PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

FORM - 1 I. Basic Information

S. No. Item Details 1 Name of the project/s Proposed expansion of residential tenements at KP Park of Village, Purasaivakkam Taluk, District by Tamil Nadu Slum Clearance Board 2 S. No. in the schedule 8 (a) 3 Proposed capacity / area / length / Proposed Built-up area is 72,346.5 Sq.m tonnage to be handled/command Total Built-up area is 88,467.8 Sq.m area / lease area / number of wells Built up area statement is given in table - to be drilled 3.2 of the Conceptual Plan. 4 New/Expansion/Modernization Expansion

5 Existing Capacity/ Area etc. Existing BUA (Phase I) - 16,121.28 sq.m 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7 Dose it attract the general No condition? If yes, please specify. 8 Dose it attract the specific No condition? If yes, please specify. 9 Location Plot/survey/ Khasra. No R.S. No. 1730/1PT, 1733, 1734/1 & 2PT, 1735/8, 1735/145 Village Veperi Tehsil Purasaivakkam District Chennai State Tamil Nadu 10 Nearest railway station/airport  Basin Bridge Railway Station – 0.8 m along with distance in Km. (NE)  Chennai Central Railway Station – 1.6 km (SE)  Chennai International Airport – 13.9 km (SW) 11 Nearest town, city, district Within the city limit headquarters along with distance in Km. 12 Village panchayats, Zilla parished, Corporation of Chennai municipal corporation, local body Address: 1131, EVR Salai, (complete postal address with Park Town, , telephone nos. to be given) Chennai - 600 003 Telephone No: 044 25619555 13 Name of the applicant Tamilnadu Slum Clearance Board 14 Registered address No. 5, Kamarajar Salai, Chennai - 600005.

1 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

15 Address for correspondence Name Mr. S. Sundararajan Designation (Owner/Partner/CEO) Executive Engineer Address Division III, Tamil Nadu Slum Clearance Board, , Chennai. Pin Code 600 039 E-Mail [email protected] [email protected] Telephone No Fax No --- 16 Details of Alternative Sites No alternative sites were examined Examined, if any, location of these sites should be shown on a topo sheet. 17 Interlinked Projects Nil 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves No approval / Clearance under the following acts: if yes, details of the same and their status to be given. (a)The Forest (Conservation) Act, 1980? (b)The Wildlife (Protection) Act, 1972? (c)The C.R.Z Notification, 1991? 22 Whether there is any government No order/ Police relevant/ relating to the site? 23 Forest land involved (hectares) Nil 24 Whether there is any litigation Nil pending against the land/ or land in which the Project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any and its relevance with the proposed project

2 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. No Information / Checklist Yes / Details thereof with approximate confirmation No quantities / rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will not be any change in the change in land use, land cover land use, land cover or topography as or topography including the site is categorized as Primary increase intensity of land use Residential Land Use as per the (with respect to local land use Development control rules of CMDA. plan) 1.2 Clearance of existing land, Yes The proposed project involves vegetation and Buildings? demolition of 23 blocks (864 tenements) and reconstruction of 10 blocks (1722 tenements) in the existing land area. 1.3 Creation of new land uses? No No creation of new land use as the site involves expansion & only tenements will be constructed. 1.4 Pre-construction investigations Yes Soil Testing has been done to find the e.g. Bore Houses, Soil testing? suitability of soil for providing adequate foundations for the proposed structures. 1.5 Construction works? Yes Construction of 1722 Tenements will be done systematically, with economy of materials. 1.6 Demolition works? Yes Demolition work has been carried out for 23 blocks which consists of 864 tenements. 1.7 Temporary sites used for Yes Inside the proposed site, a small area construction works or housing will be utilized temporarily for of construction workers? construction of sheds for the migrated workers and materials. But most of the workers will be deployed locally. 1.8 Above ground buildings, Yes Excavation works will be carried out structures or earthworks for foundation of the structures. including linear structures, cut Later on, the site will be leveled. and fill or excavations Thus the cut and fill process will be required.

3 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

1.9 Underground works mining or No No underground works will be tunneling? required as the proposed project is the construction of residential tenements. 1.10 Reclamation works? No Not envisaged. 1.11 Dredging? No Not envisaged. 1.12 Off shore structures? No Not envisaged. 1.13 Production and manufacturing No Not applicable as the project is processes? construction of residential tenements. 1.14 Facilities for storage of goods Yes Temporary sheds will be constructed or materials? for the storage of cement and other materials during construction phase. 1.15 Facilities for treatment or No Generated Sewage will be disposed to disposal of solid waste or liquid the existing sewage pumping station effluents? to CMWSSB. Biodegradable waste will be treated in OWC. 1.16 Facilities for long term housing No No long term operational workers are of operational workers? involved in this project. 1.17 New road, rail or sea traffic No The existing road network is during Construction or sufficient for connectivity of the site operation? with other parts of the city. 1.18 New road, rail, air, waterborne No There will be no change to the or other transport existing transport infrastructure. infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No As construction works will be within a transport routes or specified area, there is no need for infrastructure leading to closure or diversion of existing changes in Traffic movements? transport routes. 1.20 New or diverted transmission No No new or diversion transmission lines lines or pipelines? & pipelines are required for this project. 1.21 Impoundment, damming, No There will not be any alteration in culverting, realignment or the hydrology of the watercourses or other changes to the hydrology aquifers due to the proposed project. of watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing in the project site. 1.23 Abstraction or transfers of Yes Water requirement will be met water form ground or surface through CMWSSB. waters? 1.24 Changes in water bodies or No There is no change in the water land surface affecting drainage bodies or land surface which affects or runoff? the drainage or runoff.

4 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

1.25 Transport of personnel or Yes Transportation of personnel & materials for construction, construction materials during operation or decommissioning? construction phase will be through existing roads only. 1.26 Long-term dismantling or No As part of this project, no long-term decommissioning or restoration dismantling or decommissioning or works? restoration works would be involved. 1.27 Ongoing activity during No There will not be any decommissioning which could decommissioning works. have an impact on the environment? 1.28 Influx of people to an area Yes During construction period few either temporarily or workers will be stationed temporarily permanently? and others will be deployed locally. 1.29 Introduction of alien species? No No introduction of alien species 1.30 Loss of native species or No No loss of native species or genetic genetic diversity? diversity as the site is plain and there is no significant species. 1.31 Any other actions? No Only eco-friendly activities like tree plantation will be undertaken.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).

Details there of (with approximate Information/checklist S. No. Yes / No quantities/rates, wherever possible) confirmation with source of information data 2.1 Land especially undeveloped or No There is no agricultural land. agricultural land (ha) 2.2 Water (expected source & Yes Total Fresh water Requirement – 1,646 competing users) Unit: KLD KLD Source: CMWSSB 2.3 Minerals (MT) No No usage of mineral is envisaged 2.4 Construction material - stone, Yes The approximate consumption of aggregates, and / soil (expected cement, steel, sand, etc. are given source - MT) below. Cement - 26,499 MT Sand - 68,142 m3 Blue Metal - 49,308 m3 Bricks - 1,18,67,665 Nos Steel - 10404 MT

2.5 Forests and timber (Source - No Usage of timber will be minimal. MT)

5 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

2.6 Energy including electricity and Yes Total power requirement – 4,166 kVA fuels (source, competing users) Source – TANGEDCO Unit: fuel (MT), energy (MW) 2.7 Any other natural resources No There is no need for other natural (use appropriate standard units) resources.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details there of (with approximate Information/Checklist quantities / rates, wherever S. No. Yes / No confirmation possible) with source of information data 3.1 Use of substances or materials, No No such materials will be required for which are hazardous (as per this project. MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No There will not be any occurrence of disease or affect disease vectors diseases as activities are confined to (e.g. insect or water borne construction. diseases) 3.3 Affect the welfare of people Yes Local people will get preference in e.g. by changing living the employment during construction conditions? phase. Tenements will be provided to people living in slum areas which will improve their living standard. 3.4 Vulnerable groups of people No There is no vulnerable group of who could be affected by the people who could be affected by the project e.g. hospital patients, project. children, the elderly etc. 3.5 Any other causes No Nil

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details there of (with approximate Information/Checklist Yes / S. No. quantities/rates, wherever possible) confirmation No with source of information data 4.1 Spoil, overburden or mine No There will not be any spoil, wastes overburden or mine waste. 4.2 Municipal waste (domestic and Yes The quantity of municipal solid waste or commercial wastes) generated from the proposed project will be 6,197 kg/day 4.3 Hazardous wastes (as per Yes The estimated quantity of Hazardous

6 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

Hazardous Waste Management waste generation from the proposed Rules) project  Used oil – 0.2 TPA (Disposed to TNPCB authorized re-processors) 4.4 Other industrial process wastes No Not envisaged 4.5 Surplus product No Not applicable since this is a residential construction project 4.6 Sewage sludge or other sludge No As no treatment plants is proposed, from effluent treatment no STP sludge envisaged 4.7 Construction or demolition Yes Construction waste disposed to areas wastes identified by local body as per Construction and Demolition Waste Rules 2016. 4.8 Redundant machinery or No Most of the equipments used during equipment construction phase will be hired. 4.9 Contaminated soils or other No There is no source for contamination materials of soils or other materials. 4.10 Agricultural wastes No Does not arise 4.11 Other solid wastes No No other waste generation expected.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details there of (with approximate Information / Checklist Yes / quantities / rates, wherever S. No. confirmation No possible) with source of information data 5.1 Emissions from combustion of Yes The gaseous emissions are expected fossil fuels from stationary or from transport vehicles moving inside mobile sources the project site. This will be minimized by controlling the speed of vehicles, hiring well maintained vehicles, planting trees and spraying water periodically. 5.2 Emissions from production No Does not arise since the proposed processes project is a residential development. 5.3 Emissions from materials Yes Emissions like dust will arise during handling storage or transport the transportation of materials and the dust will be controlled by slow movement of vehicles, covering the materials properly and water spraying. 5.4 Emissions from construction Yes Marginal quantity of emission is activities including plant and expected from construction activities equipment which will be controlled by suitable control measures like water spraying.

7 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

5.5 Dust or odours from handling of Yes Dust emission will be arrested by materials including construction water spraying and covering the materials, sewage and waste stored materials with tarpaulin cover. Septic tanks & soak pit will be provided to treat the sewage during construction phase. 5.6 Emissions from incineration of No There are no incineration activities. waste 5.7 Emissions from burning of waste No No such activities will be carried out. in open air e.g. slash materials, construction debris) 5.8 Emissions from any other No No emissions from any other sources. sources

6. Generation of Noise, Vibration and Emissions of Light & Heat

Details there of (with approximate Information / Checklist Yes / quantities / rates, wherever S. No. Confirmation No possible) with source of information data 6.1 From operation of equipment Yes RMC will be used at site. In case of e.g., engines, ventilation plant, any usage of machinery/ equipment, crushers then they will be properly covered and workers will be given ear plugs in noisy area. 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or demolition Yes Noise levels in the range of 75-85 dB(A) will be generated occasionally during the construction activities. Workers in the noisy areas will be provided with earmuffs and earplugs 6.4 From blasting or piling No Not applicable 6.5 From construction or Yes During construction phase operational traffic construction materials will be transported by road, through well maintained vehicles to control noise, vibration and emissions. During operational phase traffic noise and emissions will be increased slightly that will be minimized by paving roads with asphalt / concrete, well maintained vehicles, slow movement of vehicles and by planting trees. 6.6 From lighting or cooling systems No Adequate enclosures, tree plantations

8 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

will be provided 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea.

Details there of (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 7.1 From handling, storage, use or No There will be no handling of spillage of hazardous materials hazardous materials. 7.2 From discharge of sewage or No Sewage generated of 1,518 KLD will other effluents to water or the be disposed to existing sewage land (expected mode and place Pumping station of CMWSSB of discharge) 7.3 By deposition of pollutants No There will be minimal emission of emitted to air into the land and pollutants from the project site. into water. 7.4 From any other sources No No other polluting sources exist. 7.5 Is there a risk of long term build No There will not be any long term build up of pollutants in the up of pollutants in the environment environment from these from these sources. sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.

Details there of (with approximate Information/Checklist S. No. Yes/No quantities/rates, wherever possible) confirmation with source of information data 8.1 From explosions, spillages, fires No No hazardous substances will be etc from storage, handling, use required either during construction or or production of hazardous operation phases. However adequate substances safety measures to mitigate all risks anticipated out of fire in diesel will be taken care off by installing suitable fire fighting system. 8.2 From any other causes No No risks from any other sources. 8.3 Could the project be affected No The area under study falls in Zone-III by natural disasters causing (moderate) according to the Indian environmental damage (e.g. Standard Seismic Zoning Map. The floods, earthquakes, landslides, structure was designed to be cloudburst etc)? earthquake resistant. The proposed project will not be affected by natural disasters causing environmental damage.

9 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details there of (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) confirmation with source of information data 9.1 Lead to development of Yes Proposed infrastructure like roads, supporting. Utilities, ancillary power supply, etc. will not create any development or development impact on the environment. stimulated by the project which could have impact on the environment e.g. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Housing development Yes Housing will develop in and around Extractive industry No No Extraction Supply industry No Nil 9.2 Lead to after-use of the site, No No impact will be seen due to which could have an impact on proposed the activity the environment 9.3 Set a precedent for later No No impact is seen due to the developments proposed activity 9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

Aerial distance S. No. Areas Name/ Identity (within 15km.) 1 Areas protected under international Nil No such areas within conventions, national or local 15 Km radius legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important for or No Nil sensitive Ecological reasons - Wetlands, water sources or other water bodies, coastal zone, biospheres, mountains, forests 3 Area used by protected, important or Nil No such areas within sensitive species of flora or fauna for 15 Km radius

10 DECEMBER 2017

PROPOSED EXPANSION OF RESIDENTIAL TENEMENTS UNDER PRADAN MANDRI AWAS YOJANA – HFA SCHEME FORM 1

breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or  Buckingham underground waters Canal 0.6 km (E)  Nalla 1 km (N)  1.6 km (S)  2.9 km (E)  Lake 3.2 km (SW)  8.2 km (S)  Eri 9 km (WNW)  Lake 6.9 km (NW) 5 State, National boundaries No No such areas within 15 Km radius 6 Routes or facilities used by the public No No such areas within for access to recreation or other 15 Km radius tourist, pilgrim areas 7 Defense installations No No such areas within 15 Km radius 8 Densely populated or built-up area  George Town 1.0 km, (E)  1.65 km (S)  Vyasarpadi 2.0 km (NNW)  2.7 km (W) 9 Area occupied by sensitive man-  Chennai made land uses Hospitals, schools, High School 0.75 km (W) places of worship, community  Madras facilities) Veterinary College 1.0 km (SSE)  Nehru Stadium 1.0 km (S)  1.3 km (ENE) 10 Areas containing important, high No No such areas within quality or scarce resources (ground 15 Km radius water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution No No such areas within environmental damage. (those where 15 Km radius existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No The area under study which could cause the project to falls in Zone-III present environmental problems (moderate), according (earthquakes, subsidence, landslides, to the Indian Standard flooding erosion, or extreme or Seismic Zoning Map adverse climatic conditions)

11 DECEMBER 2017