67269_GGCaseStdy_InyokernAirpt.qxd 6/19/072:42PMPage1 propagation ofreflective cracks. the with the Glasgrid System retards Reinforcing the fRna 15-33. Runway of cracking anddegradation inthesurface serious resultedin stresses January. The highthermal average monthly lowest andthe inJuly 103°F average temperature is recorded monthly highest shifts. Inyokern’s sudden ande experiences The Challenge: capability. maintain this inorderto runways its to rehabilitate oneof needed authority aircraft. In1995theairport of class any designed to land almost is This theMojave HighDesert. in aremotecorner of Inyokern Airport operates authority airport Application: INYOKERN, CA INYOKERN AIRPORT Product/System: Installation: Location: Project: PROJECT HIGHLIGHTS enocmn System Reinforcement 8501, GlasGrid Pavement GlasGrid 1995 May Inyokern, Inyokern Airport h ninWlsVle District Valley The Indian Wells h oaeHg eetclimate The Mojave HighDesert eprtr s3° in 30°F temperature is xtreme temperature aeil Supplier: Materials Contractor: General Design Engineer: Owner: Quantity: uwywith GlasGrid runway athicker overlay. Reinforcing the installation of a lowercost, longer la recommended as System was Reinforcement The Solution: 1in.per year. anapproximate rate of surface at throughtothe back to reflect cracks thermal to cause the werelikely stresses since thermal solution atemporary would provide only approach this expensive. Experience also suggested that approach would have been very however, this to therunway, considered addingathicker overlay Alternative Solution: andsafety. movement aircraft affect might defects these concerned that was authority The airport upto1in.wide. thetransverse cracks of many with cracks alligator, transverse andlongitudinal harsh climate. The surf the oxidized andbrittle because of extremely Site Conditions: xesv n fgreater size (upto 1in.inwidth). extensive andof more thecracking was to thesurface. Intheseareas cra demonstrated numerous theGlasGrid System without contrast, theareas exposure. In service andthermal of than 11 years minorcracking more after had experienced only theGlasG that observed was 31,2007, it onJanuary During areturn site visit reflective cracking. the migration of resisting strong interlayer solutioncapable of REINFORCED ASPHALT OVERLAY Road Solutions Bakersfield, California Granite Construction Company, Kleinfelders and &Shutt Hodges Airport District Valley Indian Wells 18,000 square yards The GlasGrid h uwywsbecoming was The runway ® sting alternative tothe ace layer includedthermal, h ipr authority The airport 8501 would produce a rid reinforced pavement ® k reflecting through cks Pavement GG CASESTUDY 09 67269_GGCaseStdy_InyokernAirpt.qxd 6/19/072:42PMPage2 call For moreinformation ontheGlasGrid System orother Tensar Systems, ytmfrrifreeti eeal considered generally is System forreinforcement theGlasGrid adhesive backing, installation of pressure-sensitive overlay.its With asphalt a thinlevelingcourse placed beforethemain over rolled out polymer. The gridis elastomeric coated with an material fiberglass friendly environmentally stiff of GlasGrid Systemconsists System Advantage: again.” product this consider theuseof certainly inthefuture, wewill when asimilar needarises good, and been very the GlasGrid System has significantly. Ourexperience with thesecracks of resulted indelaying thepropagation has overlay theGlasGrid System intherehabilitation use of transverse cracks. The were dealing with thermal 15-33, we Runway “Prior totherehabilitation of stated, Seymour manager Scott general Airport Printed intheU.S.A. ia eemnto fthesuitabi determination of Final arepending,andcert U.S. patents.Otherpatents ©2007, Corporation, LimitedLLC, Inc.Cert Tensar International Authorized Representative: nymnrcakn fe oeta 1yasofservice. more11 years than crackingafter minor only hadexperienced The GlasGridreinforced pavement 800-TENSAR-1 , e-mail iyo n nomto rmtra f information ormaterial any of lity Introduced in1989, the [email protected] i oeg aet n aetapplication andpatent ain foreignpatents i rdcsado plctosdesc and/orapplications ain products rteuecnepae,adism or theusecontemplated, andits or visit rcigiiitdb n rmr fthefollowing: oneormoreof cracking initiatedby theworldto throughout overlays used within asphalt successfully been available.GlasGrid System The has installed interlayer system expedient the most more than twodecades. standard for theindustry set have that expertise and challenges, onexperience,resources the rely to your engineering For innovative solutions and site construction assistance. site include evaluation, design consulting services demanding conditions. Oursupport the most provide exceptional, long-term performance under cost-effective andinstallation-friendly, they adaptable, theindustry. Highly of theforefront at assurance practices, are thoroughquality most the andtechnologies, backed by Our products andparking lots. railyards, construction platforms roadways, such as for improving structures reinfor soil geosynthetic Corporation, theleader in Tensar International Information and Services: Additional shl construction joints • Asphalt cracks • Block treated orstabilized layer • Cement • Lanewidening loading • Thermal longitudinal • Concretepavement shrinkage cracks and transverse joints REINFORCED ASPHALT OVERLAY a loeit rdmr ihsals rights alsoexist. Trademark may s www.tensar-international.com. ribed orillustrated hereinar ne fue sthesole respo use, is anner of eet fessystems cement, offers cma reflective combat e protectedunder oneormore pl sindicated herein. as o apply sblt ftheuser. of nsibility nteAeia for: Americas in the Exclusive distributors www.tensar-international.com 800-TENSAR-1 Atlanta, GA30328 5883 Glenridge Drive, Suite 200 Corporation Tensar International GG_CS_INYO_4.07 CASESTUDY