M/S. A. Surti Developers Pvt Ltd FORM-1
Total Page:16
File Type:pdf, Size:1020Kb
M/s. A. surti Developers Pvt Ltd FORM-1 (I) Basic Information Sr. Item Details No 1 Name of the Project Proposed Residential cum commercial Project 2 S. No. in the Schedule 8(b) 3 Proposed capacity/area /length/tonnage to be Total plot area: 7176.91 Sq.m handled/command area/lease area/ number of FSI area 22649.72 Sq.m wells to be drilled Non FSI area 20501.14 Sq.m Total Construction area: 43150.86 Sq.m 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. In the plot area admeasuring 7176.91 Sq.m,2 buildings with total construction area 43150.86 Sq.m with configuration are proposed: Building Wings Configuration Building 1 Wing A St + P + 22 floors Building 2 Wing A 2B + Gr (pt) + 1st to 4th commercial (pt) + 18 floors Wing B 2B + Gr + 18 floors Wing C 2B + Gr + 18 floors 6 Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7 Does it attract the general condition? If Yes, 10% BUA to be handed over to MMRDA Please specify 8 Does it attract the specific condition? If yes, Not applicable Please specify 9 Location Oshiwara District Centre, Jogeshwari Plot/Survey/Khasra No. CTS No. 288 B Village Bandivali Tehsil Andheri District Mumbai Suburban District State Maharashtra 10 Nearest railway station/airport along with Ram Mandir Railway Station (0.84 km) distance in km. Jogeshwari railway Station (0.88 km) Chhatrapati Shivaji International Airport (5.10 km) 11 Nearest Town, City, District Headquarters Mumbai along with distance in km. 12 Village Panchayats, ZillaParishad, Municipal Mumbai Metropolitan Region Development Authority 1 M/s. A. surti Developers Pvt Ltd Corporation, Local body (complete postal (MMRDA) addresses with telephone nos. to be given) 13 Name of the applicant A surti Developers Pvt Ltd 14 Registered Address CTS No.288, Amrut Nagar, Bandivali Village, Jogeshwari (W), Mumbai 400102 15 Address for correspondence: As above Name Mr. Narayan Pagarani Designation(Owner/Partner/CEO) Director Address as above Pin Code 400102 E-mail [email protected] Telephone No. 26782802/26766146 Fax No. -- 16 Details of Alternative Sites examined, If any. This is being Residential / Commercial plot leased by Location of these sites should be shown on a MMRDA Authority. No alternate site is examined. topo sheet 17 Interlinked Projects No 18 Whether separate application of interlinked No project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. Not Applicable The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. Notification, 1991? 22 Whether there is any Government No Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? Name of the Court/ Case No./ Orders/directions of the Court, if any and its Relevance with the proposed project. * Capacity corresponding to sectorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) 2 M/s. A. surti Developers Pvt Ltd (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 1.1 Permanent or No • No change in land use. temporary change in • The developers have proposed residential/commercial land use, land cover or Buildings. The land use will be Residence being the topography including area developed as per govt. Notification (MMRDA). • increase in intensity of There shall be green area development plan to provide beautification and natural environment to the land use (with respect site. to local land use plan) 1.2 Clearance of existing The plot is vacant. There is no clearance of vegetation or land, vegetation and No building required. building? 1.3 Creation of new land No Land use remains the same. uses 1.4 Pre-construction Yes Geo-Technical investigations have been carried out. investigations e.g. bore houses, soil testing? 1.5 Construction Works? Yes In the plot area of 7176.91 sq.m The work of construction of Building 1 with the configuration St + P + 22 floors as approved by local planning Authority i.e. MMRDA for the FSI area of 9425.88 sq.m as per the FSI potential prevailing at the time of approval & Non FSI area 8551.96 sq.m (Total construction area) was commenced and completed as per the CC dtd 16th February 2010. It is now proposed to add Bldg no. 2 with the configuration as under due to allocation of additional FSI by MMRDA. Building Wings Configuration Building 2 Wing A 2B + Gr (pt) + 1st to 4th commercial (pt) + 18 floors Wing B 2B + Gr + 18 floors Wing C 2B + Gr + 18 floors Thus total project details are as under Building Wings Configuration Building 1 Wing A St + P + 22 floors 3 M/s. A. surti Developers Pvt Ltd Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data Building 2 Wing A 2B + Gr (pt) + 1st to 4th commercial (pt) + 18 floors Wing B 2B + Gr + 18 floors Wing C 2B + Gr + 18 floors Since the bldg no. 1 is already completed & occupied, the environmental parameters required to be operated as per EIA Notification 2006 shall be implemented for the Bldg no.2 1.6 Démolition Works? No Not Applicable 1.7 Temporary sites used Yes • During the construction phase, 25 Labors will be for construction works provided with housing facilities which is of purely on or housing of temporary basis. construction workers? • The site has temporary store rooms and site office during construction phase, which will be later demolished. The demolition waste will be used within the site to the best possible extent. 1.8 Above ground Yes Proposed construction includes configuration: buildings, structures or Building Wings Configuration earthworks including linear structures, cut Building 1 Wing A St + P + 22 floors and fill or excavations. Building 2 Wing A 2B + Gr (pt) + 1st to 4th commercial (pt) + 18 floors Wing B 2B + Gr + 18 floors Wing C 2B + Gr + 18 floors 1.9 Underground works Yes No underground works including mining / Tunneling is including mining or required except activities like excavation of earth only for tunneling? basement, , lay down of pipes, underground storage tank, electric cables, soak pits etc. 1.10 Reclamation works? No Not envisaged 1.11 Dredging? No Not envisaged 1.12 Offshore structures? No Not envisaged 1.13 Production and No The proposal is for residential / commercial complex. manufacturing Production and manufacturing is not involved. Process? 4 M/s. A. surti Developers Pvt Ltd Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 1.14 Facilities for storage of Yes Separate raw material storage yard will be provided which goods or materials? will be temporary. Construction Phase: • Cement will be separately stored under cover in bales. • Sand will be stacked neatly under tarpaulin cover. • Bricks and steel will be laid in open. Operation Phase: Storage area for solid waste, Manure and Sludge will be provided. Biodegradable waste 255 Kg/Day Non- Biodegradable waste 109 Kg/Day Treatment & Disposal : • The biodegradable waste will be treated in OWC. Manure obtained shall be used as manure for landscaping. • Non- Biodegradable waste will be handed over to recyclers. • Sewage sludge will be used as manure for gardening. • Wastewater (99 KLD) will be treated in STP of capacity 103 KLD. Treated water will be utilized as follows; Flushing - 43 KLD Gardening - 8 KLD 1.15 Facilities for treatment Yes Construction Phase: or disposal of solid Solid waste generated during construction phase is majorly waste or liquid re-sable. effluents? Waste material like empty cement bags, scrap metal, etc. shall be sold to local vendors for recycling. Broken tiles shall be used as mosaic of terraces and skirting purposes. During the construction phase, temporary septic tanks will be provided treatment of wastewater generated from construction labours and other manpower. Temporary sanitary toilets will be provided. Operation Phase: Total solid wastes 364 Kg/Day Biodegradable waste 255 Kg/Day Non- Biodegradable waste 109 Kg/Day Treatment & Disposal : As per SWM Rule - 2016 • The biodegradable waste will be treated in an OWC Manure obtained shall be used as manure for landscaping. 5 M/s. A. surti Developers Pvt Ltd Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data • Non- Biodegradable waste will be handed over to local recyclers. • Sewage sludge will be used as manure for gardening. • Wastewater (99 KLD) will be treated in STP of capacity 103 KLD. Treated water ( 92 KLD) meeting the discharge norms of CPCB after reuse for flushing & gardening as follows; Flushing 43KLD Gardening 8KLD 1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea No Access through 13.40 m wide D.P. road & 25.00 m wide D.P. traffic during road. There will be no new road and rail proposed at this construction of juncture. operation? 1.18 New road, rail, air, No No new Rail proposal is with government as of now.