2 Victoria Avenue, Perth, WA Affinity Village Club House, Baldivis, WA

Total Page:16

File Type:pdf, Size:1020Kb

2 Victoria Avenue, Perth, WA Affinity Village Club House, Baldivis, WA CASE STUDIES 2013 1 2 Victoria Avenue, Perth, WA 54 2 Affinity Village Club House, Baldivis, WA 58 3 ANZ Centre, Melbourne, VIC 60 4 Darling Quarter, Sydney, NSW 62 5 Green and ‘future proofed’: ISPT’s Green Star portfolio 66 6 Lend Lease: Greening the residential sector one apartment at a time 68 7 McDonald’s Kilsyth South Restaurant, Melbourne, VIC 70 8 Metcash Distribution Centre, Sydney, NSW 74 9 Monash University Briggs Hall and Jackomos Hall, Melbourne, VIC 78 10 Sydney Water Corporate Headquarters, Sydney, NSW 82 11 The GPT Group Head Office Fitout, Sydney, NSW 86 12 The Key Spec 1, Keysborough, VIC 90 53 CASE STUDY 1 2 VICTORIA AVENUE 2 Victoria Avenue may seem small when compared to some of its high-rise counterparts in the Perth CBD, but as the very first project in Western Australia to achieve Green Star As Built certification, 2 Victoria Avenue represents big thinking, big sustainability and big leadership. A showcase office development, 2 Victoria Avenue is the first in Western Australia to achieve the Green Star certification ‘trifecta’ of Design, As Built and Interiors ratings. And, through the sustainable initiatives implemented and the achievement of Green Star certified ThE project ratings across all project phases, Stockland at A glANCE has delivered a ‘future-proofed’ asset that will deliver ongoing benefits through a 6 Star Green Star – Office Design v2 quality indoor environment and operational rating representing ‘World Leadership’ cost savings. in environmentally sustainable design When asked why it was so important 5 Star Green Star – Office As Built v2 for Stockland to achieve a Green Star and 5 Star Green Star – Office As Built rating for the development – Interiors v1.1 ratings representing a first in the Perth market – Stockland’s ‘Australian Excellence’ in Environmental Sustainability Manager, environmentally sustainable Greg Johnson, gives a simple answer. construction and interiors “Sustainability is embedded in The first development in Western our entire business and we have been Australia to achieve Green Star achieving Green Star ratings across a range As Built certification. 1 of sectors since 2008. The achievement of a Green Star As Built rating was a key 54 We“ set out to deliver a flexible and sustainable 5 Star Green Star - rated office building that could ‘stand the test of time.’ pROJECT DETAIlS Owner ”Greg Johnson Stockland Environmental Sustainability Manager Stockland Location 2 Victoria Avenue, Perth, Western Australia Size 7,200 square metres NLA Project TEAM commitment from the beginning of the Architect/Landscaping Consultant project. The As Built rating authenticates the Woodhead design of the building and will ensure that 2 Victoria Avenue can meet our tenants’ WhAT 2 vICTORIA Project Manager APP needs for a high performance, sustainable AvENUE AChIEvED: office space, now and into the future.” Structural/Civil Engineer Johnson explains that while Water Arup Stockland’s initial objective was to obtain a Reducing 2 Victoria Avenue’s 5 Star Green Star – Office Design v2 rating reliance on potable water consumption Main Contractor Diploma Civil Construction for the base building design, an aspirational was a top priority for the project team through approach to sustainability and partnership the building’s design and construction. Building Service Engineer/ with industry leaders enabled the developer “We are very conscious of the impact of local ESD Consultant to go one step further to achieve a ‘World conditions. At a time when Western Australia AECOM Leadership’ 6 Star Green Star – Office was in the throes of drought and with utility Design rating. prices ever on the rise, achieving the best “When it came to construction, possible water conservation outcome was we again decided to target 5 Star Green very important,” explains Johnson. For the As Star, and were pleased to achieve this Built submission, the project achieved 11 of level of certification for both the base the 13 points available under the Green Star building and our own fitout. Changing ‘Water’ category, scoring all available points circumstances meant that there were a for potable water efficiency. few aspects of the original design that Water is captured from 5 Star couldn’t be practically implemented WELS-rated showers and taps before being through construction, but the building has diverted for treatment by the building’s proven extremely successful nonetheless. onsite greywater system. This treated water We are thrilled with the way the building provides 100 per cent of water used for toilet is performing three years on, and pleased flushing across the development. Waterless with the recognition we have received for urinals further reduce water consumption our leadership in achieving a Green Star and fire test water is returned to the onsite As Built rating,” says Johnson. storage tank to be reused for site irrigation. 55 1 56 CASE STUDY / 2 Victoria AveNUe Together, the water efficiency measures implemented at 2 Victoria Avenue are conserving up to 4.4 million litres per year, a saving that equates to nearly two Olympic-sized swimming pools. Now a relatively common feature in the Australian commercial office sector, at the time that 2 Victoria Avenue was designed greywater treatment had never been implemented in a commercial building within the Perth CBD. Through the successful installation of the system, 2 Victoria Avenue became the Western Australian ‘test case’ for greywater. Project ESD Consultant, Graham Agar of AECOM explains how the implementation of the system at 2 Victoria Avenue has paved the way for recycled water treatment within the Perth market. “2 Victoria Avenue was one of the first projects to achieve an approval in principal for the design of the system, but the first Perth CBD project to have the system tested, commissioned and approved for operation. The commissioning, testing and reporting procedure required to be undertaken is now well understood by both contractors and the Western Australian Department of Health, Energy Although the wind-turbine technology meaning future projects will benefit from The energy efficiency initiatives was not implemented, Johnson is proud of the lessons learnt at 2 Victoria Avenue.” at 2 Victoria Avenue, which include T5 the leadership that Stockland and AECOM lighting, sub-metering and motion-sensors, were able to demonstrate by incorporating IEQ zoned lighting, and active chilled beam air the turbines into the building’s design. In addition to the pioneering approach conditioning, together save the building around “Knowing what we know now, we might have taken to the delivery of environmentally 50kg of CO2 per square metre of net lettable looked to other alternative energy generation sustainable outcomes, fitout flexibility, area each year – equating to a saving of initiatives, but at the time we were committed occupant amenity and indoor environment approximately 350 tonnes of CO2 each year to the turbines not only for their energy- quality (IEQ) were all high priorities. At the and around $61,000 in electricity costs. generation capacity, but as a way of visually time that the building was designed, For its Green Star – Office Design rating, demonstrating our environmental commitment the Perth market was at the peak of the 2 Victoria Avenue was recognised with a to the community. We’ve achieved great resources boom and the building was Green Star ‘Innovation’ point for the inclusion results for energy from other initiatives, so in specifically designed to accommodate the of three 2.5kW wind-powered helical turbines, the end I think we came out ahead. You never staff fluctuation and workforce mobility typical capable of generating between 6,600 know if you don’t try,” he concludes. to the resources sector. Floor plates can be and 9,600 kWh per year. However, public It is clear that the leadership shown easily reconfigured to accommodate multiple concerns and technology barriers meant that and the knowledge and experience gained tenancies, which are individually monitored the turbines were not installed at the time from 2 Victoria Avenue has inspired other and controlled to maximise energy-usage of construction. developers and project teams in Western efficiencies across the building. The building’s “The wind turbines were ideal on paper Australia to strive for Green Star ratings. active western façade incorporates but, as project teams so often discover, when Nowhere is this more evident than the automated shading, which acts to increase it came to implementation, there were external exponential growth in Green Star certifications occupant comfort by managing glare and concerns raised and risks identified with the achieved in Western Australia in 2012 – triple heat gain. The specification of low-volatile technology. As a developer, it’s important to that of the year before. By pioneering green organic compound (VOC) finishes and understand that no building exists or functions technologies and sharing their successes, low-formaldehyde wood composite products in isolation. In view of this, the decision was the 2 Victoria Avenue project team has throughout also make 2 Victoria Avenue a made not to pursue the implementation of forged a new, more sustainable path healthy and comfortable place to work. the turbines,” says Johnson. for the urban landscape of Perth. 57 CASE STUDY 2 AFFINITY VILLAGE CLUB HOUSE A Green Star rating leaves a community building, and individual metering ThE project with a lasting legacy – and a cost effective and motion sensors
Recommended publications
  • Focus Minerals Limited
    Focus Minerals Limited ABN 56 005 470 799 Interim Financial Report for the half year ended 30 June 2020 Page | 1 Table of Contents Corporate Information ...................................................................................................................................................... 3 Directors’ Report ............................................................................................................................................................... 4 Auditor’s Independence Declaration ............................................................................................................................... 6 Interim Financial Report ................................................................................................................................................... 7 Notes to the Consolidated Interim Financial Report .................................................................................................... 11 Directors’ Declaration ..................................................................................................................................................... 16 Independent Auditor’s Review Report .......................................................................................................................... 18 Page | 2 Corporate Information ABN 56 005 470 799 Directors Dianfei Pei Chairman - Non-Executive, Non-Independent Zhaoya Wang Director – Executive Gerry Fahey Director – Independent Zaiqian Zhang Director – Executive (Resigned 9 October 2020)
    [Show full text]
  • Annual Report 2010 Aerial Photo of the Burrup Peninsular Showing MMA’S Supply Base in the Foreground
    Annual Report 2010 Aerial photo of the Burrup Peninsular showing MMA’s supply base in the foreground. “MMA, in line with its growth strategy, has continued to invest in its fleet and Supply Base infrastructure spending a total of $109 million over the past year. Four new vessels were purchased including a larger 8,000bhp vessel, the Mermaid Vision.” Tony Howarth - Chairman Key Highlights • $37 million upgrade for Gorgon Project completed • Main wharf development drives increased earnings • Ongoing scope for future development and new clients Mermaid Marine Australia Limited ABN 21 083 185 693 Corporate Directory Directors Tony Howarth Chairman Jeffrey Weber Managing Director James Carver Executive Director Mark Bradley Non-Executive Director Andrew Edwards Non-Executive Director Company Secretary Dylan Darbyshire-Roberts Registered Office Endeavour Shed, 1 Mews Road FREMANTLE WA 6160 Tel: 61 8 9431 7431 Fax: 61 8 9431 7432 Email: [email protected] Web: www.mma.com.au Auditors Deloitte Touche Tohmatsu Chartered Accountants Level 14, Woodside Plaza 240 St Georges Terrace PERTH WA 6000 Tel: 61 8 9365 7000 Fax: 61 8 9365 7001 Solicitors Blake Dawson Level 32, Exchange Plaza 2 The Esplanade, PERTH WA 6000 Tel: 61 8 9366 8000 Fax: 61 8 9366 8111 Bankers National Australia Bank Limited 100 St Georges Terrace PERTH WA 6000 Tel: 1300 889 398 Fax: 61 8 9441 9282 Contents Chairman’s Address 4 Managing Director’s Review of Operations 6 Corporate Governance Statement 14 Directors’ Report 20 Auditor’s Independence Declaration 36 Audit Report 37 Directors’ Declaration 39 Statement of Comprehensive Income 42 Statement of Financial Position 43 Statement of Changes in Equity 44 Statement of Cash Flow 45 Notes to the Financial Statements 46 Additional Stock Exchange Information 88 4 Mermaid Marine Australia Limited Annual Report 2010 Chairman’s Address I am pleased to report that 2010 was another year of strong for the oil and gas industry for over 40 years.
    [Show full text]
  • 15 August 2013 the Manager Company Announcements
    15 August 2013 The Manager Company Announcements Australian Stock Exchange Limited Level 8, Exchange Plaza 2 The Esplanade Perth WA 6000 2013 Annual Financial Report The Directors of Mineral Resources Limited (Company) (ASX:MIN) are pleased to present the 2012/13 Financial Report to the markets. HIGHLIGHTS: Record revenue generated of $1. 097 billion; EBITDA of $385.0 million, 29% greater than the previous year; Net profit after tax of $180.4 million, 2% greater than the previous year; Fully franked final dividend of 32.0 cents per share declared; and Improved second half earnings, a result of: o Improved mining services business performance, and o Second half recovery of iron ore earnings due to improved prices; a weakening Australian dollar; and increased volumes. The Company has produced another record result for the year with a 2% improvement in earnings1. This result is in keeping with expectations and represents a significant improvement during the second half of the year. Both Mining Services and Mining activities achieved their respective performance targets substantiating the Company’s sound business model. Expansion of the business continued as planned this year: Contracting volumes have increased with six crushing contracts commencing operations through the year, augmented by the solid contributions from PIHA and a broadening of the service base into accommodation and materials handling activities. Mining operations produced an outstanding result despite low iron ore prices in the first half of the financial year, with iron ore export volumes 44% greater than in the previous year. Carina is now progressing towards its optimum output and the new Phil’s Creek mine is beginning to contribute to export volumes.
    [Show full text]
  • Abn 63 111 306 533 Half Year Financial
    ABN 63 111 306 533 HALF YEAR FINANCIAL REPORT FOR THE HALF YEAR ENDED 30 JUNE 2015 CORPORATE DIRECTORY DIRECTORS CONTACT DETAILS Zuyuan He (Non-executive Chairman) Website: www.energymetals.net Weidong Xiang (Managing Director) Email [email protected] Lindsay Dudfield (Non-executive Director) Telephone: + 61 8 9322 6904 Geoffrey Jones (Non-executive Director) Facsimile: + 61 8 9321 7950 Yu Zhong (Non-executive Director) Jianhua Xing (Non-Executive Director) Zimin Zhang (Non-Executive Director) REGISTERED OFFICE COMPANY SECRETARY Level 2, 8 Colin Street Xuekun Li WEST PERTH WA 6005 POSTAL ADDRESS STOCK EXCHANGE LISTING PO Box 1323 Australian Securities Exchange WEST PERTH WA 6872 ASX Code: EME AUDITORS SOLICITORS Deloitte Touche Tohmatsu Minter Ellison 240 St Georges Terrace Allendale Square Level 14 Woodside Plaza 77 St George’s Terrace PERTH WA 6000 PERTH WA 6000 SHARE REGISTRY BANKERS Security Transfer Registrars Pty Ltd National Australia Bank 770 Canning Highway 100 St Georges Terrace APPLECROSS WA 6153 PERTH WA 6000 Telephone: + 61 8 9315 2333 Facsimile: + 61 8 9315 2233 DIRECTORS’ REPORT Your Directors present the financial statements of Energy Metals Limited and its controlled entities at the end of, or during, the half-year ended 30 June 2015. DIRECTORS The names of the Directors in office during the half-year and at the date of this report are as follows. Directors were in office for this entire period unless otherwise stated: Zuyuan He (Chairman) Weidong Xiang (Managing Director) Lindsay George Dudfield (Non-executive Director) Geoffrey Michael Jones (Non-executive Director) Yu Zhong (Non-executive Director) Jianhua Xing (Non-executive Director) Zimin Zhang (Non-executive Director) REVIEW OF OPERATIONS The Company reported a net loss of $601,539 for the half-year ended 30 June 2015 (2014: a net loss of $269,645).
    [Show full text]
  • Mineral and Petroleum Statistics Digest 2017-18
    Government of Western Australia Department of Mines, Industry Regulation and Safety WESTERN AUSTRALIAN MINERAL AND PETROLEUM STATISTICS DIGEST Disclaimer Information provided in this digest is made available without charge, as a public service, in good faith. The information provided is derived from sources believed to be reliable and accurate at the time of publication. However, use of the information in the digest is at your own risk. The digest is provided solely on the basis that users will be responsible for making their own assessment of the information provided therein and users are advised to verify all representations, statements and information for decisions that concern the conduct of business that involves monetary or operational consequences. Each user waives and releases the Department of Mines, Industry Regulation and Safety and the State of Western Australia and its servants to the full extent permitted by law from all and any claims relating to the use of the material in the digest. In no event shall the Department of Mines, Industry Regulation and Safety or the State of Western Australia be liable for any incidental or consequential damages arising from any use or reliance on any material in this digest. Prices and values provided are in Australian dollars, unless otherwise stated. There may be some discrepancies in percentages owing to the rounding of values. Copyright © 2018 Copyright in this document is reserved to the State of Western Australia. Reproduction except in accordance with copyright law is prohibited. Cover
    [Show full text]
  • Annual Report 2009 How to Use This Report
    Annual Report 2009 How to use this report The buttons to the right of every page (also pictured below) are intended to aid navigation through this report. Where the button appears in pale blue the relevant action is not available for that specific page. See example of help page button below: The function for each button is explained below: Go to contents page Go to next page Go to previous page Return to start of current section Full screen view on / off Go to help page Go to contact page Mermaid Marine Australia Limited ABN 21 083 185 693 Corporate Directory Directors Tony Howarth Chairman Jeffrey Weber Managing Director James Carver Executive Director Jeffrey Mews Non-Executive Director Mark Bradley Non-Executive Director Company Secretary Dylan Darbyshire-Roberts Registered Office Eagle Jetty, 20 Mews Road FREMANTLE WA 6160 Telephone: 61 8 9431 7431 Facsimile: 61 8 9431 7432 Email: [email protected] Internet: www.mma.com.au Auditors Deloitte Touche Tohmatsu Chartered Accountants Level 14, Woodside Plaza 240 St Georges Terrace, PERTH WA 6000 Telephone: 61 8 9365 7000 Facsimile: 61 8 9365 7001 Solicitors Blake Dawson Level 32, Exchange Plaza 2 The Esplanade, PERTH WA 6000 Telephone: 61 8 9366 8000 Facsimile: 61 8 9366 8111 Bankers National Australia Bank Limited 100 St Georges Terrace, PERTH WA 6000 Telephone: 1300 889 398 Facsimile: 61 8 9441 9282 Contents Chairman’s Address 5 Managing Director’s Review of Operations 6 Corporate Governance Statement 14 Directors’ Report 19 Auditor’s Independence Declaration 33 Audit Report 34 Directors’ Declaration 36 Income Statement 38 Balance Sheet 39 Statement of Changes in Equity 40 Cash Flow Statement 42 Notes to the Financial Statements 43 Additional Stock Exchange Information 86 MMA Board of Directors MMA’s ongoing development and success is a strong endorsement of the performance of the Company’s Board, management and employees.
    [Show full text]
  • Australian Geoscience Information Association Inc
    AUSTRALIAN GEOSCIENCE INFORMATION ASSOCIATION INC. NATIONAL COMMITTEE 2012–13 PRESIDENT VICE-PRESIDENT ANGELA RIGANTI JENNY MIKUCKI WA Geology Online Content Manager Upstream Technical Computing Team Lead GSWA, Chevron Australia Pty Ltd Department of Mines and Petroleum, L15, QV1, 100 Plain Street, 250 St Georges Terrace EAST PERTH WA 6004 PERTH WA 6000 PH: (08) 9222 3063 PH: (08) 9485 5176 FAX: (08) 9222 3633 FAX: (08) 9216 4353 Email: [email protected] Email: [email protected] LinkedIn: http://au.linkedin.com/pub/angela- LinkedIn: http://au.linkedin.com/pub/jenny- riganti/50/90/744 mikucki/4b/31b/191 SECRETARY TREASURER LYN TROUCHET SANDY HAYWARD Barrick Gold of Australia Limited 18 Ord Street Level 9, Brookfield Place, NEDLANDS WA 6009 125 St Georges Terrace, PH: (08) 6162 8841, PERTH WA 6000 M: 0417 095227 PH: (08) 6318 5880 Email: [email protected] FAX: (08) 6318 5555 Email: [email protected] MEMBERSHIP SECRETARY NEWSLETTER EDITOR and SOCIAL MEDIA COORDINATOR KERRY SMITH c/o Department of Information Studies VANESSA JOHNSON School of Media, Culture & Creative Arts IM Analyst Curtin University of Technology Technical Library GPO Box U1987, Shell Development (Australia) Pty Ltd PERTH WA 6845 2 Victoria Ave PH: (08) 9266 7217 PERTH WA 6000 FAX: (08) 9266 3152 PH: (08) 9338 6000 EmaiL: [email protected] Email: [email protected] LinkedIn: http://au.linkedin.com/pub/kerry- LinkedIn: http://au.linkedin.com/pub/vanessa- smith/52/730/425 johnson/17/930/7b5 COMMITTEE MEMBER COMMITTEE MEMBER MARGARET
    [Show full text]
  • Western Australia Mineral and Petroleum Statistics Digest 2012
    WESTERN AUSTRALIA MINERAL AND PETROLEUM STATISTICS DIGEST 2012 Disclaimer Information provided in this Digest is made available without charge, as a public service, in good faith. The information provided is derived from sources believed to be reliable and accurate at the time of publication. However, use of the information in the Digest is at your own risk. The Digest is provided solely on the basis that users will be responsible for making their own assessment of the information provided therein and users are advised to verify all representations, statements and information for decisions that concern the conduct of business that involves monetary or operational consequences. Each user waives and releases the Department of Mines and Petroleum and the State of Western Australia and its servants to the full extent permitted by law from all and any claims relating to the use of the material in the Digest. In no event shall the Department of Mines and Petroleum or the State of Western Australia be liable for any incidental or consequential damages arising from any use or reliance on any material in the Digest. Copyright © 2013 Copyright in this document is reserved to the State of Western Australia. Reproduction except in accordance with copyright law is prohibited. LIST OF FIGURES, TABLES AND MAPS FIGURES Figure 1 Mining Investment 5 Figure 46 Nickel Quantity 16 Figure 2 New Capital Investment 5 Figure 47 Heavy Mineral Sands Value of Production 16 Figure 3 Mineral Exploration Expenditure 5 Figure 48 Gold Production 16 Figure 4 Petroleum
    [Show full text]
  • Table of Contents
    Brookfield Place Tower 2 Welcome Book June 2020 Page 1 of 24 Welcome Welcome to your new home! Brookfield is pleased to provide this welcome book, created exclusively for Brookfield Place Tower 2 tenants. This welcomebook will assist you to become familiar with the Brookfield Place precinct, its features, facilities, policies, procedures and of course, the on site team. Content in this welcome book will be updated from time to time to ensure information remains current and accurate. Any queries relating to Brookfield Place Tower 2 can be directed to: Brookfield Place Building Management Office Level B2, 123 St Georges Terrace Perth WA 6000 Phone 08 6244 7711 Website www.brookfieldplaceperth.com (includes retailer information and events) www.brookfieldproperties.com (corporate site and tenant information portal for Brookfield portfolio) Our team looks forward to providing you with the highest level of service and support. We strive to make a meaningful contribution to your success in your tenancy. Figure 1: Brookfield Place Surroundings Brookfield Place Tower 2 Welcome Book June 2020 Page 2 of 24 MANAGEMENT OFFICE AND OPERATIONS Concierge For the convenience of all tenants and visitors, the Brookfield Place Tower 2 concierge is located in the lobby. The concierge will assist with general enquiries (tenant directory service and information on Brookfield Place precinct events, food and beverage within the precinct and other tenant services available). We encourage you to contact the concierge. Phone 08 6244 7734 Email [email protected] Brookfield Place Tower 2 Building Management Office (located on Level B1) The management office has a dedicated and experienced team of professionals who uphold Brookfield’s commitment to outstanding service and share a common agenda to continually improve service to tenants.
    [Show full text]
  • Convention Booklet #2 Southern Cross Region 34 Perth Convention and Exhibition Centre Thursday 18 May – Sunday 21 May 2017
    ALL THE INFORMATION YOU NEED TO LAUGH, SING AND SHINE IN PERTH! CONVENTION BOOKLET #2 SOUTHERN CROSS REGION 34 PERTH CONVENTION AND EXHIBITION CENTRE THURSDAY 18 MAY – SUNDAY 21 MAY 2017 a definite ‘must read’ for anyone heading to perth! Region 34 Convention 2017 CONVENTION BOOKLET NO. 2 Contents CONVENTION SCHEDULE ........................................................................................................................ 2 AFTERGLOW ............................................................................................................................................ 3 COMPETITORS – HOW WE CAN SUPPORT THEM ................................................................................... 3 CONVENTION PHOTOS ............................................................................................................................ 4 HARMONY BAZAAR ................................................................................................................................. 4 JUDGING PANEL ...................................................................................................................................... 4 LEADERS’ BREAKFAST .............................................................................................................................. 4 MASS SING .............................................................................................................................................. 5 MASTER CLASS .......................................................................................................................................
    [Show full text]
  • Commercial Property SPECIAL REPORT
    Commercial Property SPECIAL REPORT Photo: Stockphoto businessnews.com.au Commercial Property FEATURE Long-term focus drives office outlook Perth may have the highest office building vacancy rate nationally, but that’s done little to dampen the confidence of investors, developers and real estate agents. highlighted a part of business life often taken for granted: a physical presence. Workplace culture is a major part of that, according to Redhill Partners partner Oliver Mahé. “We believe the office of the future has to become a desti- nation with a purpose and will be designed with an increased Katie McDonald focus on collaboration, with [email protected] potentially more individu- 8-PAGE FEATURE al-style work completed from home,” Mr Mahé told Business ERTH’S latest lock- News. down provided a stark “The office of the future will P reminder to employers form an important part of an and office landlords of the organisation, as it will be the changing nature of work, where physical manifestation of the staff have the ability to operate company’s culture. remotely at short notice. “Rather than simply clocking CIRCUMSTANCE: One fifth of Perth CBD office stock is now considered vacant. Photo: Gabriel Oliveira But the shift to working from in and out, we believe it will home comes with caveats. become the place of employee Some people find it diffi- creativity and engagement.” last year, but that office leas- ing activity had picked up again, cult to remain motivated and Mr Mahé’s confidence in the The fact remains that offices and productive in a home environ- longevity of the office is backed with Redhill Partners com- ment, while others can’t juggle by Redhill Partners’ recent $67.8 the CBD will always remain the lifeblood pleting 5,000 square metres of work and family needs (such as million play for a CBD office, office leasing deals in the last children home from school in pushing the Singapore-based of our city centres, and drivers of quarter of 2020.
    [Show full text]
  • 2011 WA Mineral and Petroleum Statistics Digest
    2012 WA MINERAL AND PETROLEUM2011 WA Mineral and Petroleum Statistics Digest ST© WOODSIDE ATISTICS Disclaimer Information provided in this Digest is made available without charge, as a public service, in good faith. The information provided is derived from sources believed to be reliable and accurate at the time of publication. However, use of the information in the Digest is at your own risk. The Digest is provided solely on the basis that users will be responsible for making their own assessment of the information provided therein and users are advised to verify all representations, statements and information for decisions that concern the conduct of business that involves monetary or operational consequences. Each user waives and releases the Department of Mines and Petroleum and the State of Western Australia and its servants to the full extent permitted by law from all and any claims relating to the use of the material in the Digest. In no event shall the Department of Mines and Petroleum or the State of Western Australia be liable for any incidental or consequential damages arising from any use or reliance on any material in the Digest. Copyright © 2012 Copyright in this document is reserved to the State of Western Australia. Reproduction except in accordance with copyright law is prohibited. LIST OF FIGURES, TABLES AND MAPS FIGURES Figure 1 Mining Investment 5 Figure 46 Nickel Quantity 16 Figure 2 New Capital Investment 5 Figure 47 Heavy Mineral Sands Value of Production 16 Figure 3 Mineral Exploration Expenditure 5 Figure 48 Gold
    [Show full text]