PARLIAMENTARY CONSTITUENCY

NEW RAILWAYS NEW

(2014 - May ’21) PREFACE

Ashutosh Gangal General Manager Northern Railway

Indian Railways is the lifeline of the nation and catalyst for 's progress and economic development. Railway has been providing comfortable, convenient and easy on the pocket transportation system to its patrons. Major infrastructure projects in Railways has focus on safety, enhancing speed and connecting far flung areas. New tracks are being laid. Line doubling and electrification works are in full swing. Latest technologies, digitalization and in house innovations are being used to bring more efficiency and better results. Emphasis is also on creating better business opportunities through long haul and piecemeal trains. The officers and staff of the Railways are dedicated, ready to adapt to changing scenario of the transport sector, this booklet is aimed towards listing some of the important activities involving in the recent past as well as current projects in Rohtak. The budgets allocated to various projects are not apportioned State wise but reflect the cost of the project. INPUTS BY RAILWAY IN ROHTAK PARLIAMENTARY CONSTITUENCY ROHTAK PARLIAMENTARY CONSTITUENCY

WORKS COMPLETED IN LAST SEVEN YEARS: Samargopalpur and stations on Infrastructural Developments: Line and 6 nos each at Makrauli and Jasia stations on Rohtak Line. v Construction of Road Over Bridge (ROB) at Rohtak Bye pass, Level Crossing 32 and 38 on Delhi Bathinda section. v Development of Park in front of Station (Line par) at Railway station. v Construction of Underpass at unmanned Level Crossing No. 80, 82, 83 and 84 on Delhi Batäinda route. v Toilet made for Handicaped person at platform No. 01 at Bhadurgarh & Asthal Bohar Stations Railway station. v 2 Lane Road Over Bridge (ROB) in lieu of Level Crossing No. 31C near Asauda an Delhi Bhatinda Line. v Construction of 5.60 KM elevated track in Rohtak on Rohtak- Panipat line v Underpass at Double fatak Rohtak Railway station on Delhi Bathinda Line. v Provision of 225 KWp on-grid solar rooftop plant commissioned at Rohtak Railway station. v Improvement of circulating area and development of green patch at Rohtak Railway station. v Provision of 4 No. steel benches in 1st class waiting room at Rohtak Railway station. v Construction of under pass near double phatak at Rohtâk Railway station. v Improvement to circulating area at Rohtak & Bhadurgarh Railway station. v Construction of Road Over Bridge (ROB) at Level Crossing No. 79B near Lakan Majra on -Meham road. v Two nos. small passenger shelter built at Asthal Bohar Railway station. v Construction of underpass at unmanned Level Crossing 10 and 17 on Rohtak Panipat Line. v Park in circulating area & green patch development after fixing grill at Rohtak Railway station. v Manning of Unmanned Level Crossing nos. 9 and 33 on Rohtak Panipat Line. v Elevated bye pass line on Rohtak Panipat route. v Construction of 3 underpass at km 33.43 Makrauli chandpur road, v Intermediate block sections adjacent to in stations towards longer 42.21 Barra village and 45.56 Talab Road on Rohtak block sections an Rohtak-Samar Gopalpur, - Barsola Jakhal- route. Bareta sections. v Construction of Limited Height Subway (LHS) sub-way as under v Const. of Road over bridge on Level Crossing no. 22 at Jhajjar. on Asthal Bohar-Rewari line,Machhol-Chandpur, Baüra Village, v INTRODUCTION OF NEW TRAINS : Train no- 12439/12440 (Shri Jhajjar - Talao Road. Ganganagar - H Sahib Nanded Express) having Stoppages at NDLS, v Shifting of Level Crossing Gate no. 48 from station yard at ROK, JIND, JHL Weekly started w.e.f. 31.05.2019. Kharwar. v 05 New trains have been introduced during last 5 years in Rohtak v Construction of Road Over Bridge (ROB) at Level Crossing no.79 Constituency. on Delhi Bathinda route. FUTURE WORKS: v Construction of Road Over Bridge (ROB) on Level crossing 31 & 38. v Rohtak Meham Hansi New Line. v 20 No. benches kept at Makrauli and Samargopalpur. v Elevated bye pass line on Rohtak Panipat route. v Construction of Manned Level Crossing No. 09 near Makroli v Intermediate block sections adjacent to in stations towards longer station. block sections an Rohtak-Samar Gopalpur, Jind-Barsola Jakhal- Passenger Amenities: Bareta sections. v Improvement of circulating area and platform surface at v Construction of Underpass at Bahadurgarh Railway station yard. Bahadurgarh, Asaudah and , Kharawad, Rodh Nagar, v Const. of Road Over Bridge (ROB) on Level Crossing no. 22 at Jhajjar Samar Gopalpur & Kharanti stations on Delhi Bathinda route. Railway station. v Improvement of urinals and toilets at Bahadurgarh and Sampla ONGOING WORKS: Railway stations. v Construction of new Rly Line between Rohtak - Hansi (65 Kms) v Provision of Coach Guidance Display Boards and Train information v Provision of 2.44 m wide Foot Over Bridge line par Basti to PF no.2/3 Display Boards at Rohtak Railway Station and at 1 Bahadurgarh section . v Provision of mini Platform shelters at Makrauli and Jasia stations v Construction of Underpass at Bahadurgarh station yard. on Rohtak Panipat Line, Provision of Lenches 6 nos each at SOME IMPORTANT PHOTOS

Improvement of LUX level at platform, Circulating area at Rohtak

High Mast Tower at Rohtak Stand alone Solar at Bahardurgh

Onboard House Keeping Mechanized Cleaning

Coach with Rooftop Solar Panels The Work Force