BIM Technologies

IndustryDirector, Advisory William G. Panel Miner April 2007 PPR

13 December 2007

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

BIM – OBO Initiatives

Technologies Director, William G. Miner ƒ Building Information Modeling (BIM) April 2007 PPR ƒ Dprofiler

ƒ Laser Scanning

ƒ COBIE (Construction to Operation Building Information Exchange)

Implementation

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

BIM – OBO Initiatives

Technologies Director, William G. Miner

ƒ Building Information Modeling (BIM) April 2007 PPR ƒ Dprofiler

ƒ Laser Scanning “Digital representation of the

ƒ COBIE physical and functional Implementation characteristics of a facility throughout its lifecycle”

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

BIM

BIM-Based Coordination Director, William G. Miner April 2007 PPR

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS Original Graphics: CADD Microsystems, Inc. .

BIM

Director,BIM William Data ExchangeG. Miner April 2007 PPR

Project Definition Design Review Electronic O&M and Coordination Management Job Sequencing Cost and Scheduling Lifecycle Facility As-Built Model Tracking

Planning Design/Construction Facilities Management

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

BIM - Early Adopters

Contractor-Initiated: Kingston NOX Director, William G.(2005) Miner April 2007 PPR

OBO-Initiated: Super Small SED (2005)

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

BIM - Standard Embassy Design Models

Small Medium Director, William G. Miner April 2007 PPR

Marine Security

Guard Quarters

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Dprofiler

Technologies Director, William G. Miner

ƒ Building Information Modeling (BIM) April 2007 PPR ƒ Dprofiler

ƒ Laser Scanning “A modeling software that captures the

ƒ COBIE basic engineering and cost assumptions at the pre-design stage of a project. Implementation Facilitates the site adaptation and planning decisions-making process.”

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Dprofiler

Ability to Cost associated impact project cost with change

Director, William G. Miner EFFECT April 2007 PPR Greatest ability to make changes at the lowest cost

PD SD DD CD PR CA OP

TIME U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS Original Graphics: Patrick MacLeamy AIA/HOK .

Dprofiler

Ability to Cost associated impact project cost with change

Director,BIM William G. MinerTraditional Process Design EFFORT April 2007 PPR Process

PD SD DD CD PR CA OP

TIME U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS Original Graphics: Patrick MacLeamy AIA/HOK .

Dprofiler

Planning Benefits:

ƒ Planning phaseDirector, William G. Miner modeling April 2007 PPR

ƒ Evaluation of

alternatives

ƒ Real-time cost comparisons

ƒ Properties of Space

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Dprofiler

Cost Estimating Benefits Director, William G. Miner ƒ Predict costs early April 2007 PPR ƒ Produce reliable and defendable estimates based on RSMean’s or internal cost data

ƒ Develop cost and design data simultaneously

Traditional Estimating DProfiler 240 Hours (2 estimators 120 hrs) 20 Hours

Deliverable: project cost estimate Deliverable: project cost estimate, and Project Proforma Design Criteria Document Three-Dimensional Model

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

Technologies Director, William G. Miner ƒ Building Information Modeling (BIM) April 2007 PPR ƒ Dprofiler

ƒ Laser Scanning “The capturing of the shape and

ƒ COBIE placement of physical objects in a Implementation digital format using 3D laser survey technology”

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

ƒ Laser Survey Pilot Study Director, William G. Miner April 2007 PPR

ƒ Holcim Cement Factory Headquarters

ƒ Guayaquil, Ecuador

ƒ Summer, 2007

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

Purpose of Survey Director, William G. Miner

ƒ Document existing site, buildings, and April 2007 PPR landscaping

ƒ Evaluate efficiency and effectiveness of laser scanning technology

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

Point cloud Director, William G. Miner imported into April 2007 PPR ADT

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

ADT model Director, William G. Miner imported April 2007 PPR into

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

BIM model Director, William G. Miner finalized in April 2007 PPR Revit

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

Model Director, William G. Miner checked for April 2007 PPR interference using

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

Associated Director, William G. Miner object April 2007 PPR properties for graphic and non-graphic data included

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Laser Scanning

Final BIM Director, William G. Miner site model April 2007 PPR consolidated

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

Technologies Director, William G. Miner ƒ Building Information Modeling (BIM) April 2007 PPR ƒ Dprofiler

ƒ Laser Scanning “Format for handover of O&M

ƒ COBIE information. It organizes the collection, documentation and Implementation exchange of building data required at construction completion.”

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

Typical Project Handover Data Collection Model

IPR SRP & Bid Design Construction Construction Operation Phase Test Fits PhaseDirector, Development William G.Documents Miner Phase & Maint. April 2007 PPR

COBIE Project Handover Data Collection Model

IPR SRP & Bid Design Construction Construction Operation Phase Test Fits Phase Development Documents Phase & Maint.

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

The COBIE data is captured in sequence in the corresponding spreadsheetDirector, William within G. Miner the Project file. April 2007 PPR

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

The Excel spreadsheet format is user-friendly and requires minimalDirector, expertise William to use.G. Miner April 2007 PPR

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

Electronic COBIE data is submitted on disk(s) … Director, William G. Miner POST BUILDING TYPE April 2007 PPR PROJECT NAME/ NUMBER

SBU

SUBMISSION PHASE SUBMISSION DATE

CONTACT PERSON

which can then be exported to

facility management software.

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

Contractor Benefits: OBO Benefits:

ƒ Organized structureDirector, to collect William G. ƒMiner Will receive project data in a and manage data throughout consistent and organized the design and constructionApril 2007 PPRelectronic format. phases. ƒ Facilitates accessibility, and

ƒ Prevents the need for a “job retrieval of O&M data. crawl”. ƒ Positions OBO to utilize BIM-compatible facilities ƒ Ultimately saves time/cost. management software.

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

COBIE

Pilot Study – Kingston NOX

ƒ Completed COBIEDirector, William G. Miner spreadsheets using as-builts. April 2007 PPR

ƒ Provided feedback on COBIE.

ƒ Finalizing summary report for OBO.

ƒ Producing “clean” version of COBIE data for further research and development.

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

Technologies Director, William G. Miner

ƒ Building Information Modeling (BIM) April 2007 PPR ƒ Dprofiler

ƒ Laser Scanning

ƒ COBIE

ƒ Where we are now

Implementation ƒ Challenges

ƒ Path forward

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

Where we are now: Director, William G. Miner

ƒ Implementation directive, November 2006 April 2007 PPR

ƒ Completed Business partner survey to assess progress, capabilities, concerns

ƒ BIM included in FY07 Capital Program

ƒ Ongoing R&D and Implementation

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

FY07 BIM Requirements: Director, William G. Miner ƒ Required with DD, Final and As-Built submittals

ƒ BIM model April 2007 PPR

ƒ Walk-throughs and Renderings

ƒ Clash detection & QC Reports and feedback

ƒ COBIE spreadsheet / data

ƒ Supplement the standard CAD deliverables

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

FY07 BIM models to include architectural elements only: Director, William G. Miner ƒ walls, floors, ceilings, roof April 2007 PPR ƒ columns

ƒ doors

ƒ windows

ƒ fixtures

ƒ casework

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

Challenges Director, William G. Miner ƒ Development of industry-wide standards April 2007 PPR ƒ Development of OBO requirements based on needs

ƒ Preparation (training, software, infrastructure)

ƒ Integration of more engineering (ie. MEP) disciplines

ƒ Finalization of IFC-compliant software

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

Path Forward Director, William G. Miner ƒ Continue R&D efforts April 2007 PPR ƒ Refine graphic BIM data requirements

ƒ Develop non-graphic BIM data requirements

ƒ Develop business processes that leverage BIM technologies

ƒ Apply lessons learned and best business practices for FY08 requirements

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Implementation

Ongoing Use Case Analysis Director, William G. Miner

FY07 FY08 FY09 April 2007 PPR Arch. BIM Model Struc. BIM Model Full BIM Model COBIE SED BIM Standards Automated Code Check

Cost Interface Analysis ƒ Model Template

ƒ Object Library LEED/Energy Analysis

Model Checking ƒ RIP BIM Modules 4D & 5D Interface Model Viewers Planning BIM Models Blast/Struc. Analysis Training Fac. Mgt. Pilot

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .

Summary

Technologies Director, William G. Miner ƒ BIM: Design & Construction April 2007 PPR ƒ Dprofiler: Capital Planning

ƒ Laser Scanning: Non-Capital Planning

ƒ COBIE: Operations and Maintenance

Implementation

U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS