World Bank Document Report No. PIC4820 Project Name China-Xiaolangdi Multipurpose Project Stage II (#) Region East Asia and Pacific Sector Hydro / Natural Resource Management Project ID CNPE34081 Public Disclosure Authorized Implementing Agency Yellow River Water & Hydropower Development Corp. (YRWHDC) Ministry of Water Resources Contact: Mr. Wang Xianru, Vice General Manager Xiaolangdi Site, Jiyuan City Henan Province P. R. China Tel. 86 379 390 5221 Fax. 86 379 390 5247 Environmental Category A Date Prepared February 14, 1997 Public Disclosure Authorized Projected Appraisal March 10, 1997 Projected Board Date June 2, 1997 1. Sector Background The Yellow River is the second longest water course in China and traverses nine provinces (Qinghai, Sichuan, Gansu, Ningxia, Inner Mongolia, Shaanxi, Shanxi, Henan, and Shandong). The catchment area accounts for 7T of China's total land area and supports the agriculture of 130 million people over a cultivated area of 12.7 million ha. (139 of the total cultivated area of China). Some of the most fertile and densely populated lands (2 million ha) in China are in the lower reaches of the Yellow River mainly in Henan Public Disclosure Authorized and Shandong Provinces. Floods in the lower reaches have brought severe destruction to farmlands and cities killing thousands of people and causing billions of dollars of damage. In addition, because of the young geomorphology of the loess plateau, soil erosion in the mid- regions of the river has resulted in enormous sediment being transported into the river (1.6 billion cum per year), depositing about W of this silt in the lower reaches of the river, which has caused the river bed to rise 3-5 meters higher than the surrounding ground. Historically, flood calamities in the lower reaches have affected 12 million ha and 70 million people in the provinces Henan, Shandong, and parts of Anhui, Hebei and Jiangsu. An enormous effort in fighting floods has been going on in the lower reaches for several centuries by building up the levees. However, despite these efforts floods have caused damage three Public Disclosure Authorized out of every four years. 2. Since 1955 the government has made great strides in developing a master plan for water resources which consists of a proposal to build 27 major dams for harnessing and controlling the Yellow River for hydropower, irrigation, municipal and industrial (M & I) water supply, mainly for the upper and middle reaches of the river. The master plan also proposes to implement comprehensive soil conservation measures to reduce silt flowing into the river. Seven major dams (of the 27 planned) have been built across the river. 3. The upper reaches of the river, which contribute 60t of the water resources, are now fairly well regulated. However for the lower reaches the only dam constructed (Sanmenxia) has had to be modified (resulting in only partial regulation of flood waters) to cope with large volumes of silt which filled the reservoir area within two years after its completion. The lower reaches of the Yellow River are currently protected only by flood levees. These have to be raised every 10 years at a cost of about $2 billion each time, and have to be maintained every year at a cost of $100 million. The levees at present do not provide adequate protection for the 103 million people below them, some key cities (Zhengzhou, Kaifeng, Xinxiang, Jinan, Heze, Liaochang, Dezhou, and Jining) and vital industries like the Shangli and Zhongyuan oilfields which produce about one fourth of the crude oil for China. In addition, because of the lack of regulation of water in the lower reaches, adequate irrigation water is available only once every three years, as against possible perennial irrigation for about 1 million hectares, and water supplies for cities (Beijing, Tianjin, Qingdao, Zhengzhou, Kaifeng, etc.) and for industries is very limited. Several cities such as Qingdao have to shut industries several hours every day because of lack of water. In order to solve some of these problems, the master plan recommends that the most cost effective solution will be the construction of Xiaolangdi Dam near Zhengzhou in Henan 4. Project Objectives The objectives of the project are: to provide flood protection for 103 million people in the North China Plain in rural areas, several large and medium cities and major industrial centers; to control sediment accretion in the lower reach of the Yellow River for a period of about 20 years; to generate much needed hydropower; and to supply irrigation water (and increase the reliability of irrigation) for some 2 million hectares and ensure more stable water supplies for downstream cities and industries. 5. Project Scope The project will finance the second stage in the construction of a dam and hydroelectric power plant on the Yellow River. The first stage, which consisted of the Xiaolangdi Multipurpose Dam Project and the associated Xiaolangdi Resettlement Project, was approved by the Bank Board in April 1994. The main features of the Xiaolangdi Multipurpose Project are (a)_a rockfill dam, 154 m high, with a crest length of 1,370_m; (b) a common intake structure, feeding nine large-diameter tunnels and a surface spillway for river diversion, flood handling and sediment management; and (c) a power station with six power tunnels with turbine and generators with an installed capacity of 1,800 MW (6 x 300_MW). Civil works have been under construction since 1994 -2 - under three contracts awarded following international competitive bidding procurement procedures. The contracts have an estimated total value to completion of US$883.2 million equivalent and the first-stage World Bank loan (Ln. 3727-CHA) financed US$386 million of this amount. The proposed second- stage project will provide Bank funding for (a) completion of the civil works contracts; (b) training in operation and maintenance (O&M)of the dam, powerhouse and related facilities; (c) planning and personnel training for operation of the project in the interests of flood control, sediment management, irrigation and water supply; and (d) creation of a flood forecasting system including training and equipment. As reviewed below, the implementation of stages 1 and 2 of the dam project will entail the resettlement of 200,000 people, which has been supported under a separate project. 6. Project Cost and Financing The total costs of the project are estimated to be $2,522 million equivalent, of which $1,140 million (45 percent) represents the foreign exchange component. These estimates exclude the costs of the resettlement program, totaling $821 million, financed under a separate project. The project base costs are in January 1997. Project financing would be provided as follows: $1,208 million from government contribution, $286 million from local bank loans, $138 million from export credit and $460 million and $430 million from the first and second Bank loans. 7. Implementation The project implementation period is 5 years (1997-2001). The Ministry of Water Resource (MWR) has overall responsibility for implementing the Xiaolangdi Project. A Central Project Leading Group, established under the leadership of the State Council consisting of a vice- minister of MWR and directors from the Ministry of Finance, the State Planning Commission, and Vice Governors of Henan and Shanxi Provinces, to oversee project management, resolve policy matters and solve interdepartmental/interagency problems. 8. Project Execution: The executing agency for implementing the project is the Yellow River Water and Hydropower Development Corporation (YRWHDC). YRWHDC has appointed an independent engineer Xiaolangdi Engineering Consulting Company (XECC) to be responsible for construction supervision of the project. YRWHDC will coordinate with the provincial Project Management Offices of Henan and Shanxi Provinces on matters relating to resettlement and land acquisition. YRWHDC is a state-owned enterprise whose main function is to build, operate and maintain the dam and power station. The general manager of YRWHDC reports to MWR. These organizations have performed well in implementing the first-stage project and will remain in place for the proposed second-stage project. 9. Project Sustainability The design of the dam is based on similar upstream dams functioning under large silt loads, -3 - and the designs have been tested by prototype technical studies. The safety factors used were conservative. The sustainability of technical operation of the project is therefore as certain as possible, given state-of-the-art technology in design of large dams. Project charges for power and water supply needed to recover the capital costs and to finance operation and maintenance are not excessive, making financial sustainability reasonably certain. 10. Environmental Aspects This project is classified as a category A project requiring a full environmental impact assessment (EIA). An EIA covering both stage 1 and stage 2 was carried out in 1993 by the Reconnaissance Planning and Design Institute (RPDI) with assistance of 20 design institutes for different aspects of the project and from international consultants. A copy of the complete EIA was sent to the Project Information Center (PIC) in March 1993. An update of the EIA was completed in February 1997 and will be submitted to the Board and PIC in early March 1997 prior to appraisal departure. The major environmental threat in the lower Yellow River region is catastrophic flooding. Xiaolangdi Project will offer virtually complete protection in the downstream reaches against the 1-in-1,000-year flood. Due to the initial sediment trapping and longer-term sediment regulation operations in Xiaolangdi, the project will also defer dike raising and strengthening for 20 years and reduce the magnitude of dike reconstruction thereafter. 11. The major social and environmental impact related to the project is resettlement of 200,000 mostly rural residents to be displaced by the reservoir. The resettlement program is comprehensive and represents a pioneering effort in project resettlement in China.
Recommended publications
  • Hydropower in China
    Hydro power in China DEPARTMENTOFTECHNOLOGYAND BUILTENVIRONMENT Hydropower in China Jie Cai September 2009 Master’s Thesis in Energy System Program Examiner: Alemayehu Gebremedhin Supervisor: Alemayehu Gebremedhin 1 Hydro power in China Acknowledgement This master thesis topic is Hydropower in China. After several months’ efforts, I have finally brought this thesis into existence. Firstly, I appreciated the opportunity to write this topic with my supervisor, Alemayehu Gebremedhin. I would like to thank him for attention and helped me. He is instrumental and without his honest support or guidance, my thesis would not be possible. Secondly, I would like to thank my opponent Yinhao Lu. Thirdly, I would like to thank my uncle, aunt from Australia. They helped me translate the websites and correction grammar. Lastly, I acknowledge with gratitude the contributions of the scholars, presses and journals that I have frequently referred to for relevant first-hand data. I hope that readers would find this thesis somewhat useful. In addition, I promise that there are no copies in my thesis. Jie Cai September 2009 2 Hydro power in China Abstract Today, with the great development of science and technology, it seems to be more and more important to develop renewable energy sources. In this thesis, I would like to introduce something about Chinese water resources. The renewable energy sources can generate electricity. Furthermore, hydropower is the most often used energy in the world. Hydropower develops quickly in recent years in China and it is significant to Chinese industries. The data collection in this paper comes from China Statistics Yearbook and this study draws on the existing literature, which projects Chinese future hydropower development.
    [Show full text]
  • 0Fd92edfc30b4f9983832a629e3
    NEWS BRIEF 2 NATIONAL PEOPle’s CoNGRESS OF CHINA People display the national flag in Golden Bauhinia Square in Hong Kong Special Ad- ministrative Region in south China. Li Gang ISSUE 1 · 2021 3 Safeguarding people’s health, building 10 quality basic public education stressed 目录 Contents Annual Session 2021 12 Special Report: NPC Work Report Xi stresses high-quality 6 development, improving 22 President Xi and the people people’s well-being Working for the people 8 14 New development philosophy, Senior leaders attend delibera- Law Stories of HK ethnic unity stressed tions at annual legislative session 10 16 24 Safeguarding people’s health, People as masters of their country An imperative step for long-term stability building quality basic public is essence of democracy in Hong Kong education stressed 26 Decision to improve Hong Kong elector- al system adopted 28 Explanations on the Draft Decision of the National People’s Congress On Improv- ing the Electoral System of The Hong Kong Special Administrative Region 4 NATIONAL PEOPle’s CoNGRESS OF CHINA An imperative step for long-term 24 stability in Hong Kong China unveils action plan for 36 modernization ISSUE 1 · 2021 Spotlight Insights 34 China projects confidence with over 6% 42 Xi’s messages point way for China at VOL.52 ISSUE 1 March 2021 GDP growth target historic development juncture Administrated by General Office of the Standing NPC Highlights Committee of National People’s Congress 44 NPC Standing Committee strongly Chief Editor: Wang Yang condemns US sanctions on Chinese 36 General
    [Show full text]
  • Channel Adjustments in Response to the Operation of Large Dams: the Upper Reach of the Lower Yellow River
    University of Wollongong Research Online Faculty of Science - Papers (Archive) Faculty of Science, Medicine and Health 1-1-2012 Channel adjustments in response to the operation of large dams: the upper reach of the lower Yellow River Yuanxu Ma Chinese Academy of Sciences He Qing Huang Chinese Academy of Sciences Gerald C. Nanson University of Wollongong, [email protected] Yongi Li Yellow River Institute of Hydraulic Research China Wenyi Yao Yellow River Institute of Hydraulic Research, China Follow this and additional works at: https://ro.uow.edu.au/scipapers Part of the Life Sciences Commons, Physical Sciences and Mathematics Commons, and the Social and Behavioral Sciences Commons Recommended Citation Ma, Yuanxu; Huang, He Qing; Nanson, Gerald C.; Li, Yongi; and Yao, Wenyi: Channel adjustments in response to the operation of large dams: the upper reach of the lower Yellow River 2012, 35-48. https://ro.uow.edu.au/scipapers/4279 Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: [email protected] Channel adjustments in response to the operation of large dams: the upper reach of the lower Yellow River Abstract The Yellow River in China carries an extremely large sediment load. River channel-form and lateral shifting in a dynamic, partly meandering and partly braided reach of the lower Yellow River, have been significantly influenced by construction of Sanmenxia Dam in 1960, Liujiaxia Dam in 1968, Longyangxia Dam in 1985 and Xiaolangdi Dam in 1997. Using observations from Huayuankou Station, 128 km downstream of Xiaolangdi Dam, this study examines changes in the river before and after construction of the dams.
    [Show full text]
  • Managing Soil Erosion on the Loess Plateau of China to Control Sediment Transport in the Yellow River-A Geomorphic Perspective
    12th ISCO Conference Beijing 2002 Managing Soil Erosion on the Loess Plateau of China to Control Sediment Transport in the Yellow River-A Geomorphic Perspective Brian Finlayson Centre for Environmental Applied Hydrology School of Anthropology, Geography and Environmental Studies The University of Melbourne Victoria, Australia, 3010 E-mail:[email protected] Abstract: A key part of the strategy to manage the problems of flooding and sedimentation of the lower Yellow River in China is the control of soil erosion on the loess plateau. Land use practices are assumed to be the root cause of the high sediment yield and therefore able to be controlled. An analysis of the geomorphology of the loess plateau region shows that there are natural causes of high sediment yield. Loess is a highly erodible material, and the zonal distribution in China of the climatic factors which maximise erosion shows that the loess plateau is located where the potential for erosion, particularly of coarse sediment, is at a maximum. This area would be a zone of high soil erosion even if there were no loess present. Convex slope profiles are the predominant slope form in this landscape such that farming practices are confined to the plateau surface and the gentler upper slopes of the convex profiles. The lower ends of the convex slopes are too steep for farming and are often near vertical. These are therefore the locations of highest sediment production and are little affected by land use activities. Changes to the social and economic basis of agriculture in China over the past 20 years have caused an increase in pressure on land resources and it is unlikely that farmers will manage their land to control sediment yield unless this also increases productivity.
    [Show full text]
  • Download Report
    Document of The World Bank Public Disclosure Authorized Report No.: 43061 Public Disclosure Authorized PROJECT PERFORMANCE ASSESSMENT REPORT PEOPLE’S REPUBLIC OF CHINA XIAOLANGDI RESETTLEMENT PROJECT (CREDIT 2605-CHA) February 20, 2007 Public Disclosure Authorized Public Disclosure Authorized Sector, Thematic and Global Evaluation Division Independent Evaluation Group Currency Equivalents (annual averages) Currency Unit = Yuan (Y) 1994 (Nov) US$1.00 =Y 8.70 (Xiaolangdi Resettlement Approved) 2003 (DEC) US$1.00 =Y 8.29 (Xiaolangdi Resettlement Completed) Abbreviations and Acronyms CAS - Country Assistance Strategy CRO - County Resettlement Office EIA - Environmental Impact Assessment EMO - Environment Management Office EMP - Environmental Management Plan EPB - Environment Protection Bureau ERR - Economic Rate of Return ESE - Environmental Supervising Engineer HCWCF Henan China Water Consulting Firm (Associated with NCWCHI) HPRO - Henan Provincial Resettlement Office ICR - Implementation Completion Report IDA - International Development Association MOF - Ministry of Finance MTR - Mid-term Review MWR - Ministry of Water Resources NCWCHI North China Water Conservancy and Hydropower Institute NRCR - National Research Centre For Resettlement POE - Panel of Experts RPDI - Reconnaissance Planning And Design Institute SAR - Staff Appraisal Report VEO - Village Environmental Officer SAR - Staff Appraisal Report SPRO - Shanxi Provincial Resettlement Office YRCC - Yellow River Conservancy Commission YRCH - Yellow River Central Hospital YRCCRO Yellow River Conservancy Commission Resettlement Office YRWHDC Yellow River Water Hydropower Development Corporation YRWHDCRO YRWHDC Resettlement Office LAND MEASUREMENT: 1 ha. = 15 mu Fiscal Year Government: January 1 — December 31 Director-General, Independent Evaluation : Mr. Vinod Thomas Director, Independent Evaluation Group (World Bank) : Mr. Ajay Chhibber Manager, Sector, Thematic and Global Evaluation Division : Mr. Alain Barbu Task Manager : Mr. George T.
    [Show full text]
  • Irrigation, Damming, and Streamflow Fluctuations
    Irrigation, damming, and streamflow fluctuations of the Yellow River Zun Yin, Catherine Ottle, Philippe Ciais, Feng Zhou, Xuhui Wang, Polcher Jan, Patrice Dumas, Shushi Peng, Laurent Li, Xudong Zhou, et al. To cite this version: Zun Yin, Catherine Ottle, Philippe Ciais, Feng Zhou, Xuhui Wang, et al.. Irrigation, damming, and streamflow fluctuations of the Yellow River. Hydrology and Earth System Sciences, European Geosciences Union, 2021, 25 (3), pp.1133-1150. 10.5194/hess-25-1133-2021. hal-03171222 HAL Id: hal-03171222 https://hal.archives-ouvertes.fr/hal-03171222 Submitted on 17 Mar 2021 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. Distributed under a Creative Commons Attribution - NoDerivatives| 4.0 International License Hydrol. Earth Syst. Sci., 25, 1133–1150, 2021 https://doi.org/10.5194/hess-25-1133-2021 © Author(s) 2021. This work is distributed under the Creative Commons Attribution 4.0 License. Irrigation, damming, and streamflow fluctuations of the Yellow River Zun Yin1,2,a, Catherine Ottlé1, Philippe Ciais1, Feng Zhou3, Xuhui Wang3, Polcher
    [Show full text]
  • Environmental Impact Assessments of the Xiaolangdi Reservoir on the Most Hyperconcentrated Laden River, Yellow River, China
    Edinburgh Research Explorer Environmental impact assessments of the Xiaolangdi Reservoir on the most hyperconcentrated laden river, Yellow River, China Citation for published version: Borthwick, A, Miao, C, Kong, D, Wu, J, Duan, Q & Zhang, X 2016, 'Environmental impact assessments of the Xiaolangdi Reservoir on the most hyperconcentrated laden river, Yellow River, China', Environmental science and pollution research. https://doi.org/10.1007/s11356-016-7975-4 Digital Object Identifier (DOI): 10.1007/s11356-016-7975-4 Link: Link to publication record in Edinburgh Research Explorer Document Version: Peer reviewed version Published In: Environmental science and pollution research General rights Copyright for the publications made accessible via the Edinburgh Research Explorer is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy The University of Edinburgh has made every reasonable effort to ensure that Edinburgh Research Explorer content complies with UK legislation. If you believe that the public display of this file breaches copyright please contact [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Download date: 05. Oct. 2021 Environmental impact assessments of the Xiaolangdi Reservoir on the most hyper-concentrated laden river, Yellow River, China Dongxian Kong1,2, Chiyuan Miao1,2*, Jingwen Wu1,2, Alistair G.L. Borthwick3, Qingyun Duan1,2, Xiaoming Zhang4 1 State Key Laboratory of Earth Surface Processes and Resource Ecology, College of Global Change and Earth System Science, Beijing Normal University, Beijing 100875, China 2 Joint Center for Global Change Studies, Beijing 100875, China 3 School of Engineering, The University of Edinburgh, The King’s Buildings, Edinburgh EH9 3JL, U.K.
    [Show full text]
  • Sustainable Dam Development in China Between Global Norms and Local Practices
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Hensengerth, Oliver Working Paper Sustainable dam development in China between global norms and local practices Discussion Paper, No. 4/2010 Provided in Cooperation with: German Development Institute / Deutsches Institut für Entwicklungspolitik (DIE), Bonn Suggested Citation: Hensengerth, Oliver (2010) : Sustainable dam development in China between global norms and local practices, Discussion Paper, No. 4/2010, ISBN 978-3-88985-510-7, Deutsches Institut für Entwicklungspolitik (DIE), Bonn This Version is available at: http://hdl.handle.net/10419/199339 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence. www.econstor.eu Sustainable dam development in China between global norms and local practices Oliver Hensengerth Discussion Paper / Deutsches Institut für Entwicklungspolitik ISSN 1860-0441 Hensengerth, Oliver: Sustainable dam development in China between global norms and local practices / Oliver Hensengerth.
    [Show full text]
  • Relative Contribution of the Xiaolangdi Dam to Runoff Changes in the Lower Yellow River
    land Article Relative Contribution of the Xiaolangdi Dam to Runoff Changes in the Lower Yellow River Qinghe Zhao 1,2 , Shengyan Ding 1,2,*, Xiaoyu Ji 1,2, Zhendong Hong 1,2, Mengwen Lu 1,2 and Peng Wang 3 1 College of Environment and Planning, Henan University, Kaifeng 475004, China; [email protected] (Q.Z.); [email protected] (X.J.); [email protected] (Z.H.); [email protected] (M.L.) 2 Key Laboratory of Geospatial Technology for the Middle and Lower Yellow River Regions, Henan University, Ministry of Education, Kaifeng 475004, China 3 Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450016, China; [email protected] * Correspondence: [email protected] Abstract: Human activities are increasingly recognized as having a critical influence on hydrological processes under the warming of the climate, particularly for dam-regulated rivers. To ensure the sustainable management of water resources, it is important to evaluate how dam construction may affect surface runoff. In this study, using Mann–Kendall tests, the double mass curve method, and the Budyko-based elasticity method, the effects of climate change and human activities on annual and seasonal runoff were quantified for the Yellow River basin from 1961–2018; additionally, effects on runoff were assessed after the construction of the Xiaolangdi Dam (XLD, started operation in 2001) on the Yellow River. Both annual and seasonal runoff decreased over time (p < 0.01), due to the Citation: Zhao, Q.; Ding, S.; Ji, X.; combined effects of climate change and human activities. Abrupt changes in annual, flood season, Hong, Z.; Lu, M.; Wang, P.
    [Show full text]
  • International Symposium on Modern Technologies and Long-Term Behavior of Dams
    SECOND BULLETIN Zhengzhou, China September 27-29, 2011 International Symposium on Modern Technologies and Long-term Behavior of Dams Sponsors: Chinese National Committee on Large Dams (CHINCOLD) Yellow River Conservancy Commission of Ministry of Water Resources (YRCC) Department of Water Resources of Henan Province China Three Gorges Corporation (CTGPC) Xiaolangdi Dam Project Construction and Management Bureau Origanizers: China Institute of Water Resources and Hydropower Research (IWHR) Henan Provincial Water Conservancy Research Institute Co-sponsors: Japan Commission on Large Dams Korean National Committee on Large Dams United States Society on Dams Henan Water & Power Consulting Engineering Co., Ltd. Yellow River Institute of Hydraulic Research Yellow River Engineering Consulting Co., Ltd. (YREC) Henan Water & Power Engineering Consulting Co. Ltd(HWPC) Sinohydro Bureau 7 Co., Ltd. Hydrochina Kunming Engineering Corporation Beijing CEEVIN New Materials Co., Ltd Beijing Research Institute of Construction Engineering Co., Ltd. Department of Hydraulics and Hydropower Engineering of Tsinghua University Zhengzhou University China Three Gorges University (CTGU) North China University of Water Resources and Electric Power Graz University of Technology, Austria University of Innsbruck, Austria Vienna University of Technology, Austria Technical Committee on Dams(TC210), ISSMGE Georisk Others Organizations ★ Origanizing Committee Chairman Wang Shucheng President of CHINCOLD, Former Minister of Ministry of Water Resources (MWR) Vice-chairmen Jiao
    [Show full text]
  • Irrigation, Damming, and Streamflow Fluctuations of the Yellow
    https://doi.org/10.5194/hess-2020-7 Preprint. Discussion started: 16 April 2020 c Author(s) 2020. CC BY 4.0 License. Irrigation, damming, and streamflow fluctuations of the Yellow River Zun Yin1,2, Catherine Ottlé1, Philippe Ciais1, Feng Zhou3, Xuhui Wang3, Polcher Jan2, Patrice Dumas4, Shushi Peng3, Laurent Li2, Xudong Zhou2,5,6, and Shilong Piao3 1Laboratoire des Sciences du Climat et de l’Environnement, IPSL, CNRS-CEA-UVSQ, Gif-sur-Yvette, France 2Laboratoire de Météorologie Dynamique, IPSL UPMC/CNRS, Paris 75005, France 3Sino-French Institute for Earth System Science, College of Urban and Environmental Sciences, Peking University, Beijing 100871, China 4Centre de Coopération Internationale en Recherche Agronomique pour le Développement, Avenue Agropolis, 34398 Montpellier CEDEX 5, France 5Institute of Industrial Science, The University of Tokyo, Tokyo, Japan 6State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Center for Global Change and Water Cycle, Hohai University, Nanjing 210098, China Correspondence to: Z. Yin ([email protected]) Abstract. The streamflow of the Yellow River is strongly affected by human activities of irrigation and dam regulation. Many attribution studies focused on the long-term trend of discharge, yet the contributions of these anthropogenic factors to stream- flow fluctuations have not been well quantified. This study aims to quantify the roles of irrigation and artificial reservoirs in monthly streamflow fluctuations of the Yellow River from 1982 to 2014 by using the global land surface model ORCHIDEE 5 with a new developed irrigation module, and a separate offline dam operation model. Validation with obsevations demonstrates the ability of our model in simulating the main hydrological processes under human disturbances in the Yellow River basin.
    [Show full text]
  • Picture 1. Xiaolangdi Intake Structure
    Document of The World Bank Public Disclosure Authorized Report No: 29173 IMPLEMENTATION COMPLETION REPORT (SCL-42000 SCL-42001) ON A Public Disclosure Authorized LOAN IN THE AMOUNT OF US$430 MILLION EQUIVALENT TO THE PEOPLE'S REPUBLIC OF CHINA FOR THE XIAOLANGDI MULTIPURPOSE PROJECT: STAGE II Public Disclosure Authorized June 28, 2004 Public Disclosure Authorized Rural Development and Natural Resources Sector Unit East Asia and Pacific Region CURRENCY EQUIVALENTS (Exchange Rate Effective January 2004) Currency Unit = Yuan (Y) Yuan 1.00 = US$ 0.12107 US$ 1.00 = Y 8.26 FISCAL YEAR January 1 - December 31 ABBREVIATIONS AND ACRONYMS AS - Antiepidemic Station BCM - Billion Cubic Meters CAS - Country Assistance Strategy CCPN - Central China Power Network CPLG - Central Project Leading Group CUM - Cubic Meter CUMEC - Cubic Meter per Second DRB - Disputes Review Board DSP - Dam Safety Panel EIA - Environmental Impact Assessment EMO - Environmental Management Office EMP - Environmental Management Plan EPMs - Environmental Protection Measures EPP - Emergency Preparedness Plan GOC - Government of China GWh - Gigawatt hours ICB - International Competitive Bidding IDA - International Development Association LRM - Lower Reach Model MCM - Million Cubic Meters MWR - Ministry of Water Resources NCB - National Competitive Bidding NCPN - North China Power Network NCHEI - North China Hydroelectric Institute PAB - Provincial Audit Bureau PAD - Project Appraisal Document POE - The International Panel of Experts on Environment and Resettlement PRO - Provincial
    [Show full text]