Dennis Frawley

The RINALDI Project Executive G R O U P

PROFESSIONAL EXPERIENCE The Rinaldi Group - Secaucus, NJ Project Executive 2420 Amsterdam Avenue - New York, NY A new 24-story ground-up mixed use Office & Hospitality development in the Washing Heights section on New York City. The gross square footage is approximately 287,000 GSF across two connecting towers. At over 260 feet in height this will be one of the tallest buildings in the neighborhood. Amenities will include underground parking, event space with outdoor terraces, and ground-floor restaurant and retail. VALUE $87,361,278 - SIZE 24-Story 286,999 SF 221 Key - Stonehill & Taylor - MEP Cosentini Associates - Gace Consulting - OWNER Youngwoo & Associates Residences at Mandarin Oriental 685 Fifth Avenue New York, NY Located in Manhattan’s Plaza District neighborhood, this existing 20-Story property located at 685 Fifth Avenue was built in 1926 on the block encompassing “the world’s most expensive real estate” and the country’s highest retail on average annually at $3,000/SF in 2017, as referenced by the New York Times. This most prestigious corner property located on 54th Street & Fifth Avenue between Central Park and [email protected] Rockefeller Center will undergo a significant upgrade structurally removing the existing roof structure and adding 10-Stories to this historical residential building. This monumental undertaking will add roughly 20,000 SF of residential space expanding the existing 20-Stories totaling 115,000 SF of building to newly constructed 30-Stories totaling some 135,000 SF, while converting what was once 148-residential units into 69-ultra-luxurious condominium residences. While maintaining such exclusive retail tenants such as TAG Heuer and COACH, the Residences at Mandarin Oriental create a most exquisite lifestyle experience bringing together the palatial amenities and opulent services of the legendary Mandarin Oriental with the elegance and ambience of a private home setting. “The Rinaldi Group is honored and sincerely feels privileged to be building such a significant project for such a dynamic and truly remarkable real estate mogul and developer the likes of Michael Shvo, who we have been pursuing as an organization for quite some time”, Mr. Rinaldi noted as the firm’s CEO and President – VALUE $69,987,242 – SIZE 30 Stories, 69 Units 115,000 SF – ARCHITECT Marin - STRUCTURAL ENGINEER DeSimone - March & White - MEPS ENGINEER Lilker Associates Mechanical and Electrical Engineers - DEVELOPER Michael SHVO

Happy Living Development Director Of Managed the complete Pre-construction and Construction process for 3 New Building Development Projects, overall square footage sizes of 90,000 to 160,000 square feet Residential buildings Cava Construction & Development, Inc. Project Executive Oversee a team of 5 Project Managers, 5 Assistant Project Managers and 2 Project Administrator to complete (turn-key) the full construction of 5 Superstructure Hotels (Hilton, Marriot & Doubletree) The 5 Hotels were 42 Stories/110 thousand sq. ft, 36 Stories/115 thousand sq. ft, 40 Stories/90,000 sq. ft, 45 Stories /140,000 sq. ft and 52 Stories/195,000 square feet and were taken from full Permit stage through all Excavation, Support of Excavation, Superstructure and full fit out. The budgets were approximately $650,000,000 combined. Hibernian Cm LLC General Contractors & Construction Managers 575 Lexington Avenue Lobby & Curtain Wall Renovation for Normandy Real Estate Partners ($7.3 Million) 8,000 square foot complete gut and renovation of existing Lobby, Elevators (16), 1st Floor Curtain Wall/ Façade and 100’ of Retail Storefront (Duane Reade and Cameraland)

RINALDINYC.COM GATEWAY PLAZA ONE HARMON MEADOW BLVD 1ST FLOOR • SECAUCUS NEW JERSEY 07094 • 201 601 4065 Dennis Frawley

The RINALDI Project Executive G R O U P

Jt Magen & Company Inc. Senior CHRISTIES REDSTONE ($1.5 MILLION) Creation of 10,000 square foot Climate-Controlled Fine Art & Collectibles wing within present Christies Redstone location in Long Island City. LANVIN MEN RETAIL FLAGSHIP STORE ($ 4 MILLION) VALENTINO RETAIL FLAGSHIP STORE ($5.5 MILLION) LORO PIANA RETAIL STORE ($5.5 MILLION) COLUMBUS PARK TOWERS LOBBY & ELEVATOR LOBBY FIT OUT ($2.5 MILLION) Overview: Coordinate and oversee all Subcontractor activity on several Interior Fit-Outs and Major Renovations for specific high-profile Clients throughout the New York City area. Served as Site Manager to produce a Project Schedule for submission to Architect and Owner’ Representative. Established multiple Site Office locations and coordinated Subcontractor activities and conducted all Weekly Subcontractor Meetings to monitor progress and adherence to Project Schedule. Responsible for all duties related to Site Manager while also coordinating all Submittals, Shop Drawings, RFI’s and any necessary communication with Project Architects and Engineers. Vanguard Construction Corp. Senior Project Manager BOWLMOR TIMES SQUARE- NEW YORK, N.Y. Conversion of existing 90,000 sq. ft. (Total of 3 Floors) of raw space within former N.Y. Times Building into 50 Bowling Lanes, 3 Bars and Executive Restaurant. Overview: Led development of RFP for CM Contract, reviewed, analyzed and made final Award Recommendations to Ownership for CM/GC based on all RFP responses. (12 CM/GC participated in formal Bidding Phase) Negotiated all final CM/GC contract percentages for General Conditions, Insurance and Fee Structure. Work closely with Metropolis (DOB Expeditor) for all needed DOB Permits and FDNY Sign-Offs. Responsible for all AIA Application for Payment and financial package preparation of $30,000,000 project for submission to Ownership and Landlord (Africa Israel via C.B.R.E. (Building Manager)) Review all General Contractor Change Orders for approval and validity. Represent Ownership in all C.B.R.E. (Building Manager) related matters throughout 12-month construction period. The General Theological Seminary Of The Episcopal Church - NY, NY Owner’ Representative, Redevelopment Project Manager & Facility Manager Overview: Manage and represent owner on all capital redevelopment projects and serve as Facilities Manager for the campus including the Desmond Tutu Education Center. Manage procurement, permits, and timelines, and liaise with federal, state and city agencies. Supervise a 12-person staff and 32 union personnel. Serve as Fire Safety Director. Worked directly with architects (Beyer Blinder and Belle) and engineers (AKF, Walter B. Melvin, Edwards & Zuck & P.W. Grosser). Individual GTS projects have included: - Creation of the Desmond Tutu Education Center, including conference rooms, meeting space, kitchens, and guest rooms. Oversaw all relations with Bovis Lend Lease LMB ($31M). - Supervised the building of the Dodge Kohne dormitory ($5M). - Oversaw creation of seven, 1500 ft. deep, standing column, Geothermal Wells drilled into Manhattan bedrock on surrounding sidewalks ($7.8M). - Directed relocation of 40 GTS staff out of 9th Avenue building (Sherrill Hall) into multiple buildings on campus to permit development of Campus building by The Brodsky Organization & Bovis Lend Lease. (initiated 1/2007). - Supervised internal/external renovations/rehab of three historic townhouse residences ($5M).

RINALDINYC.COM Page 2 GATEWAY PLAZA ONE HARMON MEADOW BLVD 1ST FLOOR • SECAUCUS NEW JERSEY 07094 • 201 601 4065 Dennis Frawley

The RINALDI Project Executive G R O U P

James A. Jennings Co. Inc. - New York, NY Consultant, Project Manager, Estimator, Purchasing Agent Overview: Supervised/directed construction projects at medical, radiology, and commercial facilities at Nassau University Medical Center and North Shore University Hospital. Coordinated construction design and installation with equipment representatives and clients. Liaised between architects, engineers and subcontractors. Oversaw daily scheduling of subcontractors. Conducted weekly on-site meetings with all trades and key personnel. Maintained established budgets and applied value engineering when required. Individual Jennings/Nassau Medical Center and North Shore University Hospital projects included: - Total gut rehabilitation of 10,000 sf. area Nassau University Medical Center, COPC, OMNI Healthcare, Pediatrics and Occupational Health areas (total project cost: $4M). - Total gut rehab of 16,000 sf. Emergency Room, departmental units and staff facilities of the North Shore University Hospital, Forest Hills (total project cost $8.5M). - New construction of patient rooms, nursing unit, diagnostic center, North Shore University Hospital. Construction Manager (Directly For Client) J.R.S. Architects, Inc. - New York, NY Overview: Managed construction of expedited completion of multi-million dollar building in Mineola, N.Y. for J.R.S. Architects. Supervised erection of building frame with all interior build-out during six-month project. Ordered specialty material and coordinated all subcontractor trade personnel. PRIOR CONSTRUCTION EXPERIENCE SUPERVISOR - MR Precision, Inc. - Projects in Washington, DC, Maryland and Virginia SUPERVISOR - Empire State Corporation - Building/renovating The Gap, Macy’s Herald Square, Disney Store, Coach Leather SUPERVISOR - Herbert Construction Corporation - Construction of Century 21, Toys R Us, and Disney Store CARPENTER/FOREMAN - United Brotherhood of Carpenters Local Union 608

EDUCATION BA in - Hofstra University CAD/Engineering - Nassau University Continuing Education

RINALDINYC.COM Page 3 GATEWAY PLAZA ONE HARMON MEADOW BLVD 1ST FLOOR • SECAUCUS NEW JERSEY 07094 • 201 601 4065