FAA ‐ Office of FY 2017 Grants Awarded

Region ADO State LocID Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Improve Seaplane Base, Rehabilitate Apron, AL AAL AK LHD Lake Hood P 22 $ 3,935,164 $ 3,935,164 $ Rehabilitate Taxiway AL AAL AK MRI Merrill Field P 68 $ 3,445,777 $ 3,445,777 $ Acquire Safety Equipment and/or Fencing AL AAL AK MRI Merrill Field P 69 $ 7,030,000 $ $ 7,030,000 Rehabilitate Apron, Rehabilitate Taxiway AL AAL AK MRI Merrill Field P 70 $ 346,875 $ 346,875 $ Acquire Land For Approaches AL AAL AK ANC Ted Stevens Anchorage International P 180 $ 1,053,120 $ 1,053,120 $ Rehabilitate Terminal Building Reconstruct Taxiway, Reconstruct Taxiway AL AAL AK ANC Ted Stevens Anchorage International P 181 $ 22,129,509 $ 9,609,728 $ 12,519,781 Lighting AL AAL AK ANC Ted Stevens Anchorage International P 182 $ 8,213,161 $ $ 8,213,161 Reconstruct Apron AL AAL AK ANC Ted Stevens Anchorage International P 183 $ 2,749,309 $ $ ‐ 2,749,309 Acquire Snow Removal Equipment AL AAL AK ANC Ted Stevens Anchorage International P 184 $ 4,813,484 $ 4,813,484 $ ‐ Rehabilitate ‐ 15/33 AL AAL AK +07E Angoon (Proposed GA) 7 $ 600,000 $ ‐ 600,000 $ Update Airport Master Plan Study AL AAL AK ANI Aniak P 10 $ 32,247,192 $ 4,497,587 $ ‐ 27,749,605 Construct Runway ‐ 10/28 ‐ Expand Apron, Install Perimeter Fencing required by 49 CFR 1542, Rehabilitate Apron [North Air Taxi ‐ Apron], Rehabilitate Apron [South General ‐ Aviation Apron], Rehabilitate Taxiway [Taxiway E], AL AAL AK BET Bethel P 24 $ 9,762,967 $ 9,762,967 $ ‐ Rehabilitate Taxiway [Taxiway J] ‐ AL AAL AK BET Bethel P 25 $ 614,472 $ 614,472 $ Acquire Aircraft Rescue & Fire Fighting Vehicle AL AAL AK BGQ Big Lake GA 2 $ 359,533 $ 359,533 $ Update Airport Master Plan Study AL AAL AK BVK Buckland CS 3 $ 1,085,545 $ 1,085,545 $ Improve Snow Removal Equipment Building AL AAL AK DLG Dillingham P 16 $ 9,572,170 $ 1,000,000 $ 8,572,170 Rehabilitate Runway ‐ 01/19 AL AAL AK FAI Fairbanks International P 49 $ 751,514 $ 751,514 $ Security Enhancements Acquire Aircraft Rescue & Fire Fighting Vehicle, AL AAL AK FAI Fairbanks International P 50 $ 427,673 $ 427,673 $ ‐ Acquire Snow Removal Equipment AL AAL AK FAI Fairbanks International P 51 $ 375,000 $ 375,000 $ Update Airport Master Plan Study ‐ Reconstruct Taxiway, Reconstruct Taxiway AL AAL AK FAI Fairbanks International P 52 $ 2,658,808 $ 2,658,808 $ ‐ Lighting ‐ Install Miscellaneous NAVAIDS, Rehabilitate AL AAL AK GAL Edward G Pitka Sr P 7 $ 3,323,179 $ 3,323,179 $ Apron, Remove Obstructions [Non‐Hazard] ‐ Reconstruct Runway Lighting ‐ 16/34, Rehabilitate Apron, Rehabilitate Runway ‐ 16/34, Rehabilitate AL AAL AK GAM Gambell CS 4 $ 8,931,755 $ 3,356,070 $ ‐ 5,575,685 Taxiway ‐ Install Perimeter Fencing, Rehabilitate Apron, AL AAL AK HNS Haines CS 6 $ 11,485,943 $ 11,485,943 $ Rehabilitate Taxiway AL AAL AK JNU Juneau International P 71 $ 1,979,062 $ 1,979,062 $ ‐ Rehabilitate Taxiway, Rehabilitate Taxiway AL AAL AK JNU Juneau International P 72 $ 765,000 $ $ 765,000 Improve Seaplane Base ‐ Construct Apron [Northeast Apron], Construct AL AAL AK JNU Juneau International P 73 $ 10,125,000 $ 1,696,128 $ 8,428,872 Apron [Northwest Apron] AL AAL AK JNU Juneau International P 74 $ 4,823,551 $ 323,551 $ 4,500,000 Acquire Snow Removal Equipment AL AAL AK JNU Juneau International P 75 $ 240,000 $ $ 240,000 Energy Efficiency Equipment/Infrastructure Update Miscellaneous Study, Update State AL AAL AK *AKS State of Alaska 23 $ 2,000,000 $ 2,000,000 $ ‐ System Plan Study ‐ Install Perimeter Fencing required by 49 CFR 1542 ‐ (Deadhorse; Nome; Wiley Post‐Will Rogers AL AAL AK *AKV Various Locations in Alaska 110 $ 1,922,831 $ 1,922,831 $ Memorial) Improve Snow Removal Equipment Building AL AAL AK *AKV Various Locations in Alaska 111 $ 2,236,412 $ 2,236,412 $ (Brevig Mission; Kobuk; Kotlik) ‐ Update Airport Master Plan Study (Akiak; Nikolai; AL AAL AK *AKV Various Locations in Alaska 112 $ 281,250 $ 281,250 $ Skwentna) ‐ Acquire Interactive Training System (Bethel; Cold Bay; Deadhorse; Dillingham; Homer; King Salmon; ‐ Kodiak; Nome; Ralph Wien Memorial; Sand Point; Sitka Rocky Gutierrez; Unalaska; Valdez Pioneer AL AAL AK *AKV Various Locations in Alaska 113 $ 178,772 $ 178,772 $ ‐ Field; Wiley Post‐Will Rogers Memorial) Remove Obstructions [Non‐Hazard] (Akiak; ‐ Haines; Holy Cross; Hoonah; Kwethluk; Red Devil; AL AAL AK *AKV Various Locations in Alaska 114 $ 1,030,400 $ 1,030,400 $ Stony River 2; Togiak)

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 1 of 48

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Install Apron Edge Lights (Nelson Lagoon), Install Miscellaneous NAVAIDS (Brevig Mission; Chalkyitsik; Noatak; Scammon Bay; Tuntutuliak), Rehabilitate Runway Lighting (Nelson Lagoon ‐ AL AAL AK *AKV Various Locations in Alaska 115 $ 780,502 $ 780,502 $ 08/26)

Acquire Interactive Training System (Gustavus; Merle K (Mudhole) Smith; Petersburg James A Johnson; Wrangell; Yakutat), Acquire Snow Removal Equipment (Chignik Lake; Wrangell), Install Miscellaneous NAVAIDS (Ekwok), Install ‐ Perimeter Fencing required by 49 CFR 1542 (Merle K (Mudhole) Smith), Rehabilitate Runway (Chignik ‐ 02/20; Merle K (Mudhole) Smith ‐ 09/27; New Stuyahok ‐ 14/32; Petersburg James A Johnson ‐ 05/23; Wrangell ‐ 10/28; Yakutat ‐ 02/20; Yakutat ‐ 11/29), Remove Obstructions AL AAL AK *AKV Various Locations in Alaska 116 $ 2,511,035 $ 2,511,035 $ [Non‐Hazard] (Chignik; Ekwok)

Acquire Snow Removal Equipment (Akiak; Aniak; Atmautluak; Crooked Creek; Deadhorse; King Salmon; Kipnuk; Larsen Bay; McGrath; Napaskiak; Noatak; Ralph Wien Memorial; Skwentna; Tununak; Unalaska; Valdez Pioneer Field; Wiley AL AAL AK *AKV Various Locations in Alaska 117 $ 6,717,999 $ 6,717,999 $ Post‐Will Rogers Memorial) ‐

Rehabilitate Runway (Atka ‐ 16/34; Bethel ‐ 01L/19R; Bethel ‐ 01R/19L; Deadhorse ‐ 05/23; Dillingham ‐ 01/19; Emmonak ‐ 16/34; Homer ‐ 04/22; Iliamna ‐ 07/25; Iliamna ‐ 17/35; Ketchikan International ‐ 11/29; King Salmon ‐ 12/30; King ‐ Salmon ‐ 18/36; Kodiak ‐ 01/19; Kodiak ‐ 08/26; Kongiganak ‐ 01/19; McGrath ‐ 16/34; Nelson Lagoon ‐ 08/26; Nome ‐ 03/21; Nome ‐ 10/28; Point Hope ‐ 01/19; Ralph Wien Memorial ‐ 09/27; Shaktoolik ‐ 14/32; Shungnak ‐ 09/27; Sitka Rocky Gutierrez ‐ 11/29; St George ‐ 11/29; Stebbins ‐ 05/23; Unalaska ‐ 13/31; Valdez Pioneer Field ‐ AL AAL AK *AKV Various Locations in Alaska 118 $ 3,537,708 $ 3,537,708 $ 06/24; Wiley Post‐Will Rogers Memorial ‐ 07/25) AL AAL AK ENA Kenai Municipal P 56 $ 488,444 $ 488,444 $ Rehabilitate Terminal Building AL AAL AK ENA Kenai Municipal P 57 $ 1,020,711 $ 1,020,711 $ Acquire Snow Removal Equipment AL AAL AK KTN Ketchikan International P 24 $ 300,000 $ 300,000 $ Update Airport Master Plan Study

AL AAL AK KTN Ketchikan International P 25 $ 698,040 $ 698,040 $ Acquire Aircraft Rescue & Fire Fighting Vehicle

Construct Taxiway, Expand Apron, Extend Runway ‐ ‐ 06/24, Reconstruct Runway ‐ 06/24, Reconstruct ‐ Runway Lighting ‐ 06/24, Rehabilitate Access AL AAL AK IAN Bob Baker Memorial CS 3 $ 15,061,066 $ 9,400,498 $ ‐ 5,660,568 Road, Rehabilitate Apron AL AAL AK KVC King Cove GA 5 $ 321,639 $ 321,639 $ ‐ Update Airport Master Plan Study AL AAL AK AKN King Salmon P 15 $ 185,625 $ 185,625 $ Acquire Easement For Approaches ‐ AL AAL AK AKN King Salmon P 16 $ 7,500,000 $ 900,000 $ 6,600,000 Rehabilitate Runway ‐ 12/30, Rehabilitate Taxiway AL AAL AK +09L New 1 $ 93,750 $ 93,750 $ Conduct Environmental Study Rehabilitate Apron, Rehabilitate Runway ‐ 15/33, AL AAL AK EWU Newtok CS 5 $ 2,343,930 $ 2,343,930 $ Rehabilitate Taxiway

‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 2 of 48 FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Improve Airport Miscellaneous Improvements, Install Apron Lighting, Install Emergency Generator, Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Runway ‐ 05/23, AL AAL AK AQT Nuiqsut CS 3 $ 7,188,627 $ 1,608,158 $ 5,580,469 Rehabilitate Taxiway Expand Apron, Improve Runway Safety Area ‐ 16/34, Rehabilitate Runway ‐ 09/27, Rehabilitate Runway ‐ 16/34, Rehabilitate Taxiway, Remove AL AAL AK PAQ Palmer Municipal GA 21 $ 7,335,281 $ 353,964 $ 6,981,317 Obstructions AL AAL AK +07L Pilot Station 2 $ 3,342,374 $ 3,342,374 $ Construct New Airport AL AAL AK SDP Sand Point CS 12 $ 90,374 $ 90,374 $ Acquire Safety Equipment and/or Fencing

AL AAL AK SIT Sitka Rocky Gutierrez P 31 $ 906,676 $ 906,676 $ Install Perimeter Fencing required by 49 CFR 1542 AL AAL AK VDZ Valdez Pioneer Field P 10 $ 609,375 $ 609,375 $ Update Airport Master Plan Study SO JAN AL EET Shelby County GA 20 $ 55,404 $ 55,404 $ Construct Building

Improve Airport Erosion Control, Install Perimeter ‐ Fencing, Reconstruct Taxiway, Rehabilitate Apron, SO JAN AL 8A0 Albertville Regional‐Thomas J Brumlik Field GA 27 $ 655,350 $ 655,350 $ ‐ Update Airport Master Plan Study SO JAN AL ALX Thomas C Russell Field GA 17 $ 1,222,200 $ 300,000 $ 922,200 Reconstruct Taxiway SO JAN AL 79J South Alabama Regional at Bill Benton Field GA 22 $ 154,711 $ 154,711 $ ‐ Rehabilitate Runway ‐ 11/29 SO JAN AL 26A Ashland/Lineville GA 11 $ 40,500 $ 40,500 $ ‐ Rehabilitate Runway ‐ 09/27 ‐ Construct Fuel Farm, Remove Obstructions [Non‐ SO JAN AL 0R1 Atmore Municipal GA 14 $ 318,217 $ 318,217 $ Hazard] SO JAN AL AUO Auburn University Regional GA 30 $ 3,811,500 $ 185,317 $ 3,626,183 Rehabilitate Taxiway SO JAN AL 1R8 Bay Minette Municipal GA 13 $ 1,303,838 $ 167,318 $ 1,136,520 Rehabilitate Runway ‐ 08/26 SO JAN AL EKY Bessemer R 16 $ 238,008 $ 238,008 $ ‐ Install Perimeter Fencing Rehabilitate Apron, Rehabilitate Runway ‐ 07/25, SO JAN AL PYP Centre‐Piedmont‐Cherokee County Regional GA 10 $ 310,968 $ 310,968 $ ‐ Rehabilitate Taxiway ‐ Acquire Land for Development, Update Airport SO JAN AL 0A8 Bibb County GA 11 $ 238,371 $ 238,371 $ Master Plan Study ‐ Conduct Environmental Study, Conduct SO JAN AL 02A Chilton County GA 14 $ 102,960 $ 102,960 $ Miscellaneous Study SO JAN AL 9A4 Courtland GA 12 $ 539,653 $ 539,653 $ Rehabilitate Runway ‐ 13/31 SO JAN AL CMD Cullman Regional‐Folsom Field GA 24 $ 605,318 $ 605,318 $ ‐ Reconstruct Taxiway SO JAN AL 4R9 Jeremiah Denton GA 14 $ 150,000 $ 150,000 $ Rehabilitate Runway ‐ 12/30 ‐ Construct Service Road, Install Guidance Signs, SO JAN AL DHN Dothan Regional P 40 $ 1,554,696 $ 1,554,696 $ Rehabilitate Apron SO JAN AL EUF Weedon Field GA 21 $ 1,507,516 $ 200,591 $ ‐ 1,306,925 Rehabilitate Runway ‐ 18/36 Remove Obstructions [Non‐Hazard], Update SO JAN AL GZH Middleton Field GA 14 $ 135,258 $ 135,258 $ ‐ Airport Master Plan Study SO JAN AL CQF H. L. (Sonny) Callahan GA 18 $ 66,243 $ 66,243 $ ‐ Construct Taxiway SO JAN AL M95 Richard Arthur Field GA 9 $ 1,589,341 $ 600,000 $ ‐ 989,341 Rehabilitate Runway ‐ 18/36 SO JAN AL 0J4 Florala Municipal GA 6 $ 81,086 $ 81,086 $ ‐ Conduct Environmental Study SO JAN AL 5R4 Foley Municipal GA 15 $ 78,678 $ 78,678 $ Improve Airport Drainage SO JAN AL GAD Northeast Alabama Regional GA 18 $ 150,000 $ 150,000 $ ‐ Conduct Airport Master Plan Study SO JAN AL 7A0 Greensboro Municipal GA 6 $ 150,000 $ 150,000 $ Construct Fuel Farm SO JAN AL PRN MacCrenshaw Memorial GA 13 $ 106,818 $ 106,818 $ Reconstruct Runway ‐ 14/32 SO JAN AL JKA Jack Edwards GA 30 $ 341,805 $ 341,805 $ ‐ Rehabilitate Runway Lighting ‐ 09/27 ‐ Construct Runway ‐ 07/25, Update Airport Master SO JAN AL 8A1 Guntersville Municipal ‐ Joe Starnes Field GA 21 $ 97,895 $ 97,895 $ Plan Study SO JAN AL HAB Marion County‐Rankin Fite GA 15 $ 50,400 $ 50,400 $ ‐ Construct Taxiway SO JAN AL 5M0 Hartselle‐Morgan County Regional GA 14 $ 196,227 $ 196,227 $ ‐ Remove Obstructions [Non‐Hazard] ‐ Construct Access Road, Install Weather Reporting SO JAN AL MDQ Huntsville Executive Airport Tom Sharp Jr Field GA 27 $ 1,049,746 $ 1,049,746 $ ‐ Equipment SO JAN AL HSV Huntsville International‐Carl T Jones Field P 80 $ 6,495,151 $ $ ‐ 6,495,151 Construct Taxiway ‐ Acquire Interactive Training System, Rehabilitate ‐ Apron, Rehabilitate Terminal Building [Jet SO JAN AL HSV Huntsville International‐Carl T Jones Field P 81 $ 3,706,792 $ 3,706,792 $ ‐ Bridges], Update Miscellaneous Study SO JAN AL JFX Walker County‐Bevill Field GA 19 $ 983,810 $ 983,810 $ ‐ Construct Taxiway

‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 3 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Conduct Aeronautical Survey for RNAV Approach, SO JAN AL 7A3 Lanett Municipal GA 14 $ 3,449,967 $ 150,000 $ 3,299,967 Construct Runway ‐ 08/26 Install Taxiway Lighting, Reconstruct Taxiway, SO JAN AL BFM Mobile Downtown GA 33 $ 261,508 $ 261,508 $ Update Miscellaneous Study Acquire Aircraft Rescue & Fire Fighting Vehicle, Reconstruct Runway Lighting ‐ 15/33, Rehabilitate SO JAN AL MOB Mobile Regional P 55 $ 8,319,730 $ 2,225,876 $ 6,093,854 Runway ‐ 15/33 SO JAN AL MVC Monroe County GA 14 $ 183,899 $ 183,899 $ Install Perimeter Fencing Acquire Equipment, Install Perimeter Fencing, Rehabilitate Access Road, Rehabilitate Runway ‐ SO JAN AL MGM Montgomery Regional (Dannelly Field) P 47 $ 3,597,374 $ 3,597,374 $ 10/28 SO JAN AL *ALS State of Alabama 5 $ 900,000 $ $ ‐ 900,000 Update State System Plan Study SO JAN AL DCU Pryor Field Regional GA 26 $ 888,300 $ 151,847 $ 736,453 Reconstruct Runway Lighting ‐ 18/36 Install Perimeter Fencing, Rehabilitate Terminal SO JAN AL MSL Northwest Alabama Regional GA 37 $ 438,380 $ 438,380 $ Building SO JAN AL 71J Blackwell Field GA 18 $ 54,689 $ 54,689 $ ‐ Update Airport Master Plan Study SO JAN AL PLR St Clair County R 18 $ 232,200 $ 232,200 $ Rehabilitate Runway ‐ 03/21 SO JAN AL 1A9 Prattville ‐ Grouby Field GA 19 $ 359,443 $ 359,443 $ Acquire Land for Development SO JAN AL 3M8 North Pickens GA 9 $ 41,328 $ 41,328 $ ‐ Conduct Environmental Study SO JAN AL M22 Bill Pugh Field GA 13 $ 169,975 $ ‐ 169,975 $ Improve Airport Drainage SO JAN AL 4A6 Scottsboro Municipal‐Word Field GA 21 $ 508,616 $ 508,616 $ Construct Taxiway SO JAN AL SEM Craig Field GA 18 $ 147,502 $ 147,502 $ Rehabilitate Apron ‐ Rehabilitate Taxiway, Rehabilitate Taxiway SO JAN AL 2R5 St Elmo GA 10 $ 642,471 $ 150,000 $ ‐ 492,471 Lighting SO JAN AL SCD Merkel Field Sylacauga Municipal GA 21 $ 82,344 $ 82,344 $ ‐ Rehabilitate Runway ‐ 09/27 SO JAN AL ASN Talladega Municipal GA 29 $ 369,189 $ 369,189 $ ‐ Rehabilitate Taxiway SO JAN AL TOI Troy Municipal Airport at N Kenneth Campbell Field GA 18 $ 227,864 $ 227,864 $ ‐ Rehabilitate Runway ‐ 07/25 SO JAN AL TCL Tuscaloosa Regional GA 31 $ 32,400 $ 32,400 $ ‐ Wildlife Hazard Assessments SO JAN AL 06A Moton Field Municipal GA 19 $ 585,039 $ 585,039 $ ‐ Construct Terminal Building ‐ Conduct Miscellaneous Study, Extend Runway ‐ SO JAN AL 07A Franklin Field GA 7 $ 299,348 $ 299,348 $ 14/32 Conduct Aeronautical Survey for RNAV Approach, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 09/27, SO JAN AL 08A Wetumpka Municipal GA 18 $ 191,529 $ 191,529 $ ‐ Rehabilitate Taxiway SW AROK AR M73 Almyra Municipal GA 7 $ 171,369 $ 171,369 $ ‐ Update Airport Master Plan Study SW AROK AR ADF Dexter B Florence Memorial Field GA 16 $ 51,120 $ 51,120 $ ‐ Conduct Miscellaneous Study ‐ Install Miscellaneous NAVAIDS, Rehabilitate SW AROK AR CVK Sharp County Regional GA 10 $ 88,965 $ 88,965 $ Airport Beacons SW AROK AR SUZ Saline County Regional GA 11 $ 132,511 $ 132,511 $ ‐ Rehabilitate Apron, Rehabilitate Taxiway SW AROK AR VBT Bentonville Municipal/Louise M Thaden Field GA 13 $ 2,272,603 $ 2,272,603 $ Construct Taxiway SW AROK AR XNA Northwest Arkansas Regional P 53 $ 219,136 $ 219,136 $ Improve Terminal Building SW AROK AR 4M1 Carroll County GA 16 $ 212,305 $ 212,305 $ ‐ Rehabilitate Taxiway SW AROK AR HKA Blytheville Municipal GA 16 $ 225,820 $ 225,820 $ ‐ Rehabilitate Apron, Rehabilitate Taxiway SW AROK AR M36 Frank Federer Memorial GA 10 $ 58,033 $ 58,033 $ ‐ Rehabilitate Runway ‐ 02/20 Install Weather Reporting Equipment, SW AROK AR 4M3 Carlisle Municipal GA 15 $ 352,794 $ 352,794 $ ‐ Rehabilitate Taxiway ‐ Install Perimeter Fencing not Required by 49 CFR SW AROK AR 4M8 Clarendon Municipal GA 10 $ 124,259 $ 124,259 $ ‐ 1542 ‐ Install Miscellaneous NAVAIDS, Install Runway ‐ Vertical/Visual Guidance System ‐ 09/27, SW AROK AR H35 Clarksville Municipal GA 12 $ 475,447 $ 475,447 $ ‐ Reconstruct Runway Lighting ‐ 09/27 SW AROK AR CCA Clinton Municipal GA 14 $ 98,433 $ 98,433 $ ‐ Rehabilitate Apron SW AROK AR DRP Delta Regional GA 11 $ 361,275 $ 361,275 $ Improve Airport Drainage SW AROK AR DEQ J Lynn Helms Sevier County GA 13 $ 189,065 $ 189,065 $ ‐ Rehabilitate Apron Conduct Aeronautical Survey for RNAV Approach, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 18/36, SW AROK AR 5M1 De Witt Municipal Airport Whitcomb Field GA 10 $ 300,008 $ 300,008 $ Rehabilitate Taxiway SW AROK AR 0M0 Billy Free Municipal GA 11 $ 604,696 $ 604,696 $ Construct Taxiway ‐ Install Runway Vertical/Visual Guidance System ‐ SW AROK AR ELD South Arkansas Regional at Goodwin Field CS 20 $ 196,564 $ 196,564 $ ‐ 13/31 SW AROK AR FYV Drake Field GA 44 $ 137,520 $ 137,520 $ ‐ Widen Taxiway ‐

‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 4 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SW AROK AR FYV Drake Field GA 45 $ 25,740 $ $ 25,740 Conduct Airport Energy Efficiency Assessment

SW AROK AR FSM Fort Smith Regional P 46 $ 3,131,011 $ 1,634,312 $ 1,496,699 Construct Aircraft Rescue & Fire Fighting Building SW AROK AR HBZ Heber Springs Municipal GA 13 $ 78,300 $ 78,300 $ Rehabilitate Runway ‐ 05/23 SW AROK AR M18 Hope Municipal GA 11 $ 90,629 $ 90,629 $ Conduct Miscellaneous Study SW AROK AR 6M2 Horseshoe Bend GA 8 $ 197,550 $ 197,550 $ Update Airport Master Plan Study SW AROK AR HOT Memorial Field CS 25 $ 2,279,854 $ 1,489,354 $ 790,500 Expand Apron

‐ Improve Airport Drainage, Install Miscellaneous SW AROK AR M32 Lake Village Municipal GA 12 $ 124,150 $ 124,150 $ NAVAIDS, Rehabilitate Airport Beacons Construct Runway ‐ 04R/22L, Reconstruct Runway SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 87 $ 2,704,671 $ 2,704,671 $ ‐ Lighting ‐ 04R/22L SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 88 $ 1,382,900 $ 1,382,900 $ ‐ Rehabilitate Taxiway SW AROK AR LIT Bill and Hillary Clinton National/Adams Field P 89 $ 4,962,981 $ $ ‐ 4,962,981 Improve Runway Safety Area ‐ 04L/22R

Install Runway Lighting ‐ 18/36, Install Runway SW AROK AR AGO Magnolia Municipal GA 13 $ 344,945 $ 344,945 $ Vertical/Visual Guidance System ‐ 18/36 SW AROK AR MXA Manila Municipal GA 12 $ 247,995 $ 247,995 $ ‐ Rehabilitate Taxiway SW AROK AR 7M1 McGehee Municipal GA 11 $ 101,397 $ 101,397 $ Update Airport Master Plan Study SW AROK AR 42A Melbourne Municipal ‐ John E Miller Field GA 17 $ 195,134 $ 195,134 $ ‐ Construct Taxiway SW AROK AR LLQ Monticello Municipal/Ellis Field GA 15 $ 450,000 $ 450,000 $ ‐ Expand Apron, Install Apron Lighting SW AROK AR BDQ Morrilton Municipal GA 10 $ 467,203 $ ‐ 467,203 $ Rehabilitate Runway ‐ 09/27 SW AROK AR 7M3 Bearce GA 14 $ 326,259 $ 326,259 $ Expand Apron, Rehabilitate Apron SW AROK AR BPK Baxter County GA 18 $ 312,364 $ 312,364 $ Update Airport Master Plan Study SW AROK AR ORK North Little Rock Municipal R 25 $ 250,033 $ 250,033 $ ‐ Rehabilitate Runway ‐ 05/23 SW AROK AR 7M5 Ozark‐Franklin County GA 8 $ 155,476 $ 155,476 $ ‐ Construct Taxiway SW AROK AR PGR Kirk Field GA 12 $ 129,135 $ 129,135 $ ‐ Update Airport Master Plan Study SW AROK AR PGR Kirk Field GA 13 $ 156,510 $ 156,510 $ ‐ Acquire Land For Approaches SW AROK AR 7M7 Piggott Municipal GA 11 $ 65,518 $ 65,518 $ ‐ Install Airport Beacons SW AROK AR ROG Rogers Executive ‐ Carter Field GA 36 $ 2,006,433 $ 150,000 $ ‐ 1,856,433 Expand Apron SW AROK AR 9M8 Sheridan Municipal GA 9 $ 83,101 $ 83,101 $ ‐ Construct Taxiway ‐ Install Runway Vertical/Visual Guidance System ‐ ‐ 18/36, Reconstruct Perimeter Fencing not SW AROK AR SLG Smith Field GA 14 $ 241,822 $ 241,822 $ ‐ Required by 49 CFR 1542 ‐ Reconstruct Runway Lighting ‐ 18/36, Rehabilitate SW AROK AR ASG Springdale Municipal GA 18 $ 207,450 $ 207,450 $ ‐ Runway ‐ 18/36 SW AROK AR TXK Texarkana Regional‐Webb Field P 41 $ 982,998 $ 982,998 $ ‐ Construct Taxiway SW AROK AR TXK Texarkana Regional‐Webb Field P 42 $ 651,798 $ 651,798 $ Construct Terminal Building ‐ Install Runway Vertical/Visual Guidance System ‐ 09/27, Install Runway Vertical/Visual Guidance SW AROK AR SGT Stuttgart Municipal GA 24 $ 207,915 $ 207,915 $ ‐ System ‐ 18/36, Reconstruct Taxiway Lighting SW AROK AR M27 Waldron Municipal GA 10 $ 31,338 $ 31,338 $ Rehabilitate Runway ‐ 09/27 SW AROK AR AWM West Memphis Municipal R 27 $ 2,937,464 $ 300,000 $ ‐ 2,637,464 Expand Apron ‐ WP HNL AS FAQ Fitiuta GA 30 $ 500,000 $ 500,000 $ ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle WP HNL AS Z08 Ofu GA 15 $ 500,000 $ 500,000 $ Rehabilitate Runway ‐ 08/26 WP HNL AS PPG Pago Pago International P 61 $ 1,000,000 $ 1,000,000 $ Rehabilitate Runway ‐ 05/23 WP HNL AS PPG Pago Pago International P 62 $ 3,027,755 $ $ 3,027,755 Rehabilitate Runway ‐ 05/23 WP HNL AS PPG Pago Pago International P 63 $ 500,000 $ $ ‐ 500,000 Construct Parking Lot WP HNL AS PPG Pago Pago International P 64 $ 135,000 $ $ ‐ 135,000 Improve Runway Safety Area ‐ 08/26 WP HNL AS PPG Pago Pago International P 65 $ 10,000,000 $ $ 10,000,000 Rehabilitate Apron WP PHX AZ E95 Benson Municipal GA 18 $ 375,290 $ 375,290 $ Reconstruct Access Road ‐ ‐ Conduct Miscellaneous Study, Reconstruct Apron ‐ [General Aviation Apron], Reconstruct Apron ‐ [Remain Overnight Apron], Rehabilitate Apron WP PHX AZ IFP Laughlin/Bullhead International P 48 $ 8,307,555 $ ‐ 1,346,218 $ 6,961,337 [Commercial Apron] WP PHX AZ P52 Cottonwood GA 18 $ 1,474,609 $ ‐ 1,474,609 $ Reconstruct Apron WP PHX AZ DUG Bisbee Douglas International GA 11 $ 741,497 $ ‐ 741,497 $ Reconstruct Taxiway WP PHX AZ FLG Flagstaff Pulliam P 41 $ 7,890,485 $ 5,256,500 $ ‐ 2,633,985 Rehabilitate Runway ‐ 03/21

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 5 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work WP PHX AZ GEU Glendale Municipal R 26 $ 3,125,313 $ 962,799 $ 2,162,514 Rehabilitate Apron WP PHX AZ GYR Phoenix Goodyear R 22 $ 2,701,900 $ 150,000 $ 2,551,900 Rehabilitate Apron WP PHX AZ GCN Grand Canyon National Park P 28 $ 546,360 $ 546,360 $ Conduct Miscellaneous Study Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment, Runway Incursion WP PHX AZ GCN Grand Canyon National Park P 29 $ 580,056 $ 580,056 $ Markings Improve Airport Miscellaneous Improvements, WP PHX AZ HII Lake Havasu City GA 26 $ 500,000 $ 500,000 $ Install Emergency Generator Rehabilitate Runway Lighting ‐ 04L/22R, Rehabilitate Runway Lighting ‐ 04R/22L, ‐ Rehabilitate Taxiway Lighting [Taxiway D], WP PHX AZ FFZ Falcon Field R 27 $ 1,827,514 $ 150,000 $ 1,677,514 Rehabilitate Taxiway Lighting [Taxiway E] WP PHX AZ FFZ Falcon Field R 28 $ 520,518 $ 520,518 $ Update Airport Master Plan Study WP PHX AZ IWA Phoenix‐Mesa Gateway P 39 $ 4,508,043 $ 4,508,043 $ ‐ Reconstruct Taxiway WP PHX AZ PGA Page Municipal P 31 $ 739,936 $ 739,936 $ Construct Taxiway ‐ Install Perimeter Fencing not Required by 49 CFR WP PHX AZ PAN Payson GA 21 $ 923,738 $ 923,738 $ 1542, Rehabilitate Apron WP PHX AZ 1G4 Grand Canyon West P 19 $ 1,594,551 $ 1,594,551 $ Improve Airport Drainage

WP PHX AZ 1G4 Grand Canyon West P 20 $ 3,522,427 $ 3,522,427 $ Construct Aircraft Rescue & Fire Fighting Building WP PHX AZ DVT Phoenix Deer Valley R 37 $ 3,250,800 $ 150,000 $ ‐ 3,100,800 Construct Taxiway WP PHX AZ PHX Phoenix Sky Harbor International P 84 $ 7,221,604 $ 7,221,604 $ ‐ Reconstruct Apron, Reconstruct Taxiway WP PHX AZ PHX Phoenix Sky Harbor International P 85 $ 2,000,000 $ $ ‐ 2,000,000 Reconstruct Apron WP PHX AZ SDL Scottsdale R 34 $ 1,304,159 $ $ 1,304,159 Rehabilitate Apron ‐ Reconstruct Taxiway Lighting, Rehabilitate WP PHX AZ SDL Scottsdale R 35 $ 4,369,696 $ 3,150,000 $ ‐ 1,219,696 Taxiway WP PHX AZ SOW Show Low Regional GA 26 $ 449,668 $ 449,668 $ Update Airport Master Plan Study ‐ Acquire Land For Approaches, Update Airport WP PHX AZ JTC Springerville Municipal GA 25 $ 121,640 $ 121,640 $ Master Plan Study ‐ ‐ Install Miscellaneous NAVAIDS, Install Runway WP PHX AZ TYL Taylor GA 21 $ 341,170 $ ‐ 341,170 $ Vertical/Visual Guidance System ‐ 03/21 WP PHX AZ TUS Tucson International P 76 $ 17,305,327 $ 4,701,911 $ 12,603,416 Rehabilitate Runway ‐ 11L/29R WP PHX AZ CMR H A Clark Memorial Field GA 25 $ 800,701 $ 800,701 $ Reconstruct Apron WP PHX AZ RQE Window Rock GA 15 $ 2,140,881 $ 2,140,881 $ ‐ Reconstruct Runway ‐ 02/20 Reconstruct Taxiway, Reconstruct Taxiway WP PHX AZ NYL Yuma MCAS/Yuma International P 37 $ 4,469,265 $ 4,469,265 $ ‐ Lighting

WP SFO CA ACV Arcata P 46 $ 5,966,233 $ 3,606,454 $ 2,359,779 Construct Aircraft Rescue & Fire Fighting Building WP SFO CA MER Castle GA 20 $ 217,277 $ 217,277 $ ‐ Update Airport Master Plan Study Construct Wash Rack [Pollution Abatement ‐ Facility ‐ Design], Rehabilitate Apron [Rehabilitate ‐ APron ‐ Design], Rehabilitate Runway Lighting [Runway LED Lighting Rehabilitation ‐ Design] ‐ WP SFO CA AUN Auburn Municipal GA 15 $ 70,461 $ 70,461 $ ‐ 07/25 WP LAX CA L45 Bakersfield Municipal GA 20 $ 563,202 $ 563,202 $ Rehabilitate Apron WP LAX CA BFL Meadows Field P 44 $ 12,678,731 $ 1,409,023 $ 11,269,708 Rehabilitate Runway ‐ 12L/30R WP LAX CA BIH Bishop GA 19 $ 1,671,931 $ 1,671,931 $ ‐ Rehabilitate Apron WP LAX CA BLH Blythe GA 11 $ 198,000 $ 198,000 $ Conduct Environmental Study WP LAX CA L08 Borrego Valley GA 19 $ 135,000 $ 135,000 $ Install Weather Reporting Equipment Install Apron Lighting, Install Runway Vertical/Visual Guidance System ‐ 08/26, ‐ Reconstruct Taxiway Lighting, Rehabilitate WP LAX CA BWC Brawley Municipal GA 19 $ 1,273,750 $ 1,273,750 $ ‐ Runway Lighting ‐ 08/26

‐ Rehabilitate Apron, Rehabilitate Taxiway [Taxiway WP LAX CA BUR Bob Hope P 62 $ 725,310 $ 725,310 $ ‐ C], Rehabilitate Taxiway [Taxiway D] WP LAX CA BUR Bob Hope P 63 $ 2,417,700 $ 2,417,700 $ ‐ Conduct Environmental Study WP LAX CA L71 California City Municipal GA 18 $ 811,666 $ 811,666 $ Rehabilitate Taxiway WP LAX CA CMA Camarillo R 36 $ 3,755,942 $ 3,755,942 $ Construct Apron WP SFO CA 2O6 Chowchilla GA 9 $ 187,200 $ 187,200 $ Rehabilitate Taxiway ‐

‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 6 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Install Runway Vertical/Visual Guidance System ‐ WP SFO CA O60 Cloverdale Municipal GA 11 $ 47,763 $ 47,763 $ 14/32 Improve Heliport/Helipad, Install Airfield Guidance Signs, Install Weather Reporting WP SFO CA C80 New Coalinga Municipal GA 8 $ 150,000 $ 150,000 $ Equipment, Rehabilitate Runway ‐ 01/19 WP SFO CA O22 Columbia GA 17 $ 510,042 $ 510,042 $ Reconstruct Taxiway Rehabilitate Apron, Rehabilitate Taxiway WP SFO CA O08 Colusa County GA 17 $ 437,203 $ 437,203 $ [Hanger], Rehabilitate Taxiway Reconstruct Runway ‐ 07R/25L, Reconstruct WP LAX CA CPM Compton/Woodley R 13 $ 5,704,350 $ 450,000 $ ‐ 5,254,350 Taxiway Reconstruct Runway Lighting ‐ 14L/32R, WP SFO CA CCR Buchanan Field R 22 $ 248,669 $ 248,669 $ Rehabilitate Runway ‐ 14L/32R WP SFO CA CCR Buchanan Field R 23 $ 278,460 $ 278,460 $ ‐ Update Airport Master Plan Study WP SFO CA DWA Yolo County GA 18 $ 212,200 $ 212,200 $ ‐ Improve Airport Drainage WP LAX CA EMT San Gabriel Valley R 17 $ 5,714,843 $ 300,000 $ 5,414,843 Rehabilitate Apron WP SFO CA FCH Fresno Chandler Executive R 24 $ 427,500 $ 427,500 $ ‐ Update Airport Master Plan Study WP SFO CA FAT Fresno Yosemite International P 80 $ 13,324,428 $ 4,986,105 $ 8,338,323 Rehabilitate Taxiway WP LAX CA FUL Fullerton Municipal R 25 $ 150,000 $ 150,000 $ Acquire Equipment

‐ Remove Obstructions [Non‐Hazard] [Obstruction WP SFO CA O16 Garberville GA 11 $ 124,453 $ 124,453 $ ‐ Mitigation Plan Study and aeronautical survey.] WP SFO CA E36 Georgetown GA 13 $ 276,528 $ 276,528 $ ‐ Rehabilitate Runway ‐ 16/34 Install Perimeter Fencing not Required by 49 CFR WP SFO CA GOO Nevada County Air Park GA 19 $ 1,043,595 $ 1,043,595 $ ‐ 1542 WP SFO CA HAF Half Moon Bay R 16 $ 75,087 $ 75,087 $ Rehabilitate Runway Lighting ‐ 12/30 WP SFO CA HJO Hanford Municipal GA 25 $ 900,905 $ 900,905 $ ‐ Rehabilitate Taxiway WP SFO CA HES Healdsburg Municipal GA 12 $ 383,174 $ 383,174 $ Rehabilitate Runway Lighting ‐ 13/31 Acquire Safety Equipment and/or Fencing, WP LAX CA IPL Imperial County CS 36 $ 521,597 $ 521,597 $ ‐ Rehabilitate Runway ‐ 14/32 WP SFO CA JAQ Westover Field Amador County GA 20 $ 150,000 $ 150,000 $ ‐ Wildlife Hazard Assessments WP SFO CA JAQ Westover Field Amador County GA 21 $ 150,000 $ 150,000 $ Update Airport Master Plan Study WP LAX CA L05 Kern Valley GA 8 $ 333,368 $ 333,368 $ ‐ Conduct Environmental Study WP SFO CA KIC Mesa Del Rey GA 14 $ 138,000 $ 138,000 $ ‐ Rehabilitate Runway Lighting ‐ 11/29 WP LAX CA POC Brackett Field R 18 $ 540,000 $ 540,000 $ ‐ Reconstruct Apron WP LAX CA WJF General Wm J Fox Airfield GA 18 $ 810,000 $ 300,000 $ ‐ 510,000 Reconstruct Runway ‐ 06/24 WP SFO CA LHM Lincoln Regional/Karl Harder Field R 22 $ 304,689 $ 304,689 $ Install Perimeter Fencing WP SFO CA LHM Lincoln Regional/Karl Harder Field R 23 $ 85,050 $ 85,050 $ ‐ Conduct Miscellaneous Study WP SFO CA LVK Livermore Municipal R 26 $ 45,000 $ 45,000 $ ‐ Update Miscellaneous Study ‐ Improve Runway Safety Area ‐ 07L/25R, WP LAX CA LGB Long Beach /Daugherty Field/ P 44 $ 15,304,473 $ 8,880,497 $ ‐ 6,423,976 Reconstruct Runway ‐ 07R/25L ‐ Construct Apron [Letter of Intent], Construct WP LAX CA LAX Los Angeles International P 90 $ 11,000,000 $ $ ‐ 11,000,000 Taxiway [Letter of Intent] WP LAX CA LAX Los Angeles International P 91 $ 6,022,204 $ 6,022,204 $ Rehabilitate Runway ‐ 07L/25R ‐ Noise Mitigation Measures for Residences within WP LAX CA LAX Los Angeles International P 92 $ 20,000,000 $ $ ‐ 20,000,000 65 ‐ 69 DNL ‐ Noise Mitigation Measures for Residences within WP LAX CA LAX Los Angeles International P 93 $ 6,500,000 $ $ 6,500,000 65 ‐ 69 DNL Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, WP SFO CA MAE Madera Municipal GA 28 $ 357,812 $ 357,812 $ Rehabilitate Taxiway WP SFO CA MMH Mammoth Yosemite P 37 $ 635,708 $ ‐ 635,708 $ Conduct Environmental Study WP SFO CA MPI Mariposa‐Yosemite GA 13 $ 150,000 $ 150,000 $ ‐ Rehabilitate Apron WP SFO CA MYV Yuba County GA 18 $ 3,824,245 $ 3,824,245 $ Rehabilitate Apron WP SFO CA MOD Modesto City County‐Harry Sham Field GA 41 $ 316,183 $ ‐ 316,183 $ Update Airport Master Plan Study WP SFO CA MRY Monterey Regional P 65 $ 50,000 $ 50,000 $ Conduct Miscellaneous Study ‐ Rehabilitate Runway Lighting ‐ 10R/28L, WP SFO CA MRY Monterey Regional P 66 $ 1,543,794 $ 1,543,794 $ Rehabilitate Taxiway Lighting WP SFO CA APC Napa County R 36 $ 82,581 $ 82,581 $ ‐ Conduct Environmental Study ‐ Conduct Environmental Study, Wildlife Hazard WP SFO CA DVO Gnoss Field R 22 $ 295,000 $ 295,000 $ ‐ Assessments WP SFO CA DVO Gnoss Field R 23 $ 2,274,386 $ 2,274,386 $ ‐ Rehabilitate Runway ‐ 13/31 WP SFO CA OAK Metropolitan Oakland International P 76 $ 37,406,845 $ 4,364,326 $ ‐ 33,042,519 Rehabilitate Runway ‐ 12/30 WP SFO CA OAK Metropolitan Oakland International P 78 $ 3,171,438 $ $ ‐ 3,171,438 VALE Infrastructure

‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 7 of 48 ‐ ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

WP LAX CA OKB Bob Maxwell Memorial Airfield GA 13 $ 157,500 $ 157,500 $ Rehabilitate Runway ‐ 06/24, Rehabilitate Taxiway WP LAX CA ONT Ontario International P 40 $ 6,756,837 $ 6,756,837 $ Construct Taxiway, Reconstruct Taxiway WP SFO CA O37 Haigh Field GA 6 $ 90,000 $ 90,000 $ Rehabilitate Runway ‐ 15/33 WP SFO CA OVE Oroville Municipal GA 22 $ 54,000 $ 54,000 $ Construct Taxiway WP LAX CA OXR Oxnard GA 35 $ 244,058 $ 244,058 $ Update Airport Master Plan Study

WP LAX CA TRM Jacqueline Cochran Regional GA 23 $ 144,000 $ 144,000 $ Rehabilitate Runway ‐ 17/35, Rehabilitate Taxiway WP LAX CA TRM Jacqueline Cochran Regional GA 24 $ 225,000 $ 225,000 $ Update Airport Master Plan Study ‐ Improve Terminal Building, Rehabilitate Runway ‐ Lighting ‐ 13L/31R, Rehabilitate Taxiway, WP LAX CA PSP Palm Springs International P 55 $ 3,900,000 $ 3,900,000 $ ‐ Rehabilitate Taxiway Lighting WP SFO CA PAO Palo Alto R 13 $ 8,479,497 $ 2,090,070 $ ‐ 6,389,427 Reconstruct Apron ‐ Rehabilitate Runway Lighting [Design ‐ Rehabilitate Runway 11/29 (3,600 LF by 75 Feet) WP SFO CA O69 Petaluma Municipal R 27 $ 48,429 $ 48,429 $ ‐ Lights] ‐ 11/29 WP SFO CA O85 Benton Field GA 19 $ 285,230 $ 285,230 $ ‐ Install Weather Reporting Equipment WP SFO CA RDD Redding Municipal P 49 $ 3,857,187 $ 1,274,630 $ 2,582,557 Rehabilitate Taxiway Install Runway Distance‐To‐Go Signs ‐ 08/26, ‐ Install Runway Vertical/Visual Guidance System ‐ WP LAX CA REI Redlands Municipal GA 16 $ 150,000 $ 150,000 $ 08/26 Rehabilitate Runway [Design ‐ Runway 15/33 (3,300 LF by 60 Feet Wide) Crack and Seal Coat WP SFO CA O32 Reedley Municipal GA 18 $ 63,932 $ 63,932 $ ‐ and Remarking.] ‐ 15/33 WP SFO CA O88 Rio Vista Municipal GA 17 $ 285,516 $ 285,516 $ ‐ Improve Airport Drainage

WP LAX CA RAL Riverside Municipal R 29 $ 830,662 $ 830,662 $ Rehabilitate Apron, Rehabilitate Runway ‐ 09/27

WP LAX CA F70 French Valley GA 29 $ 74,700 $ 74,700 $ ‐ Rehabilitate Runway ‐ 18/36, Rehabilitate Taxiway Improve Runway Safety Area ‐ 02/20, Improve WP SFO CA SAC Sacramento Executive R 12 $ 1,016,680 $ 1,016,680 $ Runway Safety Area ‐ 12/30 WP SFO CA SMF Sacramento International P 57 $ 2,236,305 $ $ ‐ 2,236,305 Zero Emissions Vehicle/Infrastructure WP SFO CA MHR Sacramento Mather R 20 $ 3,742,000 $ 1,483,860 $ ‐ 2,258,140 Rehabilitate Apron WP SFO CA *CAS State of California 7 $ 1,200,000 $ 1,200,000 $ Conduct Miscellaneous Study ‐ Rehabilitate Runway ‐ 08/26, Rehabilitate Runway WP SFO CA SNS Salinas Municipal GA 26 $ 100,800 $ 100,800 $ ‐ 13/31 ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, WP SFO CA SQL San Carlos R 19 $ 135,975 $ 135,975 $ Rehabilitate Taxiway WP LAX CA SDM Brown Field Municipal R 19 $ 5,683,692 $ 352,054 $ ‐ 5,331,638 Rehabilitate Runway ‐ 08L/26R WP LAX CA SEE Gillespie Field R 28 $ 1,067,550 $ ‐ 1,067,550 $ Improve Airport Drainage WP LAX CA SAN San Diego International P 77 $ 16,681,479 $ 7,267,715 $ 9,413,764 Rehabilitate Runway ‐ 09/27 ‐ Noise Mitigation Measures for Residences within WP LAX CA SAN San Diego International P 78 $ 8,000,000 $ $ 8,000,000 65 ‐ 69 DNL WP SFO CA SJC Norman Y Mineta San Jose International P 91 $ 816,417 $ 816,417 $ ‐ Rehabilitate Emergency Generator

WP SFO CA SJC Norman Y Mineta San Jose International P 92 $ 575,642 $ 575,642 $ ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle WP SFO CA SJC Norman Y Mineta San Jose International P 94 $ 4,857,478 $ $ 4,857,478 Zero Emissions Vehicle/Infrastructure WP SFO CA SJC Norman Y Mineta San Jose International P 95 $ 7,096,232 $ 749,473 $ ‐ 6,346,759 Reconstruct Apron WP SFO CA SBP San Luis County Regional P 46 $ 1,791,284 $ 1,791,284 $ Construct Terminal Building WP LAX CA SNA John Wayne Airport‐Orange County P 46 $ 3,757,162 $ 3,757,162 $ Rehabilitate Taxiway WP LAX CA SBA Santa Barbara Municipal P 51 $ 7,338,355 $ ‐ 4,675,510 $ 2,662,845 Rehabilitate Runway ‐ 07/25 WP SFO CA STS Charles M Schulz ‐ Sonoma County P 52 $ 135,000 $ 135,000 $ ‐ Conduct Environmental Study WP SFO CA STS Charles M Schulz ‐ Sonoma County P 53 $ 1,205,200 $ 1,205,200 $ Improve Runway Safety Area ‐ 14/32 ‐ Improve Airport Erosion Control, Install Perimeter ‐ Fencing not Required by 49 CFR 1542, Runway WP LAX CA IZA Santa Ynez GA 16 $ 1,525,165 $ 1,525,165 $ Incursion Markings ‐ WP LAX CA MIT Shafter‐Minter Field GA 23 $ 575,566 $ 575,566 $ ‐ Improve Airport Miscellaneous Improvements WP SFO CA TVL Lake Tahoe GA 40 $ 1,854,680 $ 1,854,680 $ Rehabilitate Apron WP SFO CA SCK Stockton Metropolitan P 37 $ 1,064,505 $ 508,964 $ ‐ 555,541 Rehabilitate Apron ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 8 of 48 ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Rehabilitate Apron, Rehabilitate Taxiway [Taxiway WP SFO CA SCK Stockton Metropolitan P 38 $ 584,731 $ 584,731 $ B], Rehabilitate Taxiway [Taxiway D]

Install Runway Vertical/Visual Guidance System ‐ WP SFO CA TCY Tracy Municipal GA 18 $ 302,420 $ 302,420 $ 12/30, Install Weather Reporting Equipment Rehabilitate Runway [Rehabilitate Runway 11/29 (7,000 feet X 100 feet) east‐ Saw and Seal Joints WP SFO CA TRK Truckee‐Tahoe GA 36 $ 231,690 $ 231,690 $ of 19,000 SF area .of ru] ‐ 11/29 Reconstruct Taxiway [Taxiway A], Reconstruct WP LAX CA VNY Van Nuys R 14 $ 12,435,189 $ 3,815,969 $ ‐ 8,619,220 Taxiway [Taxiway B] WP LAX CA VCV Southern California Logistics R 24 $ 7,322,657 $ 2,000,000 $ 5,322,657 Reconstruct Runway ‐ 17/35 Install Runway Vertical/Visual Guidance System ‐ [PAPI] ‐ 13/31, Install Runway Vertical/Visual Guidance System [REIL] ‐ 13/31, Install Weather WP SFO CA D86 Sequoia Field GA 9 $ 359,766 $ 359,766 $ Reporting Equipment ‐ Install Runway Vertical/Visual Guidance System ‐ WP SFO CA WVI Watsonville Municipal GA 14 $ 301,299 $ 301,299 $ 02/20, Rehabilitate Runway ‐ 02/20 Install Weather Reporting Equipment, WP SFO CA O28 Ells Field‐Willits Municipal GA 8 $ 143,049 $ 143,049 $ Rehabilitate Runway ‐ 16/34 NM DEN CO AKO Colorado Plains Regional GA 19 $ 253,000 $ 253,000 $ Rehabilitate Runway ‐ 11/29 Rehabilitate Runway ‐ 02/20, Rehabilitate Runway NM DEN CO ALS San Luis Valley Regional/Bergman Field CS 22 $ 6,382,570 $ 152,330 $ 6,230,240 Lighting ‐ 02/20 ‐ NM DEN CO AEJ Central Colorado Regional GA 16 $ 507,860 $ 507,860 $ Construct Snow Removal Equipment Building ‐ Install Runway Vertical/Visual Guidance System ‐ NM DEN CO 1V6 Fremont County GA 16 $ 316,500 $ 316,500 $ 11/29, Rehabilitate Runway ‐ 11/29 ‐ Rehabilitate Taxiway, Rehabilitate Taxiway NM DEN CO COS City of Colorado Springs Municipal P 60 $ 7,725,529 $ 3,225,529 $ ‐ 4,500,000 Lighting NM DEN CO COS City of Colorado Springs Municipal P 61 $ 374,422 $ 374,422 $ Reconstruct Taxiway Improve Service Road, Rehabilitate Runway ‐ 08/26, Rehabilitate Runway Lighting ‐ 08/26, ‐ Rehabilitate Taxiway, Rehabilitate Taxiway NM DEN CO DEN Denver International P 90 $ 12,320,000 $ 5,264,720 $ 7,055,280 Lighting NM DEN CO DEN Denver International P 91 $ 2,250,000 $ 2,250,000 $ ‐ Rehabilitate Taxiway NM DEN CO DRO Durango‐La Plata County P 49 $ 524,918 $ 524,918 $ Acquire Snow Removal Equipment NM DEN CO DRO Durango‐La Plata County P 50 $ 1,965,206 $ 1,965,206 $ Reconstruct Taxiway NM DEN CO EGE Eagle County Regional P 57 $ 378,580 $ 378,580 $ ‐ Reconstruct Apron NM DEN CO EGE Eagle County Regional P 58 $ 940,000 $ 940,000 $ Acquire Snow Removal Equipment NM DEN CO EIK Erie Municipal GA 17 $ 352,964 $ 352,964 $ Rehabilitate Apron NM DEN CO GJT Grand Junction Regional P 56 $ 1,894,901 $ 1,894,901 $ Construct Runway ‐ 11/29 NM DEN CO GXY Greeley‐Weld County GA 26 $ 270,000 $ 270,000 $ Conduct Airport Master Plan Study NM DEN CO GUC Gunnison‐Crested Butte Regional P 52 $ 150,000 $ 150,000 $ ‐ Conduct Airport Master Plan Study NM DEN CO GUC Gunnison‐Crested Butte Regional P 53 $ 522,535 $ 522,535 $ ‐ Acquire Snow Removal Equipment ‐ Construct Apron, Construct Snow Removal ‐ Equipment Building, Install Runway ‐ Vertical/Visual Guidance System ‐ 10/28, NM DEN CO HDN Yampa Valley P 43 $ 1,255,000 $ 1,255,000 $ ‐ Rehabilitate Apron ‐ ‐ Install Airport Beacons, Rehabilitate Apron, NM DEN CO 20V Mc Elroy Airfield GA 14 $ 287,000 $ 287,000 $ ‐ Rehabilitate Runway ‐ 09/27, Rehabilitate Taxiway ‐ Install Taxiway Lighting, Reconstruct Taxiway, NM DEN CO LHX La Junta Municipal GA 12 $ 600,218 $ 600,218 $ Rehabilitate Taxiway NM DEN CO LAA Lamar Municipal GA 19 $ 295,000 $ 295,000 $ Rehabilitate Runway ‐ 18/36 Construct Service Road, Construct Taxiway, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 15/33, NM DEN CO FNL Fort Collins‐Loveland Municipal CS 35 $ 1,000,000 $ 1,000,000 $ Rehabilitate Taxiway Install Airport Beacons, Install Perimeter Fencing NM DEN CO EEO Meeker Coulter Field GA 12 $ 335,000 $ 335,000 $ ‐ not Required by 49 CFR 1542 NM DEN CO MTJ Montrose Regional P 49 $ 107,715 $ 107,715 $ Expand Apron, Reconstruct Taxiway ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 9 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Construct Taxiway, Extend Runway ‐ 05/23, Install Runway Vertical/Visual Guidance System ‐ 05/23, NM DEN CO AIB Hopkins Field GA 11 $ 4,721,146 $ 4,721,146 $ Reconstruct Runway ‐ 05/23 Rehabilitate Runway ‐ 17/35, Rehabilitate Runway NM DEN CO PUB Pueblo Memorial CS 35 $ 3,851,643 $ 1,794,023 $ 2,057,620 Lighting ‐ 17/35 NM DEN CO RIL Garfield County Regional GA 24 $ 649,790 $ 649,790 $ Acquire Snow Removal Equipment NM DEN CO STK Sterling Municipal GA 15 $ 156,561 $ 156,561 $ Install Perimeter Fencing

NM DEN CO 4V1 Spanish Peaks Airfield GA 8 $ 226,410 $ 226,410 $ Rehabilitate Runway ‐ 09/27, Rehabilitate Taxiway NM DEN CO FTG Front Range R 41 $ 484,617 $ 484,617 $ Rehabilitate Taxiway ‐ NE ANE CT DXR Danbury Municipal R 41 $ 224,550 $ 224,550 $ Remove Obstructions [Non‐Hazard APP or DEP]

NE ANE CT DXR Danbury Municipal R 42 $ 400,428 $ 36,211 $ ‐ 364,217 Remove Obstructions [Non‐Hazard APP or DEP] ‐ Construct Taxiway, Remove Obstructions [Non‐ NE ANE CT MMK Meriden Markham Municipal GA 20 $ 397,440 $ 274,839 $ 122,601 Hazard APP or DEP] ‐ Noise Mitigation Measures for Residences within NE ANE CT HVN Tweed‐New Haven P 48 $ 2,960,266 $ $ ‐ 2,960,266 65 ‐ 69 DNL NE ANE CT OXC Waterbury‐Oxford GA 24 $ 28,882,352 $ 1,785,049 $ 27,097,303 Rehabilitate Runway ‐ 18/36 NE ANE CT OXC Waterbury‐Oxford GA 25 $ 386,199 $ 386,199 $ ‐ Rehabilitate Runway ‐ 18/36

NE ANE CT OXC Waterbury‐Oxford GA 26 $ 1,500,979 $ 1,500,979 $ Remove Obstructions [Non‐Hazard APP or DEP] NE ANE CT BDL Bradley International P 63 $ 911,077 $ 911,077 $ Remove Obstructions EA WAS DC @008 Washington Metropolitan Area 14 $ 250,000 $ 250,000 $ Conduct Metropolitan System Plan Study EA HAR DE 33N Delaware Airpark GA 20 $ 132,247 $ 132,247 $ Acquire Snow Removal Equipment EA HAR DE *DES State of Delaware 13 $ 94,500 $ ‐ 94,500 $ Conduct State System Plan Study

EA HAR DE GED Delaware Coastal GA 33 $ 430,196 $ 430,196 $ ‐ Install Infrastructure to support RNAV Approach EA HAR DE ILG New Castle P 42 $ 5,432,041 $ 1,000,000 $ 4,432,041 Construct Taxiway SO ORL FL X06 Arcadia Municipal GA 5 $ 104,141 $ 104,141 $ ‐ Rehabilitate Taxiway SO ORL FL AVO Avon Park Executive GA 18 $ 1,414,890 $ 714,890 $ ‐ 700,000 Rehabilitate Runway ‐ 05/23 SO ORL FL BOW Bartow Municipal GA 35 $ 557,418 $ 557,418 $ ‐ Improve Airport Drainage ‐ Install Runway Vertical/Visual Guidance System ‐ ‐ 05/23, Reconstruct Runway Lighting ‐ 05/23, SO ORL FL BCT Boca Raton R 22 $ 136,480 $ 136,480 $ Wildlife Hazard Assessments SO ORL FL BKV Brooksville‐Tampa Bay Regional GA 20 $ 1,382,517 $ 1,382,517 $ ‐ Reconstruct Taxiway SO ORL FL PIE St Pete‐Clearwater International P 43 $ 1,621,485 $ 1,621,485 $ Update Airport Master Plan Study SO ORL FL 2IS Airglades GA 6 $ 194,883 $ 194,883 $ ‐ Install Weather Reporting Equipment SO ORL FL CEW Bob Sikes GA 24 $ 179,141 $ 179,141 $ Update Airport Master Plan Study SO ORL FL CTY Cross City GA 12 $ 150,000 $ 150,000 $ ‐ Update Airport Master Plan Study SO ORL FL DAB Daytona Beach International P 75 $ 2,373,072 $ 2,373,072 $ Improve Terminal Building SO ORL FL DAB Daytona Beach International P 76 $ 7,966,314 $ $ 7,966,314 Construct Taxiway, Rehabilitate Taxiway SO ORL FL 54J Defuniak Springs GA 11 $ 136,485 $ 136,485 $ ‐ Update Airport Master Plan Study SO ORL FL DTS Destin Executive GA 19 $ 175,267 $ 175,267 $ ‐ Update Airport Master Plan Study SO ORL FL X01 Everglades Airpark GA 4 $ 149,850 $ 149,850 $ ‐ Rehabilitate Runway ‐ 15/33 SO ORL FL FHB Fernandina Beach Municipal GA 26 $ 356,355 $ 356,355 $ ‐ Construct Terminal Building SO ORL FL FXE Fort Lauderdale Executive R 30 $ 2,250,905 $ 150,000 $ ‐ 2,100,905 Rehabilitate Taxiway SO ORL FL FLL Fort Lauderdale/Hollywood International P 80 $ 20,000,000 $ $ ‐ 20,000,000 Extend Runway [Letter of Intent] ‐ 10R/28L SO ORL FL FLL Fort Lauderdale/Hollywood International P 81 $ 4,379,733 $ 4,379,733 $ ‐ Construct Apron ‐ Noise Mitigation Measures for Residences within SO ORL FL FLL Fort Lauderdale/Hollywood International P 82 $ 21,954,209 $ $ ‐ 21,954,209 65 ‐ 69 DNL SO ORL FL GNV Gainesville Regional P 40 $ 196,898 $ 196,898 $ ‐ Install Airport Beacons ‐ Reconstruct Perimeter Fencing not Required by SO ORL FL 01J Hilliard Airpark GA 10 $ 86,400 $ 86,400 $ ‐ 49 CFR 1542 SO ORL FL IMM Immokalee Regional GA 11 $ 983,920 $ 983,920 $ Rehabilitate Taxiway SO ORL FL CRG Jacksonville Executive at Craig R 22 $ 444,680 $ ‐ 444,680 $ Rehabilitate Access Road ‐ Reconstruct Perimeter Fencing required by 49 SO ORL FL JAX Jacksonville International P 55 $ 994,000 $ 994,000 $ CFR 1542 ‐ Noise Mitigation Measures for Residences within SO ORL FL EYW Key West International P 54 $ 2,885,577 $ $ ‐ 2,885,577 65 ‐ 69 DNL Rehabilitate Runway ‐ 09/27, Rehabilitate Runway SO ORL FL EYW Key West International P 55 $ 9,187,856 $ 2,662,962 $ ‐ 6,524,894 Lighting ‐ 09/27 ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 10 of 48 ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work SO ORL FL 42J Keystone Airpark GA 24 $ 299,956 $ 299,956 $ Rehabilitate Taxiway Install Runway Lighting ‐ 15/33, Rehabilitate Runway ‐ 15/33, Rehabilitate Runway Lighting ‐ SO ORL FL ISM Kissimmee Gateway R 35 $ 2,230,329 $ 499,100 $ 1,731,229 15/33 SO ORL FL X07 Lake Wales Municipal GA 18 $ 137,043 $ 137,043 $ Construct Taxiway, Rehabilitate Taxiway SO ORL FL LAL Lakeland Linder Regional R 39 $ 583,056 $ 583,056 $ Update Airport Master Plan Study Rehabilitate Apron [Southeast Apron], SO ORL FL LAL Lakeland Linder Regional R 40 $ 2,255,549 $ 656,218 $ 1,599,331 Rehabilitate Apron [Terminal Apron] SO ORL FL 24J Suwannee County GA 12 $ 475,076 $ 475,076 $ ‐ Expand Apron SO ORL FL MLB Melbourne International P 44 $ 18,132,588 $ 1,926,044 $ 16,206,544 Rehabilitate Runway ‐ 09R/27L SO ORL FL TMB Miami Executive R 12 $ 3,126,600 $ 2,231,700 $ 894,900 Construct Taxiway Construct Taxiway, Rehabilitate Taxiway [Taxiway ‐ M5], Rehabilitate Taxiway [Taxiway S and Taxiway SO ORL FL MIA Miami International P 72 $ 36,765,113 $ 27,594,909 $ ‐ 9,170,204 T] SO ORL FL APF Naples Municipal GA 36 $ 628,280 $ 628,280 $ Conduct Airport Master Plan Study SO ORL FL EVB New Smyrna Beach Municipal R 21 $ 89,993 $ 89,993 $ Wildlife Hazard Assessments ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle, Install Perimeter Fencing not Required by 49 CFR SO ORL FL OCF Ocala International‐Jim Taylor Field GA 26 $ 881,892 $ 543,109 $ 338,783 1542 SO ORL FL OBE Okeechobee County GA 19 $ 242,084 $ 242,084 $ Update Airport Master Plan Study SO ORL FL MCO Orlando International P 117 $ 15,979,012 $ 10,689,693 $ 5,289,319 Rehabilitate Taxiway SO ORL FL OMN Ormond Beach Municipal R 20 $ 158,593 $ 158,593 $ Rehabilitate Runway ‐ 08/26 SO ORL FL 28J Palatka Municipal ‐ Lt Kay Larkin Field GA 27 $ 118,845 $ 118,845 $ ‐ Improve Runway Safety Area ‐ 17/35 ‐ Acquire Emergency Generator, Environmental Mitigation, Improve Terminal Building [Passenger Flow Improvement], Improve Terminal Building ‐ [Passenger Loading Bridge], Rehabilitate Apron, SO ORL FL ECP Northwest Florida Beaches International P 9 $ 2,715,208 $ 2,715,208 $ Security Enhancements SO ORL FL PNS Pensacola International P 41 $ 43,796 $ 43,796 $ ‐ Remove Obstructions [Non‐Hazard] SO ORL FL PMP Pompano Beach Airpark GA 3 $ 373,167 $ 373,167 $ ‐ Update Airport Master Plan Study SO ORL FL PGD Punta Gorda P 36 $ 3,744,598 $ 3,744,598 $ Expand Apron, Expand Terminal Building SO ORL FL SPG Albert Whitted R 25 $ 303,826 $ 303,826 $ Rehabilitate Taxiway SO ORL FL SFB Orlando Sanford International P 77 $ 5,553,000 $ 4,649,247 $ 903,753 Widen Taxiway

SO ORL FL SRQ Sarasota/Bradenton International P 53 $ 7,067,527 $ 6,300,516 $ 767,011 Construct Taxiway, Improve Terminal Building ‐ Construct Taxiway [Taxiway D], Construct Taxiway SO ORL FL X26 Sebastian Municipal GA 13 $ 1,742,130 $ 1,742,130 $ ‐ [Taxiway E] SO ORL FL SEF Sebring Regional GA 24 $ 415,775 $ 415,775 $ ‐ Rehabilitate Apron SO ORL FL *FLS State of Florida 13 $ 630,000 $ 630,000 $ ‐ Conduct State System Plan Study SO ORL FL TLH Tallahassee International P 41 $ 6,936,420 $ 2,536,420 $ ‐ 4,400,000 Rehabilitate Apron, Security Enhancements

SO ORL FL TPF Peter O Knight R 3 $ 2,519,634 $ 1,638,686 $ 880,948 Rehabilitate Runway ‐ 04/22, Rehabilitate Taxiway SO ORL FL TPA Tampa International P 64 $ 9,322,825 $ 3,357,337 $ 5,965,488 Rehabilitate Taxiway Install Runway Vertical/Visual Guidance System ‐ ‐ 09/27, Install Runway Vertical/Visual Guidance SO ORL FL TIX Space Coast Regional GA 27 $ 261,405 $ 261,405 $ ‐ System ‐ 18/36 SO ORL FL X23 Umatilla Municipal GA 10 $ 474,336 $ 474,336 $ ‐ Construct Building Install Runway Lighting ‐ 14/32, Rehabilitate SO ORL FL X59 Valkaria GA 9 $ 4,004,105 $ 1,554,105 $ 2,450,000 Runway ‐ 14/32 Rehabilitate Taxiway [Taxiway D1], Rehabilitate SO ORL FL VPS Eglin AFB/Destin‐Ft Walton Beach P 27 $ 1,736,897 $ 1,736,897 $ Taxiway [Taxiway D2] SO ORL FL VPS Eglin AFB/Destin‐Ft Walton Beach P 28 $ 176,285 $ 176,285 $ Conduct Miscellaneous Study SO ORL FL VNC Venice Municipal R 16 $ 4,522,244 $ 150,000 $ 4,372,244 Rehabilitate Apron ‐ Install Runway Vertical/Visual Guidance System ‐ ‐ 18/36, Rehabilitate Runway ‐ 18/36, Rehabilitate Runway Lighting ‐ 18/36, Remove Obstructions SO ORL FL CHN Wauchula Municipal GA 14 $ 2,248,160 $ 2,248,160 $ [Non‐Hazard]

‐ Install Airfield Guidance Signs, Install Runway SO ORL FL X60 Williston Municipal GA 17 $ 186,025 $ 186,025 $ ‐ Vertical/Visual Guidance System ‐ 05/23

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 11 of 48

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Rehabilitate Taxiway, Rehabilitate Taxiway SO ORL FL ZPH Zephyrhills Municipal GA 16 $ 2,311,658 $ 152,838 $ 2,158,820 Lighting

WP HNL FM T11 Yap International GA 14 $ 500,000 $ $ 500,000 Improve Airport Miscellaneous Improvements WP HNL FM T11 Yap International GA 15 $ 1,000,000 $ $ 1,000,000 Rehabilitate Runway ‐ 07/25

WP HNL FM TTK Kosrae GA 16 $ 500,000 $ $ 500,000 Improve Airport Miscellaneous Improvements Improve Terminal Building, Rehabilitate Runway ‐ SO ATL GA ABY Southwest Georgia Regional P 46 $ 1,684,101 $ 1,684,101 $ 04/22 Non primary development projects in state block SO ATL GA *GAB Georgia State Block Grant Program 20 $ 18,267,788 $ 18,267,788 $ grant program ‐ Non primary development projects in state block SO ATL GA *GAB Georgia State Block Grant Program 21 $ 11,903,000 $ ‐ $ 11,903,000 grant program Reconstruct Runway ‐ 09L/27R, Reconstruct SO ATL GA ATL Hartsfield ‐ Jackson Atlanta International P 118 $ 16,789,242 $ ‐ 16,789,242 $ Taxiway SO ATL GA ATL Hartsfield ‐ Jackson Atlanta International P 119 $ 17,205,993 $ $ 17,205,993 Construct Taxiway SO ATL GA *GAS State of Georgia 6 $ 600,000 $ $ ‐ 600,000 Conduct Miscellaneous Study Improve Airport Drainage, Rehabilitate Apron, ‐ Runway Incursion Markings, Security SO ATL GA AGS Augusta Regional at Bush Field P 40 $ 922,705 $ 922,705 $ Enhancements SO ATL GA BQK Brunswick Golden Isles P 39 $ 1,000,000 $ ‐ 1,000,000 $ Expand Apron Construct Service Road, Improve Runway Safety SO ATL GA CSG Columbus P 41 $ 1,457,823 $ 1,457,823 $ ‐ Area ‐ 06/24, Remove Obstructions SO ATL GA CSG Columbus P 42 $ 165,890 $ ‐ 165,890 $ Improve Runway Safety Area ‐ 06/24 ‐ Improve Runway Safety Area ‐ 10/28, Install Guidance Signs, Reconstruct Taxiway [Taxiway E‐ 1], Reconstruct Taxiway [Taxiway GA‐3], SO ATL GA SAV Savannah/Hilton Head International P 58 $ 1,879,555 $ 1,879,555 $ ‐ Rehabilitate Runway Lighting ‐ 10/28 SO ATL GA SAV Savannah/Hilton Head International P 59 $ 2,125,135 $ 2,125,135 $ ‐ Improve Terminal Building Acquire Equipment, Improve Airport Drainage, SO ATL GA VLD Valdosta Regional P 33 $ 1,440,910 $ 1,440,910 $ ‐ Modify Terminal Building WP HNL GU GUM Guam International P 100 $ 4,450,500 $ 4,450,500 $ ‐ Modify Terminal Building

WP HNL GU GUM Guam International P 101 $ 3,500,000 $ $ 3,500,000 Construct Aircraft Rescue & Fire Fighting Building WP HNL GU GUM Guam International P 102 $ 1,000,000 $ $ 1,000,000 Rehabilitate Apron WP HNL GU GUM Guam International P 103 $ 750,000 $ $ ‐ 750,000 Rehabilitate Runway ‐ 06L/24R WP HNL HI ITO Hilo International P 51 $ 4,430,340 $ 4,430,340 $ ‐ Improve Airport Drainage

WP HNL HI HNL Daniel K Inouye International P 126 $ 734,280 $ 734,280 $ ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle ‐ WP HNL HI HNL Daniel K Inouye International P 129 $ 690,909 $ 690,909 $ Acquire Aircraft Rescue & Fire Fighting Vehicle ‐ WP HNL HI OGG Kahului P 52 $ 731,748 $ ‐ 731,748 $ Acquire Aircraft Rescue & Fire Fighting Vehicle WP HNL HI OGG Kahului P 54 $ 6,187,700 $ ‐ 6,187,700 $ Acquire Land For Approaches WP HNL HI MKK Molokai P 23 $ 149,630 $ 149,630 $ ‐ Acquire Equipment

WP HNL HI LIH Lihue P 48 $ 878,098 $ 878,098 $ ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle CE ACE IA *IAS State of Iowa 23 $ 311,788 $ 62,884 $ 248,904 Conduct State System Plan Study ‐ Install Perimeter Fencing not Required by 49 CFR CE ACE IA IKV Ankeny Regional R 23 $ 1,527,187 $ 151,056 $ 1,376,131 1542 CE ACE IA AIO Atlantic Municipal GA 12 $ 135,723 $ 135,723 $ ‐ Expand Apron CE ACE IA BRL Southeast Iowa Regional CS 37 $ 109,780 $ 109,780 $ ‐ Acquire Land For Approaches CE ACE IA CIN Arthur N Neu GA 14 $ 300,000 $ 300,000 $ ‐ Reconstruct Access Road

‐ Improve Terminal Building [Hold Room], Improve CE ACE IA CID The Eastern Iowa P 49 $ 6,645,703 $ 6,645,703 $ Terminal Building [Security Checkpoint] CE ACE IA CID The Eastern Iowa P 51 $ 579,870 $ $ 579,870 Energy Efficiency Equipment/Infrastructure CE ACE IA TVK Centerville Municipal GA 9 $ 525,399 $ 525,399 $ Construct Taxiway CE ACE IA CCY Northeast Iowa Regional GA 13 $ 460,800 $ 460,800 $ ‐ Reconstruct Apron CE ACE IA ICL Schenck Field GA 13 $ 182,929 $ 182,929 $ ‐ Reconstruct Taxiway CE ACE IA CBF Council Bluffs Municipal GA 20 $ 424,680 $ 424,680 $ ‐ Construct Fuel Farm

‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 12 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

CE ACE IA CSQ Creston Municipal GA 13 $ 57,600 $ 57,600 $ Construct Taxiway, Rehabilitate Runway ‐ 16/34 CE ACE IA DNS Denison Municipal GA 14 $ 444,717 $ 444,717 $ Construct Runway ‐ 18/36 CE ACE IA DSM Des Moines International P 67 $ 13,255,878 $ 6,489,574 $ 6,766,304 Rehabilitate Runway ‐ 13/31 CE ACE IA DSM Des Moines International P 68 $ 657,215 $ $ 657,215 Rehabilitate Runway ‐ 13/31 CE ACE IA DSM Des Moines International P 69 $ 149,081 $ $ 149,081 Rehabilitate Runway ‐ 13/31 CE ACE IA DBQ Dubuque Regional P 62 $ 45,180 $ 45,180 $ Conduct Miscellaneous Study CE ACE IA DBQ Dubuque Regional P 63 $ 788,868 $ 788,868 $ Construct Terminal Building CE ACE IA FXY Forest City Municipal GA 16 $ 247,500 $ 247,500 $ Rehabilitate Runway ‐ 15/33 CE ACE IA FOD Fort Dodge Regional CS 33 $ 2,487,371 $ 300,000 $ ‐ 2,187,371 Reconstruct Apron CE ACE IA GFZ Greenfield Municipal GA 7 $ 207,000 $ 207,000 $ ‐ Rehabilitate Runway Lighting CE ACE IA 0K7 Humboldt Municipal GA 11 $ 200,857 $ 200,857 $ Acquire Snow Removal Equipment CE ACE IA IOW Iowa City Municipal GA 24 $ 142,110 $ ‐ 142,110 $ Conduct Environmental Study ‐ CE ACE IA EOK Keokuk Municipal GA 21 $ 343,581 $ 343,581 $ ‐ Remove Obstructions [Non‐Hazard APP or DEP] ‐ CE ACE IA MIW Marshalltown Municipal GA 15 $ 445,500 $ 445,500 $ ‐ Rehabilitate Runway ‐ 18/36, Rehabilitate Taxiway CE ACE IA MCW Mason City Municipal CS 43 $ 516,526 $ 150,000 $ 366,526 Reconstruct Apron CE ACE IA MXO Monticello Regional GA 8 $ 600,000 $ 600,000 $ ‐ Construct Building CE ACE IA OLZ Oelwein Municipal GA 8 $ 155,662 $ 155,662 $ ‐ Construct Taxiway CE ACE IA OOA Oskaloosa Municipal GA 11 $ 315,423 $ 315,423 $ ‐ Rehabilitate Taxiway CE ACE IA OTM Ottumwa Regional GA 19 $ 473,850 $ 473,850 $ Reconstruct Runway ‐ 13/31 CE ACE IA PEA Pella Municipal GA 11 $ 221,234 $ 221,234 $ ‐ Rehabilitate Runway ‐ 16/34 CE ACE IA RDK Red Oak Municipal GA 15 $ 219,817 $ 219,817 $ Reconstruct Taxiway CE ACE IA SHL Sheldon Municipal GA 14 $ 318,254 $ 318,254 $ ‐ Acquire Snow Removal Equipment CE ACE IA +09B New 11 $ 4,701,929 $ 3,136,621 $ 1,565,308 Construct New Airport CE ACE IA SUX Sioux Gateway/Col Bud Day Field P 51 $ 1,519,499 $ 957,371 $ ‐ 562,128 Reconstruct Runway ‐ 17/35 CE ACE IA SUX Sioux Gateway/Col Bud Day Field P 52 $ 42,629 $ 42,629 $ ‐ Reconstruct Runway ‐ 17/35 CE ACE IA SPW Spencer Municipal GA 24 $ 330,765 $ 330,765 $ ‐ Reconstruct Apron ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 13/31, CE ACE IA SLB Storm Lake Municipal GA 12 $ 216,684 $ 216,684 $ ‐ Rehabilitate Taxiway ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 11/29, CE ACE IA 8C4 Mathews Memorial GA 2 $ 161,829 $ 161,829 $ ‐ Rehabilitate Taxiway CE ACE IA VTI Vinton Veterans Memorial Airpark GA 11 $ 90,900 $ 90,900 $ Conduct Environmental Study Reconstruct Taxiway, Rehabilitate Runway ‐ CE ACE IA ALO Waterloo Regional P 45 $ 2,655,686 $ 2,655,686 $ ‐ 12/30, Rehabilitate Runway ‐ 18/36 CE ACE IA C25 Waverly Municipal GA 8 $ 399,903 $ 399,903 $ ‐ Extend Runway ‐ 11/29 CE ACE IA 3Y2 George L Scott Municipal GA 7 $ 137,462 $ 137,462 $ Construct Fuel Farm, Rehabilitate Apron ‐ Acquire Snow Removal Equipment, Reconstruct ‐ Taxiway, Rehabilitate Runway ‐ 03/21, NM HLN ID PIH Pocatello Regional P 40 $ 998,437 $ 998,437 $ ‐ Rehabilitate Runway ‐ 17/35, Rehabilitate Taxiway NM HLN ID U02 McCarley Field GA 15 $ 1,155,863 $ 1,155,863 $ Rehabilitate Taxiway NM HLN ID BOI Boise Air Terminal/Gowen Field P 66 $ 281,250 $ $ ‐ 281,250 Install Noise Monitoring System ‐ Rehabilitate Aircraft Rescue & Fire Fighting NM HLN ID BOI Boise Air Terminal/Gowen Field P 67 $ 3,560,586 $ 3,560,586 $ ‐ Building Improve Runway Safety Area ‐ 10L/28R, NM HLN ID BOI Boise Air Terminal/Gowen Field P 68 $ 3,922,633 $ 3,922,633 $ Rehabilitate Taxiway NM HLN ID *IDS State of Idaho 12 $ 410,000 $ 410,000 $ Update State System Plan Study NM HLN ID 65S Boundary County GA 15 $ 96,886 $ 96,886 $ ‐ Acquire Land For Approaches ‐ Install Runway Vertical/Visual Guidance System ‐ NM HLN ID LLJ Challis GA 10 $ 198,000 $ ‐ 198,000 $ 16/34 Rehabilitate Apron, Rehabilitate Runway ‐ 17/35, NM HLN ID U82 Council Municipal GA 6 $ 45,000 $ 45,000 $ ‐ Rehabilitate Taxiway NM HLN ID DIJ Driggs‐Reed Memorial GA 16 $ 283,780 $ 283,780 $ Acquire Miscellaneous Land NM HLN ID GNG Gooding Municipal GA 11 $ 233,403 $ 233,403 $ ‐ Install Weather Reporting Equipment ‐ Acquire Snow Removal Equipment, Expand Apron, NM HLN ID SUN Friedman Memorial P 43 $ 2,624,098 $ 1,724,098 $ ‐ 900,000 Rehabilitate Runway ‐ 13/31 NM HLN ID SUN Friedman Memorial P 44 $ 104,981 $ 104,981 $ Conduct Environmental Study NM HLN ID COE Coeur D'Alene ‐ Pappy Boyington Field GA 45 $ 568,178 $ 568,178 $ ‐ Update Airport Master Plan Study

‐ ‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 13 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Install Guidance Signs, Rehabilitate Taxiway [Taxiway A and Connectors], Rehabilitate Taxiway NM HLN ID IDA Idaho Falls Regional P 43 $ 7,813,597 $ 1,461,687 $ 6,351,910 [Taxiway C] NM HLN ID JER Jerome County GA 19 $ 1,137,390 $ 1,137,390 $ Reconstruct Taxiway, Rehabilitate Apron

Construct Aircraft Rescue & Fire Fighting Building, NM HLN ID LWS Lewiston‐Nez Perce County P 40 $ 4,368,551 $ 719,237 $ 3,649,314 Construct Snow Removal Equipment Building

NM HLN ID LWS Lewiston‐Nez Perce County P 41 $ 598,275 $ 598,275 $ Acquire Aircraft Rescue & Fire Fighting Vehicle NM HLN ID MYL McCall Municipal GA 23 $ 1,250,797 $ 420,351 $ 830,446 Reconstruct Apron Install Miscellaneous NAVAIDS, Rehabilitate NM HLN ID U76 Mountain Home Municipal GA 15 $ 1,050,267 $ 1,050,267 $ ‐ Apron

NM HLN ID MAN Nampa Municipal GA 28 $ 222,641 $ 222,641 $ Rehabilitate Runway ‐ 11/29, Rehabilitate Taxiway NM HLN ID MAN Nampa Municipal GA 29 $ 175,903 $ 175,903 $ Conduct Environmental Study Conduct Environmental Study, Rehabilitate ‐ Apron, Rehabilitate Runway ‐ 09/27, Rehabilitate NM HLN ID S68 Orofino Municipal GA 6 $ 55,660 $ 55,660 $ Taxiway

‐ Install Runway Vertical/Visual Guidance System ‐ NM HLN ID 1U7 Bear Lake County GA 15 $ 259,147 $ 259,147 $ 10/28, Install Weather Reporting Equipment NM HLN ID 1S6 Priest River Municipal GA 6 $ 234,256 $ 234,256 $ ‐ Acquire Easement For Approaches ‐ Acquire Land For Approaches, Acquire Land for NM HLN ID S72 St Maries Municipal GA 10 $ 150,000 $ 150,000 $ Development, Wildlife Hazard Assessments ‐ Install Miscellaneous NAVAIDS, Rehabilitate Apron, Rehabilitate Runway ‐ 17/35, Rehabilitate NM HLN ID SMN Lemhi County GA 17 $ 299,999 $ 299,999 $ Taxiway NM HLN ID TWF Joslin Field ‐ Magic Valley Regional P 39 $ 3,460,768 $ 200,000 $ ‐ 3,260,768 Reconstruct Taxiway, Rehabilitate Taxiway ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle, NM HLN ID TWF Joslin Field ‐ Magic Valley Regional P 40 $ 1,228,658 $ 1,228,658 $ Construct Taxiway Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, NM HLN ID S87 Weiser Municipal GA 13 $ 202,383 $ 202,383 $ ‐ Rehabilitate Taxiway GL CHI IL BLV Scott AFB/Midamerica P 33 $ 1,007,521 $ 1,007,521 $ Modify Terminal Building GL CHI IL BMI Central IL Regional Airport at Bloomington‐Normal P 67 $ 846,608 $ 846,608 $ Rehabilitate Taxiway ‐ Reconstruct Runway Lighting ‐ 04R/22L, Reconstruct Runway Lighting ‐ 13C/31C, Reconstruct Taxiway Lighting [Taxiway G], ‐ Reconstruct Taxiway Lighting [Taxiway P], GL CHI IL MDW Chicago Midway International P 93 $ 3,581,250 $ 3,465,213 $ 116,037 Reconstruct Taxiway Lighting [Taxiway Y] GL CHI IL MDW Chicago Midway International P 94 $ 2,250,000 $ $ ‐ 2,250,000 Extend Taxiway GL CHI IL ORD Chicago O'Hare International P 162 $ 40,000,000 $ $ ‐ 40,000,000 Construct Runway [Letter of Intent] ‐ Plan‐2 ‐ GL CHI IL ORD Chicago O'Hare International P 163 $ 20,000,000 $ $ 20,000,000 Construct Runway [Letter of Intent] ‐ 10C/28C GL CHI IL ORD Chicago O'Hare International P 164 $ 17,473,914 $ 13,223,914 $ 4,250,000 Reconstruct Apron Rehabilitate Taxiway Lighting [A and C], GL CHI IL MWA Veterans Airport of Southern Illinois P 34 $ 1,287,462 $ 1,000,000 $ 287,462 Rehabilitate Taxiway Lighting [B and D] GL CHI IL MLI Quad City International P 85 $ 320,000 $ 320,000 $ Update Airport Master Plan Study ‐ Rehabilitate Runway Lighting ‐ 09/27, Rehabilitate GL CHI IL MLI Quad City International P 86 $ 2,974,751 $ ‐ 2,374,193 $ 600,558 Taxiway Lighting Rehabilitate Runway Lighting ‐ 04/22, Rehabilitate GL CHI IL PIA General Downing ‐ Peoria International P 64 $ 1,963,710 $ ‐ 1,963,710 $ Runway Lighting ‐ 13/31 GL CHI IL UIN Quincy Regional‐Baldwin Field CS 38 $ 2,635,463 $ 1,564,817 $ 1,070,646 Reconstruct Runway ‐ 13/31 GL CHI IL RFD Chicago/Rockford International P 79 $ 4,678,523 $ 1,934,562 $ 2,743,961 Expand Apron GL CHI IL RFD Chicago/Rockford International P 80 $ 5,500,000 $ $ 5,500,000 Expand Terminal Building GL CHI IL CMI University of Illinois‐Willard P 32 $ 1,194,294 $ 1,194,294 $ ‐ Conduct Airport Master Plan Study GL CHI IL SPI Abraham Lincoln Capital P 71 $ 2,950,589 $ 1,200,295 $ 1,750,294 Rehabilitate Service Road Non primary development projects in state block GL CHI IL *ILB Illinois State Block Grant Program 139 $ 16,682,351 $ 16,682,351 $ grant program ‐ Non primary development projects in state block GL CHI IL *ILB Illinois State Block Grant Program 140 $ 170,075 $ $ 170,075 grant program

‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 14 of 48 ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Non primary development projects in state block GL CHI IL *ILB Illinois State Block Grant Program 141 $ 484,424 $ $ 484,424 grant program Non primary development projects in state block GL CHI IL *ILB Illinois State Block Grant Program 142 $ 945,780 $ $ 945,780 grant program Non primary development projects in state block GL CHI IL *ILB Illinois State Block Grant Program 143 $ 639,430 $ $ 639,430 grant program GL CHI IN AID Anderson Municipal‐Darlington Field GA 31 $ 702,000 $ 150,000 $ 552,000 Rehabilitate Runway ‐ 12/30 GL CHI IN GWB De Kalb County GA 24 $ 1,304,754 $ 1,304,754 $ Extend Runway ‐ 09/27

GL CHI IN BFR Virgil I Grissom Municipal GA 15 $ 192,000 $ ‐ 192,000 $ Remove Obstructions [Non‐Hazard APP or DEP] GL CHI IN BMG Monroe County GA 33 $ 60,000 $ 60,000 $ Rehabilitate Taxiway GL CHI IN BAK Columbus Municipal GA 29 $ 914,850 $ ‐ 150,000 $ 764,850 Rehabilitate Taxiway GL CHI IN CEV Mettel Field GA 24 $ 150,000 $ 150,000 $ Remove Obstructions [Non‐Hazard] GL CHI IN CFJ Crawfordsville Municipal GA 16 $ 150,000 $ ‐ 150,000 $ Construct Terminal Building GL CHI IN 2R2 Hendricks County‐Gordon Graham Field R 16 $ 458,424 $ 458,424 $ Rehabilitate Runway ‐ 18/36 GL CHI IN 1I9 Delphi Municipal GA 14 $ 779,142 $ 779,142 $ ‐ Extend Runway ‐ 18/36 Install Airfield Guidance Signs, Reconstruct GL CHI IN EKM Elkhart Municipal GA 30 $ 887,159 $ 300,000 $ ‐ 587,159 Taxiway Lighting ‐ GL CHI IN EVV Evansville Regional P 60 $ 1,837,420 $ 1,837,420 $ Improve Terminal Building, Rehabilitate Apron GL CHI IN UMP Indianapolis Metropolitan R 25 $ 1,050,000 $ 150,000 $ ‐ 900,000 Rehabilitate Taxiway GL CHI IN FWA Fort Wayne International P 69 $ 3,298,095 $ 2,765,115 $ ‐ 532,980 Rehabilitate Runway ‐ 05/23 ‐ Remove Obstructions [Non‐Hazard] [This project GL CHI IN SMD Smith Field GA 18 $ 167,184 $ 167,184 $ ‐ will fund phase 2 of 3] GL CHI IN FKR Frankfort Municipal GA 20 $ 104,400 $ 104,400 $ Update Airport Master Plan Study GL CHI IN FRH French Lick Municipal GA 17 $ 27,000 $ 27,000 $ Groove Runway ‐ 08/26 GL CHI IN GYY Gary/Chicago International GA 36 $ 4,906,500 $ $ 4,906,500 Extend Runway [Letter of Intent] ‐ 12/30 GL CHI IN GYY Gary/Chicago International GA 37 $ 5,150,000 $ 150,000 $ ‐ 5,000,000 Rehabilitate Runway ‐ 12/30 Install Perimeter Fencing not Required by 49 CFR GL CHI IN GSH Goshen Municipal GA 16 $ 191,430 $ 191,430 $ 1542 GL CHI IN GPC Putnam County Regional GA 18 $ 32,400 $ 32,400 $ Conduct Environmental Study GL CHI IN I34 Greensburg Municipal GA 12 $ 337,500 $ 337,500 $ ‐ Construct Runway ‐ Plan‐1 GL CHI IN HHG Huntington Municipal GA 15 $ 441,002 $ 441,002 $ ‐ Expand Apron GL CHI IN EYE Eagle Creek Airpark R 23 $ 855,000 $ 233,399 $ ‐ 621,601 Construct Taxiway GL CHI IN 8A4 Indianapolis Downtown GA 15 $ 150,000 $ ‐ 150,000 $ Construct Fuel Farm GL CHI IN IND Indianapolis International P 149 $ 2,925,000 $ 638,415 $ 2,286,585 Rehabilitate Taxiway GL CHI IN IND Indianapolis International P 150 $ 1,000,000 $ $ 1,000,000 Zero Emissions Vehicle/Infrastructure ‐ Rehabilitate Taxiway, Rehabilitate Taxiway GL CHI IN IND Indianapolis International P 151 $ 4,050,000 $ 4,050,000 $ ‐ Lighting GL CHI IN IND Indianapolis International P 152 $ 1,000,000 $ 1,000,000 $ ‐ Rehabilitate Runway ‐ 14/32 ‐ Rehabilitate Taxiway, Rehabilitate Taxiway GL CHI IN IND Indianapolis International P 153 $ 6,475,000 $ $ 6,475,000 Lighting GL CHI IN *INS State of Indiana 15 $ 181,996 $ 181,996 $ ‐ Update State System Plan Study GL CHI IN JVY Clark Regional R 30 $ 2,860,547 $ 150,000 $ 2,710,547 Extend Runway ‐ 18/36 GL CHI IN OXI Starke County GA 14 $ 516,978 $ ‐ 516,978 $ Extend Runway ‐ 18/36 GL CHI IN OKK Kokomo Municipal GA 25 $ 263,138 $ 263,138 $ Rehabilitate Runway ‐ 14/32 GL CHI IN OKK Kokomo Municipal GA 26 $ 710,377 $ 150,000 $ ‐ 560,377 Rehabilitate Taxiway GL CHI IN PPO La Porte Municipal GA 24 $ 150,000 $ 150,000 $ ‐ Acquire Land for Development GL CHI IN LAF Purdue University CS 40 $ 3,710,664 $ 775,586 $ 2,935,078 Strengthen Runway ‐ 10/28 GL CHI IN GGP Logansport/Cass County GA 22 $ 150,000 $ ‐ 150,000 $ Acquire Land For Approaches GL CHI IN IMS Madison Municipal GA 20 $ 353,817 $ 353,817 $ ‐ Rehabilitate Apron

GL CHI IN MZZ Marion Municipal GA 26 $ 148,950 $ 148,950 $ ‐ Conduct Environmental Study, Construct Taxiway GL CHI IN MQJ Indianapolis Regional R 18 $ 53,236 $ 53,236 $ ‐ Rehabilitate Apron GL CHI IN MIE Delaware County Regional GA 31 $ 953,451 $ 150,000 $ 803,451 Rehabilitate Runway ‐ 14/32 GL CHI IN UWL New Castle‐Henry Co Municipal GA 17 $ 1,013,912 $ 150,000 $ ‐ 863,912 Construct Runway ‐ Plan‐1 GL CHI IN OVO North Vernon GA 20 $ 150,361 $ 150,361 $ Remove Obstructions [Non‐Hazard] GL CHI IN I42 Paoli Municipal GA 14 $ 1,480,463 $ 150,000 $ ‐ 1,330,463 Extend Runway ‐ 02/20 GL CHI IN I76 Peru Municipal GA 20 $ 29,700 $ 29,700 $ ‐ Reconstruct Runway Lighting ‐ 01/19 GL CHI IN C65 Plymouth Municipal GA 20 $ 208,620 $ 208,620 $ Update Airport Master Plan Study GL CHI IN PLD Portland Municipal GA 14 $ 101,584 $ 101,584 $ ‐ Extend Runway ‐ 09/27 ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 15 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Reconstruct Runway Lighting ‐ 15/33, Rehabilitate GL CHI IN RID Richmond Municipal GA 19 $ 1,870,897 $ 300,000 $ 1,570,897 Runway ‐ 15/33 GL CHI IN SER Freeman Municipal GA 16 $ 1,344,545 $ 534,150 $ 810,395 Reconstruct Taxiway GL CHI IN GEZ Shelbyville Municipal GA 26 $ 130,500 $ 130,500 $ Rehabilitate Runway ‐ 01/19 Conduct Miscellaneous Study, Construct Taxiway, GL CHI IN SBN South Bend International P 50 $ 1,987,953 $ 1,987,953 $ Modify Terminal Building GL CHI IN TEL Perry County Municipal GA 12 $ 127,291 $ 127,291 $ Construct Building GL CHI IN HUF Terre Haute International‐Hulman Field GA 45 $ 496,105 $ 496,105 $ Acquire Snow Removal Equipment GL CHI IN RWN Arens Field GA 10 $ 245,970 $ 245,970 $ Improve Fuel Farm

Install Perimeter Fencing not Required by 14 CFR GL CHI IN TYQ Indianapolis Executive R 28 $ 1,040,400 $ 150,000 $ ‐ 890,400 139/49 CFR 1542, Wildlife Hazard Assessments CE ACE KS K78 Abilene Municipal GA 11 $ 167,679 $ 167,679 $ Update Airport Master Plan Study ‐ CE ACE KS K59 Amelia Earhart GA 12 $ 427,106 $ 427,106 $ ‐ Install Taxiway Lighting, Rehabilitate Taxiway CE ACE KS ADT Atwood‐Rawlins County City‐County GA 13 $ 515,700 $ 515,700 $ ‐ Construct Taxiway CE ACE KS RPB Belleville Municipal GA 13 $ 243,008 $ 243,008 $ ‐ Reconstruct Apron Install Airport Beacons, Install Miscellaneous CE ACE KS CNU Chanute Martin Johnson GA 11 $ 174,240 $ 174,240 $ NAVAIDS CE ACE KS CFV Coffeyville Municipal GA 19 $ 746,883 $ 746,883 $ Rehabilitate Taxiway CE ACE KS CBK Shalz Field GA 17 $ 209,155 $ 209,155 $ ‐ Extend Runway ‐ 17/35 CE ACE KS DDC Dodge City Regional GA 31 $ 6,367,568 $ 4,016,398 $ 2,351,170 Reconstruct Runway ‐ 14/32 CE ACE KS 9K7 Ellsworth Municipal GA 11 $ 285,970 $ 285,970 $ ‐ Improve Access Road CE ACE KS EMP Emporia Municipal GA 11 $ 97,578 $ 97,578 $ ‐ Acquire Land For Approaches ‐ Install Guidance Signs, Rehabilitate Apron, CE ACE KS GCK Garden City Regional P 39 $ 667,864 $ 667,864 $ Rehabilitate Runway ‐ 17/35 CE ACE KS GCK Garden City Regional P 40 $ 222,412 $ 222,412 $ ‐ Conduct Miscellaneous Study CE ACE KS K34 Gardner Municipal GA 13 $ 91,436 $ 91,436 $ ‐ Acquire Land For Approaches ‐ Reconstruct Runway ‐ 17/35, Reconstruct Runway CE ACE KS GBD Great Bend Municipal GA 26 $ 496,656 $ 300,000 $ 196,656 Lighting ‐ 17/35 ‐ Install Perimeter Fencing not Required by 49 CFR CE ACE KS HYS Hays Regional CS 34 $ 1,589,895 $ 694,995 $ ‐ 894,900 1542 CE ACE KS HYS Hays Regional CS 35 $ 516,180 $ 516,180 $ Reconstruct Taxiway CE ACE KS JHN Stanton County Municipal GA 12 $ 121,844 $ 121,844 $ ‐ Construct Building CE ACE KS 9K8 Kingman Airport ‐ Clyde Cessna Field GA 16 $ 254,420 $ 254,420 $ ‐ Remove Obstructions [Non‐Hazard] ‐ Install Perimeter Fencing not Required by 49 CFR CE ACE KS LWC Lawrence Municipal GA 21 $ 1,610,005 $ 547,070 $ 1,062,935 1542 CE ACE KS LYO Lyons‐Rice County Municipal GA 19 $ 102,656 $ 102,656 $ Remove Obstructions [Non‐Hazard]

CE ACE KS MHK Manhattan Regional P 48 $ 756,279 $ 756,279 $ Acquire Aircraft Rescue & Fire Fighting Vehicle CE ACE KS MYZ Marysville Municipal GA 10 $ 581,310 $ 581,310 $ ‐ Reconstruct Apron ‐ CE ACE KS MPR McPherson GA 17 $ 1,970,387 $ 600,000 $ ‐ 1,370,387 Reconstruct Taxiway, Rehabilitate Runway ‐ 18/36 Construct Access Road, Construct Apron, CE ACE KS K51 Medicine Lodge GA 10 $ 822,469 $ 822,469 $ Construct Taxiway CE ACE KS 48K Ness City Municipal GA 10 $ 1,161,119 $ 150,000 $ ‐ 1,011,119 Construct Runway ‐ 17/35 CE ACE KS EWK Newton‐City‐County R 32 $ 296,231 $ 296,231 $ Rehabilitate Runway ‐ 08/26 CE ACE KS OEL Oakley Municipal GA 14 $ 139,806 $ 139,806 $ ‐ Rehabilitate Taxiway CE ACE KS 53K Osage City Municipal GA 11 $ 45,216 $ 45,216 $ ‐ Construct Runway ‐ 17/35 CE ACE KS K81 Miami County GA 18 $ 40,500 $ 40,500 $ Remove Obstructions CE ACE KS SLN Salina Regional P 38 $ 1,223,087 $ 1,000,000 $ 223,087 Rehabilitate Taxiway CE ACE KS TQK Scott City Municipal GA 16 $ 585,806 $ 585,806 $ Construct Building ‐ Construct Taxiway, Rehabilitate Apron, CE ACE KS SYF Cheyenne County Municipal GA 13 $ 750,000 $ 750,000 $ Rehabilitate Runway ‐ 14/32 CE ACE KS TOP Philip Billard Municipal GA 20 $ 1,613,039 $ 600,000 $ ‐ 1,013,039 Rehabilitate Taxiway CE ACE KS *KSS State of Kansas 18 $ 317,358 $ $ ‐ 317,358 Update State System Plan Study CE ACE KS FOE Topeka Regional CS 37 $ 8,030,417 $ 148,199 $ ‐ 7,882,218 Rehabilitate Runway ‐ 13/31 CE ACE KS 5K2 Tribune Municipal GA 9 $ 180,360 $ 180,360 $ ‐ Update Airport Master Plan Study Extend Runway ‐ 17/35, Rehabilitate Runway ‐ CE ACE KS EGT Wellington Municipal GA 15 $ 2,485,921 $ 451,050 $ ‐ 2,034,871 17/35 CE ACE KS ICT Wichita Dwight D Eisenhower National P 73 $ 3,685,851 $ 3,685,851 $ Construct Terminal Building CE ACE KS WLD Strother Field GA 22 $ 106,697 $ 106,697 $ ‐ Update Airport Master Plan Study

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 16 of 48

‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Conduct Environmental Study, Wildlife Hazard SO MEM KY BWG Bowling Green‐Warren County Regional GA 28 $ 75,924 $ 75,924 $ Assessments SO MEM KY AAS Taylor County GA 19 $ 90,000 $ 90,000 $ Conduct Environmental Study SO MEM KY DVK Stuart Powell Field GA 21 $ 686,210 $ 686,210 $ Construct Building SO MEM KY SJS Big Sandy Regional GA 17 $ 171,000 $ 171,000 $ Update Airport Master Plan Study

SO MEM KY EKX Addington Field GA 20 $ 198,464 $ 198,464 $ Strengthen Apron, Wildlife Hazard Assessments SO MEM KY K62 Gene Snyder GA 16 $ 124,430 $ 124,430 $ Update Airport Master Plan Study SO MEM KY FGX Fleming‐Mason GA 18 $ 43,491 $ 43,491 $ Acquire Land For Approaches SO MEM KY 1M7 Fulton GA 15 $ 86,760 $ 86,760 $ ‐ Conduct Environmental Study SO MEM KY GLW Glasgow Municipal GA 27 $ 84,920 $ 84,920 $ ‐ Conduct Airport Master Plan Study SO MEM KY CVG /Northern International P 88 $ 1,875,000 $ 1,875,000 $ ‐ Update Airport Master Plan Study SO MEM KY CVG Cincinnati/Northern Kentucky International P 89 $ 4,288,453 $ 2,634,654 $ ‐ 1,653,799 Rehabilitate Apron Acquire Land for Development, Conduct ‐ Environmental Study, Wildlife Hazard SO MEM KY M21 Muhlenberg County GA 17 $ 175,235 $ 175,235 $ ‐ Assessments ‐ SO MEM KY I93 Breckinridge County GA 10 $ 67,538 $ 67,538 $ ‐ Construct Building, Construct Terminal Building SO MEM KY I35 Tucker‐Guthrie Memorial GA 15 $ 778,500 $ 778,500 $ ‐ Acquire Land For Approaches SO MEM KY CPF Wendell H Ford GA 19 $ 135,393 $ 135,393 $ ‐ Expand Apron SO MEM KY HVC Hopkinsville‐Christian County GA 20 $ 483,885 $ 483,885 $ Install Runway Lighting ‐ 08/26

Construct Aircraft Rescue & Fire Fighting Building, ‐ Construct Taxiway, Rehabilitate Runway Lighting ‐ SO MEM KY LEX Blue Grass P 69 $ 1,098,750 $ 1,098,750 $ 04/22, Rehabilitate Taxiway Lighting SO MEM KY LEX Blue Grass P 70 $ 1,260,000 $ 1,260,000 $ ‐ Acquire Snow Removal Equipment ‐ Acquire Land for Development, Construct Taxiway ‐ [Taxiway F3], Rehabilitate Runway ‐ 17R/35L, ‐ Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway C], Rehabilitate Taxiway [Taxiway N], Widen Taxiway [Taxiways D2, D3, D4, SO MEM KY SDF Louisville International‐Standiford Field P 103 $ 4,269,831 $ 4,269,831 $ and D5] ‐ ‐ Acquire Land for Development, Install Taxiway Lighting [Taxiway B], Install Taxiway Lighting [Taxiway D], Reconstruct Apron, Rehabilitate SO MEM KY SDF Louisville International‐Standiford Field P 104 $ 11,250,669 $ 11,250,669 $ Runway ‐ 17R/35L, Rehabilitate Taxiway SO MEM KY 2I0 Madisonville Regional GA 26 $ 147,428 $ 147,428 $ Update Airport Master Plan Study SO MEM KY M25 Mayfield Graves County GA 15 $ 53,100 $ 53,100 $ Construct Building SO MEM KY SYM Morehead‐Rowan County Clyde A Thomas Regional GA 8 $ 330,470 $ 330,470 $ ‐ Improve Airport Drainage SO MEM KY CEY Kyle‐Oakley Field GA 28 $ 150,000 $ 150,000 $ Acquire Land For Approaches

SO MEM KY OWB Owensboro‐Daviess County P 52 $ 4,349,984 $ 1,460,774 $ 2,889,210 Construct Aircraft Rescue & Fire Fighting Building

‐ Construct Service Road, Improve Terminal ‐ Building, Install Airfield Guidance Signs, ‐ Rehabilitate Taxiway, Security Enhancements, SO MEM KY PAH Barkley Regional P 47 $ 2,044,165 $ 2,044,165 $ ‐ Update Airport Master Plan Study ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 09/27, SO MEM KY PBX Pike County‐Hatcher Field GA 17 $ 126,000 $ 126,000 $ Rehabilitate Taxiway SO MEM KY RGA Central Kentucky Regional GA 17 $ 85,162 $ 85,162 $ Conduct Environmental Study SO MEM KY 4M7 Russellville‐Logan County GA 19 $ 61,034 $ 61,034 $ Install Perimeter Fencing SO MEM KY 071 New 3 $ 675,000 $ 675,000 $ Conduct Environmental Study SO MEM KY TWT Sturgis Municipal GA 15 $ 53,100 $ 53,100 $ Construct Building SO MEM KY TZV Tompkinsville‐Monroe County GA 14 $ 774,322 $ 774,322 $ Construct Building SW LANM LA IYA Abbeville Chris Crusta Memorial GA 18 $ 309,301 $ 309,301 $ ‐ Construct Taxiway SW LANM LA AEX Alexandria International P 73 $ 5,152,405 $ $ 5,152,405 Construct Service Road [MAP] ‐ Noise Mitigation Measures for Residences within SW LANM LA AEX Alexandria International P 74 $ 9,297,973 $ $ ‐ 9,297,973 65 ‐ 69 DNL ‐ ‐ Improve Service Road [MAP], Install Perimeter SW LANM LA AEX Alexandria International P 75 $ 1,847,595 $ $ ‐ 1,847,595 Fencing not Required by 49 CFR 1542 [MAP] ‐ ‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 17 of 48 ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work SW LANM LA AEX Alexandria International P 76 $ 1,569,519 $ 1,569,519 $ Rehabilitate Runway ‐ 18/36 SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 107 $ 1,170,000 $ 1,170,000 $ Conduct Environmental Study SW LANM LA BTR Baton Rouge Metropolitan, Ryan Field P 108 $ 1,114,408 $ 1,114,408 $ Construct Service Road SW LANM LA BXA George R Carr Memorial Air Field GA 20 $ 1,398,056 $ 650,000 $ 748,056 Construct Taxiway SW LANM LA L31 St Tammany Regional GA 9 $ 798,000 $ 798,000 $ Reconstruct Runway Lighting ‐ 18/36 SW LANM LA 3R2 Le Gros Memorial GA 12 $ 316,201 $ 316,201 $ Rehabilitate Apron Reconstruct Perimeter Fencing not Required by SW LANM LA 5R8 DeQuincy Industrial Airpark GA 17 $ 52,135 $ 52,135 $ 49 CFR 1542 SW LANM LA DRI Beauregard Regional GA 16 $ 142,712 $ 142,712 $ ‐ Rehabilitate Apron ‐ Install Taxiway Lighting, Reconstruct Runway SW LANM LA GAO South Lafourche Leonard Miller Jr GA 16 $ 720,911 $ 720,911 $ ‐ Lighting ‐ 18/36 SW LANM LA REG Louisiana Regional GA 14 $ 141,000 $ 141,000 $ Rehabilitate Runway ‐ 17/35 SW LANM LA HDC Hammond Northshore Regional GA 20 $ 267,956 $ 267,956 $ ‐ Update Airport Master Plan Study SW LANM LA 3R7 Jennings GA 17 $ 716,180 $ 716,180 $ ‐ Rehabilitate Runway ‐ 13/31 SW LANM LA L32 Jonesville GA 8 $ 33,835 $ 33,835 $ Rehabilitate Apron SW LANM LA LFT Lafayette Regional/Paul Fournet Field P 49 $ 2,089,786 $ 2,089,786 $ ‐ Construct Terminal Building ‐ Noise Mitigation Measures for Residences within SW LANM LA LFT Lafayette Regional/Paul Fournet Field P 50 $ 1,114,571 $ $ 1,114,571 65 ‐ 69 DNL SW LANM LA CWF Chennault International GA 17 $ 4,737,695 $ 431,245 $ ‐ 4,306,450 Rehabilitate Runway ‐ 15/33 SW LANM LA LCH Lake Charles Regional P 47 $ 650,000 $ 650,000 $ ‐ Improve Airport Drainage SW LANM LA L39 Leesville GA 11 $ 964,300 $ 964,300 $ ‐ Improve Runway Safety Area ‐ 18/36 SW LANM LA MKV Marksville Municipal GA 16 $ 972,715 $ 972,715 $ ‐ Rehabilitate Runway ‐ 04/22 SW LANM LA MSY Louis Armstrong New Orleans International P 102 $ 26,114,094 $ 2,324,094 $ ‐ 23,790,000 Construct Apron SW LANM LA MNE Minden GA 11 $ 3,400,000 $ 900,000 $ ‐ 2,500,000 Construct Taxiway SW LANM LA MLU Monroe Regional P 36 $ 916,735 $ 916,735 $ Extend Runway ‐ 14/32 SW LANM LA ARA Acadiana Regional GA 20 $ 766,944 $ ‐ 766,944 $ Rehabilitate Taxiway SW LANM LA NEW Lakefront R 30 $ 389,480 $ 389,480 $ Rehabilitate Runway ‐ 18L/36R ‐ SW LANM LA HZR False River Regional GA 19 $ 245,627 $ 245,627 $ ‐ Rehabilitate Runway ‐ 18/36, Rehabilitate Taxiway SW LANM LA 9M6 Kelly‐Dumas GA 16 $ 374,715 $ 374,715 $ ‐ Construct Building Rehabilitate Apron, Rehabilitate Runway ‐ 18/36, SW LANM LA ACP Allen Parish GA 12 $ 454,087 $ 454,087 $ Rehabilitate Taxiway ‐ Rehabilitate Runway ‐ 09/27, Remove SW LANM LA ESF Esler Regional GA 26 $ 697,686 $ 697,686 $ ‐ Obstructions [Non‐Hazard APP or DEP] SW LANM LA M79 John H Hooks Jr Memorial GA 16 $ 90,000 $ 90,000 $ ‐ Update Airport Master Plan Study SW LANM LA RSN Ruston Regional GA 19 $ 242,175 $ 242,175 $ Extend Runway ‐ 18/36 SW LANM LA DTN Shreveport Downtown R 27 $ 150,000 $ 150,000 $ ‐ Extend Runway ‐ 05/23 SW LANM LA SHV Shreveport Regional P 63 $ 586,800 $ 586,800 $ ‐ Extend Runway ‐ 06/24 SW LANM LA SHV Shreveport Regional P 64 $ 274,147 $ 274,147 $ Update Airport Master Plan Study SW LANM LA ASD Slidell R 21 $ 382,033 $ 382,033 $ ‐ Expand Apron SW LANM LA UXL Southland Field GA 19 $ 244,170 $ 244,170 $ Rehabilitate Taxiway ‐ SW LANM LA TVR Vicksburg Tallulah Regional GA 16 $ 292,918 $ 292,918 $ ‐ Rehabilitate Access Road, Rehabilitate Taxiway ‐ SW LANM LA 0R4 Concordia Parish GA 13 $ 1,009,458 $ 1,009,458 $ ‐ Reconstruct Taxiway, Rehabilitate Runway ‐ 14/32 ‐ SW LANM LA F89 Winnsboro Municipal GA 10 $ 31,500 $ 31,500 $ ‐ Rehabilitate Access Road, Remove Obstructions NE ANE MA BED Laurence G Hanscom Field R 39 $ 3,105,850 $ 1,538,563 $ ‐ 1,567,287 Rehabilitate Runway ‐ 11/29 NE ANE MA BOS General Edward Lawrence Logan International P 126 $ 5,499,137 $ 5,499,137 $ ‐ Rehabilitate Runway ‐ 04R/22L NE ANE MA BOS General Edward Lawrence Logan International P 127 $ 33,427 $ $ 33,427 Acquire Equipment NE ANE MA CQX Chatham Municipal GA 22 $ 293,760 $ 293,760 $ ‐ Acquire Snow Removal Equipment NE ANE MA CEF Westover ARB/Metropolitan GA 33 $ 289,107 $ 289,107 $ Acquire Snow Removal Equipment NE ANE MA FIT Fitchburg Municipal GA 26 $ 1,152,385 $ 450,000 $ ‐ 702,385 Remove Obstructions NE ANE MA HYA Barnstable Municipal‐Boardman/Polando Field P 68 $ 999,998 $ 999,998 $ Reconstruct Runway ‐ 15/33 NE ANE MA LWM Lawrence Municipal R 38 $ 71,460 $ 71,460 $ ‐ Conduct Miscellaneous Study NE ANE MA 1B9 Mansfield Municipal GA 32 $ 171,000 $ 171,000 $ Conduct Environmental Study NE ANE MA GHG Marshfield Municipal ‐ George Harlow Field GA 27 $ 92,790 $ 92,790 $ ‐ Wildlife Hazard Assessments ‐ Install Perimeter Fencing not Required by 49 CFR NE ANE MA GHG Marshfield Municipal ‐ George Harlow Field GA 28 $ 216,092 $ 216,092 $ ‐ 1542 NE ANE MA 0B5 Turners Falls GA 19 $ 202,500 $ 202,500 $ ‐ Update Airport Master Plan Study NE ANE MA ACK Nantucket Memorial P 66 $ 94,230 $ 94,230 $ Update Airport Master Plan Study ‐ ‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 18 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Install Perimeter Fencing not Required by 49 CFR NE ANE MA ACK Nantucket Memorial P 67 $ 2,342,194 $ 2,342,194 $ 1542, Reconstruct Apron Rehabilitate Runway [Access Road Relocation] ‐ 14/32, Rehabilitate Runway ‐ 14/32, Remove NE ANE MA EWB New Bedford Regional CS 55 $ 7,459,083 $ 819,028 $ 6,640,055 Obstructions NE ANE MA EWB New Bedford Regional CS 56 $ 65,904 $ 65,904 $ Rehabilitate Runway ‐ 14/32 NE ANE MA EWB New Bedford Regional CS 57 $ 115,068 $ 115,068 $ Rehabilitate Runway ‐ 14/32 Install Perimeter Fencing not Required by 49 CFR NE ANE MA AQW Harriman‐And‐West GA 26 $ 52,837 $ 52,837 $ 1542 NE ANE MA AQW Harriman‐And‐West GA 27 $ 156,600 $ 156,600 $ ‐ Improve Building NE ANE MA AQW Harriman‐And‐West GA 28 $ 148,622 $ 148,622 $ Improve Building NE ANE MA OWD Norwood Memorial R 37 $ 297,000 $ 297,000 $ Update Airport Master Plan Study NE ANE MA ORE Orange Municipal GA 25 $ 1,750,104 $ 450,000 $ 1,300,104 Rehabilitate Taxiway ‐ Rehabilitate Runway ‐ 08/26, Rehabilitate Runway NE ANE MA PSF Pittsfield Municipal GA 30 $ 6,295,239 $ 3,373,278 $ ‐ 2,921,961 ‐ 14/32 NE ANE MA PYM Plymouth Municipal GA 45 $ 210,960 $ 210,960 $ Conduct Environmental Study ‐ Conduct Miscellaneous Study, Rehabilitate NE ANE MA PVC Provincetown Municipal P 43 $ 481,950 $ 481,950 $ ‐ Taxiway NE ANE MA TAN Taunton Municipal ‐ King Field GA 27 $ 140,130 $ 140,130 $ ‐ Improve Airport Drainage NE ANE MA MVY Martha's Vineyard P 44 $ 488,493 $ 488,493 $ ‐ Conduct Environmental Study NE ANE MA BAF Westfield‐Barnes Regional GA 51 $ 142,200 $ 142,200 $ Update Airport Master Plan Study Acquire Land for Noise Compatibility within 70 ‐ NE ANE MA BAF Westfield‐Barnes Regional GA 52 $ 2,499,999 $ $ 2,499,999 74 DNL NE ANE MA ORH Worcester Regional P 52 $ 1,000,000 $ 1,000,000 $ ‐ Rehabilitate Taxiway EA WAS MD W41 Crisfield‐Somerset County GA 13 $ 204,189 $ 204,189 $ Remove Obstructions EA WAS MD ESN Easton/Newnam Field GA 44 $ 89,935 $ 89,935 $ ‐ Conduct Miscellaneous Study EA WAS MD FDK Frederick Municipal R 43 $ 222,300 $ 222,300 $ ‐ Extend Runway ‐ 05/23 ‐ Rehabilitate Taxiway, Rehabilitate Taxiway EA WAS MD GAI Montgomery County Airpark R 29 $ 2,805,588 $ 1,347,197 $ ‐ 1,458,391 Lighting EA WAS MD BWI Baltimore/Washington International Thurgood P 95 $ 3,100,297 $ 3,100,297 $ Expand Terminal Building EA WAS MD BWI Baltimore/Washington International Thurgood P 96 $ 7,809,103 $ ‐ 982,192 $ 6,826,911 Reconstruct Apron EA WAS MD HGR Hagerstown Regional‐Richard A Henson Field P 55 $ 260,000 $ 260,000 $ ‐ Rehabilitate Taxiway EA WAS MD HGR Hagerstown Regional‐Richard A Henson Field P 56 $ 278,303 $ 278,303 $ ‐ Acquire Aircraft Deicing Equipment EA WAS MD HGR Hagerstown Regional‐Richard A Henson Field P 57 $ 581,640 $ 150,000 $ ‐ 431,640 Acquire Snow Removal Equipment EA WAS MD HGR Hagerstown Regional‐Richard A Henson Field P 58 $ 572,072 $ 572,072 $ ‐ Conduct Environmental Study EA WAS MD 2W6 St Mary's County Regional GA 24 $ 1,400,000 $ 1,400,000 $ Extend Runway ‐ 11/29 EA WAS MD 2W6 St Mary's County Regional GA 25 $ 1,572,376 $ 222,376 $ 1,350,000 Extend Runway ‐ 11/29 EA WAS MD OXB Ocean City Municipal GA 23 $ 556,324 $ 556,324 $ ‐ Conduct Environmental Study EA WAS MD SBY Salisbury‐Ocean City Wicomico Regional P 52 $ 71,499 $ 71,499 $ Conduct Miscellaneous Study ‐ Rehabilitate Taxiway, Rehabilitate Taxiway EA WAS MD SBY Salisbury‐Ocean City Wicomico Regional P 53 $ 1,218,606 $ 1,218,606 $ ‐ Lighting EA WAS MD W29 Bay Bridge GA 24 $ 136,717 $ 136,717 $ Remove Obstructions EA WAS MD W29 Bay Bridge GA 25 $ 78,308 $ 78,308 $ ‐ Conduct Miscellaneous Study EA WAS MD CBE Greater Cumberland Regional GA 23 $ 5,349,996 $ 150,000 $ ‐ 5,199,996 Rehabilitate Runway ‐ 05/23 NE ANE ME LEW Auburn/Lewiston Municipal R 23 $ 785,115 $ 150,000 $ 635,115 Rehabilitate Taxiway ‐ Install Perimeter Fencing, Rehabilitate Apron, NE ANE ME AUG Augusta State CS 30 $ 201,701 $ 201,701 $ ‐ Remove Obstructions [Non‐Hazard] NE ANE ME BGR Bangor International P 71 $ 293,234 $ 293,234 $ Rehabilitate Taxiway Lighting ‐ Install Runway Incursion Marking (14 CFR Part NE ANE ME BHB Hancock County‐Bar Harbor CS 42 $ 219,745 $ 219,745 $ ‐ 139) NE ANE ME BHB Hancock County‐Bar Harbor CS 43 $ 309,239 $ 309,239 $ ‐ Environmental Mitigation NE ANE ME 0B1 Bethel Regional GA 14 $ 144,000 $ 144,000 $ Remove Obstructions [Non‐Hazard] NE ANE ME BXM Brunswick Executive GA 27 $ 126,802 $ 126,802 $ Rehabilitate Apron

NE ANE ME BXM Brunswick Executive GA 28 $ 2,014,200 $ $ ‐ 2,014,200 Rehabilitate Building [Military Airport Program] NE ANE ME CAR Caribou Municipal GA 19 $ 582,623 $ 582,623 $ ‐ Construct Building Rehabilitate Apron, Rehabilitate Runway ‐ 17/35, NE ANE ME B21 Sugarloaf Regional GA 9 $ 92,611 $ 92,611 $ ‐ Rehabilitate Taxiway NE ANE ME B21 Sugarloaf Regional GA 10 $ 58,644 $ 58,644 $ ‐ Remove Obstructions [Non‐Hazard] NE ANE ME FVE Northern Aroostook Regional GA 20 $ 162,000 $ 162,000 $ ‐ Update Airport Master Plan Study ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 14/32, NE ANE ME FVE Northern Aroostook Regional GA 21 $ 90,000 $ 90,000 $ Rehabilitate Taxiway ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 19 of 48 ‐ ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work NE ANE ME HUL Houlton International GA 17 $ 261,000 $ 261,000 $ Acquire Snow Removal Equipment Construct Terminal Building, Reconstruct Access NE ANE ME MVM Machias Valley GA 11 $ 508,499 $ 508,499 $ Road

NE ANE ME MLT Millinocket Municipal GA 19 $ 661,609 $ 661,609 $ Construct Snow Removal Equipment Building NE ANE ME OWK Central Maine Airport of Norridgewock GA 21 $ 177,300 $ 177,300 $ Update Airport Master Plan Study Install Perimeter Fencing not Required by 49 CFR NE ANE ME 81B Oxford County Regional GA 12 $ 204,300 $ 204,300 $ 1542 ‐ Construct Taxiway, Install Runway Lighting ‐ NE ANE ME PWM Portland International Jetport P 82 $ 2,818,792 $ 2,818,792 $ 18/36, Reconstruct Apron NE ANE ME PWM Portland International Jetport P 83 $ 478,084 $ 478,084 $ ‐ Conduct Environmental Study

NE ANE ME PWM Portland International Jetport P 84 $ 548,123 $ 548,123 $ ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle NE ANE ME PWM Portland International Jetport P 85 $ 1,305,358 $ $ ‐ 1,305,358 Energy Efficiency Equipment/Infrastructure NE ANE ME PQI Northern Maine Regional Airport at Presque Isle P 46 $ 579,500 $ 579,500 $ Acquire Snow Removal Equipment ‐ Improve Airport Miscellaneous Improvements, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 01/19, NE ANE ME PQI Northern Maine Regional Airport at Presque Isle P 47 $ 338,400 $ 338,400 $ ‐ Rehabilitate Runway ‐ 10/28, Rehabilitate Taxiway NE ANE ME PNN Princeton Municipal GA 8 $ 97,200 $ 97,200 $ Reconstruct Runway ‐ 15/33 NE ANE ME PNN Princeton Municipal GA 9 $ 4,978,937 $ 1,787,353 $ ‐ 3,191,584 Reconstruct Runway ‐ 15/33 NE ANE ME 8B0 Steven A Bean Municipal GA 14 $ 531,999 $ ‐ 531,999 $ Expand Apron, Reconstruct Apron NE ANE ME 8B0 Steven A Bean Municipal GA 15 $ 204,599 $ 204,599 $ ‐ Update Airport Master Plan Study NE ANE ME RKD Knox County Regional P 53 $ 1,656,200 $ 1,656,200 $ Extend Runway ‐ 13/31

WP HNL MH MAJ Marshall Islands International GA 18 $ 500,000 $ $ 500,000 Improve Airport Miscellaneous Improvements ‐ Reconstruct Taxiway Lighting, Rehabilitate GL DET MI CVX Charlevoix Municipal GA 21 $ 1,176,592 $ 1,176,592 $ ‐ Taxiway GL DET MI LAN Capital Region International P 56 $ 220,358 $ 220,358 $ Expand Apron ‐ Construct Service Road, Improve Airport GL DET MI DTW Detroit Metropolitan Wayne County P 113 $ 3,411,782 $ 3,411,782 $ ‐ Miscellaneous Improvements ‐ Rehabilitate Runway ‐ 09/27, Rehabilitate Runway ‐ ‐ 18/36, Rehabilitate Runway Lighting ‐ 18/36, Rehabilitate Taxiway [A], Rehabilitate Taxiway [B GL DET MI ESC Delta County P 40 $ 2,609,081 $ 2,609,081 $ ‐ and C], Rehabilitate Taxiway Lighting ‐ Construct Taxiway, Install Runway Incursion Marking (non 14 CFR Part 139 Com Svc), ‐ Rehabilitate Taxiway, Rehabilitate Taxiway GL DET MI FNT Bishop International P 56 $ 4,838,646 $ 4,838,646 $ Lighting, Remove Obstructions [Non‐Hazard] GL DET MI GRR Gerald R Ford International P 55 $ 3,830,587 $ 3,830,587 $ Security Enhancements GL DET MI SAW Sawyer International P 41 $ 5,019,967 $ 2,467,513 $ 2,552,454 Rehabilitate Runway ‐ 01/19

‐ Acquire Snow Removal Equipment [Vehicle #5], Acquire Snow Removal Equipment [Vehicle #6], GL DET MI CMX Houghton County Memorial P 42 $ 1,619,231 $ 1,619,231 $ Rehabilitate Apron, Rehabilitate Runway ‐ 07/25 Reconstruct Runway Lighting ‐ 01/19, Rehabilitate GL DET MI IMT Ford P 21 $ 4,843,789 $ 2,597,745 $ ‐ 2,246,044 Runway ‐ 01/19 ‐ Reconstruct Runway Lighting ‐ 17/35, Rehabilitate Apron, Rehabilitate Runway [Design] ‐ 17/35, Rehabilitate Runway [Pavement Markings] ‐ GL DET MI AZO Kalamazoo/Battle Creek International P 44 $ 2,458,304 $ 2,458,304 $ 17/35, Rehabilitate Taxiway ‐ Non primary development projects in state block GL DET MI *MIB Michigan State Block Grant Program 98 $ 18,009,757 $ 18,009,757 $ grant program Non primary development projects in state block GL DET MI *MIB Michigan State Block Grant Program 99 $ 1,340,000 $ $ 1,340,000 grant program Non primary development projects in state block GL DET MI *MIB Michigan State Block Grant Program 100 $ 4,900,000 $ $ 4,900,000 grant program Non primary development projects in state block GL DET MI *MIB Michigan State Block Grant Program 101 $ 558,127 $ $ ‐ 558,127 grant program

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 20 of 48 ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Non primary development projects in state block GL DET MI *MIB Michigan State Block Grant Program 102 $ 1,031,500 $ $ 1,031,500 grant program Rehabilitate Runway ‐ 06/24, Rehabilitate Runway GL DET MI MKG Muskegon County P 41 $ 224,892 $ 224,892 $ Lighting ‐ 06/24 Rehabilitate Runway ‐ 14/32, Rehabilitate Runway GL DET MI PLN Pellston Regional Airport of Emmet County P 35 $ 4,006,831 $ 3,530,543 $ 476,288 Lighting ‐ 14/32

Reconstruct Runway Lighting ‐ 05/23, Rehabilitate GL DET MI MBS MBS International P 52 $ 520,928 $ 520,928 $ Runway ‐ 05/23, Rehabilitate Runway ‐ 14/32 ‐ Conduct Miscellaneous Study, Install Runway Lighting ‐ 10/28, Install Taxiway Lighting, GL DET MI CIU Chippewa County International P 38 $ 689,269 $ 689,269 $ ‐ Rehabilitate Runway ‐ 16/34 Extend Runway [Parallel Taxiway D] ‐ 10/28, Extend Runway [Runway 10] ‐ 10/28, Rehabilitate GL DET MI TVC Cherry Capital P 42 $ 6,130,114 $ 6,130,114 $ Runway ‐ 10/28 Construct Parking Lot, Construct Terminal GL DMA MN AEL Albert Lea Municipal GA 18 $ 766,342 $ 766,342 $ ‐ Building GL DMA MN BDE Baudette International GA 16 $ 954,308 $ 954,308 $ Construct Building, Rehabilitate Apron GL DMA MN BJI Bemidji Regional P 33 $ 1,007,559 $ 1,007,559 $ Construct Taxiway, Security Enhancements ‐ GL DMA MN ANE Anoka County‐Blaine Airport (Janes Field) R 14 $ 346,424 $ 346,424 $ Install Taxiway Lighting, Reconstruct Taxiway

GL DMA MN SBU Blue Earth Municipal GA 14 $ 324,625 $ 324,625 $ ‐ Construct Snow Removal Equipment Building GL DMA MN ADC Wadena Municipal GA 10 $ 448,455 $ 448,455 $ Install Perimeter Fencing ‐ GL DMA MN BRD Brainerd Lakes Regional P 42 $ 1,266,328 $ 1,266,328 $ ‐ Construct Terminal Building, Rehabilitate Taxiway GL DMA MN COQ Cloquet Carlton County GA 13 $ 112,763 $ 112,763 $ ‐ Rehabilitate Runway ‐ 17/35

GL DMA MN CQM Cook Municipal GA 10 $ 25,110 $ 25,110 $ ‐ Rehabilitate Access Road, Rehabilitate Parking Lot GL DMA MN CKN Crookston Municipal Kirkwood Field GA 13 $ 330,463 $ 330,463 $ Construct Fuel Farm ‐ ‐ Construct Runway Safety Area [Land Acquisition] ‐ 13/31, Construct Runway Safety Area [Parallel ‐ Taxiway] ‐ 13/31, Construct Runway Safety Area ‐ [Utilities] ‐ 13/31, Construct Runway Safety Area [Wetland Credits] ‐ 13/31, Construct Runway GL DMA MN DTL Detroit Lakes‐Wething Field GA 13 $ 4,471,792 $ 1,117,008 $ ‐ 3,354,784 Safety Area [Wetlands] ‐ 13/31 ‐ Reconstruct Taxiway, Rehabilitate Runway ‐ GL DMA MN TOB Dodge Center GA 11 $ 257,960 $ 257,960 $ 16/34, Rehabilitate Taxiway

Install Perimeter Fencing not Required by 49 CFR 1542, Rehabilitate Runway ‐ 09/27, Remove GL DMA MN DLH Duluth International P 61 $ 1,084,668 $ 1,084,668 $ Obstructions [Non‐Hazard APP or DEP] GL DMA MN DYT Sky Harbor GA 12 $ 4,611,690 $ 3,385,107 $ 1,226,583 Construct Runway ‐ 14/32 GL DMA MN ELO Ely Municipal GA 17 $ 90,900 $ 90,900 $ Reconstruct Apron Construct Taxiway, Rehabilitate Apron, GL DMA MN EVM Eveleth‐Virginia Municipal GA 13 $ 712,111 $ 712,111 $ ‐ Rehabilitate Taxiway GL DMA MN FSE Fosston Municipal GA 9 $ 254,925 $ 254,925 $ Rehabilitate Apron, Rehabilitate Taxiway GL DMA MN CKC Grand Marais/Cook County GA 17 $ 67,500 $ 67,500 $ Conduct Environmental Study GL DMA MN GPZ Grand Rapids/Itasca County Airport‐Gordon GA 20 $ 241,110 $ 241,110 $ Construct Taxiway, Rehabilitate Apron ‐ Construct Building, Install Runway Vertical/Visual GL DMA MN HCO Hallock Municipal GA 9 $ 201,901 $ 201,901 $ Guidance System ‐ 13/31 GL DMA MN 04Y Hawley Municipal GA 11 $ 707,223 $ 707,223 $ ‐ Construct Building

‐ Improve Airport Drainage, Install Runway Lighting ‐ ‐ 13/31, Install Runway Vertical/Visual Guidance ‐ System ‐ 13/31, Install Taxiway Lighting, ‐ Reconstruct Taxiway [B], Reconstruct Taxiway [C], GL DMA MN HIB Range Regional P 38 $ 5,268,809 $ 1,539,735 $ 3,729,074 Rehabilitate Airport Beacons ‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 21 of 48 FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Conduct Airport Master Plan Study, Expand Terminal Building, Rehabilitate Apron, Rehabilitate Runway ‐ 04/22, Rehabilitate Runway GL DMA MN INL Falls International‐Einarson Field P 30 $ 3,602,103 $ 1,000,000 $ 2,602,103 ‐ 13/31, Rehabilitate Taxiway GL DMA MN MJQ Jackson Municipal GA 14 $ 135,720 $ 135,720 $ Reconstruct Runway ‐ 13/31 Install Runway Vertical/Visual Guidance System ‐ 12/30, Light Obstructions [Hazard or Req'd by 14 GL DMA MN LVN Airlake R 10 $ 89,109 $ 89,109 $ CFR 139] Rehabilitate Apron, Rehabilitate Runway ‐ 13/31, GL DMA MN 12Y Le Sueur Municipal GA 13 $ 144,345 $ 144,345 $ Rehabilitate Taxiway Conduct Environmental Study, Rehabilitate Apron, Rehabilitate Runway ‐ 13/31, Rehabilitate ‐ Taxiway [A], Rehabilitate Taxiway [Hangar GL DMA MN LXL Little Falls/Morrison County‐Lindbergh Field GA 18 $ 201,737 $ 201,737 $ Taxilanes] Acquire Land for Development, Extend Runway ‐ GL DMA MN 14Y Todd Field GA 10 $ 280,341 $ 280,341 $ ‐ 16/34 GL DMA MN DXX Lac qui Parle County GA 12 $ 164,822 $ 164,822 $ Acquire Snow Removal Equipment GL DMA MN 3N8 Mahnomen County GA 15 $ 49,526 $ 49,526 $ ‐ Construct Terminal Building

Reconstruct Taxiway Lighting [A], Reconstruct Taxiway Lighting [B], Reconstruct Taxiway Lighting GL DMA MN MKT Mankato Regional GA 24 $ 1,813,437 $ 340,000 $ ‐ 1,473,437 [C, D, and E], Update Airport Master Plan Study GL DMA MN MML Southwest Minnesota Regional Marshall/Ryan Field GA 15 $ 640,822 $ 384,072 $ 256,750 Rehabilitate Runway ‐ 02/20 GL DMA MN FCM Flying Cloud R 19 $ 343,338 $ 343,338 $ ‐ Reconstruct Taxiway GL DMA MN MSP Minneapolis‐St Paul International/Wold‐ P 114 $ 126,191 $ 126,191 $ ‐ Rehabilitate Service Road GL DMA MN JKJ Moorhead Municipal GA 12 $ 482,168 $ 482,168 $ ‐ Reconstruct Taxiway Rehabilitate Access Road, Rehabilitate Apron, GL DMA MN MZH Moose Lake Carlton County GA 7 $ 219,015 $ 219,015 $ Rehabilitate Runway ‐ 04/22 GL DMA MN MOX Morris Municipal ‐ Charlie Schmidt Field GA 8 $ 450,000 $ 450,000 $ Conduct Airport Master Plan Study GL DMA MN ULM New Ulm Municipal GA 14 $ 264,600 $ 264,600 $ Update Airport Master Plan Study GL DMA MN PEX Paynesville Municipal GA 11 $ 156,960 $ 156,960 $ Acquire Land for Development ‐ Acquire Snow Removal Equipment, Rehabilitate ‐ Apron, Rehabilitate Runway ‐ 16/34, Rehabilitate GL DMA MN PWC Pine River Regional GA 9 $ 271,896 $ 271,896 $ ‐ Taxiway GL DMA MN PQN Pipestone Municipal GA 10 $ 125,891 $ 125,891 $ Construct Parking Lot ‐ Conduct Airport Master Plan Study, Rehabilitate ‐ Apron, Rehabilitate Runway ‐ 11/29, Rehabilitate GL DMA MN FKA Fillmore County GA 12 $ 486,041 $ 486,041 $ ‐ Taxiway ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 15/33, GL DMA MN PNM Princeton Municipal GA 13 $ 36,462 $ 36,462 $ Rehabilitate Taxiway Reconstruct Taxiway, Rehabilitate Runway ‐ GL DMA MN RGK Red Wing Regional GA 15 $ 267,018 $ 267,018 $ ‐ 09/27, Rehabilitate Taxiway GL DMA MN RWF Redwood Falls Municipal GA 16 $ 77,634 $ 77,634 $ ‐ Construct Building GL DMA MN RST Rochester International P 37 $ 701,497 $ 701,497 $ Update Airport Master Plan Study Construct Taxiway, Install Airfield Guidance Signs, GL DMA MN ROS Rush City Regional GA 9 $ 181,458 $ 181,458 $ ‐ Rehabilitate Taxiway GL DMA MN SGS South St Paul Municipal‐Richard E Fleming Field R 17 $ 219,267 $ 219,267 $ Acquire Snow Removal Equipment ‐ Construct Taxiway, Reconstruct Taxiway, Rehabilitate Taxiway, Remove Obstructions [Non‐ GL DMA MN STC St. Cloud Regional P 29 $ 1,562,449 $ 1,562,449 $ ‐ Hazard] ‐ ‐ Rehabilitate Apron, Rehabilitate Taxiway [General Aviation Hangar Area Taxilane], Rehabilitate GL DMA MN JYG St James Municipal GA 14 $ 56,237 $ 56,237 $ ‐ Taxiway [Partial Parallel Taxiway A] GL DMA MN STP St Paul Downtown Holman Field R 25 $ 486,271 $ 486,271 $ ‐ Reconstruct Apron

Reconstruct Apron, Reconstruct Taxiway [Taxiway ‐ A], Reconstruct Taxiway [Taxiway A2X], GL DMA MN TVF Thief River Falls Regional GA 21 $ 175,125 $ 175,125 $ Rehabilitate Runway ‐ 13/31, Rehabilitate Taxiway GL DMA MN TKC Tracy Municipal GA 9 $ 363,015 $ 363,015 $ Conduct Airport Master Plan Study Conduct Airport Master Plan Study, Wildlife GL DMA MN Y49 Walker Municipal GA 11 $ 227,700 $ 227,700 $ ‐ Hazard Assessments ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 22 of 48 ‐ ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work GL DMA MN BDH Willmar Municipal‐John L Rice Field GA 11 $ 361,665 $ 361,665 $ Improve Fuel Farm, Rehabilitate Taxiway GL DMA MN 10D Winsted Municipal GA 7 $ 426,600 $ 426,600 $ Reconstruct Runway ‐ 09/27 Rehabilitate Runway ‐ 11/29, Rehabilitate Runway GL DMA MN OTG Worthington Municipal GA 15 $ 784,376 $ 183,270 $ 601,106 ‐ 18/36

CE ACE MO COU Columbia Regional P 42 $ 2,945,937 $ 1,000,000 $ 1,945,937 Install Taxiway Lighting, Rehabilitate Taxiway CE ACE MO COU Columbia Regional P 45 $ 298,453 $ $ 298,453 Extend Runway ‐ 02/20 Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 78 $ 8,550,000 $ 8,550,000 $ ‐ grant program ‐ Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 79 $ 4,676,856 $ 4,676,856 $ grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 80 $ 1,065,828 $ $ 1,065,828 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 81 $ 707,832 $ ‐ $ 707,832 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 82 $ 2,109,777 $ $ ‐ 2,109,777 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 84 $ 6,084,005 $ $ ‐ 6,084,005 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 85 $ 707,758 $ ‐ $ 707,758 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 86 $ 551,798 $ ‐ $ 551,798 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 87 $ 717,660 $ ‐ $ 717,660 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 88 $ 320,612 $ ‐ $ 320,612 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 89 $ 3,091,435 $ ‐ $ 3,091,435 grant program Non primary development projects in state block CE ACE MO *MOB Missouri State Block Grant Program 90 $ 993,794 $ ‐ $ 993,794 grant program CE ACE MO *MOS State of Missouri 13 $ 206,671 $ $ 206,671 Update State System Plan Study CE ACE MO *MOS State of Missouri 14 $ 584,045 $ ‐ $ 584,045 Update State System Plan Study Install Guidance Signs, Rehabilitate Taxiway, CE ACE MO MCI Kansas City International P 75 $ 11,303,243 $ ‐ 2,409,257 $ 8,893,986 Rehabilitate Taxiway Lighting

CE ACE MO SGF Springfield‐Branson National P 53 $ 3,253,744 $ ‐ 3,253,744 $ Construct Apron, Construct Terminal Building Install Airfield Guidance Signs, Rehabilitate ‐ Runway ‐ 12L/30R, Rehabilitate Taxiway, ‐ Rehabilitate Taxiway, Rehabilitate Taxiway CE ACE MO STL St Louis Lambert International P 152 $ 7,676,680 $ ‐ 2,562,629 $ 5,114,051 Lighting Reconstruct Runway Lighting [Runway 12] ‐ 12L/30R, Reconstruct Runway Lighting [Runway 30] ‐ 12L/30R, Reconstruct Taxiway Lighting, CE ACE MO STL St Louis Lambert International P 153 $ 432,510 $ $ ‐ 432,510 Rehabilitate Runway ‐ 12L/30R VALE Infrastructure [Gate Electrification], VALE Infrastructure [Ground Power], VALE CE ACE MO STL St Louis Lambert International P 154 $ 1,352,025 $ $ 1,352,025 Infrastructure [PCA] CE ACE MO STL St Louis Lambert International P 156 $ 79,226 $ $ 79,226 VALE Vehicle WP HNL MP GSN Francisco C Ada/Saipan International P 89 $ 5,293,632 $ 5,293,632 $ Improve Terminal Building

WP HNL MP GSN Francisco C Ada/Saipan International P 90 $ 690,000 $ $ 690,000 Acquire Aircraft Rescue & Fire Fighting Vehicle ‐ WP HNL MP TNI Tinian International P 28 $ 1,951,956 $ $ 1,951,956 Improve Aircraft Rescue & Fire Fighting Building WP HNL MP TNI Tinian International P 29 $ 881,148 $ $ 881,148 Rehabilitate Runway ‐ 08/26 SO JAN MS M40 Monroe County GA 16 $ 171,000 $ ‐ 171,000 $ Install Weather Reporting Equipment ‐ Construct Building, Rehabilitate Runway Lighting ‐ SO JAN MS 00M Thigpen Field GA 11 $ 197,734 $ 197,734 $ ‐ 16/34 SO JAN MS HSA Stennis International GA 31 $ 4,787,528 $ 150,000 $ 4,637,528 Rehabilitate Runway ‐ 18/36 SO JAN MS 1M2 Belzoni Municipal GA 17 $ 239,094 $ ‐ 239,094 $ Construct Building SO JAN MS 8M1 Booneville/Baldwyn GA 18 $ 305,887 $ 305,887 $ Construct Building SO JAN MS 1R7 Brookhaven‐Lincoln County GA 14 $ 82,800 $ ‐ 82,800 $ Update Airport Master Plan Study ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 23 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Acquire Miscellaneous Land, Expand Apron, Install Perimeter Fencing not Required by 49 CFR 1542, SO JAN MS RNV Cleveland Municipal GA 21 $ 202,032 $ 202,032 $ Rehabilitate Apron SO JAN MS 0R0 Columbia‐Marion County GA 14 $ 854,057 $ 854,057 $ Extend Runway ‐ 05/23 Improve Airport Drainage, Rehabilitate Runway ‐ SO JAN MS UBS Columbus‐Lowndes County GA 19 $ 126,881 $ 126,881 $ 18/36

Expand Terminal Building, Improve Access Road [General Aviation Access Road], Improve Access Road [Terminal Entrance Road], Improve Building, ‐ Improve Terminal Building, Rehabilitate Apron, SO JAN MS GTR Golden Triangle Regional P 55 $ 1,000,000 $ 1,000,000 $ ‐ Rehabilitate Taxiway, Security Enhancements

‐ Reconstruct Taxiway, Rehabilitate Apron, SO JAN MS CRX Roscoe Turner GA 26 $ 763,116 $ 763,116 $ Rehabilitate Runway ‐ 18/36, Rehabilitate Taxiway SO JAN MS M37 Ruleville‐Drew GA 15 $ 246,736 $ 246,736 $ Construct Building, Expand Apron Install Perimeter Fencing not Required by 49 CFR SO JAN MS GLH Greenville Mid‐Delta GA 34 $ 175,275 $ 175,275 $ 1542 SO JAN MS GNF Grenada Municipal GA 14 $ 135,900 $ 135,900 $ Rehabilitate Runway ‐ 13/31 SO JAN MS GPT Gulfport‐Biloxi International P 89 $ 1,901,218 $ 1,901,218 $ ‐ Security Enhancements, Widen Taxiway Noise Mitigation Measures for Residences within SO JAN MS GPT Gulfport‐Biloxi International P 90 $ 3,420,000 $ $ 3,420,000 65 ‐ 69 DNL SO JAN MS GPT Gulfport‐Biloxi International P 91 $ 910,575 $ 992 $ ‐ 909,583 Energy Efficiency Equipment/Infrastructure SO JAN MS HBG Hattiesburg Bobby L Chain Municipal GA 24 $ 1,016,850 $ 1,016,850 $ ‐ Extend Taxiway

SO JAN MS 14M Hollandale Municipal GA 12 $ 72,805 $ 72,805 $ ‐ Rehabilitate Runway ‐ 08/26, Rehabilitate Taxiway ‐ Install Perimeter Fencing not Required by 49 CFR SO JAN MS M41 Holly Springs‐Marshall County GA 18 $ 143,124 $ 143,124 $ ‐ 1542 SO JAN MS M44 Houston Municipal GA 16 $ 150,000 $ 150,000 $ Construct Fuel Farm ‐ SO JAN MS IDL Indianola Municipal GA 19 $ 139,910 $ 139,910 $ Rehabilitate Runway ‐ 18/36, Rehabilitate Taxiway ‐ Conduct Aeronautical Survey for RNAV Approach, Improve Runway Safety Area ‐ 18/36, Rehabilitate ‐ Apron, Rehabilitate Taxiway, Remove SO JAN MS 15M Iuka GA 12 $ 276,833 $ 276,833 $ Obstructions SO JAN MS HKS Hawkins Field GA 17 $ 855,506 $ 308,950 $ ‐ 546,556 Rehabilitate Runway ‐ 16/34 ‐ Rehabilitate Taxiway, Rehabilitate Taxiway SO JAN MS JAN Jackson‐Medgar Wiley Evers International P 52 $ 5,179,167 $ 3,364,618 $ 1,814,549 Lighting SO JAN MS LUL Hesler‐Noble Field GA 9 $ 47,196 $ 47,196 $ ‐ Update Airport Master Plan Study SO JAN MS 19M C A Moore GA 18 $ 150,132 $ 150,132 $ Improve Airport Drainage SO JAN MS LMS Louisville Winston County GA 17 $ 570,651 $ 570,651 $ Rehabilitate Apron SO JAN MS 4R1 I H Bass Jr Memorial GA 14 $ 94,365 $ 94,365 $ Install Miscellaneous NAVAIDS ‐ SO JAN MS 17M Magee Municipal GA 11 $ 73,395 $ 73,395 $ Rehabilitate Apron, Rehabilitate Runway ‐ 18/36

Improve Runway Safety Area ‐ 15/33, Rehabilitate SO JAN MS MCB McComb/Pike County/John E Lewis Field GA 25 $ 1,005,046 $ 1,005,046 $ ‐ Runway ‐ 15/33, Rehabilitate Taxiway ‐ Reconstruct Airfield Guidance Signs, Rehabilitate SO JAN MS MEI Key Field P 36 $ 1,578,892 $ 1,119,285 $ ‐ 459,607 Taxiway SO JAN MS MEI Key Field P 37 $ 168,653 $ $ ‐ 168,653 Improve Airport Drainage

‐ Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Install Perimeter Fencing required by 49 CFR 1542, Install Runway Distance‐ ‐ To‐Go Signs ‐ 18/36, Install Runway SO JAN MS PIB Hattiesburg‐Laurel Regional P 38 $ 366,573 $ 366,573 $ Vertical/Visual Guidance System ‐ 18/36 Acquire Land For Approaches, Acquire Land for ‐ Development, Remove Obstructions [Hazard or SO JAN MS M72 New Albany‐Union County GA 18 $ 152,871 $ 152,871 $ Req'd by 14 CFR 139] SO JAN MS M23 James H Easom Field GA 16 $ 139,275 $ 139,275 $ Rehabilitate Runway ‐ 13/31 SO JAN MS 5A4 Okolona Municipal‐Richard Stovall Field GA 19 $ 326,821 $ 326,821 $ Rehabilitate Runway ‐ 18/36 SO JAN MS UOX University‐Oxford GA 31 $ 165,611 $ 165,611 $ Rehabilitate Runway ‐ 09/27

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 24 of 48 ‐ ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

SO JAN MS MPE Philadelphia Municipal GA 17 $ 50,760 $ 50,760 $ Install Apron Lighting, Install Perimeter Fencing SO JAN MS MJD Picayune Municipal GA 19 $ 183,240 $ 183,240 $ Construct Taxiway SO JAN MS 22M Pontotoc County GA 11 $ 477,285 $ 477,285 $ Construct Building SO JAN MS 23M Clarke County GA 16 $ 353,348 $ 353,348 $ Construct Building Conduct Miscellaneous Study, Improve Airport SO JAN MS JVW John Bell Williams GA 22 $ 139,500 $ 139,500 $ Drainage Install Airfield Guidance Signs, Install Perimeter SO JAN MS STF George M Bryan GA 22 $ 243,250 $ 243,250 $ Fencing, Remove Obstructions SO JAN MS UTA Tunica Municipal CS 23 $ 358,466 $ 358,466 $ ‐ Expand Apron ‐ Install Runway Vertical/Visual Guidance System ‐ SO JAN MS TUP Tupelo Regional CS 42 $ 75,715 $ 75,715 $ ‐ 18/36, Reconstruct Taxiway Lighting SO JAN MS VKS Vicksburg Municipal GA 9 $ 58,500 $ 58,500 $ ‐ Conduct Miscellaneous Study SO JAN MS 33M Water Valley Municipal GA 9 $ 164,923 $ 164,923 $ Expand Apron SO JAN MS 2R0 Waynesboro Municipal GA 10 $ 371,514 $ 371,514 $ ‐ Construct Building SO JAN MS M83 McCharen Field GA 14 $ 200,326 $ 200,326 $ Reconstruct Runway Lighting ‐ 18/36 ‐ SO JAN MS M24 Dean Griffin Memorial GA 17 $ 42,019 $ 42,019 $ ‐ Conduct Aeronautical Survey for RNAV Approach SO JAN MS 87I Yazoo County GA 16 $ 384,151 $ 384,151 $ Rehabilitate Taxiway ‐ Construct Taxiway, Expand Apron, Rehabilitate ‐ Apron, Rehabilitate Runway ‐ 13/31, Rehabilitate NM HLN MT BHK Baker Municipal GA 19 $ 402,831 $ 402,831 $ ‐ Taxiway ‐ Improve Airport Miscellaneous Improvements, ‐ Install Airport Beacons, Install Miscellaneous NM HLN MT 3U8 Big Sandy GA 6 $ 133,200 $ 133,200 $ NAVAIDS ‐ Construct Snow Removal Equipment Building, ‐ Install Miscellaneous NAVAIDS, Install Runway NM HLN MT 6S0 Big Timber GA 10 $ 63,000 $ 63,000 $ Lighting ‐ 06/24 NM HLN MT BIL Billings Logan International P 55 $ 1,708,386 $ 1,708,386 $ Reconstruct Runway ‐ 10R/28L NM HLN MT BIL Billings Logan International P 56 $ 1,573,454 $ 1,573,454 $ ‐ Expand Terminal Building NM HLN MT BZN Bozeman Yellowstone International P 47 $ 1,830,435 $ $ 1,830,435 Rehabilitate Taxiway NM HLN MT BZN Bozeman Yellowstone International P 48 $ 3,395,655 $ 3,395,655 $ Construct Runway ‐ 11/29 NM HLN MT BZN Bozeman Yellowstone International P 49 $ 3,312,614 $ 559,019 $ ‐ 2,753,595 Rehabilitate Runway ‐ 12/30 NM HLN MT BTM Bert Mooney P 53 $ 1,550,000 $ 1,550,000 $ Construct Terminal Building NM HLN MT BTM Bert Mooney P 54 $ 1,329,201 $ 1,329,201 $ Construct Terminal Building NM HLN MT CII Choteau GA 9 $ 291,856 $ 291,856 $ ‐ Update Airport Master Plan Study ‐ Install Perimeter Fencing not Required by 49 CFR ‐ 1542, Install Weather Reporting Equipment, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, NM HLN MT 4U6 Circle Town County GA 7 $ 224,397 $ 224,397 $ ‐ Rehabilitate Taxiway

‐ ‐ Install Airport Beacons, Install Miscellaneous ‐ NAVAIDS, Install Runway Vertical/Visual Guidance System ‐ 10/28, Reconstruct Taxiway, Rehabilitate Apron, Rehabilitate Runway ‐ 10/28, Rehabilitate NM HLN MT 6S3 Woltermann Memorial GA 13 $ 2,054,540 $ 2,054,540 $ Runway Lighting ‐ 10/28, Rehabilitate Taxiway ‐ Construct Building, Construct Taxiway, Install Runway Vertical/Visual Guidance System ‐ 06/24, Rehabilitate Airport Beacons, Rehabilitate Apron, Rehabilitate Runway ‐ 06/24, Rehabilitate Taxiway, Remove Obstructions [Non‐Hazard APP NM HLN MT S01 Conrad GA 6 $ 1,125,444 $ 1,125,444 $ or DEP] NM HLN MT S85 Big Sky Field GA 11 $ 156,285 $ 156,285 $ ‐ Install Weather Reporting Equipment

Reconstruct Apron, Rehabilitate Runway ‐ 05/23, NM HLN MT CTB Cut Bank International GA 12 $ 300,000 $ 300,000 $ Rehabilitate Runway ‐ 14/32, Rehabilitate Taxiway NM HLN MT 38S Deer Lodge‐City‐County GA 13 $ 202,690 $ 202,690 $ Conduct Environmental Study NM HLN MT 38S Deer Lodge‐City‐County GA 14 $ 304,682 $ 304,682 $ Acquire Land For Approaches

‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 25 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Construct Building, Rehabilitate Apron, NM HLN MT 97M Ekalaka GA 11 $ 557,493 $ 557,493 $ Rehabilitate Runway ‐ 13/31, Rehabilitate Taxiway Acquire Snow Removal Equipment, Install NM HLN MT EKS Ennis ‐ Big Sky GA 18 $ 265,500 $ 265,500 $ Weather Reporting Equipment NM HLN MT EKS Ennis ‐ Big Sky GA 19 $ 200,000 $ 200,000 $ Conduct Environmental Study Install Airport Beacons, Install Perimeter Fencing not Required by 49 CFR 1542, Install Taxiway NM HLN MT 88M Eureka GA 15 $ 347,872 $ 347,872 $ Lighting

‐ Install Miscellaneous NAVAIDS, Install Perimeter NM HLN MT 79S Fort Benton GA 11 $ 149,400 $ 149,400 $ Fencing not Required by 49 CFR 1542 ‐ NM HLN MT GGW Wokal Field/Glasgow International CS 20 $ 551,200 $ 551,200 $ ‐ Construct Fuel Farm, Rehabilitate Parking Lot Expand Terminal Building, Improve Terminal NM HLN MT GDV Dawson Community GA 16 $ 122,040 $ 122,040 $ Building, Install Miscellaneous NAVAIDS NM HLN MT GTF Great Falls International P 64 $ 5,252,590 $ 1,896,964 $ ‐ 3,355,626 Construct Taxiway NM HLN MT 6S5 Ravalli County GA 14 $ 205,124 $ 205,124 $ Install Airport Beacons, Reconstruct Taxiway Reconstruct Apron, Rehabilitate Apron, NM HLN MT HVR Havre City‐County GA 19 $ 1,324,478 $ 1,324,478 $ ‐ Rehabilitate Taxiway NM HLN MT HLN Helena Regional P 50 $ 477,900 $ 477,900 $ Expand Terminal Building NM HLN MT *MTS State of Montana 14 $ 67,500 $ 67,500 $ ‐ Conduct State System Plan Study

‐ Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Acquire Snow Removal Equipment, NM HLN MT GPI Glacier Park International P 52 $ 2,009,649 $ 2,009,649 $ ‐ Reconstruct Apron, Rehabilitate Apron Construct Runway ‐ 14/32, Install Miscellaneous ‐ NAVAIDS, Install Runway Vertical/Visual Guidance NM HLN MT 6S8 Laurel Municipal GA 18 $ 2,465,737 $ 2,465,737 $ ‐ System ‐ 14/32 NM HLN MT 6S8 Laurel Municipal GA 19 $ 1,043,449 $ 62,611 $ ‐ 980,838 Construct Runway ‐ 14/32 Construct Terminal Building, Expand Access Road, Reconstruct Access Road, Rehabilitate Runway ‐ NM HLN MT MSO Missoula International P 61 $ 1,416,150 $ 1,416,150 $ 07/25, Rehabilitate Runway ‐ 11/29 NM HLN MT 8S1 Polson GA 9 $ 737,355 $ 737,355 $ ‐ Reconstruct Apron NM HLN MT 7S0 Ronan GA 12 $ 192,497 $ 192,497 $ Install Weather Reporting Equipment NM HLN MT SBX Shelby GA 13 $ 1,015,000 $ 1,015,000 $ Construct Building NM HLN MT SDY Sidney‐Richland Municipal P 23 $ 472,680 $ 472,680 $ ‐ Acquire Snow Removal Equipment Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, NM HLN MT 9S4 Mineral County GA 10 $ 117,341 $ 117,341 $ Rehabilitate Taxiway NM HLN MT 8U6 Terry GA 7 $ 88,740 $ 88,740 $ Update Airport Master Plan Study ‐ Install Miscellaneous NAVAIDS, Install Runway ‐ Vertical/Visual Guidance System ‐ 02/20, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 02/20, ‐ Rehabilitate Runway Lighting ‐ 02/20, Rehabilitate NM HLN MT 9S5 Three Forks GA 12 $ 638,472 $ 638,472 $ ‐ Taxiway Rehabilitate Apron, Rehabilitate Runway ‐ 16/34, NM HLN MT 8U8 Townsend GA 11 $ 125,100 $ 125,100 $ ‐ Rehabilitate Taxiway NM HLN MT 7S1 Twin Bridges GA 12 $ 131,634 $ 131,634 $ ‐ Update Airport Master Plan Study Install Airfield Guidance Signs, Install Weather NM HLN MT 7S6 White Sulphur Springs GA 10 $ 179,259 $ 179,259 $ Reporting Equipment

Construct Building, Install Runway Vertical/Visual ‐ Guidance System ‐ 11/29, Install Runway NM HLN MT OLF L M Clayton CS 13 $ 760,000 $ 760,000 $ Vertical/Visual Guidance System ‐ 11/29 ‐ Rehabilitate Runway ‐ 17/35, Rehabilitate Runway SO MEM NC AVL Asheville Regional P 48 $ 7,878,823 $ 2,825,607 $ ‐ 5,053,216 ‐ 17/35 SO MEM NC AVL Asheville Regional P 49 $ 18,200,000 $ $ 18,200,000 Rehabilitate Runway ‐ 17/35 ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 26 of 48 FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Expand Apron, Improve Runway Safety Area ‐ 18R/36L, Rehabilitate Runway ‐ 18R/36L, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway N], Rehabilitate Taxiway [Taxiway S], Rehabilitate Taxiway [Taxiway V], SO MEM NC CLT Charlotte/Douglas International P 77 $ 14,610,809 $ 14,610,809 $ Rehabilitate Taxiway [Taxiway W] SO MEM NC JQF Concord Regional P 3 $ 414,495 $ 414,495 $ Update Airport Master Plan Study SO MEM NC JQF Concord Regional P 4 $ 5,930,156 $ 753,725 $ 5,176,431 Strengthen Runway ‐ 02/20 SO MEM NC FAY Fayetteville Regional/Grannis Field P 45 $ 1,925,763 $ 1,925,763 $ Expand Terminal Building SO MEM NC GSO Piedmont Triad International P 75 $ 14,082,277 $ 4,082,277 $ 10,000,000 Rehabilitate Runway ‐ 05R/23L Acquire Land for Noise Compatibility within 65 ‐ SO MEM NC PGV Pitt‐Greenville P 44 $ 1,035,000 $ $ 1,035,000 69 DNL SO MEM NC PGV Pitt‐Greenville P 45 $ 9,125,153 $ 1,000,000 $ 8,125,153 Rehabilitate Runway ‐ 02/20 SO MEM NC OAJ Albert J Ellis P 39 $ 2,000,000 $ 2,000,000 $ ‐ Construct Building SO MEM NC EWN Coastal Carolina Regional P 40 $ 363,969 $ 363,969 $ ‐ Update Airport Master Plan Study

‐ Install Perimeter Fencing not Required by 49 CFR 1542, Rehabilitate Apron, Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway E], SO MEM NC EWN Coastal Carolina Regional P 41 $ 2,308,797 $ ‐ 1,821,573 $ 487,224 Remove Obstructions [Non‐Hazard] Non primary development projects in state block SO MEM NC *NCB North Carolina State Block Grant Program 52 $ 14,718,047 $ 14,718,047 $ ‐ grant program ‐ Non primary development projects in state block SO MEM NC *NCB North Carolina State Block Grant Program 53 $ 2,205,380 $ $ 2,205,380 grant program SO MEM NC RDU Raleigh‐Durham International P 48 $ 16,561,952 $ 3,299,054 $ 13,262,898 Rehabilitate Taxiway SO MEM NC RDU Raleigh‐Durham International P 49 $ 1,633,300 $ $ 1,633,300 Zero Emissions Vehicle/Infrastructure SO MEM NC ILM Wilmington International P 53 $ 1,797,720 $ 1,797,720 $ Reconstruct Runway Lighting ‐ 06/24 SO MEM NC ILM Wilmington International P 54 $ 1,452,784 $ 1,000,000 $ 452,784 Improve Airport Drainage Rehabilitate Apron, Rehabilitate Runway ‐ 14/32, GL DMA ND ASY Ashley Municipal GA 1 $ 971,100 $ 971,100 $ ‐ Rehabilitate Taxiway Construct Taxiway, Improve Access Road, ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, GL DMA ND 20U Beach GA 12 $ 360,000 $ 360,000 $ Rehabilitate Taxiway GL DMA ND BIS Bismarck Municipal P 58 $ 18,440,480 $ ‐ 2,144,839 $ 16,295,641 Rehabilitate Runway ‐ 13/31 GL DMA ND BWW Bowman Regional GA 4 $ 116,006 $ 116,006 $ ‐ Construct Taxiway GL DMA ND 5N8 Casselton Robert Miller Regional GA 23 $ 28,800 $ 28,800 $ Rehabilitate Apron GL DMA ND 2C8 Cavalier Municipal GA 14 $ 1,006,031 $ 1,006,031 $ Construct Taxiway, Widen Taxiway ‐ Acquire Aircraft Rescue & Fire Fighting Safety Equipment, Rehabilitate Runway ‐ 03/21, GL DMA ND DVL Devils Lake Regional CS 36 $ 1,198,310 $ 182,721 $ ‐ 1,015,589 Rehabilitate Runway ‐ 13/31, Rehabilitate Taxiway GL DMA ND DIK Dickinson ‐ Theodore Roosevelt Regional P 37 $ 2,000,070 $ 1,556,379 $ 443,691 Widen Taxiway GL DMA ND DIK Dickinson ‐ Theodore Roosevelt Regional P 38 $ 640,000 $ 36,675 $ ‐ 603,325 Extend Runway ‐ 14/32 ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 10/28, ‐ Rehabilitate Taxiway, Remove Obstructions [Non‐ GL DMA ND S28 International Peace Garden GA 6 $ 153,000 $ 153,000 $ Hazard] GL DMA ND S28 International Peace Garden GA 7 $ 193,500 $ 193,500 $ Update Airport Master Plan Study GL DMA ND 4E7 Ellendale Municipal GA 9 $ 182,700 $ 182,700 $ Construct Fuel Farm GL DMA ND FAR Hector International P 47 $ 5,866,187 $ 3,053,378 $ 2,812,809 Reconstruct Taxiway, Rehabilitate Taxiway Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ‐ 17/35, GL DMA ND GAF Hutson Field GA 10 $ 413,450 $ 413,450 $ Rehabilitate Runway Lighting ‐ 17/35 Reconstruct Taxiway, Update Airport Master Plan GL DMA ND GFK Grand Forks International P 51 $ 1,345,708 $ 1,345,708 $ ‐ Study GL DMA ND GWR Gwinner‐Roger Melroe Field GA 15 $ 84,600 $ 84,600 $ ‐ Construct Building, Construct Taxiway ‐ Install Miscellaneous NAVAIDS, Reconstruct GL DMA ND HZE Mercer County Regional GA 13 $ 42,030 $ 42,030 $ Taxiway Rehabilitate Runway ‐ 16/34, Rehabilitate Runway GL DMA ND 3H4 Hillsboro Municipal GA 15 $ 4,593,286 $ 300,000 $ 4,293,286 Lighting ‐ 16/34 GL DMA ND JMS Jamestown Regional CS 43 $ 100,800 $ 100,800 $ ‐ Rehabilitate Runway ‐ 04/22

‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 27 of 48

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Reconstruct Taxiway, Rehabilitate Apron, Rehabilitate Runway ‐ 13/31, Rehabilitate Taxiway GL DMA ND JMS Jamestown Regional CS 44 $ 351,000 $ 351,000 $ [A and D], Rehabilitate Taxiway [B and E] GL DMA ND 7K5 Kenmare Municipal GA 13 $ 49,914 $ 49,914 $ Improve Access Road Rehabilitate Runway Lighting ‐ 14/32, Rehabilitate GL DMA ND D55 Robertson Field GA 13 $ 44,703 $ 44,703 $ Taxiway Lighting Install Perimeter Fencing not Required by 49 CFR GL DMA ND Y19 Mandan Municipal GA 22 $ 135,000 $ 135,000 $ 1542

Acquire Snow Removal Equipment, Conduct ‐ Environmental Study, Install Runway ‐ Vertical/Visual Guidance System ‐ 08/26, GL DMA ND MOT Minot International P 53 $ 1,832,693 $ 1,832,693 $ Reconstruct Apron, Reconstruct Service Road GL DMA ND HBC Mohall Municipal GA 12 $ 176,000 $ 176,000 $ ‐ Conduct Environmental Study Reconstruct Apron, Rehabilitate Runway ‐ 08/26, GL DMA ND 4V4 Northwood Municipal‐Vince Field GA 14 $ 1,143,046 $ 1,143,046 $ ‐ Rehabilitate Taxiway GL DMA ND Y37 Park River ‐ W C Skjerven Field GA 11 $ 240,080 $ 240,080 $ Update Airport Master Plan Study Construct Apron, Construct Building, Widen GL DMA ND Y74 Parshall‐Hankins GA 11 $ 454,273 $ 454,273 $ Taxiway

GL DMA ND PMB Pembina Municipal GA 10 $ 83,309 $ 83,309 $ ‐ Rehabilitate Access Road, Rehabilitate Apron GL DMA ND 08D Stanley Municipal GA 15 $ 245,565 $ 245,565 $ ‐ Acquire Land for Development Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, GL DMA ND D60 Tioga Municipal GA 9 $ 171,000 $ 171,000 $ ‐ Rehabilitate Taxiway ‐ Install Perimeter Fencing not Required by 49 CFR GL DMA ND BAC Barnes County Municipal GA 17 $ 85,605 $ 85,605 $ 1542 ‐ Reconstruct Taxiway [Exit], Reconstruct Taxiway GL DMA ND BWP Harry Stern GA 20 $ 1,691,221 $ 1,691,221 $ [Hangar] GL DMA ND 5C8 Washburn Municipal GA 15 $ 254,750 $ 254,750 $ ‐ Conduct Airport Master Plan Study GL DMA ND +09N New 3 $ 17,831,814 $ 1,312,194 $ ‐ 16,519,620 Construct New Airport GL DMA ND +09N New 4 $ 19,273,313 $ $ 19,273,313 Construct New Airport ‐ Rehabilitate Runway ‐ 13/31, Rehabilitate Runway CE ACE NE ANW Ainsworth Regional GA 11 $ 467,000 $ 467,000 $ ‐ 17/35 CE ACE NE AIA Alliance Municipal GA 19 $ 265,950 $ 265,950 $ ‐ Rehabilitate Runway ‐ 08/26 CE ACE NE AUH Aurora Municipal ‐ Al Potter Field GA 11 $ 465,000 $ 465,000 $ Reconstruct Runway ‐ 16/34 CE ACE NE BIE Beatrice Municipal GA 16 $ 366,000 $ 366,000 $ ‐ Reconstruct Runway ‐ 14/32 CE ACE NE CEK Crete Municipal GA 12 $ 853,768 $ 853,768 $ ‐ Construct Building Rehabilitate Apron, Rehabilitate Runway ‐ 14/32, CE ACE NE 93Y David City Municipal GA 11 $ 265,500 $ ‐ 265,500 $ Rehabilitate Taxiway CE ACE NE FBY Fairbury Municipal GA 11 $ 782,000 $ 782,000 $ Construct Building CE ACE NE FNB Brenner Field GA 12 $ 288,000 $ 288,000 $ ‐ Rehabilitate Building ‐ Rehabilitate Runway ‐ 13/31, Rehabilitate Runway CE ACE NE GRI Central Nebraska Regional P 39 $ 1,765,928 $ 1,765,928 $ ‐ ‐ 17/35, Rehabilitate Taxiway CE ACE NE 0B4 Hartington Municipal/ Bud Becker Field GA 9 $ 780,900 $ 780,900 $ ‐ Construct Building CE ACE NE HJH Hebron Municipal GA 8 $ 632,000 $ 632,000 $ ‐ Rehabilitate Taxiway CE ACE NE HJH Hebron Municipal GA 9 $ 252,700 $ 252,700 $ Construct Fuel Farm CE ACE NE HDE Brewster Field GA 12 $ 763,300 $ 763,300 $ ‐ Construct Building ‐ Rehabilitate Runway ‐ 18/36, Rehabilitate Runway ‐ Lighting ‐ 18/36, Rehabilitate Taxiway, CE ACE NE EAR Kearney Regional CS 31 $ 10,714,000 $ 3,070,000 $ 7,644,000 Rehabilitate Taxiway Lighting ‐ ‐ Reconstruct Airport Beacon, Reconstruct Runway CE ACE NE IBM Kimball Municipal/Robert E Arraj Field GA 8 $ 375,000 $ 375,000 $ ‐ Lighting ‐ 10/28, Reconstruct Taxiway Lighting CE ACE NE *NES State of Nebraska 24 $ 57,600 $ 57,600 $ ‐ Update State System Plan Study CE ACE NE OFK Norfolk Regional/Karl Stefan Memorial Field GA 21 $ 2,209,190 $ 2,209,190 $ ‐ Improve Airport Drainage CE ACE NE OFK Norfolk Regional/Karl Stefan Memorial Field GA 22 $ 91,000 $ 91,000 $ Rehabilitate Runway ‐ 01/19 CE ACE NE LBF North Platte Regional Airport Lee Bird Field CS 32 $ 74,594 $ 74,594 $ Acquire Passenger Lift Device Install Perimeter Fencing not Required by 49 CFR CE ACE NE LBF North Platte Regional Airport Lee Bird Field CS 33 $ 654,111 $ 654,111 $ 1542 CE ACE NE OMA Eppley Airfield P 69 $ 4,185,750 $ 4,185,750 $ Reconstruct Apron CE ACE NE MLE Millard R 10 $ 459,000 $ 459,000 $ ‐ Reconstruct Taxiway Lighting ‐ ‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 28 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work CE ACE NE ONL The O'Neill Municipal‐John L Baker Field GA 11 $ 247,000 $ 247,000 $ Reconstruct Airport Beacon CE ACE NE 50K Pawnee City Municipal GA 3 $ 537,800 $ 537,800 $ Construct Building CE ACE NE PMV Plattsmouth Municipal GA 12 $ 2,917,198 $ 2,917,198 $ Construct Taxiway CE ACE NE 9V5 Modisett GA 6 $ 189,000 $ 189,000 $ Acquire Snow Removal Equipment CE ACE NE SNY Sidney Municipal/Lloyd W Carr Field GA 6 $ 262,800 $ 262,800 $ Update Airport Master Plan Study Construct Taxiway [Taxiway B], Construct Taxiway [Taxiway C], Install Taxiway Lighting [Taxiway B], Install Taxiway Lighting [Taxiway C], Reconstruct CE ACE NE LCG Wayne Municipal/ Stan Morris Field GA 14 $ 2,308,390 $ 2,308,390 $ ‐ Taxiway CE ACE NE JYR York Municipal GA 13 $ 675,000 $ 675,000 $ ‐ Rehabilitate Runway ‐ 17/35 ‐ Non primary development projects in state block NE ANE NH *NHB New Hampshire State Block Grant Program 25 $ 2,177,659 $ 2,177,659 $ ‐ grant program ‐ Non primary development projects in state block NE ANE NH *NHB New Hampshire State Block Grant Program 26 $ 3,547,705 $ $ 3,547,705 grant program NE ANE NH LEB Lebanon Municipal P 54 $ 78,930 $ 78,930 $ Improve Terminal Building NE ANE NH LEB Lebanon Municipal P 55 $ 594,000 $ 594,000 $ Remove Obstructions [Non‐Hazard] NE ANE NH LEB Lebanon Municipal P 56 $ 130,500 $ 130,500 $ ‐ Conduct Environmental Study NE ANE NH LEB Lebanon Municipal P 57 $ 189,000 $ 189,000 $ ‐ Improve Runway Safety Area ‐ 18/36 NE ANE NH MHT Manchester P 108 $ 2,071,939 $ 2,071,939 $ Reconstruct Runway ‐ 06/24 NE ANE NH MHT Manchester P 109 $ 3,551,040 $ 2,435,116 $ ‐ 1,115,924 Reconstruct Taxiway NE ANE NH PSM Portsmouth International at Pease P 58 $ 838,065 $ 838,065 $ Reconstruct Runway ‐ 16/34 NE ANE NH PSM Portsmouth International at Pease P 59 $ 30,359 $ ‐ 30,359 $ Reconstruct Runway ‐ 16/34 ‐ Light Obstructions [Non‐Hazard], Remove NE ANE NH PSM Portsmouth International at Pease P 60 $ 1,017,000 $ 1,017,000 $ ‐ Obstructions [Non‐Hazard] NE ANE NH PSM Portsmouth International at Pease P 61 $ 353,700 $ 353,700 $ ‐ Conduct Miscellaneous Study EA HAR NJ ACY Atlantic City International P 96 $ 67,386 $ 67,386 $ ‐ Conduct Environmental Study ‐ Reconstruct Perimeter Fencing required by 49 EA HAR NJ ACY Atlantic City International P 97 $ 2,151,861 $ 2,151,861 $ CFR 1542, Rehabilitate Access Road EA HAR NJ ACY Atlantic City International P 98 $ 188,348 $ 188,348 $ ‐ Construct Service Road EA HAR NJ CDW Essex County R 40 $ 396,367 $ 396,367 $ ‐ Rehabilitate Runway ‐ 10/28 EA HAR NJ N81 Hammonton Municipal GA 23 $ 207,097 $ 207,097 $ Remove Obstructions EA HAR NJ N81 Hammonton Municipal GA 24 $ 208,453 $ 208,453 $ ‐ Update Airport Master Plan Study EA HAR NJ N07 Lincoln Park R 14 $ 269,748 $ 269,748 $ ‐ Update Airport Master Plan Study ‐ Rehabilitate Runway ‐ 10/28, Rehabilitate Runway EA HAR NJ MIV Millville Municipal GA 43 $ 4,441,702 $ 1,443,822 $ 2,997,880 Lighting ‐ 10/28 EA HAR NJ MMU Morristown Municipal R 52 $ 134,964 $ $ ‐ 134,964 Conduct Environmental Study EA HAR NJ MMU Morristown Municipal R 53 $ 1,036,697 $ 150,000 $ ‐ 886,697 Rehabilitate Runway ‐ 05/23 EA HAR NJ VAY South Jersey Regional R 15 $ 78,553 $ 78,553 $ ‐ Conduct Environmental Study EA HAR NJ MJX Ocean County GA 28 $ 2,645,264 $ 150,000 $ ‐ 2,495,264 Rehabilitate Runway ‐ 06/24 ‐ Conduct Airport Master Plan Study, Reconstruct ‐ Taxiway [Taxiway D], Reconstruct Taxiway Lighting [Taxiway D], Rehabilitate Taxiway [Taxiway G], Rehabilitate Taxiway Lighting EA HAR NJ TTN Trenton Mercer P 51 $ 5,457,178 $ ‐ 2,805,910 $ 2,651,268 [Taxiway G] Install Perimeter Fencing not Required by 49 CFR EA HAR NJ WWD Cape May County GA 38 $ 729,716 $ 729,716 $ ‐ 1542 EA HAR NJ WWD Cape May County GA 39 $ 1,181,289 $ 1,181,289 $ Improve Airport Drainage EA HAR NJ WWD Cape May County GA 40 $ 597,302 $ 597,302 $ Remove Obstructions SW LANM NM ALM Alamogordo‐White Sands Regional GA 26 $ 58,302 $ 58,302 $ Improve Runway Safety Area ‐ 04/22 SW LANM NM ABQ Albuquerque International Sunport P 51 $ 3,700,000 $ 2,700,000 $ 1,000,000 Rehabilitate Runway ‐ 08/26 SW LANM NM ABQ Albuquerque International Sunport P 52 $ 150,000 $ 150,000 $ Construct Taxiway Reconstruct Taxiway [Taxiway Realignment], SW LANM NM AEG Double Eagle II R 22 $ 82,838 $ 82,838 $ Reconstruct Taxiway [Taxiway Removal] SW LANM NM ATS Artesia Municipal GA 18 $ 150,000 $ 150,000 $ ‐ Rehabilitate Runway ‐ 03/21 SW LANM NM F37 Carrizozo Municipal GA 8 $ 107,846 $ 107,846 $ ‐ Rehabilitate Apron ‐ SW LANM NM CVN Clovis Municipal CS 30 $ 237,149 $ 237,149 $ ‐ Reconstruct Apron, Rehabilitate Runway ‐ 12/30 SW LANM NM 24N Jicarilla Apache Nation GA 14 $ 249,453 $ 249,453 $ Reconstruct Runway ‐ 17/35 SW LANM NM E14 Ohkay Owingeh GA 14 $ 103,499 $ 103,499 $ ‐ Acquire Snow Removal Equipment Rehabilitate Taxiway [Taxiway E], Rehabilitate ‐ Taxiway [Taxiway F], Rehabilitate Taxiway SW LANM NM FMN Four Corners Regional CS 41 $ 3,950,651 $ 2,219,770 $ ‐ 1,730,881 [Taxiway G] ‐

‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 29 of 48 ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Reconstruct Runway Lighting ‐ 13/31, Rehabilitate SW LANM NM GNT Grants‐Milan Municipal GA 16 $ 3,924,705 $ 3,924,705 $ Runway ‐ 13/31 SW LANM NM HOB Lea County Regional P 26 $ 146,900 $ 146,900 $ Improve Runway Safety Area ‐ 03/21 SW LANM NM HOB Lea County Regional P 27 $ 667,991 $ 667,991 $ Rehabilitate Apron SW LANM NM E26 Lea County/Jal/ GA 9 $ 245,587 $ 245,587 $ Construct Access Road

SW LANM NM LRU Las Cruces International GA 30 $ 514,389 $ 514,389 $ Improve Airport Miscellaneous Improvements SW LANM NM LVS Las Vegas Municipal GA 15 $ 501,712 $ 501,712 $ Acquire Snow Removal Equipment SW LANM NM LSB Lordsburg Municipal GA 17 $ 38,631 $ 38,631 $ Construct Taxiway SW LANM NM LSB Lordsburg Municipal GA 18 $ 102,932 $ 102,932 $ ‐ Rehabilitate Apron ‐ Reconstruct Perimeter Fencing not Required by SW LANM NM LAM Los Alamos GA 14 $ 63,724 $ 63,724 $ ‐ 49 CFR 1542 SW LANM NM E06 Lea County‐Zip Franklin Memorial GA 9 $ 302,892 $ 302,892 $ ‐ Reconstruct Apron SW LANM NM 0E0 Moriarty GA 15 $ 45,036 $ 45,036 $ Reconstruct Apron SW LANM NM PRZ Portales Municipal GA 19 $ 484,848 $ 484,848 $ ‐ Construct Fuel Farm SW LANM NM N24 Questa Municipal Nr 2 GA 11 $ 26,934 $ 26,934 $ ‐ Reconstruct Airport Beacon SW LANM NM RTN Raton Municipal/Crews Field GA 17 $ 701,246 $ 701,246 $ ‐ Reconstruct Taxiway SW LANM NM ROW Roswell International Air Center P 31 $ 819,355 $ 819,355 $ ‐ Reconstruct Taxiway SW LANM NM SRR Sierra Blanca Regional GA 26 $ 2,513,329 $ 1,763,625 $ 749,704 Rehabilitate Runway ‐ 06/24 SW LANM NM SAF Santa Fe Municipal P 47 $ 2,258,910 $ 2,169,770 $ ‐ 89,140 Rehabilitate Runway ‐ 02/20 SW LANM NM SAF Santa Fe Municipal P 48 $ 2,121,244 $ $ ‐ 2,121,244 Rehabilitate Taxiway SW LANM NM SXU Santa Rosa Route 66 GA 16 $ 194,952 $ 194,952 $ ‐ Rehabilitate Runway ‐ 01/19 SW LANM NM DNA Dona Ana County International Jetport GA 22 $ 559,460 $ 559,460 $ ‐ Extend Taxiway SW LANM NM 5V5 Shiprock Airstrip GA 5 $ 4,425,526 $ 981,768 $ ‐ 3,443,758 Rehabilitate Runway ‐ 02/20 SW LANM NM SVC Grant County CS 18 $ 107,452 $ 107,452 $ ‐ Install Emergency Generator ‐ Install Perimeter Fencing not Required by 49 CFR SW LANM NM S42 Springer Municipal GA 8 $ 241,274 $ 241,274 $ 1542 SW LANM NM TCS Truth Or Consequences Municipal GA 17 $ 150,000 $ 150,000 $ Construct Fuel Farm ‐ Reconstruct Perimeter Fencing not Required by SW LANM NM N17 Vaughn Municipal GA 11 $ 154,851 $ 154,851 $ ‐ 49 CFR 1542 ‐ Construct Apron, Construct Taxiway, Construct WP PHX NV L92 Alamo Landing Field GA 9 $ 768,302 $ 768,302 $ Taxiway WP PHX NV TMT Austin GA 17 $ 330,417 $ 330,417 $ ‐ Rehabilitate Runway ‐ 18/36 WP PHX NV BAM Battle Mountain GA 26 $ 187,500 $ 187,500 $ Reconstruct Taxiway WP PHX NV BTY Beatty GA 16 $ 605,625 $ 605,625 $ ‐ Construct Taxiway ‐ Install Apron Flood Lighting, Install Weather Reporting Equipment, Rehabilitate Apron, WP PHX NV BVU Boulder City Municipal P 25 $ 2,294,581 $ 2,294,581 $ ‐ Rehabilitate Taxiway WP PHX NV CXP Carson R 31 $ 440,625 $ 440,625 $ Update Airport Master Plan Study WP PHX NV *NVS State of Nevada 10 $ 239,063 $ 239,063 $ ‐ Conduct State System Plan Study ‐ Improve Runway Safety Area ‐ 06/24, Rehabilitate ‐ Apron, Rehabilitate Runway ‐ 12/30, Rehabilitate WP PHX NV EKO Elko Regional P 48 $ 2,741,111 $ 1,245,980 $ ‐ 1,495,131 Taxiway

Rehabilitate Access Road, Rehabilitate Apron, WP PHX NV 05U Eureka GA 12 $ 363,476 $ 363,476 $ ‐ Rehabilitate Runway ‐ 18/36, Rehabilitate Taxiway WP PHX NV FLX Fallon Municipal GA 19 $ 454,688 $ 454,688 $ ‐ Update Airport Master Plan Study ‐ Rehabilitate Runway ‐ 09/27, Rehabilitate Runway WP PHX NV GAB Gabbs GA 9 $ 196,875 $ 196,875 $ ‐ 16/34 Install Runway Vertical/Visual Guidance System ‐ WP PHX NV HTH Hawthorne Industrial GA 14 $ 71,438 $ 71,438 $ 10/28 WP PHX NV 06U Jackpot/Hayden Field GA 13 $ 495,000 $ 495,000 $ Rehabilitate Runway ‐ 15/33 WP PHX NV 0L7 Jean GA 5 $ 1,925,000 $ 1,925,000 $ Expand Apron, Reconstruct Apron ‐ ‐ Reconstruct Apron [Holding Pad 2], Reconstruct WP PHX NV LAS McCarran International P 85 $ 7,059,088 $ 7,059,088 $ Apron [South Tear Drop Holding Pad] WP PHX NV LAS McCarran International P 86 $ 478,125 $ $ ‐ 478,125 Acquire Equipment Reconstruct Perimeter Fencing not Required by WP PHX NV 67L Mesquite GA 16 $ 907,980 $ 907,980 $ ‐ 49 CFR 1542 WP PHX NV MEV Minden‐Tahoe GA 30 $ 156,153 $ 156,153 $ ‐ Acquire Equipment ‐

‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 30 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Expand Apron, Rehabilitate Apron, Rehabilitate Runway ‐ 12/30, Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway [Taxiway C], Rehabilitate WP PHX NV MEV Minden‐Tahoe GA 31 $ 2,049,634 $ 2,049,634 $ Taxiway [Taxiway S] Rehabilitate Apron, Rehabilitate Runway ‐ 05/23, WP PHX NV 10U Owyhee GA 11 $ 329,445 $ 329,445 $ Rehabilitate Taxiway WP PHX NV 1L1 Lincoln County GA 12 $ 526,265 $ 526,265 $ Construct Fuel Farm, Install Airport Beacons WP PHX NV RTS Reno/Stead R 37 $ 2,223,055 $ 150,000 $ 2,073,055 Reconstruct Apron Improve Airport Miscellaneous Improvements, Reconstruct Runway ‐ 16L/34R, Reconstruct WP PHX NV RNO Reno/Tahoe International P 103 $ 5,961,034 $ 5,961,034 $ Runway ‐ 16R/34L ‐ Rehabilitate Taxiway [Taxiway A], Rehabilitate WP PHX NV WMC Winnemucca Municipal GA 24 $ 1,749,643 $ 178,565 $ 1,571,078 Taxiway [Taxiway B] ‐ WP PHX NV O43 Yerington Municipal GA 17 $ 2,539,042 $ 376,985 $ ‐ 2,162,057 Rehabilitate Runway ‐ 01/19, Rehabilitate Taxiway EA NYC NY ALB Albany International P 132 $ 1,013,342 $ 1,013,342 $ Rehabilitate Terminal Building EA NYC NY ALB Albany International P 133 $ 90,000 $ 90,000 $ Improve Airport Drainage

‐ Reconstruct Runway Lighting ‐ 01/19, Reconstruct Taxiway Lighting [Taxiway A (Center) ‐ Circuit #6], Reconstruct Taxiway Lighting [Taxiway A (North) ‐ Circuit #1], Reconstruct Taxiway Lighting [Taxiway A (South) ‐ Circuit #4], Reconstruct Taxiway EA NYC NY ALB Albany International P 134 $ 3,404,073 $ 3,404,073 $ ‐ Lighting [Taxiway A (West) ‐ Circuit #3] ‐ Install Runway Distance‐To‐Go Signs ‐ 10/28, EA NYC NY GVQ Genesee County R 39 $ 3,076,222 $ 150,000 $ 2,926,222 Rehabilitate Runway ‐ 10/28 Reconstruct Taxiway, Reconstruct Taxiway EA NYC NY GVQ Genesee County R 40 $ 167,400 $ 167,400 $ Lighting

Acquire Aircraft Rescue & Fire Fighting Vehicle [Personal Protective Equipment (PPEs)], Acquire ‐ Aircraft Rescue & Fire Fighting Vehicle [Self‐ Contained Breathing Apparatus (SCBAs)], Acquire EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 70 $ 697,697 $ 697,697 $ Aircraft Rescue & Fire Fighting Vehicle EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 71 $ 375,305 $ 375,305 $ Rehabilitate Runway ‐ 10/28 EA NYC NY BGM Greater Binghamton/Edwin A Link Field P 72 $ 726,300 $ 726,300 $ ‐ Conduct Airport Master Plan Study EA NYC NY BUF Buffalo Niagara International P 91 $ 225,000 $ 225,000 $ Acquire Land For Approaches EA NYC NY BUF Buffalo Niagara International P 92 $ 285,758 $ 285,758 $ Construct Apron EA NYC NY BUF Buffalo Niagara International P 93 $ 81,000 $ 81,000 $ Runway Incursion Markings EA NYC NY BUF Buffalo Niagara International P 94 $ 76,500 $ 76,500 $ Wildlife Hazard Assessments EA NYC NY BUF Buffalo Niagara International P 95 $ 409,661 $ 409,661 $ Improve Access Road EA NYC NY D38 Canandaigua R 40 $ 537,106 $ 537,106 $ ‐ Rehabilitate Apron EA NYC NY N03 Cortland County‐Chase Field GA 25 $ 149,850 $ 149,850 $ ‐ Reconstruct Taxiway, Rehabilitate Apron ‐ EA NYC NY DKK Chautauqua County/Dunkirk GA 53 $ 77,310 $ 77,310 $ ‐ Remove Obstructions [Non‐Hazard APP or DEP] ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 06/24, ‐ Rehabilitate Runway ‐ 15/33, Rehabilitate Taxiway ‐ [T‐hangar Taxilanes], Rehabilitate Taxiway ‐ [Taxiway A], Rehabilitate Taxiway [Taxiway B EA NYC NY DKK Chautauqua County/Dunkirk GA 54 $ 461,034 $ 461,034 $ ‐ (North)] ‐ Reconstruct Taxiway, Reconstruct Taxiway EA NYC NY DKK Chautauqua County/Dunkirk GA 55 $ 1,254,174 $ $ 1,254,174 Lighting EA NYC NY ELM Elmira/Corning Regional P 67 $ 63,000 $ 63,000 $ ‐ Acquire Friction Measuring Equipment Improve Terminal Building [Passenger Boarding EA NYC NY ELM Elmira/Corning Regional P 68 $ 10,500,000 $ 1,563,854 $ 8,936,146 Bridge], Improve Terminal Building Reconstruct Runway Lighting ‐ 03/21, Reconstruct EA NYC NY CZG Tri‐Cities GA 24 $ 104,577 $ 104,577 $ Taxiway Lighting EA NYC NY 0B8 Elizabeth Field GA 20 $ 65,250 $ 65,250 $ ‐ Conduct Miscellaneous Study EA NYC NY FZY Oswego County GA 47 $ 345,510 $ 345,510 $ Update Airport Master Plan Study ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 31 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Install Airfield Guidance Signs, Rehabilitate Apron [Terminal Area Apron], Rehabilitate Apron [Tie‐ Down Apron], Rehabilitate Runway ‐ 01/19, Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway EA NYC NY GFL Floyd Bennett Memorial GA 61 $ 692,423 $ 692,423 $ [Taxiway C], Rehabilitate Taxiway [Taxiway D] Install Runway Vertical/Visual Guidance System ‐ 03/21, Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting ‐ 03/21, Rehabilitate EA NYC NY 1B1 Columbia County GA 35 $ 171,000 $ 171,000 $ Runway ‐ 03/21 EA NYC NY ISP Long Island MacArthur P 98 $ 895,352 $ 895,352 $ Rehabilitate Runway ‐ 06/24 EA NYC NY ISP Long Island MacArthur P 99 $ 344,635 $ 344,635 $ Conduct Miscellaneous Study Install Apron Flood Lighting, Install Perimeter EA NYC NY ITH Ithaca Tompkins Regional P 79 $ 1,550,274 $ 1,261,058 $ ‐ 289,216 Fencing, Rehabilitate Apron EA NYC NY ITH Ithaca Tompkins Regional P 80 $ 870,763 $ $ 870,763 Improve Terminal Building Install Airfield Guidance Signs, Reconstruct Runway ‐ 13/31, Rehabilitate Apron, Rehabilitate EA NYC NY JHW Chautauqua County/Jamestown GA 45 $ 991,036 $ 991,036 $ ‐ Taxiway ‐ EA NYC NY JHW Chautauqua County/Jamestown GA 46 $ 149,317 $ 149,317 $ ‐ Remove Obstructions [Non‐Hazard APP or DEP] EA NYC NY JHW Chautauqua County/Jamestown GA 47 $ 200,000 $ 200,000 $ Conduct Miscellaneous Study

‐ Install Miscellaneous NAVAIDS, Install Perimeter Fencing not Required by 49 CFR 1542, Install Runway Vertical/Visual Guidance System ‐ [Precision Approach Path Indicator] ‐ 10/28, Install Runway Vertical/Visual Guidance System ‐ [Runway End Identifer Lights] ‐ 10/28, ‐ Reconstruct Airfield Guidance Signs, Reconstruct Runway Lighting ‐ 10/28, Reconstruct Taxiway EA NYC NY NY0 Fulton County GA 20 $ 90,000 $ 90,000 $ Lighting EA NYC NY 20N Kingston‐Ulster R 24 $ 289,456 $ 289,456 $ Acquire Snow Removal Equipment EA NYC NY LKP Lake Placid GA 42 $ 369,891 $ 369,891 $ Acquire Snow Removal Equipment EA NYC NY BQR Buffalo‐Lancaster Regional R 25 $ 288,275 $ 288,275 $ Acquire Snow Removal Equipment

EA NYC NY 5G0 Le Roy R 28 $ 129,200 $ 129,200 $ Remove Obstructions [Non‐Hazard APP or DEP]

Install Airport Beacons, Install Miscellaneous ‐ NAVAIDS, Install Runway Vertical/Visual Guidance ‐ System [Precison Approach Path Indicator (PAPI)] ‐ ‐ 05/23, Install Runway Vertical/Visual Guidance ‐ System [Runway End Identifier Lights (REILs)] ‐ EA NYC NY MAL Malone‐Dufort GA 34 $ 356,775 $ 356,775 $ 05/23 ‐ EA NYC NY MAL Malone‐Dufort GA 35 $ 81,720 $ 81,720 $ Remove Obstructions [Non‐Hazard APP or DEP] Rehabilitate Taxiway, Rehabilitate Taxiway EA NYC NY MSS Massena International‐Richards Field CS 74 $ 818,900 $ 818,900 $ Lighting EA NYC NY MSS Massena International‐Richards Field CS 75 $ 480,700 $ 480,700 $ Improve Airport Drainage

EA NYC NY 06N Randall R 33 $ 40,188 $ 40,188 $ Remove Obstructions [Non‐Hazard APP or DEP] EA NYC NY 44N Sky Acres R 29 $ 648,270 $ 648,270 $ ‐ Rehabilitate Runway ‐ 17/35 EA NYC NY MGJ Orange County GA 39 $ 332,460 $ 332,460 $ Acquire Snow Removal Equipment ‐ Construct Runway [Navigational Aids] ‐ 03/21, Construct Runway [Taxiway A] ‐ 03/21, Construct EA NYC NY MGJ Orange County GA 40 $ 15,660,402 $ 1,181,803 $ ‐ 14,478,599 Runway ‐ 03/21 EA NYC NY MSV Sullivan County International GA 37 $ 68,940 $ 68,940 $ ‐ Expand Apron Install Miscellaneous NAVAIDS, Reconstruct ‐ Airfield Guidance Signs, Reconstruct Taxiway ‐ Lighting [Taxiway A], Reconstruct Taxiway ‐ Lighting [Taxiway B], Reconstruct Taxiway Lighting EA NYC NY MSV Sullivan County International GA 38 $ 733,351 $ 733,351 $ [Taxiway C]

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 32 of 48

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Install Guidance Signs, Rehabilitate Service Road, EA NYC NY JFK John F Kennedy International P 187 $ 20,822,354 $ 17,418,344 $ 3,404,010 Rehabilitate Taxiway EA NYC NY JFK John F Kennedy International P 188 $ 3,973,315 $ $ 3,973,315 VALE Infrastructure EA NYC NY LGA Laguardia P 145 $ 2,329,228 $ 2,329,228 $ Rehabilitate Runway ‐ 04/22 Rehabilitate Runway ‐ 09/27, Rehabilitate Runway EA NYC NY SWF Stewart International P 74 $ 1,633,044 $ 1,633,044 $ ‐ 16/34 Acquire Emergency Generator, Improve Airport EA NYC NY IAG Niagara Falls International P 47 $ 326,264 $ 326,264 $ Miscellaneous Improvements EA NYC NY FRG Republic GA 51 $ 189,000 $ 189,000 $ Conduct Miscellaneous Study EA NYC NY OIC Lt Warren Eaton GA 35 $ 117,000 $ 117,000 $ Reconstruct Apron EA NYC NY OGS Ogdensburg International CS 49 $ 190,469 $ ‐ 190,469 $ Improve Airport Drainage EA NYC NY OGS Ogdensburg International CS 50 $ 188,237 $ 188,237 $ ‐ Conduct Miscellaneous Study EA NYC NY OLE Cattaraugus County‐Olean GA 23 $ 269,055 $ 269,055 $ Install Perimeter Fencing ‐ EA NYC NY 01G Perry‐Warsaw GA 29 $ 45,000 $ 45,000 $ Construct Snow Removal Equipment Building ‐ EA NYC NY PBG Plattsburgh International P 57 $ 598,792 $ 598,792 $ ‐ Install Perimeter Fencing required by 49 CFR 1542 ‐ Rehabilitate Aircraft Rescue & Fire Fighting EA NYC NY PBG Plattsburgh International P 58 $ 898,329 $ 898,329 $ ‐ Building EA NYC NY PBG Plattsburgh International P 59 $ 3,427,830 $ 257,149 $ ‐ 3,170,681 Rehabilitate Runway ‐ 17/35 EA NYC NY PBG Plattsburgh International P 60 $ 358,200 $ $ ‐ 358,200 Rehabilitate Runway ‐ 17/35 EA NYC NY PTD Potsdam Municipal/Damon Field/ GA 33 $ 233,910 $ 233,910 $ Install Weather Reporting Equipment EA NYC NY POU Dutchess County GA 48 $ 130,500 $ 130,500 $ ‐ Improve Runway Safety Area ‐ 06/24 EA NYC NY ROC Greater Rochester International P 96 $ 1,958,214 $ 1,958,214 $ Reconstruct Apron ‐ EA NYC NY ROC Greater Rochester International P 97 $ 1,179,620 $ 1,179,620 $ Reconstruct Deicing Pad with Associated Facilities ‐ Improve Airport Drainage, Install Apron Flood Lighting, Install Perimeter Fencing required by 49 EA NYC NY ROC Greater Rochester International P 98 $ 1,142,670 $ ‐ 1,142,670 $ CFR 1542, Rehabilitate Apron EA NYC NY RME Griffiss International GA 42 $ 332,550 $ 332,550 $ ‐ Reconstruct Runway ‐ 15/33 ‐ EA NYC NY RME Griffiss International GA 43 $ 232,200 $ 150,000 $ ‐ 82,200 Remove Obstructions [Non‐Hazard APP or DEP] EA NYC NY RME Griffiss International GA 44 $ 597,420 $ $ 597,420 Acquire Snow Removal Equipment ‐ EA NYC NY SLK Adirondack Regional CS 64 $ 29,630 $ 29,630 $ Acquire Aircraft Rescue & Fire Fighting Vehicle EA NYC NY SLK Adirondack Regional CS 65 $ 350,672 $ 350,672 $ Acquire Snow Removal Equipment ‐ Reconstruct Airfield Guidance Signs, Reconstruct ‐ Runway Lighting ‐ 09/27, Reconstruct Taxiway EA NYC NY SLK Adirondack Regional CS 66 $ 57,000 $ 57,000 $ Lighting EA NYC NY SLK Adirondack Regional CS 67 $ 161,310 $ 161,310 $ Remove Obstructions EA NYC NY 5B2 Saratoga County GA 34 $ 495,334 $ ‐ 495,334 $ Rehabilitate Apron EA NYC NY 5B2 Saratoga County GA 35 $ 90,476 $ 90,476 $ Conduct Environmental Study ‐ Reconstruct Airfield Guidance Signs, Reconstruct ‐ Runway Lighting ‐ 04/22, Rehabilitate Runway ‐ EA NYC NY SCH Schenectady County R 53 $ 279,000 $ 279,000 $ 04/22 Reconstruct Airfield Guidance Signs, Reconstruct ‐ Taxiway Lighting, Rehabilitate Apron, Rehabilitate EA NYC NY SCH Schenectady County R 54 $ 172,800 $ 172,800 $ ‐ Taxiway EA NYC NY 0G7 Finger Lakes Regional GA 27 $ 140,850 $ 140,850 $ ‐ Reconstruct Apron EA NYC NY 0G7 Finger Lakes Regional GA 28 $ 1,441,359 $ 371,348 $ ‐ 1,070,011 Expand Apron, Reconstruct Apron EA NYC NY HWV Brookhaven R 35 $ 363,150 $ 363,150 $ Update Airport Master Plan Study EA NYC NY N23 Sidney Municipal GA 20 $ 2,027,273 $ 150,000 $ 1,877,273 Construct Taxiway ‐ EA NYC NY SDC Williamson‐Sodus R 32 $ 125,460 $ 125,460 $ Remove Obstructions [Non‐Hazard APP or DEP] EA NYC NY SYR Syracuse Hancock International P 146 $ 777,842 $ 777,842 $ Rehabilitate Terminal Building EA NYC NY SYR Syracuse Hancock International P 147 $ 1,067,459 $ 1,067,459 $ ‐ Improve Terminal Building EA NYC NY SYR Syracuse Hancock International P 148 $ 2,396,160 $ 2,396,160 $ ‐ Improve Terminal Building EA NYC NY SYR Syracuse Hancock International P 149 $ 492,300 $ 492,300 $ Reconstruct Deicing Containment Facility ‐ Install Apron Edge Lights, Install Apron Lighting, Reconstruct Apron [Eastern Section], Rehabilitate EA NYC NY ART Watertown International P 49 $ 2,017,863 $ 1,000,000 $ ‐ 1,017,863 Apron [Western Section] ‐ ‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 33 of 48 FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

EA NYC NY FOK Francis S Gabreski GA 20 $ 159,840 $ 159,840 $ Remove Obstructions [Non‐Hazard APP or DEP] EA NYC NY FOK Francis S Gabreski GA 21 $ 196,740 $ 196,740 $ Construct Building

Acquire Aircraft Deicing Equipment [Vehicle #5], EA NYC NY HPN Westchester County P 122 $ 682,624 $ 682,624 $ Acquire Aircraft Deicing Equipment [Vehicle #6] EA NYC NY HPN Westchester County P 123 $ 195,448 $ 195,448 $ Acquire Snow Removal Equipment EA NYC NY HPN Westchester County P 124 $ 487,941 $ 487,941 $ Acquire Snow Removal Equipment EA NYC NY HPN Westchester County P 125 $ 397,324 $ 397,324 $ Acquire Snow Removal Equipment ‐ ‐ Reconstruct Airfield Guidance Signs, Reconstruct EA NYC NY HPN Westchester County P 126 $ 388,156 $ 388,156 $ Taxiway Lighting, Rehabilitate Taxiway GL DET OH CAK Akron‐Canton Regional P 63 $ 396,099 $ 396,099 $ Acquire Snow Removal Equipment GL DET OH 3G4 Ashland County GA 13 $ 262,485 $ 262,485 $ ‐ Reconstruct Taxiway GL DET OH HZY Northeast Regional GA 16 $ 117,819 $ 117,819 $ ‐ Acquire Land For Approaches ‐ GL DET OH 6G5 Barnesville‐Bradfield GA 12 $ 85,076 $ 85,076 $ ‐ Remove Obstructions [Non‐Hazard APP or DEP] GL DET OH EDJ Bellefontaine Regional GA 11 $ 204,718 $ 204,718 $ Rehabilitate Apron, Rehabilitate Taxiway GL DET OH 17G Port Bucyrus‐Crawford County GA 9 $ 624,344 $ 624,344 $ Rehabilitate Runway ‐ 04/22 ‐ Reconstruct Runway Lighting ‐ 13/31, Rehabilitate GL DET OH 8G6 Harrison County GA 14 $ 2,612,286 $ 2,612,286 $ ‐ Runway ‐ 13/31 GL DET OH TSO Carroll County‐Tolson GA 12 $ 404,919 $ 404,919 $ ‐ Install Perimeter Fencing GL DET OH CQA Lakefield GA 18 $ 150,000 $ 150,000 $ ‐ Construct Building

‐ Rehabilitate Apron, Rehabilitate Runway ‐ 08/26, GL DET OH HTW Lawrence County Airpark GA 9 $ 316,987 $ 316,987 $ ‐ Rehabilitate Taxiway, Remove Obstructions ‐ Install Runway Vertical/Visual Guidance System ‐ 05/23, Reconstruct Runway Lighting ‐ 05/23, GL DET OH RZT Ross County GA 17 $ 373,301 $ 373,301 $ ‐ Rehabilitate Runway ‐ 05/23 ‐ Install Runway Distance‐To‐Go Signs ‐ 03R/21L, GL DET OH LUK Cincinnati Municipal Airport Lunken Field P 24 $ 3,550,990 $ 3,443,377 $ ‐ 107,613 Rehabilitate Runway ‐ 03L/21R

Acquire Land for Development, Install Perimeter GL DET OH CYO Pickaway County Memorial GA 15 $ 324,211 $ 324,211 $ ‐ Fencing not Required by 49 CFR 1542 GL DET OH CLE Cleveland‐Hopkins International P 109 $ 18,959,957 $ $ 18,959,957 Construct Taxiway GL DET OH CLE Cleveland‐Hopkins International P 112 $ 5,356,613 $ $ 5,356,613 Acquire Snow Removal Equipment ‐ GL DET OH CLE Cleveland‐Hopkins International P 113 $ 2,026,651 $ 2,026,651 $ Construct Runway [Letter of Intent] ‐ 06L/24R Extend Runway ‐ 06/24, Install Weather Reporting Equipment, Rehabilitate Runway [Runway 24 End] ‐ 06/24, Rehabilitate Runway [Runway 6 End] ‐ GL DET OH CGF Cuyahoga County R 28 $ 11,258,767 $ 150,000 $ ‐ 11,108,767 06/24 GL DET OH CGF Cuyahoga County R 29 $ 719,196 $ ‐ $ 719,196 Rehabilitate Runway ‐ 06/24 GL DET OH TZR Bolton Field R 25 $ 2,380,050 $ ‐ 190,199 $ 2,189,851 Rehabilitate Runway ‐ 04/22 GL DET OH CMH John Glenn Columbus International P 86 $ 1,533,015 $ 1,533,015 $ Acquire Snow Removal Equipment GL DET OH OSU Ohio State University R 31 $ 785,430 $ 407,085 $ ‐ 378,345 Update Airport Master Plan Study

GL DET OH CMH Port Columbus International P 85 $ 527,422 $ $ 527,422 Construct Runway [Letter of Intent] ‐ 10R/28L

Reconstruct Taxiway [E], Reconstruct Taxiway [G], ‐ Reconstruct Taxiway Lighting [A Phase 2], Reconstruct Taxiway Lighting [A Phase 3], ‐ Reconstruct Taxiway Lighting [E], Reconstruct GL DET OH LCK Rickenbacker International P 44 $ 7,743,384 $ 1,808,243 $ 5,935,141 Taxiway Lighting [G], Rehabilitate Taxiway [A] GL DET OH LCK Rickenbacker International P 45 $ 508,569 $ $ 508,569 VALE Infrastructure GL DET OH I40 Richard Downing GA 22 $ 125,096 $ ‐ 125,096 $ Rehabilitate Apron GL DET OH MGY Dayton‐Wright Brothers R 18 $ 256,942 $ 256,942 $ Reconstruct Taxiway Install Runway Distance‐To‐Go Signs ‐ 18/36, GL DET OH DAY James M Cox Dayton International P 83 $ 7,744,140 $ 7,744,140 $ Rehabilitate Runway ‐ 18/36 GL DET OH DAY James M Cox Dayton International P 84 $ 10,406,623 $ 796,123 $ 9,610,500 Rehabilitate Apron

‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 34 of 48 ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Acquire Land For Approaches, Remove Obstructions [Non‐Hazard], Wildlife Hazard GL DET OH DFI Defiance Memorial GA 13 $ 281,383 $ 281,383 $ Assessments GL DET OH DLZ Delaware Municipal ‐ Jim Moore Field GA 23 $ 509,624 $ 243,065 $ 266,559 Rehabilitate Taxiway GL DET OH FZI Fostoria Metropolitan GA 17 $ 213,210 $ 213,210 $ Rehabilitate Taxiway GL DET OH S24 Sandusky County Regional GA 20 $ 164,373 $ 164,373 $ Rehabilitate Runway ‐ 06/24 GL DET OH HAO Butler Co Regional‐Hogan Field R 26 $ 1,854,142 $ 335,650 $ 1,518,492 Rehabilitate Apron GL DET OH HOC Highland County GA 12 $ 207,726 $ 207,726 $ Rehabilitate Runway ‐ 05/23 Reconstruct Taxiway, Rehabilitate Runway ‐ GL DET OH I43 James A Rhodes GA 12 $ 49,873 $ 49,873 $ 01/19, Wildlife Hazard Assessments ‐ Update Airport Master Plan Study, Wildlife Hazard GL DET OH I95 Hardin County GA 12 $ 178,825 $ 178,825 $ Assessments ‐ Rehabilitate Runway ‐ 01/19, Rehabilitate Runway GL DET OH I68 Warren County/John Lane Field GA 18 $ 2,155,607 $ 150,000 $ ‐ 2,005,607 Lighting ‐ 01/19 GL DET OH AOH Lima Allen County GA 19 $ 150,000 $ 150,000 $ Acquire Snow Removal Equipment GL DET OH UYF Madison County GA 20 $ 59,764 $ 59,764 $ ‐ Construct Building GL DET OH MFD Mansfield Lahm Regional GA 30 $ 231,390 $ 231,390 $ Reconstruct Taxiway GL DET OH MNN Marion Municipal GA 25 $ 107,630 $ 107,630 $ ‐ Construct Terminal Building Acquire Land For Approaches, Update Airport GL DET OH MRT Union County GA 23 $ 620,482 $ 620,482 $ ‐ Master Plan Study

Rehabilitate Airport Beacons, Update Airport GL DET OH MWO Middletown Regional/Hook Field GA 14 $ 386,448 $ 386,448 $ ‐ Master Plan Study, Wildlife Hazard Assessments ‐ ‐ Rehabilitate Apron, Rehabilitate Taxiway [A], GL DET OH 4I9 Morrow County GA 13 $ 495,181 $ 495,181 $ ‐ Rehabilitate Taxiway [C], Rehabilitate Taxiway GL DET OH 4I3 Knox County GA 17 $ 299,885 $ 299,885 $ Reconstruct Apron ‐ GL DET OH 7W5 Henry County GA 11 $ 410,637 $ 410,637 $ Rehabilitate Runway ‐ 10/28, Rehabilitate Taxiway GL DET OH PHD Harry Clever Field GA 14 $ 1,118,686 $ 1,118,686 $ Rehabilitate Runway ‐ 14/32 GL DET OH VTA Newark‐Heath GA 27 $ 78,480 $ 78,480 $ ‐ Reconstruct Taxiway GL DET OH 3X5 North Bass Island GA 13 $ 91,800 $ 91,800 $ Conduct Environmental Study GL DET OH 5A1 Norwalk‐Huron County GA 10 $ 176,336 $ 176,336 $ Rehabilitate Apron ‐ GL DET OH OWX Putnam County GA 12 $ 46,773 $ 46,773 $ ‐ Improve Airport Drainage, Rehabilitate Apron GL DET OH PCW Erie‐Ottawa International GA 34 $ 323,100 $ 323,100 $ Update Airport Master Plan Study GL DET OH PCW Erie‐Ottawa International GA 35 $ 160,261 $ 160,261 $ ‐ Rehabilitate Runway Lighting ‐ 09/27 GL DET OH 3W2 Put‐in‐Bay GA 23 $ 673,713 $ 673,713 $ ‐ Construct Building ‐ Acquire Land For Approaches [Parcel 59], Acquire ‐ Land for Development [Parcel 27], Acquire Land ‐ for Development [Parcel 30], Acquire Land for Development [Parcel 31], Acquire Land for ‐ Development [Parcel 33], Acquire Land for GL DET OH POV Portage County GA 29 $ 124,219 $ 124,219 $ ‐ Development [Parcel 38] ‐ Extend Taxiway, Rehabilitate Runway ‐ 15/33, GL DET OH SGH Springfield‐Beckley Municipal GA 25 $ 274,398 $ 274,398 $ ‐ Rehabilitate Taxiway

Acquire Aircraft Rescue & Fire Fighting Vehicle, Reconstruct Airfield Guidance Signs, Reconstruct GL DET OH TOL Toledo Express P 78 $ 1,674,995 $ 1,674,995 $ Taxiway Lighting, Rehabilitate Taxiway GL DET OH VNW Van Wert County GA 19 $ 449,689 $ 449,689 $ Construct Apron, Construct Taxiway GL DET OH VES Darke County GA 12 $ 1,911,703 $ 1,911,703 $ ‐ Extend Runway ‐ 09/27

‐ Install Runway Vertical/Visual Guidance System ‐ 04/22, Rehabilitate Runway ‐ 04/22, Rehabilitate GL DET OH TDZ Toledo Executive R 27 $ 278,395 $ 278,395 $ Runway ‐ 14/32, Rehabilitate Taxiway Reconstruct Taxiway, Rehabilitate Apron, Wildlife GL DET OH I23 Fayette County GA 11 $ 77,400 $ 77,400 $ ‐ Hazard Assessments GL DET OH EOP Pike County GA 13 $ 87,570 $ 87,570 $ ‐ Remove Obstructions GL DET OH LNN Willoughby Lost Nation Municipal R 14 $ 115,778 $ 115,778 $ ‐ Rehabilitate Apron, Rehabilitate Taxiway GL DET OH I66 Clinton Field GA 12 $ 245,818 $ 245,818 $ Improve Airport Drainage GL DET OH 4G5 Monroe County GA 16 $ 42,205 $ 42,205 $ Rehabilitate Runway ‐ 07/25

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 35 of 48 ‐ ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work GL DET OH I19 Greene County‐Lewis A Jackson Regional GA 23 $ 150,000 $ 150,000 $ Construct Apron, Construct Taxiway

Improve Airport Drainage, Rehabilitate Runway Lighting ‐ 05/23, Rehabilitate Taxiway Lighting [Taxiways C, G, and H], Rehabilitate Taxiway GL DET OH YNG Youngstown‐Warren Regional P 45 $ 359,144 $ 359,144 $ Lighting [Taxiways F and T] Install Perimeter Fencing not Required by 49 CFR GL DET OH ZZV Zanesville Municipal GA 15 $ 237,123 $ 237,123 $ 1542 SW AROK OK AXS Altus/Quartz Mountain Regional GA 16 $ 235,952 $ 235,952 $ ‐ Rehabilitate Runway ‐ 17/35 SW AROK OK 80F Antlers Municipal GA 7 $ 135,194 $ 135,194 $ Update Airport Master Plan Study SW AROK OK 1F0 Ardmore Downtown Executive GA 16 $ 152,019 $ 152,019 $ Acquire Land For Approaches SW AROK OK K44 Beaver Municipal GA 7 $ 746,139 $ 746,139 $ Rehabilitate Runway ‐ 17/35 Install Miscellaneous NAVAIDS, Install Runway ‐ Vertical/Visual Guidance System ‐ 17/35, SW AROK OK CQB Chandler Regional GA 12 $ 340,285 $ 340,285 $ Reconstruct Runway Lighting ‐ 17/35 SW AROK OK 93F Mignon Laird Municipal GA 7 $ 237,987 $ 237,987 $ ‐ Construct Fuel Farm ‐ Install Perimeter Fencing not Required by 49 CFR SW AROK OK CHK Chickasha Municipal GA 15 $ 36,270 $ 36,270 $ ‐ 1542 ‐ SW AROK OK GCM Claremore Regional GA 20 $ 2,137,166 $ 1,174,046 $ ‐ 963,120 Rehabilitate Runway ‐ 17/35, Rehabilitate Taxiway SW AROK OK CLK Clinton Regional GA 14 $ 319,985 $ 319,985 $ Improve Fuel Farm SW AROK OK CUH Cushing Municipal GA 17 $ 174,600 $ 174,600 $ Rehabilitate Apron, Rehabilitate Taxiway ‐ Install Perimeter Fencing not Required by 49 CFR SW AROK OK DUC Halliburton Field GA 16 $ 301,375 $ 301,375 $ ‐ 1542 SW AROK OK RQO El Reno Regional GA 12 $ 139,495 $ 139,495 $ Improve Fuel Farm, Rehabilitate Apron SW AROK OK ELK Elk City Regional Business GA 18 $ 1,286,775 $ 1,286,775 $ ‐ Rehabilitate Apron, Rehabilitate Taxiway

Install Runway Vertical/Visual Guidance System ‐ SW AROK OK F08 Eufaula Municipal GA 10 $ 290,088 $ 290,088 $ ‐ 17/35, Reconstruct Runway Lighting ‐ 17/35 ‐ Conduct Aeronautical Survey for RNAV Approach, SW AROK OK 6K4 Fairview Municipal GA 8 $ 189,810 $ 189,810 $ Construct Taxiway SW AROK OK FDR Frederick Regional GA 10 $ 231,273 $ 231,273 $ ‐ Install Taxiway Lighting SW AROK OK GMJ Grove Municipal GA 18 $ 76,050 $ 76,050 $ ‐ Construct Taxiway SW AROK OK GOK Guthrie‐Edmond Regional GA 17 $ 308,754 $ 308,754 $ ‐ Rehabilitate Runway Lighting ‐ 16/34 SW AROK OK O35 Hollis Municipal GA 4 $ 101,432 $ 101,432 $ Rehabilitate Runway ‐ 17/35

SW AROK OK O45 Hooker Municipal GA 8 $ 81,360 $ 81,360 $ ‐ Conduct Aeronautical Survey for RNAV Approach SW AROK OK HHW Stan Stamper Municipal GA 13 $ 68,543 $ 68,543 $ Construct Taxiway SW AROK OK 4O4 McCurtain County Regional GA 12 $ 63,445 $ 63,445 $ ‐ Construct Taxiway ‐ ‐ Acquire Easement for Development, Acquire Land SW AROK OK 1K8 South Grand Lake Regional GA 6 $ 453,929 $ 453,929 $ ‐ for Development, Expand Apron ‐ Construct Aircraft Rescue & Fire Fighting Building, SW AROK OK LAW Lawton‐Fort Sill Regional P 35 $ 3,545,534 $ 1,143,654 $ 2,401,880 Rehabilitate Runway ‐ 17/35 SW AROK OK MLC McAlester Regional GA 15 $ 275,940 $ 275,940 $ ‐ Rehabilitate Runway ‐ 02/20 ‐ SW AROK OK O53 Medford Municipal GA 9 $ 598,188 $ 598,188 $ ‐ Rehabilitate Runway ‐ 17/35, Rehabilitate Taxiway

Install Airport Beacons, Install Miscellaneous ‐ NAVAIDS, Install Runway Vertical/Visual Guidance System [PAPIs] ‐ 17/35, Install Runway Vertical/Visual Guidance System [REILs] ‐ 17/35, SW AROK OK MIO Miami Regional GA 19 $ 426,120 $ 426,120 $ ‐ Install Weather Reporting Equipment SW AROK OK MDF Mooreland Municipal GA 5 $ 417,204 $ 417,204 $ Reconstruct Apron SW AROK OK MKO Davis Field GA 12 $ 300,000 $ 300,000 $ ‐ Rehabilitate Runway ‐ 13/31 SW AROK OK OUN University of Oklahoma Westheimer R 27 $ 215,447 $ 215,447 $ Install Weather Reporting Equipment SW AROK OK RCE Clarence E Page Municipal GA 12 $ 86,819 $ 86,819 $ Install Weather Reporting Equipment SW AROK OK *OKS State of Oklahoma 17 $ 391,632 $ 391,632 $ Update State System Plan Study

‐ ‐ ‐ ‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 36 of 48 FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Conduct Miscellaneous Study (University of Oklahoma Westheimer), Construct Taxiway (Chandler Regional), Extend Taxiway (Mid‐ America Industrial), Reconstruct Apron (Stillwater Regional), Rehabilitate Runway (Richard Lloyd Jones Jr ‐ 01R/19L), Rehabilitate Taxiway (Ardmore Downtown Executive), Widen Runway SW AROK OK *OKV Various Locations in Oklahoma 7 $ 509,753 $ 509,753 $ (South Grand Lake Regional ‐ 18/36) SW AROK OK PWA Wiley Post R 24 $ 340,000 $ 340,000 $ Update Airport Master Plan Study SW AROK OK OKC Will Rogers World P 69 $ 2,612,657 $ 2,612,657 $ Extend Taxiway SW AROK OK OKC Will Rogers World P 70 $ 1,155,123 $ 1,155,123 $ Reconstruct Apron SW AROK OK OKC Will Rogers World P 71 $ 596,266 $ 596,266 $ Rehabilitate Access Road

SW AROK OK OKC Will Rogers World P 72 $ 532,950 $ 532,950 $ Acquire Aircraft Rescue & Fire Fighting Vehicle SW AROK OK OKM Okmulgee Regional GA 23 $ 276,691 $ 276,691 $ Construct Taxiway, Rehabilitate Taxiway SW AROK OK F22 Perry Municipal GA 13 $ 228,456 $ 228,456 $ ‐ Rehabilitate Taxiway SW AROK OK O47 Prague Municipal GA 6 $ 128,669 $ 128,669 $ ‐ Rehabilitate Runway ‐ 17/35 ‐ ‐ Install Runway Vertical/Visual Guidance System ‐ SW AROK OK H71 Mid‐America Industrial GA 12 $ 77,400 $ 77,400 $ ‐ 18/36, Reconstruct Runway Lighting ‐ 18/36 SW AROK OK 3O3 Purcell Municipal ‐ Steven E Shephard Field GA 10 $ 240,484 $ 240,484 $ Construct Fuel Farm ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 17/35, SW AROK OK JSV Sallisaw Municipal GA 13 $ 222,098 $ 222,098 $ ‐ Rehabilitate Taxiway SW AROK OK 3O4 Sayre Municipal GA 9 $ 149,400 $ 149,400 $ ‐ Update Airport Master Plan Study SW AROK OK SNL Shawnee Regional GA 17 $ 74,277 $ 74,277 $ ‐ Construct Taxiway Install Perimeter Fencing not Required by 49 CFR SW AROK OK 2F6 Skiatook Municipal GA 11 $ 51,660 $ 51,660 $ 1542, Install Taxiway Lighting SW AROK OK GZL Stigler Regional GA 12 $ 528,748 $ 528,748 $ ‐ Construct Taxiway SW AROK OK SWO Stillwater Regional GA 25 $ 4,482,535 $ 1,532,831 $ ‐ 2,949,704 Construct Taxiway SW AROK OK F30 Sulphur Municipal GA 10 $ 438,968 $ 438,968 $ Rehabilitate Runway ‐ 17/35 ‐ Install Runway Vertical/Visual Guidance System ‐ SW AROK OK TQH Tahlequah Municipal GA 13 $ 255,370 $ 255,370 $ ‐ 17/35 SW AROK OK RVS Richard Lloyd Jones Jr R 31 $ 139,290 $ 139,290 $ ‐ Rehabilitate Access Road Rehabilitate Taxiway [Taxiway J], Rehabilitate SW AROK OK TUL Tulsa International P 91 $ 13,606,758 $ 4,846,758 $ ‐ 8,760,000 Taxiway [Taxiway K] ‐ SW AROK OK H68 Hefner‐Easley GA 6 $ 406,745 $ 406,745 $ Construct Parking Lot, Construct Service Road SW AROK OK OJA Thomas P Stafford GA 12 $ 132,652 $ 132,652 $ ‐ Rehabilitate Apron SW AROK OK WWR West Woodward GA 14 $ 373,573 $ 373,573 $ Rehabilitate Taxiway Lighting NM SEA OR S12 Albany Municipal GA 15 $ 1,291,500 $ 966,764 $ ‐ 324,736 Rehabilitate Apron NM SEA OR S03 Ashland Municipal‐Sumner Parker Field GA 11 $ 305,362 $ 305,362 $ ‐ Update Airport Master Plan Study NM SEA OR UAO Aurora State GA 20 $ 189,635 $ 189,635 $ Conduct Environmental Study Install Airport Beacons, Install Runway Vertical/Visual Guidance System ‐ 16/34, NM SEA OR S05 Bandon State GA 8 $ 206,789 $ 206,789 $ ‐ Rehabilitate Runway Lighting ‐ 16/34 NM SEA OR BDN Bend Municipal GA 26 $ 1,619,937 $ 410,000 $ ‐ 1,209,937 Reconstruct Apron ‐ Reconstruct Runway ‐ 03/21, Rehabilitate Runway NM SEA OR BNO Burns Municipal GA 15 $ 101,340 $ 101,340 $ ‐ 03/21 ‐ Install Airport Beacons, Install Runway ‐ Vertical/Visual Guidance System ‐ 18/36, Rehabilitate Apron, Rehabilitate Runway Lighting ‐ NM SEA OR 3S4 Illinois Valley GA 8 $ 1,904,654 $ 595,800 $ 1,308,854 18/36 NM SEA OR 2S7 Chiloquin State GA 6 $ 207,119 $ 207,119 $ ‐ Conduct Environmental Study Improve Airport Drainage, Improve Runway Safety Area ‐ 07/25, Install Airport Beacons, Install ‐ Runway Vertical/Visual Guidance System ‐ 07/25, Rehabilitate Runway Lighting ‐ 07/25, Rehabilitate NM SEA OR 3S9 Condon State Pauling Field GA 5 $ 1,578,013 $ 1,578,013 $ Taxiway NM SEA OR 61S Cottage Grove State GA 9 $ 288,551 $ 288,551 $ Update Airport Master Plan Study NM SEA OR EUG Mahlon Sweet Field P 54 $ 5,611,160 $ 5,611,160 $ Rehabilitate Taxiway ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 37 of 48 ‐ ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Construct Taxiway, Install Runway Vertical/Visual NM SEA OR 3S8 Grants Pass GA 11 $ 1,221,261 $ 450,000 $ 771,261 Guidance System ‐ 13/31 NM SEA OR HRI Hermiston Municipal GA 10 $ 283,610 $ 283,610 $ Update Airport Master Plan Study NM SEA OR 4S2 Ken Jernstedt Airfield GA 11 $ 1,313,538 $ 1,313,538 $ Rehabilitate Apron, Rehabilitate Taxiway NM SEA OR 7S5 Independence State GA 5 $ 327,890 $ 327,890 $ Update Airport Master Plan Study NM SEA OR LGD La Grande/Union County GA 22 $ 410,000 $ 410,000 $ Install Airport Beacons NM SEA OR LKV Lake County GA 9 $ 220,000 $ 220,000 $ Install Airport Beacons, Reconstruct Apron NM SEA OR 9S9 Lexington GA 8 $ 595,555 $ 595,555 $ Reconstruct Apron NM SEA OR S33 Madras Municipal GA 10 $ 241,997 $ 241,997 $ Reconstruct Taxiway Install Airport Beacons, Rehabilitate Runway ‐ ‐ 16/34, Rehabilitate Runway Lighting ‐ 16/34, NM SEA OR 26U McDermitt State GA 3 $ 2,418,155 $ 2,418,155 $ ‐ Rehabilitate Taxiway NM SEA OR MFR Rogue Valley International ‐ Medford P 43 $ 10,855,000 $ 2,704,972 $ ‐ 8,150,028 Construct Taxiway, Rehabilitate Taxiway NM SEA OR 4S9 Mulino State GA 13 $ 186,987 $ 186,987 $ ‐ Conduct Environmental Study NM SEA OR ONP Newport Municipal GA 25 $ 150,000 $ 150,000 $ ‐ Improve Airport Drainage ‐ Install Runway Vertical/Visual Guidance System ‐ NM SEA OR ONO Ontario Municipal GA 13 $ 747,900 $ 568,900 $ ‐ 179,000 14/32, Install Taxiway Lighting NM SEA OR PDT Eastern Oregon Regional at Pendleton CS 25 $ 189,788 $ 189,788 $ Rehabilitate Runway ‐ 07/25 NM SEA OR PDX Portland International P 79 $ 2,550,754 $ 2,550,754 $ Improve Airport Drainage NM SEA OR RDM Roberts Field P 42 $ 9,500,000 $ 2,240,280 $ ‐ 7,259,720 Rehabilitate Runway ‐ 11/29 NM SEA OR RBG Roseburg Regional GA 23 $ 414,226 $ 414,226 $ Update Airport Master Plan Study ‐ Install Runway Vertical/Visual Guidance System ‐ ‐ 16/34, Remove Obstructions [Non‐Hazard APP or NM SEA OR RBG Roseburg Regional GA 24 $ 200,000 $ 200,000 $ DEP] NM SEA OR SLE McNary Field GA 21 $ 3,290,168 $ 542,260 $ 2,747,908 Rehabilitate Runway ‐ 13/31 NM SEA OR *ORS State of Oregon 16 $ 357,736 $ 357,736 $ ‐ Update State System Plan Study ‐

‐ Rehabilitate Apron (Ashland Municipal‐Sumner Parker Field; Bandon State; Brookings; Chiloquin State; Cottage Grove State; Grants Pass; Hobby ‐ Field; Illinois Valley; Lake County), Rehabilitate Runway (Ashland Municipal‐Sumner Parker Field ‐ ‐ 12/30; Brookings ‐ 12/30; Chiloquin State ‐ 17/35; Gold Beach Municipal ‐ 16/34; Grants Pass ‐ 13/31; Hobby Field ‐ 15/33; Illinois Valley ‐ 18/36), Rehabilitate Taxiway (Ashland Municipal‐Sumner Parker Field; Bandon State; Cottage Grove State; NM SEA OR *ORV Various Locations in Oregon 33 $ 116,097 $ 116,097 $ Grants Pass; Hobby Field; Lake County) NM SEA OR SPB Scappoose Industrial Airpark GA 23 $ 92,364 $ 92,364 $ Rehabilitate Taxiway

EA HAR PA XLL Allentown Queen City Municipal GA 21 $ 79,830 $ 79,830 $ Remove Obstructions [Non‐Hazard APP or DEP] EA HAR PA XLL Allentown Queen City Municipal GA 22 $ 147,330 $ 147,330 $ Update Airport Master Plan Study EA HAR PA ABE Lehigh Valley International P 103 $ 1,107,010 $ 1,107,010 $ Acquire Snow Removal Equipment Rehabilitate Runway ‐ 06/24, Rehabilitate Runway Lighting ‐ 06/24, Rehabilitate Taxiway Lighting ‐ [Taxiway A], Rehabilitate Taxiway Lighting EA HAR PA ABE Lehigh Valley International P 104 $ 1,461,431 $ 1,461,431 $ ‐ [Taxiway E] Rehabilitate Taxiway [Taxiway B], Rehabilitate ‐ Taxiway [Taxiway D], Rehabilitate Taxiway ‐ Lighting [Taxiway B], Rehabilitate Taxiway EA HAR PA AVP Wilkes‐Barre/Scranton International P 64 $ 8,423,514 $ 1,922,939 $ ‐ 6,500,575 Lighting [Taxiway D] Install Miscellaneous NAVAIDS, Rehabilitate EA HAR PA BFD Bradford Regional CS 46 $ 373,884 $ 373,884 $ Runway ‐ 14/32 EA HAR PA BFD Bradford Regional CS 47 $ 347,594 $ 347,594 $ Update Airport Master Plan Study ‐ Acquire Aircraft Rescue & Fire Fighting Safety EA HAR PA DUJ Dubois Regional CS 44 $ 87,457 $ 87,457 $ Equipment EA HAR PA N68 Franklin County Regional GA 16 $ 312,584 $ 312,584 $ Install Weather Reporting Equipment EA HAR PA ERI Erie International/Tom Ridge Field P 66 $ 752,855 $ 752,855 $ Reconstruct Runway ‐ 02/20 EA HAR PA ERI Erie International/Tom Ridge Field P 67 $ 368,909 $ 368,909 $ Reconstruct Taxiway Install Perimeter Fencing not Required by 49 CFR EA HAR PA ERI Erie International/Tom Ridge Field P 68 $ 327,405 $ 63,476 $ ‐ 263,929 1542 ‐

‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 38 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work EA HAR PA W05 Gettysburg Regional GA 14 $ 382,006 $ 382,006 $ Install Perimeter Fencing EA HAR PA MDT Harrisburg International P 82 $ 15,006,278 $ 4,073,314 $ 10,932,964 Rehabilitate Runway ‐ 13/31 Non primary development projects in state block EA HAR PA *PAB Pennsylvania State Block Grant Program 85 $ 7,650,000 $ 7,650,000 $ grant program Non primary development projects in state block EA HAR PA *PAB Pennsylvania State Block Grant Program 86 $ 4,530,375 $ 4,530,375 $ grant program Non primary development projects in state block EA HAR PA *PAB Pennsylvania State Block Grant Program 87 $ 150,000 $ 150,000 $ grant program EA HAR PA JST John Murtha Johnstown‐Cambria County CS 51 $ 650,451 $ 650,451 $ ‐ Acquire Snow Removal Equipment EA HAR PA LBE Arnold Palmer Regional P 52 $ 152,991 $ 152,991 $ Reconstruct Taxiway, Widen Runway ‐ 05/23 EA HAR PA LBE Arnold Palmer Regional P 53 $ 2,460,597 $ 1,741,560 $ 719,037 Strengthen Runway ‐ 05/23 EA HAR PA LNS Lancaster GA 40 $ 138,849 $ 138,849 $ ‐ Rehabilitate Runway ‐ 08/26 EA HAR PA CXY Capital City R 35 $ 103,672 $ 103,672 $ Conduct Miscellaneous Study EA HAR PA @01N Delaware Valley Region 18 $ 83,511 $ $ ‐ 83,511 Conduct Metropolitan System Plan Study

‐ Install Airfield Guidance Signs, Install Airport ‐ Beacons, Install Miscellaneous NAVAIDS, Install ‐ Runway Distance‐To‐Go Signs ‐ 15/33, Install Runway Lighting ‐ 06/24, Install Runway EA HAR PA PNE Northeast Philadelphia R 20 $ 930,980 $ 930,980 $ ‐ Vertical/Visual Guidance System ‐ 06/24 ‐ ‐ Install Noise Monitoring System, Noise Mitigation Measures for Public Buildings, Noise Mitigation EA HAR PA PHL Philadelphia International P 110 $ 208,426 $ $ 208,426 Measures for Residences within 65 ‐ 69 DNL

EA HAR PA PHL Philadelphia International P 111 $ 16,686,735 $ 5,948,986 $ 10,737,749 Extend Runway ‐ 09R/27L, Rehabilitate Taxiway

EA HAR PA PIT Pittsburgh International P 122 $ 12,290,723 $ 2,691,896 $ ‐ 9,598,827 Reconstruct Deicing Pad with Associated Facilities

EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 57 $ 1,881,116 $ 189,716 $ 1,691,400 Install Perimeter Fencing required by 14 CFR 139 EA HAR PA RDG Reading Regional/Carl A Spaatz Field GA 58 $ 232,902 $ $ 232,902 Remove Obstructions [Non‐Hazard] EA HAR PA AGC Allegheny County R 38 $ 549,156 $ ‐ 150,000 $ 399,156 Update Airport Master Plan Study EA HAR PA FWQ Rostraver R 25 $ 875,126 $ 156,372 $ 718,754 Rehabilitate Runway ‐ 08/26 EA HAR PA IPT Williamsport Regional P 49 $ 466,118 $ $ 466,118 Construct Terminal Building Rehabilitate Runway ‐ 09/27, Rehabilitate Runway EA HAR PA IPT Williamsport Regional P 50 $ 4,827,790 $ 1,525,176 $ 3,302,614 Lighting ‐ 09/27 EA HAR PA IPT Williamsport Regional P 51 $ 218,952 $ 218,952 $ Rehabilitate Runway ‐ 09/27 SO ATL PR BQN Rafael Hernandez P 28 $ 466,074 $ 466,074 $ Conduct Environmental Study SO ATL PR PSE Mercedita P 24 $ 2,172,084 $ ‐ 2,172,084 $ Reconstruct Taxiway SO ATL PR SJU Luis Munoz Marin International P 55 $ 346,955 $ 346,955 $ Conduct Airport Master Plan Study SO ATL PR VQS Antonio Rivera Rodriguez P 17 $ 439,200 $ 439,200 $ Improve Terminal Building WP HNL PW ROR Babelthuap/Koror GA 22 $ 500,000 $ ‐ $ 500,000 Improve Runway Safety Area ‐ 09/27 NE ANE RI UUU Newport State GA 21 $ 391,802 $ 391,802 $ Remove Obstructions Noise Mitigation Measures for Residences within NE ANE RI PVD Theodore Francis Green State P 122 $ 4,310,127 $ $ ‐ 4,310,127 65 ‐ 69 DNL NE ANE RI PVD Theodore Francis Green State P 123 $ 6,862,122 $ 4,871,731 $ ‐ 1,990,391 Extend Runway ‐ 05/23 SO ATL SC AND Anderson Regional GA 21 $ 5,523,949 $ 150,000 $ ‐ 5,373,949 Rehabilitate Runway ‐ 05/23 SO ATL SC 99N Bamberg County GA 4 $ 64,444 $ 64,444 $ ‐ Remove Obstructions [Non‐Hazard] ‐ ‐ Install Perimeter Fencing not Required by 49 CFR ‐ 1542, Rehabilitate Runway ‐ 17/35, Rehabilitate SO ATL SC BNL Barnwell Regional GA 12 $ 327,881 $ 327,881 $ Taxiway, Remove Obstructions [Non‐Hazard] ‐ Expand Apron, Extend Runway Safety Area ‐ SO ATL SC ARW Beaufort County GA 13 $ 644,338 $ 644,338 $ 07/25, Extend Taxiway, Remove Obstructions SO ATL SC BBP Marlboro County Jetport ‐ H E Avent Field GA 15 $ 501,517 $ 501,517 $ ‐ Construct Building SO ATL SC CQW Cheraw Municipal/Lynch Bellinger Field GA 13 $ 183,145 $ 183,145 $ Remove Obstructions [Non‐Hazard] SO ATL SC DCM Chester Catawba Regional GA 9 $ 25,610 $ 25,610 $ Acquire Land For Approaches Improve Terminal Building, Improve Terminal SO ATL SC CAE Columbia Metropolitan P 48 $ 9,713,568 $ 3,713,568 $ ‐ 6,000,000 Building, Rehabilitate Taxiway SO ATL SC CUB Jim Hamilton L B Owens R 23 $ 558,881 $ 558,881 $ Install Airfield Guidance Signs

‐ ‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 39 of 48

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Install Perimeter Fencing not Required by 49 CFR 1542 (Hartsville Regional), Install Weather Reporting Equipment (Union County, Troy Shelton Field), Rehabilitate Runway (Aiken Municipal ‐ 07/25; Allendale County ‐ 17/35; Bamberg County ‐ 05/23; Pickens County ‐ 05/23; Summerville ‐ SO ATL SC *SCV Various Locations in South Carolina 23 $ 1,724,903 $ 1,724,903 $ 06/24; Sumter ‐ 05/23) Install Runway Vertical/Visual Guidance System ‐ SO ATL SC HYW Conway‐Horry County GA 20 $ 150,000 $ 150,000 $ 04/22 SO ATL SC UDG Darlington County GA 16 $ 191,032 $ 191,032 $ Rehabilitate Runway ‐ 05/23

SO ATL SC FLO Florence Regional P 36 $ 3,670,051 $ 913,907 $ 2,756,144 Construct Aircraft Rescue & Fire Fighting Building Expand Apron, Improve Airport Drainage, Remove SO ATL SC GGE Georgetown County GA 19 $ 191,192 $ 191,192 $ Obstructions SO ATL SC GYH Donaldson Field GA 22 $ 3,448,823 $ 150,000 $ ‐ 3,298,823 Rehabilitate Taxiway

‐ Rehabilitate Runway Lighting ‐ 01/19, Rehabilitate SO ATL SC GMU Greenville Downtown GA 26 $ 315,984 $ 315,984 $ ‐ Taxiway, Rehabilitate Taxiway Lighting SO ATL SC GRD Greenwood County GA 18 $ 189,041 $ 189,041 $ Rehabilitate Parking Lot Acquire Snow Removal Equipment, Construct Aircraft Rescue & Fire Fighting Building, Expand ‐ Apron, Rehabilitate Apron, Update Airport Master SO ATL SC GSP Greenville Spartanburg International P 53 $ 4,138,888 $ 4,138,888 $ Plan Study Extend Runway ‐ 03/21, Improve Runway Safety SO ATL SC HXD Hilton Head P 40 $ 6,548,467 $ 912,645 $ 5,635,822 Area ‐ 03/21 SO ATL SC HXD Hilton Head P 41 $ 87,355 $ 87,355 $ ‐ Extend Runway ‐ 03/21 SO ATL SC LKR Lancaster County‐Mc Whirter Field GA 19 $ 1,652,582 $ 1,652,582 $ ‐ Construct Apron SO ATL SC LUX Laurens County GA 14 $ 150,000 $ 150,000 $ Rehabilitate Parking Lot

Improve Airport Drainage, Rehabilitate Taxiway ‐ [Taxiway A], Rehabilitate Taxiway [Taxiway B], Rehabilitate Taxiway Lighting [Taxiway A], SO ATL SC MYR Myrtle Beach International P 56 $ 2,610,000 $ 2,610,000 $ Rehabilitate Taxiway Lighting [Taxiway B] SO ATL SC EOE Newberry County GA 12 $ 125,114 $ 125,114 $ ‐ Construct Terminal Building ‐ Improve Airport Drainage, Rehabilitate Runway ‐ SO ATL SC CRE Grand Strand GA 21 $ 607,899 $ 607,899 $ ‐ 05/23 SO ATL SC PYG Pageland GA 13 $ 358,705 $ 358,705 $ Construct Taxiway SO ATL SC 6J0 Lexington County at Pelion GA 16 $ 3,508,284 $ 450,000 $ 3,058,284 Rehabilitate Runway ‐ 18/36 SO ATL SC LQK Pickens County GA 22 $ 112,950 $ 112,950 $ Construct Building SO ATL SC 3J1 Ridgeland‐Claude Dean GA 11 $ 206,830 $ 206,830 $ Construct Runway ‐ Plan‐1 ‐ Extend Runway ‐ 05/23, Rehabilitate Runway ‐ SO ATL SC SPA Spartanburg Downtown Memorial GA 22 $ 11,181,065 $ 181,065 $ ‐ 11,000,000 05/23 SO ATL SC 6J2 St George GA 6 $ 374,225 $ 374,225 $ Remove Obstructions [Non‐Hazard] ‐ Install Airfield Guidance Signs, Install Runway ‐ Vertical/Visual Guidance System ‐ 05/23, Rehabilitate Runway Lighting ‐ 05/23, Rehabilitate SO ATL SC SMS Sumter GA 22 $ 1,142,480 $ 195,791 $ ‐ 946,689 Taxiway Lighting ‐ Acquire Emergency Generator, Improve Airport SO ATL SC RBW Lowcountry Regional GA 16 $ 572,000 $ 572,000 $ Drainage Rehabilitate Runway Lighting ‐ 04/22, Rehabilitate SO ATL SC FDW Fairfield County GA 16 $ 702,000 $ 153,485 $ ‐ 548,515 Taxiway Lighting Acquire Snow Removal Equipment [Vehicle #4], Acquire Snow Removal Equipment [Vehicle #44], GL DMA SD ABR Aberdeen Regional P 37 $ 1,215,000 $ 1,215,000 $ Wildlife Hazard Assessments GL DMA SD BTN Britton Municipal GA 12 $ 463,500 $ 463,500 $ Construct Taxiway GL DMA SD BKX Brookings Regional GA 29 $ 810,000 $ 520,778 $ 289,222 Rehabilitate Runway ‐ 17/35 GL DMA SD 7G9 Canton Municipal GA 7 $ 402,901 $ 402,901 $ ‐ Install Perimeter Fencing GL DMA SD 9V9 Chamberlain Municipal GA 9 $ 220,590 $ 220,590 $ Conduct Airport Master Plan Study GL DMA SD 8D7 Clark County GA 11 $ 157,500 $ 157,500 $ Acquire Snow Removal Equipment Construct Taxiway, Reconstruct Apron, GL DMA SD CUT Custer County GA 13 $ 575,000 $ 575,000 $ Reconstruct Taxiway, Rehabilitate Taxiway ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 40 of 48 ‐ ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work GL DMA SD 84D Cheyenne Eagle Butte GA 9 $ 72,000 $ 72,000 $ Expand Apron, Reconstruct Apron GL DMA SD 3W8 Eureka Municipal GA 8 $ 323,100 $ 323,100 $ Construct Taxiway GL DMA SD 3FU Faulkton Municipal GA 10 $ 112,500 $ 112,500 $ Conduct Environmental Study GL DMA SD 9D1 Gregory Municipal ‐ Flynn Field GA 14 $ 297,000 $ 297,000 $ Expand Apron Reconstruct Taxiway, Rehabilitate Runway ‐ 12/30, Remove Obstructions [Non‐Hazard APP or GL DMA SD HON Huron Regional GA 35 $ 3,121,201 $ 150,000 $ 2,971,201 DEP]

‐ Install Miscellaneous NAVAIDS, Install Runway ‐ Vertical/Visual Guidance System ‐ 11/29, ‐ Reconstruct Airport Beacon, Reconstruct Runway ‐ ‐ 11/29, Reconstruct Runway Lighting ‐ 11/29, GL DMA SD LEM Lemmon Municipal GA 13 $ 155,121 $ 155,121 $ Reconstruct Taxiway GL DMA SD MDS Madison Municipal GA 14 $ 299,700 $ 150,000 $ 149,700 Environmental Mitigation GL DMA SD MDS Madison Municipal GA 15 $ 68,400 $ 68,400 $ Construct Taxiway GL DMA SD 9V6 Martin Municipal GA 12 $ 165,000 $ 165,000 $ Install Perimeter Fencing GL DMA SD 9V6 Martin Municipal GA 13 $ 285,000 $ 285,000 $ Conduct Airport Master Plan Study GL DMA SD MHE Mitchell Municipal GA 27 $ 119,700 $ 119,700 $ Acquire Snow Removal Equipment Acquire Land For Approaches, Acquire Snow Removal Equipment, Conduct Environmental GL DMA SD MBG Mobridge Municipal GA 11 $ 215,008 $ 215,008 $ ‐ Study GL DMA SD 8V3 Parkston Municipal GA 12 $ 144,000 $ 144,000 $ Acquire Land for Development ‐ Construct Access Road, Construct Taxiway, GL DMA SD PIR Pierre Regional CS 38 $ 800,000 $ 800,000 $ ‐ Improve Terminal Building ‐ ‐ Rehabilitate Apron (Belle Fourche Municipal; Canton Municipal; Harding County; Hoven ‐ Municipal; Milbank Municipal; Sturgis Municipal; ‐ Wagner Municipal), Rehabilitate Runway (Belle Fourche Municipal ‐ 14/32; Canton Municipal ‐ ‐ 18/36; Harding County ‐ 12/30; Milbank Municipal ‐ 13/31; Sturgis Municipal ‐ 11/29; Wagner Municipal ‐ 09/27), Rehabilitate Taxiway (Belle Fourche Municipal; Canton Municipal; Harding County; Hoven Municipal; Milbank Municipal; Miller Municipal; Sturgis Municipal; Wagner GL DMA SD *SDV Various Locations in South Dakota 23 $ 820,800 $ 820,800 $ Municipal)

Acquire Snow Removal Equipment, Construct GL DMA SD RAP Rapid City Regional P 49 $ 1,615,000 $ 1,615,000 $ Deicing Containment Facility, Reconstruct Apron GL DMA SD 1D8 Redfield Municipal GA 11 $ 3,528,000 $ 150,000 $ 3,378,000 Construct Runway ‐ Plan‐1 GL DMA SD SUO Rosebud Sioux Tribal GA 10 $ 205,200 $ 205,200 $ Acquire Snow Removal Equipment GL DMA SD FSD Joe Foss Field P 51 $ 8,227,472 $ 3,625,125 $ 4,602,347 Rehabilitate Runway ‐ 03/21

‐ Install Miscellaneous NAVAIDS, Install Runway Vertical/Visual Guidance System ‐ 16/34, Reconstruct Airport Beacon, Reconstruct Runway ‐ ‐ 16/34, Reconstruct Runway Lighting ‐ 16/34, GL DMA SD 8D3 Sisseton Municipal GA 13 $ 153,000 $ 153,000 $ Reconstruct Taxiway GL DMA SD SPF Black Hills‐Clyde Ice Field GA 23 $ 125,000 $ 125,000 $ ‐ Update Airport Master Plan Study Install Runway Vertical/Visual Guidance System ‐ GL DMA SD VMR Harold Davidson Field GA 12 $ 559,800 $ 559,800 $ 12/30, Rehabilitate Apron Improve Terminal Building, Update Airport GL DMA SD ATY Watertown Regional GA 31 $ 99,000 $ 99,000 $ Master Plan Study GL DMA SD ATY Watertown Regional GA 32 $ 805,500 $ 805,500 $ Construct Taxiway Reconstruct Apron, Reconstruct Taxiway, GL DMA SD 1D7 The Sigurd Anderson GA 9 $ 1,998,000 $ 1,998,000 $ ‐ Rehabilitate Runway ‐ 12/30 GL DMA SD ICR Winner Regional GA 15 $ 436,500 $ 436,500 $ ‐ Expand Apron SO MEM TN TYS McGhee Tyson P 70 $ 7,588,033 $ 4,033,621 $ 3,554,412 Rehabilitate Runway ‐ 05L/23R SO MEM TN TRI Tri‐Cities P 69 $ 2,289,028 $ 2,289,028 $ ‐ Construct Apron SO MEM TN CHA Lovell Field P 64 $ 944,382 $ 944,382 $ Update Airport Master Plan Study ‐ ‐

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 41 of 48 ‐

‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work SO MEM TN CHA Lovell Field P 65 $ 3,581,111 $ 2,573,476 $ 1,007,635 Rehabilitate Apron

SO MEM TN MEM Memphis International P 94 $ 25,023,889 $ 25,023,889 $ Construct Deicing Pad with Associated Facilities SO MEM TN MEM Memphis International P 95 $ 2,306,809 $ 2,306,809 $ Improve Terminal Building Reconstruct Taxiway, Reconstruct Taxiway, Rehabilitate Taxiway [M], Rehabilitate Taxiway SO MEM TN MEM Memphis International P 96 $ 10,804,949 $ 10,804,949 $ [M9] SO MEM TN BNA Nashville International P 101 $ 290,500 $ 290,500 $ Rehabilitate Taxiway Non primary development projects in state block SO MEM TN *TNB Tennessee State Block Grant Program 52 $ 13,276,468 $ 13,276,468 $ grant program ‐ ‐ Non primary development projects in state block SO MEM TN *TNB Tennessee State Block Grant Program 53 $ 2,206,000 $ $ 2,206,000 grant program [Military Airport Program] Modify Aircraft Rescue & Fire Fighting Building, ‐ Rehabilitate Taxiway [Taxiways C, C1, C2, C4, S ‐ and T], Rehabilitate Taxiway [Taxiways D, D1, D2 and D3], Rehabilitate Taxiway [Taxiways M, N and SW TEX TX ABI Abilene Regional P 47 $ 1,154,400 $ 1,154,400 $ ‐ P] SW TEX TX AMA Rick Husband Amarillo International P 42 $ 3,169,171 $ 3,169,171 $ Reconstruct Apron SW TEX TX AUS Austin‐Bergstrom International P 60 $ 14,938,574 $ 2,574,866 $ 12,363,708 Expand Apron ‐ Non primary development projects in state block SW TEX TX *TXB Texas State Block Grant Program 102 $ 10,906,871 $ 10,906,871 $ grant program Non primary development projects in state block SW TEX TX *TXB Texas State Block Grant Program 103 $ 13,373,448 $ 13,373,448 $ grant program Non primary development projects in state block SW TEX TX *TXB Texas State Block Grant Program 104 $ 8,811,778 $ 8,811,778 $ ‐ grant program ‐ Non primary development projects in state block SW TEX TX *TXB Texas State Block Grant Program 105 $ 10,918,060 $ 10,918,060 $ grant program Non primary development projects in state block SW TEX TX *TXB Texas State Block Grant Program 106 $ 6,000,000 $ $ ‐ 6,000,000 grant program Non primary development projects in state block SW TEX TX *TXB Texas State Block Grant Program 107 $ 5,000,000 $ $ ‐ 5,000,000 grant program SW TEX TX BPT Jack Brooks Regional P 33 $ 3,222,505 $ 1,000,000 $ 2,222,505 Rehabilitate Taxiway SW TEX TX BRO Brownsville/South Padre Island International P 45 $ 12,719,002 $ 2,719,002 $ ‐ 10,000,000 Construct Terminal Building

SW TEX TX CRP Corpus Christi International P 55 $ 765,790 $ 765,790 $ ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle

‐ Rehabilitate Apron [GA Apron Phase 3], Rehabilitate Apron [GA Apron Phase 4], ‐ Rehabilitate Apron [Terminal Apron Phase 2], SW TEX TX CRP Corpus Christi International P 56 $ 5,576,215 $ 876,215 $ 4,700,000 Rehabilitate Apron [Terminal Apron Phase 1] SW TEX TX DAL Dallas Love Field P 52 $ 7,900,000 $ 900,000 $ 7,000,000 Rehabilitate Apron [Letter of Intent] SW TEX TX DAL Dallas Love Field P 53 $ 1,617,738 $ 1,617,738 $ Extend Taxiway, Reconstruct Taxiway SW TEX TX ELP El Paso International P 37 $ 11,635,751 $ 11,635,751 $ ‐ Reconstruct Runway ‐ 04/22 SW TEX TX DFW Dallas‐Fort Worth International P 117 $ 49,541,344 $ 8,975,471 $ 40,565,873 Reconstruct Runway ‐ 17C/35C SW TEX TX DFW Dallas‐Fort Worth International P 118 $ 2,637,344 $ $ 2,637,344 Energy Efficiency Equipment/Infrastructure SW TEX TX AFW Fort Worth Alliance R 58 $ 10,000,000 $ $ 10,000,000 Extend Runway ‐ 16L/34R

Rehabilitate Runway ‐ 16L/34R, Rehabilitate SW TEX TX AFW Fort Worth Alliance R 59 $ 892,264 $ 892,264 $ Runway ‐ 16R/34L, Rehabilitate Taxiway Lighting SW TEX TX AFW Fort Worth Alliance R 60 $ 1,500,000 $ $ ‐ 1,500,000 Extend Runway ‐ 16L/34R SW TEX TX HRL Valley International P 59 $ 2,128,437 $ 2,128,437 $ ‐ Extend Taxiway SW TEX TX IAH George Bush Intercontinental/Houston P 109 $ 23,000,320 $ 8,000,320 $ 15,000,000 Rehabilitate Taxiway SW TEX TX IAH George Bush Intercontinental/Houston P 110 $ 2,737,617 $ ‐ 2,737,617 $ Rehabilitate Taxiway ‐ Install Guidance Signs, Rehabilitate Apron, SW TEX TX LRD Laredo International P 84 $ 5,796,502 $ 1,694,148 $ 4,102,354 Rehabilitate Apron, Widen Taxiway SW TEX TX GGG East Texas Regional P 44 $ 525,060 $ 525,060 $ Update Airport Master Plan Study ‐ Improve Terminal Building, Install Airport ‐ Beacons, Reconstruct Apron, Rehabilitate Runway SW TEX TX MFE McAllen Miller International P 47 $ 3,261,674 $ 3,261,674 $ ‐ ‐ 14/32, Rehabilitate Taxiway

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 42 of 48 ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Conduct Miscellaneous Study, Construct Taxiway [Taxiway A], Construct Taxiway [Taxiway Q], SW TEX TX MAF Midland International Air And Space Port P 57 $ 7,905,401 $ 7,905,401 $ Improve Terminal Building, Rehabilitate Apron SW TEX TX SJT San Angelo Regional/Mathis Field P 35 $ 3,229,017 $ 1,377,915 $ 1,851,102 Rehabilitate Taxiway Acquire Aircraft Rescue & Fire Fighting Vehicle, SW TEX TX SJT San Angelo Regional/Mathis Field P 36 $ 603,175 $ 603,175 $ Conduct Miscellaneous Study SW TEX TX SAT San Antonio International P 88 $ 528,825 $ 528,825 $ Rehabilitate Service Road SW TEX TX SAT San Antonio International P 89 $ 5,656,278 $ 1,831,374 $ 3,824,904 Rehabilitate Taxiway Noise Mitigation Measures for Residences within SW TEX TX SAT San Antonio International P 90 $ 6,060,000 $ $ 6,060,000 65 ‐ 69 DNL SW TEX TX TYR Tyler Pounds Regional P 38 $ 10,181,858 $ 831,858 $ ‐ 9,350,000 Rehabilitate Runway ‐ 04/22 SW TEX TX TYR Tyler Pounds Regional P 39 $ 180,000 $ 180,000 $ Acquire Land For Approaches SW TEX TX SPS Sheppard AFB/Wichita Falls Municipal P 19 $ 1,000,000 $ 1,000,000 $ Construct Terminal Building NM DEN UT BDG Blanding Municipal GA 16 $ 1,908,605 $ 1,908,605 $ ‐ Rehabilitate Runway ‐ 17/35 ‐ NM DEN UT BMC Brigham City GA 27 $ 762,000 $ 762,000 $ Construct Taxiway, Install Miscellaneous NAVAIDS Install Perimeter Fencing not Required by 49 CFR NM DEN UT CDC Cedar City Regional P 32 $ 1,231,814 $ ‐ 1,231,814 $ 1542, Rehabilitate Taxiway NM DEN UT CDC Cedar City Regional P 33 $ 3,000,000 $ $ 3,000,000 Rehabilitate Apron, Rehabilitate Taxiway ‐ NM DEN UT DTA Delta Municipal GA 15 $ 298,700 $ 298,700 $ ‐ Reconstruct Runway ‐ 17/35, Reconstruct Taxiway NM DEN UT U69 Duchesne Municipal GA 9 $ 210,000 $ 210,000 $ ‐ Install Weather Reporting Equipment

‐ Install Airport Beacons, Install Miscellaneous NAVAIDS, Install Perimeter Fencing not Required ‐ by 49 CFR 1542, Install Runway Vertical/Visual NM DEN UT HVE Hanksville GA 5 $ 300,000 $ ‐ 300,000 $ Guidance System ‐ 08/26 NM DEN UT 36U Heber City Municipal ‐ Russ McDonald Field GA 28 $ 150,000 $ 150,000 $ Expand Apron ‐ Construct Taxiway, Reconstruct Runway ‐ 01/19, NM DEN UT 1L8 General Dick Stout Field GA 6 $ 355,270 $ 355,270 $ ‐ Widen Runway ‐ 01/19 Rehabilitate Apron, Rehabilitate Runway ‐ 01/19, NM DEN UT KNB Kanab Municipal GA 14 $ 173,555 $ 173,555 $ Rehabilitate Taxiway NM DEN UT LGU Logan‐Cache GA 29 $ 1,985,000 $ 485,000 $ 1,500,000 Rehabilitate Apron, Rehabilitate Taxiway NM DEN UT 41U Manti‐Ephraim GA 9 $ 913,150 $ 913,150 $ Construct Taxiway, Reconstruct Apron ‐ Rehabilitate Runway ‐ 03/21, Rehabilitate Runway NM DEN UT CNY Canyonlands Field GA 30 $ 12,428,291 $ 1,728,291 $ ‐ 10,700,000 Lighting ‐ 03/21 NM DEN UT U14 Nephi Municipal GA 19 $ 660,000 $ 660,000 $ Construct Taxiway NM DEN UT OGD Ogden‐Hinckley P 44 $ 496,410 $ 496,410 $ ‐ Acquire Snow Removal Equipment NM DEN UT OGD Ogden‐Hinckley P 45 $ 49,846 $ 49,846 $ Wildlife Hazard Assessments NM DEN UT OGD Ogden‐Hinckley P 46 $ 360,000 $ 360,000 $ ‐ Rehabilitate Taxiway Rehabilitate Taxiway, Rehabilitate Taxiway NM DEN UT PVU Provo Municipal P 43 $ 5,700,000 $ 1,105,372 $ ‐ 4,594,628 Lighting NM DEN UT RIF Richfield Municipal GA 18 $ 180,000 $ 180,000 $ Acquire Snow Removal Equipment

NM DEN UT RIF Richfield Municipal GA 19 $ 169,668 $ 169,668 $ ‐ Construct Snow Removal Equipment Building ‐ Rehabilitate Runway ‐ 14/32, Rehabilitate Runway NM DEN UT SLC Salt Lake City International P 111 $ 2,900,000 $ 1,305,110 $ ‐ 1,594,890 Lighting ‐ 14/32 NM DEN UT SLC Salt Lake City International P 112 $ 2,880,428 $ 2,880,428 $ ‐ Conduct Airport Master Plan Study NM DEN UT SLC Salt Lake City International P 113 $ 10,000,000 $ $ 10,000,000 Rehabilitate Apron NM DEN UT U77 Spanish Fork‐Springville‐Woodhouse Field GA 23 $ 277,000 $ 277,000 $ Install Weather Reporting Equipment ‐ Improve Airport Drainage, Reconstruct Runway ‐ NM DEN UT SGU St George Regional P 27 $ 1,182,168 $ 1,182,168 $ 01/19 NM DEN UT VEL Vernal Regional GA 34 $ 3,374,159 $ 175,893 $ ‐ 3,198,266 Construct Runway ‐ 16/34 Acquire Snow Removal Equipment, Expand NM DEN UT ENV Wendover GA 29 $ 480,000 $ 480,000 $ Terminal Building EA WAS VA VJI Virginia Highlands GA 34 $ 5,924,328 $ 300,000 $ ‐ 5,624,328 Extend Runway ‐ 06/24 EA WAS VA DCA Ronald Reagan Washington National P 32 $ 2,221,117 $ ‐ 2,221,117 $ Rehabilitate Taxiway EA WAS VA OFP Hanover County Municipal GA 29 $ 2,773,436 $ 150,000 $ ‐ 2,623,436 Construct Apron EA WAS VA BCB Virginia Tech/Montgomery Executive GA 22 $ 9,416,251 $ 150,000 $ 9,266,251 Extend Runway ‐ 12/30 EA WAS VA PVG Hampton Roads Executive R 18 $ 234,653 $ 234,653 $ ‐ Acquire Easement For Approaches EA WAS VA FCI Richmond Executive‐Chesterfield County R 24 $ 100,935 $ 100,935 $ Remove Obstructions [Non‐Hazard]

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 43 of 48

‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work EA WAS VA CJR Culpeper Regional GA 22 $ 147,238 $ 147,238 $ Install Apron Lighting EA WAS VA DAN Danville Regional GA 29 $ 129,377 $ 129,377 $ Rehabilitate Apron EA WAS VA PSK New River Valley GA 17 $ 68,113 $ 68,113 $ Expand Apron EA WAS VA IAD Washington Dulles International P 55 $ 5,052,296 $ 5,052,296 $ Reconstruct Taxiway EA WAS VA FVX Farmville Regional GA 17 $ 1,310,986 $ 600,000 $ 710,986 Rehabilitate Apron EA WAS VA W78 William M Tuck GA 16 $ 156,600 $ 156,600 $ Rehabilitate Runway ‐ 01/19 EA WAS VA RIC Richmond International P 64 $ 3,629,190 $ 3,629,190 $ Rehabilitate Taxiway EA WAS VA HSP Ingalls Field GA 14 $ 248,670 $ 248,670 $ Construct Fuel Farm EA WAS VA FKN Franklin Municipal‐John Beverly Rose GA 20 $ 1,632,600 $ 1,632,600 $ ‐ Extend Taxiway ‐ Conduct Miscellaneous Study, Install Perimeter EA WAS VA LKU Louisa County/Freeman Field GA 20 $ 299,700 $ 299,700 $ ‐ Fencing EA WAS VA HEF Manassas Regional/Harry P Davis Field R 43 $ 1,723,834 $ 373,834 $ ‐ 1,350,000 Rehabilitate Apron EA WAS VA FYJ Middle Peninsula Regional GA 11 $ 186,750 $ 186,750 $ Conduct Environmental Study ‐ Rehabilitate Runway ‐ 03/21, Rehabilitate Runway EA WAS VA MFV Accomack County GA 18 $ 382,500 $ 382,500 $ ‐ Lighting ‐ 03/21 EA WAS VA ORF Norfolk International P 66 $ 1,510,306 $ 1,510,306 $ ‐ Acquire Snow Removal Equipment EA WAS VA ORF Norfolk International P 67 $ 1,600,389 $ 1,600,389 $ ‐ Update Airport Master Plan Study Construct Terminal Building, Rehabilitate Runway ‐ ‐ 05/23, Rehabilitate Runway ‐ 14/32, Rehabilitate EA WAS VA ORF Norfolk International P 68 $ 1,837,620 $ 1,837,620 $ Terminal Building ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 08/26, ‐ Rehabilitate Taxiway [Hangar Taxilanes], EA WAS VA OMH Orange County GA 18 $ 249,741 $ 249,741 $ ‐ Rehabilitate Taxiway [Parallel Taxiway] EA WAS VA W96 New Kent County GA 16 $ 278,215 $ 278,215 $ ‐ Rehabilitate Runway Lighting ‐ 11/29 EA WAS VA W96 New Kent County GA 17 $ 134,910 $ 134,910 $ Rehabilitate Apron EA WAS VA *VAS Commonwealth of Virginia 10 $ 300,000 $ 300,000 $ Update State System Plan Study EA WAS VA ROA Roanoke‐Blacksburg Regional/Woodrum Field P 57 $ 276,671 $ 276,671 $ ‐ Acquire Snow Removal Equipment Improve Terminal Building, Rehabilitate Runway ‐ EA WAS VA ROA Roanoke‐Blacksburg Regional/Woodrum Field P 58 $ 3,080,551 $ 3,080,551 $ 06/24, Rehabilitate Runway ‐ 16/34 EA WAS VA MKJ Mountain Empire GA 27 $ 274,581 $ 274,581 $ Remove Obstructions [Non‐Hazard] EA WAS VA AVC Mecklenburg‐Brunswick Regional GA 16 $ 2,666,151 $ 153,124 $ ‐ 2,513,027 Rehabilitate Apron, Rehabilitate Taxiway EA WAS VA MTV Blue Ridge GA 21 $ 265,407 $ 265,407 $ ‐ Rehabilitate Runway ‐ 12/30 ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 15/33, EA WAS VA RMN Stafford Regional R 26 $ 150,000 $ 150,000 $ ‐ Rehabilitate Taxiway ‐ Rehabilitate Runway ‐ 04/22, Rehabilitate Runway EA WAS VA SFQ Suffolk Executive GA 27 $ 3,906,000 $ 150,000 $ 3,756,000 Lighting ‐ 04/22 ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 10/28, EA WAS VA XSA Tappahannock‐Essex County GA 16 $ 146,700 $ 146,700 $ ‐ Rehabilitate Taxiway Rehabilitate Taxiway Lighting, Security EA WAS VA LYH Lynchburg Regional/Preston Glenn Field P 39 $ 741,920 $ 741,920 $ ‐ Enhancements EA WAS VA HWY Warrenton‐Fauquier R 22 $ 3,765,800 $ 2,555,664 $ 1,210,136 Construct Access Road, Construct Apron EA WAS VA SHD Shenandoah Valley Regional CS 40 $ 1,737,412 $ 1,000,000 $ ‐ 737,412 Rehabilitate Taxiway Construct Taxiway, Remove Obstructions [Non‐ EA WAS VA OKV Winchester Regional GA 36 $ 306,000 $ 306,000 $ Hazard] EA WAS VA LNP Lonesome Pine GA 13 $ 162,900 $ 162,900 $ Update Airport Master Plan Study SO ATL VI STT Cyril E King P 37 $ 273,363 $ 273,363 $ ‐ Rehabilitate Taxiway SO ATL VI STX Henry E Rohlsen P 37 $ 1,477,233 $ 1,477,233 $ Rehabilitate Apron NE ANE VT DDH William H Morse State GA 10 $ 41,801 $ 41,801 $ ‐ Reconstruct Runway ‐ 13/31 NE ANE VT DDH William H Morse State GA 11 $ 32,220 $ $ 32,220 Acquire Land for Development

Construct Taxiway, Reconstruct Runway [Runway NE ANE VT DDH William H Morse State GA 12 $ 4,119,614 $ 615,308 $ ‐ 3,504,306 Safety Area] ‐ 13/31, Reconstruct Runway ‐ 13/31 NE ANE VT BTV Burlington International P 111 $ 215,824 $ 215,824 $ ‐ Rehabilitate Airport Beacons NE ANE VT BTV Burlington International P 112 $ 11,978,101 $ 3,375,856 $ ‐ 8,602,245 Reconstruct Taxiway NE ANE VT 6B0 Middlebury State GA 13 $ 140,248 $ 140,248 $ ‐ Acquire Easement For Approaches ‐ Install Perimeter Fencing not Required by 49 CFR NE ANE VT 6B0 Middlebury State GA 14 $ 404,320 $ ‐ 404,320 $ 1542 NE ANE VT MVL Morrisville‐Stowe State GA 17 $ 123,053 $ 123,053 $ Conduct Environmental Study NE ANE VT RUT Rutland ‐ Southern Vermont Regional CS 48 $ 2,490,778 $ 150,000 $ 2,340,778 Reconstruct Taxiway NE ANE VT VSF Hartness State (Springfield) GA 11 $ 346,500 $ 346,500 $ Acquire Land for Development NE ANE VT FSO Franklin County State GA 9 $ 27,720 $ 27,720 $ ‐ Conduct Miscellaneous Study

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 44 of 48 ‐

‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work NE ANE VT FSO Franklin County State GA 10 $ 77,586 $ 77,586 $ Conduct Environmental Study NM SEA WA AWO Arlington Municipal GA 26 $ 580,744 $ 580,744 $ Install Taxiway Lighting NM SEA WA S50 Auburn Municipal R 23 $ 300,000 $ 300,000 $ Extend Runway ‐ 16/34

NM SEA WA PWT Bremerton National GA 31 $ 543,126 $ 543,126 $ Rehabilitate Runway ‐ 02/20, Rehabilitate Taxiway NM SEA WA S97 Anderson Field GA 5 $ 356,163 $ 356,163 $ Update Airport Master Plan Study NM SEA WA S97 Anderson Field GA 6 $ 467,758 $ 467,758 $ Rehabilitate Runway Lighting ‐ 07/25 Conduct Miscellaneous Study, Rehabilitate NM SEA WA 8S2 Cashmere‐Dryden GA 3 $ 364,355 $ 364,355 $ ‐ Runway ‐ 07/25 NM SEA WA S10 Lake Chelan GA 11 $ 346,579 $ 346,579 $ ‐ Update Airport Master Plan Study ‐ Reconstruct Runway ‐ 05/23, Remove NM SEA WA 68S Davenport GA 7 $ 289,713 $ 289,713 $ Obstructions [Non‐Hazard APP or DEP] NM SEA WA DEW Deer Park GA 23 $ 981,225 $ 981,225 $ ‐ Construct Apron, Construct Taxiway NM SEA WA EAT Pangborn Memorial P 39 $ 1,054,758 $ 1,054,758 $ ‐ Acquire Snow Removal Equipment NM SEA WA ORS Orcas Island CS 14 $ 595,984 $ 595,984 $ ‐ Update Airport Master Plan Study

NM SEA WA ORS Orcas Island CS 15 $ 332,809 $ 332,809 $ ‐ Remove Obstructions [Non‐Hazard APP or DEP] ‐ Rehabilitate Apron, Rehabilitate Runway ‐ 03/21, NM SEA WA 3W7 Grand Coulee Dam GA 8 $ 288,759 $ 288,759 $ Rehabilitate Taxiway ‐ Install Perimeter Fencing not Required by 49 CFR ‐ 1542, Rehabilitate Runway ‐ 04/22, Rehabilitate NM SEA WA EPH Ephrata Municipal GA 18 $ 102,577 $ 102,577 $ ‐ Runway ‐ 11/29 NM SEA WA PAE Snohomish County (Paine Field) R 57 $ 12,039,412 $ 699,508 $ ‐ 11,339,904 Reconstruct Apron, Reconstruct Taxiway

NM SEA WA FHR Friday Harbor P 33 $ 800,000 $ 800,000 $ ‐ Remove Obstructions [Non‐Hazard APP or DEP] NM SEA WA FHR Friday Harbor P 34 $ 488,786 $ 488,786 $ Update Airport Master Plan Study NM SEA WA HQM Bowerman GA 15 $ 194,938 $ 194,938 $ ‐ Improve Airport Drainage NM SEA WA KLS Southwest Washington Regional GA 17 $ 328,844 $ 328,844 $ Update Airport Master Plan Study NM SEA WA KLS Southwest Washington Regional GA 18 $ 41,156 $ 41,156 $ Wildlife Hazard Assessments ‐ Install Runway Vertical/Visual Guidance System ‐ NM SEA WA S31 Lopez Island GA 14 $ 645,663 $ 645,663 $ 16/34, Rehabilitate Runway Lighting ‐ 16/34 ‐ Reconstruct Runway ‐ 14L/32R, Rehabilitate NM SEA WA MWH Grant County International GA 42 $ 427,534 $ 427,534 $ ‐ Taxiway ‐ Rehabilitate Runway ‐ 02/20, Remove NM SEA WA 43D Odessa Municipal GA 8 $ 150,000 $ 150,000 $ ‐ Obstructions [Non‐Hazard APP or DEP] NM SEA WA OLM Olympia Regional GA 27 $ 150,000 $ 150,000 $ ‐ Conduct Environmental Study NM SEA WA *WAS State of Washington 15 $ 901,490 $ 901,490 $ Conduct State System Plan Study NM SEA WA *WAS State of Washington 16 $ 1,000,000 $ 1,000,000 $ Conduct State System Plan Study ‐ Install Runway Vertical/Visual Guidance System ‐ 17/35, Rehabilitate Runway ‐ 17/35, Rehabilitate NM SEA WA OMK Omak GA 8 $ 1,948,757 $ 600,000 $ ‐ 1,348,757 Runway Lighting ‐ 17/35

NM SEA WA 55S Packwood GA 8 $ 78,370 $ 78,370 $ ‐ Install Weather Reporting Equipment [AWOS A/V] ‐ Reconstruct Taxiway, Rehabilitate Apron, NM SEA WA PSC Tri‐Cities P 44 $ 5,610,877 $ 5,610,877 $ ‐ Rehabilitate Taxiway ‐ NM SEA WA 0S9 Jefferson County International GA 14 $ 239,228 $ 239,228 $ Reconstruct Taxiway, Rehabilitate Runway ‐ 09/27 NM SEA WA S40 Prosser GA 17 $ 168,891 $ 168,891 $ Construct Taxiway NM SEA WA PUW Pullman/Moscow Regional P 44 $ 14,153,383 $ 1,000,000 $ 13,153,383 Construct Runway ‐ 06/24 NM SEA WA PUW Pullman/Moscow Regional P 46 $ 15,287,409 $ 5,287,409 $ 10,000,000 Construct Runway ‐ 06/24 NM SEA WA PUW Pullman/Moscow Regional P 45 $ 1,846,617 $ $ ‐ 1,846,617 Construct Runway ‐ 06/24 NM SEA WA PLU Pierce County ‐ Thun Field GA 18 $ 407,874 $ 407,874 $ Update Airport Master Plan Study NM SEA WA UIL Quillayute GA 6 $ 450,000 $ 450,000 $ ‐ Rehabilitate Runway ‐ 04/22 NM SEA WA RLD Richland GA 29 $ 40,000 $ 40,000 $ Construct Heliport/Helipad NM SEA WA BFI Boeing Field/King County International P 53 $ 1,409,664 $ 1,409,664 $ ‐ Install Airfield Guidance Signs NM SEA WA SFF Felts Field R 31 $ 573,686 $ 573,686 $ ‐ Update Airport Master Plan Study Rehabilitate Runway ‐ 07/25, Rehabilitate Runway Lighting ‐ 07/25, Rehabilitate Taxiway, NM SEA WA GEG Spokane International P 55 $ 1,137,886 $ ‐ 1,137,886 $ Rehabilitate Taxiway Lighting ‐ NM SEA WA 1S5 Sunnyside Municipal GA 9 $ 533,751 $ 533,751 $ ‐ Reconstruct Taxiway, Rehabilitate Runway ‐ 07/25 ‐ ‐ ‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 45 of 48 ‐

‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Install Runway Vertical/Visual Guidance System ‐ 06/24, Rehabilitate Apron, Rehabilitate Taxiway, NM SEA WA TDO Ed Carlson Memorial Field ‐ South Lewis County GA 9 $ 2,805,246 $ 605,159 $ 2,200,087 Remove Obstructions [Non‐Hazard APP or DEP]

Improve Runway Safety Area ‐ 17/35, Remove NM SEA WA 2S1 Vashon Municipal GA 6 $ 144,841 $ 144,841 $ Obstructions [Non‐Hazard APP or DEP] NM SEA WA ALW Walla Walla Regional P 34 $ 5,887,602 $ 476,708 $ 5,410,894 Rehabilitate Taxiway

NM SEA WA S52 Methow Valley State GA 8 $ 3,914,836 $ 1,214,836 $ 2,700,000 Rehabilitate Apron, Rehabilitate Runway ‐ 13/31 NM SEA WA YKM Yakima Air Terminal/McAllister Field P 39 $ 619,662 $ 619,662 $ Acquire Snow Removal Equipment Acquire Safety Equipment and/or Fencing, NM SEA WA YKM Yakima Air Terminal/McAllister Field P 40 $ 907,833 $ 907,833 $ Rehabilitate Taxiway Expand Terminal Building, Improve Terminal GL CHI WI ATW Appleton International P 53 $ 3,983,829 $ 3,983,829 $ ‐ Building, Rehabilitate Terminal Building GL CHI WI ATW Appleton International P 54 $ 562,500 $ $ 562,500 Energy Efficiency Equipment/Infrastructure Construct Taxiway [Construction], Construct GL CHI WI EAU Chippewa Valley Regional P 41 $ 417,622 $ 417,622 $ Taxiway [Design] ‐ Acquire Safety Equipment and/or Fencing, Acquire Snow Removal Equipment, Install Runway ‐ Vertical/Visual Guidance System [Construction Phase] ‐ 04/22, Install Runway Vertical/Visual ‐ Guidance System [Design Phase] ‐ 04/22, ‐ Reconstruct Runway [Design] ‐ 14/32, Reconstruct Runway [Preliminary Planning] ‐ GL CHI WI EAU Chippewa Valley Regional P 42 $ 559,468 $ 559,468 $ ‐ 14/32 Rehabilitate Taxiway, Rehabilitate Taxiway GL CHI WI GRB Green Bay‐Austin Straubel International P 49 $ 1,644,310 $ 1,644,310 $ Lighting

Install Perimeter Fencing, Install Runway Distance‐ To‐Go Signs ‐ 18/36, Reconstruct Runway Lighting ‐ 13/31, Reconstruct Runway Lighting ‐ 18/36, Reconstruct Taxiway Lighting [A and E], ‐ Reconstruct Taxiway Lighting [B], Reconstruct GL CHI WI LSE La Crosse Regional P 40 $ 1,710,000 $ 652,690 $ 1,057,310 Taxiway Lighting [F, G, H, and J] GL CHI WI LSE La Crosse Regional P 41 $ 594,000 $ 594,000 $ ‐ Conduct Airport Master Plan Study GL CHI WI MSN Dane County Regional‐Truax Field P 57 $ 4,000,000 $ 2,000,000 $ 2,000,000 Construct Taxiway GL CHI WI MSN Dane County Regional‐Truax Field P 58 $ 391,868 $ 391,868 $ Rehabilitate Taxiway

GL CHI WI MSN Dane County Regional‐Truax Field P 59 $ 10,133,502 $ 1,412,764 $ 8,720,738 Construct Taxiway, Rehabilitate Runway ‐ 14/32 Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 89 $ 15,815,165 $ 15,815,165 $ grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 90 $ 534,000 $ $ ‐ 534,000 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 91 $ 2,182,361 $ $ ‐ 2,182,361 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 92 $ 2,555,000 $ $ 2,555,000 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 93 $ 1,589,435 $ $ ‐ 1,589,435 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 94 $ 953,182 $ ‐ $ 953,182 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 95 $ 1,026,000 $ ‐ $ 1,026,000 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 96 $ 973,821 $ ‐ $ 973,821 grant program Non primary development projects in state block GL CHI WI *WIB Wisconsin State Block Grant Program 97 $ 1,663,796 $ ‐ $ 1,663,796 grant program

‐ Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 46 of 48 FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work

Reconstruct Runway Lighting ‐ 13/31, Reconstruct Taxiway, Reconstruct Taxiway Lighting [A], Reconstruct Taxiway Lighting [B], Reconstruct Taxiway Lighting [M], Reconstruct Taxiway Lighting [S], Reconstruct Taxiway Lighting [Y], Rehabilitate Runway ‐ 07R/25L, Rehabilitate GL CHI WI MKE General Mitchell International P 90 $ 1,477,500 $ 986,341 $ 491,159 Runway Lighting ‐ 01R/19L GL CHI WI MKE General Mitchell International P 91 $ 227,972 $ $ 227,972 Install Perimeter Fencing

GL CHI WI MKE General Mitchell International P 92 $ 991,212 $ 991,212 $ Expand Aircraft Rescue & Fire Fighting Building GL CHI WI MKE General Mitchell International P 93 $ 1,937,333 $ $ 1,937,333 Update Airport Master Plan Study Construct Taxiway [A2], Construct Taxiway [B, D, GL CHI WI MKE General Mitchell International P 94 $ 666,533 $ $ 666,533 and V] GL CHI WI CWA Central Wisconsin P 47 $ 223,408 $ 223,408 $ Acquire Snow Removal Equipment Rehabilitate Apron, Rehabilitate Taxiway [B], GL CHI WI CWA Central Wisconsin P 48 $ 597,254 $ ‐ 597,254 $ Rehabilitate Taxiway [C] GL CHI WI RHI Rhinelander‐Oneida County P 39 $ 761,134 $ 761,134 $ Acquire Snow Removal Equipment ‐ Acquire Aircraft Rescue & Fire Fighting Vehicle, ‐ Rehabilitate Runway ‐ 01/19, Rehabilitate EA BKW WV BKW Raleigh County Memorial GA 36 $ 310,029 $ 310,029 $ Terminal Building EA BKW WV BLF Mercer County GA 30 $ 62,144 $ ‐ 62,144 $ Rehabilitate Runway ‐ 05/23 EA BKW WV W22 Upshur County Regional GA 31 $ 60,181 $ 60,181 $ ‐ Construct Terminal Building EA BKW WV CRW Yeager P 58 $ 914,148 $ 914,148 $ Update Airport Master Plan Study ‐ Reconstruct Taxiway Lighting, Rehabilitate EA BKW WV CRW Yeager P 59 $ 2,731,571 $ 2,731,571 $ ‐ Taxiway, Rehabilitate Terminal Building Conduct Airport Energy Efficiency Assessment, EA BKW WV CRW Yeager P 60 $ 399,600 $ 399,600 $ Conduct Environmental Study EA BKW WV CRW Yeager P 61 $ 13,821,858 $ $ ‐ 13,821,858 Improve Runway Safety Area ‐ 05/23 EA BKW WV CKB North Central West Virginia P 42 $ 343,800 $ 343,800 $ ‐ Update Airport Master Plan Study EA BKW WV 4G7 Fairmont Municipal‐Frankman Field GA 17 $ 67,500 $ 67,500 $ ‐ Conduct Environmental Study ‐ Reconstruct Taxiway, Reconstruct Taxiway EA BKW WV HTS Tri‐State/Milton J Ferguson Field P 55 $ 10,280,944 $ 1,309,053 $ 8,971,891 Lighting ‐ EA BKW WV LWB Greenbrier Valley CS 36 $ 590,900 $ 590,900 $ Acquire Aircraft Rescue & Fire Fighting Vehicle EA BKW WV LWB Greenbrier Valley CS 37 $ 204,250 $ 204,250 $ ‐ Rehabilitate Apron EA BKW WV 6L4 Logan County GA 14 $ 440,565 $ ‐ 440,565 $ Rehabilitate Apron ‐ Install Runway Lighting ‐ 06/24, Install Taxiway EA BKW WV MPG Marshall County GA 23 $ 318,902 $ 318,902 $ ‐ Lighting EA BKW WV 79D Philippi/Barbour County Regional GA 17 $ 333,144 $ 333,144 $ Rehabilitate Taxiway EA BKW WV I18 Jackson County GA 22 $ 1,661,450 $ 1,661,450 $ Rehabilitate Runway ‐ 04/22 EA BKW WV EBD Appalachian Regional GA 7 $ 338,827 $ 338,827 $ Construct Taxiway NM DEN WY AFO Afton Municipal GA 24 $ 287,640 $ 287,640 $ ‐ Update Airport Master Plan Study ‐ Install Perimeter Fencing not Required by 49 CFR NM DEN WY BYG Johnson County GA 18 $ 365,769 $ 365,769 $ ‐ 1542 Rehabilitate Runway ‐ 03/21, Rehabilitate Runway NM DEN WY CPR Casper/Natrona County International P 57 $ 10,989,240 $ 1,316,240 $ ‐ 9,673,000 Lighting ‐ 03/21 NM DEN WY CYS Cheyenne Regional/Jerry Olson Field CS 53 $ 300,000 $ 300,000 $ ‐ Construct Terminal Building NM DEN WY CYS Cheyenne Regional/Jerry Olson Field CS 54 $ 470,767 $ 470,767 $ ‐ Acquire Snow Removal Equipment NM DEN WY COD Yellowstone Regional P 36 $ 116,250 $ 116,250 $ ‐ Expand Apron NM DEN WY COD Yellowstone Regional P 37 $ 200,000 $ 200,000 $ ‐ Acquire Miscellaneous Land Improve Runway Safety Area ‐ 06/24, Install NM DEN WY DWX Dixon GA 16 $ 177,068 $ 177,068 $ ‐ Airport Beacons Install Miscellaneous NAVAIDS, Rehabilitate NM DEN WY DUB Dubois Municipal GA 18 $ 450,000 $ 450,000 $ Apron ‐ ‐ Improve Airport Miscellaneous Improvements, ‐ Install Perimeter Fencing not Required by 49 CFR NM DEN WY GCC Gillette‐Campbell County P 43 $ 1,635,106 $ 1,635,106 $ ‐ 1542, Rehabilitate Apron NM DEN WY JAC Jackson Hole P 57 $ 1,035,000 $ 1,035,000 $ Rehabilitate Apron NM DEN WY JAC Jackson Hole P 58 $ 6,085,000 $ 1,373,385 $ ‐ 4,711,615 Rehabilitate Apron

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 47 of 48 ‐ ‐ FAA ‐ Office of Airports FY 2017 Grants Awarded

Region ADO State LocID Airport Service Level Grant Seq Number AIP Federal Funds Entitlement Discretionary Brief Description of Work Improve Runway Safety Area ‐ 03/21, Rehabilitate Runway ‐ 03/21, Rehabilitate Runway Lighting ‐ NM DEN WY LND Hunt Field GA 15 $ 2,600,000 $ 2,600,000 $ 03/21 NM DEN WY LAR Laramie Regional P 34 $ 311,826 $ 311,826 $ Expand Terminal Building NM DEN WY LAR Laramie Regional P 35 $ 378,412 $ 378,412 $ Rehabilitate Runway ‐ 03/21

Install Runway Vertical/Visual Guidance System ‐ NM DEN WY 82V Pine Bluffs Municipal GA 14 $ 380,000 $ 380,000 $ 08/26, Rehabilitate Runway Lighting ‐ 08/26

Acquire Land For Approaches, Install Perimeter NM DEN WY PNA Ralph Wenz Field GA 20 $ 140,586 $ 140,586 $ ‐ Fencing not Required by 49 CFR 1542 NM DEN WY RIW Riverton Regional CS 43 $ 152,252 $ 152,252 $ ‐ Rehabilitate Apron NM DEN WY RIW Riverton Regional CS 44 $ 155,000 $ 155,000 $ ‐ Install Guidance Signs NM DEN WY RKS Rock Springs‐Sweetwater County P 36 $ 2,003,387 $ 2,003,387 $ Construct Terminal Building Install Runway Vertical/Visual Guidance System ‐ ‐ 05/23, Rehabilitate Runway ‐ 05/23, Rehabilitate NM DEN WY SAA Shively Field GA 26 $ 3,080,000 $ 1,382,726 $ 1,697,274 Runway Lighting ‐ 05/23 NM DEN WY SHR Sheridan County GA 50 $ 524,804 $ 524,804 $ Acquire Snow Removal Equipment NM DEN WY HSG Hot Springs County GA 9 $ 300,000 $ 300,000 $ ‐ Construct Fuel Farm NM DEN WY EAN Phifer Airfield GA 9 $ 449,515 $ 449,515 $ ‐ Acquire Land For Approaches ‐ ‐

‐ ‐ ‐

Service Level Description: P ‐Primary CS ‐ Commercial Service R ‐ Reliever GA ‐ General Aviation 48 of 48