35847Main.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

35847Main.Pdf Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 35847-UG PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 22.0 MILLION Public Disclosure Authorized (US$33.6 MILLION EQUIVALENT) TO THE REPUBLIC OF UGANDA FOR THE KAMPALA INSTITUTIONAL AND INFRASTRUCTURE DEVELOPMENT ADAPTABLE PROGRAM LOAN (APL) PROJECT IN SUPPORT OF THE FIRST PHASE OF THE STRATEGIC FRAMEWORK FOR REFORM FOR Public Disclosure Authorized KAMPALA URBAN DEVELOPMENT PROGRAM September 12,2007 AFT: Water and Urban 1 Eastern Africa Country Cluster 1 AFRICA Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective July 3 1,2007) Currency Unit = Uganda Shillings (USh) Ush 1 = US$O.O005 US$ 1.53 = SDR 1 FISCAL YEAR July 1 - June 30 ABBREVIATIONS AND ACRONYMS APL Adaptable Program Loan CFAA Country Financial Accountability Assessment CPAR Country Procurement Assessment Report CTB Central Tender Board DE0 District Environment Officer DPP Director of Public Prosecutions DWD Directorate of Water Development EA EnvironmentalAnalysis ECOSAN Ecological Sanitation Project EFMP Economic and Financial Management Project ERR Economic Internal Rate of Return EMP EnvironmentalManagement Plan FA Financing Agreement FINMAP Financial Management and Accountability Project FMM Financial Management Manual FRAP Financial Recovery Action Plan GAC Governance and Anti-Corruption GIS Global Information System GOU Government of Uganda IAF Inter Agency Forum ICT Information, Communication and Technology IDA International Development Association IFMS Integrated Financial Management System IFR Interim Financial Report IG Inspectorate of Government IGG Inspector General of Government ISR Implementation Status Report KCC Kampala City Council KFRAP Kampala Financial Recovery Action Plan KIIDP Kampala Institutional and Infrastructure Development Project KUSIP Kampala Urban and Improvement Project KUTIP Kampala Urban Traffic Improvement Plan LCA Leadership Code Act LGA Local Government Act LGDP Local Government Development Program LGFAR Local Government (Financial and Accounting) Regulations FOR OFFICIAL USE ONLY M&E Monitoring and Evaluation MOFPED Ministry of Finance, Planning and Economic Development MOLG Ministry of Local Government MTEF Medium-Term Economic Framework NCRP Nakivubo Channel Rehabilitation Project NEMA National Environment Management Authority NGO Non-GovernmentalOrganization NPV Net Present Value O&M Operations and Maintenance OAG Office of the Auditor General PCU Project Coordination Unit PDE Procuring and Disposal Entity PDO Project Development Objective PDU Procurement and Disposal Unit PEAP Poverty Eradication Action Plan POCA Prevention of Corruption Act PPDA Public Procurement and Disposal of Public Assets Authority PPO Principal Procurement Officer RAP Resettlement Action Plan SFR Strategic Framework for Reform SIL Specific Investment Loan SPSCP Second Private Sector Competitiveness Project TOR Terms of Reference UFUP Uganda First Urban Project UJAS Uganda Joint Assistance Strategy URA Uganda Revenue Authority UTODA Uganda Taxi Operators and Drivers Association WID Wetlands Inspection Division WRD Water Resources Department WSSP Wetlands Sector Strategic Plan This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not be otherwise disclosed without World Bank authorization. Vice President: Obiageli K. Ezekwesili Country Director: John Murray McIntire Sector Manager: Jaime M. Biderman Task Team Leader: Solomon Alemu UGANDA Kampala Institutional and Infrastructure Development APL 1 Project CONTENTS Page A. STRATEGIC CONTEXT AND RATIONALE ................................................................. 3 1. Country and sector issues .................................................................................................... 3 2 . Rationale for Bank involvement ......................................................................................... 4 3 . Higher level objectives to which the project contributes .................................................... 5 B. PROJECT DESCRIPTION ................................................................................................. 6 1. Lending instrument ............................................................................................................. 6 2 . Program objective and phases ............................................................................................. 6 3 . Project development objective and key indicators.............................................................. 7 4 . Project components ............................................................................................................. 7 5 . Lessons learned and reflected in the project design ............................................................ 9 6 . Alternatives considered and reasons for rejection ............................................................ 10 C. IMPLEMENTATION ........................................................................................................ 10 1. Partnership arrangements (if applicable) .......................................................................... 10 2 . Institutional and implementation arrangements ................................................................ 10 3. Monitoring and evaluation ofoutcomeshesults ................................................................ 12 ... 4 . Sustainability..................................................................................................................... 12 5 . Critical risks and possible controversial aspects ............................................................... 13 6 . Credit conditions and covenants ....................................................................................... 14 D. APPRAISAL SUMMARY ................................................................................................. 14 1. Economic and financial analyses ...................................................................................... 14 2 . Technical ........................................................................................................................... 15 3 . Fiduciary ........................................................................................................................... 15 4 . Social................................................................................................................................. 17 5 . Environment ...................................................................................................................... 18 6 . Safeguard policies ............................................................................................................. 19 7 . Policy Exceptions and Readiness...................................................................................... 21 Annex 1: Country and Sector or Program Background......................................................... 22 Annex 2: Major Related Projects Financed by the Bank and/or other Agencies ................. 26 Annex 3: Results Framework and Monitoring........................................................................ 27 Annex 4: Detailed Project Description...................................................................................... 30 Annex 5: Project Costs ............................................................................................................... 35 Annex 6: Implementation Arrangements ................................................................................. 36 Annex 7: Financial Management and Disbursement Arrangements ..................................... 38 Annex 8: Procurement Arrangements ...................................................................................... 49 Annex 9: Economic and Financial Analysis ............................................................................. 62 Annex 10: Safeguard Policy Issues ............................................................................................ 71 Annex 11: Governance and Anti-Corruption (GAC) Action Plan......................................... 82 Annex 12: Project Preparation and Supervision ..................................................................... 96 Annex 13: Documents in the Project File ................................................................................. 97 Annex 14: Statement of Loans and Credits .............................................................................. 98 Annex 15: Country at a Glance ............................................................................................... 100 MAP: Non-Bank Map of Uganda UGANDA KAMPALA INSTITUTIONAL AND INFRASTRUCTURE DEVELOPMENT APL PROJECT IN SUPPORT OF THE FIRST PHASE OF THE STRATEGIC FRAMEWORK FOR REFORM FOR KAMPALA URBAN DEVELOPMENT PROGRAM PROJECT APPRAISAL DOCUMENT AFRICA AFTU 1 Date: September 12,2007 Team Leader: Solomon Alemu Country Director: John McIntire Sectors: Roads and highways (40%); Flood Sector Managermirector: Jaime M. Biderman protection (3 5%); Sub-national government administration (25%) Themes: Municipal governance and institution building (P) Project ID: PO78382 Environmental screening category: Partial Assessment Lending Instrument: Adaptable Program
Recommended publications
  • Characterization of the Soil Nematode Fauna of Makerere Hill, Kampala, Uganda
    Vol. 11(6), pp. 70-84, Oct-Dec 2019 DOI: 10.5897/JEN2019.0239 Article Number: F82FA2462098 ISSN 2006-9855 Copyright ©2019 Author(s) retain the copyright of this article Journal of Entomology and Nematology http://www.academicjournals.org/JEN Full Length Research Paper Characterization of the Soil Nematode Fauna of Makerere Hill, Kampala, Uganda Nzeako S. O.1*, Talwana H.2, Teye E.3, Sekanjako I.2, Nabweteme J.2 and Businge M. A.3 1Department of Animal and Environmental Biology, Faculty of Science, University of Port Harcourt, Port Harcourt, Rivers State, Nigeria. 2Department of Agriculture Engineering, University of Cape Coast, College of Agriculture and Natural Science, School Agriculture, Cape Coast, Ghana. 3School of Agricultural Sciences, College of Agricultural and Environmental Sciences, Makerere University, Makerere, Kampala, Uganda. Received 17 June, 2019; Accepted 13 August, 2019 Soil nematode faunal analysis is necessary to ascertain the health status of the soil ecosystem. Composite soil samples were taken at designated sites; A, B, C and D from the Makerere Hill area, Kampala and analyzed to characterize the nematode fauna status. Soil samples were collected vertically at 0-5 cm, 5-10 cm and 10-15 cm core depths with a 5 cm wide soil auger. A total of 7,900 nematodes were collected from the study out of which 1,720 (21.8%) nematodes came from 0-5 cm core depth, 5,270 (66.7) from 5-10 cm core depth and 910 (11.52) from the 10-15 cm core depth. Species diversity showed nine orders of nematodes comprising twenty four families and forty nine species.
    [Show full text]
  • Chapter 5 Traffic Survey and Traffic Demand Forecast
    Final Report – Executive Summary The Study on Greater Kampala Road Network and Transport Improvement in the Republic of Uganda November 2010 CHAPTER 5 TRAFFIC SURVEY AND TRAFFIC DEMAND FORECAST 5.1 TRAFFIC SURVEY The Study Team conducted a traffic survey in January 2010 to identify the current traffic condition and to forecast the future traffic demand. A supplemental traffic survey was also conducted on major junctions in June 2010 to study the current intersection condition and problems. The objective, method and coverage of six types of traffic survey are summarized as below: Table 5.1.1 Outline of Traffic Survey Survey Objectives Method Coverage To obtain traffic volumes on 12 locations (12hr) Traffic Count Survey Vehicular Traffic Count major roads 2 locations (24hr) Origin-Destination (O-D) To capture trip information of Interview with drivers at 9 locations Survey vehicles roadsides To obtain traffic volumes and Intersection Traffic Count movement at major Vehicular Traffic Count 2 locations Survey intersections To collect information about Taxi (Minibus) Passenger and Interview with taxi public transport driver and 5 major taxi parks Driver Interview Survey drivers and users users, and their opinions Boda-Boda (Bike Taxi) To collect information about Interview with boda-boda 6 areas on major Passenger and Driver boda-boda drivers and users, drivers and users roads Interview Survey and their opinions To collect information on Actual driving survey by Travel Speed Survey present traffic situation on passenger car major roads Source: JICA Study Team Actual traffic survey was conducted from January to February 2010. Each type of survey schedule is shown in below figure: 2009 2010 Survey Dec.
    [Show full text]
  • Licenced Forex Bureau As at March 10, 2020 No. Name Address Telephone Email Address 1 Abia P.O
    LICENCED FOREX BUREAUS AS AT March 10, 2020 LICENCED FOREX BUREAU AS AT MARCH 10, 2020 NO. NAME ADDRESS TELEPHONE EMAIL ADDRESS 1 ABIA P.O. Box 10706 Arua, Plot No. 22B Avenue Road Arua 0750-777758 [email protected] 2 ABISELOM P. O. Box 35492, Kampala, Plot No 2530 Tirupati Mazima Mall, Ggaba Road, Kabalagala, Kampala 0786-758888 [email protected] 3 ACCESS P.O. Box 27632 Kampala, Shop No.12 Krish Mall, Old Portbell Road, Bugolobi, Kampala. 0414-223508 [email protected] 4 ACE P.O. Box 21921, Kampala, Entebbe International Airport – Arrival Lounge, Entebbe 0782-841378 [email protected] 5 ALPACA P. O. Box 7456, Kampala, Plot No. 1387 Rubaga Road, Kampala 0700-001002 [email protected] 6 ALPHA CAPITAL PARTNERS P.O. Box 33996, Kampala, Plot No.12 Kampala Road, Cham Towers, Shop No. 17, Kampala, 0392-612648 [email protected] 7 ALREADY Plot No. 4 Rashid Khamis Road, Already Hotel Building, Kampala 0772-429001 [email protected] 8 AMAL P.O.Box 10363 Kampala, Plot No.1 Central Lane, Arua 0753-819042 [email protected] 9 AMRON P.O. Box 1255, Mbarara, Nakumatt Building, Plot 4, Buremba – Kakoba Road, Mbarara. 0775-729890 [email protected] 10 ASANTE P.O. Box 70643, Kampala, Plot No.18, Nabugabo Road, Mariam Nabusi Arcade, Shop No. 4, Kampala 0774-763432 [email protected] 11 ASHANTI P.O. Box 31364, Plot 5B Wilson Road, Shop No. F-2, Arua Park Mall, Kampala. 0414-343559 [email protected] 12 ASIAN OVERSEAS P.O. Box 7669, Kampala, Plot No. 4A Crown House, Shop No.1, Kampala Road, Kampala.
    [Show full text]
  • INSURANCE REGULATORY AUTHORITY of UGANDA Plot 5 Kyadondo Road Legacy Towers Block B 2Nd Floor P O Box 22855 KAMPALA LIST of APPROVED AUDITORS for the YEAR 2021
    INSURANCE REGULATORY AUTHORITY OF UGANDA Plot 5 Kyadondo Road Legacy Towers Block B 2nd Floor P O Box 22855 KAMPALA LIST OF APPROVED AUDITORS FOR THE YEAR 2021 M/s Abet & Company M/s Allied Certified Public Accountants Certified Public Accountants of Uganda 4th Floor Raja Chambers Plot 79 Bukoto Street Kamwokya Plot 3 Parliament Avenue POBox 21199 P O Box 24234 KAMPALA KAMPALA Email: [email protected] Email:[email protected] M/s AN Associates M/s Ardenfield Certified Public Accountants Certified Public Accountants Plot 114 MutajaziRoad, Kibuli Plot 9 Kampala Road PO Box 5030 Suite 24 Agip House KAMPALA Opposite Orient House Email:[email protected] P O Box 40327 KAMPALA Email:[email protected] M/s Augustus Associates M/s Bawunha&Badebye Certified Public Accountants Certified Public Accountants 1st Floor Suites A9 A12 &A13 3rd Floor-Suite 3D Opposite Salz Hotel Musana Plaza Plot 399/4 Ntinda-Naalya Road Plot 1904 Ntinda-Kisaasi Road PO Box 9752 P O Box 40210 KAMPALA KAMPALA Tel: +256414668614 Email:[email protected] Email:[email protected] 1 M/s Biz & Company M/S BVL & Co Certified Public Accountants Certified Public Accountants Tulip Development House Plot 1A Naguru East Road Plot 37/39 Kimera close, Naguru Naguru Hill 3rd floor Block A P O Box 26285 P.O BOX 10939 KAMPALAEmail:[email protected] KAMPALA Email:[email protected] M/s Cartwright M/s CMK & Co Certified Public Accountants Certified Public Accountants Plot 121 Ntinda Nakasero Road Former Information Flats P.O BOX 34078 Ntinda Road, Ntinda KAMPALA
    [Show full text]
  • Forex Bureaux
    NO. NAME ADDRESS TELEPHONE EMAIL ADDRESS 1 ACCESS P.O.Box 27632 Kampala, Shop No.12 Krish Mall, Old Portbell Road, Bugolobi, Kampala. 0414-223508 [email protected] 2 ACCESS P.O.Box 27632 Kampala, Plot No.1744 Muyenga Road, Kabalagala, Kampala 0414 266377 [email protected] 3 ACE P.O. Box 21921, Kampala, Entebbe International Airport – Arrival Lounge, Entebbe 0782-841378 [email protected] 4 ALPACA P. O. Box 7456, Kampala, Plot No. 1387 Rubaga Road, Kampala 5 ALPHA CAPITAL PARTNERS P.O. Box 33996, Kampala, Plot No.12 Kampala Road, Cham Towers, Shop No. 17, Kampala, 0392-612648 [email protected] 6 ALREADY Plot No. 4 Rashid Khamis Road, Already Hotel Building, Kampala 0772-429001 [email protected] 7 AMAL P.O.Box 10363 Kampala, Plot No.1 Central Lane, Arua 0753-819042 [email protected] 8 AMAL P.O. Box 10363, Kampala, Plot 74/74A Bombo Road, Nalubega Arcade 0753-819042 [email protected] 9 AMAL P.O. Box 10363, Plot 444 Kisenyi Butikiro Road 0753-819042 [email protected] 10 AMRON P.O. Box 1255, Mbarara, Nakumatt Building, Plot 4, Buremba – Kakoba Road, Mbarara. 0775-729890 [email protected] 11 ARACH P.O. Box 34983, Kampala, Plot 15 Wilson Road, Fortune Plaza, Shop No. FF-09, Arua Park, Kampala. 0775-657686 [email protected] 12 ASANTE P.O. Box 70643, Kampala, Plot No.18, Nabugabo Road, Mariam Nabusi Arcade, Shop No. 4, Kampala 0774-763432 [email protected] 13 ASHANTI P.O. Box 31364, Plot 5B Wilson Road, Shop No. F-2, Arua Park Mall, Kampala.
    [Show full text]
  • World Bank Document
    Document of The World Bank Public Disclosure Authorized Report No: ICR00002916 IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43670) ON A CREDIT Public Disclosure Authorized IN THE AMOUNT OF SDR 22.0 MILLION (US$ 33.6 MILLION EQUIVALENT) TO THE REPUBLIC OF UGANDA FOR A KAMPALA INSTITUTIONAL AND INFRASTRUCTURE DEVELOPMENT ADAPTABLE PROGRAM LOAN (APL) PROJECT Public Disclosure Authorized June 27, 2014 Public Disclosure Authorized Urban Development & Services Practice 1 (AFTU1) Country Department AFCE1 Africa Region CURRENCY EQUIVALENTS (Exchange Rate Effective July 31, 2007) Currency Unit = Uganda Shillings (Ushs) Ushs 1.00 = US$ 0.0005 US$ 1.53 = SDR 1 FISCAL YEAR July 1 – June 30 ABBREVIATIONS AND ACRONYMS APL Adaptable Program Loan CAS Country Assistance Strategy CRCS Citizens Report Card Surveys CSOs Civil Society Organizations EA Environmental Analysis EIRR Economic Internal Rate of Return EMP Environment Management Plan FA Financing Agreement FRAP Financial recovery action plan GAAP Governance Assessment and Action Plan GAC Governance and Anti-corruption GoU Government of Uganda HDM-4 Highway Development and Management Model HR Human Resource ICR Implementation Completion Report IDA International Development Association IPF Investment Project Financing IPPS Integrated Personnel and Payroll System ISM Implementation Support Missions ISR Implementation Supervision Report KCC Kampala City Council KCCA Kampala Capital City Authority KDMP Kampala Drainage Master Plan KIIDP Kampala Institutional and Infrastructure Development Project
    [Show full text]
  • List of URA Service Offices Callcenter Toll Free Line: 0800117000 Email: [email protected] Facebook: @Urapage Twitter: @Urauganda
    List of URA Service Offices Callcenter Toll free line: 0800117000 Email: [email protected] Facebook: @URApage Twitter: @URAuganda CENTRAL REGION ( Kampala, Wakiso, Entebbe, Mukono) s/n Station Location Tax Heads URA Head URA Tower , plot M 193/4 Nakawa Industrial Ara, 1 Domestic Taxes/Customs Office P.O. Box 7279, Kampala 2 Katwe Branch Finance Trust Bank, Plot No 115 & 121. Domestic Taxes 3 Bwaise Branch Diamond Trust Bank,Bombo Road Domestic Taxes 4 William Street Post Bank, Plot 68/70 Domestic Taxes Nakivubo 5 Diamond Trust Bank,Ham Shopping Domestic Taxes Branch United Bank of Africa- Aponye Hotel Building Plot 6 William Street Domestic Taxes 17 7 Kampala Road Diamond Trust Building opposite Cham Towers Domestic Taxes 8 Mukono Mukono T.C Domestic Taxes 9 Entebbe Entebbe Kitooro Domestic Taxes 10 Entebbe Entebbe Arrivals section, Airport Customs Nansana T.C, Katonda ya bigera House Block 203 11 Nansana Domestic Taxes Nansana Hoima road Plot 125; Next to new police station 12 Natete Domestic Taxes Natete Birus Mall Plot 1667; KyaliwajalaNamugongoKira Road - 13 Kyaliwajala Domestic Taxes Martyrs Mall. NORTHERN REGION ( East Nile and West Nile) s/n Station Location Tax Heads 1 Vurra Vurra (UG/DRC-Border) Customs 2 Pakwach Pakwach TC Customs 3 Goli Goli (UG/DRC- Border) Customs 4 Padea Padea (UG/DRC- Border) Customs 5 Lia Lia (UG/DRC - Border) Customs 6 Oraba Oraba (UG/S Sudan-Border) Customs 7 Afogi Afogi (UG/S Sudan – Border) Customs 8 Elegu Elegu (UG/S Sudan – Border) Customs 9 Madi-opei Kitgum S/Sudan - Border Customs 10 Kamdini Corner
    [Show full text]
  • Money Remitters As at March 10, 2020 No
    LICENCED MONEY REMITTERS AS AT MARCH 10, 2020 NO. NAME ADDRESS TELEPHONE EMAIL ADDRESS 1 ACCESS P.O.Box 27632 Kampala, Shop No.12 Krish Mall, Old Portbell Road, Bugolobi, Kampala. 0414-223508 [email protected] 2 AMAL P.O.Box 10363 Kampala, Plot No.1 Central Lane, Arua 0753-819042 [email protected] 3 ASHANTI P.O. Box 31364, Plot 5B Wilson Road, Shop No. F-2, Arua Park Mall, Kampala. 0772-246065 [email protected] 4 ASIAN OVERSEAS EXCHANGE P.O. Box 7669, Kampala, Plot No. 4A Kampala Road, Crown House, Shop No. 1, Ground Floor. 0754-885881 [email protected] 5 BAKAAL P.O.Box 10161 Kampala, Plot 82 Ben Kiwanuka Street, Tropical Complex, Kampala. 0772-097027 [email protected] 6 BEST P.O. Box 22701 Kampala , Plot No. 25A&B William Street, Trade Link Building, Level 2, Kampala 0712-729729 [email protected] 7 BEST RATES P.O.Box 31448, Kampala , Capital Shoppers Shopping Centre, Shop 1 Ntinda Road, Kampala. 0705-734431 [email protected] 8 BICCO P.O. Box 3307, Kampala,Plot 13, Buganda Road, Mukwano Courts, Shop No. G-02, Kampala. 0414-252428 [email protected] 9 BRAVE P.O. Box 75666, Kampala, Plot 505 Bombo Road, Block 38 Kagugube, Wandegeya. 0772-333370 [email protected] 10 BT PAYMENTS P.O. Box 2455, KampalaGuardian Building, Plot No. 67A, Spring Road, Bugolobi [email protected] 11 BUDDU P.O.Box 23442 Kampalak, Plot No. 22A, Shop No.L3-662/3, Gaza land Plaza, William Street, Kampala 0414-340397 [email protected] 12 CAPITAL P.O.
    [Show full text]
  • EXAMING POOR DRAINAGE in BWAISE II PARISH, KAWEMPE DIVISION, KAMPALA the Streams in Bwaise II Parish Are No Longer in Their Natural State
    2011 Mubiru Katya Paul Written by Sarah Namulondo EXAMING POOR DRAINAGE IN BWAISE II PARISH, KAWEMPE DIVISION, KAMPALA The streams in Bwaise II Parish are no longer in their natural state. They flow in straight courses and carry polluted water. This is because of the various forms of the both direct and indirect human interferences. Changes on the land surface consequent to urbanization constitute an indirect interference. EXAMINING POOR DRAINAGE IN BWAISE II PARISH, KAWEMPE DIVISION, KAMPALA BY MUBIRU KATYA PAUL A DISSERTATION SUBMITTED TO THE POSTGRADUATE SCHOOL AS PARTIAL FULFILLMENT FOR THE REQUIREMENTS FOR AWARD OF MASTERS DEGREE IN NATURAL RESOURCES MANAGEMENT OF NKUMBA UNIVERSITY SEPTEMBER 2011 2 DECLARATION I, MUBIRU KATYA PAUL, hereby declare that this dissertation is my original work and has never been published or submitted to any university or institution of higher learning for the award of a Post graduate Degree. SIGNED……………………………………………………………………………….. DATE…………………………………………………………………………………… i APPROVAL This dissertation has been produced under my supervision and has been submitted with my approval as the university supervisor for examination and award of Masters of Science degree in Natural Resources Management. Professor Eric Edroma ………………. ..................... SUPERVISOR Signed Date ii DEDICATION This dissertation is dedicated to: I. The people who will find my research data useful in helping to implement and cover the gaps of Environmental law, II. The members of my family who have supported me emotionally and financially throughout my academic career, III. My mother and father Mr and Mrs Katya II Difasi (Senior of Nawansenga Iganga District) and my Aunt Hanifa Nadongo Walangira (Bulebi- Bugiri) who sacrificed a lot for my education, and IV.
    [Show full text]
  • Approved Bodaboda Stages
    Approved Bodaboda Stages SN Division Parish Stage ID X-Coordinate Y-Coordinate 1 CENTRAL DIVISION BUKESA 1001 32.563999 0.317146 2 CENTRAL DIVISION BUKESA 1002 32.564999 0.317240 3 CENTRAL DIVISION BUKESA 1003 32.566799 0.319574 4 CENTRAL DIVISION BUKESA 1004 32.563301 0.320431 5 CENTRAL DIVISION BUKESA 1005 32.562698 0.321824 6 CENTRAL DIVISION BUKESA 1006 32.561100 0.324322 7 CENTRAL DIVISION INDUSTRIAL AREA 1007 32.610802 0.312010 8 CENTRAL DIVISION INDUSTRIAL AREA 1008 32.599201 0.314553 9 CENTRAL DIVISION KAGUGUBE 1009 32.565701 0.325353 10 CENTRAL DIVISION KAGUGUBE 1010 32.569099 0.325794 11 CENTRAL DIVISION KAGUGUBE 1011 32.567001 0.327003 12 CENTRAL DIVISION KAGUGUBE 1012 32.571301 0.327249 13 CENTRAL DIVISION KAMWOKYA II 1013 32.583698 0.342530 14 CENTRAL DIVISION KOLOLO I 1014 32.605900 0.326255 15 CENTRAL DIVISION KOLOLO I 1015 32.605400 0.326868 16 CENTRAL DIVISION MENGO 1016 32.567101 0.305112 17 CENTRAL DIVISION MENGO 1017 32.563702 0.306650 18 CENTRAL DIVISION MENGO 1018 32.565899 0.307312 19 CENTRAL DIVISION MENGO 1019 32.567501 0.307867 20 CENTRAL DIVISION MENGO 1020 32.567600 0.307938 21 CENTRAL DIVISION MENGO 1021 32.569500 0.308241 22 CENTRAL DIVISION MENGO 1022 32.569199 0.309950 23 CENTRAL DIVISION MENGO 1023 32.564800 0.310082 24 CENTRAL DIVISION MENGO 1024 32.567600 0.311253 25 CENTRAL DIVISION MENGO 1025 32.566002 0.311941 26 CENTRAL DIVISION OLD KAMPALA 1026 32.567501 0.314132 27 CENTRAL DIVISION OLD KAMPALA 1027 32.565701 0.314559 28 CENTRAL DIVISION OLD KAMPALA 1028 32.566002 0.314855 29 CENTRAL DIVISION OLD
    [Show full text]
  • Local Pharmaceutical Production Challenges (1)-1.Pdf
    PROMOTING LOCAL PHARMACEUTICAL PRODUCTION IN UGANDA Challenges facing local pharmaceutical firms Report of A Survey conducted June 2013 social justice in health CEHURD Center for Health, Human Rights and Development The Center for Health, Human Rights and Development (CEHURD) research and advocacy organization is an indigenous, non-profit, which is pioneering the justiciability of the right to health in the East African Region. Started in 2007 and formally registered in 2009, CEHURD was founded to contribute towards ensuring that public health laws are used as principle tools for the promotion and protection of public health of the vulnerable populations in Uganda and in the East African region. Our mission is to work towards cantered health system and ensure an effective, equitable, people- the full realization of the right to health and promote respect for human rights. For more information: CEHURD: Center for Health, Human Rights and Development Plot 614 Tufnell Drive, Kamwokya P.O Box 16617 Wandegeya, Kampala, Uganda Telephone: +256 414 532283 Email: [email protected] www.cehurd.org CEHURD: Social Justice in Health TABLE OF CONTENts ACRONYMS ................................................................................................................. II EXECUTIVE SUMMARY ......................................................................................... III ACKNOWLEDGEMENTS ........................................................................................ IV INTRODUCTION ......................................................................................................
    [Show full text]
  • Characteristics of Macrophytes in the Lubigi Wetland in Uganda
    Vol. 10(10), pp. 394-406, October 2018 DOI: 10.5897/IJBC2018.1206 Article Number: 98C504658827 ISSN: 2141-243X Copyright ©2018 International Journal of Biodiversity and Author(s) retain the copyright of this article http://www.academicjournals.org/IJBC Conservation Full Length Research Paper Characteristics of macrophytes in the Lubigi Wetland in Uganda John K. Kayima and Aloyce W. Mayo* Department of Water Resources Engineering, University of Dar es Salaam, P. O. Box 35131, Dar es Salaam, Tanzania. Received 1 July, 2018; Accepted 16 August, 2018 The Lubigi wetland, which is located in the north-western part of Kampala, the capital city of Uganda has been severely strained from anthropogenic encroachment and activities. These activities include harvesting of Cyperus papyrus and other plants, land filling for reclamation, human settlements and disposal of wastewater into the wetland among others. As a result of these anthropogenic activities, the macrophytes diversity and biomass in the wetland have been affected, which in turn affects the effectiveness of wetland for removal of pollutants. It is therefore important to investigate the characteristics of wetland macrophytes in the Lubigi wetland. Pertinent field investigations, surveys, data collection and laboratory tests and analyses were carried out. The problem being addressed was the current lack of information and knowledge about the biomass and biodiversity of the Lubigi wetland to protect the downstream Mayanja River and Lake Kyoga. Three transects each of 1.0 m wide was cut across this zone at about 700 m downstream of the main wastewater inlet, the second at about 1,440 m downstream of the main wastewater inlet and the third at about 1,930 m downstream of the main wastewater inlet.
    [Show full text]