Work wise details (Cities & Towns)

Rs in lacs Total Type of budget S. No Work description work allocation 2020-21 1 New Road KM 1ST to 15TH 130.00 2 New Mehandikadal to Janglat Mandi road 30.00 Town Roads (Cheeni Chowk, Malknag, Nazuk Mohalla, Rehatdadi, 3 New 60.00 Sheerbagh, Mattan Chowk, Kadipora- Sarnal) 4 New Dabruna Uttersoo Road 60.00 5 New Naibasti inner roads including Mehandikdal Sarnal Road Upto Kadipora 15.00 6 New ADV Road (KM 1-7) 60.00 7 New Various Establishment in Anantnag Town 40.00 8 New Brad Hassanoor road 40.00 9 New Interior roads at Seer 53.00 10 New Laripora Golf Course Road 40.00 11 New Badigam Karshangam road 60.00 12 New Wullarhama Shahpora road 40.00 13 New Wullarhama Lehendajan Road 36.00 14 New Langanbal road 150.00 15 New Magraypora nanil Road 30.00 16 New Vidday Link road 38.00 17 New Town roads Bijbehara (Phase-III) 50.00 18 New Jablipora Shamsipora (Balance length) 39.00 19 New Moomen Shirpora 31.00 20 New Uranhal Pazalpora / Kanjigund link 58.00 21 New Semthen Tulkhun road 58.00 22 New Mirpora Monghal, Muqdampora Mughal & Sangeenpora inner road 80.00 23 New Badura Hakura Road Includign Syedpora link road 35.00 24 New Tengpawa Soyan shalnard including Tenpawa link road 70.00 25 New Hiller khalhar Sagam raad 52.00 26 New Interor Links at 15.00 27 New Doodkul Cheerward road incluidng Lohar Sanzi link 70.00 28 New Khrity Godvail Syedpora road 140.00 29 New Chatisinghpora Wantrag including Checki Isherdas road 70.00 30 New Shelipora Kutbal road 70.00 31 New Dethinag Buchan including Sheikh Gund Oh road 70.00 32 New Paision Phalipora to Peerpora road 18.00 33 New Intrior roads at 70.00 34 New Utrasoo Brariangan road 87.00 35 New Gawas to Kapran road. 105.00 36 New Ujjer road 140.00 37 New Verinag Imoh Jawhar Tunnel road. 100.00 38 New Verinag Feeder road. 60.00 39 New Poolia Inner link; incld Chontipora Kokagund link. 80.00 40 New Bragam , Nathipora Mirgund Degree College and Duruloom link road. 105.00 41 New Sumbal Road 35.00 42 New Inner links at Safapora 35.00 43 New Sumbal Markundal Naidkhai Road upto Bridge ( Sumbal Bazar) 70.00 44 New Inner links at Hajin 70.00 Total Type of budget S. No Work description work allocation 2020-21 45 New Shilvath Ganastan road Phase-I 35.00 46 New Inner links at Naidkhai 35.00 47 New Tangpora Nesbal Manasbal Road 50.00 48 New Hajin Shahgund Gundjahangir Road 70.00 49 New Shah Mohalla/Roomi Mohalla Quil Muqgam road 60.00 50 New Mangnipora link road 23.00 51 New Bandipora road 98.00 52 New Lawadara road 65.00 53 New Ganie Mohalla Ayathmullah inner link 15.00 54 New Quilmuqam to Seer Mohallah link 35.00 55 New Laherwalpora link road 60.00 56 New Sumbal Bandiproa road 1 to 4th 15.00 57 New Kanzalwan Chuntiwari road 40.00 58 New Sheikhpora Manzgund road 40.00 59 New Upgradation of Dawar Achoora Chorwan road 80.00 60 New Upgradation of Dawar Town road & Sheikhpora 100.00 61 New Noorbagh Bowli Road 30.00 62 New Kanlibagh Sangri & Gujjar Sangri Road 24.00 63 New Road leading to Ziyarat Sharief Khanpora / links 30.00 64 New Baba Reshi Sahib Road incl. links 45.00 65 New Khowjabagh Inner Links upto High School & Jail Road 45.00 66 New Old Town Baramulla (Chattipadshahi Faqirwani Road) 30.00 67 New Kanispora Juhama road 50.00 68 New Singhpora Nowpora road 60.00 69 New Sherwani Colony inner links 50.00 70 New Jetty link road 40.00 71 New Reservior link road at Sangri 42.00 72 New Kanthbagh inner links 37.00 73 New Janbazpora Binner road 20.00 74 New Binner Venkura 50.00 75 New Binner Kawdara 38.00 76 New Up-Town roads of Baramulla town incl. left out links. 45.00 77 New inner links balance Portion 27.00 78 New Buran Gunjipora road balance portion 45.00 79 New Singhpora (Pattan) inner links 36.00 80 New Palhalan inner links 45.00 81 New Wanigam inner links 36.00 82 New Wagila road ( Km 4th & 5th balance portion) 30.00 83 New Nowpora inner links 45.00 84 New Wagoora inner links 30.00 85 New Watergam Kalantra road ( 4.00 kms). 80.00 86 New Shrakwara inner links 30.00 87 New Katari Mohalla, Bandi Bala, Nilsar roads 50.00 88 New Khargam Pattan link roads 27.00 89 New Nihalpora pattan inner links 50.00 Inner links of Manzseer Gurseer, Pethseer, Darul-Aloom at Tarzoo and 90 New 50.00 Aalibagh 91 New Darul-Aloom Nowpora link 15.00 92 New Sangramma Sopore Chowkibal road 200.00 Total Type of budget S. No Work description work allocation 2020-21 93 New Sopore Bandipora road 70.00 94 New Sopore Town road incl Upper Ashpeer link 100.00 95 New Ziyarath road Tujar Sharief link 50.00 96 New Kahmoh Braman road 35.00 97 New Pazalpora Hamam Markote road 90.00 98 New Sopore Nowpora Hadipora road 25.00 99 New Panzulla Shalkote road 30.00 100 New Rohama Shitloo Brandub road 25.00 101 New Seelu Waterigam road 40.00 102 New Rebbon Chetloora Waterigam Hibdangerpora road 50.00 103 New Lasser Budden road 70.00 104 New Hyderbeigh to Loolipora via Chanderhama 70.00 105 New Panzulla Takiya road 32.00 106 New Duroo Brath road 40.00 107 New Sultandaki Link Road. 63.00 108 New Basgran Link Road. 42.00 109 New Nambla to Chowkidar Mode. 22.00 110 New Mughal Mohalla to Kalgai Road. 42.00 111 New Julla Link Road. 42.00 112 New Reshawari Link Road. 42.00 113 New Reshawari Jabadar Road. 21.00 114 New Bijhama Jabadar Road. 21.00 115 New Nowshera Khudhalan Road. 21.00 116 New road 250.00 117 New Baramulla Baba Reshi Sahib Road incl. Baba Reshi Junction 75.00 118 New Mangloora Lalpora Mamoosa road incd.Mamoosa B via Shah Mohalla 60.00 119 New Tangmarg Babarshi Sahib road 60.00 120 New Tangmarg road 100.00 121 New Mulgam road 30.00 122 New Chndiloora Kalantra road 60.00 123 New Peer Mohalal Sheerabad Khour via Golipora to Zangam road 60.00 124 New Inner links at Goom Ahmadpora 40.00 125 New Inner linsk of Gund Khowja Qasim 40.00 126 New Shah Anwar/ Gulbahar / Gulberg Colony roads 90.00 127 New Mehdi Colony at Khanpora road from Zabah Khana 30.00 128 New Humhama Budgam road & Budgam Yachgam road 80.00 129 New Nasarullahpora Sholipora & Mirgund to Waterwani 45.00 130 New Choon Budgam road 45.00 131 New Imptt: of road near Armed Camp LHS of Humhama Budgam Km-2nd 16.00 Narkara Hyderpora road incld. links at Ompora/Mushtaq Colony Zaid Bin Haris 132 New 60.00 Link/Pamposh Colony 133 New Narkara Koolipora( Khumani Chowk) via Rathwar road 60.00 134 New Karipora Link road incl. Bon Mohalla incl. Main DC office Budgam road 45.00 135 New Naroo Gudsathoo Road Jamia Masjid Naroo to Airforce gate 45.00 136 New Mohanpora Link road at Ompora 30.00 137 New Daharmuna link road ( balance portion) taking off from Soibugh Sonpah Road 45.00 138 New Khag Trappy Road 60.00 139 New Khag Drung Road 60.00 140 New Kandhama Abura Road 60.00 Total Type of budget S. No Work description work allocation 2020-21 141 New Hamchipora Gogaldara Road 30.00 142 New Bonsharan Pethsharan road 30.00 143 New Khaipora Brass via Chill 30.00 144 New Khag Nowrozbaba Road upto Shrine 60.00 145 New Khag Inner Links 30.00 146 New Kanihama Bridge to Budran 30.00 147 New Dharmuna Digtil Road 30.00 148 New Churpora Aarth main road 30.00 149 New Chewa Razwan Watalpora road 30.00 150 New Peth Makhama New Colony via PHC Tangpora 48.00 151 New Yarikhah Reyar Doodpathri Road 40.00 152 New Bugroo Khansahib Road ( Balance Portion ) 45.00 153 New Bugroo Raithan Reyar Road 45.00 154 New Kaitch Khansahib Road 45.00 155 New Beeru Arizal upto Reyar 45.00 156 New Zabgul to Kralnewa Road 30.00 157 New Watrihal Arigam Road 30.00 158 New Yachgam Bnugroo Road 30.00 159 New Parthan to Watrihal road 30.00 160 New Braripora Road at Shamasabad 30.00 Charisharief road from Railway bridge to (from to 161 New 132.00 Chadoora with ERA) 162 New Srinagar Charisharief road . 100.00 163 New Nagam Hayatpora Darpora Dalwan Kanidjan road. 70.00 164 New Charisharief yousmarg including Pakherpora road. 70.00 165 New Nowhar Kherigund road 90.00 166 New Repora Namtihal road 55.00 167 New Peer colony Kralpora 46.00 168 New Kralpora Chattergam road 49.00 169 New Hayatpora Wahibugh Road 88.00 170 New Mac. Bahrampora Barigund road 74.00 171 New Town Roads at Chadoora 74.00 172 New Jamia Masjid Link road including PHC link Dadompora 55.00 173 New Natipora Newa Road 67.00 174 New Madinabad opposite Iqbal cloth House Kralpora Knathbagh 45.00 175 New Imprt./Upgrd. of Gogji Gund Chindina road 40.00 Improvement/Upgradation of road from Gorinagh upto PMGSY 176 New road,Chountwaliwar via High School Chountwaliwar,Chopan Mohalla aliied links 70.00 and PMGSY road Chanthan Gulabpora upto Darul-Uloom incld.Pakhtoon Mohalla 177 New Mac of Kharbagh road 30.00 178 New Impytt./Upgrd. of Ziyarat raheem sahib road 35.00 179 New Impr./Upgrd. of Mongam road NHW Govt. School incl. Chattergul Gundi Wussan 45.00 180 New Impr./Upgrd. of Barwalla road 24.00 improvement /upgrd of inner links of duderhama incl. Mini- ssecerariat link , 181 New 45.00 old Hospital link . 182 New Improvement/Upgradation of Kurag, Dumarg, Darakpora road . 60.00 Total Type of budget S. No Work description work allocation 2020-21

183 New Improvement/Upgradation of Zakoora Wayil road incl. inner links at Wayil 60.00

184 New Improvement/Upgradation of Gratbal road near Pandach crossing upto Nagbal. 30.00 185 New Improvement/Upgradation of Beehama safapora road from Barsoo onwards . 110.00 186 New Improvement/Upgradation of Baserbugh Gulab bagh road 60.00 187 New Improvement/Upgradation of Forest Colllege road at Benhama 60.00 188 New Baba Sualleh to Ziyarat Sharief road 30.00 Impptt/Upgradation of Kangan Panzinlink, kangan Hospital road , kangan akhal 189 New 40.00 road, Magray Mohalla Thune and Jamia Masjid (old) upto Graveyard kangan . 190 New Upgradation of Kullan Rezan road. 60.00 191 New Baba Mohalla Yanihama road incld Dar Mohalla Dangerpora road 50.00 192 New Doorsuma Yarimuqam road Km 1st incl. Arhama road 60.00 Balance Portion of Lar road including inner link of Manigam and Dub 193 New 50.00 canal link & Fire Service link/ Sheikh Mohalla Lar) Macadamization of Laroo to Tsawalgam incl: Clock Tower to Hospital and 194 New 170.00 Interior Roads at Tsawalgam( 9.00 KM) 195 New Macadamization of Shalipora Kharbari Road(2.00KM) 64.00 196 New Macadamization of Chinarchowk Ladgoo Rambhama Samnoo Road ( 3.75 KM) 131.00 197 New Upgradation of Avil Road(1.00KM) 36.00 198 New Upgradation of Yaroo Singoora Road(2.50KM) 100.00 199 New Upgradation of Boh Dragdon Road.(1.00KM) 34.00 Macadamization of Kanjikullah Kokergund road from Yaripora Arwani to 200 New 33.00 Kokergund ( 1.00 KM) 201 New Macadamization of Kutbari Shiganpora Naidhanjan Road.(1.80) 57.00 202 New Macadamizationof Katrosoo Kadder Road(1.50KM) 50.00 203 New Ganiepora (Kurigam upto Junction of Qazimohalla Railway Station road. 56.00 204 New Wanipora road. 16.00 205 New Kilam Devsar Road. 87.00 206 New Sopat Tangpora road.(Interior links) 55.00 207 New Salyaloo Kulbagh road 35.00 208 New Mirbazar Akhran Zangalpora road. 110.00 209 New Palpora Amanpora road. 70.00 210 New Akhran Nai Basti road. 30.00 211 New Upgradation of Ganbugh Anderbugh Chandigam road (Km 1st to 6th) 95.00 212 New Upgradation of Batapora Thandipora 32.00 Construction of Poly-Tech college Karihama with 75mm & 25mm semidence by 213 New 27.00 way of P/L 75mm & 25mm semidence Construction of Parllar By Pass road Lolab double lane with by way of P/L 214 New 50.00 75mm & 25mm semidence Construction of Town alliied links Agg. Length 2.00kmsby way of P/L 215 New 28.00 75mm & 25mm semidence Construction of Kralpora Gazriyal Agg. Length 2.50kms by way of P/L 75mm & 216 New 35.00 25mm semidence Construction of Darzipora to Sulkote road with allied links by way of P/L 75mm 217 New 32.00 & 25mm semidence Total Type of budget S. No Work description work allocation 2020-21

Construction of Muqam Shahwali link Anger Mohalla Grave yard to Peer Mohalla 218 New 32.00 bala incl. Drughmulla inner links by way of P/L 75mm & 25mm semidence Construction of Pazipora vi Pazipora bridge by way of P/L 75mm & 219 New 42.00 25mm semidence Up gradation of Kralpora inner links byway of 75mm WMM with 220 New 65.00 25mmthickemidense in full . Incl. Hari Tangwari road Construction of Kupwara Sulkote road agg. Length 2.00kms by way of P/L 221 New 48.00 75mm & 25mm semidence Construction of District Head Quarter i.e D.C office complex , court complex , 222 New SDH Kupwara Dak Banglow, Fish Market, Hajaj Market ,Sumo stand,Galzoo link, 35.00 agg. Length 2.00kms , by way of P/L 75mm & 25mm semidence Up gradation of Zirhama Marhama (Agg length 1.50Km) byway of 75mm WMM 223 New 35.00 with 25mmthickemidense in full . Up gradation of inner links of Pazipora and Gushi (Agg length 2.00Km) byway 224 New 46.00 of 75mm WMM with 25mmthickemidense in full . Sagipora Kulangam road (3Kms Constituency) (2Kms 225 New 33.00 Constituency) 226 New Handwara Zachaldara Nichama road 85.00 227 New Khangund link road 12.00 228 New Handwara Byepass road 75.00 229 New Handwara Shaloora road 295.00 230 New Army Cam Keegam road 44.00 231 New Hajin Takiya road 40.00 232 New Batgund inner links 26.00 233 New Tangdar inner links 40.00 234 New Kandi Jada road 65.00 235 New Ibkote Bahadorkate road 65.00 236 New Gundi Gujara road 65.00 237 New Sikh Bridge road 65.00 238 New Koil Road (Balance length) 70.00 road Km 27th to 32nd with circular road and Interior roads of 239 New 120.00 Gangoo. 240 New Litter-Naina-Sangam road. 120.00 241 New Interior roads at Pulwama. 50.00 242 New Chakoora Naina road. 50.00 243 New Wasoora-Nowpora incl. Interior roads at Audoora/ Nowpora 50.00 244 New Gudoora bridge to Jamia Masjid (high school link) 15.00 245 New Pulwama-Tahab-Lassipora road. 100.00 246 New Sountbugh-Putrigam road. 30.00 247 New Tiken Sonsomil road. 30.00 248 New Newa Fraisipora road. 55.00 249 New Kellar Lassidaban road. 55.00 250 New Abhama-Pakherpora road. 50.00 251 New Achagoze Abhama Sangerwani road. 50.00 252 New Khaigam-Sonbanjar Sangerwani road. 30.00 253 New Pampore Shopian road Km 15th to 26th. 120.00 254 New Gallander road. 60.00 255 New Pampore Ladhoo-Khrew Wuyen road 91.00 Total Type of budget S. No Work description work allocation 2020-21 256 New Lethpora-Ladhoo road. 50.00 257 New Marwal to Nehama. 30.00 258 New Kachajkote Shikargah road. 70.00 259 New Saimoh to Her Buchoo road. 25.00 260 New Tral via Gamraj. 30.00 261 New Interior roads of Tral. 55.00 262 New National Highway to Kaigam incld.Hari Kaigam link road 70.00 263 New Midoora Idd Gah road. 15.00 264 New Shopian town road including allied links 100.00 265 New Keegam Checki Haji road 70.00 266 New Widening/ upgradation of Habdipora Sangloo road 75.00 267 New Adijan Kanjiullar road 35.00 268 New Sedow Hospital link 40.00 269 New Moshwara Keller road including approaches of Vishru bridge 90.00 Zainpora town road i/c Middle School Link at Reshipora & Degree College link 270 New 100.00 via CRPF Camp 271 New Mantribugh Tengpora road i/c Kilbal 45.00 272 New Ziyarat Sharief Reshipora to Degree College Zainpora 40.00 273 New Kundalan Manzimpora road i/c Dugpora 55.00 274 New Ahgam Children Bagi Noor-ud-din 30.00 275 New Kiloora Trapadpora road 30.00 276 New Manihal Batapora road 30.00 277 New Imamsahib Woyan road 60.00 278 New Nadigam School Link 20.00 279 New Meemender to Aharbal junction via Khudpora 70.00 280 New road 150.00 281 New Batapora Saidpora Hamchi road 94.00 282 New Dawood Colony Anchar 88.00 283 New Teilbal Danihama road 54.00 284 New Wanihama Khimber Road 54.00 285 New Inner road at Buchpora 47.00 286 New Danamazar Chaidub road 37.00 287 New Noorbagh Baghwanpora road 37.00 288 New Rampora road via Chattabal 34.00 289 New Kawadara Dalipora road & Tarabal Ahamad Sahib road 37.00 290 New from Zakoora Crossing to Saqlain Masjid via Laddakhi Colony 22.00 291 New Road from UNMOGIP to C.D Hospital via Malteng 67.00 292 New Main road from Kralsangri to Brein via Syed Rehman Sahib 44.00 Sheergari Police Station to PCR via Reck Chowk incl. Link towards Batmaloo Bus 293 New 103.00 Stand 294 New HMT road from Shalteng via SICOP Market upto Mustafabad (Loop) 120.00 295 New Qammerwari to Parimpora Chowk 135.00 296 New Road 180.00 297 New Links of either side of Firdousabad incl. Lane No.15 (Sector-D) 80.00 298 New Main Iqbal Abad road Lane No.4 61.00 299 New Firdousabad - Tengpora road 58.00 300 New Link roads on Right side of HMT road viz., Gazaliabad & Rose Avenue 58.00 301 New Links on either side of NH from Shalteng to Narbal 58.00 302 New Danihama - Darbag road 44.00 Total Type of budget S. No Work description work allocation 2020-21 303 New Link roads of Qammerwari Qammerabad incl. Masjid Anjum link etc 44.00 304 New Links on either side of Qammerwari to Parimpora 44.00 305 New Links on either side of Srinagar - Bandipora road upto Panzinara 44.00 306 New Road behind Tatoo ground from IMI to Batmaloo incl. Bakshipora lane 44.00 307 New Roads in Magarmalbagh area 44.00 Allied links of Sheerwani road viz., Poloview link, Linz link, Labert Lane, Abi 308 New 40.00 Guzar lane, Forest Lane etc 309 New Chandpora link road & allied links 28.00 310 New Jawahir Nagar inner links 28.00 311 New New Theed inner links incl. Mavas Canal 28.00 312 New Nundreshi colony incl. Alamdar Colony 28.00 313 New Road connecting byepass with Qammerwari Parimpora road via Nath Mohalla 29.00 314 New Road of Moominabad Links 29.00 315 New Roads in Gogjibagh area incl. Links behind DAV School 29.00 316 New Hyderia Colony Shalimar 22.00 317 New Road on NH near Transformer Muslimabad Sector - 1 upto Masjid Muslimeen 18.00 318 New Upgradation of Natipora Nowgam Road 70.00 Various link roads in Chanapora area including Lal Nagar/Gulshan Nagar/ 319 New 155.00 Gulposh Colony/ Baghi mehtab/ & other links 320 New Upgradation of various Colonies at Rangreth Gogoo road 55.00 321 New Upgrd. Of Goripora colony roads 55.00 Khan Colony including Balance links of Shah-i-Hamdan Colony & other links of 322 New 60.00 Natipora area 323 New Upgradation of Humhama Baginder Road. 44.00 324 New Link roads on either side of I G road from Hyderpora to Humhama 100.00 325 New Arfat lane (Stadium Colony) Budshah Nagar & Umer link at Azad Basti. 29.00 326 New Mehjoor Nagar colonies 29.00 327 New Barooj enclave at Humhama 22.00 328 New Colony roads in Sanantnagar / Majeed Bagh area 45.00 329 New Rose Avenue Colony at Peerbagh 15.00 330 New Link road at Barzullah 30.00 Links at Housing Col.left side of Lalbazae,Road from Gulshan Mazar to Satboni 331 New 59.00 incld.Zari Mohalla,Botshah Mohalla to Charyar junction incld. links. Imptt./Upgrd.of road with links from Budoo Bagh (GHSI) Koolipora to EFS road 332 New 45.00 (DKB) with Kaw Mohalla, Sheeshgari Mohalla, Gousia Road. Imptt./Upgrd.of road with links from Nowpora Chowk to Victory X-ing/ 333 New Rainawari Chowk, Baghi Roop Singh, Syedpora Khajpora, Friends Col, Peerwari 45.00 link road 1st. 334 New Imptt./Upgrd.of Kanitar road to Habak Naseembagh road incld.allied link. 29.00 Imptt./Upgrd.of road with links from Pandan Malaratta to Rajourikadal via 335 New 29.00 Sarafkadal, around Jamia Masjid, Mir Mohalla, Chandpora. Links at JKPCC Col. Agro Park, Tibitian Col.link, Gulshan Bagh main incld. 336 New 29.00 Zahidpora. 337 New Main Col.road on left side of Lalbazar, Sgr. 22.00 338 New Soura Col.roads. 22.00 Upgrd./Imptt.of road with links from Jabgaripora to Sangeen Darwaza 339 New 22.00 via Bahau-Din shrine. Imptt./Upgrd.of road with links from Rozbal to JLNM Hosp.with Hamambal, 340 New 14.00 Bandook Khar Mohala, Aram Masjid upto Victory X-ing. Total Type of budget S. No Work description work allocation 2020-21 341 New Links at right side of Lalbazar Qasmia link & other links. 14.00 Upgrd./Imptt. of Bohrikadal, Naidkadal, K.K Mohalla via Kalashpora 342 New 14.00 incld.Namchibal, Baba Nund-Gund incld. link. Upgrd./Imptt.of road with links from Bohrikadal to Nowhatta via Malaratta, 343 New Kalardoori, Naidkadal to Naqashband shrine, Rangar stop, Khosul shrine, 14.00 Doorani Anderwani Naidkadal. 344 New Macadamization of Green Avenue Lane at Illahibagh 20.00 345 New New HIG, MIG, Boatman Colony including service roads. 140.00 346 New Main road (60 feet) upto various office Complexes. 85.00 347 New Batamaloo Tengpora via Moominabad (ERA road) 87.00 Gousia Al-Farooq road SDA Colony, Hamza Colony, Firdous Colony, Usmania 348 New 66.00 Colony, Umer Colony and Shahi Hamdan Ibrahim Colony, Hajiabad Iqra Colony. Neelam Chowk to Shaheed Gunj via back gate of New Secretariat. Internal roads 349 New 66.00 of Shaheed Gunj. Shutrashahi internal links. Road behind New Secretariat. Barbarshah bridge to Ikhwan Chowk via Naqashpora incld.road from Ikhwan 350 New Chowk to Khyber Hospital, internal links of Gadoodbagh and Baghwanpora 71.00 including Gawkadal & Mandir Bagh. 351 New Illahibagh Colony incld. Mini Soura Housing Colony. 66.00 352 New Kh. Habibullah Nowsheri Colony including Hamdani Colony Nowshera. 44.00 353 New Parimpora Housing Colony including all links. 29.00 Chottabazar to Habbakadal via Kanikadal Habbakadal Fatehkadal and 354 New Babademb via Chinkeral Mohalla incld. Kanikadal Karfali Mohalla Khanwari road 51.00 Road behind FCI to Guru Bazar. Internal links of Habbakadal. Pathar Masjid Bazar including Nawabazar Qalamdanpora link, Zaldagar 355 New Fatehkadal Biscoe Bridge and Zainakadal Aalikadal via Gurguri Mohalla & Gunz 29.00 Khud Dabtal link. Upgradation of road from Safakadal to Rajourikadal via Jamalatta Aalikadal, 356 New 29.00 Sokalipora. Habbakadal Reshi Mohalla road including Dal Hassanyar Kani Kadal Syed 357 New 14.00 Mansoor Bund road. Jamalatta Shorgari Mohalla including Watalkadal Bund 2 & 3 and Shah Mohalla 358 New 14.00 Bund road. 359 New Imptt./ Upgrad. Of various links of Gangbugh 58.00 360 New NSC (90 Ft) road left tube from Doonibagh junction to Pandach. 90.00 Alamdar Col.road from R.P School Mallabagh. Side lane on both sides of Alamdar 361 New 81.00 Col. Mallabagh road from Charyar junction. Side lanes on both sides of NSC road from Doonibagh junction to Pandach. 362 New 81.00 Various lanes on Akmal bridge to Doonibagh Chowk. 363 New Links at upper Buchpora. Links at Ahmad Nagar Pandach.Links at Umerhair. 59.00 Ummer Col.B from Lane No.1 to 5 incld. side links. Links around Sarwar Azam 364 New 55.00 Stadium (incld. Panchayat Lane and allied links) 365 New Noorbagh Palpora Gundi Roshan road KM 4th to 6.5th (RD 4000 to 6500) 51.00 366 New Noorbagh Palpora Gundi Roshan road KM 11th to 16.5th (RD 16500) 29.00 367 New Pamposh Col.Bund road & Goripora inner main road. 29.00 368 New Links on right side Western Foreshore road (RD 0-4077) & EFS road. 14.00 Usmanabad link connecting KZP with NSC and allied links except Naqashband 369 New 14.00 Col. 370 New Zoonimar allied links including Shah Hamdan Avenue (Dr. Ali Jan road) 14.00 Total Type of budget S. No Work description work allocation 2020-21

371 New Almadar Colony road from RP School Malbagh incld. Panchayat Ghar Eidgah Lane 60.00 Macadamization of link connecting Khalsa Chowk to Sector-5, Internal lanes of 372 Ongoing 116.84 Sector-5, 7, 8, 11 & 14 Nanak Nagar 373 Ongoing Macadamization of roads in Green Valley, Gaziabad Sunjwan 19.00 374 Ongoing Macadamization in Lane No. 1, 2, 3, 5, 6, 7 and 8 in Moominabad Sunjwan 23.00 Macadamization of link roads adjoining Kunjwani Bandhu Rakh, road in Ekta 375 Ongoing 19.65 Vihar, Arjun Vihar & Bandhu Rakh incl. Const. of drain 376 Ongoing Chatha Matadoor Stand to Khandwal upto Km 2nd RD 500 40.00 377 Ongoing Road from Chatha to PMGSY road via Peer Baba Satwari 43.40 378 Ongoing Road from Main stop to 200 Bedded Hospital via Gole Market Ganndhi Nagar 36.00 Road from Chatha Matador stand to Khandwal from Km 2nd RD 500 to Km 3rd 379 Ongoing 7.00 RD 500 Upgradation of road with Macadamization at Mohalla Narwal Bala near Taj 380 Ongoing 12.10 Enclave Macadamization of road opposite Army Gate Sunjwan upto the house of Abdul 381 Ongoing 3.00 Rashid Channi Rama 382 Ongoing Improvement/Upgradation of Ratnal to Hasla Chak L = 5.00 Km 4.50 383 Ongoing Improvement/Upgradation of Deoli to Hasla Chak upto Rehal Bazar L = 6.00 Km 31.00 a) Improvement/Upgradation of Kunjwani road L= 2.00 Km b) Road 384 Ongoing 43.50 marking & berm filling 385 Ongoing Road from Shibu Chak to Joian L = 1.20 Km 45.00 386 Ongoing Dablehar to Arnia to Kalyana 15.00 387 Ongoing Kotli Shah Doula Tanda to SKUAST Gate R.S.Pura 15.00 388 Ongoing D.C Chowk to Simbal 80.00 389 Ongoing Kadyal Village to house of Bana Singh 21.00 Laxmi Narayan Mandir Keshaw Nagar Railway Line to Chak Talab upto Guru 390 Ongoing 23.00 Ravi Dass Mandir and allied links Link road from the House of Pawan Raina via GHSS to house of Roshan Din 391 Ongoing 4.60 Choudhary Brij Nagar R.S.Pura 392 Ongoing Brij Nagar to Singhpura and allied links 8.50 393 Ongoing Dablehar to Kothey Salehar 31.95 394 Ongoing Kotli Mian Fateh to Dablehar Mamka road 81.90 395 Ongoing Baba Bhajan Dass Samadhi to Shamshan Ghat at Village Ganda and allied links 7.80 396 Ongoing R.S.Pura to Satrayian Satowali 30.00 397 Ongoing Link road to to Village Kangdair 10.00 398 Ongoing Gulabgarh Basti to Abtal 10.00 399 Ongoing PHC Sai to Sai Khurd 10.00 400 Ongoing Suchetgarh Octori Post to KK road via Suchetgarh 19.00 401 Ongoing PHC Sai to Tangowali Chowk and link road to Nikowal Budwar Post Bhatta Post 20.00 402 Ongoing Fatehpur Salarian and allied links 34.65 403 Ongoing Internal roads in Greater Kailash 60.00 404 Ongoing Roads in Nideesh Vihar and Dream Valley Chowadhi 11.00 405 Ongoing Roads in Sector D,E,F & G in Sainik Colony incld war widow colony, 84.00 406 Ongoing Various roads in Ware House area 18.00 Total Type of budget S. No Work description work allocation 2020-21

407 Ongoing Construction of link road Ward No. 6 Bari Brahmana and internal links of Bassi 8.50 Macadamization of link road from Lakshmi Narayan Mandir Keshav Nagar 408 Ongoing 15.00 Railway line to Chak Talab upto Guru Ravi Dass Mandir 409 Ongoing Patoli Chowk to Lohan Park. 2.50 Women Polytechnic to Shiv Nagar, Nagar, Panchi Nagar, Janipur Park 410 Ongoing 33.00 to Amba Theatre including side links. 411 Ongoing Internal roads of Jammu High Court. 13.37 412 Ongoing Imptt. Upgd. Of Pamposh Colony road Sec. 4 from Swagat Showroom upto Park. 21.41 413 Ongoing Pawan Ice Cream to Toph Bridge & allied links. 45.85 414 Ongoing Internal roads of East Constituency including Moti Bazar, Pacca Danga etc. 4.75 415 Ongoing Janipur Ambgrota road km 15th to 21st and Km 1st to 5th 115.00 Impvtt/ upgradation of various lanes/ by lanes at Durga Nagar by way of 416 Ongoing providing and laying 20mm thick open graded premix carpet & Impvtt/ 9.50 Upgradation of lane No:1, at Zorawar Chowk Dogra Nagar. Impvtt/ upgradation alongwith premix carpet opposite lane No:1 near Zorawar 417 Ongoing 8.00 Chowk Dogra Nagar, Lower Durga Nagar Jammu. Upgradation/Macadamization and drainage of link road at Raipur Nardani New 418 Ongoing 10.00 Colony Jammu from BR Farms upto the house of Pishori Lal Raina. 419 Ongoing Main road Jandrah to Devika via Jandhra Bazar. 8.62 Jandhra See-Gala road Km 2nd RD 290-450,Km 4th RD 425-1000 and Km 5th 420 Ongoing 17.50 RD 0-65. 421 Ongoing Lane No:2, Green Enclave Colony Asrarabad Sidhra 5.00 Imptt. Upgd. Of Sidhra Surinsar Mansar Road Km 0 to 5th & link road to Kupper 422 Ongoing 48.00 Malori road (Tawi Vihar, Upper Majeen Sidhra) B C Road & Adjoining link Road including road from ST Peter school to K C 423 Ongoing Rotary mini shakuntla and Hotel Revira to Gujjar Nagar & upto Jogi gate & 60.00 other links 424 Ongoing Flyover and allied links form Tawi Bridge to Maheshpura chowk 80.00 425 Ongoing Internal Road of Governor house including all allied works 40.00 426 Ongoing Internal Roads of Govt. Medical college and its associated hospital jammu 45 427 Ongoing Karloop to Hira Chak 10.00 428 Ongoing Gadla to Simbli 10.00 429 Ongoing Mishriwala to Chano Chak 15.00 430 Ongoing Gari Ladore road 30.00 431 Ongoing Gole Gujral to Rajpur Sarora, Amar Colony, Ajit Colony 20.00 432 Ongoing Akalpur to Patnyal 15.00 433 Ongoing Ghai to Pandorian 5.00 434 Ongoing Akalpur to Pouni Chak 30.00 435 Ongoing Sari to Borh Drank ( Double Lane) 20.00 436 Ongoing Tomal Jattan link road and allied links 15.00 437 Ongoing Distributory No. 1 to Rajpura l km 2nd 15.00 438 Ongoing Link road to Netar Kothian 15.00 Macadamization of link road from Bazigar Kullian Road Purkhoo to 439 Ongoing 5.00 Jungwari 440 Ongoing Nagbani to Machlian upto karan Palace & allied links 25.00 441 Ongoing K.C Door Road 10.00 442 Ongoing Canal Head to Patta Chowk & allied links 130.00 Total Type of budget S. No Work description work allocation 2020-21 443 Ongoing Canal Head to Bhagwati Nagar 10.00 444 Ongoing Bhagwati Nagar to Gole Pully via Kissan Kender Panjpeer 20.00 445 Ongoing Nitco Lane/UNO Lane & other link in Talab Tillo 70.00 446 Ongoing Akhnoor road to Kamla Palace 20.00 Upgradation of road from Lane No. 1 & Lane N o.2 in Amar Colony from SBI 447 Ongoing 15.00 ATM to H/O Mohinder Singh Saini Talab Tillo Jammu 448 Ongoing Iinternal links of Mohinder Nagar/ Colonel Colony 40.00 449 Ongoing Link road to Dakkar HSS from Manawar Tawi upto NodoSidh 35.00 450 Ongoing Sailanwali to Lam via Kot Maira 15.00 451 Ongoing Barmana to Seoni 50.00 452 Ongoing Kanni Dakki to Kallah 20.00 453 Ongoing Link road from Bomal to Sangrampur 14.00 454 Ongoing Distributory No. 1 to Pargwal 42.00 Macadamization of road from Sohal to Ashram upto Shamshanghat Badyala 455 Ongoing 15.00 Chak Akhnoor 456 Ongoing Link road from Rajpura to Sartian ( L =4.25 kms) 56.00 Link road to Sohanda ( L = 0.50 kms), Link road to Chann Matloni ( L= 1.50 457 Ongoing 47.00 kms) and Link road to Upper Harsath ( L = 2.00 kms) 458 Ongoing Link road to Bain Glarh ( L = 0.50 Kms) 6.50 459 Ongoing Road in Barian & supwal ( L = 2.00 kms) 15.00 460 Ongoing Chhani to Vijaypur 30.00 461 Ongoing Koulpur to Pakhri 40.00 Sambal Danga upto the House of Isher Dass, Bade- De- Gair to Nade De- Gair, Road from Chowdhary Cafteria to Chumha Mohalla (Mand), Road from Pole 462 Ongoing 10.60 Factory to Chowdhary Mohalla (Mand), Approach road to Motorabe Bridge at Mand 463 Ongoing Ferna Magiote road Under Macadamization programme 2018-19 32.5 464 Ongoing Nagallian Bashoora road Under Macadamization programme 2018-19 25.00 465 Ongoing Ramnagar road in Km 9 th RD 850-1000, Km 10 th RD 0-500 7.70 466 Ongoing Majalta Link road 32.10 467 Ongoing Tringulian Basantgarh 40.00 468 Ongoing Ritti to Kuperala road in km 1st RD 0 to km 3rd RD 800 17.00 469 Ongoing Udhampur Ghordi road Km 36 th RD 400 to Km 37 th including Bus Stop. 58.01 470 Ongoing Mantalai Dudu road km 34th to 38th RD 500 87.00 471 Ongoing Udhampur Ghordi road in KM 31st Langha Bazar 32.11 Link roads in Chiryai area including Gutyal Morh to Dhanu via Seen Brahmina 472 Ongoing 38.00 road 473 Ongoing Tikri Katra Road Km 1st to 10th in stretches (D/L) 2.25 474 Ongoing Latori Dhanori to Nomain Road 24.96 475 Ongoing Serward to Saroon road. 34.77 476 Ongoing Circular Road Katra (D/L). 4.70 477 Ongoing 4-Lane Approach roads to Railway Station Katra. 13.76 478 Ongoing Link road Aghar Ballian in front of District Hospital 20.50 479 Ongoing Link road in Reasi Town [Nai Basti to Degree College road Nai Basti] 41.50 480 Ongoing Link road Talwara to Gujjar Bakarwal Hostel at Talwara 23.75 481 Ongoing Reasi Vijaypur road 5.44 482 Ongoing Seri Pangal Road 18.00 483 Ongoing Dharmari to Thuroo road 44.00 484 Ongoing Thuroo to buddan Ph -1 34.00 Total Type of budget S. No Work description work allocation 2020-21 485 Ongoing Thuroo to buddan Ph -II 47.00 486 Ongoing Bagga to Gulabgarh 150.00 487 Ongoing Kund Morh to Shajroo via Cheeral road 16.00 488 Ongoing Such Nallah to Chann road 32.00 489 Ongoing Police line to ACD office &PHE complex to Sat tent House 30.00 Internal road of Danishabad/ Toheed Nagar/Nazamia colony Kheora , 490 Ongoing Left side Approach of Alternate bridge (Linear length), Power House Kheora 100.00 road & Hospital gate to diet complex 491 Ongoing Gunni to Charian Phagla, Dhangri Dhoba via Ashram & Dhangri Gunni road 55.00 492 Ongoing Potha to Androla via Sangpur Narian, Saranoo Peo Manyala rod 30.00 Panja Chowk to Gujjar Basti, Upgrafation /Macadamization of link road 493 Ongoing Dhanidhar Ward No 5 Sudesh Bakshi Mohalla, Petrol Pump Jawahar Nagar to 50.00 Thudi & Bholi Mata Mandir road 494 Ongoing Thudi Kotedhera & Kotedhera (Domail to HS anihad) 75.00 495 Ongoing Road from Kandi to Hubbi (transferred from PMGSY) & Hubbi to Bagyalkote 30.00 496 Ongoing JNV Kandi & Mandir Gala Panjnara road 50.00 497 Ongoing Gadyog to CheekaKhetar & Mohra Jaglanoo road 30.00 498 Ongoing Koteranka Town & Tralla link road 30.00 499 Ongoing Darhali bridge to Chatyar, T01 to Saim Smith & Nadian to Badanoo 50.00 Rajouri Darhal road, Darhal Chowkian, Darhal town & Lik road to Sardar Mohalla 500 Ongoing 30.00 Dodaj Darhal Rajouri Darhal to Patta Thannaa road, Patta Thanna to Hariban & Khoriwali Budhkhnari 501 Ongoing 70.00 road 502 Ongoing Sora Khablan & Sora Shadra Sharief including Rajdhani Tota Bisa Mohra 25.00 503 Ongoing Thannaamndi Shahdra Sharief & Right river road 100.00 504 Ongoing Kallar Sawani road, Approaches of Dhanwan Chakli bridge& Kalidab to Loorkote 60.00 505 Ongoing Chingus Badla Nadyala 100.00 Army Gate to Gurdanbala, Bathuni Pullulian & Shahpur to Khanka Dhara via Shiv 506 Ongoing 50.00 Mandir Manjakote to Mangalnar, Approach road to Saleri bridge & Kalki to Sheikh 507 Ongoing 40.00 Mohalla 508 Ongoing Tatapani Broh road 25.00 509 Ongoing Sialsui to Nagalian road 30.00 510 Ongoing Metka Kanthole road 84.00 511 Ongoing Moughla Dhaleri road 84.00 512 Ongoing Siot road km 12th to 22nd 45.00 513 Ongoing Kabu to Kote 15.00 514 Ongoing Barmandal soom road 15.00 515 Ongoing Tundla to Kothian road 20.00 516 Ongoing Chaid to Metka Gurah road 25.00 517 Ongoing Qila Darhal Andhrooth road 22.00 518 Ongoing Road from HS Parat to Mohalla Pherian 15.00 519 Ongoing Rajpur Kamila kote road 15.00 520 Ongoing Road from Parat to Raghunath Temple 15.00 521 Ongoing Bareri Dhanika road 60.00 522 Ongoing Siot Kalakote road km 1st to 11th 15.00 523 Ongoing Rajal Garan road 84.00 Total Type of budget S. No Work description work allocation 2020-21 524 Ongoing Bus stand to Ashram via BDO office road 15.00 525 Ongoing Rahsalyote Patrara road 30.00 526 Ongoing Peengagalla Marchola road 30.00 527 Ongoing Hathi Darwaza Road 20.00 528 Ongoing Darshan Nagar Road 28.00 529 Ongoing Rajal to Hanjana road 30.00 530 Ongoing Lamberi Gojri road 10.00 531 Ongoing Town roads 25.00 532 Ongoing Kamsar to Nai Basti road 20.00 533 Ongoing Makki Post road 25.00 534 Ongoing Sain Faqir Din road 15.00 535 Ongoing Bainch Mukhayala Road 40.00 536 Ongoing Dhalera Link Road 20.00 537 Ongoing Kojra to Bandihechian 25.00 538 Ongoing Mughaldab to Azmabad road 15.00 539 Ongoing Lassana to Bachianwali road 20.00 540 Ongoing Eidgah Marhote to Tola Mumtaz 20.00 541 Ongoing Jaranwali Gali to Khetan via Draba 20.00 542 Ongoing to Sarhooti 35.00 543 Ongoing Bhainch to mohalla Kassana via Plassi 45.00 544 Ongoing Const. of Behrote to Upper 15.00 545 Ongoing Ghat Bhabhoor-Dhara Road km 18th to km 21st ( Incl. Bus Stand Ghat) 50.00 546 Ongoing Doda Beoli and Beoli Bijarni Road km 1st & 2nd 28.00 547 Ongoing Doda Bharath Road km 13th to 17th 90.00 Approach road to Dak Bunglow Khellani & Paryoot link road km 1st & 2nd RD 548 Ongoing 40.00 (0-525) 549 Ongoing Ghat via Nagri Road & Parmaz link road from ITI side & Sanik Board side 20.00 Old Bus Stand to Nehru Chowk Doda, Ghat via Nagri road km 5th and Degree 550 Ongoing 20.00 College link road Doda, Doda Town link road km 1st to 5th RD (780) incl. lane to Bun Doda/Tondwah 551 Ongoing 30.00 Circular & Mashroom, Road, new bus stand 552 Ongoing Approach Road to Sport Stadium 20.00 Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 553 Ongoing 40.00 thick SDBC on University link road. Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 554 Ongoing 15.00 thick SDBC on Sartingle Kassa link road. Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 555 Ongoing 50.00 thick SDBC on Malothi to Panjgrain link road. 556 Ongoing Mangni to Old Bhatyas upto House of Sh Musarat Hussain 20.00 557 Ongoing Mehar Neera road in km 3rd to 4th 32.00 558 Ongoing Maitra Ballout road (km 3rd, 4th 5th RD 1000) 10.00 559 Ongoing Patnitop Sanasar road in km 16-19th 42.00 560 Ongoing Gool Bye-Pass Road km 3-4th (L=2km) 60.00 Imptt./up-gradation of T.B Hospital to Matta/Hidyal Chowk to Hargadi Matta 561 Ongoing /Hidyal Chowk to Bimarnag link link road by way of providing/laying 50 mm 60.00 thick bitumenous macadam, 25 mm thick premix carpet surfacing. Total Type of budget S. No Work description work allocation 2020-21

Imptt./ up-gradation of Palmar Rakna Ziyarat Sharief road/Cherhar Bunjwar 562 Ongoing link road by way of providing / laying 50mm thick Bituminous Macadam, 25mm 107.00 thick Premix Carpet Surfacing and Metal Patches & Drain in stretches. Imptt./up-gradation of link road from Sheetla Mandir to Kali Mata Mandir, Circular road around stadium & link to Gumpa Gulabgarh padder and Atholi link 563 Ongoing road extn. Upto Gossi by way of providing/laying 50 mm thick bitumenous 40.00 macadam, 25 mm thick premix carpet surfacing and metal patches & drain in stretches. Improvement/up-gradaion of Sangrambhata to Haradraman link road/K.P Road to Balashram/DSB Poohie Road/Girinagar Hatta/Shalimar Trigam link road by 564 Ongoing 122.00 way of provind/laying 50 mm tick bitumenous macadam, 25 mm thick premix carpet surfacing and Metal patches & drain in stretches Imptt./up-gradation of Gurian Katersaman link road/Lanyal to Seman Bridge Link road via Dewaroo Km 2nd by way of providing/laying 50 mm thick 565 Ongoing 51.00 bitumenous macadam, 25 mm thick premix carpet surfacing and shingle/,etal patches & drain in stretches (premix & metal). Imp./upgradation incl. Drain and removal of Slips etc. on approach road to 566 Ongoing 117.69 Halipad and Halipad to Guzzar via Revenue complex Chatroo Imp./upgradation incl. Drain and removal of Slips and Const. of B Wall & R Wall 567 Ongoing 120.00 etc on link road from Lower Kuchal to Upper Kuchal link road km 1st to 2nd

Improvement/Upgradation in Lane No. 6, 7, 8 & 9 Sector-1 Nanak Nagar and 568 New 35.00 Road from Treasury to Pawan Chowk Dr. C.D Gupta Shastri Nagar Jammu Imp/Upgradation of various lanes in Vaishnavi enclave sector 7, sector 6, sector- 569 New 50.00 3 & behind Gurudawara sector-1 in Channi Himmat 570 New Road from Bikram Chowk to Satwari 30.00 Imp/Upgradation of road from Bahu Rotary to Gujjar Nagar Bridge and 571 New 25.00 Ambedkar Chowk Bahu Plaza and Dilawar Mir Mohalla at Channi Himmat Improvement of road by way of providing/laying of wet mix macadam in various roads in Bathindi area viz alif colony, farooqanabad, bathindi top , 572 New 100.00 peerbagh,Main road to NH IA Byepss to old Bermini via Bathindi, Tarkhana and Sagar mohalla Improvement/Upgradation of road from Little Flower Higher Secondary School 573 New 56.00 Greater Kailash to Kunjwani Byepss Improvement of road from Ambica Chowk Sector-7 to Channi Himmat to Deeli 574 New via Jodhamal Public School to NHIA and lane from H/O S.Saran Singh to Sh 25.00 Ashok Choudhary Sector B ,Sainik Colony. Providing/laying of 50mm thick BM, 25mm thick SDBC, 30mm SDBC on road 575 New from upper Sunjwan upto House of MLA Baramullah and Nakhi to upper Batala 40.00 road Road from Nanak Nagar to Sanjay Nagar via sector 8, Dudhadhari Temple 576 New Shastri Nagar road and Sunney Book Centre Nanak Nagar upto Main road incld 50.00 roads in Shastri Nagar (Small Plots and adjoining area) . 577 New Macadamization of roads in Sector-7, 10,12 & 13 Nanak Nagar Jammu 110.00 578 New Improvement/Upgradation of Internal roads in Gangyal Jammu 40.00 Improvement/Upgradation of roads in Green Avenue and other allied links, 579 New 65.00 Model Town, Digiana Jammu Total Type of budget S. No Work description work allocation 2020-21 580 New Roads in A, B, Cand D block Gandhi Nagar, & Arpit Electronics to Apsara road 39.15 581 New Road from PDP office to upper Moominabad Sunjwan 10.00 582 New Road from NH to Raika Village and in Qasim Nagar area 110.00 583 New Roads in Sector A,B & C in Sainik Colony 13.00 Road from Narwal to Dongian village incld roads in Vidhata Nagar and Kargil 584 New 40.00 Colony house of Haseeb Mughal Roads in Channi Rama Area incld road from NH to Apartment upto Police Line 585 New 50.00 Gate via Sai Palace in Channi Rama Roads in Channi Himmat Area incld link road from Marble Market towards 586 New 45.00 Chahal Farm incld links in Greater Jammu Roads in Trikuta Nagar Area incld Road in Preet Nagar to Trikuta Nagar via 587 New Khowali Gali, Trikuta Nagar to Nanak Nagar with Sector-3, 5 & 13 of Trikuta 80.00 Nagar, Trikuta nagar extension and allied links Link road to Shomalli Mohalla L/S of Rani Bagh Peer Baba road opposite Peer 588 New 20.00 Baba Dargah Improvement/Upgradation of Old Satwari Bazar road L/S of Chatha Peer Baba 589 New 20.00 road and allied links Improvement/Upgradation of road by way of BM & SDBC from Satwari Chowk 590 New 60.00 to Airport entry gate on Satwari Chowk to Technical Gate via Manik Shah Chowk Improvement/Upgradation of link road to Mahakali Nagar by way of BM & SDBC 591 New 25.00 from R/S Jevan Nagar Murallian road Improvement/Upgradation of road from Hand Pump Ware House to 4th Tawi 592 New 50.00 Bridge Improvement/Upgradation of alternate connectivity upto Nikki Tawi via 593 New 25.00 Belicharana Improvement/Upgradation of Dhyansar to Chak Murar and Palli Tanda road L = 594 New 140.00 6.00 Km 595 New Improvement/Upgradation of Bari Brahmana to Bishnah road L = 6.10 Km 160.00 Pindi Kathar Trewa road Km 11th and 12th Thamala nallah bridge to Trewa 596 New 45.00 town Internal links of Indira Nagar and Miran Sahib incld Link road to Prem Nagar 597 New 50.00 Basti Pyt Bansultan Link road to Kothey Sheikh and Sudan Nagar Ban Sultan Upper Miran Sahib 598 New 50.00 incld Tali Morh to Murallian Head Miran Sahib 599 New Govt. High School to Sadhu Ram Aara near Matadoor Stand at Simbal 17.50 Improvement/Upgradation of Miran Sahib Murallian Bishnah road by way of 600 New 150.00 WMM, BM & SDBC 601 New Link road to Bakshi Colony on Kunjwani -Bishnah road 17.00 602 New Jinder Mellu to Rathana 30.00 603 New Link road from Kullian to Gazipur 9.50 604 New Link road to Goppar Basti and Link road Satrayian to Towna Tibba 50.00 605 New Shera Chak to Shamshan Ghat and allied links Chak Talab 20.00 606 New Link road to Chak Bhakhtawar and Bhojpur 40.00 607 New Link road Nowabad and Panjgrain 40.00 608 New Link road to Thikerayian 24.00 609 New Link road from Mokhey Mandir to Satraian and Chowala to Badyal Qazian 80.00 610 New Link road from Kotli Galabana to Khana Chak via Purobana Part-I 45.00 611 New Link road to Rangpur Sidrey Part-I 24.00 Total Type of budget S. No Work description work allocation 2020-21 Main road from NH IA Byepss to Chowadhi incld roads in dhera mohalla, Bhatti 612 New 34.70 mohalla and friends colony Chowadhi 613 New Road from Asia Hotel to Hand Pump ware house along allied links 25.00 Const. of Road from Gurudwara Shri Guru Singh Sabha W.No 4 & 5 to land of 614 New 15.00 Capt. Jagdish Singh 615 New Road from Kanal to Seheora via Lala Chak 60.00 616 New Jinder Mehlu Khour Pounia langotia road 50.00 617 New Main Chatha road to H/O balvinder Singh 20.00 Const. of road from the House of Sh Ashok Kumar to Filter Factory, along with 618 New 15.00 Nallah adjoining Kotwal Mohalla Jallo Chak 619 New Providing and laying premix carpet on various lanes of New Plot & Janipur area 65.00 Internal Roads of Bakshinagar (Gurha) & Resham Ghar Colony, internal roads of 620 New 105.00 Rehari, Sarwal and Subhash Nagar. Internal Roads of Patoli via Thathar, Mandleek Nagar, Shanti Nagar & internal 621 New 50.00 Roads of Krishna nagar near Ravi Das Temple Vivek Vihar Paloura and allied Links, Dream land School to Patoli Paloura via 622 New 120.00 Shant Nagar & Buta Nagar and allied links Road from Chowk Chabutra to Parade chowk via pacca Danga and Moti Bazaar 623 New and internal Roads of Dewana Mandir and Chowk Chabutra to Sehgal chowk but 60.00 first with Road Cutting . Road from Radio station to Chowk chabutra via Mubarak mandi and Thounthaly 624 New 90.00 Bazar, Circular Road DC office to Panjtirthi including link to Peerkho Raghunathamandir to Shahidi chowk via kanak mandi, Rajendar bazaar and Talab Khadeekan Via Meat market, DPS School Road, Eidgah road and Hari Singh 625 New 108.00 School Road, Hari Market Area, Raghunath Mandir to Gumat Stairs and internal roads of Kanji House, internal roads of Kaleeth Nagar Road from Panjtirthi to J.P. Chowk via Civil Sectt. & Indira Chowk, Road from 626 New Library Chowk Kachi Chawni to Rameshwar temple chowk via parade,CPO 116.00 Chowk to Mian Deedo including internal links. 627 New Jewel Chowk To Canal Head, Rajendar Nagar, Lajpat Nagar and Dr. Goel's Lane 75.00 628 New Upper Gujjar Nagar and Lower Gujjar Nagar 47.00 Macadamization of Road from main road Raipur Nardani to lower Nardani 629 New 10.00 Jammu 630 New Macadamization of road from Khajuria Mohalla to Mandlik Nagar and allied links. 25.00 Providing and laying BM and premix carpet near house of SP Koushal at Patoli 631 New 65.00 Brahmna and Tersha Talab Bathera road Providing and laying 50mm thick BM and 25mm thick premix carpet in Purkhoo 632 New area (Jat Colony, Parshuram Mandir, Mashwara Kendra to Ramdasian Mohalla 95.00 and Mohalla Bhagtan) ,Kote area , Domana Bridge to Mohalla Salathia Providing and laying 30mm thick premix carpet in Bharat Nagar and Sayed 633 New Nagar ,Swarn Vihar , Karan Vihar to Shiv Mandir Thather opp. Petrol Pump, 61.00 Barnai Bridge to Dream City 634 New Roads from J.A road to Seri Panditan ,Bhalwal link road , Amb link road. 112.50 635 New Improvement of road from Dhanu to Mera Mandrain , Grand to Kharota. 70.00 Total Type of budget S. No Work description work allocation 2020-21 636 New Various link roads from Jagti to Bamyal, Khanpur and Nagrota. 55.00 637 New Impvt of road from Kanyala to Makwal Road and Manwal to Dhoon road 75.00 638 New Various links of Waliabad, Ragoora & Sidhra. 19.50 639 New NH-44 to Upper Majeen, Sidhra & allied links. 118.00 640 New Jakheri link road. 83.42 641 New Road from Karan Vihar to Shiv Mandir Thather opp. Petrol Pump. 30.00 Road from Jewal to St Peter School via SS Hospital Mahespura Chowk and 642 New 50.00 Flyover 643 New Const. of Road from House of Baldev Sarpanch to Primary School Thourni 15.00 644 New K.C Public School and allied links 30.00 645 New Internal road of Gajnasoo and Galwadey Chak, Bagh road & Khalse Chak 40.00 646 New Internal links roads in Jhiri area 70.00 647 New Makwal to Rakh Makwal 10.00 648 New Internal links of Marh area 80.00 649 New Link road to Bhela Colony 10.00 650 New link road Dayran to mohalla sardarian & allied links 20.00 link road Chak Attar singh to Karnalya chak and bakshi de khothe to sahib 651 New 10.00 bandgi ashram 652 New road from suhanjana to prambli(1.5km) 15.00 653 New link road from pahari mohalla to kalka mohalla ghaneshu chak(1km) 10.00 654 New Poonch lane and links 30.00 655 New Rajouri lane , vasuki vihar , and allied links 30.00 656 New Santra Morh to Borh Dherank 15.00 657 New Ghomanhasan to Mahvir Basti 10.00 658 New Approaches of Pouni Chak Bridge 18.00 659 New Road from Udheywala and internal links 35.00 660 New Link road to Dub Ditta 12.00 661 New Link road to Baje Shah Shop to Pakhian upto H/O Romesh Kumar 20.00 662 New Road to Karan Palace area 20.00 663 New Guraha Brahamana Ganesh Vihar (1km) 10.00 664 New Patoli Guraha bramna to Gajya singh pura (1.5km) 15.00 665 New Geeta colony 10.00 link road from main akhnoor road to house of mangal das and joginder 666 New 10.00 singh(0.8km) 667 New Sarswati Vihar to Talab Tillo Bohri Road 20.00 Revenue Complex road Km.3rd to Km.4th from Yog Ashram to Gho Manhasan 668 New 15.00 road 669 New Pzatta Chowk to Sangrampur Km.2nd & 3rd including allied links 35.00 670 New Link road from Nandani to H/O Inspector Raj Kumar 15.00 671 New Internal links at Sehar 40.00 672 New Dhanger to Kharah and allied linkds 25.00 673 New Panyali to Sarmala & allied links 50.00 674 New Pargwal to Bhalwal Bharth linking Radha Swami Ashram 40.00 675 New Bhalwal Molu to Rajpura 15.00 676 New Pargwal to N.S pura road 40.00 677 New Pargwal to Hamirpur Kona 80.00 678 New Matto to Jattain De Kothey 25.00 679 New Channi to Najwal 35.00 Total Type of budget S. No Work description work allocation 2020-21 680 New Gowar to Kulley Meghan 35.00 681 New Road from Khugga to Jeri Km.6th to 20th 301.00 682 New Road from Ardan to Kathar Km.1st & 2nd 28.00 683 New road from Chowki to Choura 35.00 684 New road from Bomal to Sangrampur 14.00 685 New Roads in Akhnoor Town 21.00 686 New Road Sohal to Badgal Km.1st 14.00 687 New Sangani to Parsoti (Bamyali Chapri) 21.00 688 New Road Tanda to Khugan 28.00 689 New Parole road & link to Bua Di Bai road 32.00 690 New Approach road to District Hospital Kathua incl. CTM Fruit Mandi road 77.00 691 New Mah Patti link road 75.00 Bhallar to Ghatti and Mata Bala Sundri incl. Bypass 692 New 155.00 road from uttri 693 New Chack Sajjan to Kanyari and link to Mohalla Parnal 65.00 694 New Internal road of Chack Desa singh 25.00 695 New Maggar Khad to Kuke road & indra colony link road 50.00 Lane from Sahar Khad to Kuke chak road in km 1st upto House of Mohan Lal and 696 New 6.00 km 1st near BGR Palace 697 New Chapakki link road & its allied links (Ghair tube well to Gadhyal upto OSK) 65.00 698 New Link road from OSK Tarnah to meet with Town 25.00 699 New Town interior road 30.00 Link road to village Bassi Panthal and link to Arjun chak 700 New 75.00 to vill Gurah Ballu Sukhdevpura to Hande chak link road & Link to 701 New 80.00 village Gair Seswan to Thathi link & Chandwan road incl Bann to Thathi 702 New 55.00 Mohalla Jattan 703 New Satoora link road 6.00 704 New Dhaloti link road 20.00 705 New Katli link road 20.00 706 New Dhamal Circular road 20.00 707 New Amala link road & Amala circular road 40.00 708 New Dayalachak Dinga Amb Challan road 90.00 709 New Berni link road 45.00 710 New Dhanore to Tridwan via Choi incl. Patyani to Tridwan link road 70.00 711 New Const.of link Road from Raj Bagh Krandi road to Raj Bagh Hari Chak 15.00 712 New Const.of Parnallah to Koard km 1st & 2nd 20.00 713 New Mandli Kishanpur road km 2nd to 5th 100.00 714 New Dhar road to Tussar via Rampur Rasool km 2nd 15.00 715 New Dewal to Dharamkot via Surara link road km 1st 10.00 716 New Uchapind link road km 1st 2nd 3rd, Sukralla road to Billowaria Mohalla km 1st, 120.00 717 New Gurah Dandian link road km 1st 30.00 718 New Charoli Mohalla Bhaddu km 1st, Jalait link road km 1st, Jastar to Nilt road km.Ist 85.00 Dhan Jasdhar Road km 1st, Mandli Khog road to Thakurdwara km 1st, Barota 719 New 85.00 Jakhole road km 1st 720 New Kishanpur to Ghat via Koti road km 6th 20.00 Total Type of budget S. No Work description work allocation 2020-21 721 New Diara Sunari link road km 2nd & 3rd 55.00 Kotla Swankh link road km 3rd to 5th, Raipur link road km 6th, 722 New Mantha Banhore road km 1st, Dhamlar link road km 3rd to 4th, Dharalta Sulari 220.00 link road km 1st & 2nd Prungal link road 1st & 2nd, Plassi to Thed road km 1st, Sandhar link road km 723 New 185.00 1st to 3rd, Link road from Plassi Thana road to House of Sh.Chhalako Lahar 724 New Chandal Roulka road from Assoo km 1st to 5th 120 725 New Siara Jourian Mata ji road km 2nd RD 500 to km 3rd 40 726 New Panekhy to Ghorighat road km 1st & 2nd 50 727 New Gatti to Bhandhar upto village Panekhi km 3rd & 4th 50 728 New Bani Dhaggar road km 1st to 6th, Asso Chachal road km 1st 220 Link road from Sartian to Sial ( L =2.00 kms) upto Chachwal and Link road 729 New 37.50 Chellarian ( L = 1.00 km) Link road NH -44 to Tapyal Mohalla Pattie( L = 1.50 Kms) and Link road 730 New 42.50 Sangwali Morha Nonath ( L = 2.00 kms) 731 New Jatwal to Narian ( L = 2.50 kms) 67.00 732 New Gurah -Slathia Utterbehani road (L= 2.50 Kms) (double lane) 140.00 733 New Link road to Sunjwan ( L= 1 Km) 15.00 734 New Link road from Mandal to Queli ( L= 1.00 kms) 13.00 Link road Talout Chanouri ( L = 1.50 kms), Link road Penthi to Koloha and allied 735 New 55.00 links ( L= 1.00 kms) and Link road Jallaper Chandli ( L = 0.50 km) 736 New Link road Sumb Dhakhi ( L = 1.00 km) 20.00 737 New Link road Samba Mandi links ( L = 2.00 kms 40.00 738 New Link road Sarna to Chilla Danga ( L = 2.50 kms) 50.00 739 New Samba Mansar road ( L= 2.50Kms) ( DL)) 50.00 740 New Link road papper Brahmana ( 0.75 km) 10.00 741 New Nud -Jatta road ( L = 2.00 km) 30.00 742 New Link road to Shiva Colony from NH-44 ( L = 1.00 kms) 12.50 Link road Samba to Pangdhour km 4th RD 650 to Km 5th RD 600) ( L =1.00 kms 743 New 35.00 (Int. lane) Link road from Tall Garh to Sadoh ( L = 1.50 kms and Link road to Sinki Chapari 744 New 30.00 including its links ( L = 1.00 kms 745 New Nud to Janda Gujjrain ( L = 2.00 kms) 25.00 746 New Link roadto Medhera ( L = 1.00 km) 12.50 747 New Link road from NH to Chak Chibba Khurd Barian & Chajwal ( L =1.00 kms) 12.00 Link road Najwal (L= 1.50 kms), Link road to Khanpur ( L = 2.00 kms) and Link 748 New 60.00 road in Vijaypur Town 749 New Link road in Gurah Slathia ( L = 2.00 kms) 20.00 750 New Link road Nandpur to Jerda ( L = 2.00 kms) 20.00 751 New Link road to Barkatpur ( L= 1.00 km) 10.00 Link road from H/o of Quader Hussian to H/o Tehsildar at Fahala ( L = 1.00 Km) 752 New 53.00 and Bari Brahmana Badhori road Link road from Ratnuchak to Kotli ( L = 2.00 kms), Link road from kaluchak 753 New 51.00 purmandal road to Takkir ( L= 1 km) and Internal links of Birpur area Link road from Barjani to Meen sarkar ( L = 1.50 kms), Internal links of Khatna , 754 New Khepper, and Bajad Mohalla ( L = 1.50 kms and Link road from Smailpur to 74.00 Badhori ( L = 1.50 kms) Total Type of budget S. No Work description work allocation 2020-21 Link road from Karyal to karwal ( L = 1.00 Kms), Internal roads of Bari 755 New Brahmana Muncipality , Ward 1,2 & 6 and Link road NH to Nehalki Temple (Opp 65.00 KFC restaurant) 756 New Link road Rajinder pura to Hatli Datti Temple ( 1.00 kms) 15.00 757 New Amwal to Sangwal road including links 20.00 758 New Link road from Bouchar to Koular ( L = 1.50 kms) 20.00 Khuddian Palli Upper Hartaryan road km Ist and km 2nd RD 500 (L=1.5 km);Bade- Da- Gair to NH by Kangaroo km Ist.(L=1 km);Majalta to Dhani via 759 New Chang km Ist and km 2nd (L=1.10 km);Adjoining link to Ekta Vihar km Ist. (L= 130.00 700 mtr);Megani Magiote road km Ist (L= 1 km) Subash Stadium road km Ist RD 0-700 (L= 0.70 km);Sail link road from NH kkm Ist RD 0-500 (L=0.50 km);Approach road to Mohalla Tej Bahadur km Ist RD 0- 760 New 80.00 200 (L= 0.20 km);Main link road from Mohalla Meldi Opposite Trikuta Flour Mill including links km Ist RD 0-500. (L= 0.50 km) Vishal Kawa road km Ist and km 2nd RD 500 (L= 1.50 km);Kawa Circular road 761 New 60.00 km Ist RD 0-500. (L=0.50 km);Jaganoo Bazar link km Ist RD 500 (L= 0.50 km) Various small city links Opposite Raj Theater, Hare Rama Hare Krishana temple lane, Opposite Masjid, Dhar road to Shakti Nagar school, Jeevika Bhawan 762 New towards Samrat Hotel (L= 2 km);Mian Bagh to Railway Station km 2nd RD 0- 70.00 500 (L= 0.50 km);Approach road to Omara Opposite Petrol pump km Ist RD 0- 500 (L= 0.50 km) 763 New Ramnagar Dudu road km 10th RD 400-km 15th RD 1000 (L=4.70 km) 130.00 Roun Domel to Ramnagar km 5th to 10th RD 800 (L= 5.80 km); Roun Domel to 764 New Ramnagar in stretches in km 18th RD 400-800, km 19th RD 500-950, km 23rd 120.00 RD 100-250, km 24th RD 400-700 (L=1 km); 765 New Thalora to Pinger road Phase Ist km Ist to km 5th RD 0-500 (L= 4.50 km) 100.00 Chanunta Panjgrain road from school onwards 766 New 10.50 (L= 0.30 km) 767 New Mantalai Dudu road km 40th, 42nd, 43rd ,44th, 45th, 46th, 47th & 48th (L= 7 km) 150.00 768 New Champari road km 3rd RD 300-900 (L=0.60 km) 20.00 769 New Tikri Katra Road Km 1st to 10th in stretches (D/L) 25.00 770 New Link road from M.S Moori to Shamshanghat 12.00 771 New Tikri Katra road from Searli Helipad to Bus Stand Katra (D/L) 20.00 772 New Didi to Tamoori Road 8.00 773 New Circular Road Katra (D/L). 10.00 774 New Kadmal (Nikki Masha) to Nomain road Km 1st. Length = 1.00 Km. 15.00 775 New Katra Nomain road. Length = 1.50 Km. 20.00 776 New Link road to Kalka Temple (Court road). Length 0.375 Km. 8.00 777 New Sarpatian to Devi Pindian road. Length = 1.30 Km. 50.00 Road from Railway Station Katra to SMVD University (Double lane) Length = 778 New 40.00 7.00 Km Imp/Up-gradation of road from Bus Stand to Trintha via Nai Basti Chowk (Part- 779 New 50.00 II) [L=1.2Km] 780 New Road From Degree College to SSP office via Polytechnic Reasi [L=1.0Km] 20.00 781 New Link road Arnas Bazar [L=0.6 Km] 15.00 782 New Approach road to Rud Bridge [L=2.00Km] 20.00 783 New Link road Pouni to Darooni [L=3.00Km] 35.00 Total Type of budget S. No Work description work allocation 2020-21 784 New Internal Links at Dharmari 25.00 785 New Sarh to Lallana Road 50.00 786 New Hill Market to Jamlan 30.00 787 New Kurlian to Moughla via Keri Chabber 35.00 788 New Thandapani Saleri Sarooti Teryath road 25.00 789 New Mangla Mata Ji road 15.00 790 New Chak Madan road 15.00 791 New Road from Radha Soami Ashram to Mohra Charangal 15.00 792 New Nonial Garhi road 15.00 793 New Road from Siot to Takiya Mohalla 15.00 794 New Seri to Mangal Devi via Tikkneparat 25.00 795 New Siot to Shamshan Ghat Nowshera 18.00 796 New Brachar Markote road 20.00 797 New Bainch Mukhayala to Kote Dakki 45.00 798 New Bainch Mukhayala Kassana to Muklhayala Zairat vua Palani Poonch 20.00 799 New Sakhimaidan Kalai road Km 33rd road 30.00 800 New Fatehpur to Lalpak road and Mandi Phagla road 40.00 801 New Link road from Main road Loran to PHC/HSS Loran 10.00 802 New Malti to Bagyaldhara road 15.00 803 New Link road and Mangnar to Super Bazaar Nagri road 40.00 804 New Poonch Town roads and Umar Colony Kunuyian road 35.00 805 New Sial to Batwari road , and Gulpur Karmara road 30.00 806 New Degwar Dheerian to Yadgaar road 15.00 807 New Chentra to Jabri wala Bandhi Chechian Nr. House of Ch, Faiz Mohd 40.00 808 New Noonabandi to Indiagate road and Sokar Mandhar road 35.00 809 New Main road to Gaddi Nangali Sahib road and Dingla Kandyara road 35.00 810 New Chandak to Narhad 20.00 811 New Jhullas Behra to laxman pani 15.00 812 New Khanater Tanda to Kalsan road and Tanda to Duprian Khanater 40.00 813 New Azmabad to Chella Dhangri and Bedar to Zairat Chowkiwala Balnai 40.00 Kalai to Sheindhara road, Kalai to High School Kalai and PMGSY Road to Hari 814 New 65.00 Wala Kalai Seri Khawaja to Bani road and Approach road to Motorable bridge Seri Khawaja 815 New 45.00 upto Madrassa Qasim Ul Uloom 816 New Fazlabad to Betair road and Pamrote to Sangla via Zairat 45.00 Surankote Town roads, Degree College to Mohalla Manhasana and Link road to 817 New 80.00 Mohalla Manhasan , Upgd of road from Jogi Morh to Dak Bungalow Surankote 818 New Seri Khawaja to Gagerkote road 20.00 819 New Jaranwali Gali to Mohrawala Nakka 20.00 820 New Const. of road from Charallan to Sangla via Dandidhara 35.00 Sangiote Link road Km 1st to 3rd, Upgd of Harni BG road Km 1st to 3rd and 821 New 100.00 Harni Chown to Mohalla Bagylan Sardaran 822 New Upgd of road from Chajjla Bridge to PMGSY road and Dharana to Challja 60.00 823 New Upgd of Dak Bungalow Golad to Behrote Km 4th & 5th 45.00 824 New Upgd of road from Dharana to Malikpur Km 1st to 3rd 70.00 825 New Biryani gali to PHC Behrooti 20.00 826 New Bhatidhar to Thera 25.00 827 New Town roads mendhar 35.00 Total Type of budget S. No Work description work allocation 2020-21 828 New Doda Dessa Road 20.00 829 New Sherarna link road 15.00 830 New Posta Malna link road 15.00 831 New Kulhand to Nilsoo Road Km Ist and 2nd 20.00 PHE Revisior Pull- Doda to Khellani Via Ganpath Bridge /Approah road from 832 New 40.00 Ganpath Bridge to Doda Town link Road Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 833 New 26.00 thick SDBC Rainda Link road Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 834 New 60.00 thick SDBC sarolbagh to Atalgarh link Road Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 835 New 30.00 thick SDBC Eid Gha link road Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 836 New 14.00 thick SDBC on Senai Khellani link road. Up-gradation of road by way of providing and laying 50mm thick BM and 25mm 837 New 20.00 thick SDBC on Chinar Mohalla to Qilla Mohalla 838 New Kahra Jai Road (Km 10th to Km 14th RD (700) 150.00 839 New Kilhotran Road Km 1 o 18th (in stretches) 80.00 840 New Gandoh Jai Road (Km 1st to Km 3rd) 50.00 841 New Gowari Dhossa Road Km 1st and Km 2nd RD (250) 25.00 842 New Changa tawaie to Soti Dehra Link Road (Km 1st and Km 2nd RD (500) 15.00 843 New Thathri Kilhotran Road (Km 25 to 34th) 150.00 844 New TV Tower to Gugwal via Faility road km 3-4th (Length = 2km) 50.00 845 New Distt. Pheriphary road (L =0.80km) 25.00 846 New Approach road to DDC Complex Maitra 25.00 847 New Maita Ballout road (Length = 1km) 25.00 848 New Duligam road km 1st to 2nd (L =2kms) 20.00 849 New Neel Chamalwas road in km 25th to 26th (L =2kms 35.00 850 New Chacknarwa link road km 7th,&9th (L =2km) 35.00 851 New Shalgadi Krachihal Nowgam road (L = 1.50km) 35.00 852 New Ukheral Maligam road 40.00 853 New Patnitop Sanasar road km 14 to 15th (L= 2kms) 35.00 854 New Batote Town roads (Old Alignment NH44) (L =2kms) 25.00 855 New Gool Gundi Dharam Tatapani road (L= 2km) 35.00 856 New Jaman to Hara road (L= 1km) 25.00 857 New Gool Dheeda via Dachan road 30.00 Imptt./ up-gradation of Dool Sheikhpora link road by way of providing / laying 858 New 50mm thick Bituminous Macadam, 25mm thick Premix Carpet Surfacing and 40.00 Metal Patches & Drain in stretches Km 2nd & 3rd 859 New Grid Station to Gurian Malipeth Near Masjid km 1st RD 0-450 km 20.00 Imptt./up-gradation of Gulhutti Sanjyote Road by way of P/L 50mm BM, 25mm 860 New 50.00 thick Premix Carpet incl. Shingle Metal and Drain L=.6 Km's (Div Rajouri) Imptt./up-gradation of Gurian to Astan Bala via Qila Top and around Qila by way 861 New of P/L 50mm BM, 25mm thick Premix Carpet incl. Shingle Metal and Drain 25.00 L=.450 Km's Improvement up-gradation of Approach road to Hatchery at Mughalmaidan 862 New 10.00 (length 2.10mtr) GRAND TOTAL 40000.00