BIM Technologies
IndustryDirector, Advisory William G. Panel Miner April 2007 PPR
13 December 2007
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
BIM – OBO Initiatives
Technologies Director, William G. Miner Building Information Modeling (BIM) April 2007 PPR Dprofiler
Laser Scanning
COBIE (Construction to Operation Building Information Exchange)
Implementation
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
BIM – OBO Initiatives
Technologies Director, William G. Miner
Building Information Modeling (BIM) April 2007 PPR Dprofiler
Laser Scanning “Digital representation of the
COBIE physical and functional Implementation characteristics of a facility throughout its lifecycle”
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
BIM
BIM-Based Coordination Director, William G. Miner April 2007 PPR
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS Original Graphics: CADD Microsystems, Inc. .
BIM
Director,BIM William Data ExchangeG. Miner April 2007 PPR
Project Definition Design Review Electronic O&M and Coordination Management Job Sequencing Cost and Scheduling Lifecycle Facility As-Built Model Tracking
Planning Design/Construction Facilities Management
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
BIM - Early Adopters
Contractor-Initiated: Kingston NOX Director, William G.(2005) Miner April 2007 PPR
OBO-Initiated: Super Small SED (2005)
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
BIM - Standard Embassy Design Models
Small Medium Director, William G. Miner April 2007 PPR
Marine Security
Guard Quarters
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Dprofiler
Technologies Director, William G. Miner
Building Information Modeling (BIM) April 2007 PPR Dprofiler
Laser Scanning “A modeling software that captures the
COBIE basic engineering and cost assumptions at the pre-design stage of a project. Implementation Facilitates the site adaptation and planning decisions-making process.”
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Dprofiler
Ability to Cost associated impact project cost with change
Director, William G. Miner EFFECT April 2007 PPR Greatest ability to make changes at the lowest cost
PD SD DD CD PR CA OP
TIME U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS Original Graphics: Patrick MacLeamy AIA/HOK .
Dprofiler
Ability to Cost associated impact project cost with change
Director,BIM William G. MinerTraditional Process Design EFFORT April 2007 PPR Process
PD SD DD CD PR CA OP
TIME U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS Original Graphics: Patrick MacLeamy AIA/HOK .
Dprofiler
Planning Benefits:
Planning phaseDirector, William G. Miner modeling April 2007 PPR
Evaluation of
alternatives
Real-time cost comparisons
Properties of Space
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Dprofiler
Cost Estimating Benefits Director, William G. Miner Predict costs early April 2007 PPR Produce reliable and defendable estimates based on RSMean’s or internal cost data
Develop cost and design data simultaneously
Traditional Estimating DProfiler 240 Hours (2 estimators 120 hrs) 20 Hours
Deliverable: project cost estimate Deliverable: project cost estimate, and Project Proforma Design Criteria Document Three-Dimensional Model
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Technologies Director, William G. Miner Building Information Modeling (BIM) April 2007 PPR Dprofiler
Laser Scanning “The capturing of the shape and
COBIE placement of physical objects in a Implementation digital format using 3D laser survey technology”
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Laser Survey Pilot Study Director, William G. Miner April 2007 PPR
Holcim Cement Factory Headquarters
Guayaquil, Ecuador
Summer, 2007
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Purpose of Survey Director, William G. Miner
Document existing site, buildings, and April 2007 PPR landscaping
Evaluate efficiency and effectiveness of laser scanning technology
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Point cloud Director, William G. Miner imported into April 2007 PPR Autodesk ADT
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
ADT model Director, William G. Miner imported April 2007 PPR into Autodesk Revit
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
BIM model Director, William G. Miner finalized in April 2007 PPR Revit
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Model Director, William G. Miner checked for April 2007 PPR interference using Navisworks
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Associated Director, William G. Miner object April 2007 PPR properties for graphic and non-graphic data included
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Laser Scanning
Final BIM Director, William G. Miner site model April 2007 PPR consolidated
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
Technologies Director, William G. Miner Building Information Modeling (BIM) April 2007 PPR Dprofiler
Laser Scanning “Format for handover of O&M
COBIE information. It organizes the collection, documentation and Implementation exchange of building data required at construction completion.”
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
Typical Project Handover Data Collection Model
IPR SRP & Bid Design Construction Construction Operation Phase Test Fits PhaseDirector, Development William G.Documents Miner Phase & Maint. April 2007 PPR
COBIE Project Handover Data Collection Model
IPR SRP & Bid Design Construction Construction Operation Phase Test Fits Phase Development Documents Phase & Maint.
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
The COBIE data is captured in sequence in the corresponding spreadsheetDirector, William within G. Miner the Project file. April 2007 PPR
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
The Excel spreadsheet format is user-friendly and requires minimalDirector, expertise William to use.G. Miner April 2007 PPR
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
Electronic COBIE data is submitted on disk(s) … Director, William G. Miner POST BUILDING TYPE April 2007 PPR PROJECT NAME/ NUMBER
SBU
SUBMISSION PHASE SUBMISSION DATE
CONTACT PERSON
which can then be exported to
facility management software.
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
Contractor Benefits: OBO Benefits:
Organized structureDirector, to collect William G. Miner Will receive project data in a and manage data throughout consistent and organized the design and constructionApril 2007 PPRelectronic format. phases. Facilitates accessibility, and
Prevents the need for a “job retrieval of O&M data. crawl”. Positions OBO to utilize BIM-compatible facilities Ultimately saves time/cost. management software.
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
COBIE
Pilot Study – Kingston NOX
Completed COBIEDirector, William G. Miner spreadsheets using as-builts. April 2007 PPR
Provided feedback on COBIE.
Finalizing summary report for OBO.
Producing “clean” version of COBIE data for further research and development.
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
Technologies Director, William G. Miner
Building Information Modeling (BIM) April 2007 PPR Dprofiler
Laser Scanning
COBIE
Where we are now
Implementation Challenges
Path forward
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
Where we are now: Director, William G. Miner
Implementation directive, November 2006 April 2007 PPR
Completed Business partner survey to assess progress, capabilities, concerns
BIM included in FY07 Capital Program
Ongoing R&D and Implementation
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
FY07 BIM Requirements: Director, William G. Miner Required with DD, Final and As-Built submittals
BIM model April 2007 PPR
Walk-throughs and Renderings
Clash detection & QC Reports and feedback
COBIE spreadsheet / data
Supplement the standard CAD deliverables
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
FY07 BIM models to include architectural elements only: Director, William G. Miner walls, floors, ceilings, roof April 2007 PPR columns
doors
windows
fixtures
casework
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
Challenges Director, William G. Miner Development of industry-wide standards April 2007 PPR Development of OBO requirements based on needs
Preparation (training, software, infrastructure)
Integration of more engineering (ie. MEP) disciplines
Finalization of IFC-compliant software
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
Path Forward Director, William G. Miner Continue R&D efforts April 2007 PPR Refine graphic BIM data requirements
Develop non-graphic BIM data requirements
Develop business processes that leverage BIM technologies
Apply lessons learned and best business practices for FY08 requirements
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Implementation
Ongoing Use Case Analysis Director, William G. Miner
FY07 FY08 FY09 April 2007 PPR Arch. BIM Model Struc. BIM Model Full BIM Model COBIE SED BIM Standards Automated Code Check
Cost Interface Analysis Model Template
Object Library LEED/Energy Analysis
Model Checking RIP BIM Modules 4D & 5D Interface Model Viewers Planning BIM Models Blast/Struc. Analysis Training Fac. Mgt. Pilot
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS .
Summary
Technologies Director, William G. Miner BIM: Design & Construction April 2007 PPR Dprofiler: Capital Planning
Laser Scanning: Non-Capital Planning
COBIE: Operations and Maintenance
Implementation
U.S. DEPARTMENT OF STATE, OVERSEAS BUILDINGS OPERATIONS