LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2014-15

SI Admn Sanc Year Constituency Quota Proc.No Mandal Description of the work Sector Estd Cost Exe Agen 1st Inst Date 2nd Inst Date Total Exp Status No Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Plg.II/137/CDP/2014- CC R/F UPS School to Railways, Roads & EE.PR., 1 2014-15 Peddapalle MLA SULTANABAD ITHRAJPALLE 298000 22/08/2015 0 272622 24/09/2016 272622 Completed 15(1st)PDPL Gummadi Mallaiah (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Dheshetti Rajavva Railways, Roads & EE.PR., Not 2 2014-15 Peddapalle MLA SULTANABAD KANUKULA 199000 22/08/2015 0 0 0 15(1st)PDPL (H) to Muddasani Rajaiah (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Kunta Rangaiah (H) Railways, Roads & EE.PR., 3 2014-15 Peddapalle MLA SULTANABAD 398000 22/08/2015 0 364010 28/04/2016 364010 Completed 15(1st)PDPL to Pogaku Kanukaiah (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Building to Railways, Roads & EE.PR., Not 4 2014-15 Peddapalle MLA SULTANABAD NARAYANAPOOR 200000 22/08/2015 0 0 0 15(1st)PDPL Thirupathi Rao (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Ponnam Prabhakar Railways, Roads & EE.PR., Not 5 2014-15 Peddapalle MLA SULTANABAD NARAYANAPOOR 199000 22/08/2015 0 0 0 15(1st)PDPL (H) to Pochamma Temple Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Kalaveni Gattaiah Railways, Roads & EE.PR., Not 6 2014-15 Peddapalle MLA SULTANABAD NEERUKULLA 199000 22/08/2015 0 0 0 15(1st)PDPL (H) to R&B road Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Dasari Sadi (H) to Railways, Roads & EE.PR., 7 2014-15 Peddapalle MLA SULTANABAD NEERUKULLA 199000 22/08/2015 0 199000 13/07/2016 199000 Completed 15(1st)PDPL Nerella Rajaiah (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Ch Laxmaiah (H) to Railways, Roads & EE.PR., Not 8 2014-15 Peddapalle MLA SULTANABAD POOSALA 199000 22/08/2015 0 0 0 15(1st)PDPL P.Sampath (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Primary School to Railways, Roads & EE.PR., 9 2014-15 Peddapalle MLA SULTANABAD POOSALA 199000 22/08/2015 0 199000 08/06/2016 199000 Completed 15(1st)PDPL Pochamma Temple Buildings Peddapalle

CC R/F Kukatla Komuraiah Plg.II/137/CDP/2014- Railways, Roads & EE.PR., Not 10 2014-15 Peddapalle MLA SULTANABAD SAMBIAHPALLI (H) to Kukatla Kattheraiah 199000 22/08/2015 0 0 0 15(1st)PDPL Buildings Peddapalle Reported (H)

Plg.II/137/CDP/2014- CC R/F G. Anjaiah (H) to Railways, Roads & EE.PR., Not 11 2014-15 Peddapalle MLA SULTANABAD SAMBIAHPALLI 199000 22/08/2015 0 0 0 15(1st)PDPL Dongala Ilareddy (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F P Sathish Reddy (H) Railways, Roads & EE.PR., Not 12 2014-15 Peddapalle MLA SULTANABAD SUDDALA 398000 22/08/2015 0 0 0 15(1st)PDPL to P.Rajaiah (H) Buildings Peddapalle Reported

CC R/F Bojja Rajaiah (H) to Plg.II/137/CDP/2014- Railways, Roads & EE.PR., 13 2014-15 Peddapalle MLA SULTANABAD SUGLAMAPALLY Sarla Yellaiah (H) at 199000 22/08/2015 199000 04.11.2016 0 199000 Completed 15(1st)PDPL Buildings Peddapalle Hanumandlapally

CC R/F Kalvala Bheemaraj Plg.II/137/CDP/2014- Railways, Roads & EE.PR., Not 14 2014-15 Peddapalle MLA SULTANABAD SUGLAMAPALLY (H) to N.Saraiah 199000 22/08/2015 0 0 0 15(1st)PDPL Buildings Peddapalle Reported Sriramulapally LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2014-15

SI Admn Sanc Year Constituency Quota Proc.No Mandal Description of the work Sector Estd Cost Exe Agen 1st Inst Date 2nd Inst Date Total Exp Status No Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Plg.II/137/CDP/2014- CC R/F Choppari Radha (H) Railways, Roads & EE.PR., 15 2014-15 Peddapalle MLA PEDDAPALLE BHOJANNAPET 199000 22/08/2015 199000 15.10.2016 0 199000 Completed 15(1st)PDPL to Katla Saraswathi (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Katla Saraswathi (H) Railways, Roads & EE.PR., 16 2014-15 Peddapalle MLA PEDDAPALLE BHOJANNAPET 199000 22/08/2015 199000 15.10.2016 0 199000 Completed 15(1st)PDPL to Gosukula Lingaiah (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Pedda Poshalu (H) to Railways, Roads & EE.PR., Not 17 2014-15 Peddapalle MLA PEDDAPALLE CHEEKURAI 298000 22/08/2015 0 0 0 15(1st)PDPL Hanuman Temple Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F R&B road to Bandari Railways, Roads & EE.PR., Not 18 2014-15 Peddapalle MLA PEDDAPALLE CHEEKURAI 199000 22/08/2015 0 0 0 15(1st)PDPL Mallaiah (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F M.Shankaramma (H) Railways, Roads & EE.PR., Not 19 2014-15 Peddapalle MLA PEDDAPALLE GOWREDDIPET 199000 22/08/2015 0 0 0 15(1st)PDPL to Pochamma Temple Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Hanuman Temple to Railways, Roads & EE.PR., Not 20 2014-15 Peddapalle MLA PEDDAPALLE GOWREDDIPET 199000 22/08/2015 0 0 0 15(1st)PDPL Kommu Rajesham (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Hanuman Temple to Railways, Roads & EE.PR., Not 21 2014-15 Peddapalle MLA PEDDAPALLE GURRAMPALLY 199000 22/08/2015 0 0 0 15(1st)PDPL Thogari Sammaiah (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Bhairi Rajamma (H) Railways, Roads & EE.PR., 22 2014-15 Peddapalle MLA PEDDAPALLE GURRAMPALLY 200000 22/08/2015 198762 15.10.2016 0 198762 Completed 15(1st)PDPL to Mula Chandra Reddy (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Guggilla Sathaiah Railways, Roads & EE.PR., Not 23 2014-15 Peddapalle MLA PEDDAPALLE KASULAPALLY 497500 22/08/2015 0 0 0 15(1st)PDPL (H) to Jadala Sammaiah (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F R&B road to Railways, Roads & EE.PR., Not 24 2014-15 Peddapalle MLA PEDDAPALLE MAREDUGONDA 199000 22/08/2015 0 0 0 15(1st)PDPL Gadhem Sadaiah (H) Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Vengala Komuraiah Railways, Roads & EE.PR., 25 2014-15 Peddapalle MLA PEDDAPALLE PEDDABONKUR 199000 22/08/2015 0 199000 27/05/2016 199000 Completed 15(1st)PDPL (H) to M Thirupathi (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Avunuri Chandraiah Railways, Roads & EE.PR., 26 2014-15 Peddapalle MLA PEDDAPALLE PEDDABONKUR 199000 22/08/2015 0 199000 28/04/2016 199000 Completed 15(1st)PDPL (H) to Tummala Narsaiah (H) Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Ch.Hanumandlu (H) Railways, Roads & EE.PR., 27 2014-15 Peddapalle MLA PEDDAPALLE PEDDAKALWALA 200000 22/08/2015 0 181964 27/05/2016 181964 Completed 15(1st)PDPL to Nalla Pochamma Temple Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F T.Swamy (H) to Railways, Roads & EE.PR., Not 28 2014-15 Peddapalle MLA PEDDAPALLE RAGHAVAPOOR 298000 22/08/2015 0 0 0 15(1st)PDPL K.Kumara Swamy (H) Buildings Peddapalle Reported LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2014-15

SI Admn Sanc Year Constituency Quota Proc.No Mandal Description of the work Sector Estd Cost Exe Agen 1st Inst Date 2nd Inst Date Total Exp Status No Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Plg.II/137/CDP/2014- CC R/F Malka Sadi (H) to Railways, Roads & EE.PR., Not 29 2014-15 Peddapalle MLA PEDDAPALLE RAGINEEDU 298000 22/08/2015 0 0 0 15(1st)PDPL Janda Buildings Peddapalle Reported

Plg.II/137/CDP/2014- CC R/F Tallapalli Rajesham Railways, Roads & EE.PR., 30 2014-15 Peddapalle MLA PEDDAPALLE RAMPALLY 298000 22/08/2015 294771 15.10.2016 0 294771 Completed 15(1st)PDPL (H) to Nune Gadda Varaku Buildings Peddapalle

Plg.II/137/CDP/2014- CC R/F Gurrala Narsaiah(H) Railways, Roads & EE.PR., 31 2014-15 Peddapalle MLA PEDDAPALLE RANGAPOOR 298000 22/08/2015 0 298000 07/04/2016 298000 Completed 15(1st)PDPL to Govt.School Buildings Peddapalle

7462500 1090533 1912596 3003129

Chief Planning Officer Peddapalli LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2014-15

SI Admn Sanc Year Constituency Quota Proc.No Mandal Village Description of the work Sector Estd Cost Exe Agen 1st Inst Date 2nd Inst Date Total Exp Status No Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Plg.II/138/CDP/PDPL CC R/F Peerila Masid to Railways, Roads & EE.PR., Not 1 2014-15 Peddapalle DIM ODELA KANGARTHI 199000 22/08/2015 0 0 0 /(I/M) Thatikonda Sambaiah (H) Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F M Kalavathi (H) to Railways, Roads & EE.PR., Not 2 2014-15 Peddapalle DIM ODELA KANGARTHI 199000 22/08/2015 0 0 0 /(I/M) Venkateshwara Temple Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F Thota Chandraiah Railways, Roads & EE.PR., Not 3 2014-15 Peddapalle DIM ODELA KOLANOOR 199000 22/08/2015 0 0 0 /(I/M) (H) to M.Chinnaiah (H) Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F Doddi Ratnakar Tela Railways, Roads & EE.PR., Not 4 2014-15 Peddapalle DIM ODELA KOLANOOR 199000 22/08/2015 0 0 0 /(I/M) (H) to Doddi Rajaiah (H) Buildings Peddapalle Reported

CC R/F B.Umapathi Reddy Plg.II/138/CDP/PDPL Railways, Roads & EE.PR., 5 2014-15 Peddapalle DIM ODELA MADAKA (H) to Avula Pedda Rajaiah 199000 22/08/2015 0 199000 06/07/2016 199000 Completed /(I/M) Buildings Peddapalle (H)

Plg.II/138/CDP/PDPL CC R/F Gudipati Saireddy Railways, Roads & EE.PR., 6 2014-15 Peddapalle DIM ODELA MADAKA 199000 22/08/2015 0 199000 06/07/2016 199000 Completed /(I/M) (H) to Pothula Swamy (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F G.Veeramallu (H) to Railways, Roads & EE.PR., Not 7 2014-15 Peddapalle DIM ODELA NAMSANIPALLE 298000 22/08/2015 0 0 0 /(I/M) J.Sadaiah at Abbidipally Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F A.Madhunaiah (H) to Railways, Roads & EE.PR., 8 2014-15 Peddapalle DIM ODELA SANAGONDA 199000 22/08/2015 0 199000 08/06/2016 199000 Completed /(I/M) M.Shabkaraiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Merugu Mallaiah (H) Railways, Roads & EE.PR., 9 2014-15 Peddapalle DIM ODELA SANAGONDA 199000 22/08/2015 199000 15.10.2016 0 199000 Completed /(I/M) to B.Srinivas (H) at Gollapally Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Merugu Mondaiah Railways, Roads & EE.PR., 10 2014-15 Peddapalle DIM ODELA SANAGONDA 199000 22/08/2015 153381 15.10.2016 0 153381 Completed /(I/M) (H) to Merugu Ilaiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Oddi Sailu (H) to Railways, Roads & EE.PR., 11 2014-15 Peddapalle DIM SRIRAMPUR RATHUPALLE 298000 22/08/2015 0 272265 09/03/2016 272265 Completed /(I/M) Dugyala Rajamalli (H) Buildings Peddapalle

CC R/F Dasari Plg.II/138/CDP/PDPL Railways, Roads & EE.PR., 12 2014-15 Peddapalle DIM SRIRAMPUR EDULAPURAM Ramchandram (H) to 298000 22/08/2015 0 270286 29/03/2016 270286 Completed /(I/M) Buildings Peddapalle D.Chandraiah (H)

Plg.II/138/CDP/PDPL CC R/F M.Rajaiah (H) to Railways, Roads & EE.PR., 13 2014-15 Peddapalle DIM SRIRAMPUR KUNARAM 199000 22/08/2015 0 199000 01/06/2016 199000 Completed /(I/M) Bondilla Raju (H) Buildings Peddapalle LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2014-15

SI Admn Sanc Year Constituency Quota Proc.No Mandal Village Description of the work Sector Estd Cost Exe Agen 1st Inst Date 2nd Inst Date Total Exp Status No Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Plg.II/138/CDP/PDPL CC R/F R.Lingaiah (H) to Railways, Roads & EE.PR., 14 2014-15 Peddapalle DIM SRIRAMPUR KUNARAM 199000 22/08/2015 0 199000 01/06/2016 199000 Completed /(I/M) Gorla Sailu (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Odela Kotesh (H) to Railways, Roads & EE.PR., Not 15 2014-15 Peddapalle DIM SRIRAMPUR MANGAPET 199000 22/08/2015 0 0 0 /(I/M) M.Srinivas (H) Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F Rangu Satthaiah (H) Railways, Roads & EE.PR., Not 16 2014-15 Peddapalle DIM SRIRAMPUR MANGAPET 199000 22/08/2015 0 0 0 /(I/M) to Pedla Jampaiah (H) Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F BT Road to Railways, Roads & EE.PR., 17 2014-15 Peddapalle DIM SRIRAMPUR MIRZAMPET 199000 22/08/2015 0 199000 09/03/2016 199000 Completed /(I/M) Kothapally Janda Gadde Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F MD Ismail (H) to Railways, Roads & EE.PR., Not 18 2014-15 Peddapalle DIM SRIRAMPUR PANDILLA 298000 22/08/2015 0 0 0 /(I/M) Anganwadi School Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F Manohar Reddy (H) Railways, Roads & EE.PR., 19 2014-15 Peddapalle DIM SRIRAMPUR PEGADAPALLE 298000 22/08/2015 275650 04.11.2016 0 275650 Completed /(I/M) to Thatha Sadaiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Mettu Gattaiah (H) to Railways, Roads & EE.PR., 20 2014-15 Peddapalle DIM SRIRAMPUR SRIRAMPUR 298000 22/08/2015 0 275700 01/06/2016 275700 Completed /(I/M) Gangadari Rajaiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Panasa Komuraiah Railways, Roads & EE.PR., Not 21 2014-15 Peddapalle DIM SRIRAMPUR VENNAMPALLE 199000 22/08/2015 0 0 0 /(I/M) (H) to Buddi Narayana (H) Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F Buddi Narayana (H) Railways, Roads & EE.PR., Not 22 2014-15 Peddapalle DIM SRIRAMPUR VENNAMPALLE 199000 22/08/2015 0 0 0 /(I/M) to Bandi Sadanandam (H) Buildings Peddapalle Reported

CC R/F Gyadasi Rajesham Plg.II/138/CDP/PDPL BHOOPATHIPURA Railways, Roads & EE.PR., Not 23 2014-15 Peddapalle DIM SULTANABAD (H) to Pochampalli Mondaiah 199000 22/08/2015 0 0 0 /(I/M) M Buildings Peddapalle Reported (H)

Plg.II/138/CDP/PDPL CC R/F R&B road to Jakka Railways, Roads & EE.PR., 24 2014-15 Peddapalle DIM SULTANABAD GARREPALLE 298500 22/08/2015 0 273642 06/07/2016 273642 Completed /(I/M) Manohar (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Velpula Mallaiah (H) Railways, Roads & EE.PR., Not 25 2014-15 Peddapalle DIM SULTANABAD CHINNABONKUR 298000 22/08/2015 0 0 0 /(I/M) to Velpula Ragupathi (V) Buildings Peddapalle Reported

Plg.II/138/CDP/PDPL CC R/F Choppari Gattaiah Railways, Roads & EE.PR., 26 2014-15 Peddapalle DIM SULTANABAD CHINNAKALVALA 200000 22/08/2015 0 200000 08/06/2016 200000 Completed /(I/M) (H) to Kummam Mogilig (H) Buildings Peddapalle LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2014-15

SI Admn Sanc Year Constituency Quota Proc.No Mandal Village Description of the work Sector Estd Cost Exe Agen 1st Inst Date 2nd Inst Date Total Exp Status No Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Plg.II/138/CDP/PDPL CC R/F G.Agam Rao (H) to Railways, Roads & EE.PR., 27 2014-15 Peddapalle DIM SULTANABAD CHINNAKALVALA 200000 22/08/2015 0 200000 09/08/2016 200000 Completed /(I/M) G.Thirupathi (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Jakkula Rajaiah (H) Railways, Roads & EE.PR., 28 2014-15 Peddapalle DIM SULTANABAD GARREPALLE 298000 22/08/2015 0 274526 01/06/2016 274526 Completed /(I/M) to Hanumaiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Nallavelli Madunaiah Railways, Roads & EE.PR., 29 2014-15 Peddapalle DIM SULTANABAD GATTEPALLE 199000 22/08/2015 0 199000 07/05/2016 199000 Completed /(I/M) (H) to Venaka Ramulu (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Chintha Madunaiah Railways, Roads & EE.PR., 30 2014-15 Peddapalle DIM SULTANABAD GATTEPALLE 199000 22/08/2015 0 199000 06/07/2016 199000 Completed /(I/M) (H) to Nallavelli Odelu (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Kunta Rangaiah (H) Railways, Roads & EE.PR., 31 2014-15 Peddapalle DIM SULTANABAD KADAMBAPUR 199000 22/08/2015 0 199000 07/05/2016 199000 Completed /(I/M) to Pogaku Kanukaiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Thonti Lingaiah (H) Railways, Roads & EE.PR., 32 2014-15 Peddapalle DIM SULTANABAD KADAMBAPUR 200000 22/08/2015 199207 15.10.2016 0 199207 Completed /(I/M) to Misa Komuraiah (H) Buildings Peddapalle

Plg.II/138/CDP/PDPL CC R/F Maruthi Nagar R&B Railways, Roads & EE.PR., Not 33 2014-15 Peddapalle DIM SULTANABAD KANUKULA 200000 22/08/2015 0 0 0 /(I/M) road to Yama Pochalu (H) Buildings Peddapalle Reported

7462500 827238 3557419 4384657

Chief Planning Officer Peddapalli LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2015-16 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Cumulative Area Date of 2ND & Sl. Date of Scheme Estimated Scheme Fund Executive Department Date of 1ST Date of Total Work Description Mandal Village (SC/ST/ Sector Name Admn Proceedings No. Final No. Proposal Name Cost in Rs. In Rs. Agency Name Release Instalment Releases Expenditure Gen) Sanction Installment Incurred

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

L/O CC R/F M.Lachaiah(H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 1 06-08-2015 Eligaid Mupparithota General CDP 18-09-2015 200000 200000 9/25/2017 172169 0 172169 B.Lachavva(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F M.Rajaiah(H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 2 06-08-2015 Eligaid Narsapoor General CDP 18-09-2015 200000 200000 0 0 0 M.Odelu(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F K.Chandraiah(H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 3 06-08-2015 Eligaid Shivapalle General CDP 18-09-2015 200000 200000 5/28/2018 198109 0 198109 V.Ajith Rao(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F M.Pochamallu(H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 4 06-08-2015 Eligaid Sulthanpoor General CDP 18-09-2015 200000 200000 18-05-2017 197502 0 197502 T.Chandra Rao(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F G.Rajesham(H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 5 06-08-2015 Eligaid Sulthanpoor General CDP 18-09-2015 200000 200000 0 0 0 T.Venkataiah(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F R&B Road to Mandala Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 6 06-08-2015 Julapalle Julapalle General CDP 18-09-2015 200000 200000 0 0 0 Rajanarsu (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F Loka Damoder Reddy(H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 7 06-08-2015 Julapalle Julapalle General CDP 18-09-2015 200000 200000 0 0 0 to Kummari Rajaiah(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

L/O CC R/F Rampelli Ananthaiah(H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 8 06-08-2015 Julapalle Kachapur General CDP 18-09-2015 200000 200000 6/21/2018 178728 0 178728 to Tadipalli Sathaiah(H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

B/W of C/O Community Hall for Other Public Facilities Plg.II/139/CDP/15- DPRE, Panchayathraj 9 06-08-2015 Sulthanabad Kanukula General CDP 18-09-2015 100000 100000 01-10-2016 100000 0 100000 Fishermen Co-Op Society Ltd. 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Dathu Sadaiah (H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 10 12-01-2016 Peddapalli Palthem General CDP 09-02-2016 250000 250000 01-10-2016 231250 0 231250 to Mangali Narsaiah (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Katnapally Sathaiah Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 11 12-01-2016 Peddapalli Kasulapally General CDP 09-02-2016 250000 250000 03-08-2017 206245 0 206245 (H) to Bandi Ramulu (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

C/o Community hall in Padmashali Other Public Facilities Plg.II/139/CDP/15- DPRE, Panchayathraj 12 12-01-2016 Peddapalli Peddapalli General CDP 09-02-2016 500000 500000 0 0 0 colony at Hanuman Nagar 16/PDPL(MLA-Q) Peddapally Engineering

C/o Shed near Nayi Brahmana Other Public Facilities Plg.II/139/CDP/15- DPRE, Panchayathraj 13 12-01-2016 Peddapalli Peddapalli General CDP 09-02-2016 150000 150000 11/9/2017 131776 0 131776 Society Building in Shanthinagar 16/PDPL(MLA-Q) Peddapally Engineering

B/W of Building of Retired Employees Other Public Facilities Plg.II/139/CDP/15- DPRE, Panchayathraj 14 12-01-2016 Association at Tahsil office Peddapalli Peddapalli General CDP 09-02-2016 400000 400000 13-07-2016 370179 22-02-2017 29821 400000 16/PDPL(MLA-Q) Peddapally Engineering Peddapally

100 Mtrs CC R/F Vengala Komuraiah Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 15 12-01-2016 Peddapalli Peddabonkoor General CDP 09-02-2016 250000 250000 21-04-2017 227922 7/11/2018 22078 250000 (H) to Parsha Mallesham (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Katla Narsaiah (H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 16 12-01-2016 Peddapalli General CDP 09-02-2016 250000 250000 22-02-2017 228648 0 228648 to Puli Laxmi Rajam (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2015-16 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Cumulative Area Date of 2ND & Sl. Date of Scheme Estimated Scheme Fund Executive Department Date of 1ST Date of Total Work Description Mandal Village (SC/ST/ Sector Name Admn Proceedings No. Final No. Proposal Name Cost in Rs. In Rs. Agency Name Release Instalment Releases Expenditure Gen) Sanction Installment Incurred

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

40 Mtrs CC R/F Goskula Rajesham Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 17 12-01-2016 Peddapalli Ragineedu General CDP 09-02-2016 100000 100000 04-07-2017 100000 0 100000 (H) to Yadava Sangam Building Buildings 16/PDPL(MLA-Q) Peddapally Engineering

150 Mtrs CC R/F Gurijala Laxmaiah Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 18 12-01-2016 Peddapalli Brahmanapalli General CDP 09-02-2016 325000 325000 18-05-2017 288916 11/9/2017 35624 324540 (H) to Bathala Laxmaiah (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Perka Mondaiah (H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 19 12-01-2016 Peddapalli Peddapalli General CDP 09-02-2016 250000 250000 04-07-2017 228896 10/4/2017 20594 249490 to Elugam Rajanarsu (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Banda Kiran (H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 20 12-01-2016 Peddapalli Nittur General CDP 09-02-2016 250000 250000 15-10-2016 228267 9/25/2017 21733 250000 Hanuman Temple Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Mallaiah (H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 21 12-01-2016 Peddapalli Rangampalle General CDP 09-02-2016 250000 250000 9/25/2017 228186 0 228186 Peddireddy Rajireddy (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Kandunuri Rajaiah Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 22 12-01-2016 Peddapalli Maredugonda General CDP 09-02-2016 250000 250000 22-02-2017 231047 0 231047 (H) to Ramanaveni Sadaiah (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

C/o. R/F. Nagula Sathaiah (H) to Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 23 12-01-2016 Peddapalli Maredugonda General CDP 09-02-2016 250000 250000 18-05-2017 199519 199519 Kondu Venkateshrao (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Gaddam Srihari (H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 24 12-01-2016 Peddapalli Rampalle General CDP 09-02-2016 250000 250000 0 0 0 to Gaddam Mallesham (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Kanaka Shena Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 25 12-01-2016 Peddapalli Rampalle General CDP 09-02-2016 250000 250000 0 0 0 Rao(H) to Oruganti Laxman (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Gangi Komuraiah Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 26 12-01-2016 Peddapalli Raghavapur General CDP 09-02-2016 250000 250000 04-07-2017 228295 0 228295 (H) to Gunda Saraiah (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Marella Rajaiah (H) Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 27 12-01-2016 Odela Kolanoor General CDP 09-02-2016 250000 250000 0 0 0 to Marella Rajesham (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

100 Mtrs CC R/F Suddala Mogilaiah Railways, Roads & Plg.II/139/CDP/15- DPRE, Panchayathraj 28 12-01-2016 Odela Madaka General CDP 09-02-2016 250000 250000 21-04-2017 250000 250000 (H) to Rapolu Hanumantha Rao (H) Buildings 16/PDPL(MLA-Q) Peddapally Engineering

C/o Community hall at Mudiraj Other Public Facilities Plg.II/139/CDP/15- DPRE, Panchayathraj 29 12-01-2016 Odela Komera General CDP 09-02-2016 300000 300000 22-02-2017 170849 4/28/2018 129151 300000 Colony 16/PDPL(MLA-Q) Peddapally Engineering

C/O B/W of Fisheries CO-OP Plg.II/139/CDP/15- DPRE, Panchayathraj 30 16-02-2015 Sulthanabad Kadambapur General Other Public facilities CDP 19-03-2016 100000 100000 0 0 0 SocietyBuilding 16/PDPL(MLA-Q) Peddapally Engineering

Plg.II/139/CDP/15- DRWS&S, Rural Water 31 30-10-2015 Augmentation to PWS Scheme . Srirampur Malliala General Other Public facilities CDP 23-11-2015 200000 200000 25-07-2016 195656 0 195656 16/PDPL(MLA-Q) Peddapally Supply

Plg.II/139/CDP/15- DRWS&S, Rural Water 32 12-01-2016 Drilling of Borewell at Harijana Wada Peddapalli Peddapalli SC Drinking water Facility CDP 09-02-2016 50000 50000 01-10-2016 49178 0 49178 16/PDPL(MLA-Q) Peddapally Supply LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2015-16 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Cumulative Area Date of 2ND & Sl. Date of Scheme Estimated Scheme Fund Executive Department Date of 1ST Date of Total Work Description Mandal Village (SC/ST/ Sector Name Admn Proceedings No. Final No. Proposal Name Cost in Rs. In Rs. Agency Name Release Instalment Releases Expenditure Gen) Sanction Installment Incurred

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Plg.II/139/CDP/15- DRWS&S, Rural Water 33 12-01-2016 Drilling of Borewell at Kurmawada Peddapalli Kasulapally General Drinking water Facility CDP 09-02-2016 50000 50000 01-10-2016 49178 0 49178 16/PDPL(MLA-Q) Peddapally Supply

Drilling of Borewell at ZPSS Boys Plg.II/139/CDP/15- DRWS&S, Rural Water 34 12-01-2016 Peddapalli Peddapalli General Drinking water Facility CDP 09-02-2016 50000 50000 01-10-2016 49178 0 49178 High School 16/PDPL(MLA-Q) Peddapally Supply

Plg.II/139/CDP/15- DRWS&S, Rural Water 35 12-01-2016 Drilling of Borewell at Gollapally Peddapalli Turkalamaddikunta General Drinking water Facility CDP 09-02-2016 50000 50000 26-04-2016 41850 0 41850 16/PDPL(MLA-Q) Peddapally Supply

Plg.II/139/CDP/15- DRWS&S, Rural Water 36 12-01-2016 Erection of Pump set in Reddy colony Odela Kolanoor General Drinking water Facility CDP 09-02-2016 25000 25000 01-10-2016 24886 0 24886 16/PDPL(MLA-Q) Peddapally Supply

Grand Total 7500000 7500000 4806429 259001 5065430

33865 CHIEF PLANNING OFFICER PEDDAPALLY Status of the Work(Comp/P rog/Not Started)

20

Progress

Not Started

Completed

Completed

Not Started

Not Started

Not Started

Progress

Completed

Completed

Progress

Not Started

Completed

Completed

Completed

Completed Status of the Work(Comp/P rog/Not Started)

20

Completed

Completed

Completed

Completed

Completed

Completed

Progress

Not Started

Not Started

Completed

Not Started

Completed

Completed

Not Started

Completed

Completed Status of the Work(Comp/P rog/Not Started)

20

Completed

Completed

Completed

Completed LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2015-16 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY - District Incharge Minister Quota

Name of the District: Peddapalli

2ND & Cumulative Status of the Area Sl. Date of Date of Estimated Scheme Executive Department Date of 1ST Date of Final Total Work(Comp/P Work Description Mandal Village (SC/ST/ Sector Name Scheme Name Proceedings No. No. Proposal Sanction Cost in Rs. Fund In Rs. Agency Name Release Instalment Releases Installme Expenditure rog/Not Gen) nt Incurred Started)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

L/O CC R/F T.Anjaiah(H) to Revelli Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 1 08-08-2015 Julapalle Kachapur General CDP 22-08-2015 200000 200000 0 0 0 Not Started Buchaiah(H) Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F GP Building to Revelli Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 2 08-08-2015 Julapalle Wadkapur General CDP 22-08-2015 300000 300000 0 0 0 Not Started Buchaiah(H) Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F T.Satyanaraya(H) to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 3 08-08-2015 Odela Goparapalli General CDP 22-08-2015 200000 200000 0 0 0 Not Started Boyini Odelu(H) Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F T.Ramesh(H) to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 4 08-08-2015 Odela Gudem General CDP 22-08-2015 200000 200000 18-05-2017 184673 0 184673 Completed Ch.Narsaiah(H) Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F Tippani Sadaiah(H) to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 5 08-08-2015 Odela Gudem General CDP 22-08-2015 200000 200000 13-03-2017 200000 0 200000 Completed Budige Ramulu(H) Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F GP Building to Oora Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 6 08-08-2015 Odela Indurthi General CDP 22-08-2015 200000 200000 0 0 0 Not Started Chervu Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F GP Building to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 7 08-08-2015 Odela Indurthi General CDP 22-08-2015 200000 200000 0 0 0 Not Started Nagapuri Veeraiah(H) Buildings 16/PDPL(I/M) Peddapally Engineering

L/O CC R/F Hanuman temple to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 8 08-08-2015 Odela Pothkapalle General CDP 22-08-2015 300000 300000 0 0 0 Not Started M.Komuraiah(H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Bandari Komaraiah Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 9 20-02-2016 Srirampur Edulapur General CDP 08-03-2016 250000 250000 04-07-2017 231250 231250 Completed (H) to Bandarapu Ravinder (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Ollala Mogili (H) to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 10 20-02-2016 Srirampur Peddarathpally General CDP 08-03-2016 250000 250000 0 0 0 Not Started Agolapu Madhuraiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Dugyala Sathish Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 11 20-02-2016 Srirampur Chinnarathpally General CDP 08-03-2016 250000 250000 04-05-2017 216255 216255 Completed (H) to Voddi Rajaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Lanka Sadaiah (H) Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 12 20-02-2016 Srirampur Malliala General CDP 08-03-2016 250000 250000 0 0 0 Not Started to Orre Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Potharaveni Odelu Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 13 20-02-2016 Srirampur Pandilla General CDP 08-03-2016 250000 250000 9/5/2018 222922 0 222922 Progress (H) to R&B road Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Jakkula Mohan (H) Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 14 20-02-2016 Srirampur Peddampeta General CDP 08-03-2016 250000 250000 04-05-2017 229879 229879 Completed to Siluveri Sailu (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Kolipaka Odelu (H) Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 15 20-02-2016 Srirampur Gangaram General CDP 08-03-2016 250000 250000 29-09-2016 223654 10/4/2017 26346 250000 Completed to Sunkari Ilaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

Drilling of Borewell at Burial Drinking water Plg.II/136/CDP/15- DPRE, Panchayathraj 16 20-02-2016 Srirampur Kunaram General CDP 08-03-2016 50000 50000 0 0 0 Not Started Ground facility 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Atla Bakkaiah (H) Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 17 20-02-2016 Sulthanabad Kodurupaka General CDP 08-03-2016 250000 250000 04-05-2017 226991 226991 Completed to Nitturu Road Buildings 16/PDPL(I/M) Peddapally Engineering LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2015-16 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY - District Incharge Minister Quota

Name of the District: Peddapalli

2ND & Cumulative Status of the Area Sl. Date of Date of Estimated Scheme Executive Department Date of 1ST Date of Final Total Work(Comp/P Work Description Mandal Village (SC/ST/ Sector Name Scheme Name Proceedings No. No. Proposal Sanction Cost in Rs. Fund In Rs. Agency Name Release Instalment Releases Installme Expenditure rog/Not Gen) nt Incurred Started)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

100 Mtrs CC R/F Janmapalli Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 18 20-02-2016 Sulthanabad Suglampally General CDP 08-03-2016 250000 250000 2/17/2018 206705 9/17/2018 43295 250000 Completed Mallaiah (H) to Ramesh (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F P.Rajaiah (H) to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 19 20-02-2016 Sulthanabad Garrepally General CDP 08-03-2016 250000 250000 09-08-2016 230170 230170 Completed Perumandla Hanumaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Kalva Ramulu (H) Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 20 20-02-2016 Sulthanabad Itharajpally General CDP 08-03-2016 250000 250000 03-08-2017 231250 231250 Progress to Kalvala Bheemaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Arelli Sadaiah Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 21 20-02-2016 Odela Gudem General CDP 08-03-2016 250000 250000 13-03-2017 224108 18-05-2017 25892 250000 Completed (H)to Budige Rajaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Godugu Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 22 20-02-2016 Sammaiah (H) to Madaraveni Raja Odela Shanagonda General CDP 08-03-2016 250000 250000 10/4/2017 231250 231250 Completed Buildings 16/PDPL(I/M) Peddapally Engineering Komuraiah (H)

100 Mtrs CC R/F Ojja Srinivas (H) to Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 23 20-02-2016 Odela Goparapalli General CDP 08-03-2016 250000 250000 ######### 205476 205476 Progress Bandi Mondaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Thummala Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 24 20-02-2016 Chandraiah (H) to Thummala Odela Haripuram General CDP 08-03-2016 250000 250000 0 0 0 Not Started Buildings 16/PDPL(I/M) Peddapally Engineering Ramulu (H)

100 Mtrs CC R/F Mallaveni Kathulu Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 25 20-02-2016 Odela Namsanipally General CDP 08-03-2016 250000 250000 2/17/2018 231362 0 231362 Progress (H) to Mallaveni Rajaiah (H) Buildings 16/PDPL(I/M) Peddapally Engineering

100 Mtrs CC R/F Thrimurthula Railways, Roads & Plg.II/136/CDP/15- DPRE, Panchayathraj 26 20-02-2016 Odela Indurthi General CDP 08-03-2016 250000 250000 0 0 0 Not Started Ilaiah (H) to Pusala Odelu (H) Buildings 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at GP Plg.II/136/CDP/15- DPRE, Panchayathraj 27 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 04-07-2017 63449 63449 Completed Janda 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 28 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed Nehru Statue 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 29 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed Ambedkar Statue 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 30 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed Court Chowrasta 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 31 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed MPDO Office Chowrasta 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Old Plg.II/136/CDP/15- DPRE, Panchayathraj 32 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 03-08-2017 73031 73031 Completed Janda 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 33 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 04-07-2017 63449 63449 Completed Bathukamma Center 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 34 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed Agriculture Market Chowrasta 16/PDPL(I/M) Peddapally Engineering

Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 35 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed Yadavanagar Chowrasta 16/PDPL(I/M) Peddapally Engineering LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2015-16 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY - District Incharge Minister Quota

Name of the District: Peddapalli

2ND & Cumulative Status of the Area Sl. Date of Date of Estimated Scheme Executive Department Date of 1ST Date of Final Total Work(Comp/P Work Description Mandal Village (SC/ST/ Sector Name Scheme Name Proceedings No. No. Proposal Sanction Cost in Rs. Fund In Rs. Agency Name Release Instalment Releases Installme Expenditure rog/Not Gen) nt Incurred Started)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Erection of high mass lights at Plg.II/136/CDP/15- DPRE, Panchayathraj 36 15-03-2016 Sulthanabad Sulthanabad General Electrical CDP 18-04-2016 100000 100000 2/2/2018 92898 0 92898 Completed Ambedkar Chowrasta 16/PDPL(I/M) Peddapally Engineering

Plg.II/136/CDP/15- DRWS&S, Rural Water 37 20-02-2016 Erection of Pump set to open well Sulthanabad Dubbapally General Electrical CDP 08-03-2016 100000 100000 0 0 0 Not Started 16/PDPL(I/M) Peddapally Supply

Drilling of Borewell at Dubbapally Drinking water Plg.II/136/CDP/15- DRWS&S, Rural Water 38 20-02-2016 Sulthanabad Dubbapally General CDP 08-03-2016 50000 50000 0 0 0 Not Started H/o Ithrajpally facility 16/PDPL(I/M) Peddapally Supply

7250000 7250000 4146160 95533 4241693

CHIEF PLANNING OFFICER PEDDAPALLY LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Railways, roads & CC R/F G.P road to Kallem PLGII/22/CDP/2016- Panchayathraj 1 25-01-2017 Eligaid Lalapalli Gen Buildings & 22-04-2017 385000 77000 308000 DPRE,Peddapally 0 0 0 Not Started Lingareddy (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Bompalli Mallaiah (H) to PLGII/22/CDP/2016- Panchayathraj 2 25-01-2017 Eligaid Ryakaldevpalli Gen Buildings & 22-04-2017 420000 84000 336000 DPRE,Peddapally 0 0 0 Not Started Theetla Lachaiah (H) 17/PDPL/MGNRGES Engineering Bridges C/o of CC Road from Dande Railways, roads & PLGII/22/CDP/2016- Panchayathraj 3 25-01-2017 Nagamma (H) to perka Odela Kanagarthy Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 10/27/2018 62800 0 62800 Completed 17/PDPL/MGNRGES Engineering Mondaiah(H) Bridges Railways, roads & C/o of CC Road from Geetla PLGII/22/CDP/2016- Panchayathraj 4 25-01-2017 Odela Kolanoor Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started Ramreddy (H) to R&B Road 17/PDPL/MGNRGES Engineering Bridges C/o of CC Road from Bemari Railways, roads & PLGII/22/CDP/2016- Panchayathraj 5 25-01-2017 Thirupathi (H) to Burra Odela Komire Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering kanakaiah (H) Bridges

C/o of CC Road from Jakkula Railways, roads & PLGII/22/CDP/2016- Panchayathraj 6 25-01-2017 chinna Dasharatham(H)to Odela Komire Gen Buildings & 22-04-2017 960000 192000 768000 DPRE,Peddapally 9/10/2018 192000 0 192000 Completed 17/PDPL/MGNRGES Engineering Elaveni Srilatha Bridges

Railways, roads & C/o of CC Road from Bogi PLGII/22/CDP/2016- Panchayathraj 7 25-01-2017 Odela Madaka Gen Buildings & 22-04-2017 640000 128000 512000 DPRE,Peddapally 0 0 0 Not Started Odelu (H) to Thota Rangaiah (H) 17/PDPL/MGNRGES Engineering Bridges C/o of CC Road from Bogi Railways, roads & PLGII/22/CDP/2016- Panchayathraj 8 25-01-2017 Madhunaiah (H) to Ramojula Odela Madaka Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Rajamouli(H) Bridges Railways, roads & C/o of CC Road from Gattu PLGII/22/CDP/2016- Panchayathraj 9 25-01-2017 Odela Namsanipalle Gen Buildings & 22-04-2017 576000 115200 460800 DPRE,Peddapally 0 0 0 Not Started Komuraiah (H) to R&B Road 17/PDPL/MGNRGES Engineering Bridges Railways, roads & C/o of CC Road from Ojja PLGII/22/CDP/2016- Panchayathraj 10 25-01-2017 Odela Namsanipalle Gen Buildings & 22-04-2017 256000 51200 204800 DPRE,Peddapally 0 0 0 Not Started Srinivas (H) to Ojja Suresh 17/PDPL/MGNRGES Engineering Bridges Railways, roads & C/o of CC Road from Ramineni PLGII/22/CDP/2016- Panchayathraj 11 25-01-2017 Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started Raju(H) to D86 canal 17/PDPL/MGNRGES Engineering Bridges C/o of CC Road from Bomma Railways, roads & PLGII/22/CDP/2016- Panchayathraj 12 25-01-2017 Rajaiah(H) to Bireddy Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 9/10/2018 95977 0 95977 Completed 17/PDPL/MGNRGES Engineering sadasivareddy(H) Bridges C/o of CC Road from Ramineni Railways, roads & PLGII/22/CDP/2016- Panchayathraj 13 25-01-2017 Sunil(H)to chinthakunta Odela Odela Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Rajaiah(H) Bridges Railways, roads & C/o of CC Road from Pendam PLGII/22/CDP/2016- Panchayathraj 14 25-01-2017 Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 5/17/2018 88800 0 88800 Completed sammaiah (H) to Railway Gate 17/PDPL/MGNRGES Engineering Bridges Railways, roads & C/o of CC Road from Jagan (H) PLGII/22/CDP/2016- Panchayathraj 15 25-01-2017 Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 6/6/2018 96000 0 96000 Completed to Railway Gate 17/PDPL/MGNRGES Engineering Bridges Railways, roads & C/o of CC Road from D86 canal PLGII/22/CDP/2016- EE Rural Water 16 25-01-2017 Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 0 0 0 Not Started to Bodakunta Bhumaiah(H) 17/PDPL/MGNRGES RWS,PEDDAPALLI Supply Bridges C/o of CC Road from Railways, roads & PLGII/22/CDP/2016- Panchayathraj 17 25-01-2017 Bodakunta Bhumaiah (H) to Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 7/18/2018 92355 0 92355 Completed 17/PDPL/MGNRGES Engineering Sarojana (H) Bridges C/o of CC Road from Yembati Railways, roads & PLGII/22/CDP/2016- Panchayathraj 18 25-01-2017 Sambaiah (H) to Yembati Odela Odela Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Srinivas(H) Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Railways, roads & C/o of CC Road from R&B road PLGII/22/CDP/2016- Panchayathraj 19 25-01-2017 Odela Pothkapalle Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started to pittala Anjaiah 17/PDPL/MGNRGES Engineering Bridges C/o of CC Road Railways, roads & PLGII/22/CDP/2016- Panchayathraj 20 25-01-2017 A.Ramachandram (H)to Gona Odela Roopnarayanapet Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Mohan (H) Bridges Railways, roads & C/o of CC Road from G.P.Office PLGII/22/CDP/2016- Panchayathraj 21 25-01-2017 Odela Sanagonda Gen Buildings & 22-04-2017 640000 128000 512000 DPRE,Peddapally 9/23/2018 120878 0 120878 Completed to Gouthireddy Laxmareddy(H) 17/PDPL/MGNRGES Engineering Bridges C/o of CC Road from Vaarala Railways, roads & PLGII/22/CDP/2016- Panchayathraj 22 25-01-2017 Kanakaiah(H) to Guduri Kishan Odela Upparapally Gen Buildings & 22-04-2017 960000 192000 768000 DPRE,Peddapally 12/23/2017 143145 0 143145 Progress 17/PDPL/MGNRGES Engineering Rao (H) Bridges CC R/F Karre Shankaraiah (H) Railways, roads & PLGII/22/CDP/2016- Panchayathraj 23 25-01-2017 to SC colony drinking water Peddapally Andugulapally SC Buildings & 22-04-2017 1500000 300000 1200000 DPRE,Peddapally 9/10/2018 288948 0 288948 Completed 17/PDPL/MGNRGES Engineering well Bridges Railways, roads & CC Road from Dasharatham(H) PLGII/22/CDP/2016- Panchayathraj 24 25-01-2017 Peddapally Appannapet Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 9/17/2018 107407 0 107407 Progress to Rapelli Narasaiah(H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Kolakaani Mallesham PLGII/22/CDP/2016- Panchayathraj 25 25-01-2017 Peddapally Bandhampalli Gen Buildings & 22-04-2017 300000 60000 240000 DPRE,Peddapally 0 0 0 Not Started (H) to Narra Ilaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Enagandula Rajkumar PLGII/22/CDP/2016- Panchayathraj 26 25-01-2017 Peddapally Bandhampalli Gen Buildings & 22-04-2017 200000 40000 160000 DPRE,Peddapally 0 0 0 Not Started (H)to Enagandula Mogili (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC Road from Katla Mallaiah PLGII/22/CDP/2016- Panchayathraj 27 25-01-2017 Peddapally Bojannapeta Gen Buildings & 22-04-2017 400000 80000 320000 DPRE,Peddapally 9/17/2018 73439 0 73439 Completed Land to Avula Lingaiah(H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Pambaala Laxmaiah PLGII/22/CDP/2016- Panchayathraj 28 25-01-2017 Peddapally Bompally Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 9/10/2018 124409 0 124409 Completed (H) Kasthuri Laxmi (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Konkati Mallaiah (H) to PLGII/22/CDP/2016- Panchayathraj 29 25-01-2017 Peddapally Brahmanpalle(PS) Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 4/28/2018 135829 0 135829 Completed K.Pochaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Kamareddy Komaraiah PLGII/22/CDP/2016- Panchayathraj 30 25-01-2017 Peddapally Chandapalli Gen Buildings & 22-04-2017 400000 80000 320000 DPRE,Peddapally 6/21/2018 80000 0 80000 Completed (H) to Panaganti Swamy (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Pinikasi Swamy (H) to PLGII/22/CDP/2016- Panchayathraj 31 25-01-2017 Peddapally Cheekurai Gen Buildings & 22-04-2017 300000 60000 240000 DPRE,Peddapally 0 0 0 Not Started Bandari Rajaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Savati to Hanuman PLGII/22/CDP/2016- Panchayathraj 32 25-01-2017 Peddapally Cheekurai Gen Buildings & 22-04-2017 300000 60000 240000 DPRE,Peddapally 0 0 0 Not Started Temple 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Ambati Shankaraiah (H) PLGII/22/CDP/2016- Panchayathraj 33 25-01-2017 Peddapally Gowreddipet Gen Buildings & 22-04-2017 600000 120000 480000 DPRE,Peddapally 5/17/2018 88831 0 88831 Progress to Papeneni Shankaraiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Pendli Rajireddy (H) PLGII/22/CDP/2016- Panchayathraj 34 25-01-2017 Peddapally Kanagarthy Gen Buildings & 22-04-2017 400000 80000 320000 DPRE,Peddapally 10/4/2017 77462 0 77462 Completed Maderaveni Kanukaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Bonkuri Premaiah (H) PLGII/22/CDP/2016- Panchayathraj 35 25-01-2017 Peddapally Kasulapally SC Buildings & 22-04-2017 900000 180000 720000 DPRE,Peddapally 0 0 0 Not Started to Ankusamma (H) SC 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Gaddala Kistaiah (H) PLGII/22/CDP/2016- Panchayathraj 36 25-01-2017 Peddapally Kasulapally SC Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 0 0 0 Not Started to Bonkuri Rajitha (H) SC 17/PDPL/MGNRGES Engineering Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Railways, roads & CC R/F Kammari Sathaiah (H) PLGII/22/CDP/2016- Panchayathraj 37 25-01-2017 Peddapally Maredugonda Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 0 0 0 Not Started to Hanuman temple 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Kare lachamma (H) to PLGII/22/CDP/2016- Panchayathraj 38 25-01-2017 Peddapally Mulasala Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 9/17/2018 140000 0 140000 Completed Kasu Thiru pathi (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F GP Office to Bandi PLGII/22/CDP/2016- Panchayathraj 39 25-01-2017 Peddapally Mutharam Gen Buildings & 22-04-2017 500000 100000 400000 DPRE,Peddapally 6/21/2018 100000 0 100000 Completed Shanker (H) 17/PDPL/MGNRGES Engineering Bridges

CC R/F Veerabonia Mondaiah Railways, roads & PLGII/22/CDP/2016- Panchayathraj 40 25-01-2017 (H) to Singeraveni Shankaraiah Peddapally Mutharam Gen Buildings & 22-04-2017 500000 100000 400000 DPRE,Peddapally 6/21/2018 97465 0 97465 Completed 17/PDPL/MGNRGES Engineering (H) Bridges

CC Road from Gasiganti Railways, roads & PLGII/22/CDP/2016- Panchayathraj 41 25-01-2017 Ramesh(H) to Bollam Peddapally Palthem Gen Buildings & 22-04-2017 500000 100000 400000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Paramesh(H) Bridges Railways, roads & CC Road from Ponnam PLGII/22/CDP/2016- Panchayathraj 42 25-01-2017 Peddapally Ragineedu Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 0 0 0 Not Started Rajaiah(H) to Basavaiah(H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC Road from Dama kanakaiah PLGII/22/CDP/2016- Panchayathraj 43 25-01-2017 Peddapally Rampally Gen Buildings & 22-04-2017 1500000 300000 1200000 DPRE,Peddapally 7/18/2018 300000 0 300000 Completed (H) to Karupakala Sadaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Chanda Srinivas (H) to PLGII/22/CDP/2016- Panchayathraj 44 25-01-2017 Peddapally Rangapoor Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 02-02-2018 139882 0 139882 Completed Sankari Rajaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F R.Kanthaiah (H) to Erla Thurkalamaddiku PLGII/22/CDP/2016- Panchayathraj 45 25-01-2017 Peddapally Gen Buildings & 22-04-2017 500000 100000 400000 DPRE,Peddapally 02-02-2018 71815 0 71815 Progress Rajam (H) nta 17/PDPL/MGNRGES Engineering Bridges Railways, roads & CC R/F Burra Bakkaiah (H) to Thurkalamaddiku PLGII/22/CDP/2016- Panchayathraj 46 25-01-2017 Peddapally Gen Buildings & 22-04-2017 700000 140000 560000 DPRE,Peddapally 23-10-2017 132997 0 132997 Completed Balaji (H) nta 17/PDPL/MGNRGES Engineering Bridges CC Road from Kummari Railways, roads & PLGII/22/CDP/2016- Panchayathraj 47 25-01-2017 Rangamma(H) to Bejjanki Sulthanabad Bonthakuntapalli Gen Buildings & 22-04-2017 200000 40000 160000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Rajaiah(H) Bridges CC Road from Bejjanki Railways, roads & PLGII/22/CDP/2016- Panchayathraj 48 25-01-2017 Bapu(H) to Bejjanki Odaiah(H) Sulthanabad Bonthakuntapalli SC Buildings & 22-04-2017 290000 58000 232000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering SC Model school Bridges C.C. Road S.C. Colony Ralla Railways, roads & PLGII/22/CDP/2016- Panchayathraj 49 25-01-2017 Matu to Aarnakonda Laxmaiah Sulthanabad Chinna Bonkur Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering House Bridges Railways, roads & Sahakaara Bank to Gantla PLGII/22/CDP/2016- Panchayathraj 50 25-01-2017 Sulthanabad Chinnakalvala Gen Buildings & 22-04-2017 576000 115200 460800 DPRE,Peddapally 0 0 0 Not Started Nagama (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Kundella Rajesham house to PLGII/22/CDP/2016- Panchayathraj 51 25-01-2017 Sulthanabad Garrepally Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 9/17/2018 83133 0 83133 Progress Thota Mallaiah house 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Peramandla Hanumaiah to PLGII/22/CDP/2016- Panchayathraj 52 25-01-2017 Sulthanabad Garrepally Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started Konda Mallaiah house 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Lanaka Dasari Pochaiah (H) to PLGII/22/CDP/2016- Panchayathraj 53 25-01-2017 Sulthanabad Garrepally Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started Kavvampelly Bhoomesh (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & C/o CC Road from Kalluri PLGII/22/CDP/2016- Panchayathraj 54 25-01-2017 Sulthanabad Gattepally Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 9/10/2018 64000 0 64000 Completed Lingaiah (H) to Are Madhu (H) 17/PDPL/MGNRGES Engineering Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 C/o CC Road from Ambala Railways, roads & PLGII/22/CDP/2016- Panchayathraj 55 25-01-2017 Yadagiri (H) to Shilam Shanker Sulthanabad Gattepally SC Buildings & 22-04-2017 384000 76800 307200 DPRE,Peddapally 9/10/2018 59696 0 59696 Progress 17/PDPL/MGNRGES Engineering (H) SC Colony Bridges CC Road from Kothoori Railways, roads & PLGII/22/CDP/2016- Panchayathraj 56 25-01-2017 Kondaiah(H) to Water tank at Sulthanabad Gollapalli Gen Buildings & 22-04-2017 385000 77000 308000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Narayanapally Bridges C/o CC Road from Kalvala Railways, roads & PLGII/22/CDP/2016- Panchayathraj 57 25-01-2017 kanukaiah (H) to Rajvi Road Sulthanabad Ithrajpalle SC Buildings & 22-04-2017 960000 192000 768000 DPRE,Peddapally 10/15/2018 185866 0 185866 Completed 17/PDPL/MGNRGES Engineering (Dubbapalli) Itharajpalli SC Bridges Railways, roads & Meesa Thirupathi house to PLGII/22/CDP/2016- Panchayathraj 58 25-01-2017 Sulthanabad Kanukula Gen Buildings & 22-04-2017 800000 160000 640000 DPRE,Peddapally 0 0 0 Not Started Ramalayam 17/PDPL/MGNRGES Engineering Bridges Railways, roads & P.R road to S.C Colony PLGII/22/CDP/2016- Panchayathraj 59 25-01-2017 Sulthanabad Kodurupaka Gen Buildings & 22-04-2017 800000 160000 640000 DPRE,Peddapally 0 0 0 Not Started Kallapelly Rayamallu 17/PDPL/MGNRGES Engineering Bridges Mekala Komaraiah House to Railways, roads & PLGII/22/CDP/2016- Panchayathraj 60 25-01-2017 Eerala Rayamallu House B.C Sulthanabad Miyapur Gen Buildings & 22-04-2017 256000 51200 204800 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Colony Bridges Manupati Sammiah House to Railways, roads & PLGII/22/CDP/2016- Panchayathraj 61 25-01-2017 Gandla Anjaiah House S,T Sulthanabad Miyapur Gen Buildings & 22-04-2017 448000 89600 358400 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering colony Bridges Railways, roads & Molguri Rangaiah (H) to PLGII/22/CDP/2016- Panchayathraj 62 25-01-2017 Sulthanabad Neerukulla SC Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started Muthyam Odelu (H) (SC Colony) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Mulluri Chandraiah (H) to PLGII/22/CDP/2016- Panchayathraj 63 25-01-2017 Sulthanabad Neerukulla SC Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started Pogula Anjaiah (H) (SC Colony) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Mulluri Shankraiah (H) to PLGII/22/CDP/2016- Panchayathraj 64 25-01-2017 Sulthanabad Neerukulla SC Buildings & 22-04-2017 384000 76800 307200 DPRE,Peddapally 0 0 0 Not Started Mulluri Narsaiah (H) SC Colony) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Illaveni Lingaiah (H) to R&B PLGII/22/CDP/2016- Panchayathraj 65 25-01-2017 Sulthanabad Neerukulla Gen Buildings & 22-04-2017 256000 51200 204800 DPRE,Peddapally 0 0 0 Not Started road BC colony 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Kyadasi Rajaiah (H) to Nerrala PLGII/22/CDP/2016- Panchayathraj 66 25-01-2017 Sulthanabad Neerukulla SC Buildings & 22-04-2017 384000 77000 307000 DPRE,Peddapally 6/21/2018 76800 0 76800 Completed Gangaiah (H) SC Colony) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Boorgu Srinivas (H) to Poosala PLGII/22/CDP/2016- Panchayathraj 67 25-01-2017 Sulthanabad Neerukulla Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started Venkatchary (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Gajula Laxmaiah house to PLGII/22/CDP/2016- Panchayathraj 68 25-01-2017 Sulthanabad Regadimaddikunta Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started Abbayya S.C. Colony 17/PDPL/MGNRGES Engineering Bridges Yelugu Pochamma house Railways, roads & PLGII/22/CDP/2016- Panchayathraj 69 25-01-2017 toBurra Komuraiah(H) S.T. Sulthanabad Regadimaddikunta Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started 17/PDPL/MGNRGES Engineering Colony Bridges Railways, roads & Dugyala Rajaiah house to R & PLGII/22/CDP/2016- Panchayathraj 70 25-01-2017 Sulthanabad Regadimaddikunta Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started B Road S.T Colony 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Avunoiori Raja Mallaiah house PLGII/22/CDP/2016- Panchayathraj 71 25-01-2017 Sulthanabad Suddala Gen Buildings & 22-04-2017 576000 115200 460800 DPRE,Peddapally 0 0 0 Not Started to Irugurala Ilaiah (H) 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Avunoiori Ashalau house to PLGII/22/CDP/2016- Panchayathraj 72 25-01-2017 Sulthanabad Suddala Gen Buildings & 22-04-2017 320000 64000 256000 DPRE,Peddapally 0 0 0 Not Started Iguram Mallaiah house 17/PDPL/MGNRGES Engineering Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Railways, roads & Thogiri Srinu house to thogari PLGII/22/CDP/2016- Panchayathraj 73 25-01-2017 Sulthanabad Suddala Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 0 0 0 Not Started Chandraiah house 17/PDPL/MGNRGES Engineering Bridges Railways, roads & Rajvi Rahadaari to Boddu PLGII/22/CDP/2016- Panchayathraj 74 25-01-2017 Sulthanabad Suglamapally SC Buildings & 22-04-2017 256000 51200 204800 DPRE,Peddapally 0 0 0 Not Started Shankaraiah (H) SC Colony 17/PDPL/MGNRGES Engineering Bridges Railways, roads & GP road to kankanaala Ravi (H) PLGII/22/CDP/2016- Panchayathraj 75 25-01-2017 Sulthanabad Suglamapally Gen Buildings & 22-04-2017 192000 38400 153600 DPRE,Peddapally 0 0 0 Not Started to CC road BC colony 17/PDPL/MGNRGES Engineering Bridges Railways, roads & R&B Road to Kyadasi Pochyaiah PLGII/22/CDP/2016- Panchayathraj 76 25-01-2017 Sulthanabad Togarrai Gen Buildings & 22-04-2017 480000 96000 384000 DPRE,Peddapally 9/28/2018 91554 0 91554 Completed House S.C Colony 17/PDPL/MGNRGES Engineering Bridges

Installation of Good quality of Other Public PLGII/22/CDP/16-17/ Nagara 77 4/11/2017 Peddapalli Peddapalli Gen 5/9/2017 500000 492963 0 Nagara Panchayathi 3/29/2018 455486 0 455486 Progress CC TV Cameras in Peddapally facilities PDPL Panchayathi

Drilling of borewell & provide Drinking water PLGII/22/CDP/16-17/ EE Rural Water 78 14-07-2016 Peddapally Palthem Gen 03-08-2017 65000 65000 0 29-09-2016 64714 0 64714 Completed hand pump facility PDPL RWS,PEDDAPALLI Supply

DRINKING OF BOREWELL & Merapalli Drinking water PLGII/22/CDP/16-17/ EE Rural Water 79 14-07-2016 HAND PUMP SET AT ODDERA Peddapally Gen 03-08-2017 65000 65000 0 29-09-2016 60697 0 60697 Completed Bompalli facility PDPL RWS,PEDDAPALLI Supply COLONY DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 80 14-07-2016 HAND PUMP SET AT Peddapally Peddabonkur Gen 03-08-2017 65000 65000 0 29-09-2016 64697 0 64697 Completed facility PDPL RWS,PEDDAPALLI Supply PEDDAMMA TEMPLE DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 81 14-07-2016 HAND PUMP SET AT THALLA Sulthanabad Ithrajpalle Gen 03-08-2017 60000 60000 0 29-09-2016 52373 0 52373 Completed facility PDPL RWS,PEDDAPALLI Supply KUNTA DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 82 14-07-2016 HAND PUMP SET AT NADARI Sulthanabad Ithrajpalle Gen 03-08-2017 60000 60000 0 29-09-2016 52373 0 52373 Completed facility PDPL RWS,PEDDAPALLI Supply LACHAIAH(H) DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 83 14-07-2016 HAND PUMP SET AT Sulthanabad Ithrajpalle Gen 03-08-2017 60000 60000 0 29-09-2016 55885 0 55885 Completed facility PDPL RWS,PEDDAPALLI Supply MALLAREDDY (H) DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 84 14-07-2016 HAND PUMP SET IN THE Sulthanabad Ithrajpalle Gen 03-08-2017 60000 60000 0 29-09-2016 55885 0 55885 Completed facility PDPL RWS,PEDDAPALLI Supply VILLAGE DRILLING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 85 14-07-2016 HAND PUMP SET AT Sulthanabad Bhoopathipuram Gen 03-08-2017 60000 60000 0 29-09-2016 55311 0 55311 Completed facility PDPL RWS,PEDDAPALLI Supply POCHAMPALLY HOUSE DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 86 14-07-2016 HAND PUMP SETS AT V. Sulthanabad Bhoopathipuram Gen 03-08-2017 60000 60000 0 29-09-2016 55885 0 55885 Completed facility PDPL RWS,PEDDAPALLI Supply POCHAIAH(V) DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 87 14-07-2016 HAND PUMP SETS AT Sulthanabad Bhoopathipuram Gen 03-08-2017 60000 60000 0 21-07-2017 59928 0 59928 Completed facility PDPL RWS,PEDDAPALLI Supply PEDDAMMA TEMPLE DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 88 14-07-2016 HAND PUMP SETS AT YADAVA Sulthanabad Gollapalli Gen 03-08-2017 60000 60000 0 0 0 0 Not Started facility PDPL RWS,PEDDAPALLI Supply COMMUNITY HALL

Drinking water PLGII/22/CDP/16-17/ EE Rural Water 89 14-07-2016 DRILLING OF BORE WELL Peddapally Palthem Gen 03-08-2017 65000 65000 0 29-09-2016 64748 0 64748 Completed facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 90 14-07-2016 HAND PUMP SETS AT ODELA Indurthi Gen 03-08-2017 120000 120000 0 15-02-2017 94222 0 94222 Progress facility PDPL RWS,PEDDAPALLI Supply HANUMAN TEMPLE LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 91 14-07-2016 ODELA Odela Gen 03-08-2017 50000 50000 0 29-09-2016 39139 0 39139 Completed NEAR BUSTAND facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 92 14-07-2016 HAND PUMP SETS AT ODELA Odela Gen 03-08-2017 65000 65000 0 15-02-2017 47512 0 47512 Completed facility PDPL RWS,PEDDAPALLI Supply BUSSTAND DRILLING OF BORE WELL& HAND PUMP SETS AT SUNIL Drinking water PLGII/22/CDP/16-17/ EE Rural Water 93 14-07-2016 ODELA Odela Gen 03-08-2017 60000 60000 0 29-09-2016 53521 0 53521 Completed KIRANAM NEAR facility PDPL RWS,PEDDAPALLI Supply MALLIKARJUNA NAGAR DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 94 14-07-2016 HAND PUMP SETS AT V. ODELA Odela Gen 03-08-2017 60000 60000 0 29-09-2016 56339 0 56339 Completed facility PDPL RWS,PEDDAPALLI Supply POCHAIAH(V) DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 95 14-07-2016 HAND PUMP SETS AT ODELA Odela Gen 03-08-2017 60000 60000 0 29-09-2016 52356 0 52356 Progress facility PDPL RWS,PEDDAPALLI Supply NAGENDRA NAGAR DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 96 14-07-2016 HAND PUMP SETS AT ODELA ODELA Odela Gen 03-08-2017 60000 60000 0 0 0 0 Not Started facility PDPL RWS,PEDDAPALLI Supply VILLAGE

PROVIDING PUMP SET IN THE Drinking water PLGII/22/CDP/16-17/ EE Rural Water 97 14-07-2016 ODELA Pathkapalle Gen 03-08-2017 75000 75000 0 15-02-2017 53208 0 53208 Progress POLICE STATION facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 98 14-07-2016 Peddapally Palthem Gen 03-08-2017 65000 65000 0 29-09-2016 64275 0 64275 Completed HAND PUMP SETS facility PDPL RWS,PEDDAPALLI Supply

DRILIING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 99 14-07-2016 Peddapally Palthem Gen 03-08-2017 65000 65000 0 29-09-2016 64849 0 64849 Completed HAND PUMP SETS facility PDPL RWS,PEDDAPALLI Supply

Drinking water PLGII/22/CDP/16-17/ EE Rural Water 100 14-07-2016 DRILLING OF BOREWELL Peddapally Palthem Gen 03-08-2017 65000 65000 0 29-09-2016 65000 0 65000 Completed facility PDPL RWS,PEDDAPALLI Supply

drilling of bore well & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 101 14-07-2016 providing hand pump sets allte Peddapally Palthem Gen 03-08-2017 65000 65000 0 0 0 0 Not Started facility PDPL RWS,PEDDAPALLI Supply manoher DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 102 14-07-2016 HAND PUMP SETS NEAR GP Peddapally Kasulapally Gen 03-08-2017 65000 65000 0 29-09-2016 64972 0 64972 Completed facility PDPL RWS,PEDDAPALLI Supply OFFICE DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 103 14-07-2016 HAND PUMP SET AT Peddapally Kasulapally Gen 03-08-2017 65000 65000 0 29-09-2016 65000 0 65000 Completed facility PDPL RWS,PEDDAPALLI Supply NEERUMALL HANUMATHU(H) DRINKING OF BOREWELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 104 14-07-2016 HAND PUMP SET AT AVUNURI Peddapally Kasulapally Gen 03-08-2017 65000 65000 0 29-09-2016 64748 0 64748 Completed facility PDPL RWS,PEDDAPALLI Supply RAJAIAH DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 105 26-07-2016 HAND PUMP SETS AT CHAKALI Julapally Julapalle Gen 19-08-2016 50000 50000 0 29-09-2016 50000 0 50000 Completed facility PDPL RWS,PEDDAPALLI Supply WADA

DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 106 26-07-2016 Julapally Kurmapalli Gen 19-08-2016 50000 50000 0 29-09-2016 49281 0 49281 Completed PUMP SET AT BC COLONY facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 107 26-07-2016 HAND PUMP SET AT Julapally Telukunta Gen 19-08-2016 50000 50000 0 29-09-2016 49281 0 49281 Completed facility PDPL RWS,PEDDAPALLI Supply HANUMAN TEMPLE DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 108 26-07-2016 HAND PUMP SET NEAR BUS Julapally Telukunta Gen 19-08-2016 50000 50000 0 29-09-2016 49281 0 49281 Completed facility PDPL RWS,PEDDAPALLI Supply STAND LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 109 26-07-2016 HAND PUMP SET NEAR Julapally Nagulapalli Gen 19-08-2016 50000 50000 0 29-09-2016 49754 0 49754 Completed facility PDPL RWS,PEDDAPALLI Supply POCHAMMA TEMPLE DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 110 26-07-2016 HAND PUMP SET AT MODEL Julapally Peddapur Gen 19-08-2016 50000 50000 0 29-09-2016 27218 0 27218 Completed facility PDPL RWS,PEDDAPALLI Supply SCHOOL DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 111 26-07-2016 HAND PUMP SET AT BC Julapally Peddapur Gen 19-08-2016 50000 50000 0 29-09-2016 49281 0 49281 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY GOLLAWADA DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 112 26-07-2016 HAND PUMP SET AT Julapally Peddapur Gen 19-08-2016 50000 50000 0 29-09-2016 50000 0 50000 Completed facility PDPL RWS,PEDDAPALLI Supply YELLAMMA TEMPLE DRILLING OF BORE WELL& Drinking water PLGII/22/CDP/16-17/ EE Rural Water 113 26-07-2016 HAND PUMP SETS BIRANNA Julapally Julapalle Gen 19-08-2016 50000 50000 0 29-09-2016 49754 0 49754 Completed facility PDPL RWS,PEDDAPALLI Supply TEMPLE

DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 114 26-07-2016 Julapally Kummarikunta Gen 19-08-2016 50000 50000 0 29-09-2016 45281 0 45281 Completed HAND PUMP SET AT GP OFFICE facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 115 26-07-2016 HAND PUMP SET AT Julapally Kachapur Gen 19-08-2016 50000 50000 0 29-09-2016 45281 0 45281 Completed facility PDPL RWS,PEDDAPALLI Supply POCHAMMA TEMPLE DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 116 26-07-2016 HAND PUMP SET AT BC Julapally Kachapur Gen 19-08-2016 50000 50000 0 29-09-2016 45720 0 45720 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 117 26-07-2016 HAND PUMP SET AT Julapally Wadkapur Gen 19-08-2016 50000 50000 0 15-02-2017 48827 0 48827 Completed facility PDPL RWS,PEDDAPALLI Supply BEERANNAGUDA DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 118 26-07-2016 HAND PUMP SET AT YADAVA Julapally Wadkapur Gen 19-08-2016 50000 50000 0 29-09-2016 49771 0 49771 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 119 26-07-2016 HAND PUMP SET AT ST Julapally Wadkapur ST 19-08-2016 50000 50000 0 29-09-2016 49754 0 49754 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY

PROVIDING PUMP SET AT Drinking water PLGII/22/CDP/16-17/ EE Rural Water 120 26-07-2016 ODELA Pathkapalle Gen 19-08-2016 100000 100000 0 15-02-2017 64000 0 64000 Progress MANERU VAGU facility PDPL RWS,PEDDAPALLI Supply

PROVIDING PUMP SET AT Drinking water PLGII/22/CDP/16-17/ EE Rural Water 121 26-07-2016 ODELA Kanagarthy Gen 19-08-2016 100000 100000 0 15-02-2017 92382 0 92382 Completed MANERU VAGU facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 122 26-07-2016 PROVIDING PUMP SETS AT Srirampur Kunaram Gen 19-08-2016 150000 150000 0 15-02-2017 52419 0 52419 Progress facility PDPL RWS,PEDDAPALLI Supply FIELDS DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 123 26-07-2016 PROVIDING PUMPSET NEAR Srirampur Jafarkhanpet Gen 19-08-2016 150000 150000 0 15-02-2017 49954 0 49954 Progress facility PDPL RWS,PEDDAPALLI Supply VAGU DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 124 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Cheekurai Gen 19-08-2016 40000 40000 0 29-09-2016 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply KEARI LINGAIAH(H) DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 125 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Cheekurai Gen 19-08-2016 40000 40000 0 15-02-2017 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply M. LINGAIAH(H)

SOURCE OF PUMP SET NEAR Drinking water PLGII/22/CDP/16-17/ EE Rural Water 126 26-07-2016 Peddapally Rangampalle Gen 19-08-2016 150000 150000 0 15-02-2017 149803 0 149803 Completed UNUKONDA VAIKUNTAM facility PDPL RWS,PEDDAPALLI Supply LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 127 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Ragineedu SC 19-08-2016 40000 40000 0 29-09-2016 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply PATHA BAVI SC COLONY Drilling of Bore Well & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 128 26-07-2016 Providing Hand pump near PS Peddapally Ragineedu Gen 19-08-2016 40000 40000 0 29-09-2016 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply School Drilling of Bore Well & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 129 26-07-2016 Providing of Hand Pump at Peddapally Brahmanpalle(PS) Gen 19-08-2016 40000 40000 0 29-09-2016 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply Orsula Rajamallamma House Drilling Borewell and Providing Drinking water PLGII/22/CDP/16-17/ EE Rural Water 130 26-07-2016 Hand Pumpset near Gandla Peddapally Brahmanpalle(PS) Gen 19-08-2016 40000 40000 0 29-09-2016 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply Ravi House Drilling of Bore WEll and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 131 26-07-2016 Providing Hand Pump at Peddapally Mulasala Gen 19-08-2016 40000 40000 0 15-02-2017 39983 0 39983 Completed facility PDPL RWS,PEDDAPALLI Supply Gandla Wada DRILLING OF Drinking water PLGII/22/CDP/16-17/ EE Rural Water 132 26-07-2016 BORE&PROVIDING HAND PUMP Peddapally Mulasala Gen 19-08-2016 40000 40000 0 15-02-2017 39983 0 39983 Completed facility PDPL RWS,PEDDAPALLI Supply NEAR BEERANNA TEMPLE DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 133 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Mulasala Gen 19-08-2016 40000 40000 0 15-02-2017 39983 0 39983 Completed facility PDPL RWS,PEDDAPALLI Supply YELLAMMA TEMPLE DRILLING OF BORE & Thurkalamaddiku Drinking water PLGII/22/CDP/16-17/ EE Rural Water 134 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Gen 19-08-2016 80000 80000 0 15-02-2017 78458 0 78458 Completed nta facility PDPL RWS,PEDDAPALLI Supply HANUMANTEMPLE

DRILLING OF BORE & Thurkalamaddiku Drinking water PLGII/22/CDP/16-17/ EE Rural Water 135 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Gen 19-08-2016 80000 80000 0 15-02-2017 78885 0 78885 Completed nta facility PDPL RWS,PEDDAPALLI Supply BARRIAL GORUND PRIMISES

DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 136 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Peddakalvala Gen 19-08-2016 40000 40000 0 15-02-2017 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply MUTYALA POCHAMMA HOUSE

DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 137 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Peddakalvala Gen 19-08-2016 40000 40000 0 15-02-2017 39983 0 39983 Completed facility PDPL RWS,PEDDAPALLI Supply NETTETLA KANUKAIAH HOUSE

DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 138 26-07-2016 PROVIDING HAND PUMP NEAR Peddapally Peddapally Gen 19-08-2016 40000 40000 0 0 0 0 Not Started facility PDPL RWS,PEDDAPALLI Supply IPPALAPALLI RAVI HOUSE

Providing Pipeline and Pumpset Drinking water PLGII/22/CDP/16-17/ EE Rural Water 139 26-07-2016 Peddapally Brahmanpalle(PS) Gen 19-08-2016 200000 200000 0 21-07-2017 181586 0 181586 Completed in theVillage facility PDPL RWS,PEDDAPALLI Supply

Providing Pump Set and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 140 26-07-2016 Pumping Main at Govt. Peddapally Peddapally Gen 19-08-2016 150000 150000 0 0 0 0 Not Started facility PDPL RWS,PEDDAPALLI Supply Hospital, Peddapally

Drilling of Borewell & Pump Set Drinking water PLGII/22/CDP/16-17/ EE Rural Water 141 26-07-2016 Srirampur Kunaram Gen 19-08-2016 100000 100000 0 0 0 0 Not Started at Yellamma Temple facility PDPL RWS,PEDDAPALLI Supply

Drilling of Bore Well and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 142 26-07-2016 Providing Hand Pump Near Eligaid Lalapalli Gen 19-08-2016 40000 40000 0 15-02-2017 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply Temple Drilling of Bore Well and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 143 26-07-2016 Providing Hand Pump at SC Eligaid Sulthanpur SC 19-08-2016 40000 40000 0 15-02-2017 39696 0 39696 Completed facility PDPL RWS,PEDDAPALLI Supply Colony LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Drilling of Bore Well and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 144 26-07-2016 Providing of Hand Pump at SC Eligaid Burhanmiyapet SC 19-08-2016 40000 40000 0 0 0 0 Not Started facility PDPL RWS,PEDDAPALLI Supply Colony

Providing Handpump at BC Drinking water PLGII/22/CDP/16-17/ EE Rural Water 145 26-07-2016 Eligaid Burhanmiyapet Gen 19-08-2016 40000 40000 0 0 0 0 Not Started Colony facility PDPL RWS,PEDDAPALLI Supply

Providing Hand Pump Set at Drinking water PLGII/22/CDP/16-17/ EE Rural Water 146 26-07-2016 Sulthanabad Bonthakuntapalli Gen 19-08-2016 40000 40000 0 05-10-2017 40000 0 40000 Completed Kodati Narasimha House facility PDPL RWS,PEDDAPALLI Supply

Providing Handpump set and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 147 26-07-2016 Sulthanabad Narsaiahpalle Gen 19-08-2016 40000 40000 0 05-10-2017 40000 0 40000 Completed Bore at V. Rajesham House facility PDPL RWS,PEDDAPALLI Supply

Drilling of Bore Well and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 148 26-07-2016 Sulthanabad Kodurupaka Gen 19-08-2016 40000 40000 0 29-09-2016 35623 0 35623 Completed Handpump near G.P. Office facility PDPL RWS,PEDDAPALLI Supply

Drilling of Bore Well and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 149 26-07-2016 Providing Hand at Adla Sulthanabad Kodurupaka Gen 19-08-2016 40000 40000 0 29-09-2016 35623 0 35623 Completed facility PDPL RWS,PEDDAPALLI Supply Kistaiah House Drilling of Bore Well and Drinking water PLGII/22/CDP/16-17/ EE Rural Water 150 26-07-2016 Providing Hand Pump Near Sulthanabad Sultanabad Gen 19-08-2016 40000 40000 0 29-09-2016 40000 0 40000 Completed facility PDPL RWS,PEDDAPALLI Supply High Way

Providing Power Supply to Drinking water PLGII/22/CDP/16-17/ EE Rural Water 151 26-07-2016 Srirampur Rathupalle Gen 19-08-2016 84000 84000 0 04-05-2017 83100 0 83100 Completed Drinking Water facility PDPL RWS,PEDDAPALLI Supply

Digging of Open Well Near Drinking water PLGII/22/CDP/16-17/ EE Rural Water 152 26-07-2016 Peddapally Brahmanpalle(PS) Gen 19-08-2016 400000 400000 0 21-07-2017 400000 0 400000 Completed Chervu facility PDPL RWS,PEDDAPALLI Supply

B/W f C/o. of Open Well at Drinking water PLGII/22/CDP/16-17/ EE Rural Water 153 26-07-2016 Peddapally Kanagarthy Gen 19-08-2016 150000 150000 0 15-02-2017 149811 0 149811 Completed Roadside facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 154 26-07-2016 PROVIDING PUMP AT Julapally Julapalle Gen 19-08-2016 50000 50000 0 29-09-2016 50000 0 50000 Completed facility PDPL RWS,PEDDAPALLI Supply CHINNABADI DRILLING OF BORE & PROVIDING HAND PUMP AT BC Drinking water PLGII/22/CDP/16-17/ EE Rural Water 155 26-07-2016 Julapally Julapalle Gen 19-08-2016 50000 50000 0 29-09-2016 49754 0 49754 Completed COLONY AT facility PDPL RWS,PEDDAPALLI Supply BATHUKAMMAGATTU

DRILLING OF BORE WELL & Drinking water PLGII/22/CDP/16-17/ EE Rural Water 156 26-07-2016 Julapally Julapalle Gen 19-08-2016 50000 50000 0 29-09-2016 49754 0 49754 Completed PUMP SET AT TENUGU WADA facility PDPL RWS,PEDDAPALLI Supply

Drinlling of Bore and Providing Drinking water PLGII/22/CDP/16-17/ EE Rural Water 157 26-07-2016 Julapally Julapalle SC 19-08-2016 50000 50000 0 29-09-2016 49737 0 49737 Completed hand pump in SC Colony 1 facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE AND Drinking water PLGII/22/CDP/16-17/ EE Rural Water 158 26-07-2016 PROVIDING HAND PUMP IN SC Julapally Julapalle SC 19-08-2016 50000 50000 0 29-09-2016 49720 0 49720 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY II, JULAPALLI DRILLING OF BORE WELL AND Drinking water PLGII/22/CDP/16-17/ EE Rural Water 159 26-07-2016 PROVIDING HAND PUMP IN SC Julapally Konaraopet SC 19-08-2016 50000 50000 0 29-09-2016 49720 0 49720 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY, KONARAOPET DRILLING OF BORE WELL AND HAND PUMP SET IN BC Drinking water PLGII/22/CDP/16-17/ EE Rural Water 160 26-07-2016 Julapally Konaraopet Gen 19-08-2016 50000 50000 0 29-09-2016 49737 0 49737 Completed COLONY (VADLURI SAYILU) - facility PDPL RWS,PEDDAPALLI Supply KONARAOPET LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DRILLING OF BORE WELL AND Drinking water PLGII/22/CDP/16-17/ EE Rural Water 161 26-07-2016 HAND PUMP SET IN BC Julapally Julapalle Gen 19-08-2016 50000 50000 0 29-09-2016 49281 0 49281 Completed facility PDPL RWS,PEDDAPALLI Supply COLONY IN MANGALI WADA

DRILLING OF BORE WELL AND Drinking water PLGII/22/CDP/16-17/ EE Rural Water 162 26-07-2016 Julapally Nagulapalli Gen 19-08-2016 50000 50000 0 29-09-2016 49754 0 49754 Completed HAND PUMP SET AT ROAD SIDE facility PDPL RWS,PEDDAPALLI Supply

DRILLING OF BORE WELL AND PROVIDING HANAD PUMP IN Drinking water PLGII/22/CDP/16-17/ EE Rural Water 163 26-07-2016 Julapally Konaraopet Gen 19-08-2016 50000 50000 0 29-09-2016 49781 0 49781 Completed BC COLONY NEAR GANDAL facility PDPL RWS,PEDDAPALLI Supply CHANDRAIAH (H) Railways, roads & Formation of Road form Dodla PLGII/22/CDP/16-17/ Panchayathraj 164 05-08-2016 Srirampur KUNARAM Gen Buildings & 10-10-2016 200000 200000 0 DPRE,Peddapally 04-05-2017 199925 0 199925 Completed Rajaiah (H) To Marri Cheruvu PDPL Engineering Bridges Formation of Road form Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 165 05-08-2016 Tharupalli(V) to Chinna Srirampur Tarupalli Gen Buildings & 10-10-2016 200000 200000 0 DPRE,Peddapally 06-07-2017 179964 0 179964 Progress PDPL Engineering Rathpalli Bridges Railways, roads & Formation of Road from Water PLGII/22/CDP/16-17/ Panchayathraj 166 05-08-2016 Srirampur Chinnarathpalli Gen Buildings & 10-10-2016 100000 100000 0 DPRE,Peddapally 28-03-2017 99882 0 99882 Completed Tank to Bangaru Kunta PDPL Engineering Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 167 05-08-2016 Eligaid Ryakaldevpalli Gen Buildings & 10-10-2016 250000 250000 0 DPRE,Peddapally 04-05-2017 229810 0 229810 Progress Ryakaldevapalli to Sulthnabad PDPL Engineering Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 168 05-08-2016 Eligaid Ryakaldevpalli Gen Buildings & 10-10-2016 150000 150000 0 DPRE,Peddapally 28-03-2017 149935 0 149935 Completed Ryakaldevapalli to Dhulikatta PDPL Engineering Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 169 05-08-2016 Muppirithota to Dhulikatta Eligaid Muppirithota Gen Buildings & 10-10-2016 300000 300000 0 DPRE,Peddapally 21-07-2017 116570 0 116570 Progress PDPL Engineering Canal Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 170 05-08-2016 Sulthanapur GP Office to Eligaid Sulthanpur Gen Buildings & 10-10-2016 100000 100000 0 DPRE,Peddapally 6/6/2018 99911 0 99911 Completed PDPL Engineering Burhanmiyapeta Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 171 05-08-2016 Jakkulapalli (V) to Mallikarjuna ODELA Komire Gen Buildings & 10-10-2016 200000 200000 0 DPRE,Peddapally 18-05-2017 200000 0 200000 Completed PDPL Engineering swamty temple Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 172 05-08-2016 Komire (V) to Abbidipalli ODELA Komire Gen Buildings & 10-10-2016 200000 200000 0 DPRE,Peddapally 18-05-2017 200000 0 200000 Completed PDPL Engineering shivaru Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 173 05-08-2016 ODELA Namsanipalle Gen Buildings & 10-10-2016 400000 400000 0 DPRE,Peddapally 18-05-2017 364682 0 364682 Progress Namsanipalli(V) to Kolanoor (V) PDPL Engineering Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 174 05-08-2016 Abbidipalli (v) to Mallikarjuna ODELA Namsanipalle Gen Buildings & 10-10-2016 200000 200000 0 DPRE,Peddapally 03.08.2017 200000 0 200000 Completed PDPL Engineering swamy Temple Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 175 05-08-2016 ODELA Abbidipalli Gen Buildings & 10-10-2016 150000 150000 0 DPRE,Peddapally 03.08.2017 150000 0 150000 Completed Abbidipalli (v) to Rayapeta PDPL Engineering Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 176 05-08-2016 Abbidipalli (v) to Komire ODELA Abbidipalli Gen Buildings & 10-10-2016 150000 150000 0 DPRE,Peddapally 03.08.2017 150000 0 150000 Completed PDPL Engineering Shivaru Bridges Railways, roads & Formation of Road from Odela PLGII/22/CDP/16-17/ Panchayathraj 177 05-08-2016 ODELA ODELA Gen Buildings & 10-10-2016 100000 100000 0 DPRE,Peddapally 16-02-2018 92898 0 92898 Completed SRSP Canal to Komire PDPL Engineering Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Formation of Road from Odela Railways, roads & SRSP Canal to Komire up to PLGII/22/CDP/16-17/ Panchayathraj 178 05-08-2016 ODELA Gudem SC Buildings & 10-10-2016 250000 250000 0 DPRE,Peddapally 04-05-2017 227432 21-07-2017 22568 250000 Completed Chitharla Venkatrao plot & SC PDPL Engineering Bridges Colony Levelig Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 179 05-08-2016 Sulthanabad Mancharami Gen Buildings & 10-10-2016 100000 100000 0 DPRE,Peddapally 04-05-2017 100000 0 100000 Completed Bandam Cheruuo Keshavapur PDPL Engineering Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 180 05-08-2016 Sulthanabad Miyapur Gen Buildings & 10-10-2016 80000 80000 0 DPRE,Peddapally 15-02-2017 79928 0 79928 Completed Perkapalli (V) to Upparapalli (V) PDPL Engineering Bridges Formation of Road from Nalla Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 181 05-08-2016 Sudhakar Reddy (H) to Hussain Sulthanabad Miyapur Gen Buildings & 10-10-2016 50000 50000 0 DPRE,Peddapally 15-02-2017 49955 0 49955 Completed PDPL Engineering Miya Vagu Bridges Formation of Road from Rajiv Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 182 05-08-2016 Rahadaari To Neerukulla R&B Sulthanabad Katnapalli Gen Buildings & 10-10-2016 150000 150000 0 DPRE,Peddapally 15-02-2017 150000 0 150000 Completed PDPL Engineering Road Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 183 05-08-2016 Sulthanabad Katnapalli Gen Buildings & 10-10-2016 50000 50000 0 DPRE,Peddapally 15-02-2017 50000 0 50000 Completed substation to bhimarao field PDPL Engineering Bridges Formation of Road from R&B Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 184 05-08-2016 Road Durganagar to Aakula Peddapally Bojannapeta Gen Buildings & 10-10-2016 150000 150000 0 DPRE,Peddapally 15-02-2017 150000 0 150000 Completed PDPL Engineering Venkatesham Field Bridges Railways, roads & Formation of Road from PLGII/22/CDP/16-17/ Panchayathraj 185 05-08-2016 Peddapally Bojannapeta Gen Buildings & 10-10-2016 100000 100000 0 DPRE,Peddapally 15-02-2017 99896 0 99896 Completed Bojannapeta (V) to Rampalli (V) PDPL Engineering Bridges Formation of Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 186 05-08-2016 Bojannapeta (V) to Kothapalli Peddapally Bojannapeta Gen Buildings & 10-10-2016 100000 100000 0 DPRE,Peddapally 15-02-2017 100000 0 100000 Completed PDPL Engineering (V) Bridges Formation of Road from Railways, roads & Thurkalamaddiku PLGII/22/CDP/16-17/ Panchayathraj 187 05-08-2016 Isamoddin (H)o Mudiraj Peddapally Gen Buildings & 10-10-2016 50000 50000 0 DPRE,Peddapally 28-03-2017 50000 0 50000 Completed nta PDPL Engineering Smashana Vaatika Bridges Laying of Metel Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 188 30-05-2017 Kasrapur Lachaiah (H) to Srirampur Vennampalli Gen Buildings & 16-11-2017 499000 499000 0 DPRE,Peddapally 16-02-2018 459274 0 459274 Progress PDPL Engineering Rajavaani Kunta Bridges Laying of Metel Road from Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 189 30-05-2017 Bodakunta Chandraiah (H) to Srirampur Gen Buildings & 16-11-2017 499000 499000 0 DPRE,Peddapally 16-02-2018 459394 0 459394 Progress Jaferkhanpet PDPL Engineering SRSP canal Bridges Railways, roads & Laying of Metel Road from PLGII/22/CDP/16-17/ Panchayathraj 190 30-05-2017 Julapally Kachapur Gen Buildings & 16-11-2017 280000 280000 0 DPRE,Peddapally 0 0 Not Started SRSP Main Canal to 131 canal PDPL Engineering Bridges Laying of Metel Road from D 83 Railways, roads & PLGII/22/CDP/16-17/ Panchayathraj 191 30-05-2017 Canal to Dudapaka Chandraiah Peddapally Gurrampalli Gen Buildings & 16-11-2017 499000 499000 0 DPRE,Peddapally 16-02-2018 410365 0 410365 Progress PDPL Engineering Agricultural land Bridges Railways, roads & Laying of Metel Road from PR PLGII/22/CDP/16-17/ Panchayathraj 192 30-05-2017 ODELA Komire Gen Buildings & 16-11-2017 125000 125000 0 DPRE,Peddapally 5/17/2018 121875 0 121875 Completed Road to Mallikarjuna Temple PDPL Engineering Bridges

C/o Compound Wall at Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 193 10-01-2017 Julapally Nagulapally Gen 14-11-2017 468000 468000 0 9/12/2018 129463 0 129463 Progress Nagulapally facilities 17/ PDPL Karimnagar

C/o Compound wall at ZPHS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 194 10-01-2017 Julapally Kummarikunta Gen 14-11-2017 720000 720000 0 0 0 Not Started Kummarikunta facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at MPUPS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 195 10-01-2017 Odela Upparipally Gen 14-11-2017 450000 450000 0 3/13/2018 237481 0 237481 Progress Upparipally facilities 17/ PDPL Karimnagar Karimnagar LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME (CDP) REPORT OF PEDDAPALLY DISTRICT FOR THE YEAR 2016-17 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Date of Date of Date of Work(Comp/ Date of Estimated Scheme Department Expenditure Expenditure Sl. No. Work Description Mandal Village Area Sector Admn. Proceedings No. MGNREGS Executive Agency Release Release Total Prog/ Proposal Cost in Rs. Fund In Rs. Name in Rs. in Rs. Sanction 1st 2nd Not Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 C/o Compound wall at MPUPS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 196 10-01-2017 Odela Roopnarayanapet Gen 14-11-2017 600000 600000 0 6/6/2018 279701 0 279701 Progress Roopnarayanapet facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 197 10-01-2017 Peddapally Peddabonkur Gen 14-11-2017 1050000 1050000 0 5/28/2018 313463 9/10/2018 241236 554699 Progress Peddabonkur facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS at Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 198 10-01-2017 Peddapally Raghavapur Gen 14-11-2017 900000 900000 0 9/24/2018 617214 0 617214 Progress Raghavapur facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS at Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 199 10-01-2017 Srirampur Mallaial Gen 14-11-2017 900000 900000 0 0 0 Not Started Mallial facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS at Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 200 10-01-2017 Srirampur Motlapally Gen 14-11-2017 600000 600000 0 0 0 Not Started Motlapally facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS at Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 201 10-01-2017 Srirampur Mirzapeta Gen 14-11-2017 660000 660000 0 0 0 Not Started Mirzampeta facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 202 10-01-2017 Sulthanabad Garrepally Gen 14-11-2017 1560000 1560000 0 10/1/2018 543066 0 543066 Progress Garrepally facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 203 10-01-2017 Sulthanabad Poosala Gen 14-11-2017 900000 900000 0 5/28/2018 340870 10/1/2018 255635 596505 Progress Poosala facilities 17/ PDPL Karimnagar Karimnagar

C/o Compound wall at ZPHS Other Public PLGII/22/CDP/SSA/16- EE TSEWIDC, EE TSEWIDC, 204 10-01-2017 Sulthanabad Regadimaddikunta Gen 14-11-2017 1200000 1200000 0 5/28/2018 497536 0 497536 Progress Regadimaddikunta facilities 17/ PDPL Karimnagar Karimnagar

Construction of Road from PR Other Public PLGII/22/CDP/16-17/ Panchayathraj 205 5/30/2017 ODELA Komere Gen 12/21/2017 200000 200000 0 DPRE,Peddapally 5/17/2018 185000 10/6/2018 15000 200000 Completed road to SRSP canal at Komere facilities PDPL Engineering

TOTAL 60723000 29832963 30883000 16677095 534439 17211534

Chief Planning Officer Peddapalli 248666 LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Cc R/F Voodari Pochalu Railways, Roads House To Jinna Thirupathi PLG.97/PLG.II/DYSO/ EE- 1 SRIRAMPUR Srirampur General & Buildings & 22-08-2017 360000 0 360000 Panchayath raj 10/11/2018 331747 0 0 331747 progress Reddy House At Srirampur PDPL/2017-18 DPRE,Peddapally Bridges (V) & (M)

Cc Road In Bc Colony Near Railways, Roads Old Gp Building Area At PLG.97/PLG.II/DYSO/ EE- 2 ODELA Pathkapalle General & Buildings & 22-08-2017 250000 0 250000 Panchayath raj 11/8/2018 250000 0 0 250000 Complited Pothkapalli (V) Of Odela PDPL/2017-18 DPRE,Peddapally Bridges Mandal

Railways, Roads C/O. Cc Road Main Road To PLG.97/PLG.II/DYSO/ EE- 3 SULTANABAD Kodurupaka General & Buildings & 04-08-2017 300000 0 300000 Panchayath raj 9/11/2018 217677 0 0 217677 progress Rajaka Wada At Kodurupaka PDPL/2017-18 DPRE,Peddapally Bridges

Cc Road From Deekonda Railways, Roads Rajaiah House To Kaias PLG.97/PLG.II/DYSO/ EE- 4 SULTANABAD Garrepalle General & Buildings & 04-08-2017 400000 0 400000 Panchayath raj 24-10-2017 365265 0 0 365265 progress Jagan Mohan Rao House At PDPL/2017-18 DPRE,Peddapally Bridges Garrepalli L/O Cc Road In Hanuman Railways, Roads Temple Street And Near PLG.97/PLG.II/DYSO/ EE- 5 PEDDAPALLE Kasulapalli General & Buildings & 25-09-2017 160000 0 160000 Panchayath raj 2/17/2018 132145 0 0 132145 progress Bandi Ramulu(H) At PDPL/2017-18 DPRE,Peddapally Bridges Kasulapally

L/O Cc Road In Sc Colony Railways, Roads PLG.97/PLG.II/DYSO/ EE- 6 And Kurmawada At PEDDAPALLE Kasulapalli SC & Buildings & 25-09-2017 190000 0 190000 Panchayath raj 2/17/2018 157021 0 0 157021 progress PDPL/2017-18 DPRE,Peddapally Kaslapally Bridges

L/O Cc Road In Hanman Railways, Roads PLG.97/PLG.II/DYSO/ EE- 7 Temple Streeet At PEDDAPALLE Kasulapalli General & Buildings & 25-09-2017 200000 0 200000 Panchayath raj 2/17/2018 165262 0 0 165262 progress PDPL/2017-18 DPRE,Peddapally Kasulapally Bridges

L/O Cc Road Erumalla Railways, Roads PLG.97/PLG.II/DYSO/ EE- 8 Lingaiah (H) To R&B Road PEDDAPALLE Peddapally General & Buildings & 25-09-2017 250000 0 250000 Panchayath raj 0 0 0 0 0 Not Started PDPL/2017-18 DPRE,Peddapally At Kasulapally(V) Bridges

L/O Cc Road From Dasari Railways, Roads Chandra Reddy (H) To PLG.97/PLG.II/DYSO/ EE- 9 PEDDAPALLE Peddapally General & Buildings & 25-09-2017 250000 0 250000 Panchayath raj 0 0 0 0 0 Not Started Dasari Raghunandan PDPL/2017-18 DPRE,Peddapally Bridges Reddy(H) Kasulapally(V)

Railways, Roads Cc R/F Rajiv Rahadari To PLG.97/PLG.II/DYSO/ EE- 10 SULTANABAD Dubbapalli General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 11/8/2018 277500 0 0 277500 progress Maseed At Dubbapally PDPL/2017-18 DPRE,Peddapally Bridges

Cc R/F Rajireddy (H) To Railways, Roads PLG.97/PLG.II/DYSO/ EE- 11 Butchireddy (H) At SULTANABAD Dubbapally General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 4/28/2018 245528 0 0 245528 progress PDPL/2017-18 DPRE,Peddapally Dubbapally Bridges

Railways, Roads Cc R/F Narla Saimallu(H) To PLG.97/PLG.II/DYSO/ EE- 12 ODELA Namsanipalle General & Buildings & 13-10-2017 200000 0 200000 Panchayath raj 11/8/2018 200000 0 0 200000 Complited Mittapalli Maisaiah(H) PDPL/2017-18 DPRE,Peddapally Bridges

Railways, Roads Cc R/F Eraveni Mallaiah(H) PLG.97/PLG.II/DYSO/ EE- 13 ODELA Namsanipalle General & Buildings & 13-10-2017 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started To Potharavena Shanker(H) PDPL/2017-18 DPRE,Peddapally Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Railways, Roads Cc R/F Kunarapu Rajalingu PLG.97/PLG.II/DYSO/ EE- 14 ODELA Namsanipalle General & Buildings & 13-10-2017 100000 0 100000 Panchayath raj 0 0 0 0 0 Not Started (H) To Munjhala Srinivas(H) PDPL/2017-18 DPRE,Peddapally Bridges

Railways, Roads Cc R/F Munjala Sadaiah(H) PLG.97/PLG.II/DYSO/ EE- 15 ODELA Namsanipalle General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started Munjala-Johny(H) PDPL/2017-18 DPRE,Peddapally Bridges

Railways, Roads Cc R/F Bhulaxami (H) To PLG.97/PLG.II/DYSO/ EE- 16 ODELA Namsanipalle General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started Jinkkeri Bheeriah PDPL/2017-18 DPRE,Peddapally Bridges

Cc R/F Guguloth Railways, Roads PLG.97/PLG.II/DYSO/ EE- 17 Kistaiah(H) To Gugulothu ODELA Namsanipalle General & Buildings & 13-10-2017 200000 0 200000 Panchayath raj 0 0 0 0 0 Not Started PDPL/2017-18 DPRE,Peddapally Muthyam (H) Bridges

Cc R/F Ambala Railways, Roads Laxmaiah(H) To Rechaveni PLG.97/PLG.II/DYSO/ EE- 18 PEDDAPALLE Peddapally General & Buildings & 13-10-2017 499000 0 499000 Panchayath raj 2/17/2018 412228 9/12/2018 85762 497990 progress Ilaiah(H) Merapally(V) Of PDPL/2017-18 DPRE,Peddapally Bridges Bompally

Railways, Roads Cc R/F Road Krishnareddy Turkalamaddi PLG.97/PLG.II/DYSO/ EE- 19 PEDDAPALLE General & Buildings & 13-10-2017 499000 0 499000 Panchayath raj 4/28/2018 414394 0 0 414394 progress (H) To Komati Rajesham(H) Kunta PDPL/2017-18 DPRE,Peddapally Bridges

Railways, Roads EE- C/O 120 Kl Glsr At PLG.97/PLG.II/DYSO/ Rural&water 20 SULTANABAD Ithrajpalle General & Buildings & 13-10-2017 500000 0 500000 RWS&S,Pewddapa 0 0 0 0 0 Not Started Mysammagutta PDPL/2017-18 Supply Bridges lly

Cc R/F Kalvala Railways, Roads Chandraiah(H) To PLG.97/PLG.II/DYSO/ EE- 21 SULTANABAD Dubbapalli General & Buildings & 13-10-2017 400000 0 400000 Panchayath raj 11/8/2018 370000 0 0 370000 progress Thirupathi (H) At PDPL/2017-18 DPRE,Peddapally Bridges Dubbapally

Providing Of Gi Pipe Line EE- Drinking water PLG.97/PLG.II/DYSO/ Rural&water 22 With Trust Block At SULTANABAD Ithrajpalle General 13-10-2017 150000 0 150000 RWS&S,Pewddapa 4/28/2018 135417 0 0 135417 Complited Facility PDPL/2017-18 Supply Mysammagutta lly

Providing Of Pipe Line And EE- Drinking water PLG.97/PLG.II/DYSO/ Rural&water 23 Pump Set At Dvunipally SULTANABAD Kodurupaka General 13-10-2017 150000 0 150000 RWS&S,Pewddapa 4/28/2018 81816 0 0 81816 progress Facility PDPL/2017-18 Supply Narasimhaswamy Temple lly

EE- Providing Borewell And Drinking water PLG.97/PLG.II/DYSO/ Rural&water 24 PEDDAPALLE Mulasala General 13-10-2017 300000 0 300000 RWS&S,Pewddapa 4/28/2018 97633 0 0 97633 progress Pipe Line And Pump Set Facility PDPL/2017-18 Supply lly

EE- Providing Of Pipeline And Drinking water PLG.97/PLG.II/DYSO/ Rural&water 25 SRIRAMPUR Vennampalle General 13-10-2017 400000 0 400000 RWS&S,Pewddapa 4/28/2018 381048 0 0 381048 Complited Pumpset Facility PDPL/2017-18 Supply lly

EE- Digging Of Open Well At Drinking water PLG.97/PLG.II/DYSO/ Rural&water 26 SULTANABAD Ithrajpalle General 13-10-2017 500000 0 500000 RWS&S,Pewddapa 4/28/2018 476189 0 0 476189 Complited Mysammagutta Facility PDPL/2017-18 Supply lly LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Railways, Roads Cc R/F Pappu Rajaiah (H PLG.97/PLG.II/DYSO/ EE- 27 SULTANABAD Dubbapalli General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 11/8/2018 199960 0 0 199960 Complited )To Pappu Pochamma (H) PDPL/2017-18 DPRE,Peddapally Bridges

Railways, Roads Cc R/F Itharajpally R&B To PLG.97/PLG.II/DYSO/ EE- 28 SULTANABAD Dubbapalli General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 11/8/2018 277500 0 0 277500 progress Mangali Anjaiah(H) PDPL/2017-18 DPRE,Peddapally Bridges

Cc R/F Satyanarayana Railways, Roads PLG.97/PLG.II/DYSO/ EE- 29 Reddy(H) To Primary School SULTANABAD Dubbapalli General & Buildings & 13-10-2017 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started PDPL/2017-18 DPRE,Peddapally At Dubbapally Bridges

Cc R/F Thirupathi Reddy Railways, Roads PLG.97/PLG.II/DYSO/ EE- 30 (H) To Satyanarayana Reddy SULTANABAD Dubbapally General & Buildings & 13-10-2017 400000 0 400000 Panchayath raj 4/28/2018 330728 0 0 330728 Progress PDPL/2017-18 DPRE,Peddapally (H) Bridges

Railways, Roads Cc R/F Itharajpally Road PLG.97/PLG.II/DYSO/ EE- 31 SULTANABAD Dubbapalli General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 11/8/2018 277500 0 0 277500 Progress To Thunga Rajaiah(H) PDPL/2017-18 DPRE,Peddapally Bridges

Cc R/F Ummenthula Railways, Roads PLG.97/PLG.II/DYSO/ EE- 32 Madhava Reddy (H) To SULTANABAD Dubbapally General & Buildings & 13-10-2017 200000 0 200000 Panchayath raj 4/28/2018 165365 0 0 165365 Progress PDPL/2017-18 DPRE,Peddapally Rajireddy Houe Bridges

Cc R/F Annam Mallareddy Railways, Roads PLG.97/PLG.II/DYSO/ EE- 33 (H) To Annam Ram SULTANABAD Dubbapally General & Buildings & 13-10-2017 300000 0 300000 Panchayath raj 4/28/2018 248046 0 0 248046 Progress PDPL/2017-18 DPRE,Peddapally Reddy(H) Bridges Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 34 Establishment Of Trevis PEDDAPALLE Ragineedu General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 35 Establishment Of Trevis PEDDAPALLE Peddabonkur General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 36 Establishment Of Trevis PEDDAPALLE Kothapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis No. Other Public PLG.97/PLG.II/DYSO/ 37 PEDDAPALLE Maredugonda General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis No. Other Public PLG.97/PLG.II/DYSO/ 38 PEDDAPALLE Rampalle General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis No. Other Public PLG.97/PLG.II/DYSO/ 39 PEDDAPALLE Peddapally General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 40 Establishment Of Trevis PEDDAPALLE Gowreddipeta General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 41 PEDDAPALLE Peddapally General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited No.Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 42 Establishment Of Trevis PEDDAPALLE Rangapur General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 43 PEDDAPALLE Raghavapur General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited No. Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 44 Establishment Of Trevis PEDDAPALLE Rangampalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 45 PEDDAPALLE Kanagarthi General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited No.Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 46 PEDDAPALLE Peddapally General 14-11-2017 33444 0 33444 Husbandry Husbandry 11/28/2017 33444 0 0 33444 Complited No. Of Trevis 3 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 47 Establishment Of Trevis PEDDAPALLE Mulasala General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 48 Establishment Of Trevis PEDDAPALLE Bhojannapet General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 49 PEDDAPALLE Peddapally General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited No. Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 50 Establishment Of Trevis PEDDAPALLE Peddapally General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 51 Establishment Of Trevis SULTANABAD Miyapur General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 52 Establishment Of Trevis SULTANABAD Chinnakalvala General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 53 Establishment Of Trevis SULTANABAD Rebbaldevipalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 54 Establishment Of Trevis SULTANABAD Chinnakalvala General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 55 Establishment Of Trevis SULTANABAD Sultanabad General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 56 PEDDAPALLE Appannapet General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited No.Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 57 Establishment Of Trevis SULTANABAD Sultanabad General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 58 Establishmet Of Trevis SULTANABAD Sultanabad General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 59 Establishment Of Trevis SULTANABAD Sultanabad General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 60 Establishment Of Trevis ODELA Indurthi General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 61 Establishment Of Trevis ODELA Kolanoor General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 62 Establishment Of Trevis SRIRAMPUR Pandilla General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 63 Establishment Of Trevis SRIRAMPUR Vennampalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 64 Establishment Of Trevis SRIRAMPUR Mirzampet General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 65 Establishment Of Trevis SRIRAMPUR Madipalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 66 Establishment Of Trevis SRIRAMPUR Pegadapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 67 Establishment Of Trevis PEDDAPALLE Peddapally General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 68 Establishment Of Trevis Julapalli Julapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 69 Establishment Of Trevis Julapalli Julapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 70 Establishment Of Trevis Julapalli Julapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 71 Establishment Of Trevis Julapalli Wadkapur General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 72 Establishment Of Trevis Julapalli Julapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 73 Establishment Of Trevis ELGAID Raikaldevapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis Other Public PLG.97/PLG.II/DYSO/ 74 ELGAID Doolikatta General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited No. Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 75 Establishment Of Trevis ELGAID Elgaid General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 76 Establishment Of Trevis ELGAID Elgaid General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 77 Establishment Of Trevis ELGAID Sivapalle General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis No. Turkalamaddi Other Public PLG.97/PLG.II/DYSO/ 78 PEDDAPALLE General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited Of Trevis 2 Kunta facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 79 Establishment Of Trevis PEDDAPALLE Peddapally General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Establishment Of Trevis No. Other Public PLG.97/PLG.II/DYSO/ 80 PEDDAPALLE Palthem General 14-11-2017 22296 0 22296 Husbandry Husbandry 11/28/2017 22296 0 0 22296 Complited Of Trevis 2 facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 81 Establishment Of Trevis PEDDAPALLE Nittur General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Dist. Veterinary Dist. Veterinary & Animal & Animal Other Public PLG.97/PLG.II/DYSO/ 82 Establishment Of Trevis PEDDAPALLE Peddakalvala General 14-11-2017 11148 0 11148 Husbandry Husbandry 11/28/2017 11148 0 0 11148 Complited facilities PDPL/2017-18 Officer, Officer, Peddapalli Peddapalli Errection Of High Mass EE- Lights At Perkapalli Other Public PLG.97/PLG.II/DYSO 83 SULTANABAD Miyapur General 14-11-2017 100000 0 100000 DPRE,Peddapall Panchayath raj 9/12/2018 86822 0 0 86822 Complited Chowarastha H/O Miypur facilities /PDPL/2017-18 y Of Sulthanabad

Errection Of High Mass EE- Other Public PLG.97/PLG.II/DYSO 84 Lights At Miypur Of SULTANABAD Miyapur General 14-11-2017 100000 0 100000 DPRE,Peddapall Panchayath raj 5/28/2018 80025 0 0 80025 progress facilities /PDPL/2017-18 Sulthanabad y Cc R/F Veterinary Hospital To Balmuri Railways, Roads EE- PLG.97/PLG.II/DYSO 85 Rajeshwar Rao House Via PEDDAPALLE Ragineedu General & Buildings & 14-11-2017 499000 0 499000 DPRE,Peddapall Panchayath raj 2/17/2018 369038 9/5/2018 117541 486579 Complited /PDPL/2017-18 Primary Shool At Bridges y Ragineedu(V) Of Cc R/F High School To Railways, Roads EE- Veterinary Hospital At PLG.97/PLG.II/DYSO 86 PEDDAPALLE Ragineedu General & Buildings & 14-11-2017 499000 0 499000 DPRE,Peddapall Panchayath raj 2/17/2018 369039 9/5/2018 109598 478637 Complited Ragineedu(V) Of /PDPL/2017-18 Bridges y Peddapally (M)

Cc Road From Pollaveni Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 87 Komuraiah(H) To SULTANABAD Narayanpur General & Buildings & 12/8/2017 280000 0 280000 Panchayath raj 9/24/2018 226221 0 0 226221 progress /PDPL/2017-18 PEDDAPALLY Mandala Sahadevulu (H) Bridges

Cc Road From Konda Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 88 Rajaiah (H) To Sunder Raj Srirampur Kunaram General & Buildings & 12/8/2017 250000 0 250000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY House Bridges

Cc Road From Phani Railways, Roads Laxmipur H/o PLG.97/PLG.II/DYSO EE DPRE, 89 Kanukaiah (H) To School Srirampur General & Buildings & 12/8/2017 500000 0 500000 Panchayath raj 0 0 0 0 0 Not Started Peddampet /PDPL/2017-18 PEDDAPALLI At Laxmipur Bridges

Construction Of Kurma Other Public PLG.97/PLG.II/DYSO EE DPRE, 90 Community Hall At Peddapally Raghavapur SC 12/8/2017 150000 0 150000 Panchayath raj 7/18/2018 150000 0 0 150000 Complited facilities /PDPL/2017-18 PEDDAPALLY Raghavapur LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Balance Work Of Other Public PLG.97/PLG.II/DYSO EE DPRE, 91 Community Hall At Sc Peddapally kanagarthi SC 12/8/2017 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started facilities /PDPL/2017-18 PEDDAPALLY Mala Wada

Balance Work Of State Retired Other Public PLG.97/PLG.II/DYSO EE DPRE, 92 Peddapally Peddapally General 12/8/2017 490000 0 490000 Panchayath raj 8/18/2018 408144 0 0 408144 progress Employees Association facilities /PDPL/2017-18 PEDDAPALLY Buidling At Peddapally

Balance Work Of Sc Mala Other Public PLG.97/PLG.II/DYSO EE DPRE, 93 Community Hall At SULTANABAD Garrepally SC 12/8/2017 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started facilities /PDPL/2017-18 PEDDAPALLY Garrepally

Construction Of DISTRICT Fisherman Co-Operative Other Public PLG.97/PLG.II/DYSO FISHERIES Fisheries 94 Peddapally Appannapet General 12/21/2017 100000 0 100000 0 0 0 0 0 Not Started Society Ltd At facilities /PDPL/2017-18 OFFICER, Department Appannapet PEDDAPALLY

Construction Of Other Public PLG.97/PLG.II/DYSO EE DPRE, 95 Community Hall At Peddapally Bhojannapet General 12/21/2017 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started facilities /PDPL/2017-18 PEDDAPALLY Bojannapet

Construction Of Mahila Other Public PLG.97/PLG.II/DYSO EE DPRE, 96 Peddapally Bandampally General 12/30/2017 300000 0 300000 Panchayath raj 10/8/2018 300000 0 0 300000 Complited Samakya Bhavan facilities /PDPL/2017-18 PEDDAPALLY

Construction Of Balance Other Public PLG.97/PLG.II/DYSO EE DPRE, 97 Work Of Yadava Sangam Peddapally Andugulapally General 12/30/2017 400000 0 400000 Panchayath raj 10/11/2018 351242 0 0 351242 progress facilities /PDPL/2017-18 PEDDAPALLY Bhavan

Construction Of Balance Other Public PLG.97/PLG.II/DYSO EE DPRE, 98 Work Of Community Hall SULTANABAD Narayanraopally ST 12/30/2017 300000 0 300000 Panchayath raj 9/12/2018 277500 0 0 277500 progress facilities /PDPL/2017-18 PEDDAPALLY In Budige Jangala Colony

Balance Work Of Yadava Other Public PLG.97/PLG.II/DYSO EE DPRE, 99 Julapalli Kummarikunta General 12/30/2017 250000 0 250000 Panchayath raj 6/21/2018 231250 0 0 231250 progress Sangam Committee Hall facilities /PDPL/2017-18 PEDDAPALLY

C/O. Community Hall At Other Public PLG.97/PLG.II/DYSO EE DPRE, 100 Peddapally Brahmanapalli General 12/30/2017 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started Yadava Nagar facilities /PDPL/2017-18 PEDDAPALLY

C/O B/w of Community Other Public PLG.97/PLG.II/DYSO EE DPRE, 101 Peddapally Cheekurai General 12/30/2017 300000 0 300000 Panchayath raj 8/18/2018 277500 0 0 277500 progress Building At Kapuwada facilities /PDPL/2017-18 PEDDAPALLY

Construction Of Road From Rekunta Mallesham Other Public PLG.97/PLG.II/DYSO EE DPRE, 102 Peddapally Peddakalala General 12/30/2017 500000 0 500000 Panchayath raj 5/28/2018 419454 0 0 419454 progress House To Sriram facilities /PDPL/2017-18 PEDDAPALLY Narayana House C/o Gouda sangam Other Public PLG.97/PLG.II/DYSO EE DPRE, 103 Community hall at SULTANABAD Thogarrai General 2/2/2018 490000 0 490000 Panchayath raj 7/18/2018 453250 0 0 453250 progress facilities /PDPL/2017-18 PEDDAPALLY Thogarrai(V) LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 C/o Balance Work to Community Hall at Other Public PLG.97/PLG.II/DYSO EE DPRE, 104 SULTANABAD Thogarrai SC 2/2/2018 400000 0 400000 Panchayath raj 7/18/2018 358955 0 0 358955 progress Ambedkar Nagar facilities /PDPL/2017-18 PEDDAPALLY Thogarrai

C/o Mahila Samakya Other Public PLG.97/PLG.II/DYSO EE DPRE, 105 SULTANABAD Thogarrai ST 2/2/2018 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started Building facilities /PDPL/2017-18 PEDDAPALLY

C/o Community Hall at Other Public PLG.97/PLG.II/DYSO EE DPRE, 106 Julapalli Peddapur General 2/2/2018 450000 0 450000 Panchayath raj 0 0 0 0 0 Not Started gangaputra wada facilities /PDPL/2017-18 PEDDAPALLY

C/o Rythu Seva Kendram Other Public PLG.97/PLG.II/DYSO EE DPRE, 107 ODELA Pothkapalli General 2/2/2018 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started at Pothkapalli facilities /PDPL/2017-18 PEDDAPALLY

C/o Dhobhi Ghat at Other Public PLG.97/PLG.II/DYSO EE DPRE, 108 ODELA Gumpula General 2/2/2018 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started Gumpula facilities /PDPL/2017-18 PEDDAPALLY

C/o B/w of Community Other Public PLG.97/PLG.II/DYSO EE DPRE, 109 SULTANABAD Sulthanabad SC 4/7/2018 450000 0 450000 Panchayath raj 0 0 0 0 0 Not Started Hall & toilets in SC Colony facilities /PDPL/2017-18 PEDDAPALLY

C/o Community Hall for Other Public PLG.97/PLG.II/DYSO EE DPRE, 110 SULTANABAD Kadambapur ST 4/7/2018 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started Hamali sangam facilities /PDPL/2017-18 PEDDAPALLY

C/o Community Hall at Bonthakuntapall Other Public PLG.97/PLG.II/DYSO EE DPRE, 111 SULTANABAD SC 4/7/2018 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started Ravu Dubba in SC Colony y facilities /PDPL/2017-18 PEDDAPALLY C/o Community Hall in Other Public PLG.97/PLG.II/DYSO EE DPRE, 112 Vishwa Brahmana SULTANABAD Sulthanabad General 4/7/2018 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started facilities /PDPL/2017-18 PEDDAPALLY (Swarnakka) Colony C/o Balance work of Other Public PLG.97/PLG.II/DYSO EE DPRE, 113 Community Hall in SULTANABAD Miyapur General 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started facilities /PDPL/2017-18 PEDDAPALLY Gouda Colony C/o Balance work of Other Public PLG.97/PLG.II/DYSO EE DPRE, 114 Community Hall at Peddapally Raghavapur General 4/7/2018 150000 0 150000 Panchayath raj 7/18/2018 150000 0 0 150000 Complited facilities /PDPL/2017-18 PEDDAPALLY Padmashali wada

C/o Balance work of Other Public PLG.97/PLG.II/DYSO EE DPRE, 115 Community Hall at Peddapally Brahmanapally General 4/7/2018 200000 0 200000 Panchayath raj 9/24/2018 200000 0 0 200000 Complited facilities /PDPL/2017-18 PEDDAPALLY Padmashali wada

C/o Community Hall in Other Public PLG.97/PLG.II/DYSO EE DPRE, 116 Peddapally Bandampally General 4/7/2018 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started Yadava Nagar facilities /PDPL/2017-18 PEDDAPALLY

C/o Community Hall in Other Public PLG.97/PLG.II/DYSO EE DPRE, 117 ODELA Gudem SC 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started SC Colony facilities /PDPL/2017-18 PEDDAPALLY

C/o Community Hall at Other Public PLG.97/PLG.II/DYSO EE DPRE, 118 ODELA Madaka General 4/7/2018 400000 0 400000 Panchayath raj 0 0 0 0 0 Not Started Gouda Colony facilities /PDPL/2017-18 PEDDAPALLY

C/o CC Road from PR Railways, Roads Narayanraopally PLG.97/PLG.II/DYSO EE DPRE, 119 Road to Anjaiah Goud SULTANABAD General & Buildings & 4/7/2018 490000 0 490000 Panchayath raj 11/8/2018 453250 0 0 453250 progress H/o Gollapally /PDPL/2017-18 PEDDAPALLY House Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 C/o CC Road from Railways, Roads Narayanraopally PLG.97/PLG.II/DYSO EE DPRE, 120 Miryala Anjaiah House to SULTANABAD SC & Buildings & 4/7/2018 250000 0 250000 Panchayath raj 0 0 0 0 0 Not Started H/o Gollapally /PDPL/2017-18 PEDDAPALLY Janda Bridges

C/o CC Road from PR Railways, Roads Narayanraopally PLG.97/PLG.II/DYSO EE DPRE, 121 Road to Thirupathi SULTANABAD SC & Buildings & 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started H/o Gollapally /PDPL/2017-18 PEDDAPALLY Muthamma House Bridges

C/o CC Road from PR Railways, Roads Narayanraopally PLG.97/PLG.II/DYSO EE DPRE, 122 Road to Ganda SULTANABAD SC & Buildings & 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started H/o Gollapally /PDPL/2017-18 PEDDAPALLY Komuraiah House Bridges

C/o CC Road from Railways, Roads Narayanraopally PLG.97/PLG.II/DYSO EE DPRE, 123 Moluguri Sathaiah House SULTANABAD General & Buildings & 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started H/o Gollapally /PDPL/2017-18 PEDDAPALLY to M. Srinivas House Bridges

C/o CC Road from PR Railways, Roads Narayanraopally PLG.97/PLG.II/DYSO EE DPRE, 124 Road to D. Ravi Reddy SULTANABAD General & Buildings & 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started H/o Gollapally /PDPL/2017-18 PEDDAPALLY House Bridges C/o Balance Work of Narayanraopally Other Public PLG.97/PLG.II/DYSO EE DPRE, 125 Community Hall at SULTANABAD General 4/7/2018 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started H/o Gollapally facilities /PDPL/2017-18 PEDDAPALLY Gouda Colony C/o Community Hall in Other Public PLG.97/PLG.II/DYSO EE DPRE, 126 ELGAID Burhanmiyapet SC 4/7/2018 490000 0 490000 Panchayath raj 0 0 0 0 0 Not Started SC Colony facilities /PDPL/2017-18 PEDDAPALLY

C/o CC Road from Railways, Roads Bhoomaiah House to PLG.97/PLG.II/DYSO EE DPRE, 127 ELGAID Burhanmiyapet SC & Buildings & 4/7/2018 150000 0 150000 Panchayath raj 0 0 0 0 0 Not Started Potharla Bhoomaiah /PDPL/2017-18 PEDDAPALLY Bridges House

C/o CC Road from Railways, Roads Modugula Malla Reddy PLG.97/PLG.II/DYSO EE DPRE, 128 ELGAID Burhanmiyapet General & Buildings & 4/7/2018 150000 0 150000 Panchayath raj 0 0 0 0 0 Not Started House to Hanuman /PDPL/2017-18 PEDDAPALLY Bridges Temple

C/o C Road from Dubasi Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 129 Chandraiah House to ELGAID Burhanmiyapet SC & Buildings & 4/7/2018 150000 0 150000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Hanuman House Bridges

C/o CC Road from M. Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 130 Venkat Reddy House to ELGAID Burhanmiyapet General & Buildings & 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Gatla papi Reddy house Bridges

C/o CC Road from Railways, Roads Putyala Srinivas Reddy PLG.97/PLG.II/DYSO EE DPRE, EE DPRE, 131 ELGAID Burhanmiyapet General & Buildings & 4/7/2018 250000 0 250000 0 0 0 0 0 Not Started House to Sanjeeva Reddy /PDPL/2017-18 PEDDAPALLY PEDDAPALLY Bridges House

C/o CC Road from Gade Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 132 Mall Reddy House to ELGAID Burhanmiyapet General & Buildings & 4/7/2018 300000 0 300000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Chandra Reddy House Bridges

C/o of CC Road from Railways, Roads PLGII/22/CDP/2016- EE DPRE, 133 Goparaveni poshalu (H) Odela Gundlapalli General & Buildings & 4/22/2017 960000 768000 192000 Panchayath raj 0 0 0 0 0 Not Started 17/PDPL/MGNRGES PEDDAPALLY to Velpula Ilaiah(H) Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 C/o CC Road from Railways, Roads Arikilla Rayamallu (H) to PLG.97/PLG.II/DYSO EE DPRE, 134 Peddapally Appannapet SC & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Suddala Laxman (H) in SC /PDPL/2017-18 PEDDAPALLY Bridges Colony at Appannapet(v)

C/o CC Road from G.P. Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 135 Office to Are Gattaiah (H) Peddapally Appannapet General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY at Appannapet(v) Bridges C/o CC Road from Kukka Venkatswamy (H) to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 136 Shanigarapu Hemalatha Peddapally Bandampalli SC & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY (H) in SC Colony at Bridges Bandampalli(v) C/o CC Road from Bus Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 137 Stant to Avula Komraiah Peddapally Bhojannapet General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY (H) at Bhojannapet(v) Bridges

C/o CC Road from Railways, Roads Bodasu Ravi (H) to PLG.97/PLG.II/DYSO EE DPRE, 138 Peddapally Bompalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Muddagula Sanjeev (H) at /PDPL/2017-18 PEDDAPALLY Bridges Bompalli(v) C/o CC Road from Kasarla Poshamallu (H) to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 139 Ganda Sammaiah (H) in Peddapally Brahmanapalli SC & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY SC Colony at Bridges C/oBrahmanapalli(v) CC Road from GP Road to Godugu Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 140 Lasmakka (H) via Peddapally Chandapalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Ch.Komuraiah, Bridges T.Venkatesham (H) at C/o CC from R&B Road to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 141 Vengala Bakkaiah (H) at Peddapally Cheekurai General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Cheekurai(v) Bridges C/o CC Road from Railways, Roads Bonkuri Madhunaiah (H) PLG.97/PLG.II/DYSO EE DPRE, 142 Peddapally Goureddypet General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started to Bonkuri Kistaiah (H) at /PDPL/2017-18 PEDDAPALLY Bridges Goureddypet(v) C/o CC Road from SC Railways, Roads Colony community hall PLG.97/PLG.II/DYSO EE DPRE, 143 Peddapally Gurrampalli SC & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started to Madi Reddy Chandra /PDPL/2017-18 PEDDAPALLY Bridges Redy (H) at Gurrampalli(v) C/o CC Road from R&B Road to Ramagiri Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 144 Chandraiah (H) at Peddapally Kanagarthi General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Kapulapalli H/o Bridges Kanagarthi(v) C/o CC Road from SC Railways, Roads Community Hall to PLG.97/PLG.II/DYSO EE DPRE, 145 Peddapally Kasulapally SC & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started Avunuri Srinivas (H) at /PDPL/2017-18 PEDDAPALLY Bridges Kasulapalli(v) C/o CC Road from Railways, Roads Erram Ravinder Reddy (H) PLG.97/PLG.II/DYSO EE DPRE, 146 Peddapally Kasulapally General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started to Enugala Raji Reddy (H) /PDPL/2017-18 PEDDAPALLY Bridges at Kasulapalli(v) LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 C/o CC Road from Gotte Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 147 Lachaiaha (H) to Konkati Peddapally Kasulapally General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Laxmi (H) at Kasulapalli(v) Bridges C/o CC Road from Railways, Roads Kalavena Narsaiah (H) to PLG.97/PLG.II/DYSO EE DPRE, 148 Peddapally Kothapalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Kalavena Rajaiah (H) at /PDPL/2017-18 PEDDAPALLY Bridges Kothapalli(v) C/o CC Road from Pulipaka Rajanarsu (H) to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 149 Kampalli Premadas (H) Peddapally Mulasala SC & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY in SC Colony at Bridges Mulasala(v) C/o CC Road from Kirthi Railways, Roads Rajaiah (H) to Puli PLG.97/PLG.II/DYSO EE DPRE, 150 Peddapally Mutharam General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Laxmirajam (H) at /PDPL/2017-18 PEDDAPALLY Bridges Mutharam(v) C/o CC Road from Railways, Roads Sandanaveni Dharmaiah PLG.97/PLG.II/DYSO EE DPRE, 151 Peddapally Nittur General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started (H) to Madasu Balaiah (H) /PDPL/2017-18 PEDDAPALLY Bridges at Nittoor(v) C/o CC R/F Kumbala Railways, Roads Rajanarsu (H) to Kasarla PLG.97/PLG.II/DYSO EE DPRE, 152 Peddapally Nittur General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started Mahender Reddy (H) at /PDPL/2017-18 PEDDAPALLY Bridges Nittur (V) C/o CC Road from Madasu Thirupathi (H) to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 153 Madasu Lingaiah(H) at Peddapally Palitham General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Gopaiahpalli H/o Bridges Palitham(v) C/o CC Road from Railways, Roads Kalavena Mallaiah (H) to PLG.97/PLG.II/DYSO EE DPRE, 154 Peddapally Peddabonkur General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started Kothuri Sathaiah (H) at /PDPL/2017-18 PEDDAPALLY Bridges Peddabonkur(v) C/o CC Road from Railways, Roads Dasari Swami (H) to PLG.97/PLG.II/DYSO EE DPRE, 155 Peddapally Peddabonkur General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started Pochamma Temple at /PDPL/2017-18 PEDDAPALLY Bridges Peddabonkur(v) C/o CC Road from Chittavena Hanmandlu Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 156 (H) to Chelukala Peddapally Peddakalwala General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Komuraiah (H) at Bridges Peddakalwala(v) C/o CC Road from Railways, Roads Salendra Ramulu (H) to PLG.97/PLG.II/DYSO EE DPRE, 157 Peddapally Peddakalwala General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started SRSP Canal at /PDPL/2017-18 PEDDAPALLY Bridges Peddakalwala(v) C/o CC Road from Kunta Railways, Roads Laxmaiah (H) to Peddi PLG.97/PLG.II/DYSO EE DPRE, 158 Peddapally Raghavapur General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Thirupathi (H) at /PDPL/2017-18 PEDDAPALLY Bridges Raghavapur(v) C/o CC Road from Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 159 Atender Laxmaiah (H) to Peddapally Rampalli General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY R&B Road at Rampalli(v) Bridges C/o CC Road from Perka Railways, Roads Sathish (H) to Perka PLG.97/PLG.II/DYSO EE DPRE, 160 Peddapally Rangampalli General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started Ramulu (H) at /PDPL/2017-18 PEDDAPALLY Bridges Rangampalli(v) LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 C/o CC Road from Water Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 161 Tank to Kalavena Rajaiah Peddapally Rangapur General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY (H) at Rangapoor(v) Bridges C/o CC Road from Thangella Anantha Railways, Roads Thurkalamaddik PLG.97/PLG.II/DYSO EE DPRE, 162 Reddy (H) to Thangella Peddapally General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started unta /PDPL/2017-18 PEDDAPALLY Kishan Reddy (H) at Bridges Thurkalamaddikunta(v) CC R/F Dr.Govardhan (H) Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 163 to Dommeti Srinivas (H) Srirampur Vennampally General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY at Vennampally (V) Bridges

CCR/F Burra Sammaiah Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 164 House to K. Rajaiah at Srirampur Vennampally General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Vennampally (V) Bridges

CCR/F R&B road to kUSA Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 165 Rayamallu (H) at Srirampur Anshanpally General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY ASHANNAPALLY (V) Bridges

CCR/F Chittampalli Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 166 Mallaiah (H)to Errakunta Srirampur Bheemarampalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY at Bheemarampalli(V) Bridges CCR/F Thirumani Railways, Roads Rajasab (H) to Koppula PLG.97/PLG.II/DYSO EE DPRE, 167 Srirampur Peddarathpalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Sammaiah (H) at /PDPL/2017-18 PEDDAPALLY Bridges peddarathpalli(V) CCR/F Byaram Rajaiah (H) Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 168 to Kasarla Mallaiah (H) at Srirampur Tharupalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Tharupalli (V) Bridges

CCR/F pallala Rajaiah(H) Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 169 to ps Schoolat Srirampur Chinnarathpalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Chinnarathpalli(V) Bridges

CC R/F Hanuman Temple Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 170 to Pogula Ravi (H) at Srirampur Edulapur General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Edulapur Bridges

CCR/F Renella Saraiah Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 171 (H)to R&B Road at Srirampur Pandilla General & Buildings & 9/5/2018 350000 315000 35000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Pandilla (V) Bridges

Railways, Roads CC R/f Gotte Narsaiah (H) PLG.97/PLG.II/DYSO EE DPRE, 172 Srirampur Mangapeta General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started to Godsela Chandraiah (H) /PDPL/2017-18 PEDDAPALLY Bridges

CC R/F Thigutla Rajaiah Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 173 (H) to Pochama Gudi at Srirampur Motlapalli General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Motlapally Bridges

Pallerla Lingaiah House Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 174 to R&Broad at Srirampur Kistampet General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY KISTAMPET(V) Bridges LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2017-18 Peddapalli Assembly Constituency

MLA: D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST 2ND & Sl. Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Work(Comp/ Description Mandal Village (SC/ST/G Sector Name Proceedings No. INSTALL Final No. Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total Prog/Not en) MENT Installment Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 CC R/F Sandanavena Railways, Roads Odelu (H) to Chigeru PLG.97/PLG.II/DYSO EE DPRE, 175 Srirampur Pegadapally General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Komuraiah at /PDPL/2017-18 PEDDAPALLY Bridges Pegadapalli(V) CCR/F Mada Sudaker Railways, Roads reddy (H) to Mada PLG.97/PLG.II/DYSO EE DPRE, 176 Srirampur Peddampet General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started Mallareddy(H)at /PDPL/2017-18 PEDDAPALLY Bridges Peddampet(V) CC R/F Modam Railways, Roads Thirupathi (H) to PLG.97/PLG.II/DYSO EE DPRE, 177 Srirampur Malyal General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Raparthisanthosh (H) at /PDPL/2017-18 PEDDAPALLY Bridges MALYAL(V) Kagithapu SathishHouse Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 178 to P.R. Road at Srirampur Kunaram General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY Kunaram(V) Bridges

CC R/F R&B Road to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 179 Ummaiah (H) at Srirampur Jaferkhanpet General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY JAFFERKHANPET(V) Bridges CCR/F Pachhika Railways, Roads Venkatreddy (H) to Uyalla PLG.97/PLG.II/DYSO EE DPRE, 180 Srirampur Mirjampet General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started Saraiah (H) at /PDPL/2017-18 PEDDAPALLY Bridges Mirjampet(V) CC R/F Ilaveni Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 181 Narsaiah(H) to G P road Odela Roopnarayanpet General & Buildings & 9/5/2018 300000 270000 30000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY at Roopnarayanapet Bridges

CC R/F Shivalayam to Railways, Roads PLG.97/PLG.II/DYSO EE DPRE, 182 Thangallapally srinivas Odela Indurthy General & Buildings & 9/5/2018 400000 360000 40000 Panchayath raj 0 0 0 0 0 Not Started /PDPL/2017-18 PEDDAPALLY (H) at Indurthi(v) Bridges

46287176 16563000 29724176 12062835 312901 12375736

TOTAL LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 C/o. Balance Work of EE-DPRE- 1 9/4/2018 Padmashali Community Hall at Elegaid Sulthanapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Sulthanpur

C/o. Community Hall in Gouda EE-DPRE- 2 9/4/2018 Elegaid Dhoolikatta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Colony Peddapally

C/o Fishermen Cooperative EE-DPRE- 3 9/4/2018 Society of Mudiraj Community Elegaid Muppirithota Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Peddapally Hall

C/o. Balance Work of Gouda EE-DPRE- 4 9/4/2018 Elegaid Sulthanapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Sangham Bhavanam Peddapally

Fishermen Co-operative Society EE-DPRE- 5 9/4/2018 Elegaid Narayanraopalli SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 at Eligaid Peddapally

CC Road from Polavena EE-DPRE- 6 9/4/2018 Rayagattu (H) to Pochamma Elegaid Muppirithota Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 Peddapally Temple

EE-DPRE- 7 9/4/2018 Improvements to internal Roads Elegaid Muppirithota Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 150000 Peddapally

Providing of Electrical poles NPDCL, 8 9/4/2018 Elegaid Dhoolikatta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 149600 and conductor (31) Nos Peddapally

DRWS&S Drilling of Borewell, Pumpset 9 9/4/2018 Elegaid Lokapet Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 Engineer and Pipeline at Lokapet (2) Peddapally

C/o. B/W of Munnurukapu EE-DPRE- 10 9/4/2018 Community Hall at Jualpally Julapally Julapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally (V0&(M)

C/o. Gouda Community Hall at EE-DPRE- 11 9/4/2018 Julapally Peddapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapur Peddapally

C/.o. Balance Work of Kurma EE-DPRE- 12 9/4/2018 Sangha Community Hall at Julapally Kummarikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Kummarikunta (V) C./o. Balance Work of Compound Wall to Muduraj EE-DPRE- 13 9/4/2018 Julapally Kummarikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Sangha Community Hall in BC Peddapally Colony LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

C/o. of B/W of Mala EE-DPRE- 14 9/4/2018 Julapally Wadkapur SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Community Hall Peddapally

C/O SC Community Hall at EE-DPRE- 15 9/4/2018 Julapally Nagulaplli SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Nagulapalli Peddapally

NPDCL, 16 9/4/2018 Electrical Poles Wadkapur (25) Julapally Wadkapur ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 55000 Peddapally

NPDCL, 17 9/4/2018 Electrical Poles Wadkapur (5) Julapally Wadkapur ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 12000 Peddapally

C/o.B/W of Community Hall at EE-DPRE- 18 9/4/2018 Odela Odela SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Artison Colony in SC Colony Peddapally

C/O SC Community Hall at EE-DPRE- 19 9/4/2018 Odela Jeelakunta SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Jeelakunta Peddapally

Amenities to Compound Wall EE-DPRE- 20 9/4/2018 to Yadhava Community Hall at Odela Haripuram Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 350000 Peddapally Haripuram

DRWS&S Drilling of New Bore Well & 21 9/4/2018 Odela Odela Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Pump set at Odela Peddapally

Improvement of Road from EE-DPRE- 22 9/4/2018 Bayammapally Road to Odela Indurthi Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 Peddapally Gollapally Road

Improvement of Road from EE-DPRE- 23 9/4/2018 Indurthy Road to Odela Indurthi Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 Peddapally Roopnarayanapeta Road

Improvement of Road from EE-DPRE- 24 9/4/2018 Odela Indurthi Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 Indurthy Road to Manair Road Peddapally

C/o B/W of Compound Wall at EE-DPRE- 25 9/4/2018 Odela Odela Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Renuka Yellamma Temple Peddapally

DRWS&S 26 9/4/2018 Drilling of Bore Well at Odela Odela Odela ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Peddapally

C/o Balance Work of Gouda EE-DPRE- 27 9/4/2018 Odela Odela Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Sangam Bhavanam at Odela Peddapally LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

C/o. Yadava (Oggu) Community Bayammapally EE-DPRE- 28 9/4/2018 Odela ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 Hall at Bayammapally (Indurthy) (Indurthy) Peddapally

C/o. CC R/F Gundeti Ilaiah EE-DPRE- 29 9/4/2018 Odela Madaka Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 250000 House to GP Peddapally

Providing of 7.50 HP Open Well DRWS&S Submersible Pumpset at 30 9/4/2018 Odela Kolanoor Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 90000 Engineer Kolanoor (V) of Odela Near Peddapally Chervu Katta C/o B/W of Community Hall in EE-DPRE- 31 9/4/2018 Gouda Colony at Tilak Nagar, Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Peddapallay

C/o. Balance Work of EE-DPRE- 32 9/4/2018 Peddapalli Kothapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Community Hall in SC Colony Peddapally

C/o Balance Work of Arya EE-DPRE- 33 9/4/2018 Vyshya Bhavan at Pragathi Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 Peddapally Nagar

C/o Poosala sangam Bhavan at EE-DPRE- 34 9/4/2018 Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 Peddamma Nagar Peddapally

C/o Fishermen Co - Operative EE-DPRE- 35 9/4/2018 Peddapalli Peddabonkur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Society Community Hall Peddapally

C/o Balance work of EE-DPRE- 36 9/4/2018 Swarnakara & Varthaka sangam Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 Peddapally community Hall

C/o. B/W of Mera Sangam EE-DPRE- 37 9/4/2018 Community Hall at Peddapalli Appannapeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 Peddapally Appannapeta

C/o. B/of Ambedkar Bhavan EE-DPRE- 38 9/4/2018 Community Hall at SC Colony Peddapalli Brahamanpally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 Peddapally at Brahamanapalli

C/o. B/W of Vishwa Brahaman EE-DPRE- 39 9/4/2018 Sangha Community Hall at Peddapalli Ragineedu Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Ragineedu

C/o SC Community Hall in SC EE-DPRE- 40 9/4/2018 Peddapalli Andugulapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Colony Peddapally

Construct the Balance Work of EE-DPRE- 41 9/4/2018 Yadava Charitable Trust Peddapalli Rangampalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 Peddapally Community Hall LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Construct the Balance Work of EE-DPRE- 42 9/4/2018 SC Community Hall in SC Peddapalli Appannapeta SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 Peddapally Colony

c/o Mera Sangham Community EE-DPRE- 43 9/4/2018 Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 hall Peddapally

Amenities to Compound Wall EE-DPRE- 44 9/4/2018 to SC Community Hall at Peddapalli Cheekurai SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 250000 Peddapally Cheekurai

C/o. CC R/F H.No.2-8-66 to EE-DPRE- 45 9/4/2018 End at Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 Peddapally 15 th Ward Peddapally

Providing of Electrical Poles NPDCL, 46 9/4/2018 Peddapalli Gopalaiahpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 140000 and conductor (25) Nos Peddapally

C/o. Gouda Community Hall at EE-DPRE- 47 9/4/2018 Peddapalli Hanumanthunipet Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Hanumanthunipeta (V) Peddapally

NPDCL, 48 9/4/2018 Electrical Poles at Mutharam(4) Peddapalli Mutharam SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 10000 Peddapally

NPDCL, 49 9/4/2018 Electrical Poles at Kapulapally(4) Peddapalli Kapulapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 10000 Peddapally

DRWS&S Drilling of Bore Well near Nalla 50 9/4/2018 Peddapalli Brahamanpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 60000 Engineer Pochamma Temple Peddapally

Drilling of Borewell and DRWS&S 51 9/4/2018 Erection of Hand Pumpset at Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Bandalapally Peddapally

Drilling of Borewell and DRWS&S 52 9/4/2018 Erection of Hand Pumpset at Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer gollawada Peddapally

Drilling of Borewell and DRWS&S 53 9/4/2018 Erection of Hand Pumpset at Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Padmashaliwada Peddapally

Drilling of Borewell and DRWS&S 54 9/4/2018 Erection of Hand Pumpset at Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Perukawada Peddapally

Drilling of Borewell and DRWS&S 55 9/4/2018 Erection of Hand Pumpset at SC Peddapalli Kapulapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Colony Peddapally LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Drilling of Borewell and DRWS&S 56 9/4/2018 Erection of Hand Pumpset at Peddapalli Ragineedu Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Razakawada Peddapally

Drilling of Borewell and DRWS&S 57 9/4/2018 Erection of Hand Pumpset at SC Peddapalli Ragineedu SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Colony Peddapally

Drilling of Borewell and DRWS&S 58 9/4/2018 Erection of Hand Pumpset as Peddapalli Ragineedu Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Yadava Community Hall Peddapally

DRWS&S Drilling of Borewell and 59 9/4/2018 Peddapalli Gurrampally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Erection of Hand Pumpset Peddapally

Drilling of Bore Well, Pumpset DRWS&S 60 9/4/2018 at Kothapally Near Ambedkar Peddapalli Kothapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Statue Peddapally

Drilling of Borewell, Pumpset DRWS&S 61 9/4/2018 and Pipeline at Yellamma Peddapalli Rangapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 60000 Engineer Temple Peddapally

Drilling of Borewell and DRWS&S 62 9/4/2018 Erection of Hand Pumpset as Peddapalli Ragineedu SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Engineer Mala Colony Peddapally

C/o Gouda Community Hall at EE-DPRE- 63 9/4/2018 Srirampur Mangapeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Mangapet Peddapally

C/o. Balance Work of EE-DPRE- 64 9/4/2018 Community Hall at Oddera Srirampur Srirampur ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Colony in Srirmapur

EE-DPRE- 65 9/4/2018 C/o Yadava Community Hall Srirampur Peddarathupalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally

EE-DPRE- 66 9/4/2018 C/o Mudiraj Community Hal Srirampur Peddampeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally

C/o Cc Road from Sandilla EE-DPRE- 67 9/4/2018 Rajaiah (H) to Korre Komuraiah Srirampur Ushanapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 240000 Peddapally (H)

C/o CC Road from Shanker EE-DPRE- 68 9/4/2018 Srirampur Ushanapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 225000 House to Medi Mallesh House Peddapally LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

NPDCL, 69 9/4/2018 Electrical Poles at Kunaram (6) Srirampur Kunaram ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 15000 Peddapally

DRWS&S Drilling of Borewell and 70 9/4/2018 Srirampur Mangapeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Erection of Hand Pumpset Peddapally

DRWS&S Drilling of Borewell and 71 9/4/2018 Srirampur Vennampally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Erection of Hand Pumpset Peddapally

DRWS&S Drilling of Borewell and 72 9/4/2018 Srirampur Vennampally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Erection of Hand Pumpset Peddapally

DRWS&S Drilling of Bore Well at 73 9/4/2018 Srirampur Vennampally ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Vennampallay Peddapally

C/o Gouda Community Hall at EE-DPRE- 74 9/4/2018 Sulthanabad Poosala Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 450000 Poosala Peddapally

C/o. B/W of Kurma Sangha EE-DPRE- 75 9/4/2018 Sulthanabad Itharajpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Community Hall at Itharajpally Peddapally

C/o B/w of Shalivahana EE-DPRE- 76 9/4/2018 Kummari Sangha Community Sulthanabad Bhoopathipoor Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Hall

Construct the Balance Work of EE-DPRE- 77 9/4/2018 Budiga Jangala Community Hall Sulthanabad Narayanraopalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Peddapally in Budiga Jangala Colony

C/o. Gangaputra Community EE-DPRE- 78 9/4/2018 Hall and Toilets in Gangaputra Sulthanabad Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Colony

Fishermen Co-operative Society EE-DPRE- 79 9/4/2018 Sulthanabad Itharajpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 at Itherajaplle Peddapally

CC R/F Dulam Thirupathi(H) to EE-DPRE- 80 9/4/2018 Sulthanabad Kodurupaka Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 350000 Ch. Srinivas (h) Peddapally

B/W SC Community Hall at EE-DPRE- 81 9/4/2018 Sulthanabad Kodurupaka SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 Kodurupaka Peddapally

Amenities to Compound Wall EE-DPRE- 82 9/4/2018 to Yadhava Community Hall at Sulthanabad Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Yadhava nagar

C/o CC Road from Appala EE-DPRE- 83 9/4/2018 Sulthanabad Kadambapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Beeraiah (H) to Gunti Rajaiah (H) Peddapally LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

C/o CC Road Dam for Oora EE-DPRE- 84 9/4/2018 Sulthanabad Chinnabonkur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Cheruvu at Chinna Bonkur Peddapally

C/o Culvert for Oora Cheruvu EE-DPRE- 85 9/4/2018 Sulthanabad Chinnabonkur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Flood water at Chinna Bonkur Peddapally

C/o CC Road from Muthyala EE-DPRE- 86 9/4/2018 Krishna Murthi House to Balla Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Odelu C/o CC Road from Chikkundu EE-DPRE- 87 9/4/2018 Narsaiah (H) to Veeravena Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 Peddapally Narsaiah (H) C/o CC Road from Gopidi Rami EE-DPRE- 88 9/4/2018 Reddy House to Mallaiahpalle Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 Peddapally School C/o CC Road from Marri EE-DPRE- 89 9/4/2018 Laxmaiah (H) to Gunda Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Kalavathi (H)

EE-DPRE- 90 9/4/2018 C/o. of CC Road in SC Colony Sulthanabad Katnapalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally C/o. of Road from kandula Miyapur H/o. EE-DPRE- 91 9/4/2018 Buchaiah Land to Upparapally Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 Perukapally Peddapally Myakala Mallaiah Land C/o,. of Road from Perkapally Miyapur H/o. EE-DPRE- 92 9/4/2018 Narra Shankaraiah Land to Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 25000 Perukapally Peddapally Yerram Chetti Odelu

Providing of Electrical poles NPDCL, 93 9/4/2018 Sulthanabad Poosala Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 138400 and conductor (24) Nos Peddapally

C/o. CC R./F Sunchula EE-DPRE- 94 9/4/2018 Rajeshwari House to Sulthanabad Kodurupaka SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 40000 Peddapally Bogamallaiah House

CC R/F Kallapelli Rajamallu (H) EE-DPRE- 95 9/4/2018 Sulthanabad Kodurupaka SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 110000 to Voodluri Lingaiah House Peddapally

DRWS&S Drilling of New Bore Well & 96 9/4/2018 Sulthanabad Kodurupaka Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Engineer Pump Sets(3) Peddapally

DRWS&S Installation of RO Water Plant 97 9/4/2018 Sulthanabad Bhoopathipoor Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 135000 Engineer 500 LPH Peddapally

EE-DPRE- 98 9/4/2018 C/o. B/W of IKP Building Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 250000 Peddapally

C/o. Balance Work to C/o. 40 DRWS&S 99 9/4/2018 KL OHSR at Upparapally H/o. Sulthanabad Chinnakalvala Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 350000 Engineer Chinnakalvala Peddapally DRWS&S Drilling of Borewell and 100 9/4/2018 Sulthanabad Narayaranpur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer Erection of Hand Pumpset Peddapally LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Construction of CC Road from EE-DPRE- 101 9/4/2018 Tudi Kanakaiah (H) to Ogula Sulthanabad Katnapalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 Peddapally Lachaiah (H) CC R/F R&B Road Bismilla (H) to EE DPRE, 102 Muddasani Janardhan Reddy(H) at Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 PEDDAPALLY Kangarthi(v)

CCR/F Veeramutti Beeraiah (H) EE DPRE, 103 Odela Gudem General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 to Tipani Sadaiah (H) at Gudem(v) PEDDAPALLY

CCR/F Bustand to Bogi Cheralu (H) EE DPRE, 104 Odela Madaka General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 at Madaka(v) PEDDAPALLY

CCR/F Godugu Jampaiah (H) to EE DPRE, 105 Godugu Sadaiah (H) at Odela Shanagonda General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 PEDDAPALLY Shanagonda(v)

CCR/F Bandari surender (H) to EE DPRE, 106 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 Bandari Srinivas(H) at Gumpula(v) PEDDAPALLY

CCR/F Eluvaka Shekaraiah(H) to EE DPRE, 107 Keshavapur hanman temple at Odela Gundlapalli General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 PEDDAPALLY Keshavapur H/o Gundlapalli(v)

CCR/F Dara Ramulu(H) to Meesala EE DPRE, 108 Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 Chandru(H) at Jeelakunta(v) PEDDAPALLY

CCR/F Bodakunta Lasmaiah(H) to EE DPRE, 109 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 Panala Rajaiah(H) at Odela(v) PEDDAPALLY

CC R/F Racherla Banaiah (H) to Ila EE DPRE, 110 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 500000 450000 50000 Roddamma (H) at Odela PEDDAPALLY

CC R/F Thulagani Sampath (H) to EE DPRE, 111 Thulagani Ramulu (H) Odela Goparapally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 PEDDAPALLY Goparapalli(v)

CCR/F Janga Srinivasreddy(H) to EE DPRE, 112 Odela Goparapally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 Janga Rajireddy(H) at Goparapalli(v) PEDDAPALLY

CCR/F Abbidi Sampath reddy(H) to EE DPRE, 113 Vangala Saireddy(H) at Odela namsanipally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 PEDDAPALLY Namshanipalli(v) CC R/F Pulipaka Lachamma (H) to EE DPRE, 114 Pulipaka Laxmaiah (H) at Odela Upparapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 PEDDAPALLY Upparapally

CCR/F Main road to Sandi EE DPRE, 115 Odela Komire General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 Rajireddy (H)at Komire(v) PEDDAPALLY

CCR/F Kasarla Rajireddy (H) to EE DPRE, 116 Chinnakomire Bhulaxmi(H) at Odela Komire General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 PEDDAPALLY Komire(v)

CC R/F Mittapally Srinivas (H) to EE DPRE, 117 Odela Komire General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 Kannuri Saraiah (H) at Komire PEDDAPALLY

CCR/F R&B road to Pittala EE DPRE, 118 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 Chandraiah at Pothkapalli(v) PEDDAPALLY LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CCR/F Rudrarapu Mondaiah(H) to EE DPRE, 119 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 Main road at pothkapalli(v) PEDDAPALLY

CC R/F Sattu Mogili (H) to EE DPRE, 120 Doddipalli Jampaiah (H) at Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 PEDDAPALLY Pothkapally

CC R/F Purushotham Swamy to EE DPRE, 121 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 Kallapelli at Kolanur PEDDAPALLY

CC R/F Peddapally R&B Road to EE DPRE, 122 Ireddy Sudhakarreddy (H) at Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 PEDDAPALLY Kolanur CC R/F Thumala Mallaiah (H) to EE DPRE, 123 Thota Kanukaiah (H) at Odela Haripuram General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 PEDDAPALLY Haripuram(v)

CC R/F Devaraju (H) to Deva EE DPRE, 124 Eligaid Doolikatta General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Laxmirajam (H) at Dhoolikatta PEDDAPALLY

CC R/F Bongoni Rajkumar (H) to EE DPRE, 125 Busarapu Venkati (H) at Eligaid Muppirithota General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 PEDDAPALLY Muppirithota

CC R/F Ravadi Pullarao (H) to Veldi EE DPRE, 126 Eligaid Sulthanpur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Damodar Rao (H) at Sulthanpur PEDDAPALLY

CC R/F Peddi Rajaiah (H) to EE DPRE, 127 Eligaid Lalapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Chegurla Ravi (H) at Lalapally PEDDAPALLY

CC R/F Poosala Road to Rapolu EE DPRE, 128 Eligaid narsapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Venktaiah (H) at Narsapur PEDDAPALLY

CC R/F R&B Road to Vengaldas EE DPRE, 129 Eligaid Eligaid General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Narayana (H) at Eligaid PEDDAPALLY

CC R/F R&B Road to Bire EE DPRE, 130 Eligaid Lokapet General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Ramaswamy (H) at Lokapet PEDDAPALLY

CC R/F Dugyala Thirupathi Rao (H) EE DPRE, 131 to Thadicherla Ramulu (H) at Eligaid Shivapalli General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 PEDDAPALLY Shivapalli CC R/F Dubbasi Rajamma (H) to EE DPRE, 132 Racharla Lingaiah at Eligaid Burahanmiyapet General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 PEDDAPALLY Burahanmiyapet

CC R/F Botla Kondamallaiah (H) to EE DPRE, 133 Julapalli Telukunta General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Padari Satthaah (H) at Telukunta PEDDAPALLY

CC R/F Bonkuri Lingaiah (H) to EE DPRE, 134 Samanapelli Pochalu (H) at Julapalli Peddapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 PEDDAPALLY Peddapur

CC r/F Ragula Shanker (H) to PR EE DPRE, 135 Julapalli Wadkapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Road at Wadkapur PEDDAPALLY

CC R/F M.Rajaiah (H) to K.Rajaiah EE DPRE, 136 Julapalli Venkatraopally General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 (H) at Venkatraopally PEDDAPALLY LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CC R/F Gollapalli Shankaraiah (H) EE DPRE, 137 Julapalli Kachapur General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 to PR Road at Kachapur PEDDAPALLY

CC R/F Edula Srinivas Reddy (H) to EE DPRE, 138 Julapalli Abbapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 E.Narayana Reddy at Abbapur PEDDAPALLY

CC R/F Ismalla Odelu (H) to Avula EE DPRE, 139 Julapalli Konaraopet General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 Lachaiah (H) at Konaraopet PEDDAPALLY

CC R/F Gaddam Mohan Reddy (H) EE DPRE, 140 Julapalli Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 to Dadi Gopal (H) at Julapally PEDDAPALLY

CC R/F Thammidi Mondaiah (H) to EE DPRE, 141 Julapalli Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Cheduru Mahankali (H) at Julapally PEDDAPALLY

Construction of Cement Concrete EE DPRE, 142 Roads with out Drains at Eligaid Doolikatta General 9/5/2018 Plg.II/43/CDP/2018-19 1500000 1350000 150000 PEDDAPALLY Dhoolikatta (V) of Eligaid (M) Construction of Cement Concrete EE DPRE, 143 Roads with out Drains at Peddapally Rangampalli General 9/5/2018 Plg.II/43/CDP/2018-19 5000000 4500000 500000 PEDDAPALLY Rangampalli (V) of Peddapalli (M) Formation and Metalling Road EE DPRE, 144 From Yellamma Temple to Budha Eligaid Doolikatta General 9/5/2018 Plg.II/43/CDP/2018-19 5000000 4500000 500000 PEDDAPALLY Stupam in Dhilikatta (V) CC R/F Jangam Gattamma (H) to 145 Srirampur Vennampally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 R&B Road at Vennampally CC R/F Manthini Narsaiah House 146 Srirampur Vennampally General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 to Peddamma Temple CCR/F Ankampally R&B road to 147 Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 chittikala Ravi (H) at Madipally(V) CCR/F Ankampally R&B Road to sc 148 colony Marapaka mondaiah (H) at Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 480000 432000 48000 Madipally (V) CC R/F Baba (H) to Pittala 149 Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 Bhumaiah (H) CC R/F Pittala Bhumaiah (H) to 150 Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 Ramveni Rajender (H) CCR/F High Scholl to Marka 151 Srirampur Tharupalli General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Mallaiah (H) at Tharupalli (V) CC R/F Marka Mallaiah (H) to Bolli 152 Srirampur Tharupalli General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Swamy CCR/F SC Communiti Hall to 153 Chippari Ravi (H) at Srirampur Chinnarathpalli General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Chinnarathpalli(V) CCR/F Ponaganti Nandam(H) to 154 Srirampur Edulapur General 9/5/2018 Plg.II/43/CDP/2018-19 360000 324000 36000 Siddam Madhavi(H) at Edulapur(V) CCR/F Bandarapu Chinna 155 Komuraiah(H) to Siddam Srirampur Edulapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Rajaiah(H)at Edulapur(V) CC R/F Kotte Mogili (H) to Thotla 156 Srirampur Mangapeta General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Rangaiah (H) at Mangapeta(V) CC R/F Thotla Odelu (H) to 157 Srirampur Mangapeta General 9/5/2018 Plg.II/43/CDP/2018-19 360000 324000 36000 Peddamma Gudi CC R/F Anganwadi-II to Avula 158 Srirampur Mangapeta General 9/5/2018 Plg.II/43/CDP/2018-19 360000 324000 36000 Pochalu (H) at Mangapet LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CCR/F Satla Bhoomaiah (H) to 159 Bandarapu Mallaiah (H) at Srirampur Kunaram General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 Kunaram(V) Dommati Mallesham House to 160 Kotte Shankaraiah House at Srirampur Kunaram General 9/5/2018 Plg.II/43/CDP/2018-19 390000 351000 39000 Kunaram(V) CC R/F SC Community Hall to 161 Srirampur Kunaram General 9/5/2018 Plg.II/43/CDP/2018-19 390000 351000 39000 Mittapally Odelu (H) at Kunaram CCR/F R&B Road to Gouda 162 Srirampur Mirjampet General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Sangam at Mirjampet(V) 163 CC R/F Gp Office to R&B Road Srirampur Mirjampet General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 CCR/F Pachhi Venkatreddy (H) to 164 Doddi pelli Laxmaiah (H)at Srirampur Mirjampet General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Mirjampet(V) CC R/F Velchani Komuraiah (H) to 165 Odela Indurthy General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 Dasarapu Agaiah (H) at Indurthi(v) CC R/F Dasarapu Agaiah (H) to 166 Odela Indurthy General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 Batkamma Banda CC R/F Thatipelli Peddaodelu (H) 167 Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 to Gattu Sammaiah (H) CC R/F Gattu Sammaiah (H) to ZPH 168 Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 School CC R/F ZPH School to Pendotha 169 Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Narayana (H) CC R/F Pillala Srinivas (H) to 170 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Panjala Chandraiah (H) CC R/F Panjala Chandraiah (H) to 171 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Panjala Sadaiah (H) CC R/F Panjala Sadaiah (H) to 172 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 Sakinala Odelu (H) CC R/F Sottku Ellaiah (H) to 173 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Thirupathi Reddy Statue CC R/F Bandari Chinna Odelu (H) 174 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 to Kotte Raju (H) CCR/F Doddipalli Odelu(H) to 175 rajaiah(H) at Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 255000 229500 25500 Jeelakunta(v) Vangala Narayana Reddy (H) to 176 Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 390000 351000 39000 Vangala Sammireddy(H) Karra Jaipal Reddy (H) to Dasari 177 Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Komal Reddy CCR/F Bodakunta .Rajaiah(H) to 178 Gadigopula Shankaraiah .(H) at Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Odela(v) CC R/F Gadigopula Shankaraiah 179 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 (H) to Bodukunta Kanakaiah (H)

CC R/F Gadi goppula Mallaiah (H) 180 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 to Donthu .Ramesh (H) at Odela(v) CC R/F Donthu Ramesh (H) to 181 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Poloju Ramesh (H) CC R/F Gatike Ramaiah (H) to 182 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Gorla Sathaiah (H) at Odela CC R/F Gorla Sathaiah (H) to 183 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Kandula Sathaiah (H) LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 CC R/F Kommu.Thirupathi (H) to 184 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Ch.Venkata Swamy (H) at Odela(v) CC R/F Ch.Venkata Swamy (H) to 185 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Enagandula Sathaiah (H) CC R/F Eambadi.Sammaiah (H) to 186 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Biyyala Chandraiah (H) at Odela(v) CC R/F Biyyala Chandraiah (H) to 187 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Ramineni Swamy (H) Boyini Chinna Ramulu House to 188 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 435000 391500 43500 D/86 Canal Brahmanpandli Narsaiah house to 189 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 285000 256500 28500 Akkinapally Raamaiah house R&B road to Boge Ramchandram 190 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 480000 432000 48000 house Meenugu Sampath house to V. 191 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 Jampaiah house Manda Mallaiah house to Putta 192 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Sudhakar House Diddigi Ramchandram house to 193 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 Bongone Mondaiaha house Marka Parashu Ramaulu house to 194 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 Pendam Sadanandam Goggulouth Devilal (H) to 195 Odela Abbidipally Thanda General 9/5/2018 Plg.II/43/CDP/2018-19 180000 162000 18000 Goggulout Vajram (H) 196 Bukyavenu (H) to Dibla Nayak (H) Odela Abbidipally Thanda General 9/5/2018 Plg.II/43/CDP/2018-19 210000 189000 21000 CCR/F Korapati Rajanna (H) to 197 Mulugu Sammaiah (H) at Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Pothkapalli(v) CC R/F Sudhaveni Nagaiah (H) to 198 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Pasaragonda Shankar (H) Alladi Shanker Lingam (H) ot 199 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 750000 675000 75000 Church CC R/F Thota Mondaiah (H) to 200 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Chinnala Bhumaiah (H) at Kolanur CC R/F Chinnala Bhumaiah (H) to 201 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Kshetti Rajaiah (H) CC R/F R&B Road to Uppu Rajaiah 202 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 (H) CC R/F Koluri Kumar (H) to 203 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Thotapalli Mallaiah (H) CC R/F R&B Road to Bodasi 204 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Mallaiah (H) at Kolanoor(v) CC R/F Bodasi Mallaiah (H) to 205 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Pallapu Mallesh (H) CC R/F Kallapelli Thirupathi (H) to 206 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Maturi Punnaiah (H) at Kolanoor(v) CC R/F SC Colony School to Dodda 207 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Rajaiah (H) CC R/F Maturi Anjaiah (H) to 208 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Maturi Lingaiah (H) Thota Lingaiah (H) to Thotapalli 209 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 Mallaiah (H) Ireddy Kishan Reddy (H) to Janga 210 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 Banda Reddy (H) LIST OF WORKS SANCTIONED UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Area 1ST 2ND & Date of Estimated MGNREGS Scheme Fund Executive Department Date of Date of Cumulative Sl. No. Proposal Date Description Mandal Village (SC/ST/G Proceedings No. INSTALL Final Sanction Cost in Rs. FUND In Rs. Agency Name Release Releases Total en) MENT Installment

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Pulla Balaiah (H) to SC Community 211 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 750000 675000 75000 Hall CC R/F ZP High School to R&B 212 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 2375000 2137500 237500 Road via SC Colony at Appannapet CC R/F SRSP Canal to Pidugu 213 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 1175000 1057500 117500 Pochalu (H) Bolla Srinivas (H) to Mende Kumar 214 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 575000 517500 57500 House Bobbili Yellaiaha (H) to Rechaveni 215 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 Gondaiah Pidugu Mallaiah (H) to Avuleni 216 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 Kumara Swamy House CC Road from Nalla Jalpath 217 Reddy (H) to Boda Narsimha Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 350000 315000 35000 Reddy (H) at Konaraopet CC Road from Nalla Ram Reddy 218 (H) to Primary School at Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 260000 234000 26000 Konaraopet CC Road from Mallarapu 219 Rajaiah (H) to Mallarapu Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 260000 234000 26000 Kondaiah (H) at Konaraopet CC Road from Avula Rajamallu 220 (H) to Baddam Ram Reddy (H) Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 at Konaraopet CC Road from Kampelli 221 Rajaiah(H) to Mallarapu Rajaiah Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 499000 449100 50000 (H) at Konaraopet CC Road from Balengal 222 Vishwanatham (H) to M. Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 499000 449100 50000 Chandraiah (H) at Konaraopet CC Road from Bandari Rada (H) 223 to Aashadapu Srinivas (H) at Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 499000 449100 50000 Konaraopet CC Road from Sangasani Raja 224 Ram Reddy (H) to A. Mallesham Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 (H) at Konaraopet 56917000 51225300 29217000 Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19

Not started

Not started

Not started

Not started

Not started

Not started

Not started

Not started Status of the Work(Comp/ Prog/Not Started) 19 Status of the Work(Comp/ Prog/Not Started) 19 Status of the Work(Comp/ Prog/Not Started) 19 LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 C/o. Balance Work of EE-DPRE- 1 Padmashali Community Hall at Elegaid Sulthanapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Sulthanpur

C/o. Community Hall in Gouda EE-DPRE- 2 Elegaid Dhoolikatta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Colony Peddapally

C/o Fishermen Cooperative EE-DPRE- 3 Society of Mudiraj Community Elegaid Muppirithota Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started Peddapally Hall

C/o. Balance Work of Gouda EE-DPRE- 4 Elegaid Sulthanapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started Sangham Bhavanam Peddapally

Fishermen Co-operative Society EE-DPRE- 5 Elegaid Narayanraopalli SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started at Eligaid Peddapally

CC Road from Polavena EE-DPRE- 6 Rayagattu (H) to Pochamma Elegaid Muppirithota Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 0 0 0 Not started Peddapally Temple

EE-DPRE- 7 Improvements to internal Roads Elegaid Muppirithota Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 150000 0 0 0 Not started Peddapally

Providing of Electrical poles and NPDCL, 8 Elegaid Dhoolikatta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 149600 0 0 0 Not started conductor (31) Nos Peddapally

DRWS&S Drilling of Borewell, Pumpset 9 Elegaid Lokapet Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 Engineer 0 0 0 Not started and Pipeline at Lokapet (2) Peddapally

C/o. B/W of Munnurukapu EE-DPRE- 10 Community Hall at Jualpally Julapally Julapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally (V0&(M)

C/o. Gouda Community Hall at EE-DPRE- 11 Julapally Peddapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapur Peddapally

C/.o. Balance Work of Kurma EE-DPRE- 12 Sangha Community Hall at Julapally Kummarikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Kummarikunta (V) C./o. Balance Work of Compound Wall to Muduraj EE-DPRE- 13 Julapally Kummarikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Sangha Community Hall in BC Peddapally Colony LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

C/o. of B/W of Mala EE-DPRE- 14 Julapally Wadkapur SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Community Hall Peddapally

C/O SC Community Hall at EE-DPRE- 15 Julapally Nagulaplli SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Nagulapalli Peddapally

NPDCL, 16 Electrical Poles Wadkapur (25) Julapally Wadkapur ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 55000 0 0 0 Not started Peddapally

NPDCL, 17 Electrical Poles Wadkapur (5) Julapally Wadkapur ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 12000 0 0 0 Not started Peddapally

C/o.B/W of Community Hall at EE-DPRE- 18 Odela Odela SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Artison Colony in SC Colony Peddapally

C/O SC Community Hall at EE-DPRE- 19 Odela Jeelakunta SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Jeelakunta Peddapally

Amenities to Compound Wall EE-DPRE- 20 to Yadhava Community Hall at Odela Haripuram Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 350000 0 0 0 Not started Peddapally Haripuram

DRWS&S Drilling of New Bore Well & 21 Odela Odela Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Pump set at Odela Peddapally

Improvement of Road from EE-DPRE- 22 Bayammapally Road to Odela Indurthi Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 0 0 0 Not started Peddapally Gollapally Road

Improvement of Road from EE-DPRE- 23 Indurthy Road to Odela Indurthi Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 0 0 0 Not started Peddapally Roopnarayanapeta Road

Improvement of Road from EE-DPRE- 24 Odela Indurthi Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 0 0 0 Not started Indurthy Road to Manair Road Peddapally

C/o B/W of Compound Wall at EE-DPRE- 25 Odela Odela Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Renuka Yellamma Temple Peddapally

DRWS&S 26 Drilling of Bore Well at Odela Odela Odela ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Peddapally LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

C/o Balance Work of Gouda EE-DPRE- 27 Odela Odela Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Sangam Bhavanam at Odela Peddapally

C/o. Yadava (Oggu) Community Bayammapally EE-DPRE- 28 Odela ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 0 0 0 Not started Hall at Bayammapally (Indurthy) (Indurthy) Peddapally

C/o. CC R/F Gundeti Ilaiah EE-DPRE- 29 Odela Madaka Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 250000 0 0 0 Not started House to GP Peddapally

Providing of 7.50 HP Open Well DRWS&S Submersible Pumpset at 30 Odela Kolanoor Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 90000 Engineer 0 0 0 Not started Kolanoor (V) of Odela Near Peddapally Chervu Katta C/o B/W of Community Hall in EE-DPRE- 31 Gouda Colony at Tilak Nagar, Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Peddapallay

C/o. Balance Work of EE-DPRE- 32 Peddapalli Kothapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Community Hall in SC Colony Peddapally

C/o Balance Work of Arya EE-DPRE- 33 Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 0 0 0 Not started Vyshya Bhavan at Pragathi Nagar Peddapally

C/o Poosala sangam Bhavan at EE-DPRE- 34 Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 0 0 0 Not started Peddamma Nagar Peddapally

C/o Fishermen Co - Operative EE-DPRE- 35 Peddapalli Peddabonkur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started Society Community Hall Peddapally

C/o Balance work of Swarnakara EE-DPRE- 36 & Varthaka sangam community Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 0 0 0 Not started Peddapally Hall

C/o. B/W of Mera Sangam EE-DPRE- 37 Peddapalli Appannapeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 0 0 0 Not started Community Hall at Appannapeta Peddapally

C/o. B/of Ambedkar Bhavan EE-DPRE- 38 Community Hall at SC Colony at Peddapalli Brahamanpally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 0 0 0 Not started Peddapally Brahamanapalli

C/o. B/W of Vishwa Brahaman EE-DPRE- 39 Sangha Community Hall at Peddapalli Ragineedu Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Ragineedu LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

C/o SC Community Hall in SC EE-DPRE- 40 Peddapalli Andugulapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Colony Peddapally

Construct the Balance Work of EE-DPRE- 41 Yadava Charitable Trust Peddapalli Rangampalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 0 0 0 Not started Peddapally Community Hall

Construct the Balance Work of EE-DPRE- 42 Peddapalli Appannapeta SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 490000 0 0 0 Not started SC Community Hall in SC Colony Peddapally

c/o Mera Sangham Community EE-DPRE- 43 Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started hall Peddapally

Amenities to Compound Wall EE-DPRE- 44 to SC Community Hall at Peddapalli Cheekurai SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 250000 0 0 0 Not started Peddapally Cheekurai

C/o. CC R/F H.No.2-8-66 to End EE-DPRE- 45 at Peddapalli Peddapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 0 0 0 Not started Peddapally 15 th Ward Peddapally

Providing of Electrical Poles and NPDCL, 46 Peddapalli Gopalaiahpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 140000 0 0 0 Not started conductor (25) Nos Peddapally

C/o. Gouda Community Hall at EE-DPRE- 47 Peddapalli Hanumanthunipet Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Hanumanthunipeta (V) Peddapally

NPDCL, 48 Electrical Poles at Mutharam(4) Peddapalli Mutharam SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 10000 0 0 0 Not started Peddapally

NPDCL, 49 Electrical Poles at Kapulapally(4) Peddapalli Kapulapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 10000 0 0 0 Not started Peddapally

DRWS&S Drilling of Bore Well near Nalla 50 Peddapalli Brahamanpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 60000 Engineer 0 0 0 Not started Pochamma Temple Peddapally

Drilling of Borewell and Erection DRWS&S 51 of Hand Pumpset at Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Bandalapally Peddapally

DRWS&S Drilling of Borewell and Erection 52 Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset at gollawada Peddapally LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Drilling of Borewell and Erection DRWS&S 53 of Hand Pumpset at Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Padmashaliwada Peddapally

DRWS&S Drilling of Borewell and Erection 54 Peddapalli Kapulapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset at Perukawada Peddapally

DRWS&S Drilling of Borewell and Erection 55 Peddapalli Kapulapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset at SC Colony Peddapally

DRWS&S Drilling of Borewell and Erection 56 Peddapalli Ragineedu Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset at Razakawada Peddapally

DRWS&S Drilling of Borewell and Erection 57 Peddapalli Ragineedu SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset at SC Colony Peddapally

Drilling of Borewell and Erection DRWS&S 58 of Hand Pumpset as Yadava Peddapalli Ragineedu Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Community Hall Peddapally

DRWS&S Drilling of Borewell and Erection 59 Peddapalli Gurrampally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset Peddapally

Drilling of Bore Well, Pumpset DRWS&S 60 at Kothapally Near Ambedkar Peddapalli Kothapally SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Statue Peddapally

Drilling of Borewell, Pumpset DRWS&S 61 and Pipeline at Yellamma Peddapalli Rangapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 60000 Engineer 0 0 0 Not started Temple Peddapally

DRWS&S Drilling of Borewell and Erection 62 Peddapalli Ragineedu SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Engineer 0 0 0 Not started of Hand Pumpset as Mala Colony Peddapally

C/o Gouda Community Hall at EE-DPRE- 63 Srirampur Mangapeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Mangapet Peddapally

C/o. Balance Work of EE-DPRE- 64 Community Hall at Oddera Srirampur Srirampur ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Colony in Srirmapur LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

EE-DPRE- 65 C/o Yadava Community Hall Srirampur Peddarathupalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally

EE-DPRE- 66 C/o Mudiraj Community Hal Srirampur Peddampeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally

C/o Cc Road from Sandilla EE-DPRE- 67 Rajaiah (H) to Korre Komuraiah Srirampur Ushanapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 240000 0 0 0 Not started Peddapally (H)

C/o CC Road from Shanker EE-DPRE- 68 Srirampur Ushanapally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 225000 0 0 0 Not started House to Medi Mallesh House Peddapally

NPDCL, 69 Electrical Poles at Kunaram (6) Srirampur Kunaram ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 15000 0 0 0 Not started Peddapally

DRWS&S Drilling of Borewell and Erection 70 Srirampur Mangapeta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset Peddapally

DRWS&S Drilling of Borewell and Erection 71 Srirampur Vennampally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset Peddapally

DRWS&S Drilling of Borewell and Erection 72 Srirampur Vennampally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset Peddapally

DRWS&S Drilling of Bore Well at 73 Srirampur Vennampally ST 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started Vennampallay Peddapally

C/o Gouda Community Hall at EE-DPRE- 74 Sulthanabad Poosala Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 450000 0 0 0 Not started Poosala Peddapally

C/o. B/W of Kurma Sangha EE-DPRE- 75 Sulthanabad Itharajpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Community Hall at Itharajpally Peddapally

C/o B/w of Shalivahana EE-DPRE- 76 Kummari Sangha Community Sulthanabad Bhoopathipoor Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Hall LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Construct the Balance Work of EE-DPRE- 77 Budiga Jangala Community Hall Sulthanabad Narayanraopalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started Peddapally in Budiga Jangala Colony

C/o. Gangaputra Community EE-DPRE- 78 Hall and Toilets in Gangaputra Sulthanabad Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Colony

Fishermen Co-operative Society EE-DPRE- 79 Sulthanabad Itharajpally Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started at Itherajaplle Peddapally

CC R/F Dulam Thirupathi(H) to EE-DPRE- 80 Sulthanabad Kodurupaka Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 350000 0 0 0 Not started Ch. Srinivas (h) Peddapally

B/W SC Community Hall at EE-DPRE- 81 Sulthanabad Kodurupaka SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 200000 0 0 0 Not started Kodurupaka Peddapally

Amenities to Compound Wall EE-DPRE- 82 to Yadhava Community Hall at Sulthanabad Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Yadhava nagar

C/o CC Road from Appala EE-DPRE- 83 Sulthanabad Kadambapur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 0 0 0 Not started Beeraiah (H) to Gunti Rajaiah (H) Peddapally

C/o CC Road Dam for Oora EE-DPRE- 84 Sulthanabad Chinnabonkur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Cheruvu at Chinna Bonkur Peddapally

C/o Culvert for Oora Cheruvu EE-DPRE- 85 Sulthanabad Chinnabonkur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Flood water at Chinna Bonkur Peddapally

C/o CC Road from Muthyala EE-DPRE- 86 Krishna Murthi House to Balla Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Odelu C/o CC Road from Chikkundu EE-DPRE- 87 Narsaiah (H) to Veeravena Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 0 0 Not started Peddapally Narsaiah (H) C/o CC Road from Gopidi Rami EE-DPRE- 88 Reddy House to Mallaiahpalle Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 300000 0 0 Not started Peddapally School C/o CC Road from Marri EE-DPRE- 89 Laxmaiah (H) to Gunda Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Kalavathi (H)

EE-DPRE- 90 C/o. of CC Road in SC Colony Sulthanabad Katnapalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally C/o. of Road from kandula Miyapur H/o. EE-DPRE- 91 Buchaiah Land to Upparapally Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 125000 0 0 0 Not started Perukapally Peddapally Myakala Mallaiah Land C/o,. of Road from Perkapally Miyapur H/o. EE-DPRE- 92 Narra Shankaraiah Land to Sulthanabad Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 25000 0 0 0 Not started Perukapally Peddapally Yerram Chetti Odelu LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Providing of Electrical poles and NPDCL, 93 Sulthanabad Poosala Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 138400 0 0 0 Not started conductor (24) Nos Peddapally

C/o. CC R./F Sunchula EE-DPRE- 94 Rajeshwari House to Sulthanabad Kodurupaka SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 40000 0 0 0 Not started Peddapally Bogamallaiah House

CC R/F Kallapelli Rajamallu (H) EE-DPRE- 95 Sulthanabad Kodurupaka SC 9/5/2018 Plg.II/43/CDP/2018-19 0 0 110000 0 0 0 Not started to Voodluri Lingaiah House Peddapally

DRWS&S Drilling of New Bore Well & 96 Sulthanabad Kodurupaka Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 100000 Engineer 0 0 0 Not started Pump Sets(3) Peddapally

DRWS&S Installation of RO Water Plant 97 Sulthanabad Bhoopathipoor Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 135000 Engineer 0 0 0 Not started 500 LPH Peddapally

EE-DPRE- 98 C/o. B/W of IKP Building Sulthanabad Regadimaddikunta Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 250000 0 0 0 Not started Peddapally

C/o. Balance Work to C/o. 40 KL DRWS&S 99 OHSR at Upparapally H/o. Sulthanabad Chinnakalvala Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 350000 Engineer 0 0 0 Not started Chinnakalvala Peddapally DRWS&S Drilling of Borewell and Erection 100 Sulthanabad Narayaranpur Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 50000 Engineer 0 0 0 Not started of Hand Pumpset Peddapally Construction of CC Road from EE-DPRE- 101 Tudi Kanakaiah (H) to Ogula Sulthanabad Katnapalli Gen 9/5/2018 Plg.II/43/CDP/2018-19 0 0 400000 0 0 0 Not started Peddapally Lachaiah (H) CC R/F R&B Road Bismilla (H) to EE DPRE, 102 Muddasani Janardhan Reddy(H) at Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started PEDDAPALLY Kangarthi(v)

CCR/F Veeramutti Beeraiah (H) to EE DPRE, 103 Odela Gudem General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Tipani Sadaiah (H) at Gudem(v) PEDDAPALLY

CC R/F Bustand to Bogi Cheralu (H) EE DPRE, 104 Odela Madaka General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started at Madaka(v) PEDDAPALLY

CCR/F Godugu Jampaiah (H) to EE DPRE, 105 Godugu Sadaiah (H) at Odela Shanagonda General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started PEDDAPALLY Shanagonda(v)

CCR/F Bandari surender (H) to EE DPRE, 106 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Bandari Srinivas(H) at Gumpula(v) PEDDAPALLY

CCR/F Eluvaka Shekaraiah(H) to EE DPRE, 107 Keshavapur hanman temple at Odela Gundlapalli General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started PEDDAPALLY Keshavapur H/o Gundlapalli(v)

CCR/F Dara Ramulu(H) to Meesala EE DPRE, 108 Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Chandru(H) at Jeelakunta(v) PEDDAPALLY LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 CCR/F Bodakunta Lasmaiah(H) to EE DPRE, 109 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started Panala Rajaiah(H) at Odela(v) PEDDAPALLY

CC R/F Racherla Banaiah (H) to Ila EE DPRE, 110 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 500000 450000 50000 0 0 0 Not started Roddamma (H) at Odela PEDDAPALLY

CC R/F Thulagani Sampath (H) to EE DPRE, 111 Thulagani Ramulu (H) Odela Goparapally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 0 0 0 Not started PEDDAPALLY Goparapalli(v)

CCR/F Janga Srinivasreddy(H) to EE DPRE, 112 Odela Goparapally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 0 0 0 Not started Janga Rajireddy(H) at Goparapalli(v) PEDDAPALLY

CCR/F Abbidi Sampath reddy(H) to EE DPRE, 113 Vangala Saireddy(H) at Odela namsanipally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 0 0 0 Not started PEDDAPALLY Namshanipalli(v) CC R/F Pulipaka Lachamma (H) to EE DPRE, 114 Pulipaka Laxmaiah (H) at Odela Upparapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY Upparapally

CCR/F Main road to Sandi EE DPRE, 115 Odela Komire General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Rajireddy (H)at Komire(v) PEDDAPALLY

CCR/F Kasarla Rajireddy (H) to EE DPRE, 116 Chinnakomire Bhulaxmi(H) at Odela Komire General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started PEDDAPALLY Komire(v)

CC R/F Mittapally Srinivas (H) to EE DPRE, 117 Odela Komire General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started Kannuri Saraiah (H) at Komire PEDDAPALLY

CCR/F R&B road to Pittala EE DPRE, 118 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Chandraiah at Pothkapalli(v) PEDDAPALLY

CCR/F Rudrarapu Mondaiah(H) to EE DPRE, 119 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Main road at pothkapalli(v) PEDDAPALLY

CC R/F Sattu Mogili (H) to EE DPRE, 120 Doddipalli Jampaiah (H) at Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started PEDDAPALLY Pothkapally

CC R/F Purushotham Swamy to EE DPRE, 121 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started Kallapelli at Kolanur PEDDAPALLY

CC R/F Peddapally R&B Road to EE DPRE, 122 Ireddy Sudhakarreddy (H) at Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started PEDDAPALLY Kolanur CC R/F Thumala Mallaiah (H) to EE DPRE, 123 Thota Kanukaiah (H) at Odela Haripuram General 9/5/2018 Plg.II/43/CDP/2018-19 400000 360000 40000 0 0 0 Not started PEDDAPALLY Haripuram(v)

CC R/F Devaraju (H) to Deva EE DPRE, 124 Eligaid Doolikatta General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Laxmirajam (H) at Dhoolikatta PEDDAPALLY

CC R/F Bongoni Rajkumar (H) to EE DPRE, 125 Busarapu Venkati (H) at Eligaid Muppirithota General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY Muppirithota LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 CC R/F Ravadi Pullarao (H) to Veldi EE DPRE, 126 Eligaid Sulthanpur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Damodar Rao (H) at Sulthanpur PEDDAPALLY

CC R/F Peddi Rajaiah (H) to EE DPRE, 127 Eligaid Lalapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Chegurla Ravi (H) at Lalapally PEDDAPALLY

CC R/F Poosala Road to Rapolu EE DPRE, 128 Eligaid narsapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Venktaiah (H) at Narsapur PEDDAPALLY

CC R/F R&B Road to Vengaldas EE DPRE, 129 Eligaid Eligaid General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Narayana (H) at Eligaid PEDDAPALLY

CC R/F R&B Road to Bire EE DPRE, 130 Eligaid Lokapet General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Ramaswamy (H) at Lokapet PEDDAPALLY

CC R/F Dugyala Thirupathi Rao (H) EE DPRE, 131 to Thadicherla Ramulu (H) at Eligaid Shivapalli General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY Shivapalli CC R/F Dubbasi Rajamma (H) to EE DPRE, 132 Racharla Lingaiah at Eligaid Burahanmiyapet General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 0 0 0 Not started PEDDAPALLY Burahanmiyapet

CC R/F Botla Kondamallaiah (H) to EE DPRE, 133 Julapalli Telukunta General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Padari Satthaah (H) at Telukunta PEDDAPALLY

CC R/F Bonkuri Lingaiah (H) to EE DPRE, 134 Samanapelli Pochalu (H) at Julapalli Peddapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY Peddapur

CC r/F Ragula Shanker (H) to PR EE DPRE, 135 Julapalli Wadkapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Road at Wadkapur PEDDAPALLY

CC R/F M.Rajaiah (H) to K.Rajaiah EE DPRE, 136 Julapalli Venkatraopally General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started (H) at Venkatraopally PEDDAPALLY

CC R/F Gollapalli Shankaraiah (H) EE DPRE, 137 Julapalli Kachapur General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started to PR Road at Kachapur PEDDAPALLY

CC R/F Edula Srinivas Reddy (H) to EE DPRE, 138 Julapalli Abbapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started E.Narayana Reddy at Abbapur PEDDAPALLY

CC R/F Ismalla Odelu (H) to Avula EE DPRE, 139 Julapalli Konaraopet General 9/5/2018 Plg.II/43/CDP/2018-19 250000 225000 25000 0 0 0 Not started Lachaiah (H) at Konaraopet PEDDAPALLY

CC R/F Gaddam Mohan Reddy (H) EE DPRE, 140 Julapalli Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 200000 180000 20000 0 0 0 Not started to Dadi Gopal (H) at Julapally PEDDAPALLY

CC R/F Thammidi Mondaiah (H) to EE DPRE, 141 Julapalli Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Cheduru Mahankali (H) at Julapally PEDDAPALLY

Construction of Cement Concrete EE DPRE, 142 Roads with out Drains at Eligaid Doolikatta General 9/5/2018 Plg.II/43/CDP/2018-19 1500000 1350000 150000 0 0 0 Not started PEDDAPALLY Dhoolikatta (V) of Eligaid (M) LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Construction of Cement Concrete EE DPRE, 143 Roads with out Drains at Peddapally Rangampalli General 9/5/2018 Plg.II/43/CDP/2018-19 5000000 4500000 500000 0 0 0 Not started PEDDAPALLY Rangampalli (V) of Peddapalli (M) Formation and Metalling Road EE DPRE, 144 From Yellamma Temple to Budha Eligaid Doolikatta General 9/5/2018 Plg.II/43/CDP/2018-19 5000000 4500000 500000 0 0 0 Not started PEDDAPALLY Stupam in Dhilikatta (V) CC R/F Jangam Gattamma (H) to EE DPRE, 145 Srirampur Vennampally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started R&B Road at Vennampally PEDDAPALLY CC R/F Manthini Narsaiah House to EE DPRE, 146 Srirampur Vennampally General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 0 0 0 Not started Peddamma Temple PEDDAPALLY CCR/F Ankampally R&B road to EE DPRE, 147 Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started chittikala Ravi (H) at Madipally(V) PEDDAPALLY CCR/F Ankampally R&B Road to sc EE DPRE, 148 colony Marapaka mondaiah (H) at Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 480000 432000 48000 0 0 0 Not started PEDDAPALLY Madipally (V) CC R/F Baba (H) to Pittala EE DPRE, 149 Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 0 0 0 Not started Bhumaiah (H) PEDDAPALLY CC R/F Pittala Bhumaiah (H) to EE DPRE, 150 Srirampur Madipally General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 0 0 0 Not started Ramveni Rajender (H) PEDDAPALLY CCR/F High Scholl to Marka EE DPRE, 151 Srirampur Tharupalli General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Mallaiah (H) at Tharupalli (V) PEDDAPALLY CC R/F Marka Mallaiah (H) to Bolli EE DPRE, 152 Srirampur Tharupalli General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Swamy PEDDAPALLY CCR/F SC Communiti Hall to EE DPRE, 153 Chippari Ravi (H) at Srirampur Chinnarathpalli General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started PEDDAPALLY Chinnarathpalli(V) CCR/F Ponaganti Nandam(H) to EE DPRE, 154 Srirampur Edulapur General 9/5/2018 Plg.II/43/CDP/2018-19 360000 324000 36000 0 0 0 Not started Siddam Madhavi(H) at Edulapur(V) PEDDAPALLY CCR/F Bandarapu Chinna EE DPRE, 155 Komuraiah(H) to Siddam Srirampur Edulapur General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY Rajaiah(H)at Edulapur(V) CC R/F Kotte Mogili (H) to Thotla EE DPRE, 156 Srirampur Mangapeta General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Rangaiah (H) at Mangapeta(V) PEDDAPALLY CC R/F Thotla Odelu (H) to EE DPRE, 157 Srirampur Mangapeta General 9/5/2018 Plg.II/43/CDP/2018-19 360000 324000 36000 0 0 0 Not started Peddamma Gudi PEDDAPALLY CC R/F Anganwadi-II to Avula EE DPRE, 158 Srirampur Mangapeta General 9/5/2018 Plg.II/43/CDP/2018-19 360000 324000 36000 0 0 0 Not started Pochalu (H) at Mangapet PEDDAPALLY CCR/F Satla Bhoomaiah (H) to EE DPRE, 159 Bandarapu Mallaiah (H) at Srirampur Kunaram General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 0 0 0 Not started PEDDAPALLY Kunaram(V) Dommati Mallesham House to EE DPRE, 160 Kotte Shankaraiah House at Srirampur Kunaram General 9/5/2018 Plg.II/43/CDP/2018-19 390000 351000 39000 0 0 0 Not started PEDDAPALLY Kunaram(V) CC R/F SC Community Hall to EE DPRE, 161 Srirampur Kunaram General 9/5/2018 Plg.II/43/CDP/2018-19 390000 351000 39000 0 0 0 Not started Mittapally Odelu (H) at Kunaram PEDDAPALLY CCR/F R&B Road to Gouda Sangam EE DPRE, 162 Srirampur Mirjampet General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started at Mirjampet(V) PEDDAPALLY EE DPRE, 163 CC R/F Gp Office to R&B Road Srirampur Mirjampet General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started PEDDAPALLY CCR/F Pachhi Venkatreddy (H) to EE DPRE, 164 Doddi pelli Laxmaiah (H)at Srirampur Mirjampet General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started PEDDAPALLY Mirjampet(V) LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 CC R/F Velchani Komuraiah (H) to EE DPRE, 165 Odela Indurthy General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 0 0 0 Not started Dasarapu Agaiah (H) at Indurthi(v) PEDDAPALLY CC R/F Dasarapu Agaiah (H) to EE DPRE, 166 Odela Indurthy General 9/5/2018 Plg.II/43/CDP/2018-19 240000 216000 24000 0 0 0 Not started Batkamma Banda PEDDAPALLY CC R/F Thatipelli Peddaodelu (H) to EE DPRE, 167 Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Gattu Sammaiah (H) PEDDAPALLY CC R/F Gattu Sammaiah (H) to ZPH EE DPRE, 168 Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started School PEDDAPALLY CC R/F ZPH School to Pendotha EE DPRE, 169 Odela Kanagarthi General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Narayana (H) PEDDAPALLY CC R/F Pillala Srinivas (H) to EE DPRE, 170 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Panjala Chandraiah (H) PEDDAPALLY CC R/F Panjala Chandraiah (H) to EE DPRE, 171 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Panjala Sadaiah (H) PEDDAPALLY CC R/F Panjala Sadaiah (H) to EE DPRE, 172 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 0 0 0 Not started Sakinala Odelu (H) PEDDAPALLY CC R/F Sottku Ellaiah (H) to EE DPRE, 173 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Thirupathi Reddy Statue PEDDAPALLY CC R/F Bandari Chinna Odelu (H) EE DPRE, 174 Odela Gumpula General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 0 0 0 Not started to Kotte Raju (H) PEDDAPALLY CCR/F Doddipalli Odelu(H) to EE DPRE, 175 Veenavanka rajaiah(H) at Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 255000 229500 25500 0 0 0 Not started PEDDAPALLY Jeelakunta(v) Vangala Narayana Reddy (H) to EE DPRE, 176 Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 390000 351000 39000 0 0 0 Not started Vangala Sammireddy(H) PEDDAPALLY Karra Jaipal Reddy (H) to Dasari EE DPRE, 177 Odela Jeelakunta General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Komal Reddy PEDDAPALLY CCR/F Bodakunta .Rajaiah(H) to EE DPRE, 178 Gadigopula Shankaraiah .(H) at Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY Odela(v) CC R/F Gadigopula Shankaraiah (H) EE DPRE, 179 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started to Bodukunta Kanakaiah (H) PEDDAPALLY

CC R/F Gadi goppula Mallaiah (H) EE DPRE, 180 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started to Donthu .Ramesh (H) at Odela(v) PEDDAPALLY CC R/F Donthu Ramesh (H) to EE DPRE, 181 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Poloju Ramesh (H) PEDDAPALLY CC R/F Gatike Ramaiah (H) to Gorla EE DPRE, 182 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Sathaiah (H) at Odela PEDDAPALLY CC R/F Gorla Sathaiah (H) to EE DPRE, 183 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Kandula Sathaiah (H) PEDDAPALLY CC R/F Kommu.Thirupathi (H) to EE DPRE, 184 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Ch.Venkata Swamy (H) at Odela(v) PEDDAPALLY CC R/F Ch.Venkata Swamy (H) to EE DPRE, 185 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Enagandula Sathaiah (H) PEDDAPALLY CC R/F Eambadi.Sammaiah (H) to EE DPRE, 186 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Biyyala Chandraiah (H) at Odela(v) PEDDAPALLY CC R/F Biyyala Chandraiah (H) to EE DPRE, 187 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Ramineni Swamy (H) PEDDAPALLY Boyini Chinna Ramulu House to EE DPRE, 188 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 435000 391500 43500 0 0 0 Not started D/86 Canal PEDDAPALLY LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Brahmanpandli Narsaiah house to EE DPRE, 189 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 285000 256500 28500 0 0 0 Not started Akkinapally Raamaiah house PEDDAPALLY R&B road to Boge Ramchandram EE DPRE, 190 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 480000 432000 48000 0 0 0 Not started house PEDDAPALLY Meenugu Sampath house to V. EE DPRE, 191 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 0 0 0 Not started Jampaiah house PEDDAPALLY Manda Mallaiah house to Putta EE DPRE, 192 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Sudhakar House PEDDAPALLY Diddigi Ramchandram house to EE DPRE, 193 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 0 0 0 Not started Bongone Mondaiaha house PEDDAPALLY Marka Parashu Ramaulu house to EE DPRE, 194 Odela Odela General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 0 0 0 Not started Pendam Sadanandam PEDDAPALLY Goggulouth Devilal (H) to EE DPRE, 195 Odela Abbidipally Thanda General 9/5/2018 Plg.II/43/CDP/2018-19 180000 162000 18000 0 0 0 Not started Goggulout Vajram (H) PEDDAPALLY EE DPRE, 196 Bukyavenu (H) to Dibla Nayak (H) Odela Abbidipally Thanda General 9/5/2018 Plg.II/43/CDP/2018-19 210000 189000 21000 0 0 0 Not started PEDDAPALLY CCR/F Korapati Rajanna (H) to EE DPRE, 197 Mulugu Sammaiah (H) at Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started PEDDAPALLY Pothkapalli(v) CC R/F Sudhaveni Nagaiah (H) to EE DPRE, 198 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Pasaragonda Shankar (H) PEDDAPALLY Alladi Shanker Lingam (H) ot EE DPRE, 199 Odela Pothkapally General 9/5/2018 Plg.II/43/CDP/2018-19 750000 675000 75000 0 0 0 Not started Church PEDDAPALLY CC R/F Thota Mondaiah (H) to EE DPRE, 200 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Chinnala Bhumaiah (H) at Kolanur PEDDAPALLY CC R/F Chinnala Bhumaiah (H) to EE DPRE, 201 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Kshetti Rajaiah (H) PEDDAPALLY CC R/F R&B Road to Uppu Rajaiah EE DPRE, 202 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started (H) PEDDAPALLY CC R/F Koluri Kumar (H) to EE DPRE, 203 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Thotapalli Mallaiah (H) PEDDAPALLY CC R/F R&B Road to Bodasi EE DPRE, 204 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Mallaiah (H) at Kolanoor(v) PEDDAPALLY CC R/F Bodasi Mallaiah (H) to EE DPRE, 205 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Pallapu Mallesh (H) PEDDAPALLY CC R/F Kallapelli Thirupathi (H) to EE DPRE, 206 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Maturi Punnaiah (H) at Kolanoor(v) PEDDAPALLY CC R/F SC Colony School to Dodda EE DPRE, 207 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Rajaiah (H) PEDDAPALLY CC R/F Maturi Anjaiah (H) to EE DPRE, 208 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Maturi Lingaiah (H) PEDDAPALLY Thota Lingaiah (H) to Thotapalli EE DPRE, 209 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 600000 540000 60000 0 0 0 Not started Mallaiah (H) PEDDAPALLY Ireddy Kishan Reddy (H) to Janga EE DPRE, 210 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 450000 405000 45000 0 0 0 Not started Banda Reddy (H) PEDDAPALLY Pulla Balaiah (H) to SC Community EE DPRE, 211 Odela Kolanoor General 9/5/2018 Plg.II/43/CDP/2018-19 750000 675000 75000 0 0 0 Not started Hall PEDDAPALLY CC R/F ZP High School to R&B Road EE DPRE, 212 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 2375000 2137500 237500 0 0 0 Not started via SC Colony at Appannapet PEDDAPALLY CC R/F SRSP Canal to Pidugu EE DPRE, 213 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 1175000 1057500 117500 0 0 0 Not started Pochalu (H) PEDDAPALLY Bolla Srinivas (H) to Mende Kumar EE DPRE, 214 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 575000 517500 57500 0 0 0 Not started House PEDDAPALLY LIST OF FRESH WORKS WHICH HAS NOT STARETED ON GROUND (NOT STARETED) UNDER THE DEVELOPMENTAL SCHEME OF CDP OF PEDDAPALLY DISTRICT FOR THE YEAR 2018-19 Peddapalli Assembly Constituency MLA: SRI. D. MANOHAR REDDY

Name of the District: Peddapalli

Status of the Area 1ST Date of Estimated MGNREGS Scheme Fund Executive Date of Date of 2ND & Final Cumulative Work(Comp/ Sl. No. Description Mandal Village (SC/ST/Ge Proceedings No. INSTALL Sanction Cost in Rs. FUND In Rs. Agency Release Releases Installment Total Prog/Not n) MENT Started) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Bobbili Yellaiaha (H) to Rechaveni EE DPRE, 215 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started Gondaiah PEDDAPALLY Pidugu Mallaiah (H) to Avuleni EE DPRE, 216 Peddapally Appannapet General 9/5/2018 Plg.II/43/CDP/2018-19 150000 135000 15000 0 0 0 Not started Kumara Swamy House PEDDAPALLY CC Road from Nalla Jalpath EE DPRE, 217 Reddy (H) to Boda Narsimha Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 350000 315000 35000 0 0 0 Not started PEDDAPALLY Reddy (H) at Konaraopet CC Road from Nalla Ram Reddy EE DPRE, 218 (H) to Primary School at Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 260000 234000 26000 0 0 0 Not started PEDDAPALLY Konaraopet CC Road from Mallarapu EE DPRE, 219 Rajaiah (H) to Mallarapu Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 260000 234000 26000 0 0 0 Not started PEDDAPALLY Kondaiah (H) at Konaraopet CC Road from Avula Rajamallu EE DPRE, 220 (H) to Baddam Ram Reddy (H) Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY at Konaraopet CC Road from Kampelli EE DPRE, 221 Rajaiah(H) to Mallarapu Rajaiah Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 499000 449100 50000 0 0 0 Not started PEDDAPALLY (H) at Konaraopet CC Road from Balengal EE DPRE, 222 Vishwanatham (H) to M. Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 499000 449100 50000 0 0 0 Not started PEDDAPALLY Chandraiah (H) at Konaraopet CC Road from Bandari Rada (H) EE DPRE, 223 to Aashadapu Srinivas (H) at Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 499000 449100 50000 0 0 0 Not started PEDDAPALLY Konaraopet CC Road from Sangasani Raja EE DPRE, 224 Ram Reddy (H) to A. Mallesham Julapally Julapally General 9/5/2018 Plg.II/43/CDP/2018-19 300000 270000 30000 0 0 0 Not started PEDDAPALLY (H) at Konaraopet 56917000 51225300 29217000 0 0 0 PROFORMA -I(a) Physical & Financial Progress Report under CDP Report of Peddapally District Progress report on MLA quota/District Minister quota wise releases and expenditure incurred under CDP (Rs.In lakhs)

e t t Total No. of Proposals received Total No. of works sanctioned Works Completed No. of works Not started Works in progress e e l

Funds Total c n h c i b t

Quota Name of the r u

n a t Sl. No. Name of the MLA/MLC received from Expenditure l a o h i s l t

(MLA/DIM) Constituency i a i a Incurred Incurred m Govt. incurred d v a B No. Esti. Cost No. Esti. Cost No. Esti. Cost No. Esti. Cost No. Esti. Cost w Expenditure Expenditure a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Name of the District: PEDDAPALLY Funding Year: 2014-2015

1 MLA Peddapally 7500000 31 7462500 31 7462500 13 3085000 3003129 0 0 18 4377500 0 3003129 4496871 Sri. D.Manohar Reddy 1 DIM Peddapally 7500000 33 7462500 33 7462500 20 4577500 4384657 0 0 13 2885000 0 4384657 3115343

15000000 64 14925000 64 14925000 33 7662500 7387786 0 0 31 7262500 0 7387786 7612214

Funding Year: 2015-2016

1 Sri. D.Manohar MLA Peddapally 7500000 36 7500000 36 7500000 24 4700000 4508288 9 2150000 3 650000 557142 5065430 2434570 1 Reddy DIM Peddapally 7500000 38 7250000 38 7250000 21 3650000 3350683 13 2600000 4 1000000 891010 4241693 3258307 15000000 74 14750000 74 14750000 45 8350000 7858971 22 4750000 7 1650000 1448152 9307123 5692877 Funding Year: 2016-2017

Sri. D.Manohar 1 MLA Peddapally 30000000 205 29832963 205 29832963 117 10411000 10160138 60 7774200 28 1560000 7051396 17211534 12788466 Reddy

Funding Year: 2017-2018 Sri. D.Manohar 1 MLA Peddapally 30000000 182 29724176 182 29724176 62 4389176 4185828 91 15777000 29 9558000 8189908 12375736 17624264 Reddy

Funding Year: 2018-2019

Sri. D.Manohar 1 MLA Peddapally 4500000 224 29217000 224 29217000 0 0 0 0 0 0 0 0 0 4500000 Reddy

Chief Planning Officer Peddapalli District