Knit in reverse (from left to right)

1 With in back of work, 2 Bring left needle tip 3 While lifting right needle tip, insert left needle into stitch on from back to front. bring yarn through stitch and right needle from front to back onto left needle to form new and move left needle behind stitch. Pull stitch off right needle. updated 4/25/16 right needle. Knit in reverse (from left to right) Entrée to The definitive guide from abiased knitter Purl in reverse (from left to right) Corrections & Clarifications

1 With yarn in back of work, 2 Bring yarn over left needle tip 3 While lifting right needle tip, insert left needle into stitch on from back to front. bring yarn through stitch and right needle from front to back onto left needle to form new and move left needle behind stitch. Pull 1stitch With off yarn right in frontneedle. of work, 2 Wrap yarn counterclockwise 4 . . . to form a newPage stitch on29 left right needle. insert left needle into stitch on around left needle. needle. Pull stitch off right needle. right needle from back to front. 3 Bring yarn under right needle Joined Points Hat Diagram of Tier 4 and through stitch . . . should show bound off stitches instead of First Printing 2010 live stitches. Page 21 Purl in reverse (from left to right) Page 39 Pick up & knitArgyle instructions shouldPick read: up & Tierpurl 1 Pick up & knit in reverse (PUK) With A, work 4 LBT. (not 4 times). Spruce & ivory Next Tier Work 12 (14, 14, pickupgarter pickupknit 16, 18) RR and place on hold for Front; Page 23 work RR with bind-off; work 2 (2, 4, 4, 4) PUP 1 With yarn in front of work, 2 Wrap yarn counterclockwise 4 . . . toMarket form a new stitch Scarf on left Tier 1pickuppurl With A; Tier 2 With B; Dec RTT; work 12 (14, 14, 16, 18) RR for insert left needle into stitch on around left needle. With right sideneedle. facing andPull yarnstitch in off back, right insert needle. needle from With wrong side facing and With right-side facing and yarn in right needle from back to front. 3 Bring yarn under right needle Back; work RR with bind-off; work 2 (2, front to back in centerTier of edge 3 With stitch, catch A. yarn and knit yarn in front, insert needle from back, insert needle from front to and through stitch . . . a stitch. (See stockinette left, garter right.) back to front in center of edge 4,back 4, in center4) Dec of edge RTT. stitch, catch stitch, catch yarn, and purl. yarn, and knit a stitch. Page 24 Market Scarf P2tog worked in reverse & Page 48 RST Right-leaning Starting Triangle Pick up & knit Pick up & purl K2togPick worked up & knit in inreverse reverse (PUK) shown below: instead of making a slip knot, Cast on 1. P2tog worked in reverse K2tog worked in reverse pickupgarter Row 1 P2tog to join pickupknit (cast-on stitch with stitch from previous tier). PUP pickuppurl With right side facing and yarn in back, insert needle from With wrong side facing and With right-side facing and yarn in Page 54 front to back in center of edge stitch, catch yarn and knit yarn in front, insert needle from back, insert needle from front to 1 Insert left needle from right to 2 Purl these 2 stitches together a stitch. (See stockinette left, garter right.) back to front in center of edge back in center of edge stitch, catch 1 Insert leftHobo needle intobag first 2Under 2 Bring Finishing yarn over left needle the tip panels, left into back of first 2 stitches on as if they were 1. stitch, catch yarn, and purl. yarn, and knit a stitch. stitches on right needle as shown from back to front and pull yarn right needle. (left needlereplace is behind). yo withthrough a M1 these. 2 stitches (as if they were 1). Pull both stitches off right needle. 24 The result is a right- Page 56 slanting . Watercolor jacket Missing The Units Base K2tog worked in reverse P2tog worked in reverse numbers 15 (16, 17, 18).

Page 64 Top downs for everyone Man’s cast on is

1 Insert left needle from right to 2 Purl these 2 stitches together 1 Insert left needle into first 2 2 Bring yarn over left needle tip 80 (80, 120, 120, 120) Woman’s cast on is left into back of first 2 stitches on as if they were 1. stitches on right needle as shown from back to front and pull yarn 84 (84, , , 126, 126) and Child’s cast on right needle. (left needle is behind). through these 2 stitches (as if 98 98 they were 1). Pull both stitches off is 72 (72, 84). Woman’s is a Close fit. right needle. 24 The result is a right- slanting decrease. 15-st Cable 6 Stitch key 5 Knit on RS, purl on WS 4 3 Purl on RS, knit on WS 2 1 2/2 LC Place 2 stitches on cn to front, k2; k2 from cn 3/3 LC Place 3 stitches on cn to front, k3; k3 from cn 14-st Cable 4/4 LC Place 4 stitches on 6 cn to front, k4; k4 from cn 5 4 3 2 1 BO RTT-P Work same as BO RTT EXCEPT in reverse stockinette stitch (purl RS rows and knit WS rows) AND k2tog to join. 13-st Cable 6 5 4 3 2 1 Page 66 Page 87 Top downs for everyone Morning, noon & night12-st On Cable Borders use Under Underarm 6 5 yarn B. 4 gusset replace second sentence (Work 3 2 unjoined RR) with: cast on base stitches 1 Page 88bo RTT live RTT decdec RTT RTT LST 8 (9, 10, 11, 12); 10 (11, 12, 13, 14, 15); 10 BO 11-st Cable SSK Morning,PUP noon & nightPUP 6 PUP (11, 12). P2tog P2tog 5 P2tog

5 4 5 4 Pf&b Thumb Tier 2 Clarification: The right-leaning 3 SSK 2 3 2 3 2 Tier 1 1 Page 79 rectanglesLTT on the yokelive LTT and dec LTT BO P2tog body and eachSSK left-leaningSSK rectangleSSK on the Chevron Left Corner Tier 6 15-st Cable 10-st Cable Under Units PUK 6 PUK 6 PUK Stitch key sleeves in reverse5 stockinette. Also5 work 10–16, should read: With B, 3work5 2RR,4 5 4 Knit on RS, purl on WS Thumb Tier 2 4 Purl3 on RS, knit on WS 2 3 instead3 of Bo RTT Purl. 3 2 Dec2 RTT Purl RST 2 RR work Unjoined RR, cast on 61 , work Tier 1 unjoined RR 1 2/21 LC Place 2 stitches on Correction to Cable charts and notes.cn to front, k2; k2 from cn

Kf&b 3/3 LC Place 3 stitches on Double RR . . . 2 9-st Cable cn to front, k3; k3 from cn 14-st Cable 4/4 LC Place 4 stitches on Tier 1 6 Color key6 cn to front, k4; k4 from cn unjoined LR 3 5 5 PUP 4 PUP Page 80 4 P2tog P2tog 3 A 3 2 2 1 2 B A family of mittens 1 BO RTT-P1 live stitches Work same as BO RTT EXCEPT in reverse stockinette stitch

Step b 1 2 picked-up stitchesRepeat Rows 1-6(purl until RS all rows stitches and knit WS rows) AND k2tog to join. Colors in , 2nd b Join LBT RETfrom unit inInc previous LBT tier have been joined.LET PUK 13-st Cable joined edge Tier 1 6 Color key diagram is incorrect. 5 temporary cast-on 15-st Cable 4 A 1 3 bind-off Stitch key 6 SSK double-join LR Here is corrected diagram. 2 2 K1•K2tog B Kf&b a 5 1 Knit on RS, purl on WS

4 P2tog directionPUP of worklive stitches 3 Purl on RS, knit on WS P2tog Top rectangle 1 dbl-join RR 2 picked-up stitches b 1 2/2 LC Place 2 stitches on PUK Page 81 12-st Cable joinedcn edge to front, k2; k2 from cn 6 SSK A family of mittens LTT 5 temporary3/3 LC cast-on PlaceSSK 3 stitches on Missing text at 4 cn to front, k3; k3 from cn 1 14-st Cable 3 bind-off Inc RBT PUK 2 P2tog LR 4/4 PUPLC Place 4 stitches on beginning of page: Tier 2, f a SSK 1 P2tog With A, 6 directioncn to of front, work k4; k4 from cn 5 PUK Top rectangle4 [work LR, work Unjoined LR, PUK 3 Pf&b 2 11-st Cable base stitchesMitten along edge of unit just 6 1 ChartsSSK BOshow RTT-P RR Cable; Row 1 is 5 RS. ForWork LR Cables,same as BO Row RTT EXCEPT 1 is inWS. reverseJoin stockinette RBT stitch 9 Tier 2 4 bo RTT Purl PUK completed, work 4 5 3 (purl RS rows and knit WS rows) AND k2tog to join. 8 3 4 2 10 1 13-st Cable BO1 PUP Join last stitch of even- LR] twice. Diagram 2 7 11 5 6 bo RTT live RTT dec RTT LST 5 K2tog numbered rows to stitch from P1•P2tog is renumbered as f 6 4 previous tier. BO SSK 10-st Cable3 PUP PUP Mitten PUP 2 6 shownP2tog here. P2tog P2tog 5 3 1 4 Pf&b Tier 2 4 4 5 5 3 5 Diagram B 1 SSK 2 3 4 5 2 live stitches2X Tier 1 2 5 1 1 1 LTT bolive RTT LTT livedec RTT LTT dec RTT 3 LST 2 3 picked-up stitches2

Page 82 dec LTT 1 dec RTT 12-st Cable

4 BO P2tog SSK 6 4 SSK BO SSK SSK PUP 5 EnvelopePUP clutch PUP 4 9-st Cable P2tog P2tog 4 PUK PUK P2tog PUK3 Pf&b 6 3 Tier1 1 Direction5 of work On Bag body, Tier 2 SSKPageTier4 2 97 2 1 1 3 2 3 4 3 5 2 3 live stitches LTT live LTT Tier 1dec LTT 2

RST RR 1 unjoined7 With RR A, work 5 1 Arlis’4 picked-up stitches BO 3 1 P2tog SSK SSK 2 SSK 4

Kf&b 1 11-st Cablec sweaterRepeat Rows 1-6 until all stitches Dec LTT, 5LR. On Envelope flap, Tier 12PUK PUK PUK2 6 from unit in previous tier have been joined. 5 5 unjoined LR Missing1 With C, work 2 Dec RTT. Tier 1 4 3 2 Direction of work PUP PUP 3 P2tog RSTP2tog 2 RR 3 2 size small unjoined RR 1 bo RTT live RTT decdec RTT RTT LSTThumb 4 6 8 Kf&b 1 Page 84 1 2 4 numbers on BO e SSK Repeat PUP PUP PUP Sweater right 2 4 6 JoinMorning, LBT noonRET &Inc night LBT On LET PUK10-stunjoined Cable LR P2tog P2tog P2tog 5

PUP PUP 6 Pf&b S P2tog 1 P2tog Front.5 See Tier 2 SSK 2 4 . . . work 2 RR, 2 Dec 4 direction of work d 3 K1•K2tog LTT live LTT SSK dec LTT double-join LRreplacement L , RR; work . . . Kf&b 2 live stitches 2 RTT 1

BO P2tog P2tog picked-up stitches PUPSSK SSK schematic. dbl-joinSSK RR P2tog 2X Join LBT RET Inc LBT LET joined edge PUK 1 3 5 7 PUK Diagram A PUK PUK PUK 1 3 5 temporary cast-on 1 3 S, L, 2X SSK 9-st Cable SSK LTT 6 SSK double-join LR unjoinedK1•K2tog RR RST RRKf&bInc RBT PUK 5 P2tog LR PUP 4

P2tog P2tog SSK PUP 3 dbl-join RR P2tog Kf&b 2 PUK PUK Color key1

Pf&b unjoinedA SSK LR SSK Repeat Rows 1-6 until all stitches PUPLTT SSK PUP B P2tog LR GCB 2-15P2togJoin new RBT fromInc unit RBT in previous tier havePUK been joined. bo RTT Purl P2tog PUK PUP SSK P2tog

BO PUK PUP K2tog Pf&b Join LBT RET Inc LBTP1•P2tog LET PUK SSK Join RBT bo RTT Purl PUK

K1•K2tog SSK double-join LR BO Kf&b PUP PUP P2tog K2tog dbl-join RR P1•P2tog P2tog PUK

SSK LTT SSK Inc RBT PUK P2tog LR PUP SSK P2tog

PUK Pf&b

SSK Join RBT bo RTT Purl PUK

BO PUP K2tog P1•P2tog 5 4 3 2 1 C Tier 12 Work base with temporary cast-on. Tier 11 B A Tier 10 Tier 9 C 6 7 8 9 10 B Tier 8 bo RTT bo RTT 4 3 2 1 BO BOTier 7 A C Tier 6 PUP PUP Tier 1, turn work and work RR 5, 6 & 7; P2tog P2tog then work RR 8, joining to stitches from temporary cast-on of rectangle 1. Tier 5 B live stitchesA Tier 4 4 3 2 1 live LTT DK live LTT DK temporary cast-on Tier 3 C joined edge B Tier 2 join pairs join pairs

11 12 13 14 15 picked-upbo RTT stitches

10 Tier 1 A 2 4 3 1

5 column B row PU pairs PU pairs

8 7 9 6 BO bo RTT PUP 5 6 7 8 direction of work P2tog BO RST DK RSTRR DKDK RR DK Rotate work4 180 degrees,2 work RR1 9, 10 & 11, joining to stitches from temporary PUP P2tog co pairs cast-ons, then work RR 12, joining to live stitches from rectangle 4. live LTT DK co pairs

join pairs Page 11111 12 13 14 Page 138 live LTT DK

PU pairs PU pairs 10

1 2 3 5 4

15 join pairs join pairs

Lightning bolt rucksack For clarification, Hearts ‘nPU pairsblocksjoin pairs The Unitjoin pairs Icons arejoin pairs 6 8 9

7 bo RTT live stitches drawings 9are 10replaced11 12 for steps a through d. named differently. PU pairs

4 3 2 1 temporary cast-onBO RST DK RR DK 4 2 3

8 1 joinedPUP edge DK LBT RET DK 7 5 P2tog 6 DK LBT RET DK picked-up stitches co pairs BT RST STDK RRET DK column B row live LTT DK co pairs 3D view of base and Tier 1. direction of work CO pairs boPU pairs RTTCO pairs d of Tiers5 16 and 2.7 8 3D join pairs join pairs

direction of work PUjoin pairs pairs PU pairs

4 2 1 BO PU pairs join pairs join pairs

10 11 9 PUP live stitches join pairs

temporary cast-on PU pairsP2tog join pairs

4 2 3

8 1 bind-off 12

7 5

picked-up6 stitches DK LBT RSTLRRET DK DK PRRR DK live LTTTT DK joined edge DK LBT RETLR DK DK LR DK

co pairs join pairs

9 10 11 12 CO pairs

PU pairs

4 2 3 1 PU pairs

8 CO pairsjoin pairs PU pairs

join pairs join pairs 7 5

6 join pairs PU pairsjoin pairs RST DKGlow indicates a live stitches join pairs RR DK 4 3 2 1 temporary cast-on PU pairs modified unit.PU pairs c Rotate work and joined edge co pairs picked-upDK stitches LBT RETLR DK DK

complete Tier 2. column B row 10 11

9 LR DK PU pairs

join pairs join pairs 4

2

3 8 1 5 6 7 8 direction of work Page 146 sample

12 CO pairs

7 5 6 join pairs 4 2 1 spreadsheetPU pairs is available for download at live stitches join pairs join pairs PU pairs 4 3 2 1 knittinguniverse.com/entrelac.DK LBT RET DK b Begin Tier 2 temporary cast-on joined edge PU pairs picked-up stitcheslive stitches CO pairs 4 3 2 1 column B rowtemporary cast-on Page 153LR DK 9 10 11 12 joined edge PU pairs

Left-handed cast-onjoin pairs has been 4 2 3 1 picked-up stitches 5 a 86 7 8 direction of work

Tier 1 Work 4 base column B row 7

5 6 added to the school. 4 rectangles2 1 . join pairs direction of work 5 6 7 8 Left Handed

PU pairs LR DK

4 2 1

10 11

Page 1259

4 2 3 join pairs

Entrelac8 1 Flounce Duo12 On schematic

7 5

9 10 11 126 PU pairs

neck depth measurement corrected to 1 With waste yarn and leaving 2 Bring yarn over point of 4 2 3 1 9 10 11 12

8 a short tail, make a slipknot on needle and hook yarn through

4

2

3 1 . 7 5 4¾ (4¾,6 5, 5, 5, 5, 5)"

8 crochet hook. Hold hook in left loop forming next stitch.

7 5

6 hand; in right hand, hold knitting Repeat Step 2 until 1 stitch needle under yarn and on top of remains to cast on. Slip loop Page 126 hook. With hook to left of yarn, from hook to needle for Father knows best Missing text at end bring yarn through loop on hook; last stitch.

yarn goes over top of needle,

10 11

9 10 11

of third note9 . . . all pieces are the same forming a stitch.

4 2 3 4 1 2 3

8 length.8 1 12 12

7 5 6 7 5 4th note:6 Bind off stitches in pattern.

Page bo126 RTT live RTT decdec RTT RTT LST

Father knowsBO best SSK PUP PUP PUP P2tog P2tog P2tog

Replace all Bo RTT with Pf&b SSK Dec RTTLTT . live LTT dec LTT

BO P2tog SSK SSK SSK

PUK PUK PUK

unjoined RR RST RR

Kf&b unjoined LR PUP PUP P2tog P2tog

Join LBT RET Inc LBT LET PUK

SSK double-join LR K1•K2tog Kf&b

PUP P2tog dbl-join RR P2tog PUK

SSK LTT SSK Inc RBT PUK P2tog LR PUP SSK P2tog

PUK Pf&b

SSK Join RBT bo RTT Purl PUK

BO PUP K2tog P1•P2tog Page 154 Second Printing 2012 Make 1 has been added to the school. Make 1 (M1) Page 87 Morning, noon & night Knit On Borders use yarn B.

Page 125 Entrelac Flounce Duo On schematic For a left-slanting (M1L), insert The result is a left- left needle from front to back under slanting increase. neck depth measurement corrected to strand between last stitch knitted and first . stitch on left needle. Knit, twisting strand 4¾ (4¾, 5, 5, 5, 5, 5)" by working into loop at back of needle. Page 126 Father knows best Missing text at end of third note . . . all pieces are the same length. 4th note: Bind off stitches in pattern. Or, for a right-slanting increase (M1R), insert The result is a right-slanting left needle from back to front under increase. strand between last stitch knitted and first stitch on left needle. Knit, twisting strand by working into loop at front of needle.

Purl

For a left-slanting increase (M1L), insert left For a right-slanting increase (M1R), needle from front to back under strand work as for Make 1 Right, Knit, between last stitch worked and first stitch on except purl. left needle. Purl, twisting strand by working into loop at back of needle from left to right.