DA Awards and staff Jan Dec Central ASDA 5,000.00 IGF worker award and staff durbars organised Admin. durbars 49 Sponsor Assembly staff, DA Assembly members Jan Dec Central ASDA 5,000.00 IGF Assembly members and and staff supported to Admin. others to attend workshop attend training and other training programmes throughout the year 50 Provide for travelling and DA Travelling and Jan Dec Central ASDA 5,000.00 IGF 165

transport for staff who transport provided Admin. perform official duties 51 Maintain and repair official DA Office vehicles and Jan Dec Central ASDA 10,000.00 IGF, vehicle and Assembly grader maintained Admin. DACF grader 52 Engage consultants to train DA Assembly staff and Jan Dec Central ASDA 25,000.00 DDF relevant staff of the members trained by Admin. Assembly and Assembly consultant members 53 Screening of food vendors District Wide Food vendors Jan Dec Environmen ASDA 2,500.00 IGF screened tal Health Dept. 54 Support DEOC in its DA DEOC Supported Jan Dec DED ASDA 2,500.00 IGF, activities DACF 55 Provide adequate value DA Value books provided Jan Dec Central ASDA 1,500.00 IGF books for revenue collection to revenue collectors Admin. 56 Give logistics to revenue DA Logistics provided to Jan Dec Central ASDA 2,500.00 IGF collectors revenue collectors Admin. 57 Organise revenue District Wide Revenue mobilization Jan Dec Central ASDA 2,500.00 IGF mobilisation campaign and campaign and Admin. education quarterly each education organised year 58 Revise and gazette fee- DA Fee fixing revised Jan Dec Central ASDA 5,000.00 IGF fixing resolutions annually and gazetted Admin. 59 Pay commission to DA Commission paid to Jan Dec Central ASDA 5,000.00 IGF commissioned collectors commissioned Admin. collectors 60 Organise stakeholders DA Stakeholders meeting Jan Dec Central ASDA 5,000.00 IGF, meetings / public for a organised Admin. DACF 61 Ensure effective DA DPCU activities Jan Dec Central ASDA 5,000.00 DACF implementation of DPCU implementation Admin. activities 62 Pay utility bills for the DA Utility bills paid Jan Dec Central ASDA 5,000.00 IGF Assembly Admin. 63 Purchase building materials DA Building materials Jan Dec Works ASDA 15,000.00 IGF, to support community purchased to support Dept. DACF initiated projects community initiated 166

projects 64 Support Town/ Area District Wide Town/ Area Councils Jan Dec Central ASDA 5,000.00 DACF Councils in performing their supported Admin. duties 65 Implement MP constituency District Wide MPs constituency Jan Dec MP ASDA 100,000.0 MPs programmes and projects programmes 0 share of annually implemented DACF 66 Organise quarterly Heads DA Heads of Department Jan Dec Central ASDA 1,500.00 IGF of Department meetings meetings organised Admin. 67 Organise 10 durbars for DA 10 durbars organised Jan Dec Central ASDA 25,000.00 IGF, official functions annually for official functions Admin. DACF 68 Publish Assembly activities DA Assembly by-laws Jan Dec Central ASDA 10,000.00 IGF and gazette by-laws gazetted and Admin. activities gazetted 69 Monitor and evaluate DA M&E carried out on Jan Dec DPCU ASDA 10,000.00 DACF District Assembly projects projects 70 Support HIV/AIDS DA MSHAP activities Jan Dec Central ASDA 5,000.00 DACF (MSHAP) annually supported Admin. 71 Organise site inspections DA Site inspections Jan Dec Works ASDA 5,000.00 IGF, throughout the year organised throughout Dept. DACF the year 72 Implement Disability Fund DA Disability fund Jan Dec SW&CD ASDA 25,000.00 DACF implemented 73 Support paupers, children District Wide Paupers, children and Jan Dec SW&CD ASDA 5,000.00 IGF, and physically challenged physically challenged GOG annually supported 74 Organise a workshop on the District Wide Workshop organised Jan Dec Central ASDA 5,000.00 IGF role of the Judiciary in Admin development 75 Support Traditional District Wide Traditional authority Jan Dec Central ASDA 5,000.00 IGF Authorities Allowance allowance provided Admin. 76 Organise 4 Official National District Wide 4 official national day Jan Dec Central ASDA 25,000.00 DACF Day Celebrations celebrations Admin. organised 77 Construct Police Post Wuruyie Police post Jan Dec Works ASDA 50,000.00 DDF East, constructed Dept. Atwereboana 167

, Akrofuom West 78 Provide legal/security DA Legal/ security Jan Dec Central ASDA 2,500.00 DACF, expenses of the Assembly services provided Admin. IGF 79 Organise monthly District DA DISEC meetings Jan Dec Central ASDA 2,500.00 DACF Security Committee organised Admin. (DISEC) meetings 80 Procure insurance cover for DA Insurance cover Jan Dec Central ASDA 5,000.00 DACF Assembly official vehicle procured for official Admin. vehicles 81 Maintain adequate security District Wide Security Jan Dec GPS ASDA 5,000.00 DACF in the District annually

168

CHAPTER SIX

MONITORING AND EVALUATION

MONITORING AND EVALUATION ARRANGEMENT FOR DISTRICT MEDIUM TERM DEVELOPMENT PLAN (2010 – 2013)

INTRODUCTION

Planning is not an end in itself but only means of achieving a specific objective. The main objective of the planning process is the improvement in the well-being of the people, not the planning document. District Assemblies, as planning authorities are responsible not only for the formulation of plans but also for their implementation, monitoring and evaluation. One instrument which can be used to measure the success of a project/programme is the monitoring and evaluation system (M&E).

MONITORING

Monitoring is the continuous or periodic review of the implementation of an activity to ensure that input deliveries, work schedules, targeted outputs and other required actions are proceeding according to plan. Monitoring as a management instrument, pre-supposes that development programmes must be managed as planned. Monitoring measures, records progress of implementation and focuses on the compliance with the plan. It is therefore a continuous task during the whole life cycle of a programme. The monitoring process requires the timely collection and analysis of data during the analysis, planning and implementation of the District Three-year Medium Term (2010 – 2013) Development Plan (DMTDP).

Monitoring is important in achieving efficient and effective project or programme performance by providing feedback to project management. This enables management to improve operational plans and take timely corrective action in case of shortfalls and constraints.

Monitoring is important in achieving efficient and effective project or programme performance by providing feedback to project management. This enables management to improve operational plans and take timely corrective action in case of shortfalls and constraints.

At the planning level, monitoring process under the 3-year Medium Term Development Plan would compare the planned time schedules, organizational structure, and financial provisions against actual achievement.

While monitoring is correct oriented, taking the logical framework (log frame) as the core element, four major areas would be measured and analyzed, based on the indicators which were developed in the planning process. 169

1. The target set in the objectively verifiable indicators (OVI) which measure the achievement of the programme objective (that is, goal, purpose and outputs.) In this case, direct and indirect impact indicators reflect that the extent of which projects or programmes in the 3-year medium term development plan is impacting on the lives of the target population or beneficiaries would be measured.

2. The important assumption which is incorporated into a set of indicators would be continuously observed ad a measure of external conditions. For the purpose of monitoring development programme, the assumptions upon which plans have been based and the objectives to be achieved must be clearly spelt out. The assumptions are very important in monitoring projects because they serve as the pivot around which development programmes from which project emanate. Assumptions are the necessary conditions that must prevail for projects and programmes to be implemented successfully. Hence, an assumption must be continuously monitored to test their validity.

3. Operational indicators have been developed to measure the control of resources, personnel, financial disbursements, expenditure, incomes and time.

4. Performance and efficiency indicator have been developed to indicate whether activities have been completed. Monitoring assesses the extent to which the activities are being implemented according to schedule.

5. The means of verification (MOV) would indicate where data can be gathered in a cost-effective way.

The monitoring system devised for the District’s Medium Term Development Plan seeks to examine compliance with the plan. Simple monitoring techniques like the use of charts indicating time table, responsibility matrix, financial schedules, completion dates and when monitoring should take place are mainstreamed in the monitoring arrangements.

There are development programmes or projects implemented by line ministries, non-governmental organizations, para-statal and the private sector which would be monitored to avert duplication of efforts.

Monitoring the implementation of the District Medium term plan based on the Ghana Poverty Reduction Strategy 1(GPRS 1) would be done through the use of poverty monitory systems. These would facilitate the tracking of projected periods to assess the effectiveness and efficiency of wealth and growth inducing pro-pro intervention for beneficiary communities during the planning process.

Participatory monitoring would be used to record the periodically keep track of progress towards objectives on a day-to-day, week-to-week and monthly basis. Participatory monitoring would be locally tailored in recording information which meets local needs and aspirations. Monitoring tools selected primary address cultural, social, economic factors operating in the community. 170

Pending the release of monitoring and evaluation guidelines from the National Development Planning Commission (NDPC), a tentative monitoring format has been devised.

The monitoring and evaluation or programmes and projects for the four year planned period (2014-2017) would be undertaken by the District Monitoring and Evaluation Team. The composition of the team is:

The District Co-coordinating Director

The District Planning Officer

The District Budget Officer

The District Works Engineer

The District Finance Officer

The Chairman Works Sub-committee

The Relevant Heads of the Departments e.g. Agriculture, Education, and Health etc.

PROJECT MONITORING REPORT

A. Project Identification No. ……………………………………………………………

B. Project Title: ………………………………………………………………………….

C. Project Objectives: …………………………………………………………………..

D. Project Location: …………………………………………………………………….

E. Data Source: ………………………………………………………………………….

F. Methods/Tools of Monitoring: ……………………………………………………….

G. Implementation Agency (ies): ………………………………………………………..

H. Monitoring Agency (ies): …………………………………………………………….

I. Collaborating Agency (ies): ………………………………………………………….

J. Person (s) Responsible: ……………………………………………………………...

K. Project Start: …………………………………………………………………………

L. Project End: ………………………………………………………………………….. 171

M. Date of Monitoring: ………………………………………………………………….

N. Commencement of Earliest Start (ES) and Earliest Finish (EF)………………………

………………………………………………………………………………………………….

PROJECT IMPLEMENTATION

Construction Works Planned to Date Actual to date Variance

(%) (%)

Objective A……………….

Objective B……………….

Objective C……………….

EVALUATION

Evaluation determines the causes of deviations from the plan, the initial effects, (planned/unplanned) as well as the impact the programme has had, e.g., the effect on the target group and many others. Evaluation provides the planner with the explanation of why things have happened the way they have, thereby giving the beneficiary communities the necessary information to rectify the anomaly.

Participatory evaluation encourages and reflects on what has happened in the past in order to make decisions about the future. By evaluation, beneficiary communities learn about things that have worked well and vice versa and through the process, it becomes more likely that corrective measures will be implemented. The effectiveness of participatory evaluation lies in the understanding of the community to agree on the purpose of the evaluation. The objectives of the project, as well as the expected outputs provide a forum for changes and adjustments if the need arises in order to achieve desired results. In the preparation of the three-year medium term development plan,

172 community evaluation teams are envisaged to play active roles in information gathering, and analysis to ensure that recommendations from evaluations reach the intended beneficiaries. Decisions made and feedback is incorporated into the project or activities, to ensure re-planning where necessary.

Terminal, ex-ante and ex-post evaluation would be undertaken to ensure whether the intended result has been achieved or not as well as the reasons for failure. Terminal evaluation would be undertaken immediately the programme is completed, while “ex-post” evaluation would be undertaken after some years after completion of programme. Ex-post evaluation would be undertaken to analyse the goals and objective of the project to determine the impact which the development plan has had on the target population. Monitoring and evaluation (M&E) to a larger extent could be seen as involving different planning processes, such as data collection and analysis, documentation, assessment and interpretation, decision making and remedial action. Participatory Impact Monitoring and Evaluation System (PIMES) would be used to analyse and establish correlation between poverty focused intervention and impact on livelihood.

The tentative Evaluation Report underneath is prepared to spearhead the evaluation process under the District Medium Term Development Plan .

PROJECT EVALUATION REPORT

A. Project Title: …………………………………………………………………………

B. Project Identification No: ……………………………………………………………

C. Project Location: …………………………………………………………………….

D. Implementation: ………………………………………………………………………

E. Evaluation Agency (ies): ……………………………………………………………

F. Date of Evaluation: ………………………………………………………………….

G. Estimated Cost of Project: …………………………………………………………..

H. Actual Cost of Project: ………………………………………………………………

I. State length of over-run, if any: ……………………………………………………..

J. Has project objectives achieved……………………………………………………

K. Are project objectives still relevant: …………………………………………………

173

L. Did funds released as planned: ……………………………………………………….

M. Are benefits reaching the target beneficiaries: ……………………………………….

N. If not, why? : …………………………………………………………………………..

O. Is project operating as planned: ……………………………………………………….

P. If not, state reasons: ……………………………………………………………………

Q. Are project assets being maintained: ………………………………………………….

R. Where appropriate reasons for failure: ………………………………………………

174

CHAPTER SEVEN

FINANCIAL COMMUNICATION STRATEGY/ PLAN

DISSEMINATION OF THE DISTRICT MEDIUM TERM DEVELOPMENT PLAN (DMTDP) 2014 –2017

This section looks at the dissemination of the DMTDP (2014 –2017) to the relevant stakeholders and decision makers. This is very important as knowing and sharing the contents with the key stakeholders – Traditional Authority, Opinion Leaders, Religious Leaders, Sub-District Structures and Civil Society would ensure accountability and transparency. The tendency is that once accountability and transparency become the bedrock of governance. It would galvanize their support and commitment towards the implementation of the interventions contained in the Plan.

In summary, Adansi South District Assembly will implement its communication strategy in order to:  disseminate its programmes, projects, activities and Annual Progress Reports to inform/create awareness  create awareness on the roles and expectations of the stakeholders in the implementation of the District programmes to improve their living conditions for the period 2014-2017  promote dialogue and generate feedback on the performance of the District  promote access and manage expectations of the public concerning the services of the District

The dissemination strategies of the District Planning and Coordinating Unit (DPCU) would include;

 Public Hearing of the DMTDP at the District Level  Organize meetings and workshops with the Sub-District Structures  Meetings with Traditional Rulers, Religious Bodies, Communities and Civil Society Organizations.  Produce and distribute 20 copies of the District Medium Term Development Plan 2014 –2017 to the National Development Planning Commission, Regional Planning and Coordinating Unit (RPCU), District Directors of Departments and others.  Organise Quarterly, Annual, Mid-Term and End of Term performance review workshops and disseminate outcomes to all stakeholders.

175

INDICATIVE BUDGET

The estimated cost for the implementation of the Adansi South District Medium Term Development Plan (2014- 2017) is as follows:

IGF 1,176,000.00

GOG/DDF 1,075,000.00

DONOR 3,223,500.00

DACF 4,843,000.00

Total 10,317,500.00

176

ADANSI SOUTH DISTRICT ASSEMBLY NEW EDUBIASE – ASHANTI

1ST PUBLIC HEARING REPORT

NAME OF DISTRICT : ADANSI SOUTH REGION : ASHANTI NAME OF AREA/URBAN COUNCIL : NEW EDUBIASE VENUE : DIST. ASSEMBLY HALL DATE : 20TH JANUARY 201

(a) Medium of Invitation, Notice, and Announcement issued for participation: Letters, Making Phone Calls and the use of Public Address system (b) Names of Special/ Interest Group and individuals invited: Chiefs, Heads of Departments, Assemblymen, Non-Governmental Organizations, Area Council Chairmen and Secretaries (c) Identifiable representations at Hearing: District Assembly members, Heads of Departments, Security Agencies, Traders, Farmer, Teachers, Beautician and the General Public. (d) Total Number of Persons at Hearing and Languages used: 119 with 97 being males and 22 being females (List of participants attached). The mode of communication was mostly Twi and at times English (e) Major Issues at Public Hearing  Extension of Electricity to other communities without electricity  Provision of Potable water  Rehabilitation of roads  Provision of Drainage Facilities  Adequately protect the Forest Reserves in the District  Improve Sports Development  Improved Maternity Wards (f) Main controversies and Major Areas of Complaint  Institute best Teacher award  Operation of illegal Mining  Procurement Cesspool Emptier (g) Proposal for the Resolution of the above controversies  Facilitated the registration of illegal Miners and monitor their activities  Organization of best Teacher awards to be captured In the plan  Procurement of Cesspool Emptier to be captured in Plan

(h) Unresolved Questions or Queries - Not Applicable

(i) At what level are these unresolved problems going to be resolved and why - Not Applicable. (j) General comments on level of Participation 177

The participation of the people was ensured with all stakeholders fully represented.

Client acceptance of public hearing report

1) District Chief Executive ------(HON. BENJAMIN ANHWERE)

2) Presiding Member of District Assembly ------(HON.OHENEBA K.ANDOH

3) District Co-ordinating Director ------(SAMUEL NNURO AMPOSAH)

178