Natural Resource Project Inventory (NRPI) s12

Last Updated 1/28/2004

CONTRACT SUMMARY

This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below).

Use the "tab" and arrow keys to move through the form. If field is not applicable, please put N/A in block.

Date filled out:01/28/2004

A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type.
1. Contract Number: 03-103-557-0
2. Project Title: MSWD Groundwater Quality Protection Project
3. Project Purpose – Problem: Elimination of OSDS discharge over regional groundwater resources
4. Project Goals:
a. Short-term Goals: Immediate abatement of waste discharge from OSDS overlying groundwater.
b. Long-term Goals: Permanent elimination of pollution source and provision to address rapid residential growth in an
Environmentally sound manner.
5. Project Location: Salton Sea Transboundry Watershed - Catalogue #18100200. (33º 58.58N by
116º 30.61W; 33º 58.77N by 116º 30.16W; 33º 58.99N by 116º 29.62W; 33º 59.59N by 116º 29.57W)
a.  Physical Size of Project:
Approximately 29,000 lf of sewer pipeline and 5,471 ft of
sewer laterals to approx. 574 parcels will be constructed. / b. Counties included in the project: Riverside County
c. Legislative Districts: / 37th Sen & 80th Assemb.
6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies.
_XX_ Prop 13 ___ EPA 319(h) ___ Other
B) Contract Contact: Refers to contract project director.
Name: John M. Soulliere / Job Title: Government Affairs Officer
Organization: Mission Springs Water District / Webpage Address: www.MSWD.org
Address: 66575 Second Street - Desert Hot Springs, CA 92240
Phone: 760-329-6448 / Fax number: 760-329-2482
Email:
C. Contract Time Frame: Refers to the implementation period of the contract.
From: 01-01-04 / To: 06-15-05
D) Project Partner Information: Mission Springs Water District; RWQCB-7; City of Desert Hot Springs.

E) Nutrient and Sediment Load Reduction Projection (if applicable):

N/A

PLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.