The Comprehensive Study on Water Resources Development and Management in Bali Province
CHAPTER 5 FEASIBILITY STUDY
5.1 Outline of Feasibility Study 5.1.1 Necessity of the Project
To protect and mitigate the flood damage by river improvement of Badung River and Mati River 3) Electricity Generation by utilizing Ayung Dam: To generate electricity of 7,980KW by utilizing reservoir water stored in Ayung Dam in response to growing demand 4) Stable Irrigation in dry season and Expansion of Paddy Cultivated Area: To keep the current crop pattern and expand areas of two crops from one crop in dry season by discharging water stored in Ayung Dam 5) Maintenance and Improvement of River Environment: To protect and conserve existing habitat of fauna and flora as well as natural landscape by outflow discharge stored in Ayung Dam. 6) Development of Reservoir Area: As part of development of reservoir area, surrounding area of Ayung Dam shall be developed. Table-5.1 Project Component, Location and Main Facilities Project Component/Objectives Project Location/Main Facilities and Works Multipurpose Ayung Dam About 3km at down stream area from confluence of Ayung River and Development of Municipal Water, Hydraulic the tributary Siap Rive (Location name is Buaganga, near the regency Power Generation, Irrigation, River boundary between Badung regency and Gianyar regency.): Main Dam, Environment Maintenance Spillway, Check Dam and Hydraulic Power Generation Facilities Water Supply (Western System)) Weir and Treatment Plant: about 1km down stream from the confluence Supply of Municipal Water (North Kuta district of Sungi river and Penet river (about 2km upstream of river mouth) of Badung regency) Intake Facilities: between Cemagi and Krobokan Water Supply (Central System) Weir and Treatment Plant: Existing Ayung River Treatment Plant Supply of Municipal Water(Denpasar City and South Kuta districts of Badung regency) Water Supply (Eastern System) Weir and Treatment Plant: intersection of Petanu river and by-pass road Supply of Municipal Water (Southern districts (about 1km from river mouth) of Gianyar regency, and North Kuta district of Intake Facilities: from Petanu river to Kuta district (Tuban) along the Badung regency) by-pass road Badung River Improvement for Damage Middle stream area of Badung river: Riverbed excavation and bank Protection of Flood heightening, etc Mati River Improvement for Damage Middle stream area of Mati river: Banking, widening, etc of Protection of Flood non-improved section, and conservation of retarding basin
Final Report – Summary Report (5-2) The Comprehensive Study on Water Resources Development and Management in Bali Province
LAKE BUYAN r e iv
R
g KINTAMANI n u y A LAKE BATUR
BUSUNGBIU LAKE TAMBLINGAN LAKE BERATAN
r PUPUAN Rive Saba
r e BATURITI iv R h e L h r r e r e e e iv Y iv v R i n R a R li a s a B o y O A
h e
Y S J a i n n g a s h
a R n r i g v e e r v i R M r e R i v v e i e g l R r a n n r g e u g v r n y r i i t e u a e v R R i y k v i a R A a iv j R a n n e a A u r w t a O n g a a h t l e e e Y P T B u b r u e r h v i e AYUNG RIVER PETANG R v R i iv n R e RENDANG a r s is
a r p SIAP RIVER e k r m e e
E v P i
h R e i SUSUT
Y g r PAYANGAN
n e
u v
i S
R
a
w a
M TAMPAKSIRING PENEBEL SELAT r
e
v i
R
r t
e e iv n TEGALLALANG R e r r o P e v e H i iv TEMBUKU R h R AYUNGe DAM h n Y e a L t r a h e e M v r Y i er e r R iv iv e R iv h R i g BANGLI R
b n ja u a a k a l a d e B w n a S g U r a e er l iv v BANGLI e R i T u R y an ka li e Ba M r e iv R r KEDEWATAN n e MARGA a iv g R r n e u n v d a i e y R SIDEMEN P a P h SELEMADEG TIMUR SANGEH a n i SELEMADEG BARAT J r e iv EMPEL R r n r e a e v v i m i R R re g i k n T te a u lu PETANU RIVER P e SELEMADEG UBUD M ABIANSEMAL KLUNGKUNG r e KERAMBITAN iv R M n r a e e t l B iv a u R O n t g b h u a e i ik TABANAN t h
Y h R SEMARAPURA P
a R k i r v i A v e e iv r e g r n R TABANAN GIANYAR u o k H g n h e MENGWI MAMBAL DAWAN a Y P r GIANYAR e r iv r e S v R e BANJARANGKAN i u iv a R r n e h R U g v u t g i S e s in n n t R e a d a e n a L P b g R h A R e iv h i Y e v e r KEDIRI P e r Y e e r iv k R BLAHBATUH e r s i a s p a n m R E h iv e K e Y r u r e t iv u l i R R g g r n n e iv u u iv e PENETb RIVERS r R g n h P u a e B m ta la n g U u n r u e SUKAWATI R k iv iv g O e n R o r a n s P a R k A ti iv u y e K u (IPA PERAUPAN) r n h g e Y BADUNG R i v e r OONGAN
r e iv R t S e ing n r ap e e a 0510km v du P i Ri R ve n r a KUTA UTARA DENPASAR TIMUR s r a e o iv B WTP-PETANU R r i e r g iv e n v a R i P u R g DENPASAR g h n o DENPASAR BARAT a P
C h e WTP-PENET Y
r WTP-AYUNG LEGEND: e v i
R
i t a
M BUAGAN Capital of Regency UMADUI r e v MATI RIVER i WEIR R
g DENPASAR SELATAN WEIR n u d Capital of District a B Regency Boundaries KUTA BADUNG RIVER ESTUARY TUKAD District Boundaries BADUNG Lakes/Dams
River Province Road Regency Road Local Road KUTA SELATAN Bypass WTP (Water Treatment Plant) Pipe Line Service Area for Water Supply
Catchments Area
Direction
Figure-5.1 Location of the Proposed Projects 5.2 Public Water Supply for Bali Southern Area Water supplies for Southern Bali area such as Denpasar City, Badung Regency, Gianyar Regency, Tabanan Regency and Klungkung Regency are implemented by developing several Water Treatment Plan/ WTP facilities. In this stage, it is proposed to develop 3 (three) water supply systems using water resources at Penet River (Cemagi Village – Badung regency) for eastern system, Ayung River (Peraupan Village, Denpasar City) for central system, and Petanu River (Saba Village – Gianyar Regency) for eastern system. 5.2.1 Conditions for Design (1) Location of Weirs and Water Treatment Plant
It is located at existing IPA Nyanyi’s downstream (PDAM Tabanan) which the river water is not used for irrigation anymore. Current land use for planned water treatment plant (WTP) is paddy field and dry field. New access road for WTP shall be designed.
Final Report – Summary Report (5-4) The Comprehensive Study on Water Resources Development and Management in Bali Province
West System Water Treatment Plant (Penet River) 【Outline of Work】 1 New Water Treatment Plant (300 liter/s) 2 Distribution Pipe φ600 (8.8km) 3 Water Pipe Bridge ( 5 sites ) Water Pipe Bridge(5sites)
Distribution Pipe(8.8km)
Water Treatment Plant
End of Distribution Pipe
Surrounding Landuse Planning Site for Water Treatment Plant (Terraced Rice field )
Figure-5.2 Western Water Supply System and Current Condition of planned WTP
PADDY FIELD
Figure-5.3 General Plan of Western Supply System (Penet River) (2) Central Water Supply System The raw water is taken at the downstream area of Ayung River which is close to the existing WTP Ayung I, II, and III locations; those are located in Peraupan Village, East Denpasar Sub district, Denpasar City. Based on the water supply plan in the long run (target year 2025), the production capacity was planned as 1,800 l/sec (by 3 staging with 600 l/sec for each).
Final Report – Summary Report (5-6)